Upload
joshi
View
216
Download
0
Embed Size (px)
Citation preview
7/25/2019 CASE_1.2-EF (Star TCC).pdf
1/1
D14-RP - G
OC1
220kV B/S
ABBREF615
CT Ratio 3000:1
IEC - Normal Inverse
Pickup = 20 (1 - 100 xCT Sec)
Time Dial = 0.35
3x = 2.21 s, 5x = 1.5 s, 8x = 1.15 s
D05-RP - G
OC1
120MVA T/F
ABB
REF615
CT Ratio 600:1
IEC - Normal Inverse
Pickup = 20 (1 - 100 xCT Sec)
Time Dial = 0.25
3x = 1.58 s, 5x = 1.07 s, 8x = 0.824 s
1.5 1 10 100 1K3 5 30 50 300 500 3K 5K
Amps X 10 BB-1A (Nom. kV=220, Plot Ref. kV=220)
1.5 1 10 100 1K3 5 30 50 300 500 3K 5K
Amps X 10 BB-1A (Nom. kV=220, Plot Ref. kV=220)
1K
.01
.1
1
10
100
.03
.05
.3
.5
3
5
30
50
300
500
Seconds
ETAP Star 12.5.0C
N7733-ZAKHER CASE:1.2-EF
Project: 220/33/11kV Zakher Grid
Location: Zakher Area of Al Ain
Contract: N7733
Engineer: JM
Filename: C:\ETAP 1250\N7733\N7733.OTI
Date: 21-01-2016
SN: LARSENTRN2
Rev: Base
Fault : Ground
Circuit: 220kVB/S, 120MVA T/F