1 ©

NOKIA TRS Planning and TRS Equipment for Turkcell.PPT/ 21-05-2004 / GRy

Customer\Partner Confidential

Transmission Planning Processand Equipment

Page 2: Filippo Transmission Planning Workshop Part2

8/11/2019 Filippo Transmission Planning Workshop Part2

http://slidepdf.com/reader/full/filippo-transmission-planning-workshop-part2 2/33

2 ©

NOKIA TRS Planning and TRS Equipment for Turkcell.PPT/ 21-05-2004 / GRy

Customer\Partner Confidential

Transmission Planning ProcessThe transmission network planning process is divided into three stages, like

the radio network planning:

1. Pre-Planning

2. Nominal Planning

3. Detailed Planning

Activities:

• Topology planning• Capacity planning

• 2M Abis planning (“time-slot planning”)

• Cross connection planning

• Microwave radiolink planning (with availability planning)

• Q1 transmission management planning

Page 3: Filippo Transmission Planning Workshop Part2

8/11/2019 Filippo Transmission Planning Workshop Part2

http://slidepdf.com/reader/full/filippo-transmission-planning-workshop-part2 3/33

3 ©

NOKIA TRS Planning and TRS Equipment for Turkcell.PPT/ 21-05-2004 / GRy

Customer\Partner Confidential

RF Nominal Plan

Node Quantity Breakdown for

2004, AREA 2

Standart

(2,2,2)

High

Power

(2,2,2)

High

Power

(1,1,1)

Smart

Range

(3,3,3)

Standart

(4,4,4)

Road&

Add.

(1,1)

Micro

BTS

(1,1)

Total

Sites

Indoor Macro cabinet with max 12TRX capacity 0 14 393 0 8 0 0 415 Outdoor Macro cabinet with max12 TRX capacity 0 2 0 0 0 0 0 2 Mini cabinet with max 6 TRXcapacity 0 0 393 0 0 125 0 518 Micro BTS with min. 2 TRXcapacity N.A. N.A. N.A. N.A. N.A. N.A. 25 25

Total 0 16 786 0 8 125 25 960

Node Quantity Breakdown for

2005, AREA 2

Standart

(2,2,2)

High

Power

(2,2,2)

High

Power

(1,1,1)

Smart

Range

(3,3,3)

Standart

(4,4,4)

Road&

Add.

(1,1)

Micro

BTS

(1,1)

Total

Sites

Indoor Macro cabinet with max 12TRX capacity 23 36 585 14 14 0 0 672 Outdoor Macro cabinet with max

12 TRX capacity 0 4 0 0 0 0 0 4 Mini cabinet with max 6 TRXcapacity 0 0 585 0 0 150 0 735 Micro BTS with min. 2 TRXcapacity N.A. N.A. N.A. N.A. N.A. N.A. 50 50

Total 23 40 1169 14 14 150 50 1460

Page 4: Filippo Transmission Planning Workshop Part2

8/11/2019 Filippo Transmission Planning Workshop Part2

http://slidepdf.com/reader/full/filippo-transmission-planning-workshop-part2 4/33

Page 5: Filippo Transmission Planning Workshop Part2

8/11/2019 Filippo Transmission Planning Workshop Part2

http://slidepdf.com/reader/full/filippo-transmission-planning-workshop-part2 5/335 ©

NOKIA TRS Planning and TRS Equipment for Turkcell.PPT/ 21-05-2004 / GRy

Customer\Partner Confidential

Star: concentrating points

• Capacity groomed in a forward direction from node center

• Straight forward implementation

• Protection expensive when required

• Center node very vulnerable

Page 6: Filippo Transmission Planning Workshop Part2

8/11/2019 Filippo Transmission Planning Workshop Part2

http://slidepdf.com/reader/full/filippo-transmission-planning-workshop-part2 6/336 ©

NOKIA TRS Planning and TRS Equipment for Turkcell.PPT/ 21-05-2004 / GRy

Customer\Partner Confidential

Chain

• Transmission lines filled along the way

• Easily upgraded to loop topology

• Protection expensive when required

• Last link in chain vulnerable

Page 7: Filippo Transmission Planning Workshop Part2

8/11/2019 Filippo Transmission Planning Workshop Part2

http://slidepdf.com/reader/full/filippo-transmission-planning-workshop-part2 7/337 ©

NOKIA TRS Planning and TRS Equipment for Turkcell.PPT/ 21-05-2004 / GRy

Customer\Partner Confidential

Loop

• Very good protection without additional HW redundancy

• Capacity optimization and sharing

• Additional links required to complete loops

• Capacity must be the same for all links

• Additional node could be required to control loop protection

Page 8: Filippo Transmission Planning Workshop Part2

8/11/2019 Filippo Transmission Planning Workshop Part2

http://slidepdf.com/reader/full/filippo-transmission-planning-workshop-part2 8/338 ©

NOKIA TRS Planning and TRS Equipment for Turkcell.PPT/ 21-05-2004 / GRy

Customer\Partner Confidential

Nominal Plan: Nokia remarks

• Allowance must be made for 100% expandability for more sites using a E1

line:• max no of trx’s on E1 is 12

• at launch of a site max 6 trx shall be fitted on E1 to allow expansion

• when conf 1+1+1 is planned, 2 sites per E1

• 3 road or rural area sites 1+1 per E1

• sites shared on the same E1 must be geographically separated ( no

neighbour on the same E1)

• sites chained on the same E1 should share the same ET port at BSC

• BSC initial fill rate not exceeding 80% of capacity

• 1 E1 /BTS for CAPACITY PLAN (to avoide drastic change in

equipment/topology plan)

Page 9: Filippo Transmission Planning Workshop Part2

8/11/2019 Filippo Transmission Planning Workshop Part2

http://slidepdf.com/reader/full/filippo-transmission-planning-workshop-part2 9/33

9 ©

NOKIA TRS Planning and TRS Equipment for Turkcell.PPT/ 21-05-2004 / GRy

Customer\Partner Confidential

Detailed PlanPredefined availability criteria and performed calculations during the network capacity

& topology planning are used in defining possible connections betweentransmission equipment. These results are important in securing that the planned

topology satisfies the pre-defined design criteria.

I/F

MSC

TCSM

BSC

BTS ET

ET

ET

ET

ET

ET

FXC

A I/F Ater I/F Abis Air I/F

MS

Air

A-bis A-ter A

Page 10: Filippo Transmission Planning Workshop Part2

8/11/2019 Filippo Transmission Planning Workshop Part2

http://slidepdf.com/reader/full/filippo-transmission-planning-workshop-part2 10/33

10 ©

NOKIA TRS Planning and TRS Equipment for Turkcell.PPT/ 21-05-2004 / GRy

Customer\Partner Confidential

Detailed Plan: A-bis

• In the detailed Abis plan, the TRS planner performs a detailed plan of the

Abis interface, per each BTS in the network. In particular per each BTS the

planner prepares:

• “detail plan “

• Timeslot allocation tables

• Cross Connect 2Mb/s level

• BSC Report

• Q1 plan

Page 11: Filippo Transmission Planning Workshop Part2

8/11/2019 Filippo Transmission Planning Workshop Part2

http://slidepdf.com/reader/full/filippo-transmission-planning-workshop-part2 11/33

11 ©

NOKIA TRS Planning and TRS Equipment for Turkcell.PPT/ 21-05-2004 / GRy

Customer\Partner Confidential

PDH Cross Connecting

• Cross Connection level in range 8k…2M

(Depends on equipment)

Cross Connect

Detailed Plan A bis

Page 12: Filippo Transmission Planning Workshop Part2

8/11/2019 Filippo Transmission Planning Workshop Part2

http://slidepdf.com/reader/full/filippo-transmission-planning-workshop-part2 12/33

12 ©

NOKIA TRS Planning and TRS Equipment for Turkcell.PPT/ 21-05-2004 / GRy

Customer\Partner Confidential

Detailed Plan - A bisThere are following outputs of detailed planning:

Detail Plan

Detailed Plan A bis

Page 13: Filippo Transmission Planning Workshop Part2

8/11/2019 Filippo Transmission Planning Workshop Part2

http://slidepdf.com/reader/full/filippo-transmission-planning-workshop-part2 13/33

13 ©

NOKIA TRS Planning and TRS Equipment for Turkcell.PPT/ 21-05-2004 / GRy

Customer\Partner Confidential

Detailed Plan - A bisThere are following outputs of detailed planning:

Timeslot allocation tables

1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 80 Link management 0 Link management 0 Link management

1 1 1

2 2 2

3 3 3

4 4 4

5 5 5

6 6 6

7 7 7

8 8 8

9 9 9

10 10 10

11 11 11

12 12 12

13 13 13

14 14 14

15 15 15

16 16 16

17 17 17

18 18 18

19 19 19

20 20 20

21 21 21

22 22 22

23 23 23

24 24 2425 TRXSIG1 BCF SIG TRXSIG2 25 TRXSIG1 BCF SIG 1TRXSIG2 25 TRXSIG1 BCF SIG 1TRXSIG2

26 TRXSIG3 TRXSIG4 26 TRXSIG3 TRXSIG4 26 TRXSIG3 TRXSIG4

27 TRXSIG5 TRXSIG6 27 TRXSIG5 TRXSIG6 27 TRXSIG1 BCF SIG 2TRXSIG2

28 TRXSIG7 TRXSIG8 28 TRXSIG1 BCF SIG 2TRXSIG2 28 TRXSIG3 TRXSIG4

29 TRXSIG9 TRXSIG10 29 TRXSIG3 TRXSIG4 29 TRXSIG1 BCF SIG 3TRXSIG2

30 TRXSIG11 TRXSIG12 30 TRXSIG5 TRXSIG6 30 TRXSIG3 TRXSIG4

31 PILOT 1 MCB LCB 31 PILOT 1 MCB LCB 31 PILOT 1 MCB LCB

TCH TRX 3

TCH TRX 4

TCH TRX 5

TCH TRX 6

TCH TRX 7 (FUTURE)

TCH TRX 8 (FUTURE)

TCH TRX 9 (FUTURE)

TCH TRX 10 (FUTURE)

TCH TRX 11 (FUTURE)

TCH TRX 12 (FUTURE)

2+2+2 site - 1 site per 2Mbit/s 1+1+1 site - 2 sites per 2Mbit/s

TCH TRX 1

TCH TRX 2 (FUTURE)

TCH TRX 1

TCH TRX 2

TCH TRX 3

TCH TRX 4 (FUTURE)

TCH TRX 5

TCH TRX 6 (FUTURE)

TCH TRX 1

TCH TRX 2 (FUTURE)

TCH TRX 3

TCH TRX 4 (FUTURE)

TCH TRX 5

TCH TRX 6 (FUTURE)

1+1 site - 3 sites per 2Mbit/s

TCH TRX 1

TCH TRX 2 (FUTURE)

TCH TRX 3

TCH TRX 4 (FUTURE)

TCH TRX 1

TCH TRX 2 (FUTURE)

TCH TRX 3

TCH TRX 4 (FUTURE)

TCH TRX 4 (FUTURE)

TCH TRX 1

TCH TRX 2 (FUTURE)

TCH TRX 3

Timeslot allocation tables for different BTS conf

Detailed Plan A bis

Page 14: Filippo Transmission Planning Workshop Part2

8/11/2019 Filippo Transmission Planning Workshop Part2

http://slidepdf.com/reader/full/filippo-transmission-planning-workshop-part2 14/33

14 ©

NOKIA TRS Planning and TRS Equipment for Turkcell.PPT/ 21-05-2004 / GRy

Customer\Partner Confidential

Detailed Plan - A bisThere are following outputs of detailed planning:

BSC Report

BSC Summary Report

Site ID Name Eq. Type Config. ET HUB BCF BTS TRX BTS TRX BTS TRX BCF_sig TRX_sig1 TCH TRX_sig5 TCH TRX_sig9 TCH Q1 Address Baud_Rate1 CGMS94 Ultrasite 1+1+1 33 no 6 16 1 17 5 18 9 31- -12 25- -12 1-2 27- -12 9-10 29- -12 17-18 4080 9600

1 CGMS95 Ultrasite 1+1+1 34 no 5 13 1 14 5 15 9 31- -12 25- -12 1-2 27- -12 9-10 29- -12 17-18 4080 9600

1 CGMS99 Ultrasite 1+1+1 35 no 1 1 1 2 5 3 9 31- -12 25- -12 1-2 27- -12 9-10 29- -12 17-18 4080 9600

2 CGMS91 Ultrasite 1+1+1 35 no 8 22 1 23 5 24 9 31- -34 25- -56 3-4 27- -56 11-12 29- -56 19-20 4080 9600

1 CGMS98 Ultrasite 1+1+1 36 no 2 4 1 5 5 6 9 31- -12 25- -12 1-2 27- -12 9-10 29- -12 17-18 4080 9600

2 CGMS81 Ultrasite 1+1+1 36 no 10 28 1 29 5 30 9 31- -34 25- -56 3-4 27- -56 11-12 29- -56 19-20 4080 9600

1 CGMS97 Ultrasite 1+1+1 37 no 3 7 1 8 5 9 9 31- -12 25- -12 1-2 27- -12 9-10 29- -12 17-18 4080 9600

1 CGMS96 Ultrasite 1+1+1 38 no 4 10 1 11 5 12 9 31- -12 25- -12 1-2 27- -12 9-10 29- -12 17-18 4080 9600

2 CGMS88 Ultrasite 1+1+1 38 no 9 25 1 26 5 27 9 31- -34 25- -56 3-4 27- -56 11-12 29- -56 19-20 4080 9600

1 CGMS25 Ultrasite 1+1+1 39 no 25 73 1 74 5 75 9 31- -12 25- -12 1-2 27- -12 9-10 29- -12 17-18 4080 9600

1 CGMS92 Ultrasite 1+1+1 41 no 7 19 1 20 5 21 9 31- -12 25- -12 1-2 27- -12 9-10 29- -12 17-18 4080 9600

1 CGMS27 Ultrasite 1+1+1 42 no 27 79 1 80 5 81 9 31- -12 25- -12 1-2 27- -12 9-10 29- -12 17-18 4080 9600

1 CGMS17 Ultrasite 1+1+1 43 no 17 49 1 70 5 51 9 31- -12 25- -12 1-2 27- -12 9-10 29- -12 17-18 4080 9600

1 CGMS32 Ultrasite 1+1+1 44 no 29 85 1 86 5 87 9 31- -12 25- -12 1-2 27- -12 9-10 29- -12 17-18 4080 9600

1 CGMS90 Ultrasite 1+1+1 45 no 11 31 1 32 5 33 9 31- -12 25- -12 1-2 27- -12 9-10 29- -12 17-18 4080 9600

1 CGMS10 Ultrasite 1+1+1 46 no 12 34 1 35 5 36 9 31- -12 25- -12 1-2 27- -12 9-10 29- -12 17-18 4080 9600

1 CGMS80 Ultrasite 1+1+1 47 no 80 238 1 239 5 240 9 31- -12 25- -12 1-2 27- -12 9-10 29- -12 17-18 4080 9600

1 CGMS35 Ultrasite 1+1+1 48 no 35 103 1 104 5 105 9 31- -12 25- -12 1-2 27- -12 9-10 29- -12 17-18 4080 9600

1 CGMS87 Ultrasite 1+1+1 49 no 61 181 1 182 5 183 9 31- -12 25- -12 1-2 27- -12 9-10 29- -12 17-18 4080 9600

1 CGMS85 Ultrasite 1+1+1 50 no 85 253 1 254 5 255 9 31- -12 25- -12 1-2 27- -12 9-10 29- -12 17-18 4080 9600

Transmission Eq ipment

Page 15: Filippo Transmission Planning Workshop Part2

8/11/2019 Filippo Transmission Planning Workshop Part2

http://slidepdf.com/reader/full/filippo-transmission-planning-workshop-part2 15/33

15 ©

NOKIA TRS Planning and TRS Equipment for Turkcell.PPT/ 21-05-2004 / GRy

Customer\Partner Confidential

Transmission Equipmentand solutions

523 125 100 11 6 70 20 4 86 10 0 1 195 34 34

716 175 141 14 13 93 24 5 130 8 4 2 95 47 47

1239 300 241 25 19 163 44 9 216 18 4 3 290 81 81

809 192 156 12 8 105 32 5 108 10 0 2 195 47 47

1092 246 208 18 15 132 42 7 173 8 4 2 95 65 651901 438 364 30 23 237 74 12 281 18 4 4 290 112 112TOTAL

155 M

SDH RL7 Ghz

(Hop)

4x2 M

PDH RL15 Ghz

(Hop)

8x2 M

PDH RL15 Ghz

(Hop)

DXX SDH MULTIPLEXER

STM-4 STM-16 DXC (48xSTM-1)

DXXTYPE-2

DXXTYPE-3

DXXTYPE-1

STM-1

TOTAL

BSS AREA 2

BSS AREA 1

TR (2004)

RADIO-LINK

BSS AREA 2

BSS AREA 1

16x2 M

PDH RL15 Ghz

(Hop)

155 M

SDH RL15 Ghz

(Hop)

STM-1 STM-4

155 M

SDH RL

7 Ghz

(Hop)

DXX

TYPE-2

16x2 M

PDH RL

15 Ghz

(Hop)

DXX

TYPE-3

DXX

TYPE-1

TR (2005)

Cumulative

4x2 M

PDH RL

15 Ghz

(Hop)

RADIO-LINK DXX SDH MULTIPLEXER

STM-16DXC (48xSTM-

1)

155 M

SDH RL

15 Ghz

(Hop)

8x2 M

PDH RL

15 Ghz

(Hop)

F/O

infrastu

ructure

Tower Container

OTHERS

OTHERS

F/Oinfras.

Tower Container

523 125 100 11 6 70 20 4 86 10 0 1 195 34 34

716 175 141 14 13 93 24 5 130 8 4 2 95 47 47

1239 300 241 25 19 163 44 9 216 18 4 3 290 81 81

809 192 156 12 8 105 32 5 108 10 0 2 195 47 47

1092 246 208 18 15 132 42 7 173 8 4 2 95 65 651901 438 364 30 23 237 74 12 281 18 4 4 290 112 112TOTAL

155 M

SDH RL7 Ghz

(Hop)

4x2 M

PDH RL15 Ghz

(Hop)

8x2 M

PDH RL15 Ghz

(Hop)

DXX SDH MULTIPLEXER

STM-4 STM-16 DXC (48xSTM-1)

DXXTYPE-2

DXXTYPE-3

DXXTYPE-1

STM-1

TOTAL

BSS AREA 2

BSS AREA 1

TR (2004)

RADIO-LINK

BSS AREA 2

BSS AREA 1

16x2 M

PDH RL15 Ghz

(Hop)

155 M

SDH RL15 Ghz

(Hop)

STM-1 STM-4

155 M

SDH RL

7 Ghz

(Hop)

DXX

TYPE-2

16x2 M

PDH RL

15 Ghz

(Hop)

DXX

TYPE-3

DXX

TYPE-1

TR (2005)

Cumulative

4x2 M

PDH RL

15 Ghz

(Hop)

RADIO-LINK DXX SDH MULTIPLEXER

STM-16DXC (48xSTM-

1)

155 M

SDH RL

15 Ghz

(Hop)

8x2 M

PDH RL

15 Ghz

(Hop)

F/O

infrastu

ructure

Tower Container

OTHERS

OTHERS

F/Oinfras.

Tower Container

523 125 100 11 6 70 20 4 86 10 0 1 195 34 34

716 175 141 14 13 93 24 5 130 8 4 2 95 47 47

1239 300 241 25 19 163 44 9 216 18 4 3 290 81 81

809 192 156 12 8 105 32 5 108 10 0 2 195 47 47

1092 246 208 18 15 132 42 7 173 8 4 2 95 65 651901 438 364 30 23 237 74 12 281 18 4 4 290 112 112TOTAL

155 M

SDH RL7 Ghz

(Hop)

4x2 M

PDH RL15 Ghz

(Hop)

8x2 M

PDH RL15 Ghz

(Hop)

DXX SDH MULTIPLEXER

STM-4 STM-16 DXC (48xSTM-1)

DXXTYPE-2

DXXTYPE-3

DXXTYPE-1

STM-1

TOTAL

BSS AREA 2

BSS AREA 1

TR (2004)

RADIO-LINK

BSS AREA 2

BSS AREA 1

16x2 M

PDH RL15 Ghz

(Hop)

155 M

SDH RL15 Ghz

(Hop)

STM-1 STM-4

155 M

SDH RL

7 Ghz

(Hop)

DXX

TYPE-2

16x2 M

PDH RL

15 Ghz

(Hop)

DXX

TYPE-3

DXX

TYPE-1

TR (2005)

Cumulative

4x2 M

PDH RL

15 Ghz

(Hop)

RADIO-LINK DXX SDH MULTIPLEXER

STM-16DXC (48xSTM-

1)

155 M

SDH RL

15 Ghz

(Hop)

8x2 M

PDH RL

15 Ghz

(Hop)

F/O

infrastu

ructure

Tower Container

OTHERS

OTHERS

F/Oinfras.

Tower Container

Transmission Equipment

Page 16: Filippo Transmission Planning Workshop Part2

8/11/2019 Filippo Transmission Planning Workshop Part2

http://slidepdf.com/reader/full/filippo-transmission-planning-workshop-part2 16/33

16 ©

NOKIA TRS Planning and TRS Equipment for Turkcell.PPT/ 21-05-2004 / GRy

Customer\Partner Confidential

Transmission Equipmentand solutions

• The Nokia FlexiHopper PDHmicrowave radio family includes

models for 7, 8, 13, 15, 18,23, 26and 38 GHz frequency bands.

• capacity is 2x2, 4x2, 8x2 or 16x2Mbit/s. This can be selected usingthe node manager or the networkmanagement system (NetAct)without any hardware changes.

• FlexiHopper radios use forwarderror correction (FEC) andinterleaving to improve signal level.

Page 17: Filippo Transmission Planning Workshop Part2

8/11/2019 Filippo Transmission Planning Workshop Part2

http://slidepdf.com/reader/full/filippo-transmission-planning-workshop-part2 17/33

Transmission Equipment

Page 18: Filippo Transmission Planning Workshop Part2

8/11/2019 Filippo Transmission Planning Workshop Part2

http://slidepdf.com/reader/full/filippo-transmission-planning-workshop-part2 18/33

18 ©

NOKIA TRS Planning and TRS Equipment for Turkcell.PPT/ 21-05-2004 / GRy

Customer\Partner Confidential

Transmission Equipmentand solutions

• The Nokia MetroHopper PDH radiouses the unique 58 GHz-frequency

band,

• In the 58GHz band, the signal isabsorbed by oxygen, limitingfeasible hop lengths to somewhatmore than 800 m

• Maximum capacity is 4x2 Mb/s

Transmission Equipment

Page 19: Filippo Transmission Planning Workshop Part2

8/11/2019 Filippo Transmission Planning Workshop Part2

http://slidepdf.com/reader/full/filippo-transmission-planning-workshop-part2 19/33

19 ©

NOKIA TRS Planning and TRS Equipment for Turkcell.PPT/ 21-05-2004 / GRy

Customer\Partner Confidential

Transmission Equipmentand solutions

• Nokia MetroHub allows 'to install'the cross-connection and media

change functionality into the placewhere it is needed. This allows youto maximise the trunking efficiencywith less equipment. Thus itincreases network reliablity andavailability, e.g. using a looptopology.

• The maximum interface capacityis 160 x 2 Mbit/s.

• Nokia MetroHub is capable ofgrooming traffic payload at 8 kbit/sgranularity.

• MetroHub can be connected via a

Flexbus cable from up to 300 m toNokia MetroHopper radio, NokiaFlexiHopper radio with 2 x 2, 4 x 2,8 x 2, and 16 x 2Mbit/s capacity,another radio indoor unit with aFlexbus interface.

Transmission Equipment

Page 20: Filippo Transmission Planning Workshop Part2

8/11/2019 Filippo Transmission Planning Workshop Part2

http://slidepdf.com/reader/full/filippo-transmission-planning-workshop-part2 20/33

20 ©

NOKIA TRS Planning and TRS Equipment for Turkcell.PPT/ 21-05-2004 / GRy

Customer\Partner Confidential

Transmission Equipmentand solutions

FXC RRI transmission unit containstwo Flexbus interfaces, FB1 and

FB2, on the front panel forconnecting to the NokiaFlexiHopper and NokiaMetroHopper radio outdoor units orto some other radio indoor unit(e.g. FIU 19). FC RRI is designed

for MetroSite

Transmission Equipment

Page 21: Filippo Transmission Planning Workshop Part2

8/11/2019 Filippo Transmission Planning Workshop Part2

http://slidepdf.com/reader/full/filippo-transmission-planning-workshop-part2 21/33

21 ©

NOKIA TRS Planning and TRS Equipment for Turkcell.PPT/ 21-05-2004 / GRy

Customer\Partner Confidential

Transmission Equipmentand solutions

The FXC E1 is a transmission unitwith four unbalanced (75 Ω) E1

interfaces,with separateconnectors for Tx and Rx.). With it,up to 1 km distance is possible in acoaxial cable.

Transmission Equipment

Page 22: Filippo Transmission Planning Workshop Part2

8/11/2019 Filippo Transmission Planning Workshop Part2

http://slidepdf.com/reader/full/filippo-transmission-planning-workshop-part2 22/33

22 ©

NOKIA TRS Planning and TRS Equipment for Turkcell.PPT/ 21-05-2004 / GRy

Customer\Partner Confidential

Transmission Equipmentand solutions

The FXC E1/T1 is a transmission unitwith four balanced (120 Ω) E1 or

(100 Ω) T1 interfaces. Also with it,up to 1 km distance is possible in ashielded telecommunications cable

In Metro site FC E1/T1 is used, thathas two 2Mb/s interfaces (TX,RXand TX/RX)

Transmission Equipment

Page 23: Filippo Transmission Planning Workshop Part2

8/11/2019 Filippo Transmission Planning Workshop Part2

http://slidepdf.com/reader/full/filippo-transmission-planning-workshop-part2 23/33

23 ©

NOKIA TRS Planning and TRS Equipment for Turkcell.PPT/ 21-05-2004 / GRy

Customer\Partner Confidential

Transmission Equipmentand solutions

FXC STM-1 transmission unit hastwo short haul optical STM-1

interfaces and two power supplyinterfaces for Nokia UltraHopperradios.When STM-1 units areused, one FXC Bridge unit mustalso be used. It contains the mainSDH functions, such as the SDH

node clock, SDH cross-connect(VC-3, VC-2, VC-12 level).

There’s equivalent for FXC STM-1used in Metrosite only - FC STM-1. It combines STM-1 and bridgeunits (sandwich unit). It supports

only 4x2Mbit/s capacity

Transmission Equipment

Page 24: Filippo Transmission Planning Workshop Part2

8/11/2019 Filippo Transmission Planning Workshop Part2

http://slidepdf.com/reader/full/filippo-transmission-planning-workshop-part2 24/33

24 ©

NOKIA TRS Planning and TRS Equipment for Turkcell.PPT/ 21-05-2004 / GRy

Customer\Partner Confidential

Transmission Equipmentand solutions

FIU 19 is the indoor unit for 19-inch mechanics applications:• One FIU 19 can support up to 4 outdoor units.

• FIU 19 can feed power to two outdoor units via the Flexbusconnections. When more than 2 outdoor units are used, a Flexbusplug-in unit with its own power supply is required. When fouroutdoor units are connected, the OUs connected through the main unitFlexbus interfaces (FB1 andFB2) must be configured to protectedmode. So transmission to a maximum of three directions can be

achieved with one FIU 19 indoor unit.

Plug-in-unit interface

modules• 2M tributaries (75 and 120 )• Flexbuses 3 and 4• Auxiliary data channels

T i i E i t

Page 25: Filippo Transmission Planning Workshop Part2

8/11/2019 Filippo Transmission Planning Workshop Part2

http://slidepdf.com/reader/full/filippo-transmission-planning-workshop-part2 25/33

25 ©

NOKIA TRS Planning and TRS Equipment for Turkcell.PPT/ 21-05-2004 / GRy

Customer\Partner Confidential

4x2M add/drop capacity

Transmission Equipmentand solutions

Expansion unitfor 16x2Mbit/s

add/drop& basebandbranching

Protecting FIU19for 1+1 FIU 19 configuration

2 U

16x2M add/drop capacity16x2M add/drop capacity - Protected FIU 19

Modular structure enables easy configuration changes

Transmission Equipment

Page 26: Filippo Transmission Planning Workshop Part2

8/11/2019 Filippo Transmission Planning Workshop Part2

http://slidepdf.com/reader/full/filippo-transmission-planning-workshop-part2 26/33

26 ©

NOKIA TRS Planning and TRS Equipment for Turkcell.PPT/ 21-05-2004 / GRy

Customer\Partner Confidential

Transmission Equipmentand solutions

FIU 19

Transmission Equipment

Page 27: Filippo Transmission Planning Workshop Part2

8/11/2019 Filippo Transmission Planning Workshop Part2

http://slidepdf.com/reader/full/filippo-transmission-planning-workshop-part2 27/33

27 ©

NOKIA TRS Planning and TRS Equipment for Turkcell.PPT/ 21-05-2004 / GRy

Customer\Partner Confidential

Transmission Equipmentand solutions

FIU 19

Transmission Equipment

Page 28: Filippo Transmission Planning Workshop Part2

8/11/2019 Filippo Transmission Planning Workshop Part2

http://slidepdf.com/reader/full/filippo-transmission-planning-workshop-part2 28/33

28 ©

NOKIA TRS Planning and TRS Equipment for Turkcell.PPT/ 21-05-2004 / GRy

Customer\Partner Confidential

Transmission Equipmentand solutions

Transmission Equipment

Page 29: Filippo Transmission Planning Workshop Part2

8/11/2019 Filippo Transmission Planning Workshop Part2

http://slidepdf.com/reader/full/filippo-transmission-planning-workshop-part2 29/33

29 ©

NOKIA TRS Planning and TRS Equipment for Turkcell.PPT/ 21-05-2004 / GRy

Customer\Partner Confidential

a s ss o qu p e tand solutions

Tail site – Ultrasite

• Outdoor and indoor • Tower or rooftop • Tail topology

• Microwave or Leased Line transmission • FlexiHopper and FXC RRI or • Leased line and FXC E1T1

• Outdoor and indoor • Tower or rooftop • Tail topology • Optical fiber • FXC - STM1 • FXC Bridge unit

Optical fiber

Macro cabinet

R R I

Macro cabinet S T M 1

E 1 B

Macro cabinet

E 1 T 1

Leased line

Transmission Equipment

Page 30: Filippo Transmission Planning Workshop Part2

8/11/2019 Filippo Transmission Planning Workshop Part2

http://slidepdf.com/reader/full/filippo-transmission-planning-workshop-part2 30/33

30 ©

NOKIA TRS Planning and TRS Equipment for Turkcell.PPT/ 21-05-2004 / GRy

Customer\Partner Confidential

q pand solutions

Chain site – Ultrasite

• Outdoor and indoor • Tower or rooftop • Chain topology • Available now • Microwave and/or LL TRS

• 2 x FlexiHopper andFXC RRI

or • FlexiHopper , LL and

FXC RRI and FXC

E1T1

• Outdoor and indoor • Tower or rooftop • Chain topology • Optical fiber and

microwave transmission (orLeased line)

• FXC RRI and FXC E1T1 • FlexiHopper • SDH ADM

• Outdoor and indoor • Tower or rooftop • Chain topology • Optical f iber transmission • FXC - STM1 • FXC Bridge

Macro cabinet

R R I

Macro cabinet

R R I

E 1 T 1

Optical fiber

Macro cabinet

S T M 1

E 1 B Optical

fiber

Macro cabinet

E 1 T 1 Leased

line

R R I

Optical fiber

SDH ADM E1

Tellabs /Marconi/SAN

Transmission Equipment

Page 31: Filippo Transmission Planning Workshop Part2

8/11/2019 Filippo Transmission Planning Workshop Part2

http://slidepdf.com/reader/full/filippo-transmission-planning-workshop-part2 31/33

31 ©

NOKIA TRS Planning and TRS Equipment for Turkcell.PPT/ 21-05-2004 / GRy

Customer\Partner Confidential

q pand solutions

Star site – Ultrasite

• Outdoor and indoor • Tower or rooftop • Star topology

• Microwave and/or LL

transmission • 3 x FlexiHopper

and 2 x FXC RRI or • 2 x FlexiHopper ,

LL and FXC RRIand FXC E1T1

• Outdoor and indoor • Tower or rooftop • Star topology • Optical fiber and microwave

TRS • 2 x FlexiHopper • FXC RRI • FXC E1T1 • SDH Mux

• Outdoor and indoor • Tower or rooftop • Star topology • Optical fiber and microwave

TRS • FlexiHopper • FXC RRI • FXC E1T1 • SDH Mux

Macro cabinet

R R I

R R I

Optical fiber

Macro cabinet

E 1 T 1

R R I

Macro cabinet

E 1 T 1

R R I

Macro cabinet

R R I

Leased line

E 1 T 1

SDH ADM

E1

Tellabs /SAN Optical fiber

SDH ADM

E1

Tellabs /SAN Optical fiber

服务质量的承诺

Page 32: Filippo Transmission Planning Workshop Part2

8/11/2019 Filippo Transmission Planning Workshop Part2

http://slidepdf.com/reader/full/filippo-transmission-planning-workshop-part2 32/33

32 ©

NOKIA TRS Planning and TRS Equipment for Turkcell.PPT/ 21-05-2004 / GRy

Customer\Partner Confidential

服务质量的承诺 高

质量网络的承诺 • 丰富的网络规划经验保证了设计高质量话音网络的能力 • 成功的网络规划为未来网络的发展打下坚实的基础

• 最优的规划方案,充分考虑覆盖,容量,质量,预算等要求,以达到最优的服务质量

• 分析网络质量的标准方法 •覆盖概率 •切换性能 •链路质量

•掉话率 富的网络规划经验:

诺基 在 球有200多 移动网络

Page 33: Filippo Transmission Planning Workshop Part2

8/11/2019 Filippo Transmission Planning Workshop Part2

http://slidepdf.com/reader/full/filippo-transmission-planning-workshop-part2 33/33

33 ©

NOKIA TRS Planning and TRS Equipment for Turkcell.PPT/ 21-05-2004 / GRy

Customer\Partner Confidential

Thank You

!