Upload
dale-ball
View
213
Download
0
Tags:
Embed Size (px)
Citation preview
DaLin Disc Spring Starter Operation Manual
Chongqing Starting Power Unit Co. reserves the right to modify the parameters herein. For any print errors and outdated content, we will make corrections in time and update them in the latest version without prior notice.
Chongqing Starting Power Unit Co. Ltd 2
Caution
Proper installation is needed before winding and tripping
operation! Prohibit no-load energizing and releasing!
When starter is in non-working condition, always put the
trip lever in ‘Trip’ position to avoid damage of starter,
especially on twin starter engine.
Use right cranking handle to wind the starter and stop
winding once one or two red color spring occurs at the
viewing window!
Chongqing Starting Power Unit Co. Ltd 3
Table of Content
• Modifications (Inside front cover) P1
• Caution P2
• Table of content P3
• Welcome/Contacting P4
• Kit parts P5
Starter Storage P5
• Starter outside view P6
• Brief of the structure P7
• Data & Instruction Plate P8
• Installation-general P9
Attention 1 P9
Turning direction P9
Installation space P9
To be a replacement P9
• Pre Check P10
• Winding handle direction and adjustment.
P11
• Winding angle code P12
• Rear cover & pinion P13
• Groups and functions P14
• Operation P15
• Other important operations P16
Unwinding P16
Slowly crank the engine P16
Cold starting P16
• Dual starter engines P17
micro-lock switch and wiring P18
• Different flywheel housings P19
Attention 3 P19
• Trouble Shooting & Warning P20
• Starter specification P21
DL starter size P21
- Warranty (inside back cover) P22
• Back cover
Chongqing Starting Power Unit Co. Ltd 4
Welcome and Contacting
Thanks for your proper choice! DaLin (DL) Diesel engine starter serves with reliable performance. If you have
questions during installation and operation, please contact with us. The contacting information is as follow:
Chongqing Starting Power unit Co., Ltd.
Plant add : Chenjiaqiao , Shapingba , Chongqing , China Post Code : 401331 Phone: +86-23-65660596 Fax: +86-23-65660726 Sales hotline: +86-139-8309-3170 Service hotline: +86-136-0833-1945
Company add : B 10-14, Wangfujing Building, Shapingba, chongqing, China Post Code : 400030 Phone: +86-23-65304592 Fax: +86-23-65304592
Company Web-site : www.cqstart.com
Chongqing Starting Power Unit Co. Ltd 5
Kit Parts and Starter Storage
The kit parts in the starter shipping box includes pieces shown on the right table:
Part and Description No.
Winding Handle ( For easy packing, The handle is disassembled into two parts. It can be assembled again. The torque value of M10 cap screw is 13-15Nm )
1
《 Operation Manual 》 (PN230517) 1
《 Operation Instruction 》 (PN230530) 1
《 Starter View Window Color Instruction 》Sticker (PN230519) – on the body of the starter
1
Cardboard gauge for checking distance between front face of ring gear to starter mounting surface on the flywheel housing (PN230520)
1
Inspection/acceptable record (PN230521)
- It is stuck on the back of the cardboard
1
Starter Storage
• Although the starter has been anti-rusted, for long time store, the starter should be put in the area with dry andclean environment.
• Don’t energize and release the starter when it is stored on abracket!
Note: For packing purpose, the angle of the trip lever may not be proper for use. The angle can be adjusted. Torque value of lock nut is 12-14Nm.
Chongqing Starting Power Unit Co. Ltd 6
Starter outside view
A micro-lock switch is mounted here for Dual starter engines, see page 18
Chongqing Starting Power Unit Co. Ltd 7
Brief of the structure
12
3
4 5 6 7 8 9 10 11 12 13
14
1516171819
sn.
Description sn. Description sn. Description sn.
Description
1 Body 6 Spring bundle 11 Drive pinion 16 Reset knob
2 Input adaptor 7 Screw sleeve 12 Rear cover 17 Instruction plate
3 Front cover 8 Main shaft 13 Lock 18 Trip lever spring
4 Drive gear 9 Circlip 14 Lock screw 19 View window
5 Driven gear 10 Ratchet 15 Trip (release) lever 20 Data plate
20
A micro-lock switch is
mounted here
Chongqing Starting Power Unit Co. Ltd 8
Data & Instruction Plate
The data plate is on the front cover and instruction plate on the rear cover;
Trade mark on the data plate; PN : Assembly number, showing starter
Series, turning direction, angle code, etc ; SN : Serial number for individual unit of
the starter.
Trade mark
Assy Number
Serial Number
Mounting holes
Trip lever reset direction Trip lever release direction
2101 A
1 - Heavy Duty2 - HD Plus3 - Super HD4 -- HD Plus 2
1 - Clockwise, viewing toward front at flywheel end of the engine
2 - Anti- clockwise,
Application number
Turning direction
code
Series
Data plate
Instruction plate
The suffix letter is for special
requests raised by customers and changes
Chongqing Starting Power Unit Co. Ltd 9
Installation - General
It’s easy to install and operate DL starter, but you still need to read the operation manual carefully before working on it.
Turning direction : the turning direction code is shown on the data plate. please see page 8
Installation space : there should be enough space for starter installation and cranking
To replace original starter :( 1 ) Take the electric or air starter off from the engine and ensure if there is a spacer which may be used for DL starter ;( 2 ) When taking the original starter off, please check if the electrical fuel shut-off valve is closed. Electric power could be provided directly from the battery, or open the valve manually. (3)The pinion tooth number may be different between DL starter and original starter, and the center line of the rear cover may be offset for suitable engagement of the gears and larger space for starter installation.
Attention 1 : Don’t crank and release the starter before it has been properly installed on the engine! The inside parts will be damaged if the starter is energized and released without engine starting load. The warranty will be negated.
Chongqing Starting Power Unit Co. Ltd 10
Installation – Pre-check
According to design, the gap between pinion and
flywheel ring gear (B-A, see illustration below) is
about 3-5mm. Please check the depth from
starter mounting surface to the ring gear front
face through starter installation hole using
cardboard gauge. When cardboard touches the
ring gear , the green line should be at the
starter mounting surface. Or measure the gap
directly.
For check the engagement of the
gear, please make sure that the
tooth height engaged should be
larger than ½ full height of the gear
tooth.
The pinion can extend 19mm from
it’s rest position.
AB
Starter mounting surface
飞轮齿圈Ring gear
Chongqing Starting Power Unit Co. Ltd 11
Installation – Winding angle
Torque value to install starter on the engine should meet the requirement of the engine
building specification.
While the starter is mounted on the engine , the input adaptor position should be
comfortable for cranking the handle. If not, you can rebuild the assembly to change the
winding angle. Please see illustration on this page and the table on next page.
Before rebuild , please put the trip lever at ‘trip’ position.
Front cover Rear coverBody
‘0 - 0’ mark Input adaptor Trip lever
Operation Instruction plate conve
xityAlways! ......
view starter from front to rear for sequence of ‘A,B,C…’ on the front cover and ‘1,2,3….’ on the rear cover
Chongqing Starting Power Unit Co. Ltd 12
Installation 4 – Winding angle
Angl ecode
Angl eval ue °+
Angl ecode
Angl eval ue - °
1A 0 1A 02B 8. 5 6G 8. 53C 17 5F 174D 26 4E 265E 34 3D 346F 43 2C 431G 51 1B 512A 60 6A 603B 69 5G 694C 77 4F 775D 86 3E 866E 94 2D 941F 103 1C 1032G 112 6B 1123A 120 5A 1204B 129 4G 1295C 137 3F 1376D 146 2E 1461E 154 1D 1542F 163 6C 1633G 171 5B 1714A 180 4A 180
The winding angle is defined the angle between input adaptor and operation instruction plate convexity.
To meet the variation of winding angle, different screw hole segment on front and rear cover provides the possibility to make adjustment :( See illustration on page 11)
- A,B,C,D,E,F and G on the front cover sequenced clockwise (View from front to rear).
- 1 , 2 , 3 , 4 , 5 and 6 on the rear cover sequenced clockwise. (View from front to rear too).
- Angle code and angle value are shown on the right table.
Chongqing Starting Power Unit Co. Ltd 13
Installation 5 – Rear cover and pinion
Pinion parameters (modulus , pressure angle, etc. ) may be changed for different applications
Rear cover center line has two choices: concentric and offset
Concentric or offset spigot
Caution : while starter is installed on the engine, please ensure proper gear engagement to avoid parts breaking during operating. (please see page 10)
Chongqing Starting Power Unit Co. Ltd 14
Groups and functions
The functions of DL starter groups is that:
Input manual energy through
cranking group. The energy is stored
by energizing group. The releasing
group is starter control mechanism.
Pull reset knob to reset the trip lever
and ready to be energized. Push trip
lever toward trip direction to release
energy to start the engine. The first
two cranking turns is to move pinion
toward ring gear for gear
engagement. When engine is
rotating, the pinion moves backward
and gears will be disengaged
automatically by working of clutching
group.
Trip lever
Reset knob
The trip lever is at
RESET positionThe trip lever is at
TRIP position
Installation flange
Chongqing Starting Power Unit Co. Ltd 15
Operation
1. If the starter is fitted on a engine with gearbox or other power output device, ensure that the gearbox is in the neutral position.
2. Check that fuel has reached the fuel pump and fuel valve (actuator) is in the 'ON(open)' position.
3. Adjust the throttle to between 1/2 and 3/4 full open. Some electronic speed control need to reset program to enlarge minimum fuel throttle opening.
4. If there is start fuel adjust on engine speed controller, it may be necessary to adjust the fuel knob to maximum position.
5. The trip lever (with the red ball) of the starter is normally at ‘TRIP’ position. Once engine starting is needed, pull the reset knob. The trip lever will immediately spring back to its RESET position.
6. Fit right cranking handle on input adaptor and wind the handle 2 turns slowly only in a clockwise direction for fully engagement of starter pinion with flywheel ring-gear.
7. Important suggestion: Before energize the starter, please refer to <Slowly crank the engine> on next page to crank the engine about 1-2 turns, especially for cold engine that didn’t run for a long time. Wind the handle in same direction until 1 or 2 red springs are visible through the view windows (See page 21 for number of turns).
8. To start your engine, push the trip lever toward ‘TRIP’ direction through 90 degrees. If the engine does not start, repeat the above steps.
Please read < DL Starter Operation Instruction > carefully. Make sure the starter has been installed on engine properly.
Chongqing Starting Power Unit Co. Ltd 16
Other important operations
Unwinding
If fully winding is unexpected and it is necessary to de-energize the starter, simply unwind the crank handle in an anti-clockwise direction. It may be necessary, at first, to exert extra force to disengage the clutch. Continue unwinding until green springs are visible through the viewing windows. At this point the starter pinion will also retract to its rest position.
Slowly crank the engine
The DL Starter can be used to slowly crank an engine, for pre-cranking before engine cold starting or for the adjustment of valve lash, pump timing or equipment coupled to the engine. With the trip lever in the RESET position, slowly turn the winding handle clockwise about two turns. This will engage the pinion with the ring gear. Now trip the lever through 90 degrees. The reset knob will fall in and lock the trip lever in this position. The engine can now be turned with the winding handle without compressing the spring pack, and any adjustments, to the engine, may be made. Once slow cranking is completed you should pull the reset knob and either fully wind to start the engine (see Operation) or unwind to disengage the pinion (see Unwinding).
Cold Starting
When starting at ambient temperatures below 0℃, it is necessary to use some form of starting aid. Starting can be achieved through various forms of ether-assisted aids which are available in aerosol cans or as auto start kits. To cold start proceed with normal starting operation. Prior to tripping, spray the ether into the air intake, or if your engine is fitted with an auto start kit inject the ether inside the inlet manifold. If the engine fails to start, repeat the whole operation immediately.
Chongqing Starting Power Unit Co. Ltd 17
Dual starter engines
Where the engine has the facility to be operated using two starters (for example an electric starter and a DL starter), the DL starter must have its pinion disengaged from the engine flywheel when the electric starter is being used. It means that The trip lever must be in ‘TRIP’ position when using alternative starter. Please refer to the illustration on the right side.
Attention 2 : Do not attempt to start the engine with an electric or other starter while the DL Starter is wound and engaged!
Micro-lock switch
Chongqing Starting Power Unit Co. Ltd 18
On Daul starter engines, to avoid damage of the starter, the disc spring starter prepared micro-lock switch that’s mounted on the rear cover. Refer to page 6 and 7.
For wiring of the micro-lock switch, please refer to illustration on right side.
Chongqing Starting Power Unit Co. Ltd 19
Engine with different flywheel housing
One model of engine may have two or more flywheel housing which are
designed for different starter application, so that the distance between
center of starter mounting hole and the center of engine crankshaft could
be changed for various starter (electric, pneumatic or hydraulic):
1. Please refer to page 13. The DL starter is flexible to meet
the requirement of application;
2. Please refer to page 10. The pre-check should be performed
carefully to avoid starter failure during operation.
Attention 3: When DL starter replaces an original starter, please ensure that the DL starter rear cover and pinion is designed for
this application, except starter capability.
Chongqing Starting Power Unit Co. Ltd 20
Trouble shooting ( Refer to page 7)
DL Starter operation should be trouble free as long as it has been fitted correctly. On slowly turning the winding handle first two turns in a clockwise direction the input adaptor
should be rotated smoothly and causing the pinion move forward engaging with the flywheel ring gear. Further winding will cause the spring pack compressing and energizing as viewed through the viewing window on the body.
Fault Cause Action
Input adaptor could not be turned The bevel gear is broken and is locking the drive gear
Replace the bevel gear and check the drive gear for damage
Input adaptor turning is ‘stiff’ or not smooth
The lash between bevel gear and drive gear is too tight
Add or remove shim from between front cover bearing and drive gear
Input adaptor rotates but the spring core is not compressed and turned
The input shaft or the bevel gear is broken. Replace the bevel gear or input shaft
Input adaptor rotates but the pinion does not rotate and move forward
Ratchet is broken or circlip looses
Burring on shaft thread or over-rust
Change ratchet or circlip
Deburr or change the shaft
Spring core can be compressed, but discharges itself prematurely
The height of ratchet lock is incorrect
The lock or ratchet are worn
Adjust the height
Replace worn parts
Starter jams during spring core compression or fails on tripping
Worn shaft or screw sleeve causing the ball bearings to jam between them
Unwind the input adaptor until green color can be seen through view window, then disassemble.
IF starter still can’t be discharged. Please see the WARNING below.
WARNING: Do not attempt to dismantle a jammed starter as this is dangerous! Keep your fingers away from the pinion. Only lift the starter by trip lever with red ball. Contact your local expert to solve the problem.
Chongqing Starting Power Unit Co. Ltd 21
DL Starter Specification
Φ AΦ B
L
Starter application data
Starter Size (mm)
STARTER
SERIESL A B
1100 288 117 130
2100 332 117 130
4100 368 117 130
3100 368 133 143
5100 / 5200 255 117 130
HD HDP HDP2 SHD MD
1100 2100 4100 3100 5100/5200
Mounting Flange SAE # on standard 1,2 & 3 1,2 & 3 1,2 & 3 1,2 & 3 1,2 & 3
1.7 & 6 2.1 & 6 2.5 & 6 0.8 & 6
1.4 & 8 1.7 & 8 2.0 & 8 1.0 & 4
Max. Pinion torque Nm 126 126 126 167 126
Max. Winding torque Nm 100 100 100 100 100
Weight kg 18 21 23 26 16
Turns to fully wind Turns 2+8 2+11 2+13 2+15 2+6
1.4 & 6
DL starter SeriesRotating clockwise
except 5200
Diesel Engine
Displacement
Liter(l)/Cylinder
& Max cyl. number
Chongqing Starting Power Unit Co. Ltd 22
Warranty
Warranty period: One year(12 months) starting from the date shipping from our company. We can also implement warranty according to OEM’s agreement.
Warranty range: Any defect caused by starter assembly or part material and manufacturing. The starter should be properly installed and operated.
Rejection of warranty: - Failure caused by energizing and releasing before the starter properly
installed on the engine. - Failure caused by alternative starter working under the condition that
spring starter driving gear has engaged with ring gear of flywheel. - Defects cause by incorrect storage and shipment.
CHONGQING STARTING POWER UNIT CO., LTD.
Part number : 230517-05