BUS RAPID TRANSIT (BRT)
IN GUATEMALA CITY
PROJECT BASELINE
• High transportation and
maintenance costs.
• Long time per travel.
PROJECT BASELINE
PROJECT BASELINE
• High levels of air and
noise pollution.
• High fuel consumption.
PROYECT BASELINE
• High rate of assaults and
murders in units.
PROJECT BASELINE
• Lack of planned bus stops.
• Lack of infrastructure for
users (handicapped).
PROJECT DESCRIPTION
PROJECT DESCRIPTION
• Establish a new public
transportation.
• Characteristic:
- Bases in BRT System
- Safe
- Efficient
- Convenient
- Comfortable
- Organized
CHARACTERISTICS
• Exclusive right-of-way lanes
• Rapid boarding and alighting
• Enclosed trunk route stations
• Clearly defined routes
• Manage vehicle movements
• Excellence in marketing and customer
service
• Environmentally friendly
• Organized
• Public sector is responsible for the
investment.
• Local private Banks finance the
project.
• Department of Transmetro (public)
controls and manages the trunk buses.
• Fleet Management Centre.
• Pre-board collection system and cash
tokens (coins).
MASTER PLAN BRT
• Total distance CDM projected
46.9 km
Non-project line:
South Trunk Line –West
Existing Line:
Central Corridor Trunk Line
Planned Lines:
Northeast trunk Line, zone6
Northeast Trunk Line, zone 18
RooseveltTrunk Line
ACCOMPLISHED BENEFITS
Don Bosco Station
TRANSMETRO SOUTH LINE
Trebol Station Portal Plaza Barrios Station
Portal Municipalidad Station
7 YEARS in operation (2007) 500
MILLIONS users
12.5 KM with 78 ARTICULATED BUSES.
Centa-Sur Station Offers 74MTS of
services and trade.
12 STATIONS and 2 TRANSFER
STATION
TRANSMETRO CENTRAL CORRIDOR
30 MILLON users in 4 YEARS
of operation
30 articular SCANIA and Volvo
buses.
12 KM DISTANCE Integrated
system.
IGGS Station Montufar Station Los Arcos Station
Banco de Guatemala Station
TRANSMETRO HISTORICAL CENTER
1.5 MILLION users in 6
MONTHS of operation.
8 SCANIA buses in a
4 KM circuit operating
under a prepaid integrated
system.
SOCIAL IMPACT
ACCESS TO EVERYONE
FRIENDLY VISUAL COMMUNICATION
Service schedule
Urban routes
RECOVERY AND RESTAURATION OF MUNICIPAL URBAN SPACES
ROUTE AND LANDSCAPE PLANNING
BOOST OF ECONOMIC ACTIVITY
BICYCLE TRAILS
INTEGRATION OF ALTERNATIVE
TRANSPORTATION
2,500 daily commutes to the San Carlos public University
POSITIVE CULTURAL CHANGE INFLUENCED
BY TRANSMETRO
Order Respect to mothers and orderly people Social integration
Universal access Pedestrian education Citizen service
SECURE BUS STOPS
100 MILLION USERS CELEBRATION
CONCLUSIONS
• Many years of problems with the current transportation system
have stressed the environmental and social benefits in the city
of Guatemala. The success of this project has been confirmed
through the acceptance of millions of users in the metropolitan
area.
• This is a first of its kind public transportation system in Central
America, it offers access to everyone in a cleaner, safer,
organized and planned space.
• The success of this projects and the positive effects in cultural
change is barely the tip of the Iceberg. Carbon revenues are an
essential source of financial support, that is why it is important
to invite carbon buyers to be part of this innovative effort and
support the whole process off change.