FERMILAB TEST BEAM FACILITY Aria Soha All Experimenter’s Meeting December 15, 2014

F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting December 15, 2014

Embed Size (px)

Citation preview

FERMILAB TEST BEAM FACILITYFERMILAB TEST BEAM FACILITY

Aria SohaAll Experimenter’s Meeting

December 15, 2014

Latest MTest Experiments

http://www-ppd.fnal.gov/FTBF/ 2

T-99227 Users

T-104155 Users

T-101535 Users

Commissioning /beam studies

T-977 Installation25 Users

Latest MCenter Experiments

http://www-ppd.fnal.gov/FTBF/ 3

T-1034 Installation32 Users

So Far in FY 2014

• 5 Experiment Weeks• 5 Installation weeks• 1 week beam studies• 2 approved TSWs (T-977, T-1059)

http://www-ppd.fnal.gov/FTBF/ 4

Current Status

MTest•T-1015 running now. •Wednesday installing T-1041 (6 sub-experiments)MCenter•LAriaT Installing•Beamline Commissioning

http://www-ppd.fnal.gov/FTBF/ 5

ADDITIONAL SLIDES

http://www-ppd.fnal.gov/FTBF/ 6

2014 Facility Upgrades

• MCenter Beamline!• Area for High Rate Trackers (M03)• New Instrumentation– Wire chamber tracking system– Si strip telescope

• Improved Infrastructure– Temperature control– Table control / new tables

http://www-ppd.fnal.gov/FTBF/ 7

2014 Statistics

• 18 Experiments• 321 Collaborators• 84 Institutions• 20 Countries• 9 New TSW’s

http://www-ppd.fnal.gov/FTBF/ 8

Beam Delivery

• 416,139 Total Fxd Trgt events

• 183,225 MTest beam pulses• 16,496 MCntr beam pulses• MTest Beam Sum: 7.9E15• MCntr Beam Sum: 2.4E16

http://www-ppd.fnal.gov/FTBF/ 9

Weekly Usage

MTest– 48 available beam-weeks– 78 experiment-weeks– 6 weeks of beam studies/

commissioning– 177% Usage

MCenter– 5 available beam-weeks– 0.5 experiment-weeks– 5 weeks of beam studies/

commissioning– 100% Usage

• http://www-ppd.fnal.gov/FTBF/ 10

Experiments (18)

• 9 new TSW’s approved• 11 new experiments started• 7 returning experiments

http://www-ppd.fnal.gov/FTBF/ 11

Experiment Types• T1015 DRO Calorimetry• T1037 FLYSUB-Consortium• T958 FP420 (CMS+ATLAS) Fast Timing Group• T979 Fast Timing w/Cherenkov Counters• T989 DAMIC• T1058 Secondary Emission Calorimeter • T1031 Atlas Tile Calorimeter Electronics• T1036 CMS High Rate Pixel Detector• T1041CMS Forward Calorimetry• T1049 ATLAS large scale TGC• T1056 ATLAS DBM Module Qualification• T992 Radiation-hard Sensors for the SLHC• T1042 Muon g-2 straw tracker• T1018 Spacordion Tungsten Fiber Calorimeter• T1044 sPHENIX• T1048 PHENIX fast TOF• T1054 sPHENIX Pre-Shower Calorimeter• T994 JASMIN

http://www-ppd.fnal.gov/FTBF/ 12

Two Large Neutrino experiments on schedule for FY15: MINERvA & LAriaTTwo Large Neutrino experiments on

schedule for FY15: MINERvA & LAriaT

Institutions (84)

http://www-ppd.fnal.gov/FTBF/ 13

Summary

• Facility is growing at an incredible rate, and is on track to continue

• 321 collaborators this year

• Will likely break 500 next year, with new beamline

• 1.4 FTE for facility management is not enough

http://www-ppd.fnal.gov/FTBF/ 14