  • 8/10/2019 Itp Structure

    1/47

    ATTACHMENT 7.1

    Project Inspection and Test Plan-SITE

    CIVIL AND STRUCTURE

  • 8/10/2019 Itp Structure

    2/47

    Discipline Legend

    H : Hold Point A : AProject Title : P&G PROJECT W : Witness R : R

    Job No : p : Perform M : M

    Description : Project Inspection and Test Plan-Site

    Equipment Tag No. : -

    Location : -

    a.

    b.

    c.

    d.

    e.

    a.

    b.

    c. Dimensional, Welding, NDT, and Coating Inspection Inspect

    As applicable WPS/PQR,NDT procedure

    - SNO-S-ES-002 Standard Specification for

    Stuctural Steel Construction

    Comply with sp

    Welder Performance test Inspect As applicable WPS/PQR Comply w

    8.3 Inspection During Fabrication

    WPS/PQR Qualification Test Inspect As applicable WPS/PQR Comply w

    8.2 Material Inspection Inspect- SNO-S-TS-001 Specification for structural

    steel material Comply w

    Chipping and Padding Work Review- SNO-S-ES-002 Standard Specification for

    Stuctural Steel ConstructionComply with s

    Grouting Work Review- SNO-C-ES-015 Standard Specification for

    Grouting of stuctural and equipmentComply with s

    General Structure Erection Work Review- SNO-X-PR-007 Steel Structure Erection

    ProcedureComply with s

    General Fabrication Work Review-SNO-S-TS-002 Specification Standard for

    structural steel fabricationComply with s

    8.1 Procedure

    Welding Procedure Specification / Procedure

    Qualification Record ( WPS/PQR )Review As applicable WPS/PQR Comply with s

    8 STEEL STRUCTURE

    PROJECT INSPECTION & TES

    STEEL STRUCTURE

    No. DESCRIPTIONINSPECTION

    METHODREFERENCE DOCUMENT ACCEPTANCE

  • 8/10/2019 Itp Structure

    3/47

    Discipline Legend

    H : Hold Point A :Project Title : P&G PROJECT W : Witness R :

    Job No : p : Perform M :

    Description : Project Inspection and Test Plan-Site

    Equipment Tag No. : -

    Location : -

    PROJECT INSPECTION & TES

    STEEL STRUCTURE

    No. DESCRIPTIONINSPECTION

    METHODREFERENCE DOCUMENT ACCEPTANC

    a.

    b.

    c.

    d.

    e.

    1.

    2.

    3.

    4.

    5.

    6.

    f.

    f.

    Steel erection work8.5

    Steel Structure Installation Acceptance Inspect- SNO-S-ES-002 Standard Specification for

    Stuctural Steel ConstructionComply w

    Fire Proofing Inspect- SNO-S-ES-002 Standard Specification for

    Stuctural Steel ConstructionComply w

    Grout test (compressive strength) Inspect- SNO-C-ES-015 Standard Specification for

    Grouting of stuctural and equipmentComply w

    Cleaning prior to placing Inspect- SNO-C-ES-015 Standard Specification for

    Grouting of stuctural and equipmentComply w

    Anchor bolts and embedded items Inspect- SNO-C-ES-015 Standard Specification for

    Grouting of stuctural and equipmentComply with

    Form-work Inspect- SNO-C-ES-015 Standard Specification for

    Grouting of stuctural and equipmentComply with

    Mixing proportion Inspect

    - SNO-C-ES-015 Standard Specification for

    Grouting of stuctural and equipment Comply w

    Material Inspection Inspect- SNO-C-ES-015 Standard Specification for

    Grouting of stuctural and equipmentComply w

    Welding and NDT Inspection Inspect

    As applicable WPS/PQR,NDT procedure

    - SNO-S-ES-002 Standard Specification for

    Stuctural Steel Construction

    Comply w

    Grouting Work

    Bolt Tightening Inspect- SNO-S-ES-002 Standard Specification for

    Stuctural Steel ConstructionComply w

    Plumbness check Inspect Comply with

    8.4 Installation

    Chipping and Padding check Inspect- SNO-S-ES-002 Standard Specification for

    Stuctural Steel ConstructionComply with

  • 8/10/2019 Itp Structure

    4/47

    Discipline Legend

    H : Hold Point A :Project Title : P&G PROJECT W : Witness R :

    Job No : p : Perform M :

    Description : Project Inspection and Test Plan-Site

    Equipment Tag No. : -

    Location : -

    PROJECT INSPECTION & TE

    STEEL STRUCTURE

    No. DESCRIPTIONINSPECTION

    METHODREFERENCE DOCUMENT ACCEPTAN

    a.

    b.

    c.

    1.

    2.

    3.

    d.

    1.

    e.

    f.

    1.

    2.

    3.

    4.

    5.

    Form Code : SNO-Q-FM-0039 Rev.0

    Inspect Comply

    Inspect Comply

    Inspect Comply

    Overlap joint sheet Inspect Comply

    Inspect Comply

    3. Damage

    Inspect all Roofing/Walling & accessories after

    installation, Including:

    Visual (cleaning) Inspect Comply

    Connection metal Sheet ( Sheet to Sheet)

    Inspect Comply

    Inspect Comply

    1. hard Stamping

    Inspect Comply

    Inspect Comply

    Inspect all Roofing/Walling work for:

    4. Complete to marking plan

    Inspect Comply3. Touch up paint & Cleaning

    Inspect Comply

    Inspect Comply

    2. Tension of Bolts

    Aligment of Structure

    Inspect All Steel work After erection,including: Inspect Comply

    Complete to marking plan Inspect Comply

    Touch up paint & Cleaning

    Tension of Bolts Inspect Comply

    Inspect Comply

    3. Paint touch up later concealed areas

    Inspect all steel work after Modules Ground

    Assembly, Including:

    Inspect ComplyInspect Comply2. Damage

    Prepare JSEA Inspect Approv

    Complete to marking plan

    Joint plashing, Silent, Gutter

    Inspect Comply

    Inspect Comply

    2. Quantity

    Inspect Comply

    1. Hard Stamping Inspect Comply

    Inspect all steel work ( Handling Material Process) Inspect Comply

  • 8/10/2019 Itp Structure

    5/47

    Project Title Senoro Gas Development Project Sub-Contractor

    Job No 9608/SU2573 Report No.

    Client JOB Pertamina Medco E & P Tomori Sulawesi Date DD/MM/YYMain Contractor Tripatra-Samsung Consortium Page of

    (Client Name) : Attn. Mr.

    Project Manager

    Gentlemen,

    We would like to have your presence for inspection according to the following schedules.

    Date and time Place/Area Inspection Item Remarks

    Piping Civil Instrument Mechanical

    Pipeline Structural Electrical

    COMMENT :

    Name

    Sign Date

    Job TitleForm Code : SNO-Q-FM-0001 Rev.0

    Signature

    REQUEST FOR INSPECTION

    Involvement Party Performed By Approved By Reviewed By TPI (If applicable)Sub-Contractor TSC JOB PMTS

    (subcon

    logo)

  • 8/10/2019 Itp Structure

    6/47

    Project Title Senoro Gas Development Project Sub-Contractor

    Job No 9608/SU2573 Report No.

    Client JOB Pertamina Medco E & P Tomori Sulawesi Date DD/MM/YY

    Main Contractor Tripatra-Samsung Consortium Page of

    Material Arrival Date :

    PO.No. / Packing List No :

    Mill Certificate

    Conform to

    - Chemical Composition

    - Mechanical Properties

    Note:

    1) If Necessary

    2) Put check mark () on the selected result.

    Name

    Sign Date

    Job TitleForm Code : SNO-Q-FM-0002 Rev.0

    TPI (If applicable)Sub-Contractor TSC JOB PMTS

    Signature

    4 Other

    Involvement PartyPerformed By Approved By Reviewed By

    2

    3 Manufacturer Data Sheet1)

    1 Visual

    Surface Condition

    Dimension

    EQUIPMENT /MATERIAL RECEIVING INSPECTION

    REPORT

    NO. INSPECTION ITEMRESULT

    2)

    RemarksACCEPTED REJECTED

    (subcon

    logo)

  • 8/10/2019 Itp Structure

    7/47

    Project Title Senoro Gas Development Project Sub-Contractor

    Job No 9608/SU2573 Report No.

    Client JOB Pertamina Medco E & P Tomori Sulawesi Date DD/MM/YY

    Main Contractor TRIPATRA-SAMSUNG CONSORTIUM Page of

    Location :

    1. Type Inspection Item :

    Inspection / Test /Examination / Check

    2. Inspection Report :

    `

    3. Remarks :

    Supporting document attached

    YES NO

    Name

    Sign Date

    Job TitleForm Code : SNO-Q-FM-0003 Rev.0

    Signature

    INSPECTION REPORT

    Performed By Approved By Reviewed By

    Involvement Party Sub-Contractor TSC JOB PMTS

    TPI(If applicable)

    (subcon

    logo)

  • 8/10/2019 Itp Structure

    8/47

    Project Title Senoro Gas Development Project Sub-Contractor

    Job No 9608/SU2573 Report No.

    Client JOB Pertamina Medco E & P Tomori Sulawesi Date DD/MM/YY

    Main Contractor TRIPATRA-SAMSUNG CONSORTIUM Page of

    REFERENCES :

    Item Name : Location :

    Drawing No. :

    Revision :

    Sheet : Of

    E = East

    N = North

    Signature

    Sign Date

    Job TitleForm Code : SNO-Q-FM-0004 Rev.0

    Involvement

    Party Sub-Contractor TSC JOB PMTS

    TPI(If applicable)

    Signature

    E

    E

    E

    N

    N

    DESCRIPTION

    E

    N

    No.

    N

    E

    N

    N

    N

    N

    E

    E

    E

    E

    N

    N

    N

    SURVEY REPORT

    Performed By Approved By Reviewed By

    RemarksPlan Actual Difference

    ElevationCoordinate

    Plan Actual Difference

    E

    E

    (subcon

    logo)

  • 8/10/2019 Itp Structure

    9/47

    Project Title Senoro Gas Development Project Sub-Contractor

    Job No 9608/SU2573 Report No.

    Client JOB Pertamina Medco E & P Tomori Sulawesi Date DD/MM/YY

    Main Contractor TRIPATRA-SAMSUNG CONSORTIUM Page of

    REFERENCES :

    Drawing No. : Location :

    Revision :

    Sheet :

    COMMENT :

    Name

    Sign Date

    Job TitleForm Code : SNO-Q-FM-0005 Rev.0

    Approved Reviewed

    TPI(If applicable)

    Involvement Party

    Signature

    Sub-Contractor TSC JOB PMTS

    Remarks

    STABLE EXISTING AREA FOR SUPPORT THE WEIGHT OF HAULING EQUIPMENT

    TSCItem of Inspection

    Result

    Cut off flush of selected trees without

    removing its roots

    EXISTING AREA / LOW SWAMPY

    Other unsatisfactory soil material

    removal

    Organic soil material removal and

    disposal

    Accepted Sub-ConRejected

    Trees, brush, stump and resting

    vegetation removal and disposal.

    CLEARING AND GRUBBING INSPECTION REPORT

    Performed By Approved By Reviewed by

    Quality of Cleaning.

    Demolition, relocation, elevation and

    protection of existing facilities.

    JOB PMTS

    (subcon

    logo)

  • 8/10/2019 Itp Structure

    10/47

    Project Title Senoro Gas Development Project Sub-Contractor

    Job No 9608/SU2573 Report No.

    Client JOB Pertamina Medco E & P Tomori Sulawesi Date DD/MM/YY

    Main Contractor TRIPATRA-SAMSUNG CONSORTIUM Page of From KP ... To KP

    REFERENCES :

    Drawing No. : Location :

    Revision :

    Sheet :

    Name

    Sign Date

    Job Title

    Form Code : SNO-Q-FM-0006 Rev.0

    Involvement

    Party Sub-Contractor TSC JOB PMTS

    TPI

    (If applicable)

    COMMENT

    Quality Cleaning of Bottom Surface

    Dewatering

    Safety regarding excavation works,

    confirmed and Protection of Slope

    Depth of Excavation, confirmed

    Result

    Sub-Con TSC JOB PMTSAccepted

    ReviewedApproved

    Rejected

    Investigation of Existing under-ground

    Facilities

    Demolition or Protection of Existing Facility

    RemarksItem of Inspection

    Signature

    EXCAVATION INSPECTION REPORT

    Performed By Approved By Reviewed By

    Line, Slope and Grades according to

    approved drawing

    Setout location, based on shop drawing andendorsed Benchmark

    (subcon

    logo)

  • 8/10/2019 Itp Structure

    11/47

    Project Title Senoro Gas Development Project Sub-Contractor

    Job No 9608/SU2573 Report No.

    Client JOB Pertamina Medco E & P Tomori Sulawesi Date DD/MM/YY

    Main Contractor TRIPATRA-SAMSUNG CONSORTIUM Page of

    REFERENCES :

    Drawing No. : Location :

    Revision :

    Sheet :

    Legend Supporting document attachedLS : Lime StoneCLY : Clay Silt YES NO

    SCLY : Sandy Clay

    COMMENT

    Name

    Sign Date

    Job TitleForm Code : SNO-Q-FM-0007 Rev.0

    b.

    4 VISUAL SOIL MATERIAL PLASTICITY

    5 COHESIVENESS OF SOIL MATERIAL

    Cohesive / Little Cohesive / Loose

    Cohesive / Little Cohesive / Loose

    a.

    NO INSPECTION ITEMS

    LS / CLY / SCLY

    LS / CLY / SCLY

    DISTRIBUTION QUALITY OF MATERIAL2

    QUALITY OF MATERIAL USED1

    REMARKS(Sub-Con) TSC JOB PMTS

    REVIEWEDAPPROVED

    TPI

    a.

    b.

    c.

    LS / CLY / SCLY

    3 VISUAL SOIL MATERIAL GRADATION

    7 SLOPE PROTECTION

    6 CLEANING ( REMOFAL OF TRASH, DEBRIS )

    c. Cohesive / Little Cohesive / Loose

    BACKFILL MATERIAL INSPECTION REPORT

    Performed by Approved by Reviewed By

    Signature

    Involvement

    Party Sub-Contractor TSC JOB PMTS

    (subcon

    logo)

  • 8/10/2019 Itp Structure

    12/47

    Project Title Senoro Gas Development Project Sub-Contractor

    Job No 9608/SU2573 Report No.

    Client JOB Pertamina Medco E & P Tomori Sulawesi Date DD/MM/YY

    Main Contractor TRIPATRA-SAMSUNG CONSORTIUM Page of

    REFERENCES :

    Drawing No. : Location :

    Revision :

    Sheet :

    Total Unit : pc(s)

    Running Unit : pc(s)

    Stand Unit : pc(s)

    Total Unit : pc(s)

    Running Unit : pc(s)

    Stand Unit : pc(s)

    COMMENT

    Name

    Sign Date

    Job TitleForm Code : SNO-Q-FM-0008 Rev.0

    Rejected

    Accepted

    Water Quantity Due to Wet

    Compaction Check

    Water Source Check

    Accepted

    TSC JOB PMTSREMARKS

    Rejected

    NO INSPECTION ITEMS

    Fill material quality

    2

    1

    Accepted

    RESULT

    Rejected (Sub-Con)

    REVIEWEDAPPROVED

    Optimum water content

    Vibratory Compactors

    8

    7 Compactor trip number

    EQUIPMENT

    COMPACTION INSPECTION REPORT

    Approved By Reviewed By

    Sheep Foot Compactors

    Area location marking for layer

    thickness

    Soil spreading methods

    Thickness of loose soil

    Water spreading methods

    Compaction test number for

    covered area

    3

    4

    5

    6

    Signature

    Sub-Contractor TSC JOB PMTS

    Involvement

    Party

    TPI

    (If applicable)

    Performed By

    (subcon

    logo)

  • 8/10/2019 Itp Structure

    13/47

    Project Title Senoro Gas Development Project Sub-Contractor

    Job No 9608/SU2573 Report No.

    Client JOB Pertamina Medco E & P Tomori Sulawesi Date DD/MM/Main Contractor TRIPATRA-SAMSUNG CONSORTIUM Page

    Date Of Test

    Test No.

    Type of Layer

    Location Of Test

    Weight of Sand + Cone + Jar ( before ) gram a

    Weight of Sand + Cone + Jar ( after ) gram b

    Weight of Sand in Hole + Cone gram c

    Weight of Sand in Cone gram d

    Weight of Sand in Hole gram e=c-d

    Unit Weight of Sand gram/cm3

    fVolume Of Hole cm3 g=e/f

    Weight of Wet Soil + Container gram i

    Weight of Dry Soil + Container gram j

    Weight of Water gram k=i-j

    Weight of Container gram l

    Weight of Dry Soil gram m=j-l

    Moisture Content % n=(k/m)x100

    Weight of Soil from Hole + Container gram o

    Weight of Container gram p

    Weight of Soil from Hole gram q=o-p

    WET DENSITY gram/cm3 r=q/g

    DRY DENSITY gram/cm3 s=r/(1+(n/100))

    Maximum LAB DENSITY gram/cm3 t

    Optimum Moisture Content % u

    Present Compaction % v=(s/t)x100

    Remarks :

    Name

    Sign Date

    Job Title

    Form Code : SNO Q FM 0009 1 Rev 0

    13

    14

    9

    1 2

    Container No.UNIT FORMULAMOISTURE CONTENT DETERMENATION

    VOLUME DETERMINATION UNIT FORMULA

    Container No.

    Vibro smooth drum = ..X 2 passing Vibro smooth drum = ..X 2 passing

    A B

    Sheep foot = .X 2 passing Sheep foot = ..X 2 passing

    1

    2

    3

    4

    Container No. Container No.

    1

    5

    5

    4

    3

    76

    2

    6

    DENSITY DETERMENATION UNIT FORMULA21

    7

    8

    10

    11

    12

    FIELD DENSITY TEST (SAND CONE METHOD)

    Performed By Approved By Reviewed ByInvolvement Party

    Signature

    Sub-Contractor TSC JOB PMTS

    TPI(If Applica

    (sub

    log

  • 8/10/2019 Itp Structure

    14/47

    Project Title Senoro Gas Development Project Sub-Contractor

    Job No 9608/SU2573 Report No.

    Client JOB Pertamina Medco E & P Tomori Sulawesi Date DD/MM/YY

    Main Contractor TRIPATRA-SAMSUNG CONSORTIUM Page o

    Min soil Density :

    Compactor Trip :

    Compactor Trip :

    Name

    Sign DateJob Title

    Form Code : SNO-Q-FM-0009-2 Rev.0

    RENo.Date of

    Test

    DRY

    DENSITY

    (gr/cm3)

    WET

    DENSITY

    (gr/cm3)

    WATER

    CONTENT

    (gr/cm3)

    LOOSE SOIL

    THICKNESS (mm)TEST NO / LAYER / ELEVATION RESULT (%)

    SUMMARY SAND CONE TEST REPORT

    Involvement PartySub-Contractor TSC JOB PMTS

    TPI(If Applicabl

    Signature

    Performed by Approved by Reviewed By

    (sub

    log

  • 8/10/2019 Itp Structure

    15/47

    Project Title Senoro Gas Development Project Sub-Contractor

    Job No 9608/SU2573 Report No.

    Client JOB Pertamina Medco E & P Tomori Sulawesi Date DD/MM/YY

    Main Contractor TRIPATRA-SAMSUNG CONSORTIUM Page of

    Drawing No : Hammer Type :

    Point No : Weight of RAM :

    Total Length of Pile : Type of Pile :

    Location :

    JUDGEMENT

    The piles under tested are

    ACCEPTED REJECTED

    according to selected standards, code and specification.

    Attachment

    1)

    2)

    3)

    Name

    Sign Date

    Job Title

    Form Code: SNO-Q-FM-0010 Rev.0

    Signature

    Sub-Contractor TSC JOB PMTS

    PILE DRIVING ANALYZER (PDA) TEST REPORT

    Perform By Approved By Reviewed ByInvolvement Party

    TPI(If applicable)

    Test

    Load

    PointDate / Time Pile StatementNo

    Reading

    Static Load

    Capacity

    Pile

    Stress

    Pile Energy

    TransferPile

    Integrity

    (subcon

    logo)

  • 8/10/2019 Itp Structure

    16/47

  • 8/10/2019 Itp Structure

    17/47

    Project Title Senoro Gas Development Project Sub-Contractor

    Job No 9608/SU2573 Report No.

    Client JOB Pertamina Medco E & P Tomori Sulawesi Date DD/MM/YY

    Main Contractor TRIPATRA-SAMSUNG CONSORTIUM Page of PILE SPECIFICATION ITEM NO. :

    Number : LOCATION :

    Diameter : PILE DRIVING TYPE :

    Length : HAMMER SPECIFICATION

    Weight : Type :

    Weight :

    DRIVING Drop Height :

    Start/ End : CUSHION

    Delay : Material Type :

    Splicing Joint I : Thickness :

    Joint II : Final Set : cm / blow

    Joint III : Settlement : cm/blow

    PENETRATION

    Name

    Sign Date

    Job TitleForm Code : SNO-Q-FM-0011-1 Rev.0

    Signature

    31

    50

    Approved By50

    44

    Performed By Reviewed By

    50

    50

    50

    1

    50

    14

    PENETRATION

    Involvement PartyTPI

    (If applicable)TSCSub-Contractor JOB PMTS

    50

    50

    50

    3

    50

    50 50

    15

    16

    50

    5 18

    4 17

    50

    29

    50

    30

    50

    41

    DRIVING RECORD

    13

    m cm

    2

    50

    28

    5050

    4027

    0

    PENETRATION BLOW

    COUNTm cm

    BLOW

    COUNTm cm

    26

    50

    39

    5050

    BLOW COUNTPENETRATION BLOW

    COUNTm cm

    50

    50

    50

    50

    50

    50

    50

    50

    43

    50

    42

    50

    45

    46

    47

    48

    49

    50

    50

    50

    50

    50

    50

    PILE DRIVING RECORD

    50

    50 50

    6

    7

    8

    9

    10

    11

    12

    50

    50

    50

    50

    50

    50

    50

    50

    50

    50

    50

    50

    51

    19

    20

    23

    24

    21

    22

    25

    32

    33

    34

    35

    36

    37

    38

    (subcon

    logo)

  • 8/10/2019 Itp Structure

    18/47

    Project Title Senoro Gas Development Project Sub-Contractor

    Job No 9608/SU2573 Report No.

    Client JOB Pertamina Medco E & P Tomori Sulawesi Date DD/MM/YY

    Main Contractor TRIPATRA-SAMSUNG CONSORTIUM Page of

    Form Code : SNO-Q-FM-0011-2 Rev.0

    PILE DRIVING RECORD

    (subcon

    logo)

  • 8/10/2019 Itp Structure

    19/47

    Project Title Senoro Gas Development Project Sub-Contractor

    Job No 9608/SU2573 Report No.

    Client JOB Pertamina Medco E & P Tomori Sulawesi Date DD/

    Main Contractor TRIPATRA-SAMSUNG CONSORTIUM Page

    1 :

    2 :

    2 :

    3 :

    3 :

    4 :

    4 :

    5 :

    NOTES :

    1) FORMAT MM/DD/YY

    2) FORMAT HH:SS

    Name

    Sign Date

    Job TitleForm Code : SNO-Q-FM-0012 Rev.0

    APPROVED REVIEW

    Signature

    Involvement PartyT

    (If appSub-Contractor TSC JOB PMTS

    Accepted Rejected SUB-CON TSC

    WELDING INSPECTION

    JOINT

    NO

    WEATHER

    CONDITION JOB PM

    RESULTDATE

    1)START /

    FINISH2)PILE NUMBERPOINT NO.

    WELDING INSPECTION REPORT (PILE)

    Performed By Approved By Reviewed By

  • 8/10/2019 Itp Structure

    20/47

    Project Title Senoro Gas Development Project Sub-Contractor

    Job No 9608/SU2573 Report No.

    Client JOB Pertamina Medco E & P Tomori Sulawesi Date DD/MM/YY

    Main Contractor TRIPATRA-SAMSUNG CONSORTIUM Page 1 of 2

    STD REFERENCE : TESTING DATE :

    MATERIAL : SAMPLING DATE :

    SOURCE : PIC :

    SUPPLIER : TESTING DATE :

    Visual Test (Color)

    Form Code : SNO-Q-FM-0013-1 Rev.0

    Total

    Sand Equivalent

    ResultSieve No. mm

    Weight

    Retain Parameter

    Absorption

    PassingTotal

    Weight% Retain

    ASTM C33

    min max

    Washing Loss

    Silt Content

    Spec.

    Additional Test

    Specific Gravity

    Sedimentation

    Clay Lumps & Friable

    Organic Impurities

    FINE AGGREGATE (subconlogo)

  • 8/10/2019 Itp Structure

    21/47

    FINE AGGREGATE (subconlogo)

    Project Title Senoro Gas Development Project Sub-Contractor

    Job No 9608/SU2573 Report No.

    Client JOB Pertamina Medco E & P Tomori Sulawesi Date DD/MM/YY

    Main Contractor TRIPATRA-SAMSUNG CONSORTIUM Page 2 of 2

    STD REFERENCE : TESTING DATE :

    MATERIAL : SAMPLING DATE :

    SOURCE : PIC :

    SUPPLIER : TESTING DATE :

    Silt Content

    Washing Loss

    Sedimentation

    Clay Lumps & Friable

    Organic Impurities

    Visual Test (Color)

    NameSign Date

    Job TitleForm Code : SNO-Q-FM-0013-2 Rev.0

    Involvement Party

    Signature

    TPI(If applicable)Sub-Contractor TSC JOB PMTS

    Total

    minSieve No. mm

    Weight

    Retain max Parameter Spec. Result

    ASTM C33 Additional TestTotal

    Weight

    %.

    RetainPassing

    Specific Gravity

    Absorption

    max 12%

    max 3%

    max 3%

  • 8/10/2019 Itp Structure

    22/47

    Project Title Senoro Gas Development Project Sub-Contractor

    Job No 9608/SU2573 Report No.

    Client JOB Pertamina Medco E & P Tomori Sulawesi Date DD/MM/YY

    Main Contractor TRIPATRA-SAMSUNG CONSORTIUM Page of

    DESIGN MIX :

    Slump : mm

    W/C Ratio :

    Cement : Kg/m3

    Fly Ash : Kg/m3

    Silica Fume : Kg/m3

    Fine Aggregates : %

    COMPOSITION FOR 1 CuM (SSD CONDITION)

    Water : L

    CementType : Kg

    Fly Ash : Kg

    Silica Fume : Kg

    Admixture : L

    Retarder : L

    Superplasticise : L

    Other : L

    AGGREGATES VOLUME

    Aggregates : Kg

    Sand 1 : Kg

    Sand 2 : Kg

    Gravel - 01 : KgGravel - 02 : Kg

    Gravel - 03 : Kg

    Total : Ton

    Density : T/CuM

    Name

    Sign Date

    Job TitleForm Code : SNO-Q-FM-0014 Rev.0

    Sub-Contractor TSC JOB PMTSTPI

    (If applicable)

    Signature

    Involvement Party

    MIX DESIGN CONCRETE

    Performed By Approved By Reviewed By

    (subcon

    logo)

  • 8/10/2019 Itp Structure

    23/47

    Project Title Senoro Gas Development Project Sub-Contractor

    Job No 9608/SU2573 Report No.

    Client JOB Pertamina Medco E & P Tomori Sulawesi Date DD/MM/YY

    Main Contractor TRIPATRA-SAMSUNG CONSORTIUM Page of

    Equipment / Location :

    Drawing no :

    Revision :

    Sheet :

    Surveying Location

    Elevation

    Plumbness

    Rebar Diameter Bending Footing/Pedestal

    Lap LengthSurface Cleaning of Rebar

    Rigidity

    Form Work Dimension Alignment Footing/Pedestal

    Form Oil Coating

    Stability

    Top Elevation

    Chamfer Spacer

    Concrete Cleaning Pouring Place Footing/Pedestal

    Slump Test

    Using Vibrator

    Removal Laitance

    Curing

    Appearance of Surface

    Anchor Bolt or Box Emb- Size Type Number

    bedded Steel, Water Location Orientation Level

    Stop Stability

    Protection of Anchor Bolt Screw

    Misc, Opening, Sleeve, Dimension, Location, Orientation, Material

    etc

    COMMENT

    Name

    Sign Date

    Job TitleForm Code : SNO-Q-FM-0015 Rev.0

    RESULT

    Accepted Rejected

    Signature

    Involvement PartySub-Contractor TSC JOB PMTS

    FOUNDATION CHECK LIST

    Performed By Approved By Reviewed by

    6

    1

    2

    3

    4

    5

    REMARKDESCRIPTION

    TPI(If applicable)

    NO

    (subcon

    logo)

  • 8/10/2019 Itp Structure

    24/47

    Project Title Senoro Gas Development Project Sub-Contractor

    Job No 9608/SU2573 Report No.

    Client JOB Pertamina Medco E & P Tomori Sulawesi Date DD/MM/YY

    Main Contractor TRIPATRA-SAMSUNG CONSORTIUM Page of

    Drawing No. : Equipment / Location :

    Revision :

    Sheet :

    Design Mix : A(fc' = 35 Mpa) B (fc' = 28 Mpa)

    : C(fc' = 20.7 Mpa) D (fc' = 10.3 Mpa)

    Slump : Cm

    Quantity : m3

    APPROVED BY :

    Civil

    Piping

    Mechanical

    Electrical / Instrument

    Survey

    Engineering

    WEATHER Sunny Cloudy Rainy

    Placement Start Date : Time :

    Placement Completed Dat : Time :

    Number of Cube : QTY : (Nos)

    Concrete Tested by :

    REMARKS:

    Name

    Sign Date

    Job TitleForm Code : SNO-Q-FM-0016 Rev.0

    Signature

    CONCRETE POUR PERMIT

    Performed By Approved By Reviewed By

    (Print name)

    JOB SignaturesDiscipline

    (Print name) DateDate

    TSC Signatures

    Involvement PartyTPI

    (If applicable)Sub-Contractor

    REVIEWED BY

    TSC JOB PMTS

    (subcon

    logo)

  • 8/10/2019 Itp Structure

    25/47

    Project Title Senoro Gas Development ProjectJob No 9608/SU2573

    Client JOB Pertamina Medco E & P Tomori Sulawesi

    Main Contractor TRIPATRA-SAMSUNG CONSORTIUM

    Testing Laboratory :

    Name

    Sign Date

    Job TitleForm Code : SNO-Q-FM-0017 Rev.0

    Involvement PartySub-Contractor TSC JOB PMTS

    Signature

    CONCRETE COMPRESSIVE STRENGTH TEST REPORT

    Performed By Approved By Reviewed B

    ITEM

    NOPOURING LOCATION

    TESTCAST

    Actual

    Slump

    (cm)

    INSPECTION DATE AND REPORT OF TESTPOURING DATA AND DELIVERY

    SAMPLE NO.

    DATEWeight

    ( kg )

    Cube Size

    ( p x l x t )

    Cylinder

    Size

    ( d x h )

    AGE

    (days)

  • 8/10/2019 Itp Structure

    26/47

    Project Title Senoro Gas Development Project Sub-Contractor

    Job No 9608/SU2573 Report No.

    Client JOB Pertamina Medco E & P Tomori Sulawesi Date DD/MM/YY

    Main Contractor TRIPATRA-SAMSUNG CONSORTIUM Page of

    Drawing No :

    Revision :

    Sheet :

    COMMENT :

    Name

    Sign Date

    Job Title

    Form Code : SNO-Q-FM-0018 Rev.0

    Involvement PartyTPI

    (If applicable)

    Signature

    Sub-Contractor TSC JOB PMTS

    RELEASE OF FOUNDATION

    Performed By Approved By Reviewed By

    Attachment Document Hand Over

    Acc Rej

    No Document DescriptionStatus Attachment

    Remark

    3 Punch List report

    1 Related Inspection Reports

    2 Final Survey after pouring concrete

    Equipment / Location Reference Document

    THE ABOVE FOUNDATION HAS BEEN COMPLETED, AND COMPLIES WITH THE DRAWING REQUIREMENT,

    ALL SURVEY'S HAVE BEEN COMPLETED WITHNESSED AND APPROVED

    (subcon

    logo)

  • 8/10/2019 Itp Structure

    27/47

    Project Title Senoro Gas Development Project Sub-Contractor

    Job No 9608/SU2573 Report No.

    Client JOB Pertamina Medco E & P Tomori Sulawesi Date DD/MM/YY

    Main Contractor TRIPATRA-SAMSUNG CONSORTIUM Page of

    SKETCH Drawing No :

    Revision :

    Sheet :

    WPS/PQR Check : Visual Check :

    Process : Dimension Check :

    Electrode : NDT :

    Parameter :

    Welder ID :

    Painting System :

    Painting Brand :

    Surface Preparation :

    Primer / DFT :

    Intermediate / DFT :

    To / DFT :

    TOTAL DFT :

    Signature

    Name

    Sign Date

    Job TitleForm Code : SNO-Q-FM-0019 Rev.0

    Involvement PartyTPI

    (If applicable)Sub-Contractor TSC JOB PMTS

    DIMENSIONAL, WELDING, NDT & PAINTING

    INSPECTION RECORD

    Performed By Approved By Reviewed By

    #DIV/0!average

    8

    9

    7

    5

    6

    3

    4

    2

    (Sub-Con) TSC

    COATING / PAINTING INSPECTION RECORD

    JOB PMTSRejected

    1

    DFT (micron) Actual

    (micron)

    RESULT

    SAMPLE Std Tol Accepted

    Approved By Reviewed By

    Approved By Reviewed By

    JOB PMTS(Sub-Con) TSC

    TSC JOB PMTS

    D

    (Sub-Con)

    WELDING & NDT INSPECTION RECORDS

    E E

    D

    B

    A

    C

    A

    C

    B

    Tol

    DIMENSION (mm)

    Actual Rejected

    RESULT

    RejectedAcceptedMark Design

    DIMENSION (mm) RESULT

    Mark Design Tol Accepted

    DIMENSIONAL INSPECTION RECORD

    Actual

    Approved By Reviewed By

    (subcon

    logo)

  • 8/10/2019 Itp Structure

    28/47

    Project Title Senoro Gas Development Project

    Job No 9608/SU2573

    Client JOB Pertamina Medco E & P Tomori Sulawesi

    Main Contractor TRIPATRA-SAMSUNG CONSORTIUM

    Discipline : RT : A

    Request No. : UT :

    Request Date : MT :

    Area / Unit : PT :

    Name

    Sign Date

    Job TitleForm Code : SNO-Q-FM-0020 Rev.0

    Involvement Party

    Signature

    Sub-Contractor TSC JOB PMTS

    NON DESTRUCTIVE EXAMINATION REQUEST

    Performed By Approved By Reviewed By

    NO. Drawing Number Sheet Member Section No. Profile MaterialWelding

    Process

    Welder

    StampShoot DRevision

  • 8/10/2019 Itp Structure

    29/47

    Project Title Senoro Gas Development Project Sub-Contractor

    Job No 9608/SU2573 Report No.

    Client JOB Pertamina Medco E & P Tomori Sulawesi Date DD/MM/YY

    Main Contractor TRIPATRA-SAMSUNG CONSORTIUM Page of

    Drawing No. : Equipment / Location :

    Revision :

    Sheet :

    N :

    E :

    N :

    E :

    N :E :

    N :

    E :

    N :

    E :

    N :

    E :

    N :

    E :

    N :

    E :

    N :

    E :N :

    E :

    N :

    E :

    N :

    E :

    N :

    E :

    N :

    E :

    Name

    Sign Date

    Job TitleForm Code : SNO-Q-FM-0021 Rev.0

    Involvement Party

    Signature

    Sub-Contractor TSC JOB PMTS

    TPI

    (If applicable)

    PLUMBNESS INSPECTION REPORT

    Performed By Approved By Reviewed By

    REMARKTOLERANCE

    ACTUALTOP

    ELEVATION BASE PLATE

    BOT

    STRUCTURE

    NAMEPOSITION

    PLAN

    PLUMBNESS

    DIFFERENCE

    LOCATION

    (subcon

    logo)

  • 8/10/2019 Itp Structure

    30/47

    Project Title Senoro Gas Development Project Sub-Contractor

    Job No 9608/SU2573 Report No.

    Client JOB Pertamina Medco E & P Tomori Sulawesi Date DD/MM/YY

    Main Contractor TRIPATRA-SAMSUNG CONSORTIUM Page of

    Drawing No : Equipment / Location :

    Revision :

    Sheet :

    NOTE :

    Name

    Sign Date

    Job TitleForm Code : SNO-Q-FM-0022 Rev.0

    APPROVED REVIEWED

    Signature

    GROUTING INSPECTION REPORT

    Performed By Approved By Reviewed ByInvolvement Party

    TPI(If applicable)Sub-Contractor TSC JOB PMTS

    CURING

    BASE PLATE

    LOCATION

    SURFACE FINISHING

    Accepted Rejected JOB PMTS

    MIXING PROPORTION

    SURFACE ROUGHNESS

    (Sub-Con)NO CHECKING ITEM

    RESULT

    TSC

    CLEANING

    REMARKS

    TOP ELEVATION OF FORM

    WORK

    CHAMFER

    DIMENSION, ALIGNMENT &

    STABILITY OF FORM WORK

    (subcon

    logo)

  • 8/10/2019 Itp Structure

    31/47

    Project Title Senoro Gas Development Project Sub-Contractor

    Job No 9608/SU2573 Report No.

    Client JOB Pertamina Medco E & P Tomori Sulawesi Date DD/MM/YY

    Main Contractor TRIPATRA-SAMSUNG CONSORTIUM Page of

    Drawing No : Equipment / Location :

    Revision :

    Sheet :

    Name

    Sign Date

    Job TitleForm Code : SNO-Q-FM-0023 Rev.0

    BOLT TIGHTENING CHECK

    Performed By Approved by Reviewed byInvolvement Party

    TPI(If applicable)Sub-Contractor TSC JOB PMTS

    Signature

    STRUCTURE NAME BOLT SPEC./SIZETENSION STD.

    (NM)

    RESULTBOLT CHECK LOCATION

    ACCEPTED REJECTED

    (subcon

    logo)

  • 8/10/2019 Itp Structure

    32/47

    Project Title Senoro Gas Development Project Sub-Contractor

    Job No 9608/SU2573 Report No.

    Client JOB Pertamina Medco E & P Tomori Sulawesi Date DD/MM/YY

    Main Contractor TRIPATRA-SAMSUNG CONSORTIUM Page of

    Drawing No :

    Revision :

    Sheet :

    COMMENT :

    Name

    Sign Date

    Job Title

    Form Code : SNO-Q-FM-0024 Rev.0

    Signature

    Involvement PartyTPI

    (If applicable)TSCSub-Contractor JOB PMTS

    RELEASE OF STEEL STRUCTURE INSTALLATION

    Performed By Approved By Reviewed By

    2 Final Survey (Plumbness)

    3 Punch List report

    1 Related Inspection Reports

    Attachment Document Hand Over

    RemarkNo Document Description

    Status Attachment

    Acc Rej

    Equipment / Location Reference Document

    THE ABOVE STEEL STRUCTURE INSTALLATION HAS BEEN COMPLETED, AND COMPLIES WITH THE DRAWING

    REQUIREMENT, ALL SURVEY'S HAVE BEEN COMPLETED WITHNESSED AND APPROVED

    (subcon

    logo)

  • 8/10/2019 Itp Structure

    33/47

    Project Title Senoro Gas Development Project Sub-Contractor

    Job No 9608/SU2573 Report No.

    Client JOB Pertamina Medco E & P Tomori Sulawesi Date DD/MM/YY

    Main Contractor TRIPATRA-SAMSUNG CONSORTIUM Page of

    Sample No. :

    Source of Aggregate:

    Name

    Sign Date

    Job TitleForm Code : SNO-Q-FM-0025 Rev.0

    Signature

    Involvement PartyTPI

    (If applicable)TSCSub-Contrcator JOB PMTS

    AGGREGATE GRADATION REPORT

    ( SIEVE TEST )

    Performed By Approved By Reviewed By

    NOTE :

    TOTAL

    Inch mm Wt.Ret ( gr ) ( gr )

    REMARKIndividual Wt.Ret

    Pass

    SAMPLE ISieve Size

    % Ret % Pass Spec %

    (subcon

    logo)

  • 8/10/2019 Itp Structure

    34/47

    Project Title Senoro Gas Development Project Sub-Contractor

    Job No 9608/SU2573 Report No.

    Client JOB Pertamina Medco E & P Tomori Sulawesi Date DD/MM/YY

    Main Contractor TRIPATRA-SAMSUNG CONSORTIUM Page of

    REFERENCES :

    Drawing No. : Location :

    Revision :

    Sheet :

    Name

    Sign Date

    Job TitleForm Code : SNO-Q-FM-0026 Rev.0

    COMMENT

    Check Thickness and Width of Gravelling

    Signature

    JOB PMTSTSCSub-ContractorTPI

    (If applicable)Involvement Party

    GRAVEL INSPECTION REPORT

    Performed By Approved By Reviewed By

    Result

    Rejected

    Quality of Cleaning before Spreading

    Quality of Cleaning after Spreading

    Remarks

    Condition of Compaction

    JOB PMTSItem of Inspection

    Accepted

    ReviewedApproved

    Sub-Con TSC

    (subcon

    logo)

  • 8/10/2019 Itp Structure

    35/47

    Project Title Senoro Gas Development Project Sub-Contractor

    Job No 9608/SU2573 Report No.

    Client JOB Pertamina Medco E & P Tomori Sulawesi Date DD/MM/YY

    Main Contractor TRIPATRA-SAMSUNG CONSORTIUM Page 1 of 2

    Location :

    Test Date :

    Ap=

    Load= Reading x CF

    CBR 0.1"

    Corrected load x 100%

    Ap x 1000 Psi

    CBR 0.2"

    Corrected load x 100%

    Ap x 1500 Psi

    Cf = Calibration Factor

    Ap = Area of Plunger

    Note :

    Name

    Sign Date

    Job TitleForm Code : SNO-Q-FM-0027-1 Rev.0

    CALIFORNIA BEARING RATIO (CBR) INSITU

    Performed By Approved By Reviewed By

    Remarks

    900

    1000

    1100

    Involvement Party

    1200

    1300

    1400

    Signature

    Sub-Contractor TSC JOB PMTS

    TPI(If applicable)

    150

    Penetration Inc

    x 10-2

    450

    500

    600

    400

    Time second

    200

    250

    300

    700

    800

    Remarks

    Cf=

    50

    0

    1500

    350

    Reading x 10-2 Load (lbs)

    100

    (subcon

    logo)

  • 8/10/2019 Itp Structure

    36/47

    Project Title Senoro Gas Development Project Sub-Contractor

    Job No 9608/SU2573 Report No.

    Client JOB Pertamina Medco E & P Tomori Sulawesi Date DD/MM/YY

    Main Contractor TRIPATRA-SAMSUNG CONSORTIUM Page 2 of 2

    Location :

    Test Date :

    CBR 0.1" = Remarks :

    CBR 0.2" =

    Name

    Sign Date

    Job Title

    Form Code : SNO-Q-FM-0027-2 Rev.0

    Signature

    Involvement

    Party

    TPI

    (If applicable)Sub-Contractor TSC JOB PMTS

    Performed By Approved By Reviewed by

    Penetration of Plunger ( inch )

    CALIFORNIA BEARING RATIO ( CBR )REPORT

    Load

    (lbs)

    (subcon

    logo)

  • 8/10/2019 Itp Structure

    37/47

    Project Title Senoro Gas Development Project Sub-Contractor

    Job No 9608/SU2573 Report No.

    Client JOB Pertamina Medco E & P Tomori Sulawesi Date DD/MM/YY

    Main Contractor TRIPATRA-SAMSUNG CONSORTIUM Page of

    Drawing No. : Equipment / Location :

    Revision :

    Sheet :

    COMMENT

    Name

    Sign Date

    Job TitleForm Code : SNO-Q-FM-0028 Rev.0

    TPI

    (If applicable)Sub-Contractor TSC JOB PMTS

    Signature

    Reviewed ByApproved ByPerformed ByInvolvement

    Party

    SEWER PIPING AND DRAINAGE INSPECTION

    REPORT

    Result

    JOB PMTSRemarks

    Check Dimensional ( Location, Elevation &

    Slope )

    Accepted Rejected Sub-Con

    Check Installation of Pipes

    TSCItem of Inspection

    Approved Reviewed

    Concrete

    Surface Finishing

    Water Flow / Service test

    Check Connection of pipe and manhole

    (subcon

    logo)

  • 8/10/2019 Itp Structure

    38/47

    Project Title Senoro Gas Development Project Sub-Contractor

    Job No 9608/SU2573 Report No.

    Client JOB Pertamina Medco E & P Tomori Sulawesi Date DD/MM/YY

    Main Contractor TRIPATRA-SAMSUNG CONSORTIUM Page of

    Drawing No. : Equipment / Location :

    Revision :

    Sheet :

    COMMENT

    NameSign Date

    Job TitleForm Code : SNO-Q-FM-0029 Rev.0

    Involvement Party

    Signature

    TPI(If applicable)Sub-Contractor TSC JOB PMTS

    BRICK INSPECTION REPORT

    Performed By Approved by Reviewed By

    Approved Reviewed

    Location, wall centre, vertical board

    Result

    Finish of surface

    Reinforcement and installation of accessories

    (Horizontal Dowels, Veltical Dowels, etc)

    Proportioning and Mixing Mortar

    Location of door and windows

    BRICK WORK

    Sub-Con TSCRemarks

    Installation of Column Practice

    Rejected JOB PMTSAcceptedItem of Inspection

    (subcon

    logo)

  • 8/10/2019 Itp Structure

    39/47

    Project Title Senoro Gas Development Project Sub-Contractor

    Job No 9608/SU2573 Report No.

    Client JOB Pertamina Medco E & P Tomori Sulawesi Date DD/MM/YY

    Main Contractor TRIPATRA-SAMSUNG CONSORTIUM Page of

    Drawing No. : Equipment / Location :

    Revision :

    Sheet :

    Name

    Sign Date

    Job TitleForm Code : SNO-Q-FM-0030 Rev.0

    Overlap Joint

    TPI

    (If applicable)

    Signature

    Involvement PartySub-Contractor TSC JOB PMTS

    WATER PROOFING INSPECTION REPORT

    Performed by Approved by Reviewed by

    RemarksResult

    JOB PMTSSub-ConItem of Inspection

    TSC

    Condition & Application of Material

    COMMENT

    Approved Reviewed

    Leakage Test

    Accepted

    Surface Preparation

    Rejected

    (subcon

    logo)

  • 8/10/2019 Itp Structure

    40/47

    Project Title Senoro Gas Development Project Sub-Contractor

    Job No 9608/SU2573 Report No.

    Client JOB Pertamina Medco E & P Tomori Sulawesi Date DD/MM/YY

    Main Contractor TRIPATRA-SAMSUNG CONSORTIUM Page of

    Drawing No. : Equipment / Location :

    Revision :

    Sheet :

    Name

    Sign Date

    Job TitleForm Code : SNO-Q-FM-0031 Rev.0

    COMMENT

    Functional Test

    Signature

    Involvement

    Party Sub-Contractor TSC JOB PMTS

    DOORS & WINDOWS INSPECTION REPORT

    Performed By Approved By Reviewed By

    Item of Inspection

    Installation of Frames and doors & windows

    Result

    Accepted

    TPI(If applicable)

    RemarksJOB PMTSSub-Con TSCRejected

    Approved Reviewed

    Installation of Hardware

    Fixed condition of glass

    Condition of Cleaning

    (subcon

    logo)

  • 8/10/2019 Itp Structure

    41/47

    Project Title Senoro Gas Development Project Sub-Contractor

    Job No 9608/SU2573 Report No.

    Client JOB Pertamina Medco E & P Tomori Sulawesi Date DD/MM/YY

    Main Contractor TRIPATRA-SAMSUNG CONSORTIUM Page of

    Drawing No. : Equipment / Location :

    Revision :

    Sheet :

    Name

    Sign DateJob TitleForm Code : SNO-Q-FM-0032 Rev.0

    Signature

    Involvement PartySub-Contractor TSC JOB PMTS

    TPI(If applicable)

    Performed By Approved by Reviewed By

    WALL , CEILING AND FLOOR INSPECTION REPORT

    Surface

    Flatness

    Surface

    Cleaning and Waxing

    Condition of Joint

    Condition of Cleaning

    Layout and Pattern

    Pattern and Layout of Installation

    Condition of Joint

    COMMENT

    Painting

    Condition Cleaning and Protection

    III. FLOOR WORK

    Treatment of Joint

    RemarksItem of InspectionResult

    Accepted JOB PMTSTSCSub-ConRejected

    I. WALL FINISHING (Brick, Concrete, Gypsum or Partition)

    Approved Reviewed

    II. CEILING (Acoustic Board or Gypsum Board)

    Setting Frame

    Flatness

    Painting or Wall Paper

    (subcon

    logo)

  • 8/10/2019 Itp Structure

    42/47

    Project Title Senoro Gas Development Project Sub-Contractor

    Job No 9608/SU2573 Report No.

    Client JOB Pertamina Medco E & P Tomori Sulawesi Date DD/MM/YY

    Main Contractor TRIPATRA-SAMSUNG CONSORTIUM Page of

    Drawing No. : Equipment / Location :

    Revision :

    Sheet :

    Name

    Sign Date

    Job TitleForm Code : SNO-Q-FM-0033 Rev.0

    Approved Reviewed

    TPI(If applicable)

    Signature

    Involvement PartySub-Contractor TSC JOB PMTS

    Performed By Approved By Reviewed By

    PLUMBING & SANITARY FIXTURE INSPECTION

    REPORT

    TSC JOB PMTSRejectedItem of Inspection

    Result

    Check Location, Elevation & Slope

    RemarksSub-ConAccepted

    COMMENT

    Function Test

    Installation of Pipes

    II. SANITARY FIXTURE

    Equipment Location

    I. PLUMBING WORK

    Tightness of screw and / or bolts & nuts

    Cleaning Condition

    Connection of Sanitary Hardware to Pipe

    Accepted

    Alignment and Level of Installation

    Water Flow & Service Test

    (subcon

    logo)

  • 8/10/2019 Itp Structure

    43/47

    Project Title Senoro Gas Development Project Sub-Contractor

    Job No 9608/SU2573 Report No.

    Client JOB Pertamina Medco E & P Tomori Sulawesi Date DD/MM/YY

    Main Contractor TRIPATRA-SAMSUNG CONSORTIUM Page of

    Drawing No. : Equipment / Location Name :

    Revision :

    Sheet :

    Name

    Sign Date

    Job TitleForm Code : SNO-Q-FM-0034 Rev.0

    TPI(If applicable)

    Involvement Party

    Signature

    Sub-Contractor TSC JOB PMTS

    ROOFING AND SIDING INSPECTION REPORT

    Performed By Approved by Reviewed by

    COMMENT

    Installation of Roof & Accessories

    Condition of Fastening

    Lapped Joint ( Length & Width )

    RemarksRejected

    Item of InspectionResult

    Accepted Sub-Con TSC JOB PMTS

    Approved Reviewed

    Installation of Framing

    (subcon

    logo)

  • 8/10/2019 Itp Structure

    44/47

    SYSTEM / SUB SYSTEM NO. :SYSTEM DISCRIPTION :

    TEST PACKAGE NUMBER :

    REFERENCE DOC/DWG/SPEC. :

    Category A - Item must be complete before Mechanical Completion The System at Approval of JOB Pertamina Medco E & P Tomori SulawesiCategory B - Item can be complete after Mechanical Completion The System at Approval of JOB Pertamina Medco E & P Tomori Sulawesi

    Name

    Sign Date

    Job Title

    Form Code : SNO-Q-FM-0035 Rev.0

    DESCRIPTIONPLAN

    Signature

    Involvement PartySub-Contractor TSC

    Performed by Approved by

    GENERAL PUNCH LI

    COMPLETION DATE

    ACTUALORIITEM

  • 8/10/2019 Itp Structure

    45/47

    Subcontractor Name :

    Form Code : SNO-Q-FM-0036 Rev.0

    INSPECTION, MEASUREMENT & TEST E

    NO.EQUIPMENT / INSTRUMENT

    IDENTIFICATION NO.

    DESCRIPTION

    SIZE-RANGE

    MANUFACTURER

    MODEL No.

    MANUFACTU

    NUM

  • 8/10/2019 Itp Structure

    46/47

    Project Title : Senoro Gas Development Project

    Job No : 9608/SU2573

    Client : JOB Pertamina Medco E & P Tomori Sulawesi.

    Main Contractor : Tripatra-Samsung Consortium

    Sub-Contractor :

    NO WELDER NAMEWELDER

    STAMPWPS / PQR NO

    STANDARD /

    REFERENCES

    TEST

    BASE

    METAL

    JOINT

    DISEGN

    DIAMETER

    (Inch)

    TH

  • 8/10/2019 Itp Structure

    47/47

    Project Title : Senoro Gas Development Project

    Job No : 9608/SU2573

    Client : JOB Pertamina Medco E & P Tomori Sulawesi.

    Main Contractor : Tripatra-Samsung Consortium

    Sub-Contractor :

    Name

    Sign Date

    Signature

    Involvement PartySub-Contractor TSC

    WPS / PQR MATRIX

    Performed By Approved by

    NO DESCRIPTION WPS/PQR NOSTANDARD /

    REFERENCES

    TEST COUPON

    BASE

    METAL

    JOINT

    DISEGN

    DIAMETER

    (Inch)

    THICKNESS

    (mm)

    WELDING

    PROCESSESPOSITION

    WELDING

    PROGRESS

    BAS

    MET