20
Copyright [insert date set by system] by [CH2M HILL Entity] • Company Confidential Nuclear Business Group Managing Some of the World’s Largest and Most Complex Nuclear Projects

CH2M Hill_NucInfoDay_Bucharest_2014-04-15.pptx

Embed Size (px)

Citation preview

Page 1: CH2M Hill_NucInfoDay_Bucharest_2014-04-15.pptx

Copyright [insert date set by system] by [CH2M HILL Entity] • Company Confidential

Nuclear Business Group

Managing Some of the World’s Largest and Most Complex Nuclear Projects

Page 2: CH2M Hill_NucInfoDay_Bucharest_2014-04-15.pptx

CH2M HILL is a global leaderin full-service program management, consulting, design, design-build, and operations.

We help our clients build a better and more sustainable world in the areas of: Energy

EnvironmentalFacilitiesResourcesTransportationWaterNuclear

Page 3: CH2M Hill_NucInfoDay_Bucharest_2014-04-15.pptx

Copyright by CH2M HILL • Company Confidential

Founded on Values

3

Established in 1946 by three engineers and a professor, CH2M HILL operated from its very beginning on

four simple values: take care of clients, deliver great work, do right by employees, and stay true to our

integrity and honesty. In the 1970s, the firm merged with Clair Hill to form CH2M HILL.

Clair HillHolly Cornell James Howland Burke Hayes Fred Merryfield

Page 4: CH2M Hill_NucInfoDay_Bucharest_2014-04-15.pptx

Copyright by CH2M HILL • Company Confidential

CH2M HILL Overview

Headquartered in Denver, Colorado About 28,000 employees worldwide US$7 billion in revenue (2012) 100 percent owned by our employees Broadly diversified across multiple

business sectors Performing work in more than 90 countries

with more than 16,000 active projects4

Page 5: CH2M Hill_NucInfoDay_Bucharest_2014-04-15.pptx

Copyright by CH2M HILL • Company Confidential

Halcrow Acquisition

In November 2011, CH2M HILL acquired UK-headquarteredHalcrow

Yas Island

Abu Dhabi, UAE

Busan-Geoje

Fixed Link

Korea

Crossrail

United Kingdom

Dames Point

Jacksonville, Florida, USA

Some of Halcrow’s top projects:

Page 6: CH2M Hill_NucInfoDay_Bucharest_2014-04-15.pptx

Copyright by CH2M HILL • Company Confidential

Global Reach

Page 7: CH2M Hill_NucInfoDay_Bucharest_2014-04-15.pptx

Copyright by CH2M HILL • Company Confidential7

The first infrastructure projects were done in Romania in early ‘90ies and the local liability company was registered in 2002;

At present the company employs 100 Romanian consultants who are active in the environment, water and transport sectors;

With an average gross revenue of $8m in the last 3 years, CH2M Hill has in Romania both private and public clients;

The CH2M Hill offices cover well the territory of Romania with two permanent offices - Bucharest and Timisoara and four project offices in Braila, Baia Mare, Alba Iulia and Petrosani

CH2M Hill in Romania

Page 8: CH2M Hill_NucInfoDay_Bucharest_2014-04-15.pptx

Copyright by CH2M HILL • Company Confidential

CH2M HILL – A Global Leader

We help our clients build a better and more sustainable world We provide:

– Full service program management– Engineering and design– Design-build– Operations and management– Consulting services

We serve diverse market areas:– Energy, including Nuclear– Environment– Facilities– Natural Resources– Transportation– Water

Page 9: CH2M Hill_NucInfoDay_Bucharest_2014-04-15.pptx

Copyright by CH2M HILL • Company Confidential

Managing Complex Programs Worldwide

9

Page 10: CH2M Hill_NucInfoDay_Bucharest_2014-04-15.pptx

CH2M HILL’s Nuclear Business Group

Page 11: CH2M Hill_NucInfoDay_Bucharest_2014-04-15.pptx

Copyright by CH2M HILL • Company Confidential

Nuclear Capabilities and Expertise More than 20 years experience in nuclear industry Serving nuclear power clients for more than a decade More than 2,900 nuclear sector employees worldwide and 319

nuclear engineers US, UK, Canada, Europe, Middle East and Asia Generated $1.6 billion in nuclear revenue in 2011 contributing

more than 24% to the firms total revenue NQA-1-compliant Quality Management Program Strength in nuclear operations Strong safety culture

Page 12: CH2M Hill_NucInfoDay_Bucharest_2014-04-15.pptx

Copyright by CH2M HILL • Company Confidential

CH2M HILL Nuclear Business Group Overview Manage and operate nuclear facilities and provide innovative clean-up and

environmental remediation (ER) for commercial and government facilities and sites worldwide – Commercial/Civil Nuclear Power Projects and Program Management (New Build)– Nuclear Defense and Civil Liabilities Management (D&D, ER, Waste Management)– Nuclear Infrastructure Management– Nuclear Defense Sector Management (NNSA, UK MoD)– Nuclear Fuel Cycle Management

The NBG specializes in the management of complex nuclear programs and projects around the globe – United States, United Kingdom, Central Europe, MENA, Southeast Asia

CH2M HILL provides decommissioning solutions for contaminated sites in the U.S. Department of Energy (DOE) nuclear weapons complex and at United Kingdom Nuclear Decommissioning Authority (NDA) sites in Great Britain– Five major DOE cleanup projects (PRC, ICP, NNSS, SRS, Hanford RCC)– Dounreay Decommissioning Project (Northern Scotland)– Completed two of the three major DOE Closure Sites (Rocky Flats and Mound)

The NBG provides program management and OE services for civil clients in the UAE (ENEC), Poland (PGE), UK (Horizon) and in Southeast Asia (EMA)

12

Page 13: CH2M Hill_NucInfoDay_Bucharest_2014-04-15.pptx

Copyright by CH2M HILL • Company Confidential

Lifecycle Nuclear Power Services Nuclear program and project management Licensing services

– New build– ISFSI– Renewals and extensions

Engineering, design, design-build, construction, construction management (including ISFSI)

Spent fuel handling, management and operations Seismic and flooding analysis Emergency planning Environmental studies, permitting, and compliance Plant decommissioning services Waste management, storage and repository solutions Studies and consultancy services

Page 14: CH2M Hill_NucInfoDay_Bucharest_2014-04-15.pptx

Current Nuclear Projects

Page 15: CH2M Hill_NucInfoDay_Bucharest_2014-04-15.pptx

Copyright by CH2M HILL • Company Confidential

Program Scope: 2015 vision to shrink the active cleanup area to less than 75 square miles (down to 11 square miles

with ARRA funding) and focus all resources on full-scale cleanup of the Central Plateau, including: – Disposition of special nuclear material– Remediation of contaminated environmental sites and groundwater– Exhumation of buried waste– Removal of contaminated sludge from basins along the Columbia River– Placing nuclear reactors in interim safe storage– Deactivation, decontamination, decommissioning, and demolition of facilities and structures

Current Performance: Recently used explosives to safety demolish four chimneys, four bag houses and two water towers The Plutonium Finishing Plant (PFP) Closure Project team safely removed the last of the PFP vault

complex glove boxes while achieving one million hours without a lost-time injury PRC also received two Best-in-Class and two Honorable Mention EM ESTARS Pollution Prevention

Award nominations

Hanford Plateau Remediation Client: U.S. Department of Energy

Program Value: $4.5 billionLocation: Richland, Washington, USA

ARRAAdditional

Funding$1.3B

15

Page 16: CH2M Hill_NucInfoDay_Bucharest_2014-04-15.pptx

Copyright by CH2M HILL • Company Confidential

Idaho Cleanup Project Client: U.S. Department of Energy

Program Scope:• Disposal and disposition of nuclear materials • Management of spent nuclear fuel• Closure of former high-level waste tanks• Treatment and disposal of radioactive waste streams• Cleanup of contaminated soil and water• Demolition of high-risk and excess facilities• Majority PartnerCurrent Performance:• Progress on the buried waste project has been phenomenal• The Accelerated Retrieval Project IV (ARP IV) was completed 17

months early, and waste exhumation has begun at ARP V, in Pit 9, and is already at 30 percent complete

• The 216th and final target shipment of remote-handled transuranic waste was shipped out of Idaho in March

• Outstanding D&D progress continues with the demolition of 201 of 220 facilities and structures to date and the recent move of the Materials Test Reactor vessel to its final disposal location in the Idaho CERCLA Disposal Facility

Program Value: $2.9 billionLocation: Idaho Falls, Idaho, USA

ARRAAdditional

Funding$420M*

16

Page 17: CH2M Hill_NucInfoDay_Bucharest_2014-04-15.pptx

Copyright by CH2M HILL • Company Confidential

East Tennessee Technology Park (ETTP) D&D Project

Program Scope: D&D of the K-25 former uranium enrichment

process building (4 million sq. feet) D&D of the TSCA Incinerator and other site

facilities Environmental Management Operations Landfill management at the Y-12 National

Security Complex Additional scope includes other critical services

such as waste-treatment operations at the Oak Ridge National Laboratory.

Current Status: Ahead of schedule on K-25 East Wing demolition Excavated buried waste that had been a major source of

groundwater contamination Established strong community and regulator relationships

and new strategies for the cleanup program

Location: Oak Ridge , Tennessee, USAProgram Value: $2.2 billion

Client: U.S. Department of Energy

17

Page 18: CH2M Hill_NucInfoDay_Bucharest_2014-04-15.pptx

Copyright by CH2M HILL • Company Confidential

Management & Operation of the National Nuclear Security SiteClient: U.S. National Nuclear Security Administration

Program Scope:• Northrop Grumman, CH2M HILL, AECOM, and

Nuclear Fuel Services, form National Security Technologies, LLC (NSTec)

• Responsible for all Environmental and Waste Management operations at NTS, including the operation of low-level and low-level mixed waste disposal cells; planning and integration for the entire site; D&D activities; and legal counsel

• 10% minority partner

Current Performance:• We completed all ARRA Key Performance Parameters

ahead of schedule and under budget• Recently completed major facility D&D (the RMAD

facility) project 3 months ahead of schedule.

Program Value: $3 billionLocation: Las Vegas, Nevada, USA

ARRAAdditional

Funding$45M

18

Page 19: CH2M Hill_NucInfoDay_Bucharest_2014-04-15.pptx

Copyright by CH2M HILL • Company Confidential

Savannah River Site Liquid Waste ContractClient: U.S. Department of Energy

Project Scope: Treatment and disposal of an estimated 35 million gallons of

radioactive liquid waste stored in 49 underground tanks utilizing the Defense Waste Processing Facility (DWPF) and Saltstone Facility

Operational closure of the tanks and the deactivation of the major liquid waste facilities and equipment

15% minority partner

Current Performance: CH2M HILL is proceeding with the treatment and disposal of

liquid radioactive waste in 22 non-compliant underground tanks

Our team recently obtained approval for completion of Bulk Waste Removal Efforts for Tank 11, a regulatory milestone, more than 6 months early

Program Value: $3.3 billionLocation: Savannah River, South Carolina, USA

Canisters at the DWPF

19

Page 20: CH2M Hill_NucInfoDay_Bucharest_2014-04-15.pptx

Thank you!

Please contact us in Romania:Jeni IonitaManaging DirectorHalcrow Romania Ltd CH2M HILL85 Carol Davila St, Sector 5Bucharest, Romania 050453Tel: +40(0)311.065.376Fax: +40(0)311.034.189www.ch2mhill.comwww.halcrow.ro