24
BUS RAPID TRANSIT (BRT) IN GUATEMALA CITY

BUS RAPID TRANSIT (BRT) IN GUATEMALA CITY - Econegocioseconegocios.com.gt/documents/BRT.pdf · 2020. 7. 6. · CONCLUSIONS • Many years of problems with the current transportation

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: BUS RAPID TRANSIT (BRT) IN GUATEMALA CITY - Econegocioseconegocios.com.gt/documents/BRT.pdf · 2020. 7. 6. · CONCLUSIONS • Many years of problems with the current transportation

BUS RAPID TRANSIT (BRT)

IN GUATEMALA CITY

Page 2: BUS RAPID TRANSIT (BRT) IN GUATEMALA CITY - Econegocioseconegocios.com.gt/documents/BRT.pdf · 2020. 7. 6. · CONCLUSIONS • Many years of problems with the current transportation

PROJECT BASELINE

Page 3: BUS RAPID TRANSIT (BRT) IN GUATEMALA CITY - Econegocioseconegocios.com.gt/documents/BRT.pdf · 2020. 7. 6. · CONCLUSIONS • Many years of problems with the current transportation

• High transportation and

maintenance costs.

• Long time per travel.

PROJECT BASELINE

Page 4: BUS RAPID TRANSIT (BRT) IN GUATEMALA CITY - Econegocioseconegocios.com.gt/documents/BRT.pdf · 2020. 7. 6. · CONCLUSIONS • Many years of problems with the current transportation

PROJECT BASELINE

• High levels of air and

noise pollution.

• High fuel consumption.

Page 5: BUS RAPID TRANSIT (BRT) IN GUATEMALA CITY - Econegocioseconegocios.com.gt/documents/BRT.pdf · 2020. 7. 6. · CONCLUSIONS • Many years of problems with the current transportation

PROYECT BASELINE

• High rate of assaults and

murders in units.

Page 6: BUS RAPID TRANSIT (BRT) IN GUATEMALA CITY - Econegocioseconegocios.com.gt/documents/BRT.pdf · 2020. 7. 6. · CONCLUSIONS • Many years of problems with the current transportation

PROJECT BASELINE

• Lack of planned bus stops.

• Lack of infrastructure for

users (handicapped).

Page 7: BUS RAPID TRANSIT (BRT) IN GUATEMALA CITY - Econegocioseconegocios.com.gt/documents/BRT.pdf · 2020. 7. 6. · CONCLUSIONS • Many years of problems with the current transportation

PROJECT DESCRIPTION

Page 8: BUS RAPID TRANSIT (BRT) IN GUATEMALA CITY - Econegocioseconegocios.com.gt/documents/BRT.pdf · 2020. 7. 6. · CONCLUSIONS • Many years of problems with the current transportation

PROJECT DESCRIPTION

• Establish a new public

transportation.

• Characteristic:

- Bases in BRT System

- Safe

- Efficient

- Convenient

- Comfortable

- Organized

Page 9: BUS RAPID TRANSIT (BRT) IN GUATEMALA CITY - Econegocioseconegocios.com.gt/documents/BRT.pdf · 2020. 7. 6. · CONCLUSIONS • Many years of problems with the current transportation

CHARACTERISTICS

• Exclusive right-of-way lanes

• Rapid boarding and alighting

• Enclosed trunk route stations

• Clearly defined routes

• Manage vehicle movements

• Excellence in marketing and customer

service

• Environmentally friendly

• Organized

• Public sector is responsible for the

investment.

• Local private Banks finance the

project.

• Department of Transmetro (public)

controls and manages the trunk buses.

• Fleet Management Centre.

• Pre-board collection system and cash

tokens (coins).

Page 10: BUS RAPID TRANSIT (BRT) IN GUATEMALA CITY - Econegocioseconegocios.com.gt/documents/BRT.pdf · 2020. 7. 6. · CONCLUSIONS • Many years of problems with the current transportation

MASTER PLAN BRT

• Total distance CDM projected

46.9 km

Non-project line:

South Trunk Line –West

Existing Line:

Central Corridor Trunk Line

Planned Lines:

Northeast trunk Line, zone6

Northeast Trunk Line, zone 18

RooseveltTrunk Line

Page 11: BUS RAPID TRANSIT (BRT) IN GUATEMALA CITY - Econegocioseconegocios.com.gt/documents/BRT.pdf · 2020. 7. 6. · CONCLUSIONS • Many years of problems with the current transportation

ACCOMPLISHED BENEFITS

Page 12: BUS RAPID TRANSIT (BRT) IN GUATEMALA CITY - Econegocioseconegocios.com.gt/documents/BRT.pdf · 2020. 7. 6. · CONCLUSIONS • Many years of problems with the current transportation

Don Bosco Station

TRANSMETRO SOUTH LINE

Trebol Station Portal Plaza Barrios Station

Portal Municipalidad Station

7 YEARS in operation (2007) 500

MILLIONS users

12.5 KM with 78 ARTICULATED BUSES.

Centa-Sur Station Offers 74MTS of

services and trade.

12 STATIONS and 2 TRANSFER

STATION

Page 13: BUS RAPID TRANSIT (BRT) IN GUATEMALA CITY - Econegocioseconegocios.com.gt/documents/BRT.pdf · 2020. 7. 6. · CONCLUSIONS • Many years of problems with the current transportation

TRANSMETRO CENTRAL CORRIDOR

30 MILLON users in 4 YEARS

of operation

30 articular SCANIA and Volvo

buses.

12 KM DISTANCE Integrated

system.

IGGS Station Montufar Station Los Arcos Station

Banco de Guatemala Station

Page 14: BUS RAPID TRANSIT (BRT) IN GUATEMALA CITY - Econegocioseconegocios.com.gt/documents/BRT.pdf · 2020. 7. 6. · CONCLUSIONS • Many years of problems with the current transportation

TRANSMETRO HISTORICAL CENTER

1.5 MILLION users in 6

MONTHS of operation.

8 SCANIA buses in a

4 KM circuit operating

under a prepaid integrated

system.

Page 15: BUS RAPID TRANSIT (BRT) IN GUATEMALA CITY - Econegocioseconegocios.com.gt/documents/BRT.pdf · 2020. 7. 6. · CONCLUSIONS • Many years of problems with the current transportation

SOCIAL IMPACT

Page 16: BUS RAPID TRANSIT (BRT) IN GUATEMALA CITY - Econegocioseconegocios.com.gt/documents/BRT.pdf · 2020. 7. 6. · CONCLUSIONS • Many years of problems with the current transportation

ACCESS TO EVERYONE

Page 17: BUS RAPID TRANSIT (BRT) IN GUATEMALA CITY - Econegocioseconegocios.com.gt/documents/BRT.pdf · 2020. 7. 6. · CONCLUSIONS • Many years of problems with the current transportation

FRIENDLY VISUAL COMMUNICATION

Service schedule

Urban routes

Page 18: BUS RAPID TRANSIT (BRT) IN GUATEMALA CITY - Econegocioseconegocios.com.gt/documents/BRT.pdf · 2020. 7. 6. · CONCLUSIONS • Many years of problems with the current transportation

RECOVERY AND RESTAURATION OF MUNICIPAL URBAN SPACES

ROUTE AND LANDSCAPE PLANNING

Page 19: BUS RAPID TRANSIT (BRT) IN GUATEMALA CITY - Econegocioseconegocios.com.gt/documents/BRT.pdf · 2020. 7. 6. · CONCLUSIONS • Many years of problems with the current transportation

BOOST OF ECONOMIC ACTIVITY

Page 20: BUS RAPID TRANSIT (BRT) IN GUATEMALA CITY - Econegocioseconegocios.com.gt/documents/BRT.pdf · 2020. 7. 6. · CONCLUSIONS • Many years of problems with the current transportation

BICYCLE TRAILS

INTEGRATION OF ALTERNATIVE

TRANSPORTATION

2,500 daily commutes to the San Carlos public University

Page 21: BUS RAPID TRANSIT (BRT) IN GUATEMALA CITY - Econegocioseconegocios.com.gt/documents/BRT.pdf · 2020. 7. 6. · CONCLUSIONS • Many years of problems with the current transportation

POSITIVE CULTURAL CHANGE INFLUENCED

BY TRANSMETRO

Order Respect to mothers and orderly people Social integration

Universal access Pedestrian education Citizen service

Page 22: BUS RAPID TRANSIT (BRT) IN GUATEMALA CITY - Econegocioseconegocios.com.gt/documents/BRT.pdf · 2020. 7. 6. · CONCLUSIONS • Many years of problems with the current transportation

SECURE BUS STOPS

Page 23: BUS RAPID TRANSIT (BRT) IN GUATEMALA CITY - Econegocioseconegocios.com.gt/documents/BRT.pdf · 2020. 7. 6. · CONCLUSIONS • Many years of problems with the current transportation

100 MILLION USERS CELEBRATION

Page 24: BUS RAPID TRANSIT (BRT) IN GUATEMALA CITY - Econegocioseconegocios.com.gt/documents/BRT.pdf · 2020. 7. 6. · CONCLUSIONS • Many years of problems with the current transportation

CONCLUSIONS

• Many years of problems with the current transportation system

have stressed the environmental and social benefits in the city

of Guatemala. The success of this project has been confirmed

through the acceptance of millions of users in the metropolitan

area.

• This is a first of its kind public transportation system in Central

America, it offers access to everyone in a cleaner, safer,

organized and planned space.

• The success of this projects and the positive effects in cultural

change is barely the tip of the Iceberg. Carbon revenues are an

essential source of financial support, that is why it is important

to invite carbon buyers to be part of this innovative effort and

support the whole process off change.