4

Click here to load reader

Electrical ITP

Embed Size (px)

DESCRIPTION

itp

Citation preview

INSPECTION TEST PLANDocument No: MOM-SK309-64-EL-ITP-0001-00 Rev. No: 0BORF LONG-TERM POWER SOLUTIONPage 1 of 4MOM-SK309-64-PM-MOC-0034-00BORF LONG-TERM POWER SOLUTIONPROJ ECTINSPECTION TEST PLANForELECTRICAL INSTALLATIONREVISION HISTORYREV. DATE DESCRIPTION AUTHOR CHECKED APPROVED0 June-16-15 Issue for review IFR VICTOR SUHAILIDOCUMENTNO.COUNTRYCODEFIELD/ASSETCODEFACILI TYCODEDISCIPLINECODEDOCUMENTTYPESEQUENCENO.SHEETNO.REV.NO.MOM SK309 64 EL ITP 0001 010INSPECTION TEST PLANBORF LONG-TERM POWER SOLUTIONPage 2 of 4INDEXTABLE OF CONTENTSDESCRIPTION PAGECOVER PAGE 1INDEX 21.0 PURPOSE 32.0 SCOPE 33.0 DEFINATION / ABBREVATION 34.0 INSPECTION AND TEST PLAN 4Document No: MOM-SK309-64-EL-ITP-0001-00 Rev. No: 0INSPECTION TEST PLANBORF LONG-TERM POWER SOLUTIONPage 3 of 41.0 PURPOSEThe main purpose of this document Inspection and Test Plan (ITP) is to ensure the qualitycontrol and testing activities are in-placed and performed with quality and safe in a differentactivities by the QA/QC inspection personnel of Fatimah Bersatu Sdn Bhd (FBSB) and ownersrepresentative.2.0 SCOPETheinspectionandtestplancoversallinspections,checkingandtestingactivities tobeperformed at all activities related to Electrical Installation scope of works both BUS-A and BUS-B from SESCO Power Plant 33KV Substation to Murphy Oil Company.The main scope is to ensure all Electrical installation such as HV cable, Power Transformer andswitchboard are inspected and tested according to owners company standards and engineeringglobal standard.3.0 ABBREVIATION / DEFINITION3.1 MRR - Material Receiving Report3.2 P.O - Purchase Order3.3 QA/QC - Quality Assurance and Inspection Department3.4 MOC - Murphy Oil Company (Owner)3.5 FBSB - Fatimah Bersatu Sdn Bhd3.6 ITP - Inspection and Test Plan3.7 SESCO - Sarawak SESCO BerhadDocument No: MOM-SK309-64-EL-ITP-0001-00 Rev. No: 0INSPECTION TEST PLANBORF LONG-TERM POWER SOLUTIONPage 4 of 43.8 WITNESS (W) - An identified critical step in process whereby an inspectionActivities must be witnessed, inspected, approved and signed byFBSB inspection team and owners representative as mentionedin the Inspection Request Form (IRF).- I RF shall be submitted 48 hours before thedate of the inspection,on case-to-casebasis andagreedbothFBSBandOwnersrepresentativethe Inspectionactivity mayproceedwithorwithout OWNERs representative.3.9 HOLD(H) - The same as Witness (W) except that no further work canproceed on the affected item, or part of an item until the workhas been inspected and approved through Inspection RequestForm (IRF) that shall be submitted 48 hours before Inspectionto be carried out.3.10 SPOT WITNESS (S)- Also known as Surveillance, a work in progress is allowed tocontinue but where an FBSB inspector and ownersrepresentative may invoke Witness or Hold attribute asnecessary.3.11 INSPECTION (I) - The process of checking and verifying on physical which occursparallel with flow of work and carried out according to ProjectProcedures Method of Statement code and standard etc.3.12 RECORD (RC) - FBSB inspection personnel shall record all necessaryparameters, datas and results which have been inspected orwitnessed into the relevant documents as required andwitnessed by owners representative3.13 REVIEW (R) - An activity that occurs in parallel with normal flow or workapplied to cross checking and verify previous obtain datareports certificate test record etc.4.0 INSPECTION AND TEST PLAN (ELECTRICAL)(see attachment)Document No: MOM-SK309-64-EL-ITP-0001-00 Rev. No: 0