40
PLOT NO-15, SECTOR-24, OFF SION-PANVEL HIGHWAY, TURBHE, NAVI MUMBAI GENERAL PRESENTATION S T R U C T W E L

GENERAL PRESENTATION - Structwel

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: GENERAL PRESENTATION - Structwel

PLOT NO-15, SECTOR-24, OFF SION-PANVEL HIGHWAY, TURBHE, NAVI MUMBAI

GENERAL PRESENTATION

S T R U C T W E L

Page 2: GENERAL PRESENTATION - Structwel

FOUNDATION

COMPANY INCEPTION

Founded STRUCTWEL on 18th April 1967. A Highly Celebrated& an accomplished Engineer with fellowship of most of themajor institutions across the globe and Honors such as the‘Honorary Membership of ACI’.

He is the author of four books and has been bestowed with many awards and honors

Special Recognition Award for Leadership Role in the Concrete Industry in India by CANMET / ACI, 1994.

ACI, USA awarded ACI Honorary Membership, 2004. First Asian to receive this award.

RAMESH N. RAIKAR

1939 - 2008

Founder & Inspiration

Behind this ever growing company was a complete technocrat who believed in the philosophy of

Progress Through Knowledge.

Page 3: GENERAL PRESENTATION - Structwel

STRUCTWEL GROUP OF COMPANIESORGANISATION PROFILE

04

STRUCTWEL Designers & Consultants Pvt. Ltd.

TASS (Technical & Scientific Sales)

STRUCTWEL Constructions Pvt. Ltd.

CSRL-STRUCTWEL Pvt. Ltd.

STRUCTWEL FZE

Pune

Dubai

Mumbai

Mumbai

Dubai INDIA

Mumbai

Nagpur

Bangalore

Page 4: GENERAL PRESENTATION - Structwel

ORGANISATION PROFILE

STRUCTWEL HISTORY

05

Started its own In-house material Testing Laboratory

Achieved its R&Dstatus. This recognition has been renewed, till date uninterruptedly

1988

STRUCTWELbecame a private limited company

1978

Established an in-house mechanical and electrical division

Laboratories got NABL accreditation

2000

Got certified with ISO 9001

2004

2005

Shifted to its Corporate Officebuilding inNavi Mumbai

Ventured into the international markets and established STRUCTWEL FZE, Dubai

2007

Acquired TASS a laboratory equipment manufacturing & trading company

Acquired 50% shares of CSRL laboratories (now known as CSRL- STRUCTWEL Pvt. Ltd.) Pune

2007

Established EPC division under the flagship of STRUCTWEL Constructions Pvt. Ltd.

2011

Started Bangalore Office

Started Nagpur Lab

2016

2018

Affiliation with Construction Industry Development Council, New Delhi

Page 5: GENERAL PRESENTATION - Structwel

Office Locations

ORGANISATION PROFILE

LOCATIONAL PRESENCE & TEAM STRENGTH

14

8

10

10

40

18Projects

Dubai

252 Total Staff

Lab

MEP

Structural Engineers

Architects

Support Staff

Mumbai Pune

Bangalore

Nagpur

Andhra Pradesh

BiharAssam

Goa

Gujarat

Himachal Pradesh

Karnataka

Kerala

Madhya Pradesh

Maharashtra

Punjab

Rajasthan

Tamil Nadu

Telangana

Tripura

Uttarakhand

Uttar Pradesh

West Bengal

Bangladesh

Sri Lanka

Sikkim

Maldives

Haryana

Project Locations

Page 6: GENERAL PRESENTATION - Structwel

Master Planning

Architectural

Structural

Mechanical

Electrical & Instrumentation

Fire Detection & Protection

Heat, Ventilation & Air Conditioning

Public Health Engineering

SERVICES

Project Management Consultancy

Repairs & Restoration

Heritage Conservation

Research & Development

Quantity Surveying

Structural Health Assessment

Construction Material Testing

Geotechnical Testing

Page 7: GENERAL PRESENTATION - Structwel

RECOGNITIONS

ACHIEVEMENTS & AWARDSAchievements & Awards - For “Wagh Mandir, at Morvi, Gujarat”

Design Awards 2015 – 1st Prize in the category

of “Conservation of Heritage”

IBC TrophyFirst Prize

Rehabilitation / Retrofitting of

Buildings

Best Consultant for Heritage Construction

from CIA World Construction Awards

2016

The Chief Minister of Maharashtra Shri Prithvi Raj Chouhan felicitating Chetan Raikar for the work on Replication of Ajanta Caves

Chetan R. Raikar greets the then Hon. President, Late Dr. APJ Abdul Kalam at New Delhi and proudly presents our R & D achievements

Chetan Raikar receiving IBC Award for ‘Excellence in Built Environment, 2015-2016’ by the Minister of Housing and Urban Affairs Shri Hardeep Singh Puri

Page 8: GENERAL PRESENTATION - Structwel

S T R U C T W E L

Green Field Projects

Page 9: GENERAL PRESENTATION - Structwel

GREEN FIELD PROJECTS• Design of Regional Headquarters for

AAI, DGCA & BCAS.

• The Office building is a basement ground plus 7 storied structure with a unique architecture.

• The building is in a prominent location off western express highway at Andheri.

• Project Cost – INR 53 Crores

• Status – Completed in 2017

AIRPORT AUTHORITY OF INDIA

ProjectArchitecture

Detailed EngineeringInteriors

Area 2 L sq.ft.

LocationMumbai

Page 10: GENERAL PRESENTATION - Structwel

INDUSTRIAL PROJECTS• Workshop & Office Building for

Submarine Assembly for Defense Dept, Government of India

• A Project of National Importance to enhance the depleting submarine fleet of the Indian Navy.

• Project was conceived under ‘Make In India’

• Project Cost – INR 153 Cr.

• Status – Completed in 2017

MAZAGON DOCK LIMITED

Project • Master Planning• Architecture

• Detailed Engineering & PMC

AreaBUA – 2.20 L sq. ft.

LocationMumbai, India

Page 11: GENERAL PRESENTATION - Structwel

GREEN FIELD PROJECTS• Construction of Agricultural

Warehouses, Cold Storages and Silos

• Total Construction was spread over 79 locations PAN India

• Construction was carried out for

• Ware Houses – 60 nos.

• Cold Storages – 4 nos.

• Silo Complexes – 15 nos.

• Project Cost – INR 1000 Crores

• Status – 60 warehouses, 2 cold storages and 2 silo complexes completed

NATIONAL COLLATERAL

MANAGEMENT LTD

Project

AreaTotal Plot Area - 600 Acres

BUA - 75 L sq. ft.

Location13 States in India

ArchitectureDetailed Engineering

QA and Bill Certification

Page 12: GENERAL PRESENTATION - Structwel

GREEN FIELD PROJECTS• Construction of Flexible Packaging

Plant at Rudrapur, Uttaranchal

• Construction includes Plant Area and Office blocks and Utility Structures

• Plant completed and commissioned in 9 months

• Project Cost – INR 65 Crores

• Status – Completed in 2012

HUHTAMAKI PAPER PRODUCT LTD

Project

AreaBUA – 1.5 L sq. ft.

LocationRudrapur, India

ArchitectureDetailed Engineering

PMC

Page 13: GENERAL PRESENTATION - Structwel

GREEN FIELD PROJECTS• Construction of Shop Complex at BPCL

Mahul Refinery

• This Shop Complex was on Critical path with respect to BPCL’s master plan redevelopment of the entire Mahul Refinery

• Construction was carried out in 7 months and the project was awarded for Timely and Express Completion

• Project Cost – INR 40 Crores

• Status – Completed in 2013

BHARAT PETROLEUM

CORPORATION LTD

Project

AreaBUA – 1.3 L sq. ft.

LocationMumbai, India

ArchitectureDetailed Engineering

PMC

Page 14: GENERAL PRESENTATION - Structwel

GREEN FIELD PROJECTS• Structural Design of 10 L sq.ft. Five

Star Hotel at Delhi for Taj Group.

• The building is a 3 B + G + 10 storied RCC structure built with extremely challenging elevation.

• Part of this structure was designed in top-down concept, one of the very few structures executed with this concept in India

• Project Cost – INR 110 Crores

• Status – Completed in 2012

TAJ VIVANTA

Project

Structural Designing

ClientIndian Hotels Company Ltd.

LocationDwarka, Delhi

Page 15: GENERAL PRESENTATION - Structwel

GREEN FIELD PROJECTS• Design and PMC of a 135 bedded G+2

storied Hospital at Chikalim in Goa.

• Detailed Engineering including medical lines have been designed and executed.

• The project was carried out for GSIDC for Goa State Government.

• Project Cost – INR 28 Crores

• Status – Completed in 2019

COTTAGE HOSPITAL, GSIDC

ProjectArchitecture Detail Engg.

PMC

Area 75,000 sq.ft.

LocationGoa

Page 16: GENERAL PRESENTATION - Structwel

GREEN FIELD PROJECTS• Interior design for a very prestigious

auditorium and cultural center in Goa.

• This interiors had carried out including Audio Video sound acoustic design.

• Project is being executed for GSIDC.

• Project Cost – INR 53 Crores

• Status – Ongoing

KALA BHAVAN, GSIDC

ProjectInteriors

Integrated ServicesPMC

Area 1.40 L sq. ft.

LocationGoa

Page 17: GENERAL PRESENTATION - Structwel

GREEN FIELD PROJECTS• Structural and MEP design for

Multiple projects in Palghar for CIDCO.

• Project comprises of

• District Government HQ

• Collector Office Building

• SP Office Building

• Court Building

• Staff Quarters

• Guest Houses

• Project Cost – INR 250 Cores

• Status – Ongoing

PALGHAR SMART CITY DEVELOPMENT

ProjectStructural Design

MEP

Client CIDCO

LocationPalghar, Thane

Page 18: GENERAL PRESENTATION - Structwel

GREEN FIELD PROJECTS• Structural and MEP design of RCC

building complex of 9 buildings with 2 B + G + 14

• Uniqueness of this plot is that the structures are being constructed amidst a plot with more than 500 trees.

• The challenge was to retain majority of the trees during design and execution.

• The project has been constructed for M/s. Hubtown Realtors.

• Project Cost – INR 300 Crores

• Status – Ongoing

HUBTOWN SEASONS

ProjectStructural Designing

MEP

Area 25 L sq. ft.

LocationChembur, Mumbai

Page 19: GENERAL PRESENTATION - Structwel

S T R U C T W E L

Repairs & Heritage

Page 20: GENERAL PRESENTATION - Structwel

REPAIRS & HERITAGE• RIL refinery at Jamnagar, Gujarat is

one of the largest refineries in the world.

• Structwel was involved in conducting a structural audit for various plants of the refinery which include plants like R.T.F, CPP, OSBL, Hydrogen Plant,Polypropylene, Hydrotrester, Coker plant, Aromatics, Sulphur Plant, PP plant, Crude I & II and FCCU including PRU.

• Project Cost – NA

• Status – Completed in various phases starting from 2004

RELIANCE INDUSTRIES LTD.

ProjectStructural Audits

EstimateTendering

PMC during Execution

ClientReliance Industries Ltd..

LocationJamnagar, Gujarat

Page 21: GENERAL PRESENTATION - Structwel

REPAIRS & HERITAGE• BPCL has a huge petrochemical plant

in Mumbai with numerous allied structures in the compound.

• Structwel was involved in conducting structural audits of 3 pump houses, 1 FCCU stack, Pipe racks,55 residential structures and 39 allied structures. Structwel also conducted Non-destructive testing of FCCU Control Room etc.

• Project Cost – NA

• Status – Completed in various phases from 2009-16

BHARAT PETROLEUM CORPORATION LTD.

ProjectStructural Audits

EstimateTendering

PMC during Execution

ClientBharat Petroleum corporation Ltd.

LocationMahul, Mumbai

Page 22: GENERAL PRESENTATION - Structwel

REPAIRS & HERITAGE• Bayer CropSceience India Ltd. includes

Crop science, Pharmaceuticals and Animal Health Business Unit.

• Structwel carried out Structural Audits of MPBD-I & II, DICO, ALCO, MICO & LICO-I, II & III, DIBO, ECO, ARCO, Rotary Kiln Foundation & Fire Water Tanks.

• Structwel also rendered its services for retrofitting of structures for capacity enhancement of Utility plant and ETP plant.

• Project Cost – NA

• Status – Completed in 2017

BAYER CROPSCIENCE LTD.

ProjectStructural Audits

EstimateTendering

PMC during Execution

ClientBayer CropScience Ltd

LocationVapi, Gujarat

Page 23: GENERAL PRESENTATION - Structwel

REPAIRS & HERITAGE• This is a Thermal Power Plant of

Government of Karnataka situated at Raichur.

• Structwel was appointed to carry out Structural audit including Non-destructive testing of the Natural Draft Cooling Towers & Chimneys.

• The Cooling Tower is 130 m tall with diameter of 118 m at plinth level, 90 m at top level and 70 m at neck level.

• The chimney is 130 m tall with diameter of 9 m at bottom level and 4.5m at top level.

• Project Cost – INR 30 Crores

• Status – Structural Audit is completed

KARNATAKA POWER CORPORATION LTD.

ProjectStructural Audit

Non-Destructive Testing

ClientKarnataka Power Corporation Ltd.

LocationRaichur, Karnataka

Page 24: GENERAL PRESENTATION - Structwel

REPAIRS & HERITAGE• Vashi & Belapur stations are Railway

stations cum commercial complexes situated on harbor railway line.

• The total built up area of Vashi Complex is 83,237 sq. m accommodating 6 towers of G+7 storeys.

• The total built up area of Belapur complex is 1,37,650 sq. m accommodating 10 towers of G+7 storeys.

• Structwel’s services were hired for conducting Structural Audits of building structures and Condition Assessment of Electrical and Fire Fighting network along with 37 lifts.

• Project Cost – INR 90 Crores

• Status – Structural Audits & BOQs are completed. Repairs are in progress.

VASHI & BELAPUR RAILWAY STATION

COMPLEXES

ProjectStructural Audit

Estimate Tendering

PMC during Execution

ClientCity and Industrial Development

Corporation of Maharashtra

LocationNavi Mumbai

Page 25: GENERAL PRESENTATION - Structwel

REPAIRS & HERITAGE• Kolkata Metro, the first underground

Mass Rapid transit rail network of India, was commissioned partly in October, 1984 and finally in February, 1995.

• Construction of tunnels was done with ‘Cut and Cover’ method.

• The rail network from Dum Dum to Tollygunge is around 17 km with 17 stops.

• Structwel was hired to conduct Condition Assessment along with Non-destructive Testing.

• Project Cost – INR 250 Crores

• Status – Completed in 2012

KOLKATA METRO

ProjectVisual Inspection

Non-destructive TestingRepairs Methodology

ClientKolkata Metro Rail Corporation

LocationKolkata

Page 26: GENERAL PRESENTATION - Structwel

REPAIRS & HERITAGE• MCGM appointed Structwel to

conduct Structural Audit of bridges in Eastern Suburbs of MCGM.

• The project included total 66 bridges; out of which 18 bridges were of major category.

• The assignment included Non-destructive testing and preparation of cost estimates as well.

• Project Cost – INR 11.50 Crores

• Status – Audit and Estimated were completed in 2018. Repairs are in progress.

MCGM BRIDGES

ProjectStructural Audits

EstimateTendering

ClientMunicipal Corporation of Greater

Mumbai

LocationMumbai

Page 27: GENERAL PRESENTATION - Structwel

REPAIRS & HERITAGE• Taj Coral Resort in Maldives has 18

twin villas at the water resort each villa is connected with a small jetty.

• These structures were hit by a great Tsunami in 2004 shattering them massively.

• Structwel was appointed to carry out structural audit of all the villas and allied structures to restore them to their original state.

• Project Cost – NA

• Status – Completed in 2008

TAJ COREL REEF RESORT

Project Visual Inspection

Condition AssessmentRepair Methodology

Structural Audit Report

ClientTaj Coral Reef Resort

LocationMaldives

Page 28: GENERAL PRESENTATION - Structwel

REPAIRS & HERITAGE• Taj Connemara is a 5 start luxury hotel

in Chennai, India.

• The entire property is built on a 4.2 acre land with total of 5 structures and 147 rooms which include 143 double rooms and 4 suits.

• Out of the 5 structures, 1 is a heritage structure.

• Structwel’s services were engaged for Structural Audit, preparation of estimates and tendering.

• Project Cost – INR 12 Crores

• Status – Completed in 2015

TAJ CONNEMARA

ProjectStructural Audi

Estimate & Tendering

ClientIndian Hotels Company Ltd.

LocationChennai, India

Page 29: GENERAL PRESENTATION - Structwel

REPAIRS & HERITAGE• The Taj Mahal Palace is one of the

landmark heritage structures of Mumbai, with a rich history.

• The iconic hotel was subjected to the brutal terrorist attack on the 26/11/2008.

• Structwel did entire heritage conservation and structural retrofitting of the structure damaged due to fire and bomb blast.

• Project Cost – INR 600 Crores

• Status – Completed in 2010

TAJ PALACE HOTEL

ProjectRestoration of Taj Mahal Palace

Hotel after terrorist attack of 26/11

ClientThe Indian Hotels Co. Ltd.

LocationMumbai

Page 30: GENERAL PRESENTATION - Structwel

REPAIRS & HERITAGE• This 100 year old historic stone

masonry palace was under use by the state government until it was destroyed beyond repairs in the Gujarat Earthquake of 2001.

• The Palace occupies an area of approximately 2 Lakh Sq. ft. with a massive temple in its front courtyard. It has a height of up to 40’ and the temple Shikar top reaches beyond 150’.

• Structwel was appointed as an Architectural and Engineering Consultants for the Project with the mandate to restore and retrofit the entire structure.

• Project Cost – INR 24.61 Crores

• Status – Completed in 2014

WAGH MANDIR

ProjectArchitectural Conservation

Structural Restoration

ClientH. H. Maharani Saheb of Morvi

LocationMorvi, Gujarat

Page 31: GENERAL PRESENTATION - Structwel

REPAIRS & HERITAGE• This iconic building is a corporate

office of HDFC, one of the leading private banks of India.

• Structwel was appointed to carry out Condition Assessment of Terrace areas to make them leak-proof above MD’s office including lawns.

• Project Cost – NA

• Status – Completed in 2017

HDFC BANK HOUSE

ProjectConsultancy for Waterproofing

PMC during executionCertifying the work on completion

ClientHDFC Bank Ltd.

LocationLower Parel, Mumbai

Page 32: GENERAL PRESENTATION - Structwel

REPAIRS & HERITAGE• Total 26 Buildings with 52 wings and

1388 tenements were built under the Mass Housing Scheme at Sangli & Miraj as a part of Pradhan Mantri Awas Yojana.

• The buildings were constructed in the time span of 6 years starting from 2012 till 2018.

• SMKC appointed Structwel to conduct Structural Audit at pre-occupancy stage to confirm as built structures as specified.

• The assignment was carried out along with various Non-destructive testing and design review on sample basis.

• Project Cost – INR 24 Crores

• Status – Completed in 2018

MASS HOUSING SANGLI

ProjectStructural Audit

EstimationNon-Destructive Testing

ClientSangli Miraj Kupwad Municipal

Corporation (SMKC)

LocationSangli, Maharashtra

Page 33: GENERAL PRESENTATION - Structwel

REPAIRS & HERITAGE• Restoration and Strengthening of this

structure over 200 year old constructed in Moghul style of architectural was conducted.

• The damages mainly to the wooden member were related age and neglect. The intricate interior details of the damage were viewed and detected by innovative use of endoscopy and endoscopic photographs.

• The structure was strengthened for adaptive use as a hotel

• Project Cost – INR 8 Crores

• Status – Completed in 2008

FALAKNUMA PALACE

ProjectRestoration and Adaptive of

Falaknuma Palace

ClientIndian Hotels Co. Ltd.

LocationHyderabad

Page 34: GENERAL PRESENTATION - Structwel

REPAIRS & HERITAGE• This Dargah and Mosque structure is a

classic of Islamic architecture. It is a Monument constructed mid-sea of the coast of Mumbai.

• The structure is being demolish and reconstructed in marble masonry, without brick, concrete or steel.

• Project Cost – INR 30 Crores

• Status – Ongoing

CST STATION

ProjectReconstruction of Haji Ali Dargah

ClientHaji Ali Trust

LocationMumbai

Page 35: GENERAL PRESENTATION - Structwel

REPAIRS & HERITAGE• King Edward Memorial Hospital,

popularly knows as KEM Hospital, is one of the oldest medical care providing institutes in Mumbai.

• It was founded in 1926.

• The campus hosts 34 structures; out of which 3 structures are of Heritage category; which include the main hospital building, Seth G.S. Medical College and the main boys hostel.

• Project Cost – INR 11.95 Crores

• Status – Completed in

KEM HOSPITAL

ProjectStructural Audit

Non-destructive TestingEstimate

ClientMunicipal Corporation of Greater

Mumbai

LocationParel, Mumbai

Page 36: GENERAL PRESENTATION - Structwel

S T R U C T W E L

Laboratory

Page 37: GENERAL PRESENTATION - Structwel

LABORATORY SERVICES

Concrete

NDT’s & Advance NDT’s

Research & Development

Metallurgical

StructuralEngineering Tests

Geotechnical Testing

Cement & Cementatitous material

Chemical Analysis

Petrography

Mix Design

Page 38: GENERAL PRESENTATION - Structwel

LABORATORY

Page 39: GENERAL PRESENTATION - Structwel

LABORATORY

Page 40: GENERAL PRESENTATION - Structwel

THANK YOU

S T R U C T W E L