10
CoRoT/ESTA Workshop - Aarhus - Oct. 2005 1/10 Seismology Working Group ESTA The next step in the model comparison Mário João P.F.G. Monteiro

CoRoT/ESTA Workshop - Aarhus - Oct. 2005 1/10 Seismology Working Group ESTA The next step in the model comparison Mário João P.F.G. Monteiro

Embed Size (px)

Citation preview

Page 1: CoRoT/ESTA Workshop - Aarhus - Oct. 2005 1/10 Seismology Working Group ESTA The next step in the model comparison Mário João P.F.G. Monteiro

CoRoT/ESTA Workshop - Aarhus - Oct. 2005

1/10

Seismology Working GroupESTA

The next step in the model comparison

Mário João P.F.G. Monteiro

Page 2: CoRoT/ESTA Workshop - Aarhus - Oct. 2005 1/10 Seismology Working Group ESTA The next step in the model comparison Mário João P.F.G. Monteiro

CoRoT/ESTA Workshop - Aarhus - Oct. 2005

2/10Priorities

Following the work during the workshops (Nice and Aarhus) it is now time to prepare the results to be presented in the next CoRoT Week 9 in ESTEC.

We must concentrate on the following key objectives:

• Complete Task 1 on model comparisons,

• Initiate Task 2 on frequency comparisons,

• Present the results at ESTEC.

The work to be completed over the next few weeks should be planned having these objectives in mind.

Page 3: CoRoT/ESTA Workshop - Aarhus - Oct. 2005 1/10 Seismology Working Group ESTA The next step in the model comparison Mário João P.F.G. Monteiro

CoRoT/ESTA Workshop - Aarhus - Oct. 2005

3/10

9

5

10

CoRoT Week 8 - Toulouse

CoRoT/ESTA Workshop - Nice

Joint Workshop - Aarhus

2005

Preliminary results presented for Task 1.

Updated results of Task 1 have been discussed.

12

2006

CoRoT Week 9 - ESTEC

Further iteration on models for Task 1.

FINAL WORK ON TASK 1 IS DONE AND

RESULTS PREPARED FOR PRESENTATION AND PUBLICATION

Past and near future

A dedicated session on ESTA is planned (2:30 hours) and

also a presentation about ESTA to the Seismology Working

Group.

Page 4: CoRoT/ESTA Workshop - Aarhus - Oct. 2005 1/10 Seismology Working Group ESTA The next step in the model comparison Mário João P.F.G. Monteiro

CoRoT/ESTA Workshop - Aarhus - Oct. 2005

4/10Reports for the CoRoT Community

1) Oral presentation: Status and achievements of ESTAPresentation to the Seismology Working Group on what has been done up to now on ESTA and the plans for the near future. The objective is to show everyone that ESTA is very active and productive!

2) Report on Task1 (poster): Results of the model comparison

Summary of the main results for Task 1. It should not be a detailed report but instead a grand summary of the outcome of this exercise.

3) Report on Task 2 (poster): Preliminary results of the frequency comparison

Report on the preliminary results for the frequency comparison covering the first step of this exercise.

4) Reports on comparisons (oral & poster): Results of specific comparisons

Detailed comparisons between specific codes (evolution or seismic) should also be presented on pairs of codes and on specific targets/items of particular interest.

Page 5: CoRoT/ESTA Workshop - Aarhus - Oct. 2005 1/10 Seismology Working Group ESTA The next step in the model comparison Mário João P.F.G. Monteiro

CoRoT/ESTA Workshop - Aarhus - Oct. 2005

5/101) Summary of ESTA and its results

This will be an This will be an oral presentationoral presentation on ESTA, its on ESTA, its

organization and major results obtained so far as well as organization and major results obtained so far as well as

on the plans for the near future.on the plans for the near future.

It may include a description of:It may include a description of:

• Key objectives to be fulfilled,Key objectives to be fulfilled,

• Who participates in ESTA and what tools have been Who participates in ESTA and what tools have been

involved,involved,

• Strategy and modus operandi,Strategy and modus operandi,

• Description of the Tasks already initiated and brief Description of the Tasks already initiated and brief

summary of the key results.summary of the key results.

Any suggestions and/or contributions are welcome.Any suggestions and/or contributions are welcome.

Page 6: CoRoT/ESTA Workshop - Aarhus - Oct. 2005 1/10 Seismology Working Group ESTA The next step in the model comparison Mário João P.F.G. Monteiro

CoRoT/ESTA Workshop - Aarhus - Oct. 2005

6/102) Report on Task 1

Data to be prepared: ~15 September

Calculate updated models for all targets (where necessary)

Obtain the global parameters

Obtain the detailed structure

Obtain the evolutionary sequence leading to each case

Results to be reported

Comparison of the global parameters

Comparison of the evolutionary sequences

Comparison of X and c

Estimates of the frequency differences for all cases

This report will include all

people involved on producing

models for Task 1 and working on the comparison.

Page 7: CoRoT/ESTA Workshop - Aarhus - Oct. 2005 1/10 Seismology Working Group ESTA The next step in the model comparison Mário João P.F.G. Monteiro

CoRoT/ESTA Workshop - Aarhus - Oct. 2005

7/10

Data to be prepared: ~20 September

Make available a set of reference models

Obtain the frequencies calculated with each code

Test the effect of the mesh and boundary conditions This report will

include all people involved on

producing the frequencies.

Results to be reported

Preliminary comparison of the frequencies

Identification of possible items to analyze further

3) Report on Task 2

Page 8: CoRoT/ESTA Workshop - Aarhus - Oct. 2005 1/10 Seismology Working Group ESTA The next step in the model comparison Mário João P.F.G. Monteiro

CoRoT/ESTA Workshop - Aarhus - Oct. 2005

8/104) Reports on comparisons

As many reports as possible on As many reports as possible on specific comparisonsspecific comparisons

between pairs of codes and on between pairs of codes and on particular targets or key particular targets or key

aspectsaspects of the modelling should be prepared and presented. of the modelling should be prepared and presented.

These reports can be either presented asThese reports can be either presented as

• as posters oras posters or

• as oral contributions at the thematic session as oral contributions at the thematic session

dedicated to ESTA.dedicated to ESTA.

It is important that some of the detailed work already It is important that some of the detailed work already

done on comparing pairs of models, specific aspects of the done on comparing pairs of models, specific aspects of the

physics, etc, are presented at ESTEC.physics, etc, are presented at ESTEC.

An email will be sent out to the ESTA team very soon (!) An email will be sent out to the ESTA team very soon (!)

asking for proposals for a few oral contributions to be asking for proposals for a few oral contributions to be

included in the thematic session during the CoRoT Week. included in the thematic session during the CoRoT Week.

Details will be defined with the organization of the CoRoT Details will be defined with the organization of the CoRoT

Week.Week.

Page 9: CoRoT/ESTA Workshop - Aarhus - Oct. 2005 1/10 Seismology Working Group ESTA The next step in the model comparison Mário João P.F.G. Monteiro

CoRoT/ESTA Workshop - Aarhus - Oct. 2005

9/10Publications and future work

It is now also important that the results achieved so far It is now also important that the results achieved so far

are published. Two options are available (and should both are published. Two options are available (and should both

be used):be used):

• Publication on ESTAPublication on ESTA in the CoRoT Book (to be in the CoRoT Book (to be

published by ESA) - this will include a detailed published by ESA) - this will include a detailed

description of has been done and the major implications description of has been done and the major implications

for the CoRoT community of the work developed by the for the CoRoT community of the work developed by the

ESTA Team.ESTA Team.

• Publications in journalsPublications in journals - these should focus on the - these should focus on the

details of the comparison, by reporting some of the details of the comparison, by reporting some of the

most interesting aspects that have been addressed in most interesting aspects that have been addressed in

this exercise.this exercise.

The ESTA work will proceed in 2006 (mainly focus on The ESTA work will proceed in 2006 (mainly focus on

frequency comparisons).frequency comparisons).

The model comparison will also proceed both under ESTA and The model comparison will also proceed both under ESTA and

also as a wider exercise open to all and as part of the also as a wider exercise open to all and as part of the

co-ordinated action HELAS of the European Commission.co-ordinated action HELAS of the European Commission.

Page 10: CoRoT/ESTA Workshop - Aarhus - Oct. 2005 1/10 Seismology Working Group ESTA The next step in the model comparison Mário João P.F.G. Monteiro

CoRoT/ESTA Workshop - Aarhus - Oct. 2005

10/10

All information and data will be available on the ESTA website:

http://www.astro.up.pt/corot/

The presentations and reports of this meeting will also be made available.

The development of tools for exchanging models and supporting the computation of the frequencies will continue. Please send all information that can be relevant for extending as much as possible these tools.

Stay tuned and continue calculating models and producing results on comparisons…

See you in ESTEC!