© ABB GroupSeptember 29, 2014 | Slide 1
ABB OEM Days 2014Getting ready for a smarter power network
Andreas Brandt, September 24-26, 2014 – Dalmine, Italy
© ABB GroupSeptember 29, 2014 | Slide 2
Getting ready for a smarter power networkWhy it matters
§ Central importance of the environmental impact, thereliability and continuity of the services
§ Customers behavior and role changed, changing therules of the game in the marketplace
§ Increasing need and application of intelligent devices toefficiently manage the network.
Getting ready for a smarter power networkThe pillars to base the right solution on
Why ABB?
§ Cover the whole MV market requirements in terms ofsegments, international standard and applicationcomplexity
§ Worldwide presence and global experience
§ Willing to share innovation and know-how with ourpartners through dedicated programs
§ Exhaustive offering portfolio from components tocomplete solutions
© ABB GroupSeptember 29, 2014 | Slide 3
Getting ready for a smarter power networkThe pillars to base the right solution on
© ABB GroupSeptember 29, 2014 | Slide 4
Special ApplicationsSmart Secondary Distribution
Secondary Distribution Primary Distribution
Secondary DistributionFast, easy and effective
Easy customization
All typical units
Modular switch
Short delivery
GSecThree-positionswitchdisconnector
§ Secondarydistribution network
§ Building andconstruction andsmall industry
§ Enables remotecontrol
Secondary DistributionFast, easy and effective
© ABB GroupSeptember 29, 2014 | Slide 6
Secondary DistributionFast, easy and effective
© ABB GroupSeptember 29, 2014 | Slide 7
SwitchingPointAir or SF6 InsulatedLoad Break Switchesfor outdoor applications
§ Smart distributionnetwork
§ Enables faultIsolation
§ Field-proven solution resilience toharsh environments
§ Modular design of NPS LBS fits manyrequirements and allow future upgrades
§ High OEM added value ranging frompure installation to major assembly
§ Advanced control cabinet
Smart Secondary DistributionEvolving to integration
© ABB GroupSeptember 29, 2014 | Slide 8
§ Proven solution for an optimizedassembly process
Smart Secondary DistributionEvolving to integration
§ Maximum integration andcompactness
© ABB GroupSeptember 29, 2014 | Slide 9
HySecIntegrated CircuitBreaker and SwitchDisconnector
§ Smart distributionnetwork
§ Minimized footprintfor CSS application
§ Enables faultisolation andmeasurement § Sensors for new generation protection
devices
§ Perfectly meeting requirements ofCSS manufacturers and utilities
Smart Secondary DistributionEvolving to integration
SafeRingSafePlusFamilySF6 RMUs§ Compact secondary
substations
§ Wind power plants
§ Infrastructure
§ Light industries
§ Buildings, hotels,shopping centers
§ Mining applications
§ Flexible answer to smart gridrequirements
§ Space efficient solution and easy tohandle in wind applications
Primary Distribution
© ABB GroupSeptember 29, 2014 | Slide 11
MV CBsPrimary DistributionCircuit Breakers§ Primary distribution
network
§ All Industrial andprocessapplications
Primary DistributionThe bestseller
§ Fulfilling global needs
© ABB GroupSeptember 29, 2014 | Slide 12
• Based on embedded poles: compact,robust and easy to integrate
§ The most sold Circuit Breakers in theworld
§ Suitable to all ABB panels andenclosure solutions
Primary DistributionSensing to the future
© ABB GroupSeptember 29, 2014 | Slide 13
SensorsPost insulator voltagesensor
KEVCD KEVA family
VT – DIN type
Ring Core CT Family
§ Linearity: engineering reduction, fastand easy selection
§ Flexibility of solution
§ No custom configuration neededsecuring a shorter delivery time
§ Compact & Easy to integrate
Primary DistributionProactive safety
§ Minimization of the pressure riseand gas exhaust
§ Personnel safety under maintenanceconditions
§ Increased process and systemavailability
UFESUltra-Fast Active
Internal Arc Protection§ All industrial
processapplications
§ Power plants
§ Areas with publicaccess
§ Marine applications
Special ApplicationsThe key to access new markets
© ABB GroupSeptember 29, 2014 | Slide 15
© ABB9/29/2014 Apparatus Product Folio | 16
Special ApplicationsThe key to access new markets
§ Cost reductions of switchgearinstallations
§ Flexible connection of new powergeneration to utility network
§ The short-circuit current is limited atthe first current rise
§ compact high power generation inmarine applications
t-peak
130 kA
t
i
i1i2
IS-LimiterThe world’s fastestlimiting & switchingdevice§ Heavy industries
§ Power plants
§ Utilities with IPPconnection
§ Marine applications
§ Datacenters
© ABB GroupSeptember 29, 2014 | Slide 17
Special ApplicationsThe key to access new markets
§ Best footprint for Generatorapplications
§ Type tested to the newest standardIEC/IEEE 62271-37-13
§ Enables compact connection ofsmall power generators
§ Tested for out of phase switching
VD4G-50Generator CircuitBreaker
§ Small power plants
§ Networks withemergency powergenerator
§ Process industrywith own powergeneration
© ABB GroupSeptember 29, 2014 | Slide 18
Special ApplicationsThe key to access new markets
§ Integrated diagnostics
§ Top level innovation § Transient free switching
§ Future proof
DS1Diode capacitorswitch
§ Compensation ofreactive power
© ABB GroupSeptember 29, 2014 | Slide 19
Getting ready for a smarter power networkWhy it matters
ABB is the right choice to get supportwith various products, solutions andrelated know-how to fulfill the needs ofthe new smart grid challenges of yourcustomers.