144th
meeting of OCC (22.02.2018)-Additional Agenda-1
AA 1: Contingency Plan to Meet Deficient / Excess Rainfall during Monsoon
Chief Engineer, Grid Management, CEA vide letter dated 9th Feb, 2018 has
requested RPCs to make contingency plan to meet deficient/excess rainfall during
monsoon. Copy of the letter is enclosed at Annexure – AA1.1.
In the said letter, it is inter-alia mentioned that the impact (in terms of average MW)
of various contingencies on the demand and availability in respect of each
State/UT for the months of June to September, 2018 may be estimated and an
implementable action plan be prepared for handling the contingency situations like
deficit or delayed monsoon, flooding of mines or damaging of railway network or
situation of high silt, tower collapse etc. It is also mentioned that implementable
concrete steps like identification of flexible plant outages, maintaining sufficient
Coal Stock at critical plant sites and diversion of Coal via alternate route may also
be identified and documented by each RPC
Members may discuss and provide inputs to NRPC Secretariat for
preparation of contingency plan.
144th
meeting of OCC (22.02.2018)-Additional Agenda-1
Annexure – AA1.1
उपे�� कुमार
अधी(ण अ*भयंता /चालन
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
LoA for Rs.18 Crores issued.
intuts rcvd from entities\J&K\PSDF_review
meeting_20.6.2017_annexure-I - srinagar.docx
Rs. 40 Crores contract is awarded.
intuts rcvd from entities\DVC\PSDF_review
meeting_20.6.2017_annexure-I DVC Ramgarh
Ss.docx
PSDF_STATUS OF IMPLEMENTATION_ANNEXURE_I (1).xlsx Schme wise status
Ø
Ø
Ø
Ø
Ø
Ø
Ø
Ø
.
Ø
Ø
Ø
It has already been conveyed by
Phasing plan for FGD installation ANNEXURE -13 (A)
Sr.
No.Developer Name of Project Sector State Region Unit No
Total
Capacity
DT-of
COMMISSION
ING
Phasing Plan for
FGD Installation
1 HGPCorpn PANIPAT TPS State Sector Haryana NR 6 210 31-03-2001 March-April 2021
2 HGPCorpn PANIPAT TPS State Sector Haryana NR 7 250 28-09-2004 Jan-Feb 2021
3 HGPCorpn PANIPAT TPS State Sector Haryana NR 8 250 28-01-2005 Nov-Dec 2020
4 HGPCorpn RAJIV GANDHI TPS State Sector Haryana NR 1 600 31-03-2010 March-April 2022
5 HGPCorpn RAJIV GANDHI TPS State Sector Haryana NR 2 600 01-10-2010 Jan-Feb 2022
6 HGPCorpn YAMUNA NAGAR TPS State Sector Haryana NR 1 300 01-11-2007 Nov-Dec 2021
7 HGPCorpn YAMUNA NAGAR TPS State Sector Haryana NR 2 300 29-03-2008 Sept-Oct 2021
8 NTPC INDIRA GANDHI STPP Central Sector Haryana NR 1 500 31-10-2010 Sept-Oct 2020
9 NTPC INDIRA GANDHI STPP Central Sector Haryana NR 2 500 05-11-2011 March-April 2020
10 NTPC INDIRA GANDHI STPP Central Sector Haryana NR 3 500 07-11-2012 Jan-Feb 2020
11 GVK Power Ltd. GOINDWAL SAHIB Private Sector Punjab NR 1 270 14-02-2016 March-April 2020
12 GVK Power Ltd. GOINDWAL SAHIB Private Sector Punjab NR 2 270 15-03-2016 Jan-Feb 2020
13 L&T PDL (Nabha) Nabha TPP (Rajpura TPP) Private Sector Punjab NR 1 700 24-01-2014 March-April 2021
14 L&T PDL (Nabha) Nabha TPP (Rajpura TPP) Private Sector Punjab NR 2 700 06-07-2014 Jan-Feb 2021
15 PSEB GH TPS (LEH.MOH.) State Sector Punjab NR 1 210 29-12-1997 March-April 2022
16 PSEB GH TPS (LEH.MOH.) State Sector Punjab NR 2 210 16-10-1998 March-April 2022
17 PSEB GH TPS (LEH.MOH.) State Sector Punjab NR 3 250 03-01-2008 Jan-Feb 2022
18 PSEB GH TPS (LEH.MOH.) State Sector Punjab NR 4 250 31-07-2008 Jan-Feb 2022
19 TSPL TALWANDI SABO TPP Private Sector Punjab NR 1 660 17-06-2014 Jan-Feb 2021
20 TSPL TALWANDI SABO TPP Private Sector Punjab NR 2 660 25-10-2015 Nov-Dec 2020
21 TSPL TALWANDI SABO TPP Private Sector Punjab NR 3 660 29-03-2016 Sept-Oct 2020
22 Adani Power Ltd. KAWAI TPS Private Sector Rajasthan NR 1 660 28-05-2013 July-Aug 2020
23 Adani Power Ltd. KAWAI TPS Private Sector Rajasthan NR 2 660 24-12-2013 May-June 2020
24 RRVUNL CHHABRA TPP State Sector Rajasthan NR 1 250 30-10-2009 Nov-Dec 2021
25 RRVUNL CHHABRA TPP State Sector Rajasthan NR 2 250 04-05-2010 Sept-Oct 2021
26 RRVUNL CHHABRA TPP State Sector Rajasthan NR 3 250 14-09-2013 July-Aug 2021
27 RRVUNL CHHABRA TPP State Sector Rajasthan NR 4 250 30-06-2014 July-Aug 2021
28 RRVUNL CHHABRA TPP State Sector Rajasthan NR 5 660 04-04-2017 March-April 2020
29 RRVUNL KALISINDH TPS State Sector Rajasthan NR 1 600 02-05-2014 May-June 2021
30 RRVUNL KALISINDH TPS State Sector Rajasthan NR 2 600 06-06-2015 March-April 2021
31 RRVUNL KOTA TPS State Sector Rajasthan NR 5 210 26-03-1994 Nov-Dec 2022
32 RRVUNL KOTA TPS State Sector Rajasthan NR 6 195 30-07-2003 Nov-Dec 2022
33 RRVUNL KOTA TPS State Sector Rajasthan NR 7 195 30-08-2009 Sept-Oct 2022
34 RRVUNL SURATGARH TPS State Sector Rajasthan NR 1 250 10-05-1998 Nov-Dec 2022
35 RRVUNL SURATGARH TPS State Sector Rajasthan NR 2 250 28-03-2000 Sept-Oct 2022
36 RRVUNL SURATGARH TPS State Sector Rajasthan NR 3 250 29-10-2001 July-Aug 2022
37 RRVUNL SURATGARH TPS State Sector Rajasthan NR 4 250 25-03-2002 May-June 2022
38 RRVUNL SURATGARH TPS State Sector Rajasthan NR 5 250 30-06-2003 March-April 2022
39 RRVUNL SURATGARH TPS State Sector Rajasthan NR 6 250 29-08-2009 Jan-Feb 2022
40 Lalitpur Power Gen. Co LALITPUR TPS Private Sector Uttar Pardesh NR 2 660 08-01-2016 Jan-Feb 2021
41 Lalitpur Power Gen. Co LALITPUR TPS Private Sector Uttar Pardesh NR 3 660 01-04-2016 Sept-Oct 2020
42 Lalitpur Power Gen. Co. LALITPUR TPS Private Sector Uttar Pardesh NR 1 660 26-03-2016 Nov-Dec 2020
43 Lanko Anpara Pow Ltd ANPARA C TPS Private Sector Uttar Pardesh NR 1 600 12-10-2011 July-Aug 2022
44 Lanko Anpara Pow Ltd ANPARA C TPS Private Sector Uttar Pardesh NR 2 600 18-01-2012 May-June 2022
45 NTPC DADRI (NCTPP) Central Sector Uttar Pardesh NR 1 210 21-12-1991 Nov-Dec 2020
46 NTPC DADRI (NCTPP) Central Sector Uttar Pardesh NR 2 210 18-12-1992 Sept-Oct 2020
47 NTPC DADRI (NCTPP) Central Sector Uttar Pardesh NR 3 210 23-03-1993 July-Aug 2020
48 NTPC DADRI (NCTPP) Central Sector Uttar Pardesh NR 4 210 24-03-1994 May-June 2020
49 NTPC DADRI (NCTPP) Central Sector Uttar Pardesh NR 5 490 25-01-2010 March-April 2020
50 NTPC DADRI (NCTPP) Central Sector Uttar Pardesh NR 6 490 16-07-2010 Jan-Feb 2020
51 NTPC RIHAND STPS Central Sector Uttar Pardesh NR 1 500 31-03-1988 Jan-Feb 2022
52 NTPC RIHAND STPS Central Sector Uttar Pardesh NR 2 500 05-07-1989 Nov-Dec 2021
53 NTPC RIHAND STPS Central Sector Uttar Pardesh NR 3 500 31-01-2005 Sept-Oct 2021
54 NTPC RIHAND STPS Central Sector Uttar Pardesh NR 4 500 24-09-2005 March-April 2021
55 NTPC RIHAND STPS Central Sector Uttar Pardesh NR 5 500 25-05-2012 Jan-Feb 2021
56 NTPC RIHAND STPS Central Sector Uttar Pardesh NR 6 500 17-10-2013 Nov-Dec 2020
57 NTPC SINGRAULI STPS Central Sector Uttar Pardesh NR 1 200 14-02-1982 Nov-Dec 2021
58 NTPC SINGRAULI STPS Central Sector Uttar Pardesh NR 2 200 25-11-1982 Nov-Dec 2021
59 NTPC SINGRAULI STPS Central Sector Uttar Pardesh NR 3 200 28-03-1983 July-Aug 2021
60 NTPC SINGRAULI STPS Central Sector Uttar Pardesh NR 4 200 02-11-1983 July-Aug 2021
61 NTPC SINGRAULI STPS Central Sector Uttar Pardesh NR 5 200 26-02-1984 March-April 2021
62 NTPC SINGRAULI STPS Central Sector Uttar Pardesh NR 6 500 23-12-1986 Jan-Feb 2021
63 NTPC SINGRAULI STPS Central Sector Uttar Pardesh NR 7 500 24-11-1987 Nov-Dec 2020
64 NTPC UNCHAHAR TPS Central Sector Uttar Pardesh NR 1 210 21-11-1988 Nov-Dec 2022
65 NTPC UNCHAHAR TPS Central Sector Uttar Pardesh NR 2 210 22-03-1989 Nov-Dec 2022
66 NTPC UNCHAHAR TPS Central Sector Uttar Pardesh NR 3 210 27-01-1999 Sept-Oct 2022
67 NTPC UNCHAHAR TPS Central Sector Uttar Pardesh NR 4 210 22-10-1999 Sept-Oct 2022
68 NTPC UNCHAHAR TPS Central Sector Uttar Pardesh NR 5 210 28-09-2006 March-April 2022
69 NTPC UNCHAHAR TPS Central Sector Uttar Pardesh NR 6 500 31-03-2017 July-Aug 2020
70 Prayagraj PGCL PRAYAGRAJ TPP Private Sector Uttar Pardesh NR 1 660 25-12-2016 March-April 2020
71 Prayagraj PGCL PRAYAGRAJ TPP Private Sector Uttar Pardesh NR 2 660 06-09-2015 May-June 2020
72 Prayagraj PGCL PRAYAGRAJ TPP Private Sector Uttar Pardesh NR 3 660 22-05-2017 Jan-Feb 2020
73 Rosa Power Supply Co ROSA TPP Ph-I Private Sector Uttar Pardesh NR 1 300 10-02-2010 Nov-Dec 2021
74 Rosa Power Supply Co ROSA TPP Ph-I Private Sector Uttar Pardesh NR 2 300 26-06-2010 Nov-Dec 2021
75 Rosa Power Supply Co ROSA TPP Ph-I Private Sector Uttar Pardesh NR 3 300 28-12-2011 Sept-Oct 2021
76 Rosa Power Supply Co ROSA TPP Ph-I Private Sector Uttar Pardesh NR 4 300 28-03-2012 Sept-Oct 2021
77 UPRVUNL ANPARA TPS State Sector Uttar Pardesh NR 1 210 24-03-1986 Sept-Oct 2022
78 UPRVUNL ANPARA TPS State Sector Uttar Pardesh NR 2 210 28-02-1987 July-Aug 2022
79 UPRVUNL ANPARA TPS State Sector Uttar Pardesh NR 3 210 12-03-1988 May-June 2022
80 UPRVUNL ANPARA TPS State Sector Uttar Pardesh NR 4 500 19-07-1993 March-April 2022
81 UPRVUNL ANPARA TPS State Sector Uttar Pardesh NR 5 500 04-07-1994 Jan-Feb 2022
82 UPRVUNL ANPARA TPS State Sector Uttar Pardesh NR 6 500 08-06-2015 May-June 2021
83 UPRVUNL ANPARA TPS State Sector Uttar Pardesh NR 7 500 06-03-2016 March-April 2021
84 UPRVUNL HARDUAGANJ TPS State Sector Uttar Pardesh NR 8 250 27-09-2011 Nov-Dec2021
85 UPRVUNL HARDUAGANJ TPS State Sector Uttar Pardesh NR 9 250 25-05-2012 Sept-Oct 2021
86 UPRVUNL OBRA TPS State Sector Uttar Pardesh NR 9 200 26-10-1980 July-Aug 2022
87 UPRVUNL OBRA TPS State Sector Uttar Pardesh NR 10 200 14-01-1979 Sept-Oct 2022
88 UPRVUNL OBRA TPS State Sector Uttar Pardesh NR 11 200 31-12-1977 Nov-Dec 2022
89 UPRVUNL OBRA TPS State Sector Uttar Pardesh NR 12 200 28-03-1981 May-June 2022
90 UPRVUNL OBRA TPS State Sector Uttar Pardesh NR 13 200 21-07-1982 March-April 2022
91 UPRVUNL PARICHHA TPS State Sector Uttar Pardesh NR 3 210 29-03-2006 March-April 2022
92 UPRVUNL PARICHHA TPS State Sector Uttar Pardesh NR 4 210 28-12-2006 March-April 2022
93 UPRVUNL PARICHHA TPS State Sector Uttar Pardesh NR 5 250 24-05-2012 Jan-Feb 2022
94 UPRVUNL PARICHHA TPS State Sector Uttar Pardesh NR 6 250 11-03-2013 Nov-Dec 2021
95 CLP MAHATMA GANDHI TPS Private Sector Haryana NR 1 660 12-01-2012 Dec 18 -Jan 19
96 CLP MAHATMA GANDHI TPS Private Sector Haryana NR 2 660 11-04-2012 Dec 18 -Jan 19
TOTAL CAPACITY 36230 MW
(96 Units)
Annexure-1
Deviation from schedule of states for 31.01.2018.
Annexure-2
NTPC Dadri Thermal MVAR vs voltage January 18
Koldam MVAr Scatter plots January 2018
S. NO. Element NameNo. of forced
outagesUtility/ SLDC
Outage
Date
Outage
TimeReason/Remarks
07-Jan-18 23:10R-N Fault, 2.71kms (Z-1) from Bikaner; As per PMU data, Y-N fault observed.
A/R observed in 1400ms.
08-Jan-18 3:54 R-N Fault; As per PMU data, Y-N fault observed.
22-Jan-18 21:52R-N Fault, 5.1kms from Bikaner (Z-1); As per PMU data, Y-N fault observed. A/R
observed in 1400ms.
31-Jan-18 19:41 R-N Fault; As per PMU data, Y-N fault observed. A/R observed in 1400ms.
01-Jan-18 1:47 R-N fault; As per PMU data, Delayed fault clearance during A/R time
04-Jan-18 0:55
Phase to earth fault. R-N fault, 154.1km from Panchkula end & 1 km from
Panipat end. Tripped during dense fog; As per PMU data, Delayed fault
clearance during A/R time
05-Jan-18 3:12 Phase to phase fault; As per PMU data, Y-N fault. No A/R observed
05-Jan-18 4:16Phase to phase fault. Line under patroling; As per PMU data, Delayed fault
clearance during A/R time
05-Jan-18 9:55 Fault at Heerapura end; As per PMU data, No fault observed
05-Jan-18 15:14 R-Y Fault; As per PMU data, No fault observed
12-Jan-18 17:05 Distance protection operated; As per PMU data, No fault observed
14-Jan-18 16:01R-N Fault, 16 km from Heerapura; As per PMU data, R-N fault. No A/R
observed. Delayed fault clearing time (200ms)
01-Jan-18 22:45 Y-N Fault,155.6 km from Unnao; As per PMU data, R-N fault. Unsuccessful A/R
20-Jan-18 3:32Y-N Fault, dist. 47.1 Km (from Bareilly); As per PMU data, Y-N fault. Successful
A/R
20-Jan-18 22:19 Distance protection operated; As per PMU data, Y-N fault. Successful A/R
25-Jan-18 7:06Y-N Fault, at a distance of 239 km from Unnao; As per PMU data, Y-N fault
occurred. No fault in dead time.
13-Jan-18 7:16Tripped along with pole2 (BNC) & Pole4(ALDP) due to station ground over
couurent
13-Jan-18 11:21 Protection indication received from Alipurdwar
13-Jan-18 17:35 Tripped with pole-1
03-Jan-18 15:12 due to CT blast of AC filter bank at BNC end
13-Jan-18 7:16Tripped along with pole2 (BNC) & Pole4(ALDP) due to station ground over
couurent
13-Jan-18 10:06 Buchholz alarm received at Agra
06-Jan-18 0:06 Y-N Fault.6 km from Unnao; As per PMU data, Y-N fault. Successful A/R
20-Jan-18 11:33 Pole discrepancy at Agra UP; As per PMU data, No fault observed
24-Jan-18 11:20 R-N Fault; As per PMU data, R-N fault. Successful A/R
12-Jan-18 17:20 86A operated at Akal end. Line tripped only at Akal
14-Jan-18 1:10Distance protection operated. ZONE-II, B - N fault , 179.5 Km distance; As per
PMU data, Y-N fault occurred. No fault in dead time.
17-Jan-18 11:55 DIrect Trip received at Jodhpur end; As per PMU data, No fault observed
Annexure-4
2 400kV Panchkula (PG) - Panipat (BBMB) 4 BBMB
1 400kV Bikaner(RRVPNL)-Suratgarh(RRVPNL) 4 Rajasthan
8 400kV Akal(RRVPNL)-Jodhpur(RRVPNL) 3 Rajasthan
3 400kV Bassi(PG)-Heerapura(RVPNL) ckt-2 4
7 400kV Agra(UP)-Unnao(UP) 3
5 500kV Agra - Biswanath Cherialli line -1 3
UP
POWERGRID
4 400kV Bareilly(UP)-Unnao(UP) ckt-1 4
UP
3 POWERGRID
POWERGRID
6 500kV Agra - Biswanath Cherialli line -2
S. NO. Element NameNo. of forced
outagesUtility/ SLDC
Outage
Date
Outage
TimeReason/Remarks
01-Jan-18 22:54 Phase to earth fault; As per PMU data, Y-N fault. Successful A/R
02-Jan-18 5:00 Phase to earth fault
12-Jan-18 16:52 Busbar protection of Bus-1 operated; As per PMU data, No fault observed
05-Jan-18 14:18 Y-B Fault. 218 (Z-2) kms from Anpara; As per PMU data, Y-B fault
05-Jan-18 16:42 Y-N Fault; As per PMU data, Y-N fault occurred. No fault in dead time.
16-Jan-18 6:06 R-N Fault.12.3km from Mau end; As per PMU data, R-N fault. Successful A/R
01-Jan-18 1:00 B-N Fault; As per PMU data, B-N fault. Unsuccessful A/R
20-Jan-18 8:46Abnormal sound found from wave trap of Bay No 402(Baghpat-Saharanapur
Line); As per PMU data, No fault observed
26-Jan-18 22:29DT received at Saharanpur end. Attepmt taken at 23:18hrs, but line did tripped
on SOTF. Details awaited; As per PMU data, No fault observed
04-Jan-18 19:07Backup impedance relay operated at Hinduan; As per PMU data, No fault
observed
17-Jan-18 23:47 Phase to earth fault; As per PMU data, Y-N fault. Successful A/R
18-Jan-18 2:42Y-B Phase at 271.8 km from Hindaun; As per PMU data, Y-N fault. Successful
A/R
03-Jan-18 15:13 Due to commutation failure at Kuruksherta end.
27-Jan-18 15:35 Valve cooling System Failure at champa end.
31-Jan-18 19:00 Tripped due to problem in transformer tap-changer at Champa end.
05-Jan-18 3:12 Phase to earth fault; As per PMU data, B-N fault. No A/R observed
06-Jan-18 5:02 Tripped on High voltage; As per PMU data, R-N fault. Successful A/R
06-Jan-18 6:31 R-N Fault, 106.8 Km From dadri end; As per PMU data, No fault observed
15-Jan-18 5:55Tripped from Dehar end only. Details awaited; As per PMU data, No fault
observed
22-Jan-18 5:33Over voltage. at Dehar end, as reported by BBMB.; As per PMU data, No fault
observed
31-Jan-18 6:06 Relay maloperation; As per PMU data, No fault observed
10-Jan-18 15:20
R-N Fault during OPGW works, due to excess loop while removing existing old
Earth Wire between tower no. 144 to 145; As per PMU data, R-N fault. No A/R
observed
17-Jan-18 19:11
R-N fault, 26km (from Hamirpur end). It was reported by CPCC, NR-2 that OPGW
working was going on in the said line; As per PMU data, R-N fault. No A/R
observed
22-Jan-18 12:15R-N fault, 52km (from Banala end); As per PMU data, R-N fault. No A/R
observed
03-Jan-18 13:03B-N Fault. 17kms from Ratangarh. line taken under S/D w.e.f. 0932Hrs of 4.1.18;
As per PMU data, Y-N fault. No A/R observed
21-Jan-18 2:35 R-N fault; As per PMU data, B-N fault. No A/R observed
28-Jan-18 21:27R-N Fault, 22.3 Km From Ratangarh end; As per PMU data, B-N fault. No A/R
observed
07-Jan-18 3:12 B-N fault; As per PMU data, Y-N fault. No A/R observed
08-Jan-18 1:58R-N fault. 53.4kms (Z-1) from Ratangarh; As per PMU data, B-N fault. No A/R
observed
16-Jan-18 0:51 Y-N fault; As per PMU data, Y-N fault. No A/R observed
15
16
17
18400kV Ratangarh(RRVPNL)-
Suratgarh(RRVPNL) ckt-2
400kV Dehar (BBMB) - Panchkula (PG)
400kV Hamirpur(PG) -Banala(PG) ckt-1
400kV Ratangarh(RRVPNL)-
Suratgarh(RRVPNL) ckt-1
3
POWERGRID/NTPC/
BBMB
BBMB/POWERGRID
POWERGRID
Rajasthan
Rajasthan
3
3
3
POWERGRID
400kV Dadri(NTPC)-Panipat(BBMB) ckt-2 314
11 400kV Baghpat(PG)-Saharanpur(PG) 3 POWERGRID
12 400kV Chabra(RVUNL)-Hindaun(RRVPNL) 3 Rajasthan
13 800kV Champa(WR) - Kurukshetra(PG) line -2 3
UP
10 400kV Anpara(UP)-Mau(UP) 3 UP
9 400kv Aligarh(UP)-Mainpuri 765(UP) ckt-2 3
Outage
Duration
Date Time Date Time Timewithin
24hrs
after
24hrs
Not
Received
within
24hrs
after
24hrs
Not
Received
Receive
d
Not
Received
1 NR
1.400/220 kV Panipat 450 MVA
ICT 2
2.400/220 kV Panipat 450 MVA
ICT 1
3.220 kV Panipat-Narela 3
4.220 kV Panipat TPS(HVPNL)-
Panipat(BBMB) 1
5.220 kV Panipat TPS(HVPNL)-
Panipat(BBMB) 4
6.220 kV Panipat-Narela 2
7.220 kV panipat-Dhulkote 1
8.220 kV panipat-Dhulkote 2
9.220 kV panipat-Kurukshetra
10.220 kV panipat-Charkhi
Dadri
11.220 kV Panipat-Narela 1
12.220kV Panipat-Chhajpur 2
BBMB 01-Jan-18 0:30 01-Jan-18 0:55 0:25
R phase to earth fault occurred on
220kV Panipat-Chhajpur ckt 2.Besides
the operation of Line protection, Bus
bar protection operated on 220kV Bus
of Panipat station and caused complete
outage of 220kV Panipat station
From PMU, Max dip observed in R
phase.
0 220 GD-1 0.09Y
(BBMB)/
Y(DTL)
Y
(BBMB)
/
Y(DTL)
Y(BBMB)
/
Y(DTL)
80
2 NR
1.220 kV Mandola(PG)-
Narela(DTL) 1
2.220 kV Mandola(PG)-
Narela(DTL) 2
DTL 04-Jan-18 5:07 04-Jan-18 10:41 5:34
Due to fog, 220kV Mandola-Wazirabad
ckt-2(03:35) & ckt-4 (05:16), 220kV
Bawana-Kanjhawala D/C(03:43), 220kV
BTPS-Mehrauli ckt-2(05:35), 220kV
Narela-Rohtak ckt-2(04:57)& 220kV
Mandola-Narela Ckt 1 & 2 (05:07)
tripped
0 50 GD1 0.01 Y(DTL) Y(DTL) Y(DTL)
3 NR
1.400 kV Bawana(GT)-Bhiwani
(PG)
2.400 kV Bahadurgarh(PG)-
Bawana(GT)
3.400 kV Abdullapur(PG)-
Bawana(DTL) 1
4.400 kV Bawana(DTL)-
Mandola(PG) 1
5.400 kV Bawana(DTL)-
Mandola(PG) 2
6.400 kV Bawana(DTL)-
Dipalpur(HVPNL)
PG/DTL 06-Jan-18 8:27 06-Jan-18 9:49 1:22
Flashing occurred in Y-ph wave trap of
400 KV Bawana-Dipalpur line at
Bawana station. Which caused the
complete outage of Bawana (DTL)
station
From PMU,Max dip observed in Y
phase and fault clearing time approx
560msec
250 600 GD1 0.02Y(DTL)/
Y
(Haryana)
Y(DTL)/
Y
(Haryana)
Y(DTL) 560
4 NR
1.400 kV Aligarh - Panki
2.400 kV Aligarh(UP)-
Sikandrabad 400(UP) 1
3.400 kV Aligarh - Muradnagar -
1
4.400 kV Aligarh(UP)-Mainpuri
765(UP) 2
5.400 kV Aligarh (UP) 400 kV
Bus 1
UPPTCL 12-Jan-18 16:52 12-Jan-18 18:08 1:16
Busbar protection of Bus-1 operated at
400kV Aligarh station caused tripping
of multiple elements at 400kV Aligarh
station
From PMU, No fault observed
0 0 GI2 0.00 Y(UP) Y(UP) Y(UP)no fault
observed
5 NR
1.400 kV Sarnath(UP)-
Varanasi(PG) 2
2.400 kV Anpara-Sarnath 1
PGCIL/
UPPTCL14-Jan-18 15:20 14-Jan-18 16:23 1:03
400kV Sarnath-Varnasi and 400kV
Anpara-Sarnath ckt 1 tripped on RY
fault.
From PMU, Max dip observed in R & Y
phase. Fault clearing time approx
1000msec
0 0 GI2 0.00 Y(UP) Y(PG) Y(UP) Y(UP) 1000
Energy
Unserved
(in MU)
Preliminary Report DR/EL Detailed ReportFault
Clearance
time
(msec)
Annexure-5Major Grid Events for Jan, 2018_Northern Region
S.
No.Region
Name of Elements
(Tripped/Manually opened)
Owner /
Agency
Outage RevivalEvent
(As reported)
Generation
Loss (MW)
Load
Loss
(MW)
Category
as per CEA
Grid
Standards
Outage
Duration
Date Time Date Time Timewithin
24hrs
after
24hrs
Not
Received
within
24hrs
after
24hrs
Not
Received
Receive
d
Not
Received
Energy
Unserved
(in MU)
Preliminary Report DR/EL Detailed ReportFault
Clearance
time
(msec)
Major Grid Events for Jan, 2018_Northern Region
S.
No.Region
Name of Elements
(Tripped/Manually opened)
Owner /
Agency
Outage RevivalEvent
(As reported)
Generation
Loss (MW)
Load
Loss
(MW)
Category
as per CEA
Grid
Standards
6 NR
1.400 kV Bassi(PG)-
Heerapura(RVPNL) 2
2.400/220 kV Heerapura 250
MVA ICT-1
3.400/220 kV Heerapura 250
MVA ICT-3
PGCIL/
RVPNL14-Jan-18 16:01 14-Jan-18 16:59 0:58
LBB (Local Breaker Backup) operated
at 400kV Heerapura, leads to tripping
of multiple elements.
From PMU, Max dip observed in R
phase and fault clearing time approx
200msec
0 0 GI2 0.00Y(Rajasth
an)
Y(Rajast
han)
Y(Rajasth
an)200
7 NR
1.400/220 kV Azamgarh 500
MVA ICT-2
2.400/220 kV Azamgarh
315MVA ICT-1
UPPTCL 17-Jan-18 23:57 18-Jan-18 0:51 0:54
220kV backup earth fault protection
operated at Azamgarh station and
caused tripping of 500MVA and
315MVA ICT of Azamgarh station
From PMU, Max dip observed in R
phase.
0 450 GD1 0.01 Y(UP) Y(UP) Y(UP) 80
8 NR
1.220 kV Bhiwadi(PG)-
Bhiwadi(RVPNL) 2
2.220 kV Bhiwadi(PG)-
Bhiwadi(RVPNL) 1
3.500 kV HVDC Balia-Bhiwadi
Pole 2
4.400/220 kV Bhiwadi 315
MVA ICT 1
5.400/220 kV Bhiwadi 315
MVA ICT 2
6.220 kV Bhiwadi(PG)-
Kushkhera(RVPNL) 2
7.220 kV Bawal(HVPNL)-
Bhiwadi(PG) 1
8.220 kV Bhiwadi (PG) 220kV
Bus 2
PGCIL/
RVPNL22-Jan-18 10:33 22-Jan-18 10:54 0:21
R-ph jumper of 220kV Bhiwadi(PG)-
Bhiwadi(Raj) ckt 1 snapped at
Bhiwadi(Raj) end, which caused the
operation of Bus-Bar protection at
220kV Bus-2 of Bhiwadi(PG) leads to
tripping of multiple elements at
400/220kV Bhiwadi station along with
HVDC 500kV Balia-Bhiwadi.
0 0 GI2 0.00Y(Rajasth
an)
Y(PG) Y(Rajast
han)
Y(PG) Y(Rajasth
an)
Y(PG)120
9 NR
1.400 kV Bahadurgarh(PG)-
Bawana(GT)
2.400 kV Bawana-Bawana(GT)
1
3.400 kV Bawana 400 kV Bus 2
PGCIL 28-Jan-18 6:01 28-Jan-18 15:25 9:24
Bus bar protection operated on earth
fault at 400kV Bawana CCGT station,
leads to tripping of multiple elements
at 400kV Bawana CCGT station
From PMU, Max dip observed in Y
phase
0 0 GI2 0.00 Y(DTL) Y(DTL) Y(DTL) 80
10 NR
1.400 kV Bhiwani (PG) - Hisar
(PG) - 3
2.400 kV Bhiwani (PG) - Hisar
(PG) - 2
PGCIL 28-Jan-18 7:34 28-Jan-18 8:23 0:49
400kV Bhiwani Hissar ckt 2 & 3 tripped
on earth fault
From PMU, Max dip observed in Y
phase.
0 0 GI2 0.00Y(PG) Y(PG) Y(PG)
80
Date Time Date Time
1220 kV Auraiya(NTPC)-
Malanpur(PG)NTPC
03-01-
20180:19
220 kV Auraiya(NTPC)-Malanpur(PG)
tripped on R-N fault, dist. 4.85km
from Malanpur end & 82km from
Auraiya end.
03-01-
201810:02 No No
No PMU data
available
2 765 kV Agra-Gwalior -2 PGCIL03-01-
20184:03
765 kV Agra-Gwalior -2 tripped on R-N
fault, dist. 85km from Gawalior end;
dist.
03-01-
20185:16 No No
3
800 kV HVDC Agra -
Biswanath Cherialli line -
2
PGCIL03-01-
201815:12
800 kV HVDC Agra - Biswanath Cherialli
line -2 tripped, due to CT blast of AC
filter bank at BNC end
03-01-
201819:39 No No
4
800 kV HVDC
Champa(WR) -
Kurukshetra(NR) line -1
PGCIL06-01-
201815:50
800 kV HVDC Champa(WR) -
Kurukshetra(NR) line -1 tripped on
external block from Champa end { pole
DC Differential operated}
06-01-
201817:12 No No No fault observed
5
500 kV HVDC
Vindhyachal HVDC BtB
Block 1
PGCIL06-01-
201817:35
500 kV HVDC Vindhyachal HVDC BtB
Block 1 tripped on over current
protection.
06-01-
201818:29 No No
Damped
oscillations
observed
6220 kV Auraiya(NTPC)-
Malanpur(PG)NTPC
07-01-
20187:02
220 kV Auraiya(NTPC)-Malanpur(PG)
tripped on Phase to earth fault. Y-N
Fault.
07-01-
20187:27 No No
No Auto reclosure
observed
7
500 kV HVDC
Vindhyachal HVDC BtB
Block 1
PGCIL09-01-
201819:53
500 kV HVDC Vindhyachal HVDC BtB
Block 1 tripped on DC Over Current
protection
09-01-
201821:47 No No No fault observed
8
500 kV HVDC
Mohindergarh-Mundra
Pole 1
APL10-01-
201812:40
500 kV HVDC Mohindergarh-Mundra
Pole 1 tripped on Control malfunction.
10-01-
201813:56 No No No fault observed
9
800 kV HVDC Agra -
Biswanath Cherialli line -
2
PGCIL13-01-
20187:16
800 kV HVDC Agra - Biswanath Cherialli
line 1&2 tripped due to station
ground over current at Alipurduar
station
GI213-01-
20187:59 No No
No fault observed,
possible tripped
from Other end
10
800 kV HVDC Agra -
Biswanath Cherialli line -
1
PGCIL13-01-
20187:16
800 kV HVDC Agra - Biswanath Cherialli
line 1&2 tripped due to station
ground over current at Alipurduar
station
GI213-01-
201810:43 No No
No fault observed,
possible tripped
from Other end
11
800 kV HVDC Agra -
Biswanath Cherialli line -
2
PGCIL13-01-
201810:06
800 kV HVDC Agra - Biswanath Cherialli
line -2 tripped on Buchholz alarm,
received at Agra
13-01-
201818:09 No No
Annexure-6
List of Tripping of Inter Regional Lines for the month of Jan 2018_Northern Region
S. No.Name of Transmission
Element Tripped
Owner/
Utility
Outage
Load
Loss/
Gen. Loss
Brief Reason
(As reported)
Category as per
CEA Grid
standards
Restoration # Fault Clearance
Time
(>100 ms for 400
kV and 160 ms for
220 kV)
*FIR Furnished
(YES/NO)
DR/EL
provided
in 24 hrs
(YES/NO)
Other Protection
Issues and Non
Compliance
(From PMU, seems
)
Remedial
ActionRemarks
Date Time Date Time
List of Tripping of Inter Regional Lines for the month of Jan 2018_Northern Region
S. No.Name of Transmission
Element Tripped
Owner/
Utility
Outage
Load
Loss/
Gen. Loss
Brief Reason
(As reported)
Category as per
CEA Grid
standards
Restoration # Fault Clearance
Time
(>100 ms for 400
kV and 160 ms for
220 kV)
*FIR Furnished
(YES/NO)
DR/EL
provided
in 24 hrs
(YES/NO)
Other Protection
Issues and Non
Compliance
(From PMU, seems
)
Remedial
ActionRemarks
12
800 kV HVDC Agra -
Biswanath Cherialli line -
1
PGCIL13-01-
201811:21
800 kV HVDC Agra - Biswanath Cherialli
line -1 tripped, Protection indication
received from Alipurduar
13-01-
201812:05 No No No fault observed
1 restart attemt
observed
13
800 kV HVDC Agra -
Biswanath Cherialli line -
1
PGCIL13-01-
201817:35
800 kV HVDC Agra - Biswanath Cherialli
line -1 tripped, Protection indication
received from Alipurduar
13-01-
201818:05 No No No fault observed
1 restart attemt
observed
14
800 kV HVDC Agra -
Biswanath Cherialli line -
1
PGCIL16-01-
201820:29
800 kV HVDC Agra - Biswanath Cherialli
line -1 tripped, during change of
power flow direction from BNC to Agra
to Agra to BNC
16-01-
201820:41 No No No fault observed
15220 kV Badod(MP)-
Sakatpura(RVPNL)RRVPNL
28-01-
201822:36
220 kV Badod(MP)-Sakatpura(RVPNL)
tripped on distance protection.( R-
Phase, 22 KM from Kota)
29-01-
201817:30 Yes Yes
No Auto reclosure
observed
1
Fault Clearance
time(>100ms for 400kV
and >160ms for 220kV)
2DR/EL Not provided in
24hrs
3 FIR Not Furnished
4Protection System
Mal/Non Operation
5 A/R not operation
# Fault Clearance time has been computed using PMU Data from nearest node available and/or DR provided by respective utilities
1. CEA Technical Standard of Electrical Plants and Electric Lines: 43.4.C 2. CEA Technical Planning Criteria
*Yes, if written Preliminary report furnished by constituent(s)
Reporting of Violation of Regulation for various issues for above tripping
1. CEA Grid Standard-3.e 2. CEA Transmission Planning Criteria
1. IEGC 5.2(r) 2. CEA Grid Standard 15.3
1. IEGC 5.9.6.a 2. CEA Grid Standard 12.2 (Applicable for SLDC, ALDC only)
1. CEA Technical Standard of Electrical Plants and Electric Lines: 43.4.A 2. CEA (Technical Standards for connectivity to the Grid) Regulation, 2007: Schedule Part 1. (6.1, 6.2, 6.3)
Voltage
setting
stage I (%)
Time
delay
(sec)
Voltage
setting
stage 2 (%)
Time
delay
(sec)
Voltage
setting
stage I (%)
Time
delay
(sec)
Voltage
setting
stage 2 (%)
Time
delay
(sec)
A. POWERGRID
1 Agra-Fatehpur-I 108 7 150 0.1 108 7 150 0.1
2 Agra-Fatehpur-II 108 10 150 0.1 108 10 150 0.1
3 Agra-G. Noida 108 5 150 0.1 --- --- --- ---
4 Agra-Jhatikara 109 7 150 0.1 109 7 150 0.1
5 Balia-LUCKNOW7(PG) 108 5 150 0.1 108 5 150 0.1
6 Bhiwani-Jhatikara 109 10 150 0.1 109 10 150 0.1
7 Bhiwani-Meerut 109 7 150 0.1 109 7 150 0.1
8 Bhiwani-Phagi-I 109 5 150 0.1 110 5 140 0.1
9 Bhiwani-Phagi-II 109 5 150 0.1 110 5 140 0.1
10 Jhatikara-Kanpur 108 5 150 0.1 108 5 150 0.1
11 LUCKNOW7(PG)_BAREILLY7(PG) 108 5 150 0.1 108 5 150 0.1
12 Meerut-G. Noida 109 7 150 0.1 --- --- --- ---
13 Moga-Bhiwani(PG) 110% 5 140% 0.1 109 5 150 0.1
14 Moga-Meerut 110% 5 140% 0.1 108 5 140 0.1
15 Varanasi-Balia 108 5 150 0.1 108 5 150 0.1
16 Varanasi-Fatehpur 108 5 150 0.1 108 5 150 0.1
17 Varanasi-Kanpur-I 108 5 150 0.1 108 5 150 0.1
18 Varanasi-Kanpur-II 109 7 150 0.1 109 7 150 0.1
B. UPPTCL
1 Anpara C-Unnao --- --- --- --- 110 5 140 0.1
2 Anpara C-Anpara D --- --- --- --- 110 5 140 0.1
3 Bara-Mainpuri (UP)-II --- --- --- --- --- --- --- ---
4 G.Noida-Hapur --- --- --- --- --- --- --- ---
5 G.Noida-Mainpuri --- --- --- --- --- --- --- ---
6 Lalitpur - Fatehabad (765kV Agra UP)-I --- --- --- --- --- --- --- ---
7 Lalitpur - Fatehabad (765kV Agra UP)-II --- --- --- --- --- --- --- ---
C. Rajasthan
1 Anta-Phagi-I 110 3 140 0.1 110 3 140 0.1
2 Anta-Phagi-II 110 3 140 0.1 110 5 140 0.1
POWERGRID
1 Kishenpur-Moga-I 110% 4 140% 0.1 110% 4 140% 0.1
2 Kishenpur-Moga-II 110% 5 140% 0.1 110% 5 140% 0.1
3 Tehri-Koteshwar Pooling Station-I 110 5 140 0.1 110 5 150 0.1
4 Tehri-Koteshwar Pooling Station-II 110 5 140 0.1 112 6 150 0.1
5 Koteshwar Pooling-Meerut-I 110 5 150 0.1 110 5 150 0.1
6 Koteshwar Pooling-Meerut-II 112 6 150 0.1 112 6 150 0.1
7 Rihand Vindhyachal Pool Line-I 110 3 140 0.1 --- --- --- ---
8 Rihand Vindhyachal Pool Line-II 110 3 140 0.1 --- --- --- ---
A. POWERGRID
1 Abdullapur- Bawana 110% 5 140% 0.1 --- --- --- ---
2 Abdullapur- Deepalpur 110% 5 140% 0.1 --- --- --- ---
3 Abdullapur-Kurukshetra-I 110% 4 140% 0.1 110% 4 140% 0.1
4 Abdullapur-Kurukshetra-II 110% 5 140% 0.1 110% 5 140% 0.1
5 Agra PG-Fatehabad (765kV Agra UP) 112 6 150 0.1 --- --- --- ---
6 Agra UP-Fatehabad (765kV Agra UP) --- --- --- --- 110 6 150 0.1
7 Agra-Agra(UP) 110 5 150 0.1 110 5 150 0.1
8 Agra-Ballabgarh 110 5 150 0.1 110 5 150 0.1
9 Agra-Bassi 110 5 150 0.1 110 5 150 0.1
10 Agra-Bhiwadi-I 110 5 150 0.1 110 5 150 0.1
11 Agra-Bhiwadi-II 112 6 150 0.1 112 6 150 0.1
12 Agra-Jaipur South-I 110 5 150 0.1 110 5 150 0.1
13 Agra-Jaipur South-II 112 6 150 0.1 112 6 150 0.1
Annexure-7
S.No Name of Line
First end setting Second end setting
1. 765kV Transmission Line
2. 765kV Transmission Line charged at 400kV
3. 400kV HVAC Transmission Line
Voltage
setting
stage I (%)
Time
delay
(sec)
Voltage
setting
stage 2 (%)
Time
delay
(sec)
Voltage
setting
stage I (%)
Time
delay
(sec)
Voltage
setting
stage 2 (%)
Time
delay
(sec)
S.No Name of Line
First end setting Second end setting
14 Agra-Sikar-I 110 5 150 0.1 110 5 150 0.1
15 Agra-Sikar-II 112 6 150 0.1 112 6 150 0.1
16 Allahabad-Fatehpur-I 110 5 150 0.1 110 5 150 0.1
17 Allahabad-Fatehpur-II 111 5 150 0.1 111 5 150 0.1
18 Allahabad-Fatehpur-III 112 6 150 0.1 112 6 150 0.1
19 Allahabad-Kanpur 110 5 150 0.1 110 5 150 0.1
20 Allahabad-Kanpur(New-765/400kV)-I --- --- --- --- --- --- --- ---
21 Allahabad-Kanpur(New-765/400kV)-II --- --- --- --- --- --- --- ---
22 Allahabad-Varanasi 110 5 150 0.1 110 5 150 0.1
23 Amritsar- Banala( Parbati Pool) 110 5 150% 0.1 112 4 150% 0.1
24 Amritsar-Jalandhar-I 110 5 150 0.1 110 5 150 0.1
25 Amritsar-Jalandhar-II 110 5 150 0.1 110 5 150 0.1
26 Amritsar-Malerkotla-I --- --- --- --- --- --- --- ---
27 Amritsar-Malerkotla-II --- --- --- --- --- --- --- ---
28 Auraiya-Agra-I 110 5 140 0.1 110 5 150 0.1
29 Auraiya-Agra-II 110 5 140 0.1 112 6 150 0.1
30 Baghpat(PG)-Saharanpur(PG) 110 5 150 0.1 110 5 150 0.1
31 Baghpat-Kaithal-I 110 5 150 0.1 110 4 140% 0.1
32 Baghpat-Kaithal-II 112 6 150 0.1 112 5 140% 0.1
33 Bahadurgarh-Kabulpur 110 5 150 0.1 --- --- --- ---
34 Bahadurgarh-Sonepat-I 110 5 150 0.1 110 5 150 0.1
35 Bahadurgarh-Sonepat-II 112 6 150 0.1 112 6 150 0.1
36 Balia-Mau-I 110 5 150 0.1 150 0.1
37 Balia-Mau-II 112 6 150 0.1 150 0.1
38 Balia-Sohawal-I 110 5 150 0.1 110 5 150 0.1
39 Balia-Sohawal-II 112 6 150 0.1 112 6 150 0.1
40 Ballabgarh-Gurgaon 110 5 150 0.1 110 5 150 0.1
41 Ballabgarh-Maharanibagh 110 5 150 0.1 110 5 150 0.1
42 Ballabgarh-Nawada 110 5 150 0.1 --- --- --- ---
43 Banala (Parbati Pool)-Nallagarh 110% 5 150% 0.1 110% 4 150% 0.1
44 BAREILLY PG-LUCKNOW (UP) 110 5 150 0.1 110 5 150 0.1
45 BAREILLY PG-Moradabad-I 110 5 150 0.1 110 5 150 0.1
46 BAREILLY PG-Moradabad-II 112 6 150 0.1 112 6 150 0.1
47 BAREILLY7 (PG)-BAREILLY(PG)-I 110 5 150 0.1 110 5 150 0.1
48 BAREILLY7 (PG)-BAREILLY(PG)-II 112 6 150 0.1 112 6 150 0.1
49 BAREILLY7 (PG)-Kashipur-I 112 6 150 0.1 --- --- --- ---
50 BAREILLY7 (PG)-Kashipur-II 110 5 150 0.1 --- --- --- ---
51 Bassi-Bhiwadi 110 5 150 0.1 110 5 150 0.1
52 Bassi-Heerapura-I 110 5 150 0.1 110 5 150 0.1
53 Bassi-Heerapura-II 112 6 150 0.1 110 6 150 0.1
54 Bassi-Kotputli 110 5 150 0.1 110 5 150 0.1
55 Bassi-Phagi-I 110 5 150 0.1 110 5 140 0.1
56 Bassi-Phagi-II 112 6 150 0.1 110 5 140 0.1
57 Bassi-Sikar-I 110 5 150 0.1 110 5 150 0.1
58 Bassi-Sikar-II 112 6 150 0.1 112 6 150 0.1
59 Bawana(CCGT)-Bahadurgarh --- --- --- --- 110 5 150 0.1
60 Bawana(CCGT)-Bhiwani(PG) --- --- --- --- 110 5 150 0.1
61 Bhinmal-Kankroli 110 5 150 0.1 110 5 150 0.1
62 Bhiwadi-Gurgaon 110 5 150 0.1 110 5 150 0.1
63 Bhiwadi-Hissar-I 110 5 150 0.1 110 5 150 0.1
64 Bhiwadi-Hissar-II 111 5 150 0.1 111 5 150 0.1
65 Bhiwadi-Hissar-III 112 6 150 0.1 112 6 150 0.1
66 Bhiwadi-NeemranaPG-I 110 5 150 0.1 110 5 150 0.1
67 Bhiwadi-NeemranaPG-II 112 6 150 0.1 112 6 150 0.1
68 Bhiwani BBMB -Bhiwani_PG 110 5 150 0.1 110% 5 150% 0.1
69 Bhiwani_PG-Jind-I 110 5 150 0.1 110 5 150 0.1
70 Bhiwani_PG-Jind-II 112 6 150 0.1 112 6 150 0.1
71 Chamera-II - Chamba(GIS) --- --- --- --- 110 5 140 0.1
72 Chamera-II-Chamera-I 110 5 150 0 110% 6 150% 0.1
73 Chamera-II-Kishenpur 110 5 150 0 110% 5 140% 0.1
74 Chamera-I-Jalandhar-I 109% 5 150% 0.1 110% 4 140% 0.1
75 Chamera-I-Jalandhar-II 109% 5 150% 0.1 110% 5 140% 0.1
76 Chittorgarh-Kankroli --- --- --- --- 110 5 150 0.1
77 Chittorgarh PG-Chittorgarh RRVPNL-I --- --- --- --- --- --- --- ---
78 Chittorgarh PG-Chittorgarh RRVPNL-II --- --- --- --- --- --- --- ---
NA
NA
Voltage
setting
stage I (%)
Time
delay
(sec)
Voltage
setting
stage 2 (%)
Time
delay
(sec)
Voltage
setting
stage I (%)
Time
delay
(sec)
Voltage
setting
stage 2 (%)
Time
delay
(sec)
S.No Name of Line
First end setting Second end setting
79 Dadri NCTPP-G. Noida 110 5 140 0.1 --- --- --- ---
80 Dadri NCTPP-Maharanibagh 110 5 140 0.1 110 5 150 0.1
81 Dadri NCTPP-Mandola-I 121 5 140 0.1 110 5 150 0.1
82 Dadri NCTPP-Mandola-II 123.2 5 140 0.1 112 6 150 0.1
83 Dadri NCTPP-Muradnagar 110 5 140 0.1 --- --- --- ---
84 Dadri NCTPP-Panipat-I --- --- --- --- --- --- --- ---
85 Dadri NCTPP-Panipat-II --- --- --- --- --- --- --- ---
86 Dadri-Kaithal --- --- --- --- --- --- --- ---
87 Dadri-Loni Road/ Harsh Vihar-I 110 5 140 0.1 --- --- --- ---
88 Dadri-Loni Road/ Harsh Vihar-II 110 5 140 0.1 --- --- --- ---
89 Deepalpur-Bawana --- --- --- --- --- --- --- ---
90 Dehradun(PG)-Baghpat(PG)-II 110 5 150 0.1 110 5 150 0.1
91 Dehradun(PG)-Roorkee(PG)-I 110 5 150 0.1 110 5 150 0.1
92 Dulhasti-Kishenpur 110 5 150 0.1 110 5 140 0.1
93 Fatehabad-Hissar 110 5 140 0.1 110 5 150 0.1
94 Fatehpur-Kanpur-I 110 5 150 0.1 110 5 150 0.1
95 Fatehpur-Kanpur-II 112 6 150 0.1 112 6 150 0.1
96 Fatehpur-Mainpuri (PG)-I 110 5 150 0.1 110 5 150 0.1
97 Fatehpur-Mainpuri (PG)-II 112 6 150 0.1 112 6 150 0.1
98 G.Noida-Nawada --- --- --- --- --- --- --- ---
99 Gorakhpur PG-Gorakhpur UP-I 110 5 150 0.1 110 5 135 0
100 Gorakhpur PG-Gorakhpur UP-II 112 6 150 0.1 110 5 135 0
101 Gorakhpur PG-LUCKNOW PG-I 110 5 150 0.1 110 5 150 0.1
102 Gorakhpur PG-LUCKNOW PG-II 112 6 150 0.1 110 6 150 0.1
103 Gurgaon-Manesar 110 5 150 0.1 110 5 150 0.1
104 Gurgaon-Manesar 112 6 150 0.1 112 6 150 0.1
105 Hamirpur-Banala (Parbati Pool) 110% 5 140% 0.1 110% 5 150% 0.1
106 Hamirpur-Jalandhar --- --- --- --- --- --- --- ---
107 Hissar-Bhiwani(BBMB) 110 5 150 0.1 --- --- --- ---
108 Hissar-Bhiwani(PG)-I 110 5 150 0.1 110 5 150 0.1
109 Hissar-Bhiwani(PG)-II 111 5 150 0.1 111 5 150 0.1
110 Hissar-Bhiwani(PG)-III 112 6 150 0.1 112 6 150 0.1
111 Jaipur South-Bassi-I 110 5 150 0.1 110 5 150 0.1
112 Jaipur South-Bassi-II 112 6 150 0.1 112 6 150 0.1
113 Jalandhar-Chamba(GIS)-I 110% 4 140% 0.1 110% 4 140% 0.1
114 Jalandhar-Chamba(GIS)-II 110% 5 140% 0.1 110% 5 140% 0.1
115 Jalandhar-Kurukshetra 110% 5 140% 0.1 110% 5 140% 0.1
116 Jalandhar-Nakodar 110% 5 140% 0.1 110% 5 140% 0.1
117 Kabulpur-Bhiwani --- --- --- --- 110 5 150 0.1
118 Kaithal-Hissar-I 110% 4 140% 0.1 110 5 150 0.1
119 Kaithal-Hissar-II 110% 5 140% 0.1 112 6 150 0.1
120 Kankroli-Jodhpur 110 5 150 0.1 109 5 150 0.1
121 Kanpur - Kanpur GIS-I 110 5 150 0.1 110 5 150 0.1
122 Kanpur - Kanpur GIS-II 112 6 150 0.1 112 6 150 0.1
123 Kanpur-Agra 110 5 150 0.1 110 5 150 0.1
124 Kanpur-Auraiya-I 110 5 150 0.1 110 5 140 0.1
125 Kanpur-Auraiya-II 112 6 150 0.1 110 5 140 0.1
126 Kanpur-Ballabgarh-I 110 5 150 0.1 110 5 150 0.1
127 Kanpur-Ballabgarh-II 111 5 150 0.1 111 5 150 0.1
128 Kanpur-Ballabgarh-III 112 6 150 0.1 112 6 150 0.1
129 Kanpur-Panki-I 110 5 150 0.1 --- --- --- ---
130 Kanpur-Panki-II 112 6 150 0.1 --- --- --- ---
131 Kishenpur-New Wanpoh-I 110% 4 140% 0.1 110% 4 140% 0.1
132 Kishenpur-New Wanpoh-II 110% 5 140% 0.1 110% 5 140% 0.1
133 Kishenpur-New Wanpoh-III 110% 6 140% 0.1 110% 6 140% 0.1
134 Kishenpur-New Wanpoh-IV 110% 7 140% 0.1 110% 7 140% 0.1
135 Kishenpur-Samba-I 110% 4 140% 0.1 110% 4 140% 0.1
136 Kishenpur-Samba-II 110% 5 140% 0.1 110% 5 140% 0.1
137 Kota-Merta 110 5 150 0.1 108 5 150 0.1
138 Koteshwar pooling-Koteswar-I 110 5 150 0.1 110 5 140 0.1
139 Koteshwar pooling-Koteswar-II 112 6 150 0.1 110 5 140 0.1
140 Kotputli-Bhiwadi 110 5 150 0.1 110 5 150 0.1
141 Kurukshetra-Jind-I 110 5 140 0.1 110 5 140 0.1
142 Kurukshetra-Jind-II 112 6 140 0.1 112 6 140 0.1
Voltage
setting
stage I (%)
Time
delay
(sec)
Voltage
setting
stage 2 (%)
Time
delay
(sec)
Voltage
setting
stage I (%)
Time
delay
(sec)
Voltage
setting
stage 2 (%)
Time
delay
(sec)
S.No Name of Line
First end setting Second end setting
143 Kurukshetra-Malerkotla-I --- --- --- --- --- --- --- ---
144 Kurukshetra-Malerkotla-II --- --- --- --- --- --- --- ---
145 Kurukshetra-Nakodar 110% 4 140% 0.1 110% 5 140% 0.1
146 Kurukshetra-Sonipat-I 110% 4 140% 0.1 110% 4 150% 0.1
147 Kurukshetra-Sonipat-II 110% 5 140% 0.1 110% 5 150% 0.1
148 LUCKNOW PG-LUCKNOW UP 110 5 150 0.1 110 5 150 0.1
149 LUCKNOW PG-Unnao-I 110 5 150 0.1 110 5 150 0.1
150 LUCKNOW PG-Unnao-II 112 6 150 0.1 110 5 150 0.1
151 LUCKNOW7 (PG) - LUCKNOW (PG)-I 110 5 150 0.1 110 5 150 0.1
152 LUCKNOW7 (PG) - LUCKNOW (PG)-II 112 6 150 0.1 112 6 150 0.1
153 Lucknow7 (PG) - Kanpur 7 (PG)-I --- --- --- --- --- --- --- ---
154 Lucknow7 (PG) - Kanpur 7 (PG)-II --- --- --- --- --- --- --- ---
155 Ludhiana-Jalandhar 110% 5 140% 0.1 110% 5 140% 0.1
156 Ludhiana-Malerkotla 110% 5 140% 0.1 110% 5 150% 0.1
157 Ludhiana-Patiala-I 110% 4 140% 0.1 110% 4 140% 0.1
158 Ludhiana-Patiala-II 110% 5 140% 0.1 110% 5 150% 0.1
159 Mainpuri (PG)-Ballabgarh-I 110 5 150 0.1 110 5 150 0.1
160 Mainpuri (PG)-Ballabgarh-II 112 6 150 0.1 112 6 150 0.1
161 Malerkotla-Kaithal --- --- --- --- --- --- --- ---
162 Malerkotla-Patiala 110% 5 140% 0.1 110% 5 140% 0.1
163 Meerut-Baghpat-I 110 5 150 0.1 110 5 150 0.1
164 Meerut-Baghpat-II 112 6 150 0.1 112 6 150 0.1
165 Meerut-Mandola-I 112 5 150 0.1 112 5 150 0.1
166 Meerut-Mandola-II 112 6 150 0.1 112 6 150 0.1
167 Meerut-Muzzafarnagar 110 5 150 0.1 110 5 150 0.1
168 Moga-Fatehabad 110% 5 140% 0.1 110% 5 140% 0.1
169 Moga-Hissar-I 110 5 140 0.1 110 5 150 0.1
170 Moga-Hissar-II 110 4 140 0.1 111 5 150 0.1
171 Moga-Hissar-III 110 5 140 0.1 112 6 150 0.1
172 Moga-Jalandhar-I 110% 4 140% 0.1 110% 4 140% 0.1
173 Moga-Jalandhar-II 110% 5 140% 0.1 110% 5 140% 0.1
174 Moradabad-Hapur --- --- --- --- --- --- --- ---
175 Muradnagar-Hapur --- --- --- --- --- --- --- ---
176 Nallagarh-Patiala-I 110% 4 140% 0.1 110% 4 140% 0.1
177 Nallagarh-Patiala-II 110% 5 140% 0.1 110% 5 150% 0.1
178 Napthajhakri-Rampur-I 110% 5 150% 0.1 --- --- --- ---
179 Napthajhakri-Rampur-II 112% 5 150% 0.1 --- --- --- ---
180 Nathpa Jhakri-Panchkula-I 110% 5 150% 0.1 110% 5 150% 0.1
181 Nathpa Jhakri-Panchkula-II 112% 5 150% 0.1 110% 4 150% 0.1
182 NeemranaPG-Manesar-I 110 5 150 0.1 110 5 150 0.1
183 NeemranaPG-Manesar-II 112 6 150 0.1 112 6 150 0.1
184 NeemranaPG-Sikar-I 110 5 150 0.1 110 5 150 0.1
185 NeemranaPG-Sikar-II 112 6 150 0.1 112 6 150 0.1
186 New Wanpoh-Wagoora-I 110% 4 140% 0.1 110% 4 140% 0.1
187 New Wanpoh-Wagoora-II 110% 5 140% 0.1 110% 5 140% 0.1
188 Panchkula -Abdullapur-I 110% 5 150% 0.1 110% 4 140% 0.1
189 Panchkula -Abdullapur-II 110% 4 150% 0.1 110% 5 140% 0.1
190 Patiala-Panchkula-I 110% 4 140% 0.1 110 5 150 0.1
191 Patiala-Panchkula-II 110% 5 140% 0.1 110 4 150 0.1
192 Patiala-Patran-I 110% 4 140% 0.1 110 3 140 0.1
193 Patiala-Patran-II 110% 5 140% 0.1 110 3 140 0.1
194 Patran-Kaithal-I 110 3 140 0.1 --- --- --- ---
195 Patran-Kaithal-II 110 3 140 0.1 --- --- --- ---
196 Rampur-Nallagarh-I --- --- --- --- 110% 4 140% 0.1
197 Rampur-Nallagarh-II --- --- --- --- 110% 5 150% 0.1
198 RAPP-D (unit-7&8)-Kota --- --- --- --- 110 5 150 0.1
199 RAPS-C-Chittorgarh --- --- --- --- --- --- --- ---
200 RAPS-C-Kankroli --- --- --- --- 110 5 150 0.1
201 RAPS-C-Kota --- --- --- --- 110 5 150 0.1
202 Rihand-Allahabad-I 110 3 140 0.1 110 5 150 0.1
203 Rihand-Allahabad-II 110 3 140 0.1 112 6 150 0.1
204 Roorkee-Kashipur-I 110 5 150 0.1 --- --- --- ---
Voltage
setting
stage I (%)
Time
delay
(sec)
Voltage
setting
stage 2 (%)
Time
delay
(sec)
Voltage
setting
stage I (%)
Time
delay
(sec)
Voltage
setting
stage 2 (%)
Time
delay
(sec)
S.No Name of Line
First end setting Second end setting
205 Roorkee-Kashipur-II 112 6 150 0.1 --- --- --- ---
Voltage
setting
stage I (%)
Time
delay
(sec)
Voltage
setting
stage 2 (%)
Time
delay
(sec)
Voltage
setting
stage I (%)
Time
delay
(sec)
Voltage
setting
stage 2 (%)
Time
delay
(sec)
S.No Name of Line
First end setting Second end setting
206 Roorkee-Saharanpur 110 5 150 0.1 110 5 150 0.1
207 Sarnath-Varanasi-I 110 5 150 0.1 110 5 150 0.1
208 Sarnath-Varanasi-II 112 6 150 0.1 112 6 150 0.1
209 SHAHJAHANPUR PG-BAREILLY PG-I 110 5 150 0.1 110 5 150 0.1
210 SHAHJAHANPUR PG-BAREILLY PG-II 112 6 150 0.1 112 6 150 0.1
211 SHAHJAHANPUR PG-LUCKNOW-I 110 5 150 0.1 110 5 150 0.1
212 SHAHJAHANPUR PG-LUCKNOW-II 112 6 150 0.1 112 6 150 0.1
213 SHAHJAHANPUR PG-ROSA-I 110 5 150 0.1 118 10 NA NA
214 SHAHJAHANPUR PG-ROSA-II 112 6 150 0.1 118 10 NA NA
215 Shree Cement-Kota 110 5 150 0.1 110 3 150 0.1
216 Shree Cement-Merta --- --- --- --- --- --- --- ---
217 Sikar-Ratangarh-I 110 5 150 0.1 --- --- --- ---
218 Sikar-Ratangarh-II 112 6 150 0.1 --- --- --- ---
219 Singrauli-Allahabad-I 110 5 150 0.1 110 5 150 0.1
220 Singrauli-Allahabad-II 110 5 150 0.1 112 6 150 0.1
221 Singrauli-Anpara 110 5 140 0.1 110 6 140 0
222 Singrauli-Fatehpur 110 5 140 0.1 110 5 150 0.1
223 Singrauli-LUCKNOWUP 110 5 140 0.1 110 5 150 0.1
224 Singrauli-Rihand-I 110 5 140 0.1 110 3 140 0.1
225 Singrauli-Rihand-II 110 5 140 0.1 110 3 140 0.1
226 Singrauli-Vindhyachal-I 110 5 140 0.1 110 5 150 0.1
227 Singrauli-Vindhyachal-II 110 5 140 0.1 112 6 150 0.1
228 Sohawal-LUCKNOW PG-I 110 5 150 0.1 110 5 150 0.1
229 Sohawal-LUCKNOW PG-II 112 6 150 0.1 112 6 150 0.1
230 Uri-I - Wagoora-I 110 4 140 0.1 110 4 140 0.1
231 Uri-I - Wagoora-II 110 5 140 0.1 110 5 140 0.1
232 Uri-II - Uri-I 110 6 140 0.1 110 6 140 0.1
233 Uri-II - Wagoora 110 6 140 0.1 110 5 140 0.1
B. UPPTCL (Uttar Pradesh)
1 Agra UP-Fatehabad (765kV Agra UP) 115 5 140 0 --- --- --- ---
2 Agra UP-Unnao --- --- --- --- 110 5 140 0.2
3 Aligarh-Mainpuri (UP) --- --- --- --- --- --- --- ---
4 Aligarh-Mainpuri (UP) --- --- --- --- --- --- --- ---
5 Aligarh-Muradnagar --- --- --- --- --- --- --- ---
6 Aligarh-Sikandrabad --- --- --- --- --- --- --- ---
7 Aligarh-Sikandrabad --- --- --- --- --- --- --- ---
8 Ataur-Indirapuram --- --- --- --- --- --- --- ---
9 Ataur-Indirapuram --- --- --- --- --- --- --- ---
10 Rewa Road-Banda --- --- --- --- --- --- --- ---
11 Rewa Road-Banda --- --- --- --- --- --- --- ---
12 AnparaB-AnparaC --- --- --- --- --- --- --- ---
13 AnparaB-AnparaC --- --- --- --- --- --- --- ---
14 AnparaB-AnparaD --- --- --- --- 110 6 150 0.1
15 AnparaB-AnparaD --- --- --- --- --- --- --- ---
16 AnparaB-Mau 110 6 140 0 112.7 5 160 0
17 AnparaB-Obra 110 6 140 0 115 5 140 0
18 AnparaB-Sarnath 110 6 140 0 110 5 135 0.1
19 AnparaB-Sarnath 110 6 140 0 110 5 135 0.1
20 Azamgarh-Mau 115 5 150 0 112.7 5 160 0
21 Azamgarh-Sultanpur 115 5 150 0 115 5 150 0
22 Bara-Rewa Road --- --- --- --- --- --- --- ---
23 BAREILLY UP-Unnao 110 4 145 0.1 110 5 140 0.2
24 BAREILLY UP-Unnao 113 5 145 0.1 110 4 140 0.2
25 Fatehabad-Agra(South)-II --- --- --- --- --- --- --- ---
26 Fatehabad-Agra(South)-II --- --- --- --- --- --- --- ---
27 Fatehabad-Mathura --- --- --- --- --- --- --- ---
28 Fatehabad-Mathura --- --- --- --- --- --- --- ---
29 G.Noida(400kV)-G.Noida(765kV) --- --- --- --- --- --- --- ---
30 Gorakhpur UP-Azamgarh 110 5 135 0 115 5 140 0
31 Gr.Noida-Sikandrabad --- --- --- --- --- --- --- ---
32 Gr.Noida-Sikandrabad --- --- --- --- --- --- --- ---
33 Hapur-Ataur-I --- --- --- --- --- --- --- ---
34 Hapur-Ataur-II --- --- --- --- --- --- --- ---
35 Hapur-Dasna-I --- --- --- --- --- --- --- ---
36 Hapur-Dasna-II --- --- --- --- --- --- --- ---
Voltage
setting
stage I (%)
Time
delay
(sec)
Voltage
setting
stage 2 (%)
Time
delay
(sec)
Voltage
setting
stage I (%)
Time
delay
(sec)
Voltage
setting
stage 2 (%)
Time
delay
(sec)
S.No Name of Line
First end setting Second end setting
37 Mainpuri(UP)-Mainpuri(PG)-I --- --- --- --- --- --- --- ---
38 Mainpuri(UP)-Mainpuri(PG)-II --- --- --- --- --- --- --- ---
39 Mainpuri(UP)-Orai-I 110 5 150 0.1
40 Mainpuri(UP)-Paricha-2 112 6 150 0.1 110 5 120 1
41 Meja (NTPC)-Allahabad (PG)-I --- --- --- --- 110 5 150 0.1
42 Meja (NTPC)-Allahabad (PG)-II --- --- --- --- 112 6 150 0.1
43 Meja (NTPC)-Bara --- --- --- --- --- --- --- ---
44 Meja (NTPC)-Rewa Road --- --- --- --- --- --- --- ---
45 Muradnagar-Ataur --- --- --- --- --- --- --- ---
46 Muradnagar New-Mathura --- --- --- --- --- --- --- ---
47 Muzaffarnagar-Ataur --- --- --- --- --- --- --- ---
48 Muzaffarnagar-Vishnuprayag --- --- --- --- 112 5 120 0.4
49 Obra-Rewa road 115 5 140 0 --- --- --- ---
50 Obra-Sultanpur 115 5 140 0 115 5 150 0
51 Orai-Paricha 115 5 140 0 110 5 120 1
52 Panki-Aligarh --- --- --- --- --- --- --- ---
53 Rewa road-Panki --- --- --- --- --- --- --- ---
54 Roorkee-Muzaffarnagar 110 5 150 0.1 --- --- --- ---
55 Sarnath-Azamgarh 110 5 135 0.1 115 5 150 0
56 Srinagar-Muzaffarnagar --- --- --- --- --- --- --- ---
57 Sultanpur-LUCKNOW PG 115 5 150 0 110 5 150 0.1
58 Unnao-LUCKNOW UP 110 5 140 0.1 110 5 150 0.1
59 Unnao-Panki 110 5 140 0.2 --- --- --- ---
60 Vishnuprayag-Srinagar 110 5 120 0.5 --- --- --- ---
C. Rajasthan
1 Ajmer-Deedwana 110 5 150 0.1 110 5 150 0.1
2 Akal-Barmer 110 3 150 0.1 110 3 150 0.1
3 Akal-Jodhpur 110 5 150 0.1 110 5 150 0.1
4 Akal-Ramgarh-I --- --- --- --- --- --- --- ---
5 Akal-Ramgarh-II --- --- --- --- --- --- --- ---
6 Alwar-Hindaun 110 5 150 0.1 110 5 150 0.1
7 Anta-Chhabra-I 110 3 150 0.1 110 3 150 0.1
8 Anta-Chhabra-II 110 3 150 0.1 110 3 150 0.1
9 Anta-Kalisindh-I 110 3 150 0.1 110 3 150 0.1
10 Anta-Kalisindh-II 110 3 150 0.1 110 3 150 0.1
11 Anta-Kawai-I 110 3 150 0.1 110 3 140 0.1
12 Anta-Kawai-II 110 3 150 0.1 110 3 140 0.1
13 Barmer-Rajwest 110 5 150 0.1 110 3 --- ---
14 Bikaner-Deedwana 110 4 150 0.1 110 4 150 0.1
15 Bikaner-Bhadla-I --- --- --- --- 110 5 140 0.1
16 Bikaner-Bhadla-II --- --- --- --- 110 5 140 0.1
17 Bikaner-Sikar-I --- --- --- --- 110 5 150 0.1
18 Bikaner-Sikar-II --- --- --- --- 112 6 150 0.1
19 Bhilwara-Chhabra 110 5 150 0.1 110 5 150 0.1
20 Chhabra-Kawai 110 3 140 0.15 110 3 140 0.15
21 Heerapura-Hindaun 108 3 150 0.1 110 3 150 0.1
22 Hindaun-Chhabra 110 5 150 0.1 110 5 150 0.1
23 Merta-Bikaner 110 3 150 0.1 110 4 150 0.1
24 Merta-Heerapura 110 3 150 0.1 108 5 150 0.1
25 Merta-Jodhpur-I 110 5 150 0.1 110 5 150 0.1
26 Merta-Jodhpur-II 110 4 150 0.1 108 3 150 0.1
27 Merta-Ratangarh 110 3 150 0.1 108 4 150 0.1
28 Phagi-Heerapura-I 110 5 140 0.1 110 5 140 0.1
29 Phagi-Heerapura-II 110 5 140 0.1 110 5 140 0.1
30 Rajwest-Jodhpur-I 110 5 --- --- 108 4 150 0.1
31 Rajwest-Jodhpur-II 109 5 --- --- 110 5 150 0.1
32 Suratgarh-Bikaner 110 4 150 0.1 110 4 150 0.1
33 Suratgarh-Ratangarh-I 110 5 150 0.1 110 5 150 0.1
34 Suratgarh-Ratangarh-II 110 5 150 0.1 110 5 150 0.1
D. JPVL/JPL(Jaypee POWERGRID Ltd)
1 Baspa-Karcham Wangtoo-I 110 3 140 1 --- --- --- ---
2 Baspa-Karcham Wangtoo-II 112 3 140 1 --- --- --- ---
3 Karcham Wangtoo-NJPC-I 110 3 140 1 110 5 150 0.1
4 Karcham Wangtoo-NJPC-II 112 3 140 1 112 5 150 0.1
5 Karchamwangtoo- Kala Amb-I 110 3 140 1 --- --- --- ---
* - Fixed series capacitor (FSC) is owned by POWERGRID
Voltage
setting
stage I (%)
Time
delay
(sec)
Voltage
setting
stage 2 (%)
Time
delay
(sec)
Voltage
setting
stage I (%)
Time
delay
(sec)
Voltage
setting
stage 2 (%)
Time
delay
(sec)
S.No Name of Line
First end setting Second end setting
6 Karchamwangtoo- Kala Amb-II 112 3 140 1 --- --- --- ---
Voltage
setting
stage I (%)
Time
delay
(sec)
Voltage
setting
stage 2 (%)
Time
delay
(sec)
Voltage
setting
stage I (%)
Time
delay
(sec)
Voltage
setting
stage 2 (%)
Time
delay
(sec)
S.No Name of Line
First end setting Second end setting
7 Abdullapur- Kala Amb-I --- --- --- --- --- --- --- ---
8 Abdullapur- Kala Amb-II --- --- --- --- --- --- --- ---
E. HVPNL (Haryana)
1 Jhajjar(IGSTPS)-Daulatabad --- --- --- --- 110 5 140 0.1
2 Jhajjar(IGSTPS)-Daulatabad --- --- --- --- 110 5 140 0.1
3 Khedar-Fathehabad --- --- --- --- --- --- --- ---
4 Khedar-Nuhiawali --- --- --- --- --- --- --- ---
5 Nuhiawali-Fathehabad --- --- --- --- --- --- --- ---
6 Khedar-Kirori --- --- --- --- --- --- --- ---
7 Khedar-Kirori --- --- --- --- --- --- --- ---
8 CLP Jhajjar(MGSTPS)- Kabulpur --- --- --- --- --- --- --- ---
9 CLP Jhajjar(MGSTPS)- Kabulpur --- --- --- --- --- --- --- ---
10 Deepalpur-Kabulpur --- --- --- --- --- --- --- ---
11 Deepalpur-Kabulpur --- --- --- --- --- --- --- ---
12 Dhanonda-Daulatabad --- --- --- --- --- --- --- ---
13 Dhanonda-Daulatabad --- --- --- --- --- --- --- ---
14 Gurgaon-Daulatabad 110 5 150 0.1 --- --- --- ---
15 Gurgaon-Daulatabad 112 6 150 0.1 --- --- --- ---
16 CLP Jhajjar (MGSTPS -Dhanonda) --- --- --- --- --- --- --- ---
17 CLP Jhajjar (MGSTPS -Dhanonda) --- --- --- --- --- --- --- ---
F. APCPL
1 Jhajjar (IGSTPS)-Mundka 110 5 140 0.1 112 8 s 150 0.1
2 Jhajjar (IGSTPS)-Mundka 110 5 140 0.1 112 10s 150 0.1
G. DTL (Delhi)
1 Bawana-Mundka 110 4 s 150 0.1 110 4 s 150 0.1
2 Bawana-Mundka 112 4 s 150 0.1 112 4 s 150 0.1
3 Ballabgarh-Bamnoli 110 5 150 0.1 110 4 150 0.1
4 Ballabgarh-Bamnoli 112 6 150 0.1 112 6 150 0.1
5 Bamnoli-Jhatikra 110 6 150 0.1 110 5 150 0.1
6 Bamnoli-Jhatikra 112 4 150 0.1 112 6 150 0.1
7 Mandola-Bawana 110 5 150 0.1 110 6 s 150 0.1
8 Mandola-Bawana 112 6 150 0.1 112 6 s 150 0.1
9 Jhatikra-Mundka 110 5 150 0.1 110 6 150 0.1
10 Jhatikra-Mundka 112 6 150 0.1 112 6 150 0.1
H. PDD (J&K)
1 Baglihar-Kishenpur --- --- --- --- --- --- --- ---
2 Baglihar-Kishenpur --- --- --- --- --- --- --- ---
I. PSTCL (Punjab)
1 Makhu-Amritsar 110 5 150 0.1 --- --- --- ---
2 Makhu-Amritsar 112 5 150 0.1 --- --- --- ---
3 Makhu-Mukatsar 110 5 150 0.1 110 5 150 0.1
4 Makhu-Mukatsar 112 5 150 0.1 112 5 150 0.1
5 Nakodar-Makhu 110 5 150 0.1 110 5 150 0.1
6 Nakodar-Makhu 112 5 150 0.1 112 5 150 0.1
7 Nakodar-Moga 110 5 150 0.1 110 5 150 0.1
8 Rajpura-Rajpura TPS 110 5 150 0.1 110 5 150 0.1
9 Rajpura-Dhuri 110 5 150 0.1 110 5 150 0.1
10 Rajpura-Rajpura TPS --- --- --- --- 111 5 150 0.1
11 Rajpura-Dhuri --- --- --- --- 112 5 150 0.1
12 Rajpura TPS-Nakodar 110 2 140 0.1 112 5 150 0.1
13 Rajpura TPS-Nakodar 110 2 140 0.1 110 5 150 0.1
14 Talwandi Sabo-Dhuri 130 0.5 110 5 150 0.1
15 Talwandi Sabo-Dhuri 130 0.5 112 5 150 0.1
16 Talwandi Sabo-Moga --- --- --- --- 130 0.5 Disable Disable
17 Talwandi Sabo-Nakodar 110 5 150 0.1 110 5 150 0.1
18 Talwandi Sabo-Mukatsar 110 5 150 0.1 130 0.5 Disable Disable
19 Talwandi Sabo-Mukatsar 112 5 150 0.1 130 5 Disable Disable
J. PTCUL (Uttrakhand)
1 Muradabad-Kashipur --- --- --- --- 110 3 115 0.1
2 Rishikesh-Nehtaur --- --- --- --- --- --- --- ---
3 Kashipur-Nehtaur --- --- --- --- --- --- --- ---
4 Roorkee-Rishikesh 110 5 150 0.1 110 3 115 0.1
5 Srinagar-Alakhnanda (GVK) ckt-1 --- --- --- --- --- --- --- ---
6 Srinagar-Alakhnanda (GVK) ckt-2 --- --- --- --- --- --- --- ---
Voltage
setting
stage I (%)
Time
delay
(sec)
Voltage
setting
stage 2 (%)
Time
delay
(sec)
Voltage
setting
stage I (%)
Time
delay
(sec)
Voltage
setting
stage 2 (%)
Time
delay
(sec)
S.No Name of Line
First end setting Second end setting
K. BBMB
1 Bhiwani-Rajpura 109 4 150 0.1 --- --- --- ---
2 Dehar-Rajpura 110 5 150 0.1 --- --- --- ---
3 Dehar-Panchkula 110 5 150 0.1 110% 5 150% 0.1
4 Panchkula-Panipat 110% 5 150% 0.1 --- --- --- ---
1 BAREILLY PG-Meerut 110 5 150 0.1 110 5 150 0.1
2 BAREILLY PG-Meerut 112 6 150 0.1 112 6 150 0.1
3 Meerut-Mandola 110 5 150 0.1 110 5 150 0.1
4 Meerut-Mandola 111 6 150 0.1 111 6 150 0.1
5 Gorakhpur PG-LUCKNOW PG 110 5 150 0.1 110 5 150 0.1
6 Gorakhpur PG-LUCKNOW PG 112 6 150 0.1 112 6 150 0.1
7 BAREILLY UP-BAREILLY PG 110 5 Disable Disable 110 5 150 0.1
8 BAREILLY UP-BAREILLY PG 112 6 Disable Disable 112 6 150 0.1
1 Bhiwani PG -Mohindergarh (APL)-I 110 5 150 0.1 111 12 150 0.1
2 Bhiwani PG -Mohindergarh (APL)-II 112 6 150 0.1 111 11 150 0.1
3 Dhanonda-Mohindergarh (APL)-I --- --- --- --- 111 9 150 0.1
4 Dhanonda-Mohindergarh (APL)-II --- --- --- --- 111 10 150 0.1
N. PKTCL (Parbati-Koldam Transmission Company Limited)
1 Koldam-Nallagarh 110% 5 140% 0.1 110% 5 140% 0
2 Koldam-Banala 110% 5 140% 0 110% 5 150% 0.1
3 Ludhiana-Koldam --- --- --- --- --- --- --- ---
4 Ludhiana-Koldam --- --- --- --- --- --- --- ---
5 Parbati III-Banala 110% 5 140% 0 110% 5 150% 0.1
6 Parbati-II- Banala --- --- --- --- --- --- --- ---
7 Sainj(HP)-Parbati II --- --- --- --- --- --- --- ---
8 Sainj(HP)-Parbati III --- --- --- ---
O. SPTL (Sterlite Power Transmission Limited): NRSS-29 Transmission Company Limited
1 Jalandhar-Samba --- --- --- --- --- --- --- ---
2 Jalandhar-Samba --- --- --- --- --- --- --- ---
1 Fatehpur - Unchahar --- --- --- --- 110 5 150 0.1
2 Fatehpur - Unchahar --- --- --- --- 112 6 150 0.1
A. POWERGRID
1 Dhauliganga-BAREILLY(UP) --- --- --- --- --- --- --- ---
2 Dhauliganga-Pithoragarh 111 5 150 0.1 --- --- --- ---
3 Pithoragarh-BAREILLY(UP) 110 5 150 0.1 --- --- --- ---
B. Rajasthan
1 Dholpur-Hindaun --- --- --- --- --- --- --- ---
2 Kota-KTPS --- --- --- --- --- --- --- ---
3 Kota-KTPS --- --- --- --- --- --- --- ---
L. POWERLINK
M. Adani Transmission India Ltd. (ATIL)
P. POWERGRID Unchahar Transmission Ltd.
4. 400kV Transmission Line charged at 220kV
List for Operation Issues
842 000
From organizations which are yet to submit revised nominations
New Members for the year 2016-17 (Nominations not received)