    Huawei ConfidentialHuawei Technologies Co., Ltd.

    GSM Radio

    Network

    Capacity Planning

    India NTS Technical Support

  • 7/27/2019 Capacity Planing

    2/25

    Page 2Huawei Technologies Co., Ltd.

    Basic Knowledge

    Capacity Planing Strategy

    BTS Configuration

    Channel Configuration

    Capacity Solution

    Contents

  • 7/27/2019 Capacity Planing

    3/25

    Page 3Huawei Technologies Co., Ltd.

    Basic Knowledge

    Traffic Load

    BHCA: Busy Hour Call Attempt

    GoS

    Grade of Service

    It is the probability of a call in a circuit group being blocked or delayed for

    more than a specified interval.

    For a Lost Call system, the GoS can be measured using such equation:

    )(3600

    TimeHoldingCallAvg.BHCABH@LoadTrafficAvg. Erlang

    callsofferedofNumber

    callslostofNumberServiceofGrade

  • 7/27/2019 Capacity Planing

    4/25

    Page 4Huawei Technologies Co., Ltd.

    Basic Knowledge

    Erlang-B Table

    Assumption: All traffic through the network is pure-chance traffic

    i .e. al l call arr ivals and termin ations are independent random

    events

    There is statistical equilibrium

    i .e., the average number of cal ls does not ch ange

    Full availability of the network

    i .e., every outlet from a switch is access ible from every inlet

    Any call that encounters congestion is immediately lost.

    Erlang-B equation of GoS

    A = Expected traffic intensity in Erlangs; N = Number of circuits in group.

    N

    K

    K

    N

    KA

    NAerviceGrade of S

    0

    !

    !

  • 7/27/2019 Capacity Planing

    5/25

    Page 5Huawei Technologies Co., Ltd.

    Basic Knowledge

    Capacity Planning Strategy

    BTS Configuration

    Channel Configuration

    Capacity Solution

    Contents

  • 7/27/2019 Capacity Planing

    6/25

    Page 6Huawei Technologies Co., Ltd.

    Capacity Planning Strategy

    Key point of RNP

    Its always changing along with the network developing

    Initial phase

    Mainly pay attention to coverage, capacity is not the problem

    Capacity planning is very easy:

    Coverage

    Dimension

    Coverage

    area per Site

    Traffic model

    Subscribers

    Distribution

    Traffic Load

    pre Site

    TRX/Channel/

    .

    Configuration

  • 7/27/2019 Capacity Planing

    7/25

    Page 7Huawei Technologies Co., Ltd.

    Capacity Planning Strategy

    Developing phase

    Pay attention to both coverage and capacity:

    Coverage

    Dimension

    Coverage

    area per Site

    Traffic model

    Subscribers

    Distribution

    Traffic Load

    pre Site

    TRX/Channel/

    Configuration

    LimitationJudgment

    Figure out the

    max. configuration

    Frequency

    Planning

    Channel

    Configuratio

    n

    END

    Traffic Load

    per Site

    Coverage

    area per Site

    Coverage

    limitation

    BTS Quantity

    Capacity

    limitation

  • 7/27/2019 Capacity Planing

    8/25

    Page 8Huawei Technologies Co., Ltd.

    Capacity Planning Strategy

    Mature phase

    Pay more attention to capacity while coverage is good enough

    Solve the congestion by

    Cell sp l i t

    Micro c el ls

    Special In-Bu i ldin g Coverage system

    Dual-band network

    Capaci ty enhancement technolog y

  • 7/27/2019 Capacity Planing

    9/25

    Page 9Huawei Technologies Co., Ltd.

    Capacity Estimation

    Capacity requirement contains

    No. of subscribers

    Population, distribution and increasing rate

    Mobile penetration & market share

    Roaming factor, active factor, events (festival),

    Traffic model

    Which relate to the actual situation such as society, economy, user habit

    and so on.

    Capacity estimation

    Method

    Short-term, Long-term; Analogy, Modeling,

    Reference

    Population, existing radio networks, PLMN, GDP,

  • 7/27/2019 Capacity Planing

    10/25

    Page 10Huawei Technologies Co., Ltd.

    Basic Knowledge

    Capacity Planning Strategy

    BTS Configuration

    Channel Configuration

    Capacity Solution

    Contents

  • 7/27/2019 Capacity Planing

    11/25

    Page 11Huawei Technologies Co., Ltd.

    Basic Knowledge of Frequency Planning

    GSM frequency resource

    GSM900

    fUL(n) = 890 + n * 0.2 MHz

    fDL(n) = fUL(n) + 45 MHz

    DCS1800

    fUL(n) = 1710 + (n 511) * 0.2 MHz

    fDL(n) = fUL(n) + 95 MHz

    C/I & CA

    C/I request in GSM: 9dB (extra 3dB margin in the project)

    Carrier/Interference, interference from the signal with same frequency

    CA request in GSM: -9dB (extra 3dB margin in the project)

    Interference from the signal with adjacent frequency, in GSM is 200KHz

    890MHz 915MHz 935MHz 960MHz

    1710MHz 1785MHz 1805MHz 1880MHz

  • 7/27/2019 Capacity Planing

    12/25

    Page 12Huawei Technologies Co., Ltd.

    loose

    Frequency Reuse

    Frequency reuse

    {f1, fj, fk}

    {f1, fj, fk} {f1, fj, fk}

    Reuse Reuse

    More and more mobile subscribersfnfn

    fn

    RD

    fn

    fn

    fnfn

    Frequency reuse factor

    i .e. number of cel ls in a frequency reuse clusterTRX

    ARFCN

    reuse

    N

    Nf

    0 12 20t igh t

    High efficiency

    Serious interference

    Good quality, easy to plan

    Low efficiency

  • 7/27/2019 Capacity Planing

    13/25

    Page 13Huawei Technologies Co., Ltd.

    Frequency Reuse

    Frequency reuse pattern

    Common frequency reuse pattern

    4*3 (or 3/12)

    A clu ster has 4 si tes

    3 cel ls per site

    General ly for BCCH frequency planning

    Tight frequency reuse

    MRP (Multiple frequency Reuse Pattern)

    Grouping frequency

    Use dif ferent reus e pattern for d if ferent TRX layer

    Frequency Hopping (1*3, 1*1)

    No. of ARFCNs in MA shou ld be at least 2 times more than no. of

    TRXs

    Usual ly BCCH layer doesnt adopt hopping for good q uali ty

    IUO

    Use tight reuse pattern for o verlay-cel ls

    B3

    A1

    C1

    B1

    D1A2

    A3B2

    B3

    C2

    C3D2

    D3

    B1B2

    B3

    D3A1

    C1

    B1

    D1A2

    A3

    B2

    B3

    C2

    C3D2

    D3

    A1

    C1

    A2

    A3

  • 7/27/2019 Capacity Planing

    14/25

    Page 14Huawei Technologies Co., Ltd.

    BTS Configuration

    Frequency resource, Capacity and Quality

    Max. BTS Configuration China Unicom has 6MHz GSM900 frequency (29 ARFCNs)

    max. BTS configuration while 4*3 reuse?

    max. BTS configuration while 1*3 hopping?

    Capacity

    Quality

    Balance

    AvailableFrequency

    Frequency

    Reuse Pattern

    Interference

    RxQual BER Range

    MOS

    Non-

    Hop

    Hop

    0 12.8% E E

  • 7/27/2019 Capacity Planing

    15/25

    Page 15Huawei Technologies Co., Ltd.

    Basic Knowledge

    Capacity Planning Strategy

    BTS Configuration

    Channel Configuration

    Capacity Solution

    Contents

  • 7/27/2019 Capacity Planing

    16/25

    Page 16Huawei Technologies Co., Ltd.

    Basic Knowledge of GSM Channels

    Logical channel

    Traffic CHannel and Control CHannel

    4 kinds of CCH according to the function

    BCH: Broadcast Channel

    CCCH: Common Control Channel

    DCCH: Dedicated Control Channel

    CBCH: Cell Broadcast Channel

    Channel combination types (GSM Phase 2)

    TCH/F + FACCH/F + SACCH/TF

    FCCH + SCH + BCCH + CCCH FCCH + SCH + BCCH + CCCH + SDCCH/4(0..3) + SACCH/C4(0..3)

    SDCCH/8(0..7) + SACCH/C8(0..7)

    CCH

    BCH

    CCCH

    DCCH

    CBCH

    FCCH

    SCH

    BCCH

    PCH

    AGCH

    RACH

    SDCCH

    SACCH

    FACCH

  • 7/27/2019 Capacity Planing

    17/25

    Page 17Huawei Technologies Co., Ltd.

    Basic Knowledge of GSM Channels

    BCCH

    It carries very important information such as

    list of frequencies used in cell, cell ID, location area ID, list of neighbor cells,

    access control and DTX information, etc.

    It transmit at a constant power all the time from the BTS.

    Usually the BCCH TRX doesnt hopping, 4*3 reuse

    SDCCH

    SDCCH bears such traffic as following:

    Mobility management such as location update;

    Radio resource management such as call setup;

    Point to point SMS, etc.

    SDCCH/8 & SDCCH/4

  • 7/27/2019 Capacity Planing

    18/25

    Page 18Huawei Technologies Co., Ltd.

    Channel Configuration

    BCCH Configuration

    Only 1 BCCH per cell; TS0 of TRX0 Combined BCCH (considering SDCCH traffic)

    TCH Configuration

    8 channels (i.e. time slots) per TRX

    n = No. of TRX

    Consult Erlang-B table

    Exercises

    No.SDCCH-No.BCCH8TCHofNo. n

    TRX No. TCH No. GoS Traffic (Erl)

    2 ? 2% ?

    ? ? 2% 15

    ? ? 5% 15

  • 7/27/2019 Capacity Planing

    19/25

    Page 19Huawei Technologies Co., Ltd.

    SDCCH Configuration

    SDCCH capacity requirement

    Which relate to

    Traffic model, user habit, network structure, etc.

    Default value:

    ~5mErl/user @ BH

    20%~25% of voice traffic load

    Event Normal

    Cell

    Inner Cell Edge Cell Notes

    Location update 0.4 0 1.2 1, Unit:

    mErl/user

    2, TCH traffic

    load

    assumption:

    25mErl/user

    Periodic location update 1.8 1.8 1.8

    IMSI attach/detach 0.8 0.8 0.8

    Call setup 0.9 0.9 0.9

    Point to point SMS 1.0 1.0 1.0

    Other applications 0.2 0.2 0.2

    SUM 5.1 4.7 5.9

  • 7/27/2019 Capacity Planing

    20/25

    Page 20Huawei Technologies Co., Ltd.

    SDCCH Configuration (cont.)

    GoS of SDCCH

    SDCCH/8, of TCHs GoS

    SDCCH/4, of TCHs GoS

    For instance, TCH GoS = 2%, and then

    GoS of SDCCH/8 = 0.5%

    GoS of SDCCH/4 = 1%

    SDCCH type

    SDCCH/4, combine with BCCH (TS0); 4 sub-channels

    SDCCH/4 + CBCH, 3 sub-channels

    SDCCH/8, on any time slot except for BCCH time slot, 8 sub-

    channels

    SDCCH/8 + CBCH, 7 sub-channels

  • 7/27/2019 Capacity Planing

    21/25

    Page 21Huawei Technologies Co., Ltd.

    SDCCH Configuration (cont.)

    SDCCH configuration suggestion

    TRX

    No.

    Without CBCH With CBCH

    Normal cell Inner cell Edge cell Normal cell Inner cell Edge cell

    1 SDCCH/4 SDCCH/8

    2 SDCCH/8 SD/8 + SD/4

    3 SDCCH/8 + SDCCH/4

    4 2*SDCCH/8 SD/8 + SD/4 2*SDCCH/8

    5 2*SDCCH/82*SDCCH/8

    + SDCCH/4

    62*SDCCH/8

    + SDCCH/42*SDCCH/8 2*SDCCH/8 + SDCCH/4

    7 2*SDCCH/8 + SDCCH/4 3*SDCCH/82*SDCCH/8

    + SDCCH/43*SDCCH/8

    8 3*SDCCH/83*SDCCH/8

    + SDCCH/4

    Simply calculating: 1 SDCCH/8 per 2 TRXs

  • 7/27/2019 Capacity Planing

    22/25

    Page 22Huawei Technologies Co., Ltd.

    Basic Knowledge

    Capacity Planning Strategy

    BTS Configuration

    Channel Configuration

    Capacity Solution

    Contents

  • 7/27/2019 Capacity Planing

    23/25

    Page 23Huawei Technologies Co., Ltd.

    Half Rate Solution

    Half Rate theory

    Half Rate is a speech encoding system for GSM

    Since the codec, operating at 5.6 kbit/s, requires half the

    bandwidth of the Full Rate codec, network capacity for voice

    traffic is doubled

    HR Channel Allocation Principle

    Be used in area with little interference

    HR dynamic allocation

    When network busy: HR > FR, for more capacity

    When network idle: FR > HR, for better quality

    Others

    Priority ofSingle > Couple

    Allocate channels on the TRX which cannot adjust rate firstly

  • 7/27/2019 Capacity Planing

    24/25

    Page 24Huawei Technologies Co., Ltd.

    Half Rate Solution

    Capacity enhancement by HR

    A S6 cell, 42 traffic time slots; GoS = 2%

    Half rate ratio

    By TRX: = HR_TRX_No. / Total_TRX_No.

    By time slot: = HR_TS_No. / Total_TS_No.

    By channel: = 2*HR_TS_No. / (2*HR_TS_No. + FR_TS_No.)

    Ratio of Full

    Rate Call

    Required

    TCHF No.

    Capacity

    (Erl)

    Capacity of

    all FR (Erl)

    Capacity

    Enhancemen

    t

    20% 14 59.1332.84

    80%30% 20 53.43 62.7%

    40% 24 49.64 51.2%

  • 7/27/2019 Capacity Planing

    25/25