13
1 John Arthur [email protected] d.edu 1 FEH Status CXI Review June 3, 2009 FEH Layout, Status John Arthur – LCLS Expt’l Facilities Div June 3, 2009

1 John Arthur [email protected] 1 FEH Status CXI Review June 3, 2009 FEH Layout, Status John Arthur – LCLS Expt’l Facilities Div June 3, 2009

  • View
    217

  • Download
    2

Embed Size (px)

Citation preview

1 John [email protected]

1FEH StatusCXI Review June 3, 2009

FEH Layout, Status

John Arthur – LCLS Expt’l Facilities DivJune 3, 2009

2 John [email protected]

2FEH StatusCXI Review June 3, 2009

Near Experimental Hall

Far Experimental Hall

Front End Enclosure

Undulator Hall

LCLS new construction

3 John [email protected]

3FEH StatusCXI Review June 3, 2009

First LCLS FEL light at 1.5 Å

4 John [email protected]

4FEH StatusCXI Review June 3, 2009

Gain vs undulator length at 1.5 Å

FEL gain length = 3.3 m

FEL saturation indicated

Pulse energy ~ 1 mJ

5 John [email protected]

5FEH StatusCXI Review June 3, 2009

3 Hutches

X-ray transport tunnel

Far Experimental Hall

Near Experimental Hall

Front End Enclosure

3 Hutches

The LCLS X-ray Beamline

6 John [email protected]

6FEH StatusCXI Review June 3, 2009

FEE

Gas Detectors

Gas Attenuator

Direct Imager(Scintillator) FEL Offset Mirror Systems

Beam Direction

SolidAttenuators

K-Mono

Calorimeter

Slit

5 mm collimator

7 John [email protected]

7FEH StatusCXI Review June 3, 2009

800-2000 eV to Hutch 1

800-2000 eV to Hutch 2

2000-25000 eV to Hutch 3-6

insertable

insertable

HOMS: Hard x-ray Offset Mirror System

SOMS: Soft x-ray Offset Mirror System

LCLS Offset Mirror Systems

Shadow Wall

Wall 2

8 John [email protected]

8FEH StatusCXI Review June 3, 2009

Far Experimental Hall

9 John [email protected]

9FEH StatusCXI Review June 3, 2009

Roll-up door (interlocked)

HPS door (one per hutch)

Accelerator status lights (two places)

PPS door (Tunnel entrance)

PPS control (keybank, etc)

HPS control

Online-offline status lights

FEH Hutch Layout

exit

10 John [email protected]

10FEH StatusCXI Review June 3, 2009

Roll-up door (interlocked)

HPS door (one per hutch)

Accelerator status lights (two places)

HPS control

Online-offline status lights

FEH Hutch Layout Detail

20 m

9 m

11 John [email protected]

11FEH StatusCXI Review June 3, 2009

FEH Hutch construction plan

Bids were well below estimates

Contract about to be signedSteel frame procurement already under way

Construction finished Dec 2009CXI installation could start early 2010

Basic services installed Feb 2010Network, PPS

12 John [email protected]

12FEH StatusCXI Review June 3, 2009

Open issues with hutches

PPS design needs to be finalized

Utilization of mezzanine

Cooling water system upgrade

These issues will be easier to resolve when instrument designs are final

13 John [email protected]

13FEH StatusCXI Review June 3, 2009

Summary

LCLS works

FEH hutches will be ready in early 2010

Operations support including User support is in place

Support staff being hired