PLOT NO-15, SECTOR-24, OFF SION-PANVEL HIGHWAY, TURBHE, NAVI MUMBAI
HERITAGECONSERVATION
S T R U C T W E L
FOUNDATION
COMPANY INCEPTION
Founded STRUCTWEL on 18th April 1967. A Highly Celebrated& an accomplished Engineer with fellowship of most of themajor institutions across the globe and Honors such as the‘Honorary Membership of ACI’.
He is the author of four books and has been bestowed with many awards and honors
Special Recognition Award for Leadership Role in the Concrete Industry in India by CANMET / ACI, 1994.
ACI, USA awarded ACI Honorary Membership, 2004. First Asian to receive this award.
RAMESH N. RAIKAR
1939 - 2008
Founder & Inspiration
Behind this ever growing company was a complete technocrat who believed in the philosophy of
Progress Through Knowledge.
STRUCTWEL GROUP OF COMPANIESORGANISATION PROFILE
04
STRUCTWEL Designers & Consultants Pvt. Ltd.
TASS (Technical & Scientific Sales)
STRUCTWEL Constructions Pvt. Ltd.
CSRL-STRUCTWEL Pvt. Ltd.
STRUCTWEL FZE
Pune
Dubai
Mumbai
Mumbai
Dubai INDIA
Mumbai
Nagpur
Bangalore
ORGANISATION PROFILE
STRUCTWEL HISTORY
05
Started its own In-house material testing laboratory
Achieved its R&Dstatus. This recognition has been renewed, till date uninterruptedly
1988
STRUCTWELbecame a private limited company
1978
Established an in-house mechanical and electrical division
Laboratories got NABL accreditation
2000
Got certified with ISO 9001
2004
2005
Shifted to its Corporate officebuilding inNavi Mumbai
Ventured into the international markets and established STRUCTWEL FZE, Dubai
2007
Acquired TASS a laboratory equipment manufacturing & trading company
Acquired 50% shares of CSRL laboratories (now known as CSRL- STRUCTWEL Pvt. Ltd.) Pune
2007
Established EPC division under the flagship of STRUCTWEL Constructions Pvt. Ltd.
2011
Started Bangalore Office
Started Nagpur Lab
2016
2018
Affiliation with Construction Industry Development Council, New Delhi
Office Locations
ORGANISATION PROFILE
LOCATIONAL PRESENCE & TEAM STRENGTH
14
8
10
10
40
18Projects
Dubai
252 Total Staff
Lab
MEP
Structural Engineers
Architects
Support Staff
Mumbai Pune
Bangalore
Nagpur
Andhra Pradesh
BiharAssam
Goa
Gujarat
Himachal Pradesh
Karnataka
Kerala
Madhya Pradesh
Maharashtra
Punjab
Rajasthan
Tamil Nadu
Telangana
Tripura
Uttarakhand
Uttar Pradesh
West Bengal
Bangladesh
Sri Lanka
Sikkim
Maldives
Haryana
Project Locations
Master Planning
Architectural
Structural
Mechanical
Electrical & Instrumentation
Fire Detection & Protection
Heat, Ventilation & Air Conditioning
Public Health Engineering
SERVICES
Project Management Consultancy
Repairs & Restoration
Heritage Conservation
Research & Development
Quantity Surveying
Structural Health Assessment
Construction Material Testing
Geotechnical Testing
RECOGNITIONS
ACHIEVEMENTS & AWARDSAchievements & Awards - For “Wagh Mandir, at Morvi, Gujarat”
Design Awards 2015 – 1st Prize in the category
of “Conservation of Heritage”
IBC TrophyFirst Prize
Rehabilitation / Retrofitting of
Buildings
Best Consultant for Heritage Construction
from CIA World Construction Awards
2016
The Chief Minister of Maharashtra Shri Prithvi Raj Chouhan felicitating Chetan Raikar for the work on Replication of Ajanta Caves
Chetan R. Raikar greets the then Hon. President, Late Dr. APJ Abdul Kalam at New Delhi and proudly presents our R & D achievements
Chetan Raikar receiving IBC Award for ‘Excellence in Built Environment, 2015-2016’ by the Minister of Housing and Urban Affairs Shri Hardeep Singh Puri
S T R U C T W E L
Heritage Conservation
HERITAGE• The Taj Mahal Palace is one of the
landmark heritage structures of Mumbai, with a rich history.
• The iconic hotel was subjected to the brutal terrorist attack on the 26/11/2008.
• Structwel did entire heritage conservation and structural retrofitting of the structure damaged due to fire and bomb blast.
• Project Cost – INR 600 Crores
• Status – Completed in 2010
TAJ PALACE HOTEL
ProjectRestoration of Taj Mahal Palace
Hotel after terrorist attack of 26/11
ClientThe Indian Hotels Co. Ltd.
LocationMumbai
HERITAGE
TAJ MAHAL
ProjectTesting of Allied Structure in the Taj
Mahal Complex
ClientArcheological Survey of India
LocationAgra, India
• Archeological Survey of India appointed Structwel for testing of allied structure in the Phase I of this great world renounced monument.
• The testing was done under the control of Archeology Survey of India and International group of Conservation consultants.
• Project Cost – Not Applicable
• Status – Completed
HERITAGE• This is a World Heritage Building. It is
the Head Quarters of the Central Railway.
• It is a 1.76 lakh Sq.ft. building. This Gothic architecture monument built in 1888 is an aesthetic splendor and the most important landmark of the city of Mumbai.
• Phase I, Completed.
Project Cost – INR 10 Crores
• Phase II, Ongoing
Project Cost – INR 50 Crores
CHHATRAPATI SHIVAJI MAHARAJ TERMINUS
ProjectConservation of Main Terminal
Building
ClientCentral Railway, Mumbai
LocationMumbai
HERITAGE
HAJI ALI DARGAH
Project
Reconstruction of Haji Ali Dargah
ClientHaji Ali Trust
LocationMumbai
• This Dargah and Mosque structure is a classic of Islamic architecture. It is a Monument constructed mid-sea of the coast of Mumbai.
• The structure is being demolish and reconstructed in marble masonry, without brick, concrete or steel.
• Project Cost – INR 30 Crores
• Status – Ongoing
HERITAGE
GATEWAY OF INDIA
ProjectStrengthening of Plinth and
Cleaning of facade for Gateway Of India
Client Dept. of Archeology, Govt. of
Maharashtra
LocationMumbai
• The structure is a distinguishing landmark of Mumbai constructed in 1924
• The structure has Muslim - Indian Architectural features based on 16th Century Gujarati styles of architecture.
• Now remembered as the point from which the last British troops left India
• Project Cost – INR 3 Crores
• Status – Completed in 2004
HERITAGE• Pune University Main building was
originally summer residence of Governor of Bombay, during the British Raj. The structure was built in 1864 and is a typical example of colonial architecture.
• This is a load bearing structure with composite masonry and comprises of huge articulately decorated meeting halls.
• Unique features are its grandeur and a tower block.
• The work on restoration including the interior furnishing is in final stages of execution.
• Project Cost – INR 20 Crores
• Status – Completed in 2018
PUNE UNIVERSITY
ProjectConservation of Pune University,
Main Building
Client University of Pune
LocationPune
HERITAGE
WAGH MANDIR, MORVI
ProjectRestoration and Conservation of
Wagh Mandir
Client H.H. Maharani Of Morvi
LocationMorvi, Gujarat
• STRUCTWEL provided EPC services for Heritage Conservation of this 2 Lac sq.ft. monumental palace in Morvi, Gujarat.
• Wagh Mandir, erstwhile called Mani Mandir is a stunning piece of Temple & Hindu Palace Architecture and is situated in the courtyard of Wellington Secretariat in Morvi.
• Built in 1935, the magnificent structure took shape in Golden Yellow sand Stone.
• The Palace was extensively damaged in the earthquake of 2001
• This conservation project received multiple National and International Awards.
• Project Cost – INR 17 Crores
• Status – Completed in 2015
HERITAGE
DARBARGADHPALACE, MORVI
ProjectRestoration of Darbargadh Palace of
Morvi
Client H.H. Maharani Of Morvi
LocationMorvi, Gujrat
• The palace complex comprises of several structures totaling to 1,50,000 sq.ft. constructed around 100 years back.
• Retrofitting and repairs of this complex damaged by severe earthquake was undertaken to restore the structural elements.
• Project Cost – INR 3 Crores
• Status – Completed in 2002
HERITAGE
ENTRANCE FACADE BUILDING, RAJWADA
ProjectRestoration of Entrance Façade
building of Indore Rajwada
ClientDepartment of Archeology, M.P.
LocationIndore, M.P.
• This is a unique structure, 235 years old. The structure has a blend French, Mogul and Hindu Palace styles of architecture the lower three floors of the structure are made of stone (sand stone & black basalt) and the upper four floors are made of wood (Burma Teak wood)
• Project Cost – INR 2 Crores
• Status – Completed in 2004
HERITAGE
DARBAR HALL & GANESH HALL
RAJWADA
ProjectRestoration of Darbar Hall and
Ganesh Hall at Rajwada at Indore
ClientIndore Gaurav Foundation
LocationMumbai
• This is a unique structure, 235 years old, which had got severely divested by fire.
• The structure has a blend French, Mogul and Hindu Palace styles of architecture, which was bought back to original shape through intricate study, meticulous detailing and laborious inputs from skilled artisans
• Project Cost – INR 5 Crores
• Status – Completed in 2002
HERITAGE• Restoration and Strengthening of this
structure over 200 year old constructed in Moghul style of architectural was conducted.
• The damages mainly to the wooden member were related age and neglect. The intricate interior details of the damage were viewed and detected by innovative use of endoscopy and endoscopic photographs.
• The structure was strengthened for adaptive use as a hotel
• Project Cost – INR 8 Crores
• Status – Completed in 2008
FALAKNUMA PALACE
ProjectRestoration and Adaptive of
Falaknuma Palace
Client Indian Hotels Co. Ltd.
LocationHyderabad
HERITAGE• Carried out Structural Health
Assessment and Audit of the Palace Hotel
• The assignment was to identify the gravity and give revenant to marble cladding that was in danger of falling off.
• Project Cost – Not Applicable
• Status – Completed in 2017
UDAIPUR LAKE PALACE
Project
Heath Assessment
ClientThe Indian Hotels Co. Ltd.
LocationUdaipur
HERITAGE
CHOWMAHALLAPALACE
Project
Structural Testing and Repairs to Chowmahalla Palace
Client Indian Hotels Co. Ltd.
LocationHyderabad
• Testing of this structure over 200 year old constructed in Moghul style of architectural was conducted.
• Endoscopic inspection to check the condition of incased wooden joists
• Measuring Moisture Content to record the extent of dampness
• Project Cost – Not Applicable
• Status – Completed in 2000
HERITAGE
CENTRAL TELEGRAPH
OFFICE BUILDING
ProjectConservation of Central Telegraph
Office
ClientBharat Sanchar Nigam Ltd
LocationMumbai
• The conservation mainly revolves around the age related deteriorations affected by rain.
• The building styled on Gothic architecture is slated to receive a complete treatment of retaining the originality besides re-strengthening damaged chajja and Mangalore tiled roofing.
• Project Cost – INR 6 Crores
• Status – Completed in 2010
BHARATIYA VIDYABHAVAN
ProjectConservation & Restoration of
Bharatiya Vidya Bhavan
Client University of Mumbai
LocationMumbai
• This is a basement + ground+ 3 storey commercial structure, which has been restored for an enhanced satisfactory performance of minimum life of another 25 years.
• The structure had enormous damage and accumulated maintenance. The structure has been restored for old age related damage and the work has been completed.
• Project Cost – INR 6 Crores
• Status – Completed in 1997
HERITAGE
HERITAGE• Mumbai House of Maharaja of Bikaner,
was acquired by BMC and later converted into official residence of Mayor of Mumbai.
• Built in 1920's, this is a typical example of oriental style of architecture with arched doors and windows and an ornate portico. The structure has load bearing walls and pitched roof, complete with intricate stone artwork in the elevations
• The conservation project included structural strengthening of the bungalow without causing any harm to the heritage features. The work was completed in 2005.
• Project Cost – INR 3 Crores
• Status – Completed in 2005
MAYORAL BUNGALOW
Project
Conservation of Mayoral Bungalow
Client Municipal Corporation of Greater
Mumbai
LocationMumbai
HERITAGE
STANDARD CHARTERED BANK
Project
Conservation of Standard Chartered Building
ClientStandard Chartered Bank
LocationMumbai
• Conservation of the Grade II Heritage Structure which is over 100 years old, which has been a landmark opposite Flora fountain.
• All the external features were developed by developing innovative technology to match the original looks.
• Works carried out were Structural repairs to stone masonry, arches, wooden and steel joists flooring. Conservation of stone masonry. Revamping Mangalore tiled roof. Overhauling of storm water drainage system.
• Project Cost – INR 3 Crores
• Status – Completed in 2000
HERITAGE• This is a landmark structure in Fort area
of Mumbai. This building is corporate logo of Central Bank and completed 100 years in 2010.
• Project Cost – INR 3 Crores
• Status – Completed in 2010
CENTRAL BANK BUILDING
ProjectConservation of Central Bank
Building at Fort
ClientCentral Bank of India
LocationMumbai
HERITAGE
• Located in Canacona, South Goa, the Cabo-da-Rama fort presents a desolate spectacle of crumbling ruins unlike the forts.
Cabo –de –Rama, predates the Portuguese invasion of Goa. Possession changed hands many a time as dynasties fell & rose during the ages. Portuguese claimed the fort in 1763 after defeating Raja of Scoonda & renovated it.
• Project Cost – Not Applicable
• Status – Completed in 2007
CABO DE RAMA FORT, GOA
ProjectPreparation of DPR for adaptive
reuse of the Fort
ClientDirectorate of Archaeology, Goa
LocationGoa
HERITAGE• In 1530 the Portuguese came to
Thane but they only began building the Ghodbunder fort in 1730. The Portuguese name for the fort was Cacabe de Tanna.
• Report for Conservation and Restoration of the Ghodbunder Fort was carried out for Archaelogy and Museums dept.
• Project Cost – Not Applicable
• Status – Completed in 2011
GHODBUNDARFORT
ProjectReport on Conservation &
Restoration of Ghodbunder Fort Monuments
ClientArchaeology & Museums,
Government of Maharashtra
LocationThane
HERITAGE
GOA SECRETARIAL BUILDING
ProjectConservation & Adaptive reuse of
Old Goa Secretarial Building
ClientGoa State Infrastructure Development Corp. Ltd.
LocationGoa
• Old Goa Secretariat is a prominent landmark of Panaji City. This is oldest building of City and is situated on the bank of Mandovi River.
• Structural Repairs and Strengthening including conservation of architectural features was carried out.
• The building was later converted into a Arts and Cultures Museum.
• Project Cost – INR 11 Crores
• Status – Completed in 2013
HERITAGE
BARODA MUSEUM
ProjectArchitectural Conservations of
Baroda Museum
ClientBaroda Museum & Picture Gallery
LocationVadodara
• Baroda Museum is a heritage structure with basement, ground and two upper floors built in Maratha and European style of Architecture way back in the year 1894.
• Picture gallery is a ground + one storey structure built in European style in the year 1914 and connected to the museum building through passage with brick masonry arches at ground floor and a covered passage at first floor level.
• The total floor area of both the buildings together is 40,000 sft.
• Project Cost – Not Applicable
• Status – Ongoing
HERITAGE
NANAWADA
ProjectConservation & Restoration of
Nanawada, Historic Buildings and open spaces around the Wada.
ClientPune Municipal Corporation
LocationPune
• Nanawada is a 250 years old, Grade I listed structure. Originally a mansion of Nanasaheb Phadnavis , now being used as a school and ancillary uses.
• Work involved repairs and architectural elements of the building.
• Project Cost – INR 2.5 Crores
• Status – Completed in 2017
HERITAGE• Siddhesvara & Mahadev Mandir, are
the two Kalyani Chalukya temples outof four from village Hottal, located onthe western side of the village. Thesetemples are constructed after thearchitectural style of later period ofKalyani Chalukya. Both temples hadcommon prakar wall around. Both thetemples were constructed in the lasthalf of the 11th century.
• Project involves preparation ofscheme of conservation of temples
• Project Cost – Not Applicable
• Status – Completed in 2011
SIDDHESVARA & MAHADEV MANDIR
ProjectConservation & Restoration of
Temples at Hottal
ClientArchaeology & Museums
Government of Maharashtra
LocationNanded, Maharashtra
HERITAGE• Road widening through Kalawad Gate
“Wellington crescent” building at Jamnagar – Gujarat Thoroughfare for two way traffic
• Project Cost – INR 1 Crore
• Status – Completed in 2006
KALAWAD GATE
ProjectWidening of entrance gate of
Kalawad Gate Building
ClientGovernment of Gujrat
LocationJamnagar, Gujarat
HERITAGE
SARDAR BAUG
ProjectRestroration of Sardar Baug Circuit
House
ClientGovernment of Gujrat
LocationRajkot, Gujarat
• The building was badly affected during the Gujarat Earthquake in 2001
• The building was used as a Circuit House for Govt. Officials at Rajkot
• Project Cost – INR 2.5 Crores
• Status – Completed in 2004
HERITAGE• Raj Bhavan Complex is the official
residence and office of the Governor of Maharashtra.
• Structwel is involved in Restoration and revamping of Interiors of the following Bunglows
• Jal Bhushan – Governor’s Residence
• Jal Kiran – Presidential Suite
• Jal Chintan – Guest house for other state Governors
• Jal Laxshan - Guest house for other state Governors
RAJ BHAVAN
Project
Conservation & Interior
ClientPWD
LocationMumbai
• Structwel is also involved in Conservation and adaptive reuse of Bunker found inside the complex
• Project Cost – INR 70 Crores
• Status – Ongoing
THANK YOU