    D14-RP - G

    OC1

    220kV B/S

    ABBREF615

    CT Ratio 3000:1

    IEC - Normal Inverse

    Pickup = 20 (1 - 100 xCT Sec)

    Time Dial = 0.35

    3x = 2.21 s, 5x = 1.5 s, 8x = 1.15 s

    D05-RP - G

    OC1

    120MVA T/F

    ABB

    REF615

    CT Ratio 600:1

    IEC - Normal Inverse

    Pickup = 20 (1 - 100 xCT Sec)

    Time Dial = 0.25

    3x = 1.58 s, 5x = 1.07 s, 8x = 0.824 s

    1.5 1 10 100 1K3 5 30 50 300 500 3K 5K

    Amps X 10 BB-1A (Nom. kV=220, Plot Ref. kV=220)

    1.5 1 10 100 1K3 5 30 50 300 500 3K 5K

    Amps X 10 BB-1A (Nom. kV=220, Plot Ref. kV=220)

    1K

    .01

    .1

    1

    10

    100

    .03

    .05

    .3

    .5

    3

    5

    30

    50

    300

    500

    Seconds

    ETAP Star 12.5.0C

    N7733-ZAKHER CASE:1.2-EF

    Project: 220/33/11kV Zakher Grid

    Location: Zakher Area of Al Ain

    Contract: N7733

    Engineer: JM

    Filename: C:\ETAP 1250\N7733\N7733.OTI

    Date: 21-01-2016

    SN: LARSENTRN2

    Rev: Base

    Fault : Ground

    Circuit: 220kVB/S, 120MVA T/F