John Arthur Photon overview [email protected] .edu October 27, 2005 1 Photon Systems Overview John Arthur SLAC

John Arthur Photon [email protected] October 27, 2005 1 Photon Systems Overview John Arthur SLAC

  • View
    222

  • Download
    0

Embed Size (px)

Citation preview

John Arthur

Photon overview [email protected]

October 27, 20051

Photon Systems OverviewJohn Arthur

SLAC

John Arthur

Photon overview [email protected]

October 27, 20052

Photon Systems

Includes LCLS x-ray and laser groups

X-ray Transport, Optics and Diagnostics (XTOD)managed by LLNL (Richard Bionta)

X-ray Endstation Systems (XES)managed by SLAC (Stefan Moeller)

Laser Systemsmanaged by SLAC (Bill White)

John Arthur

Photon overview [email protected]

October 27, 20053

XTOD Scope

Transport the x-ray beam, in vacuum, to all the experimental stations

Condition the x-ray beam, with attenuators and apertures

Analyze the x-ray beam, with sophisticated diagnostics

John Arthur

Photon overview [email protected]

October 27, 20054

XES Scope

The X-Ray Endstation Systems group provides the infrastructure required for experimenters to make best scientific use of the LCLS radiation safely. Includes advanced x-ray detector R&D.

John Arthur

Photon overview [email protected]

October 27, 20055

Laser Group Scope

The Laser group coordinates laser design and acquisition throughout the LCLS. Lasers will be used in the electron gun and x-ray experimental areas, and also possibly for accelerator diagnostics and alignment.

John Arthur

Photon overview [email protected]

October 27, 20056

LUSI Project Scope

LCLS Ultrafast Science Instruments is a distinct DOE project closely coordinated with LCLS. It will build 4 science instruments which will occupy LCLS x-ray hutches. This will enable work in three of the LCLS Science Thrust Areas: X-ray pump-probe dynamics, Coherent x-ray imaging, and X-ray photon correlation spectroscopy. The project is just starting, with major funding expected in FY2007.

John Arthur

Photon overview [email protected]

October 27, 20057

LCLS Designs are maturing

XTOD instrumentation at concept review stage

Conventional facilities at Title 2 stage

John Arthur

Photon overview [email protected]

October 27, 20058

32 m

GAS ATTENSOLID ATTENSTOP COLLIM

Mirrors

STOP

FEE

7 ft Fe 3 ft concrete 4 ft Fe

Extra length added to accommodate x-ray offset mirrors

John Arthur

Photon overview [email protected]

October 27, 20059

Building up the X-Ray Systems

XTOD group has about 20 people now

XES has 1 person and 2 openings

2 other recent x-ray related hires at LCLS, 1 opening

LUSI has 5 openings now, more soon

John Arthur

Photon overview [email protected]

October 27, 200510

LCLS CF costs are expected to be high

May need to cut some scope

Need to prioritize possible cuts

John Arthur

Photon overview [email protected]

October 27, 200511

Possible Scope Reductions

Eliminate flipper mirrors (~$1M)

Reduce length of x-ray transport tunnel by 10%

(20m, ~$0.5M)

John Arthur

Photon overview [email protected]

October 27, 200512

NEH

Flipper Mirrors

Hutch 19.5x10m

Hutch 2 Hutch 3

John Arthur

Photon overview [email protected]

October 27, 200513

19ft tunnel

46ft tunnel

212ft

Hutch 4 Hutch 5 Hutch 6

Entrance tunnel

Reduced scope FEH design

hutch extended

single beamline

John Arthur

Photon overview [email protected]

October 27, 200514

Effects of reductions

No flipper mirrors: beamline shared in FEH

Shorter tunnel: side beams closer to each other by 10% (1.8m vs 2m)

John Arthur

Photon overview [email protected]

October 27, 200515

LUSI Progress

CD0 signed in August, project is official

Initial hiring taking place

Input from potential users is helping to define instruments

Working closely with XES and XTOD groups to develop an optimal layout for experiments

John Arthur

Photon overview [email protected]

October 27, 200516

NEH

Flipper Mirrors

X-ray pump-probe

Atomic physics, other soft x-ray science, and

diagnostics

John Arthur

Photon overview [email protected]

October 27, 200517

FEH

XPCSCoherent

x-ray imaging

High energy density science

(FUTURE)

John Arthur

Photon overview [email protected]

October 27, 200518

Summary

Major staff increase ongoing

Experimental needs coming into focus

XTOD design well along, XES starting

Need to consider possible scope cuts to save $