144 th meeting of OCC (22.02.2018)-Additional Agenda-1 AA 1: Contingency Plan to Meet Deficient / Excess Rainfall during Monsoon Chief Engineer, Grid Management, CEA vide letter dated 9 th Feb, 2018 has requested RPCs to make contingency plan to meet deficient/excess rainfall during monsoon. Copy of the letter is enclosed at Annexure – AA1.1. In the said letter, it is inter-alia mentioned that the impact (in terms of average MW) of various contingencies on the demand and availability in respect of each State/UT for the months of June to September, 2018 may be estimated and an implementable action plan be prepared for handling the contingency situations like deficit or delayed monsoon, flooding of mines or damaging of railway network or situation of high silt, tower collapse etc. It is also mentioned that implementable concrete steps like identification of flexible plant outages, maintaining sufficient Coal Stock at critical plant sites and diversion of Coal via alternate route may also be identified and documented by each RPC Members may discuss and provide inputs to NRPC Secretariat for preparation of contingency plan.

Chief Engineer, Grid Management, CEA vide letter dated 9 ...hpaldc.org/NRPC_OCC/144/144_Agenda.pdf · monsoon. Copy of the letter is enclosed at Annexure – AA1.1. In the said letter,

  • Upload
    buidang

  • View
    215

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Chief Engineer, Grid Management, CEA vide letter dated 9 ...hpaldc.org/NRPC_OCC/144/144_Agenda.pdf · monsoon. Copy of the letter is enclosed at Annexure – AA1.1. In the said letter,

144th

meeting of OCC (22.02.2018)-Additional Agenda-1

AA 1: Contingency Plan to Meet Deficient / Excess Rainfall during Monsoon

Chief Engineer, Grid Management, CEA vide letter dated 9th Feb, 2018 has

requested RPCs to make contingency plan to meet deficient/excess rainfall during

monsoon. Copy of the letter is enclosed at Annexure – AA1.1.

In the said letter, it is inter-alia mentioned that the impact (in terms of average MW)

of various contingencies on the demand and availability in respect of each

State/UT for the months of June to September, 2018 may be estimated and an

implementable action plan be prepared for handling the contingency situations like

deficit or delayed monsoon, flooding of mines or damaging of railway network or

situation of high silt, tower collapse etc. It is also mentioned that implementable

concrete steps like identification of flexible plant outages, maintaining sufficient

Coal Stock at critical plant sites and diversion of Coal via alternate route may also

be identified and documented by each RPC

Members may discuss and provide inputs to NRPC Secretariat for

preparation of contingency plan.

Page 2: Chief Engineer, Grid Management, CEA vide letter dated 9 ...hpaldc.org/NRPC_OCC/144/144_Agenda.pdf · monsoon. Copy of the letter is enclosed at Annexure – AA1.1. In the said letter,

144th

meeting of OCC (22.02.2018)-Additional Agenda-1

Annexure – AA1.1

Page 3: Chief Engineer, Grid Management, CEA vide letter dated 9 ...hpaldc.org/NRPC_OCC/144/144_Agenda.pdf · monsoon. Copy of the letter is enclosed at Annexure – AA1.1. In the said letter,

उपे�� कुमार

अधी(ण अ*भयंता /चालन

Page 4: Chief Engineer, Grid Management, CEA vide letter dated 9 ...hpaldc.org/NRPC_OCC/144/144_Agenda.pdf · monsoon. Copy of the letter is enclosed at Annexure – AA1.1. In the said letter,

·

·

·

·

·

·

·

Page 5: Chief Engineer, Grid Management, CEA vide letter dated 9 ...hpaldc.org/NRPC_OCC/144/144_Agenda.pdf · monsoon. Copy of the letter is enclosed at Annexure – AA1.1. In the said letter,

·

·

·

·

·

Page 6: Chief Engineer, Grid Management, CEA vide letter dated 9 ...hpaldc.org/NRPC_OCC/144/144_Agenda.pdf · monsoon. Copy of the letter is enclosed at Annexure – AA1.1. In the said letter,

·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

Page 7: Chief Engineer, Grid Management, CEA vide letter dated 9 ...hpaldc.org/NRPC_OCC/144/144_Agenda.pdf · monsoon. Copy of the letter is enclosed at Annexure – AA1.1. In the said letter,

·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

·

Page 8: Chief Engineer, Grid Management, CEA vide letter dated 9 ...hpaldc.org/NRPC_OCC/144/144_Agenda.pdf · monsoon. Copy of the letter is enclosed at Annexure – AA1.1. In the said letter,

·

·

·

·

Page 9: Chief Engineer, Grid Management, CEA vide letter dated 9 ...hpaldc.org/NRPC_OCC/144/144_Agenda.pdf · monsoon. Copy of the letter is enclosed at Annexure – AA1.1. In the said letter,
Page 10: Chief Engineer, Grid Management, CEA vide letter dated 9 ...hpaldc.org/NRPC_OCC/144/144_Agenda.pdf · monsoon. Copy of the letter is enclosed at Annexure – AA1.1. In the said letter,
Page 11: Chief Engineer, Grid Management, CEA vide letter dated 9 ...hpaldc.org/NRPC_OCC/144/144_Agenda.pdf · monsoon. Copy of the letter is enclosed at Annexure – AA1.1. In the said letter,
Page 12: Chief Engineer, Grid Management, CEA vide letter dated 9 ...hpaldc.org/NRPC_OCC/144/144_Agenda.pdf · monsoon. Copy of the letter is enclosed at Annexure – AA1.1. In the said letter,
Page 13: Chief Engineer, Grid Management, CEA vide letter dated 9 ...hpaldc.org/NRPC_OCC/144/144_Agenda.pdf · monsoon. Copy of the letter is enclosed at Annexure – AA1.1. In the said letter,

·

·

·

·

·

Page 14: Chief Engineer, Grid Management, CEA vide letter dated 9 ...hpaldc.org/NRPC_OCC/144/144_Agenda.pdf · monsoon. Copy of the letter is enclosed at Annexure – AA1.1. In the said letter,

LoA for Rs.18 Crores issued.

intuts rcvd from entities\J&K\PSDF_review

meeting_20.6.2017_annexure-I - srinagar.docx

Rs. 40 Crores contract is awarded.

intuts rcvd from entities\DVC\PSDF_review

meeting_20.6.2017_annexure-I DVC Ramgarh

Ss.docx

PSDF_STATUS OF IMPLEMENTATION_ANNEXURE_I (1).xlsx Schme wise status

Ø

Ø

Ø

Ø

Ø

Ø

Ø

Ø

.

Ø

Ø

Ø

It has already been conveyed by

Page 15: Chief Engineer, Grid Management, CEA vide letter dated 9 ...hpaldc.org/NRPC_OCC/144/144_Agenda.pdf · monsoon. Copy of the letter is enclosed at Annexure – AA1.1. In the said letter,

Phasing plan for FGD installation ANNEXURE -13 (A)

Sr.

No.Developer Name of Project Sector State Region Unit No

Total

Capacity

DT-of

COMMISSION

ING

Phasing Plan for

FGD Installation

1 HGPCorpn PANIPAT TPS State Sector Haryana NR 6 210 31-03-2001 March-April 2021

2 HGPCorpn PANIPAT TPS State Sector Haryana NR 7 250 28-09-2004 Jan-Feb 2021

3 HGPCorpn PANIPAT TPS State Sector Haryana NR 8 250 28-01-2005 Nov-Dec 2020

4 HGPCorpn RAJIV GANDHI TPS State Sector Haryana NR 1 600 31-03-2010 March-April 2022

5 HGPCorpn RAJIV GANDHI TPS State Sector Haryana NR 2 600 01-10-2010 Jan-Feb 2022

6 HGPCorpn YAMUNA NAGAR TPS State Sector Haryana NR 1 300 01-11-2007 Nov-Dec 2021

7 HGPCorpn YAMUNA NAGAR TPS State Sector Haryana NR 2 300 29-03-2008 Sept-Oct 2021

8 NTPC INDIRA GANDHI STPP Central Sector Haryana NR 1 500 31-10-2010 Sept-Oct 2020

9 NTPC INDIRA GANDHI STPP Central Sector Haryana NR 2 500 05-11-2011 March-April 2020

10 NTPC INDIRA GANDHI STPP Central Sector Haryana NR 3 500 07-11-2012 Jan-Feb 2020

11 GVK Power Ltd. GOINDWAL SAHIB Private Sector Punjab NR 1 270 14-02-2016 March-April 2020

12 GVK Power Ltd. GOINDWAL SAHIB Private Sector Punjab NR 2 270 15-03-2016 Jan-Feb 2020

13 L&T PDL (Nabha) Nabha TPP (Rajpura TPP) Private Sector Punjab NR 1 700 24-01-2014 March-April 2021

14 L&T PDL (Nabha) Nabha TPP (Rajpura TPP) Private Sector Punjab NR 2 700 06-07-2014 Jan-Feb 2021

15 PSEB GH TPS (LEH.MOH.) State Sector Punjab NR 1 210 29-12-1997 March-April 2022

16 PSEB GH TPS (LEH.MOH.) State Sector Punjab NR 2 210 16-10-1998 March-April 2022

17 PSEB GH TPS (LEH.MOH.) State Sector Punjab NR 3 250 03-01-2008 Jan-Feb 2022

18 PSEB GH TPS (LEH.MOH.) State Sector Punjab NR 4 250 31-07-2008 Jan-Feb 2022

19 TSPL TALWANDI SABO TPP Private Sector Punjab NR 1 660 17-06-2014 Jan-Feb 2021

20 TSPL TALWANDI SABO TPP Private Sector Punjab NR 2 660 25-10-2015 Nov-Dec 2020

21 TSPL TALWANDI SABO TPP Private Sector Punjab NR 3 660 29-03-2016 Sept-Oct 2020

22 Adani Power Ltd. KAWAI TPS Private Sector Rajasthan NR 1 660 28-05-2013 July-Aug 2020

23 Adani Power Ltd. KAWAI TPS Private Sector Rajasthan NR 2 660 24-12-2013 May-June 2020

24 RRVUNL CHHABRA TPP State Sector Rajasthan NR 1 250 30-10-2009 Nov-Dec 2021

25 RRVUNL CHHABRA TPP State Sector Rajasthan NR 2 250 04-05-2010 Sept-Oct 2021

26 RRVUNL CHHABRA TPP State Sector Rajasthan NR 3 250 14-09-2013 July-Aug 2021

27 RRVUNL CHHABRA TPP State Sector Rajasthan NR 4 250 30-06-2014 July-Aug 2021

28 RRVUNL CHHABRA TPP State Sector Rajasthan NR 5 660 04-04-2017 March-April 2020

29 RRVUNL KALISINDH TPS State Sector Rajasthan NR 1 600 02-05-2014 May-June 2021

30 RRVUNL KALISINDH TPS State Sector Rajasthan NR 2 600 06-06-2015 March-April 2021

31 RRVUNL KOTA TPS State Sector Rajasthan NR 5 210 26-03-1994 Nov-Dec 2022

32 RRVUNL KOTA TPS State Sector Rajasthan NR 6 195 30-07-2003 Nov-Dec 2022

33 RRVUNL KOTA TPS State Sector Rajasthan NR 7 195 30-08-2009 Sept-Oct 2022

34 RRVUNL SURATGARH TPS State Sector Rajasthan NR 1 250 10-05-1998 Nov-Dec 2022

35 RRVUNL SURATGARH TPS State Sector Rajasthan NR 2 250 28-03-2000 Sept-Oct 2022

36 RRVUNL SURATGARH TPS State Sector Rajasthan NR 3 250 29-10-2001 July-Aug 2022

37 RRVUNL SURATGARH TPS State Sector Rajasthan NR 4 250 25-03-2002 May-June 2022

38 RRVUNL SURATGARH TPS State Sector Rajasthan NR 5 250 30-06-2003 March-April 2022

39 RRVUNL SURATGARH TPS State Sector Rajasthan NR 6 250 29-08-2009 Jan-Feb 2022

40 Lalitpur Power Gen. Co LALITPUR TPS Private Sector Uttar Pardesh NR 2 660 08-01-2016 Jan-Feb 2021

41 Lalitpur Power Gen. Co LALITPUR TPS Private Sector Uttar Pardesh NR 3 660 01-04-2016 Sept-Oct 2020

42 Lalitpur Power Gen. Co. LALITPUR TPS Private Sector Uttar Pardesh NR 1 660 26-03-2016 Nov-Dec 2020

43 Lanko Anpara Pow Ltd ANPARA C TPS Private Sector Uttar Pardesh NR 1 600 12-10-2011 July-Aug 2022

44 Lanko Anpara Pow Ltd ANPARA C TPS Private Sector Uttar Pardesh NR 2 600 18-01-2012 May-June 2022

45 NTPC DADRI (NCTPP) Central Sector Uttar Pardesh NR 1 210 21-12-1991 Nov-Dec 2020

46 NTPC DADRI (NCTPP) Central Sector Uttar Pardesh NR 2 210 18-12-1992 Sept-Oct 2020

47 NTPC DADRI (NCTPP) Central Sector Uttar Pardesh NR 3 210 23-03-1993 July-Aug 2020

48 NTPC DADRI (NCTPP) Central Sector Uttar Pardesh NR 4 210 24-03-1994 May-June 2020

49 NTPC DADRI (NCTPP) Central Sector Uttar Pardesh NR 5 490 25-01-2010 March-April 2020

50 NTPC DADRI (NCTPP) Central Sector Uttar Pardesh NR 6 490 16-07-2010 Jan-Feb 2020

51 NTPC RIHAND STPS Central Sector Uttar Pardesh NR 1 500 31-03-1988 Jan-Feb 2022

52 NTPC RIHAND STPS Central Sector Uttar Pardesh NR 2 500 05-07-1989 Nov-Dec 2021

53 NTPC RIHAND STPS Central Sector Uttar Pardesh NR 3 500 31-01-2005 Sept-Oct 2021

54 NTPC RIHAND STPS Central Sector Uttar Pardesh NR 4 500 24-09-2005 March-April 2021

55 NTPC RIHAND STPS Central Sector Uttar Pardesh NR 5 500 25-05-2012 Jan-Feb 2021

56 NTPC RIHAND STPS Central Sector Uttar Pardesh NR 6 500 17-10-2013 Nov-Dec 2020

57 NTPC SINGRAULI STPS Central Sector Uttar Pardesh NR 1 200 14-02-1982 Nov-Dec 2021

58 NTPC SINGRAULI STPS Central Sector Uttar Pardesh NR 2 200 25-11-1982 Nov-Dec 2021

59 NTPC SINGRAULI STPS Central Sector Uttar Pardesh NR 3 200 28-03-1983 July-Aug 2021

60 NTPC SINGRAULI STPS Central Sector Uttar Pardesh NR 4 200 02-11-1983 July-Aug 2021

61 NTPC SINGRAULI STPS Central Sector Uttar Pardesh NR 5 200 26-02-1984 March-April 2021

62 NTPC SINGRAULI STPS Central Sector Uttar Pardesh NR 6 500 23-12-1986 Jan-Feb 2021

63 NTPC SINGRAULI STPS Central Sector Uttar Pardesh NR 7 500 24-11-1987 Nov-Dec 2020

64 NTPC UNCHAHAR TPS Central Sector Uttar Pardesh NR 1 210 21-11-1988 Nov-Dec 2022

65 NTPC UNCHAHAR TPS Central Sector Uttar Pardesh NR 2 210 22-03-1989 Nov-Dec 2022

66 NTPC UNCHAHAR TPS Central Sector Uttar Pardesh NR 3 210 27-01-1999 Sept-Oct 2022

67 NTPC UNCHAHAR TPS Central Sector Uttar Pardesh NR 4 210 22-10-1999 Sept-Oct 2022

68 NTPC UNCHAHAR TPS Central Sector Uttar Pardesh NR 5 210 28-09-2006 March-April 2022

69 NTPC UNCHAHAR TPS Central Sector Uttar Pardesh NR 6 500 31-03-2017 July-Aug 2020

70 Prayagraj PGCL PRAYAGRAJ TPP Private Sector Uttar Pardesh NR 1 660 25-12-2016 March-April 2020

71 Prayagraj PGCL PRAYAGRAJ TPP Private Sector Uttar Pardesh NR 2 660 06-09-2015 May-June 2020

72 Prayagraj PGCL PRAYAGRAJ TPP Private Sector Uttar Pardesh NR 3 660 22-05-2017 Jan-Feb 2020

73 Rosa Power Supply Co ROSA TPP Ph-I Private Sector Uttar Pardesh NR 1 300 10-02-2010 Nov-Dec 2021

74 Rosa Power Supply Co ROSA TPP Ph-I Private Sector Uttar Pardesh NR 2 300 26-06-2010 Nov-Dec 2021

75 Rosa Power Supply Co ROSA TPP Ph-I Private Sector Uttar Pardesh NR 3 300 28-12-2011 Sept-Oct 2021

76 Rosa Power Supply Co ROSA TPP Ph-I Private Sector Uttar Pardesh NR 4 300 28-03-2012 Sept-Oct 2021

77 UPRVUNL ANPARA TPS State Sector Uttar Pardesh NR 1 210 24-03-1986 Sept-Oct 2022

78 UPRVUNL ANPARA TPS State Sector Uttar Pardesh NR 2 210 28-02-1987 July-Aug 2022

79 UPRVUNL ANPARA TPS State Sector Uttar Pardesh NR 3 210 12-03-1988 May-June 2022

80 UPRVUNL ANPARA TPS State Sector Uttar Pardesh NR 4 500 19-07-1993 March-April 2022

81 UPRVUNL ANPARA TPS State Sector Uttar Pardesh NR 5 500 04-07-1994 Jan-Feb 2022

82 UPRVUNL ANPARA TPS State Sector Uttar Pardesh NR 6 500 08-06-2015 May-June 2021

83 UPRVUNL ANPARA TPS State Sector Uttar Pardesh NR 7 500 06-03-2016 March-April 2021

84 UPRVUNL HARDUAGANJ TPS State Sector Uttar Pardesh NR 8 250 27-09-2011 Nov-Dec2021

85 UPRVUNL HARDUAGANJ TPS State Sector Uttar Pardesh NR 9 250 25-05-2012 Sept-Oct 2021

86 UPRVUNL OBRA TPS State Sector Uttar Pardesh NR 9 200 26-10-1980 July-Aug 2022

87 UPRVUNL OBRA TPS State Sector Uttar Pardesh NR 10 200 14-01-1979 Sept-Oct 2022

88 UPRVUNL OBRA TPS State Sector Uttar Pardesh NR 11 200 31-12-1977 Nov-Dec 2022

89 UPRVUNL OBRA TPS State Sector Uttar Pardesh NR 12 200 28-03-1981 May-June 2022

90 UPRVUNL OBRA TPS State Sector Uttar Pardesh NR 13 200 21-07-1982 March-April 2022

91 UPRVUNL PARICHHA TPS State Sector Uttar Pardesh NR 3 210 29-03-2006 March-April 2022

92 UPRVUNL PARICHHA TPS State Sector Uttar Pardesh NR 4 210 28-12-2006 March-April 2022

93 UPRVUNL PARICHHA TPS State Sector Uttar Pardesh NR 5 250 24-05-2012 Jan-Feb 2022

94 UPRVUNL PARICHHA TPS State Sector Uttar Pardesh NR 6 250 11-03-2013 Nov-Dec 2021

95 CLP MAHATMA GANDHI TPS Private Sector Haryana NR 1 660 12-01-2012 Dec 18 -Jan 19

96 CLP MAHATMA GANDHI TPS Private Sector Haryana NR 2 660 11-04-2012 Dec 18 -Jan 19

TOTAL CAPACITY 36230 MW

(96 Units)

Annexure-1

Page 16: Chief Engineer, Grid Management, CEA vide letter dated 9 ...hpaldc.org/NRPC_OCC/144/144_Agenda.pdf · monsoon. Copy of the letter is enclosed at Annexure – AA1.1. In the said letter,

Deviation from schedule of states for 31.01.2018.

Page 17: Chief Engineer, Grid Management, CEA vide letter dated 9 ...hpaldc.org/NRPC_OCC/144/144_Agenda.pdf · monsoon. Copy of the letter is enclosed at Annexure – AA1.1. In the said letter,

Annexure-2

NTPC Dadri Thermal MVAR vs voltage January 18

Page 18: Chief Engineer, Grid Management, CEA vide letter dated 9 ...hpaldc.org/NRPC_OCC/144/144_Agenda.pdf · monsoon. Copy of the letter is enclosed at Annexure – AA1.1. In the said letter,

Koldam MVAr Scatter plots January 2018

Page 19: Chief Engineer, Grid Management, CEA vide letter dated 9 ...hpaldc.org/NRPC_OCC/144/144_Agenda.pdf · monsoon. Copy of the letter is enclosed at Annexure – AA1.1. In the said letter,

S. NO. Element NameNo. of forced

outagesUtility/ SLDC

Outage

Date

Outage

TimeReason/Remarks

07-Jan-18 23:10R-N Fault, 2.71kms (Z-1) from Bikaner; As per PMU data, Y-N fault observed.

A/R observed in 1400ms.

08-Jan-18 3:54 R-N Fault; As per PMU data, Y-N fault observed.

22-Jan-18 21:52R-N Fault, 5.1kms from Bikaner (Z-1); As per PMU data, Y-N fault observed. A/R

observed in 1400ms.

31-Jan-18 19:41 R-N Fault; As per PMU data, Y-N fault observed. A/R observed in 1400ms.

01-Jan-18 1:47 R-N fault; As per PMU data, Delayed fault clearance during A/R time

04-Jan-18 0:55

Phase to earth fault. R-N fault, 154.1km from Panchkula end & 1 km from

Panipat end. Tripped during dense fog; As per PMU data, Delayed fault

clearance during A/R time

05-Jan-18 3:12 Phase to phase fault; As per PMU data, Y-N fault. No A/R observed

05-Jan-18 4:16Phase to phase fault. Line under patroling; As per PMU data, Delayed fault

clearance during A/R time

05-Jan-18 9:55 Fault at Heerapura end; As per PMU data, No fault observed

05-Jan-18 15:14 R-Y Fault; As per PMU data, No fault observed

12-Jan-18 17:05 Distance protection operated; As per PMU data, No fault observed

14-Jan-18 16:01R-N Fault, 16 km from Heerapura; As per PMU data, R-N fault. No A/R

observed. Delayed fault clearing time (200ms)

01-Jan-18 22:45 Y-N Fault,155.6 km from Unnao; As per PMU data, R-N fault. Unsuccessful A/R

20-Jan-18 3:32Y-N Fault, dist. 47.1 Km (from Bareilly); As per PMU data, Y-N fault. Successful

A/R

20-Jan-18 22:19 Distance protection operated; As per PMU data, Y-N fault. Successful A/R

25-Jan-18 7:06Y-N Fault, at a distance of 239 km from Unnao; As per PMU data, Y-N fault

occurred. No fault in dead time.

13-Jan-18 7:16Tripped along with pole2 (BNC) & Pole4(ALDP) due to station ground over

couurent

13-Jan-18 11:21 Protection indication received from Alipurdwar

13-Jan-18 17:35 Tripped with pole-1

03-Jan-18 15:12 due to CT blast of AC filter bank at BNC end

13-Jan-18 7:16Tripped along with pole2 (BNC) & Pole4(ALDP) due to station ground over

couurent

13-Jan-18 10:06 Buchholz alarm received at Agra

06-Jan-18 0:06 Y-N Fault.6 km from Unnao; As per PMU data, Y-N fault. Successful A/R

20-Jan-18 11:33 Pole discrepancy at Agra UP; As per PMU data, No fault observed

24-Jan-18 11:20 R-N Fault; As per PMU data, R-N fault. Successful A/R

12-Jan-18 17:20 86A operated at Akal end. Line tripped only at Akal

14-Jan-18 1:10Distance protection operated. ZONE-II, B - N fault , 179.5 Km distance; As per

PMU data, Y-N fault occurred. No fault in dead time.

17-Jan-18 11:55 DIrect Trip received at Jodhpur end; As per PMU data, No fault observed

Annexure-4

2 400kV Panchkula (PG) - Panipat (BBMB) 4 BBMB

1 400kV Bikaner(RRVPNL)-Suratgarh(RRVPNL) 4 Rajasthan

8 400kV Akal(RRVPNL)-Jodhpur(RRVPNL) 3 Rajasthan

3 400kV Bassi(PG)-Heerapura(RVPNL) ckt-2 4

7 400kV Agra(UP)-Unnao(UP) 3

5 500kV Agra - Biswanath Cherialli line -1 3

UP

POWERGRID

4 400kV Bareilly(UP)-Unnao(UP) ckt-1 4

UP

3 POWERGRID

POWERGRID

6 500kV Agra - Biswanath Cherialli line -2

S. NO. Element NameNo. of forced

outagesUtility/ SLDC

Outage

Date

Outage

TimeReason/Remarks

01-Jan-18 22:54 Phase to earth fault; As per PMU data, Y-N fault. Successful A/R

02-Jan-18 5:00 Phase to earth fault

12-Jan-18 16:52 Busbar protection of Bus-1 operated; As per PMU data, No fault observed

05-Jan-18 14:18 Y-B Fault. 218 (Z-2) kms from Anpara; As per PMU data, Y-B fault

05-Jan-18 16:42 Y-N Fault; As per PMU data, Y-N fault occurred. No fault in dead time.

16-Jan-18 6:06 R-N Fault.12.3km from Mau end; As per PMU data, R-N fault. Successful A/R

01-Jan-18 1:00 B-N Fault; As per PMU data, B-N fault. Unsuccessful A/R

20-Jan-18 8:46Abnormal sound found from wave trap of Bay No 402(Baghpat-Saharanapur

Line); As per PMU data, No fault observed

26-Jan-18 22:29DT received at Saharanpur end. Attepmt taken at 23:18hrs, but line did tripped

on SOTF. Details awaited; As per PMU data, No fault observed

04-Jan-18 19:07Backup impedance relay operated at Hinduan; As per PMU data, No fault

observed

17-Jan-18 23:47 Phase to earth fault; As per PMU data, Y-N fault. Successful A/R

18-Jan-18 2:42Y-B Phase at 271.8 km from Hindaun; As per PMU data, Y-N fault. Successful

A/R

03-Jan-18 15:13 Due to commutation failure at Kuruksherta end.

27-Jan-18 15:35 Valve cooling System Failure at champa end.

31-Jan-18 19:00 Tripped due to problem in transformer tap-changer at Champa end.

05-Jan-18 3:12 Phase to earth fault; As per PMU data, B-N fault. No A/R observed

06-Jan-18 5:02 Tripped on High voltage; As per PMU data, R-N fault. Successful A/R

06-Jan-18 6:31 R-N Fault, 106.8 Km From dadri end; As per PMU data, No fault observed

15-Jan-18 5:55Tripped from Dehar end only. Details awaited; As per PMU data, No fault

observed

22-Jan-18 5:33Over voltage. at Dehar end, as reported by BBMB.; As per PMU data, No fault

observed

31-Jan-18 6:06 Relay maloperation; As per PMU data, No fault observed

10-Jan-18 15:20

R-N Fault during OPGW works, due to excess loop while removing existing old

Earth Wire between tower no. 144 to 145; As per PMU data, R-N fault. No A/R

observed

17-Jan-18 19:11

R-N fault, 26km (from Hamirpur end). It was reported by CPCC, NR-2 that OPGW

working was going on in the said line; As per PMU data, R-N fault. No A/R

observed

22-Jan-18 12:15R-N fault, 52km (from Banala end); As per PMU data, R-N fault. No A/R

observed

03-Jan-18 13:03B-N Fault. 17kms from Ratangarh. line taken under S/D w.e.f. 0932Hrs of 4.1.18;

As per PMU data, Y-N fault. No A/R observed

21-Jan-18 2:35 R-N fault; As per PMU data, B-N fault. No A/R observed

28-Jan-18 21:27R-N Fault, 22.3 Km From Ratangarh end; As per PMU data, B-N fault. No A/R

observed

07-Jan-18 3:12 B-N fault; As per PMU data, Y-N fault. No A/R observed

08-Jan-18 1:58R-N fault. 53.4kms (Z-1) from Ratangarh; As per PMU data, B-N fault. No A/R

observed

16-Jan-18 0:51 Y-N fault; As per PMU data, Y-N fault. No A/R observed

15

16

17

18400kV Ratangarh(RRVPNL)-

Suratgarh(RRVPNL) ckt-2

400kV Dehar (BBMB) - Panchkula (PG)

400kV Hamirpur(PG) -Banala(PG) ckt-1

400kV Ratangarh(RRVPNL)-

Suratgarh(RRVPNL) ckt-1

3

POWERGRID/NTPC/

BBMB

BBMB/POWERGRID

POWERGRID

Rajasthan

Rajasthan

3

3

3

POWERGRID

400kV Dadri(NTPC)-Panipat(BBMB) ckt-2 314

11 400kV Baghpat(PG)-Saharanpur(PG) 3 POWERGRID

12 400kV Chabra(RVUNL)-Hindaun(RRVPNL) 3 Rajasthan

13 800kV Champa(WR) - Kurukshetra(PG) line -2 3

UP

10 400kV Anpara(UP)-Mau(UP) 3 UP

9 400kv Aligarh(UP)-Mainpuri 765(UP) ckt-2 3

Outage

Duration

Date Time Date Time Timewithin

24hrs

after

24hrs

Not

Received

within

24hrs

after

24hrs

Not

Received

Receive

d

Not

Received

1 NR

1.400/220 kV Panipat 450 MVA

ICT 2

2.400/220 kV Panipat 450 MVA

ICT 1

3.220 kV Panipat-Narela 3

4.220 kV Panipat TPS(HVPNL)-

Panipat(BBMB) 1

5.220 kV Panipat TPS(HVPNL)-

Panipat(BBMB) 4

6.220 kV Panipat-Narela 2

7.220 kV panipat-Dhulkote 1

8.220 kV panipat-Dhulkote 2

9.220 kV panipat-Kurukshetra

10.220 kV panipat-Charkhi

Dadri

11.220 kV Panipat-Narela 1

12.220kV Panipat-Chhajpur 2

BBMB 01-Jan-18 0:30 01-Jan-18 0:55 0:25

R phase to earth fault occurred on

220kV Panipat-Chhajpur ckt 2.Besides

the operation of Line protection, Bus

bar protection operated on 220kV Bus

of Panipat station and caused complete

outage of 220kV Panipat station

From PMU, Max dip observed in R

phase.

0 220 GD-1 0.09Y

(BBMB)/

Y(DTL)

Y

(BBMB)

/

Y(DTL)

Y(BBMB)

/

Y(DTL)

80

2 NR

1.220 kV Mandola(PG)-

Narela(DTL) 1

2.220 kV Mandola(PG)-

Narela(DTL) 2

DTL 04-Jan-18 5:07 04-Jan-18 10:41 5:34

Due to fog, 220kV Mandola-Wazirabad

ckt-2(03:35) & ckt-4 (05:16), 220kV

Bawana-Kanjhawala D/C(03:43), 220kV

BTPS-Mehrauli ckt-2(05:35), 220kV

Narela-Rohtak ckt-2(04:57)& 220kV

Mandola-Narela Ckt 1 & 2 (05:07)

tripped

0 50 GD1 0.01 Y(DTL) Y(DTL) Y(DTL)

3 NR

1.400 kV Bawana(GT)-Bhiwani

(PG)

2.400 kV Bahadurgarh(PG)-

Bawana(GT)

3.400 kV Abdullapur(PG)-

Bawana(DTL) 1

4.400 kV Bawana(DTL)-

Mandola(PG) 1

5.400 kV Bawana(DTL)-

Mandola(PG) 2

6.400 kV Bawana(DTL)-

Dipalpur(HVPNL)

PG/DTL 06-Jan-18 8:27 06-Jan-18 9:49 1:22

Flashing occurred in Y-ph wave trap of

400 KV Bawana-Dipalpur line at

Bawana station. Which caused the

complete outage of Bawana (DTL)

station

From PMU,Max dip observed in Y

phase and fault clearing time approx

560msec

250 600 GD1 0.02Y(DTL)/

Y

(Haryana)

Y(DTL)/

Y

(Haryana)

Y(DTL) 560

4 NR

1.400 kV Aligarh - Panki

2.400 kV Aligarh(UP)-

Sikandrabad 400(UP) 1

3.400 kV Aligarh - Muradnagar -

1

4.400 kV Aligarh(UP)-Mainpuri

765(UP) 2

5.400 kV Aligarh (UP) 400 kV

Bus 1

UPPTCL 12-Jan-18 16:52 12-Jan-18 18:08 1:16

Busbar protection of Bus-1 operated at

400kV Aligarh station caused tripping

of multiple elements at 400kV Aligarh

station

From PMU, No fault observed

0 0 GI2 0.00 Y(UP) Y(UP) Y(UP)no fault

observed

5 NR

1.400 kV Sarnath(UP)-

Varanasi(PG) 2

2.400 kV Anpara-Sarnath 1

PGCIL/

UPPTCL14-Jan-18 15:20 14-Jan-18 16:23 1:03

400kV Sarnath-Varnasi and 400kV

Anpara-Sarnath ckt 1 tripped on RY

fault.

From PMU, Max dip observed in R & Y

phase. Fault clearing time approx

1000msec

0 0 GI2 0.00 Y(UP) Y(PG) Y(UP) Y(UP) 1000

Energy

Unserved

(in MU)

Preliminary Report DR/EL Detailed ReportFault

Clearance

time

(msec)

Annexure-5Major Grid Events for Jan, 2018_Northern Region

S.

No.Region

Name of Elements

(Tripped/Manually opened)

Owner /

Agency

Outage RevivalEvent

(As reported)

Generation

Loss (MW)

Load

Loss

(MW)

Category

as per CEA

Grid

Standards

Outage

Duration

Date Time Date Time Timewithin

24hrs

after

24hrs

Not

Received

within

24hrs

after

24hrs

Not

Received

Receive

d

Not

Received

Energy

Unserved

(in MU)

Preliminary Report DR/EL Detailed ReportFault

Clearance

time

(msec)

Major Grid Events for Jan, 2018_Northern Region

S.

No.Region

Name of Elements

(Tripped/Manually opened)

Owner /

Agency

Outage RevivalEvent

(As reported)

Generation

Loss (MW)

Load

Loss

(MW)

Category

as per CEA

Grid

Standards

6 NR

1.400 kV Bassi(PG)-

Heerapura(RVPNL) 2

2.400/220 kV Heerapura 250

MVA ICT-1

3.400/220 kV Heerapura 250

MVA ICT-3

PGCIL/

RVPNL14-Jan-18 16:01 14-Jan-18 16:59 0:58

LBB (Local Breaker Backup) operated

at 400kV Heerapura, leads to tripping

of multiple elements.

From PMU, Max dip observed in R

phase and fault clearing time approx

200msec

0 0 GI2 0.00Y(Rajasth

an)

Y(Rajast

han)

Y(Rajasth

an)200

7 NR

1.400/220 kV Azamgarh 500

MVA ICT-2

2.400/220 kV Azamgarh

315MVA ICT-1

UPPTCL 17-Jan-18 23:57 18-Jan-18 0:51 0:54

220kV backup earth fault protection

operated at Azamgarh station and

caused tripping of 500MVA and

315MVA ICT of Azamgarh station

From PMU, Max dip observed in R

phase.

0 450 GD1 0.01 Y(UP) Y(UP) Y(UP) 80

8 NR

1.220 kV Bhiwadi(PG)-

Bhiwadi(RVPNL) 2

2.220 kV Bhiwadi(PG)-

Bhiwadi(RVPNL) 1

3.500 kV HVDC Balia-Bhiwadi

Pole 2

4.400/220 kV Bhiwadi 315

MVA ICT 1

5.400/220 kV Bhiwadi 315

MVA ICT 2

6.220 kV Bhiwadi(PG)-

Kushkhera(RVPNL) 2

7.220 kV Bawal(HVPNL)-

Bhiwadi(PG) 1

8.220 kV Bhiwadi (PG) 220kV

Bus 2

PGCIL/

RVPNL22-Jan-18 10:33 22-Jan-18 10:54 0:21

R-ph jumper of 220kV Bhiwadi(PG)-

Bhiwadi(Raj) ckt 1 snapped at

Bhiwadi(Raj) end, which caused the

operation of Bus-Bar protection at

220kV Bus-2 of Bhiwadi(PG) leads to

tripping of multiple elements at

400/220kV Bhiwadi station along with

HVDC 500kV Balia-Bhiwadi.

0 0 GI2 0.00Y(Rajasth

an)

Y(PG) Y(Rajast

han)

Y(PG) Y(Rajasth

an)

Y(PG)120

9 NR

1.400 kV Bahadurgarh(PG)-

Bawana(GT)

2.400 kV Bawana-Bawana(GT)

1

3.400 kV Bawana 400 kV Bus 2

PGCIL 28-Jan-18 6:01 28-Jan-18 15:25 9:24

Bus bar protection operated on earth

fault at 400kV Bawana CCGT station,

leads to tripping of multiple elements

at 400kV Bawana CCGT station

From PMU, Max dip observed in Y

phase

0 0 GI2 0.00 Y(DTL) Y(DTL) Y(DTL) 80

10 NR

1.400 kV Bhiwani (PG) - Hisar

(PG) - 3

2.400 kV Bhiwani (PG) - Hisar

(PG) - 2

PGCIL 28-Jan-18 7:34 28-Jan-18 8:23 0:49

400kV Bhiwani Hissar ckt 2 & 3 tripped

on earth fault

From PMU, Max dip observed in Y

phase.

0 0 GI2 0.00Y(PG) Y(PG) Y(PG)

80

Page 20: Chief Engineer, Grid Management, CEA vide letter dated 9 ...hpaldc.org/NRPC_OCC/144/144_Agenda.pdf · monsoon. Copy of the letter is enclosed at Annexure – AA1.1. In the said letter,

Date Time Date Time

1220 kV Auraiya(NTPC)-

Malanpur(PG)NTPC

03-01-

20180:19

220 kV Auraiya(NTPC)-Malanpur(PG)

tripped on R-N fault, dist. 4.85km

from Malanpur end & 82km from

Auraiya end.

03-01-

201810:02 No No

No PMU data

available

2 765 kV Agra-Gwalior -2 PGCIL03-01-

20184:03

765 kV Agra-Gwalior -2 tripped on R-N

fault, dist. 85km from Gawalior end;

dist.

03-01-

20185:16 No No

3

800 kV HVDC Agra -

Biswanath Cherialli line -

2

PGCIL03-01-

201815:12

800 kV HVDC Agra - Biswanath Cherialli

line -2 tripped, due to CT blast of AC

filter bank at BNC end

03-01-

201819:39 No No

4

800 kV HVDC

Champa(WR) -

Kurukshetra(NR) line -1

PGCIL06-01-

201815:50

800 kV HVDC Champa(WR) -

Kurukshetra(NR) line -1 tripped on

external block from Champa end { pole

DC Differential operated}

06-01-

201817:12 No No No fault observed

5

500 kV HVDC

Vindhyachal HVDC BtB

Block 1

PGCIL06-01-

201817:35

500 kV HVDC Vindhyachal HVDC BtB

Block 1 tripped on over current

protection.

06-01-

201818:29 No No

Damped

oscillations

observed

6220 kV Auraiya(NTPC)-

Malanpur(PG)NTPC

07-01-

20187:02

220 kV Auraiya(NTPC)-Malanpur(PG)

tripped on Phase to earth fault. Y-N

Fault.

07-01-

20187:27 No No

No Auto reclosure

observed

7

500 kV HVDC

Vindhyachal HVDC BtB

Block 1

PGCIL09-01-

201819:53

500 kV HVDC Vindhyachal HVDC BtB

Block 1 tripped on DC Over Current

protection

09-01-

201821:47 No No No fault observed

8

500 kV HVDC

Mohindergarh-Mundra

Pole 1

APL10-01-

201812:40

500 kV HVDC Mohindergarh-Mundra

Pole 1 tripped on Control malfunction.

10-01-

201813:56 No No No fault observed

9

800 kV HVDC Agra -

Biswanath Cherialli line -

2

PGCIL13-01-

20187:16

800 kV HVDC Agra - Biswanath Cherialli

line 1&2 tripped due to station

ground over current at Alipurduar

station

GI213-01-

20187:59 No No

No fault observed,

possible tripped

from Other end

10

800 kV HVDC Agra -

Biswanath Cherialli line -

1

PGCIL13-01-

20187:16

800 kV HVDC Agra - Biswanath Cherialli

line 1&2 tripped due to station

ground over current at Alipurduar

station

GI213-01-

201810:43 No No

No fault observed,

possible tripped

from Other end

11

800 kV HVDC Agra -

Biswanath Cherialli line -

2

PGCIL13-01-

201810:06

800 kV HVDC Agra - Biswanath Cherialli

line -2 tripped on Buchholz alarm,

received at Agra

13-01-

201818:09 No No

Annexure-6

List of Tripping of Inter Regional Lines for the month of Jan 2018_Northern Region

S. No.Name of Transmission

Element Tripped

Owner/

Utility

Outage

Load

Loss/

Gen. Loss

Brief Reason

(As reported)

Category as per

CEA Grid

standards

Restoration # Fault Clearance

Time

(>100 ms for 400

kV and 160 ms for

220 kV)

*FIR Furnished

(YES/NO)

DR/EL

provided

in 24 hrs

(YES/NO)

Other Protection

Issues and Non

Compliance

(From PMU, seems

)

Remedial

ActionRemarks

Date Time Date Time

List of Tripping of Inter Regional Lines for the month of Jan 2018_Northern Region

S. No.Name of Transmission

Element Tripped

Owner/

Utility

Outage

Load

Loss/

Gen. Loss

Brief Reason

(As reported)

Category as per

CEA Grid

standards

Restoration # Fault Clearance

Time

(>100 ms for 400

kV and 160 ms for

220 kV)

*FIR Furnished

(YES/NO)

DR/EL

provided

in 24 hrs

(YES/NO)

Other Protection

Issues and Non

Compliance

(From PMU, seems

)

Remedial

ActionRemarks

12

800 kV HVDC Agra -

Biswanath Cherialli line -

1

PGCIL13-01-

201811:21

800 kV HVDC Agra - Biswanath Cherialli

line -1 tripped, Protection indication

received from Alipurduar

13-01-

201812:05 No No No fault observed

1 restart attemt

observed

13

800 kV HVDC Agra -

Biswanath Cherialli line -

1

PGCIL13-01-

201817:35

800 kV HVDC Agra - Biswanath Cherialli

line -1 tripped, Protection indication

received from Alipurduar

13-01-

201818:05 No No No fault observed

1 restart attemt

observed

14

800 kV HVDC Agra -

Biswanath Cherialli line -

1

PGCIL16-01-

201820:29

800 kV HVDC Agra - Biswanath Cherialli

line -1 tripped, during change of

power flow direction from BNC to Agra

to Agra to BNC

16-01-

201820:41 No No No fault observed

15220 kV Badod(MP)-

Sakatpura(RVPNL)RRVPNL

28-01-

201822:36

220 kV Badod(MP)-Sakatpura(RVPNL)

tripped on distance protection.( R-

Phase, 22 KM from Kota)

29-01-

201817:30 Yes Yes

No Auto reclosure

observed

1

Fault Clearance

time(>100ms for 400kV

and >160ms for 220kV)

2DR/EL Not provided in

24hrs

3 FIR Not Furnished

4Protection System

Mal/Non Operation

5 A/R not operation

# Fault Clearance time has been computed using PMU Data from nearest node available and/or DR provided by respective utilities

1. CEA Technical Standard of Electrical Plants and Electric Lines: 43.4.C 2. CEA Technical Planning Criteria

*Yes, if written Preliminary report furnished by constituent(s)

Reporting of Violation of Regulation for various issues for above tripping

1. CEA Grid Standard-3.e 2. CEA Transmission Planning Criteria

1. IEGC 5.2(r) 2. CEA Grid Standard 15.3

1. IEGC 5.9.6.a 2. CEA Grid Standard 12.2 (Applicable for SLDC, ALDC only)

1. CEA Technical Standard of Electrical Plants and Electric Lines: 43.4.A 2. CEA (Technical Standards for connectivity to the Grid) Regulation, 2007: Schedule Part 1. (6.1, 6.2, 6.3)

Voltage

setting

stage I (%)

Time

delay

(sec)

Voltage

setting

stage 2 (%)

Time

delay

(sec)

Voltage

setting

stage I (%)

Time

delay

(sec)

Voltage

setting

stage 2 (%)

Time

delay

(sec)

A. POWERGRID

1 Agra-Fatehpur-I 108 7 150 0.1 108 7 150 0.1

2 Agra-Fatehpur-II 108 10 150 0.1 108 10 150 0.1

3 Agra-G. Noida 108 5 150 0.1 --- --- --- ---

4 Agra-Jhatikara 109 7 150 0.1 109 7 150 0.1

5 Balia-LUCKNOW7(PG) 108 5 150 0.1 108 5 150 0.1

6 Bhiwani-Jhatikara 109 10 150 0.1 109 10 150 0.1

7 Bhiwani-Meerut 109 7 150 0.1 109 7 150 0.1

8 Bhiwani-Phagi-I 109 5 150 0.1 110 5 140 0.1

9 Bhiwani-Phagi-II 109 5 150 0.1 110 5 140 0.1

10 Jhatikara-Kanpur 108 5 150 0.1 108 5 150 0.1

11 LUCKNOW7(PG)_BAREILLY7(PG) 108 5 150 0.1 108 5 150 0.1

12 Meerut-G. Noida 109 7 150 0.1 --- --- --- ---

13 Moga-Bhiwani(PG) 110% 5 140% 0.1 109 5 150 0.1

14 Moga-Meerut 110% 5 140% 0.1 108 5 140 0.1

15 Varanasi-Balia 108 5 150 0.1 108 5 150 0.1

16 Varanasi-Fatehpur 108 5 150 0.1 108 5 150 0.1

17 Varanasi-Kanpur-I 108 5 150 0.1 108 5 150 0.1

18 Varanasi-Kanpur-II 109 7 150 0.1 109 7 150 0.1

B. UPPTCL

1 Anpara C-Unnao --- --- --- --- 110 5 140 0.1

2 Anpara C-Anpara D --- --- --- --- 110 5 140 0.1

3 Bara-Mainpuri (UP)-II --- --- --- --- --- --- --- ---

4 G.Noida-Hapur --- --- --- --- --- --- --- ---

5 G.Noida-Mainpuri --- --- --- --- --- --- --- ---

6 Lalitpur - Fatehabad (765kV Agra UP)-I --- --- --- --- --- --- --- ---

7 Lalitpur - Fatehabad (765kV Agra UP)-II --- --- --- --- --- --- --- ---

C. Rajasthan

1 Anta-Phagi-I 110 3 140 0.1 110 3 140 0.1

2 Anta-Phagi-II 110 3 140 0.1 110 5 140 0.1

POWERGRID

1 Kishenpur-Moga-I 110% 4 140% 0.1 110% 4 140% 0.1

2 Kishenpur-Moga-II 110% 5 140% 0.1 110% 5 140% 0.1

3 Tehri-Koteshwar Pooling Station-I 110 5 140 0.1 110 5 150 0.1

4 Tehri-Koteshwar Pooling Station-II 110 5 140 0.1 112 6 150 0.1

5 Koteshwar Pooling-Meerut-I 110 5 150 0.1 110 5 150 0.1

6 Koteshwar Pooling-Meerut-II 112 6 150 0.1 112 6 150 0.1

7 Rihand Vindhyachal Pool Line-I 110 3 140 0.1 --- --- --- ---

8 Rihand Vindhyachal Pool Line-II 110 3 140 0.1 --- --- --- ---

A. POWERGRID

1 Abdullapur- Bawana 110% 5 140% 0.1 --- --- --- ---

2 Abdullapur- Deepalpur 110% 5 140% 0.1 --- --- --- ---

3 Abdullapur-Kurukshetra-I 110% 4 140% 0.1 110% 4 140% 0.1

4 Abdullapur-Kurukshetra-II 110% 5 140% 0.1 110% 5 140% 0.1

5 Agra PG-Fatehabad (765kV Agra UP) 112 6 150 0.1 --- --- --- ---

6 Agra UP-Fatehabad (765kV Agra UP) --- --- --- --- 110 6 150 0.1

7 Agra-Agra(UP) 110 5 150 0.1 110 5 150 0.1

8 Agra-Ballabgarh 110 5 150 0.1 110 5 150 0.1

9 Agra-Bassi 110 5 150 0.1 110 5 150 0.1

10 Agra-Bhiwadi-I 110 5 150 0.1 110 5 150 0.1

11 Agra-Bhiwadi-II 112 6 150 0.1 112 6 150 0.1

12 Agra-Jaipur South-I 110 5 150 0.1 110 5 150 0.1

13 Agra-Jaipur South-II 112 6 150 0.1 112 6 150 0.1

Annexure-7

S.No Name of Line

First end setting Second end setting

1. 765kV Transmission Line

2. 765kV Transmission Line charged at 400kV

3. 400kV HVAC Transmission Line

Voltage

setting

stage I (%)

Time

delay

(sec)

Voltage

setting

stage 2 (%)

Time

delay

(sec)

Voltage

setting

stage I (%)

Time

delay

(sec)

Voltage

setting

stage 2 (%)

Time

delay

(sec)

S.No Name of Line

First end setting Second end setting

14 Agra-Sikar-I 110 5 150 0.1 110 5 150 0.1

15 Agra-Sikar-II 112 6 150 0.1 112 6 150 0.1

16 Allahabad-Fatehpur-I 110 5 150 0.1 110 5 150 0.1

17 Allahabad-Fatehpur-II 111 5 150 0.1 111 5 150 0.1

18 Allahabad-Fatehpur-III 112 6 150 0.1 112 6 150 0.1

19 Allahabad-Kanpur 110 5 150 0.1 110 5 150 0.1

20 Allahabad-Kanpur(New-765/400kV)-I --- --- --- --- --- --- --- ---

21 Allahabad-Kanpur(New-765/400kV)-II --- --- --- --- --- --- --- ---

22 Allahabad-Varanasi 110 5 150 0.1 110 5 150 0.1

23 Amritsar- Banala( Parbati Pool) 110 5 150% 0.1 112 4 150% 0.1

24 Amritsar-Jalandhar-I 110 5 150 0.1 110 5 150 0.1

25 Amritsar-Jalandhar-II 110 5 150 0.1 110 5 150 0.1

26 Amritsar-Malerkotla-I --- --- --- --- --- --- --- ---

27 Amritsar-Malerkotla-II --- --- --- --- --- --- --- ---

28 Auraiya-Agra-I 110 5 140 0.1 110 5 150 0.1

29 Auraiya-Agra-II 110 5 140 0.1 112 6 150 0.1

30 Baghpat(PG)-Saharanpur(PG) 110 5 150 0.1 110 5 150 0.1

31 Baghpat-Kaithal-I 110 5 150 0.1 110 4 140% 0.1

32 Baghpat-Kaithal-II 112 6 150 0.1 112 5 140% 0.1

33 Bahadurgarh-Kabulpur 110 5 150 0.1 --- --- --- ---

34 Bahadurgarh-Sonepat-I 110 5 150 0.1 110 5 150 0.1

35 Bahadurgarh-Sonepat-II 112 6 150 0.1 112 6 150 0.1

36 Balia-Mau-I 110 5 150 0.1 150 0.1

37 Balia-Mau-II 112 6 150 0.1 150 0.1

38 Balia-Sohawal-I 110 5 150 0.1 110 5 150 0.1

39 Balia-Sohawal-II 112 6 150 0.1 112 6 150 0.1

40 Ballabgarh-Gurgaon 110 5 150 0.1 110 5 150 0.1

41 Ballabgarh-Maharanibagh 110 5 150 0.1 110 5 150 0.1

42 Ballabgarh-Nawada 110 5 150 0.1 --- --- --- ---

43 Banala (Parbati Pool)-Nallagarh 110% 5 150% 0.1 110% 4 150% 0.1

44 BAREILLY PG-LUCKNOW (UP) 110 5 150 0.1 110 5 150 0.1

45 BAREILLY PG-Moradabad-I 110 5 150 0.1 110 5 150 0.1

46 BAREILLY PG-Moradabad-II 112 6 150 0.1 112 6 150 0.1

47 BAREILLY7 (PG)-BAREILLY(PG)-I 110 5 150 0.1 110 5 150 0.1

48 BAREILLY7 (PG)-BAREILLY(PG)-II 112 6 150 0.1 112 6 150 0.1

49 BAREILLY7 (PG)-Kashipur-I 112 6 150 0.1 --- --- --- ---

50 BAREILLY7 (PG)-Kashipur-II 110 5 150 0.1 --- --- --- ---

51 Bassi-Bhiwadi 110 5 150 0.1 110 5 150 0.1

52 Bassi-Heerapura-I 110 5 150 0.1 110 5 150 0.1

53 Bassi-Heerapura-II 112 6 150 0.1 110 6 150 0.1

54 Bassi-Kotputli 110 5 150 0.1 110 5 150 0.1

55 Bassi-Phagi-I 110 5 150 0.1 110 5 140 0.1

56 Bassi-Phagi-II 112 6 150 0.1 110 5 140 0.1

57 Bassi-Sikar-I 110 5 150 0.1 110 5 150 0.1

58 Bassi-Sikar-II 112 6 150 0.1 112 6 150 0.1

59 Bawana(CCGT)-Bahadurgarh --- --- --- --- 110 5 150 0.1

60 Bawana(CCGT)-Bhiwani(PG) --- --- --- --- 110 5 150 0.1

61 Bhinmal-Kankroli 110 5 150 0.1 110 5 150 0.1

62 Bhiwadi-Gurgaon 110 5 150 0.1 110 5 150 0.1

63 Bhiwadi-Hissar-I 110 5 150 0.1 110 5 150 0.1

64 Bhiwadi-Hissar-II 111 5 150 0.1 111 5 150 0.1

65 Bhiwadi-Hissar-III 112 6 150 0.1 112 6 150 0.1

66 Bhiwadi-NeemranaPG-I 110 5 150 0.1 110 5 150 0.1

67 Bhiwadi-NeemranaPG-II 112 6 150 0.1 112 6 150 0.1

68 Bhiwani BBMB -Bhiwani_PG 110 5 150 0.1 110% 5 150% 0.1

69 Bhiwani_PG-Jind-I 110 5 150 0.1 110 5 150 0.1

70 Bhiwani_PG-Jind-II 112 6 150 0.1 112 6 150 0.1

71 Chamera-II - Chamba(GIS) --- --- --- --- 110 5 140 0.1

72 Chamera-II-Chamera-I 110 5 150 0 110% 6 150% 0.1

73 Chamera-II-Kishenpur 110 5 150 0 110% 5 140% 0.1

74 Chamera-I-Jalandhar-I 109% 5 150% 0.1 110% 4 140% 0.1

75 Chamera-I-Jalandhar-II 109% 5 150% 0.1 110% 5 140% 0.1

76 Chittorgarh-Kankroli --- --- --- --- 110 5 150 0.1

77 Chittorgarh PG-Chittorgarh RRVPNL-I --- --- --- --- --- --- --- ---

78 Chittorgarh PG-Chittorgarh RRVPNL-II --- --- --- --- --- --- --- ---

NA

NA

Page 21: Chief Engineer, Grid Management, CEA vide letter dated 9 ...hpaldc.org/NRPC_OCC/144/144_Agenda.pdf · monsoon. Copy of the letter is enclosed at Annexure – AA1.1. In the said letter,

Voltage

setting

stage I (%)

Time

delay

(sec)

Voltage

setting

stage 2 (%)

Time

delay

(sec)

Voltage

setting

stage I (%)

Time

delay

(sec)

Voltage

setting

stage 2 (%)

Time

delay

(sec)

S.No Name of Line

First end setting Second end setting

79 Dadri NCTPP-G. Noida 110 5 140 0.1 --- --- --- ---

80 Dadri NCTPP-Maharanibagh 110 5 140 0.1 110 5 150 0.1

81 Dadri NCTPP-Mandola-I 121 5 140 0.1 110 5 150 0.1

82 Dadri NCTPP-Mandola-II 123.2 5 140 0.1 112 6 150 0.1

83 Dadri NCTPP-Muradnagar 110 5 140 0.1 --- --- --- ---

84 Dadri NCTPP-Panipat-I --- --- --- --- --- --- --- ---

85 Dadri NCTPP-Panipat-II --- --- --- --- --- --- --- ---

86 Dadri-Kaithal --- --- --- --- --- --- --- ---

87 Dadri-Loni Road/ Harsh Vihar-I 110 5 140 0.1 --- --- --- ---

88 Dadri-Loni Road/ Harsh Vihar-II 110 5 140 0.1 --- --- --- ---

89 Deepalpur-Bawana --- --- --- --- --- --- --- ---

90 Dehradun(PG)-Baghpat(PG)-II 110 5 150 0.1 110 5 150 0.1

91 Dehradun(PG)-Roorkee(PG)-I 110 5 150 0.1 110 5 150 0.1

92 Dulhasti-Kishenpur 110 5 150 0.1 110 5 140 0.1

93 Fatehabad-Hissar 110 5 140 0.1 110 5 150 0.1

94 Fatehpur-Kanpur-I 110 5 150 0.1 110 5 150 0.1

95 Fatehpur-Kanpur-II 112 6 150 0.1 112 6 150 0.1

96 Fatehpur-Mainpuri (PG)-I 110 5 150 0.1 110 5 150 0.1

97 Fatehpur-Mainpuri (PG)-II 112 6 150 0.1 112 6 150 0.1

98 G.Noida-Nawada --- --- --- --- --- --- --- ---

99 Gorakhpur PG-Gorakhpur UP-I 110 5 150 0.1 110 5 135 0

100 Gorakhpur PG-Gorakhpur UP-II 112 6 150 0.1 110 5 135 0

101 Gorakhpur PG-LUCKNOW PG-I 110 5 150 0.1 110 5 150 0.1

102 Gorakhpur PG-LUCKNOW PG-II 112 6 150 0.1 110 6 150 0.1

103 Gurgaon-Manesar 110 5 150 0.1 110 5 150 0.1

104 Gurgaon-Manesar 112 6 150 0.1 112 6 150 0.1

105 Hamirpur-Banala (Parbati Pool) 110% 5 140% 0.1 110% 5 150% 0.1

106 Hamirpur-Jalandhar --- --- --- --- --- --- --- ---

107 Hissar-Bhiwani(BBMB) 110 5 150 0.1 --- --- --- ---

108 Hissar-Bhiwani(PG)-I 110 5 150 0.1 110 5 150 0.1

109 Hissar-Bhiwani(PG)-II 111 5 150 0.1 111 5 150 0.1

110 Hissar-Bhiwani(PG)-III 112 6 150 0.1 112 6 150 0.1

111 Jaipur South-Bassi-I 110 5 150 0.1 110 5 150 0.1

112 Jaipur South-Bassi-II 112 6 150 0.1 112 6 150 0.1

113 Jalandhar-Chamba(GIS)-I 110% 4 140% 0.1 110% 4 140% 0.1

114 Jalandhar-Chamba(GIS)-II 110% 5 140% 0.1 110% 5 140% 0.1

115 Jalandhar-Kurukshetra 110% 5 140% 0.1 110% 5 140% 0.1

116 Jalandhar-Nakodar 110% 5 140% 0.1 110% 5 140% 0.1

117 Kabulpur-Bhiwani --- --- --- --- 110 5 150 0.1

118 Kaithal-Hissar-I 110% 4 140% 0.1 110 5 150 0.1

119 Kaithal-Hissar-II 110% 5 140% 0.1 112 6 150 0.1

120 Kankroli-Jodhpur 110 5 150 0.1 109 5 150 0.1

121 Kanpur - Kanpur GIS-I 110 5 150 0.1 110 5 150 0.1

122 Kanpur - Kanpur GIS-II 112 6 150 0.1 112 6 150 0.1

123 Kanpur-Agra 110 5 150 0.1 110 5 150 0.1

124 Kanpur-Auraiya-I 110 5 150 0.1 110 5 140 0.1

125 Kanpur-Auraiya-II 112 6 150 0.1 110 5 140 0.1

126 Kanpur-Ballabgarh-I 110 5 150 0.1 110 5 150 0.1

127 Kanpur-Ballabgarh-II 111 5 150 0.1 111 5 150 0.1

128 Kanpur-Ballabgarh-III 112 6 150 0.1 112 6 150 0.1

129 Kanpur-Panki-I 110 5 150 0.1 --- --- --- ---

130 Kanpur-Panki-II 112 6 150 0.1 --- --- --- ---

131 Kishenpur-New Wanpoh-I 110% 4 140% 0.1 110% 4 140% 0.1

132 Kishenpur-New Wanpoh-II 110% 5 140% 0.1 110% 5 140% 0.1

133 Kishenpur-New Wanpoh-III 110% 6 140% 0.1 110% 6 140% 0.1

134 Kishenpur-New Wanpoh-IV 110% 7 140% 0.1 110% 7 140% 0.1

135 Kishenpur-Samba-I 110% 4 140% 0.1 110% 4 140% 0.1

136 Kishenpur-Samba-II 110% 5 140% 0.1 110% 5 140% 0.1

137 Kota-Merta 110 5 150 0.1 108 5 150 0.1

138 Koteshwar pooling-Koteswar-I 110 5 150 0.1 110 5 140 0.1

139 Koteshwar pooling-Koteswar-II 112 6 150 0.1 110 5 140 0.1

140 Kotputli-Bhiwadi 110 5 150 0.1 110 5 150 0.1

141 Kurukshetra-Jind-I 110 5 140 0.1 110 5 140 0.1

142 Kurukshetra-Jind-II 112 6 140 0.1 112 6 140 0.1

Voltage

setting

stage I (%)

Time

delay

(sec)

Voltage

setting

stage 2 (%)

Time

delay

(sec)

Voltage

setting

stage I (%)

Time

delay

(sec)

Voltage

setting

stage 2 (%)

Time

delay

(sec)

S.No Name of Line

First end setting Second end setting

143 Kurukshetra-Malerkotla-I --- --- --- --- --- --- --- ---

144 Kurukshetra-Malerkotla-II --- --- --- --- --- --- --- ---

145 Kurukshetra-Nakodar 110% 4 140% 0.1 110% 5 140% 0.1

146 Kurukshetra-Sonipat-I 110% 4 140% 0.1 110% 4 150% 0.1

147 Kurukshetra-Sonipat-II 110% 5 140% 0.1 110% 5 150% 0.1

148 LUCKNOW PG-LUCKNOW UP 110 5 150 0.1 110 5 150 0.1

149 LUCKNOW PG-Unnao-I 110 5 150 0.1 110 5 150 0.1

150 LUCKNOW PG-Unnao-II 112 6 150 0.1 110 5 150 0.1

151 LUCKNOW7 (PG) - LUCKNOW (PG)-I 110 5 150 0.1 110 5 150 0.1

152 LUCKNOW7 (PG) - LUCKNOW (PG)-II 112 6 150 0.1 112 6 150 0.1

153 Lucknow7 (PG) - Kanpur 7 (PG)-I --- --- --- --- --- --- --- ---

154 Lucknow7 (PG) - Kanpur 7 (PG)-II --- --- --- --- --- --- --- ---

155 Ludhiana-Jalandhar 110% 5 140% 0.1 110% 5 140% 0.1

156 Ludhiana-Malerkotla 110% 5 140% 0.1 110% 5 150% 0.1

157 Ludhiana-Patiala-I 110% 4 140% 0.1 110% 4 140% 0.1

158 Ludhiana-Patiala-II 110% 5 140% 0.1 110% 5 150% 0.1

159 Mainpuri (PG)-Ballabgarh-I 110 5 150 0.1 110 5 150 0.1

160 Mainpuri (PG)-Ballabgarh-II 112 6 150 0.1 112 6 150 0.1

161 Malerkotla-Kaithal --- --- --- --- --- --- --- ---

162 Malerkotla-Patiala 110% 5 140% 0.1 110% 5 140% 0.1

163 Meerut-Baghpat-I 110 5 150 0.1 110 5 150 0.1

164 Meerut-Baghpat-II 112 6 150 0.1 112 6 150 0.1

165 Meerut-Mandola-I 112 5 150 0.1 112 5 150 0.1

166 Meerut-Mandola-II 112 6 150 0.1 112 6 150 0.1

167 Meerut-Muzzafarnagar 110 5 150 0.1 110 5 150 0.1

168 Moga-Fatehabad 110% 5 140% 0.1 110% 5 140% 0.1

169 Moga-Hissar-I 110 5 140 0.1 110 5 150 0.1

170 Moga-Hissar-II 110 4 140 0.1 111 5 150 0.1

171 Moga-Hissar-III 110 5 140 0.1 112 6 150 0.1

172 Moga-Jalandhar-I 110% 4 140% 0.1 110% 4 140% 0.1

173 Moga-Jalandhar-II 110% 5 140% 0.1 110% 5 140% 0.1

174 Moradabad-Hapur --- --- --- --- --- --- --- ---

175 Muradnagar-Hapur --- --- --- --- --- --- --- ---

176 Nallagarh-Patiala-I 110% 4 140% 0.1 110% 4 140% 0.1

177 Nallagarh-Patiala-II 110% 5 140% 0.1 110% 5 150% 0.1

178 Napthajhakri-Rampur-I 110% 5 150% 0.1 --- --- --- ---

179 Napthajhakri-Rampur-II 112% 5 150% 0.1 --- --- --- ---

180 Nathpa Jhakri-Panchkula-I 110% 5 150% 0.1 110% 5 150% 0.1

181 Nathpa Jhakri-Panchkula-II 112% 5 150% 0.1 110% 4 150% 0.1

182 NeemranaPG-Manesar-I 110 5 150 0.1 110 5 150 0.1

183 NeemranaPG-Manesar-II 112 6 150 0.1 112 6 150 0.1

184 NeemranaPG-Sikar-I 110 5 150 0.1 110 5 150 0.1

185 NeemranaPG-Sikar-II 112 6 150 0.1 112 6 150 0.1

186 New Wanpoh-Wagoora-I 110% 4 140% 0.1 110% 4 140% 0.1

187 New Wanpoh-Wagoora-II 110% 5 140% 0.1 110% 5 140% 0.1

188 Panchkula -Abdullapur-I 110% 5 150% 0.1 110% 4 140% 0.1

189 Panchkula -Abdullapur-II 110% 4 150% 0.1 110% 5 140% 0.1

190 Patiala-Panchkula-I 110% 4 140% 0.1 110 5 150 0.1

191 Patiala-Panchkula-II 110% 5 140% 0.1 110 4 150 0.1

192 Patiala-Patran-I 110% 4 140% 0.1 110 3 140 0.1

193 Patiala-Patran-II 110% 5 140% 0.1 110 3 140 0.1

194 Patran-Kaithal-I 110 3 140 0.1 --- --- --- ---

195 Patran-Kaithal-II 110 3 140 0.1 --- --- --- ---

196 Rampur-Nallagarh-I --- --- --- --- 110% 4 140% 0.1

197 Rampur-Nallagarh-II --- --- --- --- 110% 5 150% 0.1

198 RAPP-D (unit-7&8)-Kota --- --- --- --- 110 5 150 0.1

199 RAPS-C-Chittorgarh --- --- --- --- --- --- --- ---

200 RAPS-C-Kankroli --- --- --- --- 110 5 150 0.1

201 RAPS-C-Kota --- --- --- --- 110 5 150 0.1

202 Rihand-Allahabad-I 110 3 140 0.1 110 5 150 0.1

203 Rihand-Allahabad-II 110 3 140 0.1 112 6 150 0.1

204 Roorkee-Kashipur-I 110 5 150 0.1 --- --- --- ---

Voltage

setting

stage I (%)

Time

delay

(sec)

Voltage

setting

stage 2 (%)

Time

delay

(sec)

Voltage

setting

stage I (%)

Time

delay

(sec)

Voltage

setting

stage 2 (%)

Time

delay

(sec)

S.No Name of Line

First end setting Second end setting

205 Roorkee-Kashipur-II 112 6 150 0.1 --- --- --- ---

Voltage

setting

stage I (%)

Time

delay

(sec)

Voltage

setting

stage 2 (%)

Time

delay

(sec)

Voltage

setting

stage I (%)

Time

delay

(sec)

Voltage

setting

stage 2 (%)

Time

delay

(sec)

S.No Name of Line

First end setting Second end setting

206 Roorkee-Saharanpur 110 5 150 0.1 110 5 150 0.1

207 Sarnath-Varanasi-I 110 5 150 0.1 110 5 150 0.1

208 Sarnath-Varanasi-II 112 6 150 0.1 112 6 150 0.1

209 SHAHJAHANPUR PG-BAREILLY PG-I 110 5 150 0.1 110 5 150 0.1

210 SHAHJAHANPUR PG-BAREILLY PG-II 112 6 150 0.1 112 6 150 0.1

211 SHAHJAHANPUR PG-LUCKNOW-I 110 5 150 0.1 110 5 150 0.1

212 SHAHJAHANPUR PG-LUCKNOW-II 112 6 150 0.1 112 6 150 0.1

213 SHAHJAHANPUR PG-ROSA-I 110 5 150 0.1 118 10 NA NA

214 SHAHJAHANPUR PG-ROSA-II 112 6 150 0.1 118 10 NA NA

215 Shree Cement-Kota 110 5 150 0.1 110 3 150 0.1

216 Shree Cement-Merta --- --- --- --- --- --- --- ---

217 Sikar-Ratangarh-I 110 5 150 0.1 --- --- --- ---

218 Sikar-Ratangarh-II 112 6 150 0.1 --- --- --- ---

219 Singrauli-Allahabad-I 110 5 150 0.1 110 5 150 0.1

220 Singrauli-Allahabad-II 110 5 150 0.1 112 6 150 0.1

221 Singrauli-Anpara 110 5 140 0.1 110 6 140 0

222 Singrauli-Fatehpur 110 5 140 0.1 110 5 150 0.1

223 Singrauli-LUCKNOWUP 110 5 140 0.1 110 5 150 0.1

224 Singrauli-Rihand-I 110 5 140 0.1 110 3 140 0.1

225 Singrauli-Rihand-II 110 5 140 0.1 110 3 140 0.1

226 Singrauli-Vindhyachal-I 110 5 140 0.1 110 5 150 0.1

227 Singrauli-Vindhyachal-II 110 5 140 0.1 112 6 150 0.1

228 Sohawal-LUCKNOW PG-I 110 5 150 0.1 110 5 150 0.1

229 Sohawal-LUCKNOW PG-II 112 6 150 0.1 112 6 150 0.1

230 Uri-I - Wagoora-I 110 4 140 0.1 110 4 140 0.1

231 Uri-I - Wagoora-II 110 5 140 0.1 110 5 140 0.1

232 Uri-II - Uri-I 110 6 140 0.1 110 6 140 0.1

233 Uri-II - Wagoora 110 6 140 0.1 110 5 140 0.1

B. UPPTCL (Uttar Pradesh)

1 Agra UP-Fatehabad (765kV Agra UP) 115 5 140 0 --- --- --- ---

2 Agra UP-Unnao --- --- --- --- 110 5 140 0.2

3 Aligarh-Mainpuri (UP) --- --- --- --- --- --- --- ---

4 Aligarh-Mainpuri (UP) --- --- --- --- --- --- --- ---

5 Aligarh-Muradnagar --- --- --- --- --- --- --- ---

6 Aligarh-Sikandrabad --- --- --- --- --- --- --- ---

7 Aligarh-Sikandrabad --- --- --- --- --- --- --- ---

8 Ataur-Indirapuram --- --- --- --- --- --- --- ---

9 Ataur-Indirapuram --- --- --- --- --- --- --- ---

10 Rewa Road-Banda --- --- --- --- --- --- --- ---

11 Rewa Road-Banda --- --- --- --- --- --- --- ---

12 AnparaB-AnparaC --- --- --- --- --- --- --- ---

13 AnparaB-AnparaC --- --- --- --- --- --- --- ---

14 AnparaB-AnparaD --- --- --- --- 110 6 150 0.1

15 AnparaB-AnparaD --- --- --- --- --- --- --- ---

16 AnparaB-Mau 110 6 140 0 112.7 5 160 0

17 AnparaB-Obra 110 6 140 0 115 5 140 0

18 AnparaB-Sarnath 110 6 140 0 110 5 135 0.1

19 AnparaB-Sarnath 110 6 140 0 110 5 135 0.1

20 Azamgarh-Mau 115 5 150 0 112.7 5 160 0

21 Azamgarh-Sultanpur 115 5 150 0 115 5 150 0

22 Bara-Rewa Road --- --- --- --- --- --- --- ---

23 BAREILLY UP-Unnao 110 4 145 0.1 110 5 140 0.2

24 BAREILLY UP-Unnao 113 5 145 0.1 110 4 140 0.2

25 Fatehabad-Agra(South)-II --- --- --- --- --- --- --- ---

26 Fatehabad-Agra(South)-II --- --- --- --- --- --- --- ---

27 Fatehabad-Mathura --- --- --- --- --- --- --- ---

28 Fatehabad-Mathura --- --- --- --- --- --- --- ---

29 G.Noida(400kV)-G.Noida(765kV) --- --- --- --- --- --- --- ---

30 Gorakhpur UP-Azamgarh 110 5 135 0 115 5 140 0

31 Gr.Noida-Sikandrabad --- --- --- --- --- --- --- ---

32 Gr.Noida-Sikandrabad --- --- --- --- --- --- --- ---

33 Hapur-Ataur-I --- --- --- --- --- --- --- ---

34 Hapur-Ataur-II --- --- --- --- --- --- --- ---

35 Hapur-Dasna-I --- --- --- --- --- --- --- ---

36 Hapur-Dasna-II --- --- --- --- --- --- --- ---

Page 22: Chief Engineer, Grid Management, CEA vide letter dated 9 ...hpaldc.org/NRPC_OCC/144/144_Agenda.pdf · monsoon. Copy of the letter is enclosed at Annexure – AA1.1. In the said letter,

Voltage

setting

stage I (%)

Time

delay

(sec)

Voltage

setting

stage 2 (%)

Time

delay

(sec)

Voltage

setting

stage I (%)

Time

delay

(sec)

Voltage

setting

stage 2 (%)

Time

delay

(sec)

S.No Name of Line

First end setting Second end setting

37 Mainpuri(UP)-Mainpuri(PG)-I --- --- --- --- --- --- --- ---

38 Mainpuri(UP)-Mainpuri(PG)-II --- --- --- --- --- --- --- ---

39 Mainpuri(UP)-Orai-I 110 5 150 0.1

40 Mainpuri(UP)-Paricha-2 112 6 150 0.1 110 5 120 1

41 Meja (NTPC)-Allahabad (PG)-I --- --- --- --- 110 5 150 0.1

42 Meja (NTPC)-Allahabad (PG)-II --- --- --- --- 112 6 150 0.1

43 Meja (NTPC)-Bara --- --- --- --- --- --- --- ---

44 Meja (NTPC)-Rewa Road --- --- --- --- --- --- --- ---

45 Muradnagar-Ataur --- --- --- --- --- --- --- ---

46 Muradnagar New-Mathura --- --- --- --- --- --- --- ---

47 Muzaffarnagar-Ataur --- --- --- --- --- --- --- ---

48 Muzaffarnagar-Vishnuprayag --- --- --- --- 112 5 120 0.4

49 Obra-Rewa road 115 5 140 0 --- --- --- ---

50 Obra-Sultanpur 115 5 140 0 115 5 150 0

51 Orai-Paricha 115 5 140 0 110 5 120 1

52 Panki-Aligarh --- --- --- --- --- --- --- ---

53 Rewa road-Panki --- --- --- --- --- --- --- ---

54 Roorkee-Muzaffarnagar 110 5 150 0.1 --- --- --- ---

55 Sarnath-Azamgarh 110 5 135 0.1 115 5 150 0

56 Srinagar-Muzaffarnagar --- --- --- --- --- --- --- ---

57 Sultanpur-LUCKNOW PG 115 5 150 0 110 5 150 0.1

58 Unnao-LUCKNOW UP 110 5 140 0.1 110 5 150 0.1

59 Unnao-Panki 110 5 140 0.2 --- --- --- ---

60 Vishnuprayag-Srinagar 110 5 120 0.5 --- --- --- ---

C. Rajasthan

1 Ajmer-Deedwana 110 5 150 0.1 110 5 150 0.1

2 Akal-Barmer 110 3 150 0.1 110 3 150 0.1

3 Akal-Jodhpur 110 5 150 0.1 110 5 150 0.1

4 Akal-Ramgarh-I --- --- --- --- --- --- --- ---

5 Akal-Ramgarh-II --- --- --- --- --- --- --- ---

6 Alwar-Hindaun 110 5 150 0.1 110 5 150 0.1

7 Anta-Chhabra-I 110 3 150 0.1 110 3 150 0.1

8 Anta-Chhabra-II 110 3 150 0.1 110 3 150 0.1

9 Anta-Kalisindh-I 110 3 150 0.1 110 3 150 0.1

10 Anta-Kalisindh-II 110 3 150 0.1 110 3 150 0.1

11 Anta-Kawai-I 110 3 150 0.1 110 3 140 0.1

12 Anta-Kawai-II 110 3 150 0.1 110 3 140 0.1

13 Barmer-Rajwest 110 5 150 0.1 110 3 --- ---

14 Bikaner-Deedwana 110 4 150 0.1 110 4 150 0.1

15 Bikaner-Bhadla-I --- --- --- --- 110 5 140 0.1

16 Bikaner-Bhadla-II --- --- --- --- 110 5 140 0.1

17 Bikaner-Sikar-I --- --- --- --- 110 5 150 0.1

18 Bikaner-Sikar-II --- --- --- --- 112 6 150 0.1

19 Bhilwara-Chhabra 110 5 150 0.1 110 5 150 0.1

20 Chhabra-Kawai 110 3 140 0.15 110 3 140 0.15

21 Heerapura-Hindaun 108 3 150 0.1 110 3 150 0.1

22 Hindaun-Chhabra 110 5 150 0.1 110 5 150 0.1

23 Merta-Bikaner 110 3 150 0.1 110 4 150 0.1

24 Merta-Heerapura 110 3 150 0.1 108 5 150 0.1

25 Merta-Jodhpur-I 110 5 150 0.1 110 5 150 0.1

26 Merta-Jodhpur-II 110 4 150 0.1 108 3 150 0.1

27 Merta-Ratangarh 110 3 150 0.1 108 4 150 0.1

28 Phagi-Heerapura-I 110 5 140 0.1 110 5 140 0.1

29 Phagi-Heerapura-II 110 5 140 0.1 110 5 140 0.1

30 Rajwest-Jodhpur-I 110 5 --- --- 108 4 150 0.1

31 Rajwest-Jodhpur-II 109 5 --- --- 110 5 150 0.1

32 Suratgarh-Bikaner 110 4 150 0.1 110 4 150 0.1

33 Suratgarh-Ratangarh-I 110 5 150 0.1 110 5 150 0.1

34 Suratgarh-Ratangarh-II 110 5 150 0.1 110 5 150 0.1

D. JPVL/JPL(Jaypee POWERGRID Ltd)

1 Baspa-Karcham Wangtoo-I 110 3 140 1 --- --- --- ---

2 Baspa-Karcham Wangtoo-II 112 3 140 1 --- --- --- ---

3 Karcham Wangtoo-NJPC-I 110 3 140 1 110 5 150 0.1

4 Karcham Wangtoo-NJPC-II 112 3 140 1 112 5 150 0.1

5 Karchamwangtoo- Kala Amb-I 110 3 140 1 --- --- --- ---

* - Fixed series capacitor (FSC) is owned by POWERGRID

Voltage

setting

stage I (%)

Time

delay

(sec)

Voltage

setting

stage 2 (%)

Time

delay

(sec)

Voltage

setting

stage I (%)

Time

delay

(sec)

Voltage

setting

stage 2 (%)

Time

delay

(sec)

S.No Name of Line

First end setting Second end setting

6 Karchamwangtoo- Kala Amb-II 112 3 140 1 --- --- --- ---

Voltage

setting

stage I (%)

Time

delay

(sec)

Voltage

setting

stage 2 (%)

Time

delay

(sec)

Voltage

setting

stage I (%)

Time

delay

(sec)

Voltage

setting

stage 2 (%)

Time

delay

(sec)

S.No Name of Line

First end setting Second end setting

7 Abdullapur- Kala Amb-I --- --- --- --- --- --- --- ---

8 Abdullapur- Kala Amb-II --- --- --- --- --- --- --- ---

E. HVPNL (Haryana)

1 Jhajjar(IGSTPS)-Daulatabad --- --- --- --- 110 5 140 0.1

2 Jhajjar(IGSTPS)-Daulatabad --- --- --- --- 110 5 140 0.1

3 Khedar-Fathehabad --- --- --- --- --- --- --- ---

4 Khedar-Nuhiawali --- --- --- --- --- --- --- ---

5 Nuhiawali-Fathehabad --- --- --- --- --- --- --- ---

6 Khedar-Kirori --- --- --- --- --- --- --- ---

7 Khedar-Kirori --- --- --- --- --- --- --- ---

8 CLP Jhajjar(MGSTPS)- Kabulpur --- --- --- --- --- --- --- ---

9 CLP Jhajjar(MGSTPS)- Kabulpur --- --- --- --- --- --- --- ---

10 Deepalpur-Kabulpur --- --- --- --- --- --- --- ---

11 Deepalpur-Kabulpur --- --- --- --- --- --- --- ---

12 Dhanonda-Daulatabad --- --- --- --- --- --- --- ---

13 Dhanonda-Daulatabad --- --- --- --- --- --- --- ---

14 Gurgaon-Daulatabad 110 5 150 0.1 --- --- --- ---

15 Gurgaon-Daulatabad 112 6 150 0.1 --- --- --- ---

16 CLP Jhajjar (MGSTPS -Dhanonda) --- --- --- --- --- --- --- ---

17 CLP Jhajjar (MGSTPS -Dhanonda) --- --- --- --- --- --- --- ---

F. APCPL

1 Jhajjar (IGSTPS)-Mundka 110 5 140 0.1 112 8 s 150 0.1

2 Jhajjar (IGSTPS)-Mundka 110 5 140 0.1 112 10s 150 0.1

G. DTL (Delhi)

1 Bawana-Mundka 110 4 s 150 0.1 110 4 s 150 0.1

2 Bawana-Mundka 112 4 s 150 0.1 112 4 s 150 0.1

3 Ballabgarh-Bamnoli 110 5 150 0.1 110 4 150 0.1

4 Ballabgarh-Bamnoli 112 6 150 0.1 112 6 150 0.1

5 Bamnoli-Jhatikra 110 6 150 0.1 110 5 150 0.1

6 Bamnoli-Jhatikra 112 4 150 0.1 112 6 150 0.1

7 Mandola-Bawana 110 5 150 0.1 110 6 s 150 0.1

8 Mandola-Bawana 112 6 150 0.1 112 6 s 150 0.1

9 Jhatikra-Mundka 110 5 150 0.1 110 6 150 0.1

10 Jhatikra-Mundka 112 6 150 0.1 112 6 150 0.1

H. PDD (J&K)

1 Baglihar-Kishenpur --- --- --- --- --- --- --- ---

2 Baglihar-Kishenpur --- --- --- --- --- --- --- ---

I. PSTCL (Punjab)

1 Makhu-Amritsar 110 5 150 0.1 --- --- --- ---

2 Makhu-Amritsar 112 5 150 0.1 --- --- --- ---

3 Makhu-Mukatsar 110 5 150 0.1 110 5 150 0.1

4 Makhu-Mukatsar 112 5 150 0.1 112 5 150 0.1

5 Nakodar-Makhu 110 5 150 0.1 110 5 150 0.1

6 Nakodar-Makhu 112 5 150 0.1 112 5 150 0.1

7 Nakodar-Moga 110 5 150 0.1 110 5 150 0.1

8 Rajpura-Rajpura TPS 110 5 150 0.1 110 5 150 0.1

9 Rajpura-Dhuri 110 5 150 0.1 110 5 150 0.1

10 Rajpura-Rajpura TPS --- --- --- --- 111 5 150 0.1

11 Rajpura-Dhuri --- --- --- --- 112 5 150 0.1

12 Rajpura TPS-Nakodar 110 2 140 0.1 112 5 150 0.1

13 Rajpura TPS-Nakodar 110 2 140 0.1 110 5 150 0.1

14 Talwandi Sabo-Dhuri 130 0.5 110 5 150 0.1

15 Talwandi Sabo-Dhuri 130 0.5 112 5 150 0.1

16 Talwandi Sabo-Moga --- --- --- --- 130 0.5 Disable Disable

17 Talwandi Sabo-Nakodar 110 5 150 0.1 110 5 150 0.1

18 Talwandi Sabo-Mukatsar 110 5 150 0.1 130 0.5 Disable Disable

19 Talwandi Sabo-Mukatsar 112 5 150 0.1 130 5 Disable Disable

J. PTCUL (Uttrakhand)

1 Muradabad-Kashipur --- --- --- --- 110 3 115 0.1

2 Rishikesh-Nehtaur --- --- --- --- --- --- --- ---

3 Kashipur-Nehtaur --- --- --- --- --- --- --- ---

4 Roorkee-Rishikesh 110 5 150 0.1 110 3 115 0.1

5 Srinagar-Alakhnanda (GVK) ckt-1 --- --- --- --- --- --- --- ---

6 Srinagar-Alakhnanda (GVK) ckt-2 --- --- --- --- --- --- --- ---

Voltage

setting

stage I (%)

Time

delay

(sec)

Voltage

setting

stage 2 (%)

Time

delay

(sec)

Voltage

setting

stage I (%)

Time

delay

(sec)

Voltage

setting

stage 2 (%)

Time

delay

(sec)

S.No Name of Line

First end setting Second end setting

K. BBMB

1 Bhiwani-Rajpura 109 4 150 0.1 --- --- --- ---

2 Dehar-Rajpura 110 5 150 0.1 --- --- --- ---

3 Dehar-Panchkula 110 5 150 0.1 110% 5 150% 0.1

4 Panchkula-Panipat 110% 5 150% 0.1 --- --- --- ---

1 BAREILLY PG-Meerut 110 5 150 0.1 110 5 150 0.1

2 BAREILLY PG-Meerut 112 6 150 0.1 112 6 150 0.1

3 Meerut-Mandola 110 5 150 0.1 110 5 150 0.1

4 Meerut-Mandola 111 6 150 0.1 111 6 150 0.1

5 Gorakhpur PG-LUCKNOW PG 110 5 150 0.1 110 5 150 0.1

6 Gorakhpur PG-LUCKNOW PG 112 6 150 0.1 112 6 150 0.1

7 BAREILLY UP-BAREILLY PG 110 5 Disable Disable 110 5 150 0.1

8 BAREILLY UP-BAREILLY PG 112 6 Disable Disable 112 6 150 0.1

1 Bhiwani PG -Mohindergarh (APL)-I 110 5 150 0.1 111 12 150 0.1

2 Bhiwani PG -Mohindergarh (APL)-II 112 6 150 0.1 111 11 150 0.1

3 Dhanonda-Mohindergarh (APL)-I --- --- --- --- 111 9 150 0.1

4 Dhanonda-Mohindergarh (APL)-II --- --- --- --- 111 10 150 0.1

N. PKTCL (Parbati-Koldam Transmission Company Limited)

1 Koldam-Nallagarh 110% 5 140% 0.1 110% 5 140% 0

2 Koldam-Banala 110% 5 140% 0 110% 5 150% 0.1

3 Ludhiana-Koldam --- --- --- --- --- --- --- ---

4 Ludhiana-Koldam --- --- --- --- --- --- --- ---

5 Parbati III-Banala 110% 5 140% 0 110% 5 150% 0.1

6 Parbati-II- Banala --- --- --- --- --- --- --- ---

7 Sainj(HP)-Parbati II --- --- --- --- --- --- --- ---

8 Sainj(HP)-Parbati III --- --- --- ---

O. SPTL (Sterlite Power Transmission Limited): NRSS-29 Transmission Company Limited

1 Jalandhar-Samba --- --- --- --- --- --- --- ---

2 Jalandhar-Samba --- --- --- --- --- --- --- ---

1 Fatehpur - Unchahar --- --- --- --- 110 5 150 0.1

2 Fatehpur - Unchahar --- --- --- --- 112 6 150 0.1

A. POWERGRID

1 Dhauliganga-BAREILLY(UP) --- --- --- --- --- --- --- ---

2 Dhauliganga-Pithoragarh 111 5 150 0.1 --- --- --- ---

3 Pithoragarh-BAREILLY(UP) 110 5 150 0.1 --- --- --- ---

B. Rajasthan

1 Dholpur-Hindaun --- --- --- --- --- --- --- ---

2 Kota-KTPS --- --- --- --- --- --- --- ---

3 Kota-KTPS --- --- --- --- --- --- --- ---

L. POWERLINK

M. Adani Transmission India Ltd. (ATIL)

P. POWERGRID Unchahar Transmission Ltd.

4. 400kV Transmission Line charged at 220kV

Page 23: Chief Engineer, Grid Management, CEA vide letter dated 9 ...hpaldc.org/NRPC_OCC/144/144_Agenda.pdf · monsoon. Copy of the letter is enclosed at Annexure – AA1.1. In the said letter,

List for Operation Issues

842 000

From organizations which are yet to submit revised nominations

New Members for the year 2016-17 (Nominations not received)