architectural t0.0 TITLE SHEET a0.0 SHADOW STUDIES a0.1 SITE & LANDSCAPE PLAN a1.0 EXISTING BUILDING PLAN a1.1 FIRST FLOOR PLAN a1.2 SECOND FLOOR PLAN a1.3 ROOF PLAN a2.0 EXISTING ELEVATIONS a2.1 EXTERIOR ELEVATIONS a2.2 STRIP STREET ELEVATIONS & SITE SECTIONS a2.3 MATERIALS & COLORS a2.4 PERSPECTIVE PHOTO MONTAGE a3.1 EXISTING SECTIONS a3.2 PROPOSED SECTIONS c1.0 GRADING & DRAINAGE PLAN For Assessment Use Only Gtle sheet t0.0 vicinity map Scale: 1/32" = 1'0" 1 not for construction owner: 1819 5th Street LLC 768 San Luis Road Berkeley, CA 94707 contact: Frances Hellman 510.642.6135 1819 5th Street, LLC 768 San Luis Road Berkeley, CA 94707 apn: 0572098164 date: phase: maYhew stromberg Architect, LEED AP 2113 9th St Berkeley, CA 94710 510.316.0443 m [email protected] architect: MaRhew Stromberg 2113 9th Street Berkeley, CA 94710 510.316.0443 [email protected] mechanical engineer: tbd contractor / esGmator: Holland & Harley ConstrucUon, Inc. 702 F Harrison St. Berkeley, CA 94710 contact: Chip Harley 5105283373 ph 510.528.3704 f ren. date C32401 12.31.2011 structural engineer: Jeffrey Weber & Associates, Inc. 1939 Harrison Street, Suite 215 Oakland, CA 94612 contact: Jeff Weber 5102519578 ph 510.251.9580 f 09.08.11 use permit 12.02.11 REV 1 use permit electrical engineer: Cammisa and Wipf Electrical ConsulUng Engineers 642 Harrison St San Francisco, CA 94107 contact: George PuffeR 4158635740 ph 415.863.5758 civil engineer: David Franco Civil Engineer 1930 ShaRuck Avenue, Suite A Berkeley, CA 94704 contact: David Franco 5108481930 Copyright © 2011 stromberg architecture, sole proprietorship. This document, as an instrument of service, is the property of stromberg architecture. project north DRAWING SYMBOLS AREA DESIGNATION CENTERLINE DETAIL REFERENCE DOOR DESIGNATION WINDOW DESIGNATION SECTION/ELEVATION THRESHOLD @ MATERIAL CHANGE WORK POINT ELEVATION MARKER INTERIOR ELEVATION SLOPE 1 HOUR FIRERATED ENCLOSURE ABBREVIATIONS PROJECT STATEMENT The Project: The Project aims to rehabilitate this classic brick warehouse building by renovaUng the exisUng machine shop space and adding two residenUal units in the spirit of the west Berkeley MixedUse ResidenUal (MUR) zone. The exisUng unreinforced brick walls will remain intact and will be engineered with new seismic improvements. New dualglazed warehouse replacement windows will replace the current singleglazed windows along the west and south façade. In the rear of the building, a new sawtooth roof is planned that will replace exisUng woodframed flat roof to draw in north facing light to the machine shop and provide ideal orientaUon for the proposed roofmounted solar PVs. The sawtooth roof is designed to match the scale of the exisUng west (front) trussframed roof as well as the scale and character of the neighborhood. The derelict east wall will be removed and reconstructed. Two residenUal units are planned to occupy exisUng floor space at the south side of the building and are designed so as not to cast shadows offsite or unreasonably obstruct significant neighbor views. AddiUonally, the overgrown and unpaved porUon of the site just south of the building is to be paved and stripped for 4 new car parking spaces as well as lockup space for bicycles. The enUre project is designed to exceed the Build it Green Residen’al Checklist and the Stopwaste.org Small Commercial Green Building Checklist sustainability standards. 2 3 12 5 1 A2.1 a5.1 1 PROPERTY LINE 1 PROJECT NORTH N DRAWING NUMBER, PROJECT NORTH ARROW, TRUE NORTH ARROW PROJECT INFO PROPERTY OWNER: TENANT: PROJECT ADDRESS: ASSESSOR'S PARCEL NUMBER: ARCHITECT: ZONING DISTRICT: OCCUPANCY: TYPE OF CONSTRUCTION: APPLICABLE CODES: LOT SQUARE FOOTAGE: PROPOSED GROSS FLOOR AREA: PROPOSED LOT COVERAGE: FAR: PROPOSED # OF UNITS: PROPOSED OVERALL HEIGHT: OPEN SPACE REQUIREMENT: PARKING REQUIREMENTS: SETBACK REQUIREMENTS: 1819 5TH STREET LLC 768 SAN LUIS ROAD BERKELEY, CA 94707 5TH STREET MACHINE ARTS 1819 5TH STREET 0572098164 STROMBERG ARCHITECTURE 2113 9TH STREET BERKELEY, CA 94710 510/3160443 MUR F1 & R3 TYPE V NONRATED & 1HOUR RATED 2010 CALIFORNIA BUILDING CODE 2010 CALIFORNIA MECHANICAL CODE 2010 CALIFORNIA ELECTRICAL CODE 2010 CALIFORNIA PLUMBING CODE 2010 GREEN BUILDING STANDARDS CODE AS AMENDED BY BUILDING STANDARDS COMMISSION, STATE OF CALIFORNIA AND THE CITY OF BERKELEY 19,610 SQUARE FEET 11,796 SQUARE FEET [7,679 SQUARE FEET F1 + 4117 SQUARE FEET R3] 51% 60.1% 2 32'6" 150 SQUARE FEET / DWELLING UNIT REQ'D 2 UNITS X 150 = 300 SQUARE FEET REQUIRED 425 SQUARE FEET (SHARED) PROVIDED @ UPSTAIRS OUTDOOR DECK BETWEEN RESIDENTIAL UNITS 1 AUTO PARKING SPACE / DWELLING UNIT REQ'D NO ADDITIONAL PARKING REQ'D FOR EXISTING MANUFACTURER USE. 2 UNITS X 1 SPACE = 2 PARKING SPACES REQ'D 4 PARKING SPACES PROVIDED 1 BIKE PARKING SPACE / 2000 SF MFR SPACE 7,850 / 2000 = 4 BIKE SPACES REQUIRED 10 PROVIDED FRONT YARD = 0' SIDE & REAR = 0' @ NONRESIDENTIAL NEIGHBOR SIDE & REAR = 10' @ RESIDENTIAL NEIGHBOR AFF ABOVE FINISH FLOOR ALT ALTERNATE BD BOARD CONC CONCRETE CONT CLEAN OUT TO GRADE CNTR CENTER CT CERAMIC TILE DTL DWG EA EACH ELEV ELEVATION EQ EQUAL EXT EXTERIOR FAC FACTORY F.D. FLOOR DRAIN FF FINISHED FLOOR FIN FINISH FLASH'G FLASHING APPROX APPROXIMATE ABV ABOVE AB ANCHOR BOLT N NEW (E) EXISTING @ AT + AND ADJ ADJUSTABLE BLDG BUILDING BLK BLOCK BLKG BLOCKING BM BEAM B.O. BOTTOM OF... C CHANNEL C.J. CONTROL JOINT CLR CLEAR CLG CEILING CDR CEDAR COL COLUMN DBL DOUBLE DIA. DIAMETER DIM DIMENSION DN DR DOOR EXSTG EXISTING FL FLOOR F.O. FACE OF... F.W. FINISH WALL GAL GALLON GALV GALVANIZED GWB GYPSUM WALL BOARD GYP GYPSUM HDW HARDWARE HORIZ HORIZONTAL HB HOSE BIB HT HEIGHT I.D. INSIDE DIAMETER INS INSULATION INT INTERIOR JST. JOIST JT JOINT K.D.D.F. KILN DRIED DOUGLAS FIR GL GLASS HDR HEADER ADD'L ADDITIONAL ELECT ELECTRICAL LAM LAMINATE MANUF MANUFACTURER MAX MAXIMUM MECH MECHANICAL MIN MINIMUM MTL METAL N.I.C. NOT IN CONTRACT N.T.S. NOT TO SCALE NAT NATURAL NO./ # NUMBER O.C. ON CENTER O.D. OUTSIDE DIAMETER O.DR. OVERFLOW DRAIN PERF PERFORATED PL PLATE PLYWD PLYWOOD PNL PANEL PTD PAINTED PT PRESSURE TREATED PTN PARTITION RM ROOM REQ'D REQUIRED RAD RADIUS R.O. ROUGH OPENING R. ROUND REINF. REINFORCING OPPOSITE HAND O.H. LOC LOCATION RDWD REDWOOD O.F.C.I. OWNER FURNISHED, CONTRACTOR INSTALLED S.A.D. SEE ARCHITECTURAL DRAWINGS SIM SIMILAR S.C.D. SEE CIVIL DRAWINGS SL SLOPE S.L.D. SEE LANDSCAPE DRAWINGS S.E.D. SEE ELECTRICAL DRAWINGS STD STANDARD SS STAINLESS STEEL STL STEEL STRUC STRUCTURAL SUPPL SUPPLEMENTAL SUSP SUSPENDED T&G TONGUE AND GROOVE T.O. TOP OF... THK THICK OR THICKNESS TYP TYPICAL U.B.C. UNIFORM BUILDING CODE VAR VARIES VER VERIFY V.I.F. VERIFY IN FIELD VERT VERTICAL W.R. WATER RESISTANT W/ WITH WD WOOD WP WATERPROOF TEL TELEPHONE U.N.O. UNLESS NOTED OTHERWISE U.O.N. UNLESS OTHERWISE NOTED SCHED SCHEDULE S.S.D. SEE STRUCTURAL DRAWINGS TS TUBE STEEL W WASHER DETAIL DOWN C.H. CEILING HEIGHT BETWEEN BTWN CMU CONCRETE MASONRY UNIT GA GAUGE C.O.T.G. CONTINUOUS DRAWING CL CENTERLINE GFI GROUND FAULT INTERRUPTER S.M.D. SEE MECHANICAL DRAWINGS S.D. SMOKE DETECTOR DRAWINGS INDEX 2 A2.3 2 4 3 1 TREE EQUIPMENT DESIGNATION 1 VICINITY MAP PARCEL MAP 1819 5TH STREET TV TV CABLE JACK DATA / TELEPHONE JACK Landscape: The landscape consists of the following 3 zones and in all cases will be at least 80% naUve and the rest drought tolerant / Mediterranean variety: 1) PlanUng strips along 5th Street sidewalk 2) Parking area along south property line 3) Rear PaUo UGliGes: Electric, telephone, cable uUliUes will run overhead to the south western corner of 1819 5th Street. A solar pv array of approximately 30 KW is to be located on the roof. Water and gas service will be underground. Grading & Drainage: The site slopes approximately 1.75% from the rear of the site to the front. There will be minimal grading given the level nature of the site and that there is no plan to build outside the exisUng footprint. Spoils will be removed from the site. The site and downspouts will be gravity drained to the exisUng storm drain on 5th Street. See c1.0 for addiUonal informaUon. 1812 1816 1808 1798 1802 1804 1818 1824 5th Street 1828 1830 1823 1827 803 Hearst Avenue 809 813 815 1830 1832 6th Street 1826 1822 1820 1816 1814 1812 1808 1810 1800 820 822 818 816 814 808 810 806 802 800 Delaware Street 1801 1803 1805 1807 1809 800 806 1900 commercial mixed use residenUal building key ATTACHMENT 1 DRC 02-16-12 Page 1 of 15

1819 REV1 plans 12 02 11 - Berkeley, California · architectural t0.0 titlesheet a0.0 shadowstudies a0.1 site&0landscapeplan a1.0 existing0building0plan a1.1 first0floor0plan a1.2

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 1819 REV1 plans 12 02 11 - Berkeley, California · architectural t0.0 titlesheet a0.0 shadowstudies a0.1 site&0landscapeplan a1.0 existing0building0plan a1.1 first0floor0plan a1.2

architectural

t0.0 TITLE  SHEET

a0.0 SHADOW  STUDIESa0.1 SITE  &  LANDSCAPE  PLAN

a1.0 EXISTING   BUILDING   PLANa1.1 FIRST  FLOOR   PLANa1.2 SECOND  FLOOR  PLANa1.3 ROOF  PLAN

a2.0 EXISTING  ELEVATIONSa2.1 EXTERIOR  ELEVATIONSa2.2 STRIP  STREET  ELEVATIONS  &  SITE  SECTIONSa2.3 MATERIALS  &  COLORSa2.4 PERSPECTIVE  PHOTO  MONTAGE

a3.1 EXISTING  SECTIONSa3.2 PROPOSED  SECTIONS

c1.0 GRADING  &  DRAINAGE  PLAN

For Assessment Use Only

not for construction

Gtle  sh

eet

t0.0vicinity  mapScale:    1/32"  =  1'-­‐0"1

not for construction

owner:

1819  5th  Street  LLC768  San  Luis  RoadBerkeley,  CA    94707contact:  Frances  Hellman510.642.6135

1819  5th  Street,  LLC

768  San  Luis  Roa

dBe

rkeley,  CA    947

07ap

n:    057

-­‐209

8164

date: phase:

maYhew  strombergArchitect,  LEED  AP

2113  9th  St   Berkeley,  CA    94710510.316.0443  m

[email protected]

architect:

MaRhew  Stromberg2113  9th  StreetBerkeley,  CA    [email protected]

mechanical  engineer:

tbd

contractor  /  esGmator:

Holland  &  Harley  ConstrucUon,  Inc.702  F  Harrison  St.Berkeley,  CA    94710contact:    Chip  Harley510-­‐528-­‐3373  ph510.528.3704  f

ren.  date

C-­‐32401

12.31.2011

structural  engineer:

Jeffrey  Weber  &  Associates,  Inc.1939  Harrison  Street,  Suite  215Oakland,  CA    94612contact:    Jeff  Weber510-­‐251-­‐9578  ph510.251.9580  f

09.08.11 use  permit12.02.11 REV  1  use  permit

electrical  engineer:

Cammisa  and  Wipf  Electrical  ConsulUng  Engineers642  Harrison  StSan  Francisco,  CA    94107contact:    George  PuffeR415-­‐863-­‐5740  ph415.863.5758

civil  engineer:

David  Franco  Civil  Engineer1930  ShaRuck  Avenue,  Suite  ABerkeley,  CA    94704contact:    David  Franco510-­‐848-­‐1930

Copyright   ©   2011   stromberg   architecture,  sole   proprietorship.    This   document,  as  an   instrument  of   service,  is   the   property  of   stromberg   architecture.

project  north

DRAWING  SYMBOLS

AREA  DESIGNATION

CENTERLINE

DETAIL  REFERENCE

DOOR  DESIGNATION

WINDOW  DESIGNATION

SECTION/ELEVATION

THRESHOLD  @  MATERIAL  CHANGE

WORK  POINT

ELEVATION  MARKER

INTERIOR  ELEVATION

SLOPE

1  HOUR  FIRE-­‐RATED  ENCLOSURE

ABBREVIATIONS PROJECT  STATEMENT

The  Project:

The  Project  aims  to  rehabilitate  this  classic  brick  warehouse  building  by  renovaUng  the  exisUng  machine  shop  space  and  adding  two  residenUal  units  in  the  spirit  of  the  west  Berkeley  Mixed-­‐Use  ResidenUal  (MU-­‐R)  zone.    The  exisUng  un-­‐reinforced  brick  walls  will  remain  intact  and  will  be  engineered  with  new  seismic  improvements.    New  dual-­‐glazed  warehouse  replacement  windows  will  replace  the  current  single-­‐glazed  windows  along  the  west  and  south  façade.    In  the  rear  of  the  building,  a  new  saw-­‐tooth  roof  is  planned  that  will  replace  exisUng  wood-­‐framed  flat  roof  to  draw  in  north  facing  light  to  the  machine  shop  and  provide  ideal  orientaUon  for  the  proposed  roof-­‐mounted  solar  PVs.    The  saw-­‐tooth  roof  is  designed  to  match  the  scale  of  the   exisUng  west  (front)  truss-­‐framed  roof   as  well  as  the  scale  and  character  of  the   neighborhood.    The  derelict  east  wall  will  be  removed  and  re-­‐constructed.    Two  residenUal  units  are  planned  to  occupy  exisUng  floor  space  at  the  south  side  of  the  building  and  are  designed  so  as  not  to  cast  shadows  offsite  or  unreasonably  obstruct  significant  neighbor  views.    AddiUonally,  the  overgrown  and  unpaved  porUon  of  the  site  just  south  of  the  building  is  to  be  paved  and  stripped  for  4  new  car  parking  spaces  as  well  as  lock-­‐up  space  for  bicycles.    The  enUre  project  is  designed  to  exceed  the  Build  it  Green   Residen'al  Checklist  and  the  Stopwaste.org   Small  Commercial  Green  Building  Checklist  sustainability  standards.    

2

3

12

5

1A2.1

a5.11

PROPERTY  LINE

1

PROJECT

 NORTH

N DRAWING  NUMBER,PROJECT  NORTH  ARROW,TRUE  NORTH  ARROW

PROJECT  INFOPROPERTY  OWNER:

TENANT:

PROJECT  ADDRESS:  

ASSESSOR'S  PARCEL  NUMBER:

ARCHITECT:

ZONING  DISTRICT:

OCCUPANCY:

TYPE  OF  CONSTRUCTION:

APPLICABLE  CODES:

LOT  SQUARE  FOOTAGE:

PROPOSED   GROSS  FLOOR  AREA:

PROPOSED   LOT  COVERAGE:

FAR:

PROPOSED  #  OF  UNITS:

PROPOSED  OVERALL  HEIGHT:

OPEN  SPACE  REQUIREMENT:

PARKING  REQUIREMENTS:

SETBACK  REQUIREMENTS:

1819  5TH  STREET  LLC768  SAN  LUIS  ROADBERKELEY,  CA    94707

5TH  STREET  MACHINE  ARTS

1819  5TH  STREET

057-­‐2098164

STROMBERG  ARCHITECTURE2113  9TH  STREETBERKELEY,  CA    94710510/316-­‐0443

MU-­‐R

F-­‐1  &  R-­‐3

TYPE   V   NON-­‐RATED  &  1-­‐HOUR  RATED

2010  CALIFORNIA  BUILDING  CODE2010  CALIFORNIA  MECHANICAL  CODE2010  CALIFORNIA  ELECTRICAL  CODE2010  CALIFORNIA  PLUMBING  CODE2010  GREEN  BUILDING   STANDARDS  CODE        AS  AMENDED  BY  BUILDING   STANDARDS  COMMISSION,  STATE  OF  CALIFORNIA  AND  THE  CITY  OF  BERKELEY

19,610  SQUARE  FEET

11,796  SQUARE  FEET[7,679  SQUARE  FEET  F-­‐1  +   4117  SQUARE  FEET  R-­‐3]

51%

60.1%

2  

32'-­‐6"

150  SQUARE  FEET  /  DWELLING  UNIT  REQ'D2  UNITS  X  150  =  300  SQUARE  FEET  REQUIRED425   SQUARE  FEET   (SHARED)   PROVIDED  @  UPSTAIRS  OUTDOOR  DECK  BETWEEN  RESIDENTIAL  UNITS

1   AUTO   PARKING  SPACE  /  DWELLING  UNIT  REQ'DNO   ADDITIONAL  PARKING  REQ'D  FOR  EXISTING  MANUFACTURER  USE.  2  UNITS  X  1  SPACE  =  2  PARKING  SPACES  REQ'D4  PARKING  SPACES   PROVIDED

1  BIKE  PARKING  SPACE  /  2000  SF   MFR  SPACE7,850  /  2000  =  4  BIKE   SPACES  REQUIRED10  PROVIDED  

FRONT  YARD  =   0'SIDE  &  REAR  =  0'  @  NON-­‐RESIDENTIAL  NEIGHBORSIDE   &  REAR  =  10'  @  RESIDENTIAL  NEIGHBOR  

AFF                                 ABOVE  FINISH  FLOOR                            ALT                           ALTERNATE                  

BD                               BOARD                            

CONC                               CONCRETE                        

CONT                                CLEAN  OUT  TO  GRADE                      

CNTR                                 CENTER                    CT                                 CERAMIC  TILE                            

DTL                                

DWG                                

EA                                 EACH                          

ELEV                           ELEVATION                          

EQ                                 EQUAL                    

EXT EXTERIOR                      

FAC                               FACTORY                            

F.D.                                 FLOOR  DRAIN                        

FF                                 FINISHED  FLOOR                            

FIN                                 FINISH

FLASH'G                                FLASHING                  APPROX APPROXIMATE                      

ABV                                 ABOVE                      

AB                                 ANCHOR  BOLT                      

N                               NEW

(E)                       EXISTING

@                     AT                      

+                                 AND                      

ADJ                                 ADJUSTABLE            

BLDG                             BUILDING                      

BLK                             BLOCK                    

BLKG                               BLOCKING                          

BM                               BEAM                        

B.O.                               BOTTOM  OF...                            

C                               CHANNEL                            C.J.                               CONTROL  JOINT

CLR                               CLEAR                            CLG                               CEILING                            

CDR                         CEDAR              COL                               COLUMN                            

DBL                                 DOUBLE                            

DIA.                                 DIAMETER                            

DIM                                 DIMENSION                            

DN                                

DR                               DOOR                            

EXSTG                               EXISTING                

FL                                 FLOOR                            

F.O.                                 FACE  OF...                          

F.W.                                 FINISH  WALL            

GAL                                 GALLON                          

GALV                               GALVANIZED                            

GWB                                 GYPSUM  WALL  BOARD                            

GYP                                 GYPSUM                      

HDW                                 HARDWARE                            

HORIZ                                 HORIZONTAL                            

HB                                 HOSE  BIB                            

HT                                 HEIGHT                          

I.D.                                 INSIDE  DIAMETER                        

INS                               INSULATION                        

INT                                 INTERIOR

JST.                                 JOIST                            

JT                                 JOINT                            

K.D.D.F.                               KILN  DRIED  DOUGLAS  FIR                            

GL                               GLASS                            

HDR                                 HEADER                            

ADD'L                             ADDITIONAL

ELECT                               ELECTRICAL                          

LAM                                 LAMINATE                            

MANUF                             MANUFACTURER                            

MAX                                 MAXIMUM                            

MECH                               MECHANICAL                        

MIN                               MINIMUM                        

MTL                               METAL                    

N.I.C.                               NOT  IN  CONTRACT

N.T.S.                               NOT  TO  SCALE                        

NAT                               NATURAL                        

NO./  #                               NUMBER                        

O.C.                               ON  CENTER                        

O.D.                               OUTSIDE  DIAMETER                        

O.DR.                               OVERFLOW  DRAIN                        

PERF PERFORATED                        PL                               PLATE                        

PLYWD                               PLYWOOD                        

PNL                               PANEL                        

PTD                               PAINTED                        

PT                               PRESSURE   TREATED                  

PTN                               PARTITION                        

RM                               ROOM                      

REQ'D                               REQUIRED                      

RAD                               RADIUS

R.O.                       ROUGH  OPENING

R.                                 ROUND                      

REINF.                               REINFORCING

OPPOSITE  HANDO.H.                      

LOC                                 LOCATION                        

RDWD               REDWOOD                

O.F.C.I. OWNER  FURNISHED,  CONTRACTOR   INSTALLED

S.A.D.                               SEE  ARCHITECTURAL  DRAWINGS

SIM                                 SIMILAR                            

S.C.D.                             SEE  CIVIL  DRAWINGS                        

SL                             SLOPE                      

S.L.D. SEE  LANDSCAPE  DRAWINGS                      

S.E.D.                                 SEE  ELECTRICAL  DRAWINGS            

STD STANDARD                      

SS STAINLESS  STEEL                      

STL STEEL                      

STRUC STRUCTURAL                      

SUPPL SUPPLEMENTAL                      

SUSP SUSPENDED                      

T&G TONGUE  AND  GROOVE                      

T.O. TOP  OF...                    

THK THICK  OR  THICKNESS                      

TYP TYPICAL                      

U.B.C. UNIFORM  BUILDING  CODE                      

VAR VARIES                      

VER VERIFY                      

V.I.F. VERIFY  IN  FIELD                      

VERT VERTICAL                    

W.R. WATER   RESISTANT                      

W/ WITH                      WD WOOD                    WP WATERPROOF                

TEL TELEPHONE                    

U.N.O. UNLESS  NOTED  OTHERWISE                      

U.O.N. UNLESS  OTHERWISE  NOTED                      

SCHED                               SCHEDULE                      

S.S.D. SEE  STRUCTURAL  DRAWINGS                    

TS TUBE  STEEL              

W WASHER            

DETAIL                          

DOWN                            

C.H.                             CEILING  HEIGHT                          

BETWEEN                            BTWN                            

CMU                           CONCRETE  MASONRY  UNIT                

GA                                 GAUGE                            

C.O.T.G.                                CONTINUOUS

DRAWING                  

CL                               CENTERLINE

GFI                               GROUND   FAULT  INTERRUPTER                            

S.M.D. SEE  MECHANICAL  DRAWINGS                      

S.D.                                 SMOKE  DETECTOR                      

DRAWINGS  INDEX2

A2.3 24

3

1

TREE

EQUIPMENT  DESIGNATION1

VICINITY  MAP

PARCEL  MAP

1819  5TH  STREET

TV TV  CABLE  JACK

DATA  /  TELEPHONE  JACK

Landscape:

The  landscape  consists  of  the  following  3  zones  and  in  all  cases  will  be  at  least  80%  naUve  and  the  rest  drought  tolerant  /  Mediterranean  variety:

1) PlanUng  strips  along  5th  Street  sidewalk  2) Parking  area  along  south  property  line3) Rear   PaUo

UGliGes:

Electric,  telephone,  cable  uUliUes  will  run  overhead  to  the  south  western  corner  of  1819  5th  Street.    A  solar  pv  array  of  approximately  30  KW  is  to  be  located  on  the  roof.    Water  and  gas  service  will  be  underground.

Grading  &  Drainage:

The  site  slopes  approximately  1.75%  from  the  rear  of  the  site  to  the  front.    There  will  be  minimal  grading  given  the  level  nature  of  the  site  and  that  there  is  no  plan  to  build  outside  the  exisUng  footprint.     Spoils  will  be  removed  from  the  site.    The  site  and  downspouts  will  be  gravity  drained  to  the  exisUng  storm  drain  on  5th  Street.    See  c1.0  for  addiUonal  informaUon.

1812 18161808

179818021804 1818 1824

5th  Street

18281830

1823 1827

803

Hearst  Aven

ue

809

813

815

18301832

6th  Street

182618221820181618141812

180818101800

820

822

818

816

814

808

810

806

802

800

Delaw

are  Street

18011803

1805

1807

1809

800

806

1900

commercial

mixed  use

residenUal

building  key

ATTACHMENT 1 DRC 02-16-12 Page 1 of 15

Page 2: 1819 REV1 plans 12 02 11 - Berkeley, California · architectural t0.0 titlesheet a0.0 shadowstudies a0.1 site&0landscapeplan a1.0 existing0building0plan a1.1 first0floor0plan a1.2

site  &

land

scap

eplan

a0.1 not for construction

owner:

1819  5th  Street  LLC768  San  Luis  RoadBerkeley,  CA    94707contact:  Frances  Hellman510.642.6135

1819  5th  Street,  LLC

768  San  Luis  Roa

dBe

rkeley,  CA    947

07ap

n:    057

-­‐209

8164

date: phase:

maHhew  strombergArchitect,  LEED  AP

2113  9th  St   Berkeley,  CA    94710510.316.0443  m

[email protected]

architect:

MaKhew  Stromberg2113  9th  StreetBerkeley,  CA    [email protected]

mechanical  engineer:

tbd

contractor  /  esOmator:

Holland  &  Harley  ConstrucNon,  Inc.702  F  Harrison  St.Berkeley,  CA    94710contact:    Chip  Harley510-­‐528-­‐3373  ph510.528.3704  f

structural  engineer:

Jeffrey  Weber  &  Associates,  Inc.1939  Harrison  Street,  Suite  215Oakland,  CA    94612contact:    Jeff  Weber510-­‐251-­‐9578  ph510.251.9580  f

09.08.11 use  permit12.02.11 REV  1  Use  Permit

electrical  engineer:

Cammisa  and  Wipf  Electrical  ConsulNng  Engineers642  Harrison  StSan  Francisco,  CA    94107contact:    George  PuffeK415-­‐863-­‐5740  ph415.863.5758

civil  engineer:

David  Franco  Civil  Engineer1930  ShaKuck  Avenue,  Suite  ABerkeley,  CA    94704contact:    David  Franco510-­‐848-­‐1930

Copyright   ©   2011   stromberg   architecture,  sole   proprietorship.    This   document,  as  an   instrument  of   service,  is   the   property  of   stromberg   architecture.

project  northproposed  site  &  landscape  planScale:    1/8"  =  1'-­‐0"note:  exis*ng  site  survey  info  provided  by  Bay  Area  Land  Surveying  Inc.,  December  2006

1

the  general  landscape  concept  is  to  preserve  the  exisNng  street  trees  and  add  planNng  along  the  street  strip  and  in  the  parking  area  and  rear  PaNo  as  shown.  

the  locaNon  and  character  of  uNliNes  as  shown  is  per  field  measurements  and  or  records  of  controlling  agencies  and  is   approximate.    on  site  underground  items  may  exist.     contractor  shall  verify  locaNon  of  all  uNliNes  and  underground  structures  prior  to  construcNon.

fine  grade  soil  to  balance  cut  and  fill  and  to  ensure  posiNve  drainage  away  from  all  buildings.

all  new  plants  shall  be  selected  for  their  drought  tolerance,  hardiness,  and  fire  resistance,  with  preference  toward  naNve  or  mediterranean  species.

locaNons  of  new  plants  shall  not   obstruct  view  corridors.

planNng  areas  shall  be  amended  prior  to  planNng,  and  all  planted  areas  shall  be  mulched  with  2-­‐3"  of  bark  following  planNng.     provide   shredded  redwood  or  cedar  on  slopes  over  3:1,  any  bark  based  wood  product  on  slopes  under  3:1.

exisNng  street  trees  to  remain.

all  planted  areas  shall  be  watered  with  a  combinaNon  of  low   volume  micro   spray  heads,  drip  and  trickle  line  emiKers,  and  limited   spray  heads.    all  automaNcally  valved  and  controlled.

planNng  areas  to  have  water  distribuNon  of    4  gpm.

the  irrigaNon  system  controller   shall  contain  an  automated  rain  shut  off  device.

spray  head  adjustments   shall  result  in  head  to  head  coverage  w/  minimum  overspray  onto  adjacent  structures.    no  overspray  against  building.

all  landscape  lighNng  to  be  energy  efficient,  12v  or  120v  and  automaNcally  Nmed.

posiNoning  of  light  fixtures  shall  not  result  in  glare  and  shall  not   disturb  neighbors.

overall  night  illuminaNon  of  site  shall  be  modest  and  shall  underline  the  layout  of  the   buildings  and  landscape  as  well  as   conform  to  the  general  light  level  of  the  neighborhood.

landscape  notes:

landscape  concept:

1.

general  notes:

1.

2.

3.

4.

5.

6.

general   irrigaNon  notes:

1.

2.

3.

4.

general  site  lighNng  notes:

1.

2.

3.

s  76°47'18"  w 141.03'

n  13°12'10"  w139.04'

n  76°47'09"  e 141.03'

s  13°12'12"  e139.05'

up

8'-­‐0"

9'-­‐0"

8'-­‐0"

8'-­‐0"

8'-­‐0"

10'-­‐0"setback

10'-­‐0

"setba

ck

7'-­‐0"

16'-­‐0

"

18'-­‐0"  min.

transformerpad

area  of  finish  grading  for  parking.    remove  exisNng  ashpalt  remnants,  and  prep  subgrade  for  basecourse  and  paving,  compact  and  slope  to  drain,  s.c.d.

(e)  street  tree  to  remain

(e)  uNlity  vault

(n)  plants,  typ.  -­‐  seenotes  this  sheet

(n)  in-­‐swing  entry  /  security  gate

bicycle  parking  (10  bikes)wsf-­‐10-­‐ss

new  trough  drain  typ.,  see  grading  and  drainage  plan

(e)  manhole  -­‐  see  c1.0

2'-­‐11"

6'-­‐4"

paNo000

parking000

(e)  curb  cut

(e)  curb  cut

caretakerresidence[1214  sq.  m.]

mainresidence[2093  sq.  m.]

(e)  fence  to  remain

new  downspout,  typ.

area  of  finish  grading.    remove  exisNngconcrete  slab  on  grade  fragments  andprep  for  topsoil,  slope  to  drain,  s.c.d.

(e)  fence  to  remain,  typ.

paNo  w/  pervious  pavers

11'-­‐0

"

aisle  width

stall  d

epth

16'-­‐0",  typ.

stall  length

refuse  pick  up  area

electric  vehicle  charging  staNon

3'-­‐0" 5'-­‐0"

line  of  entry  awning  aboveshown  dashed

note:  8'-­‐0"  clr.  above  publicr.o.w.

(e)  plants  along  fence  toremain,  typ.

(n)  planNng  strip  in  publicright-­‐of-­‐way,  typ.    see

notes  this  sheet  forplanNng  info

28'-­‐8

"

44'-­‐10"

(e)  street  tree  to  remain

manufacturing[7679  sq.  m.]

2'-­‐0"

min

wheel  stop,  typ. new  planNng  strip(e)   vegetaNon  alongboth  sides  of  fence  to

remain

14'-­‐1

"

9'-­‐0"  min.  d

riveway  width

30°

(e)  light  pole

4'-­‐0"

(e)  planNng  strip  to  remain  with  (n)plants  to  provide  screening  of

transformer  beyond

4'-­‐0"

line  of   average  buffer  alongparking  area  of  4  cars  or

more

20'-­‐0"

6'-­‐3"

(e)  uNlity  vaults

(n)  bench  and  plants  inexisNng  planNng  strip

(n)  street  treenote:  verify  species  and

locaNon  with  publicworks,  forestry  and

architect  prior  to  planNng

(e)  building

(n)  accessible  path  of   travel

line  of  second  floor  aboveshown  dashed

ren.  date

C-­‐32401

12.31.2011

(n)  "parNally"  accessible  van  parking  stall  to  be  provided  for  manufacturing  occupant  use.note:  due  to  technical   infeasibility  of  fully  accessible  parking  stall,  owner  to  apply  for  unreasonable  hardship  excepNon  for  disabled  parking.

new  sidewalk  to  have  5'  min.   r.o.w.  with  max  cross  slope  of  2%.

exisNng  curb  cuts  to  remain,  max  driveway  slope  to  be  17%.

new  bench  in  exisNng  planNng  strip  at   building  entry  intended  to  meet  the  definiNon  of  "Minor   Encroachment"  as  defined  in  BMC  16.18.010D.

entry  awning  /  sign  to  be  min.  8'-­‐0"  above  public   r.o.w  and  shall  comply  with  CBC  Chapter  32.

general  site  plan  notes:

parking:

1.

sidewalk:

1.

2.

3.

4.

plant  notes:

naNve  &  drought  tolerant  plants:

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

Santa  Cruz  Island   Ironwood

Pink  flowering  Currant

Pacific  Coast  Iris

Coast  Aster

California  Fuchsia

Saint  Catherine's  Lace

Manzanita  

Rosemary

BoKlebush

Huckleberry

Foothill  Penstamon

Coastal  Wood  Fern

Red-­‐flowered  Buckwheat

Berkeley  Sedge

Leather  Leaf  Sedge

Weeping  Brown  Sedge

Red-­‐Hot  Poker  (yellow)

Red-­‐Hot  Poker  (red)

Lyonothamnus  floribundus    

Ribes  sanguinium  glu*nosum  

Iris  douglasiana

Aster  chilensis  

Zauschneria  

Eriogonum  giganteum  

Arctostaphylos  

Rosmarinus  officianalis  

Callistemon  (dwarf  variety)  

Vaccinium  ovatum  

Penstamon  heterophyllus  

Dryopteris   arguta  

Eriogonum  grande  var  rubescens  

Carex  tumulicola

Carex  buchananii

Carex  flagellifera

Kniphofia  citrina

Kniphofia  uvaria

ATTACHMENT 1 DRC 02-16-12 Page 2 of 15

Page 3: 1819 REV1 plans 12 02 11 - Berkeley, California · architectural t0.0 titlesheet a0.0 shadowstudies a0.1 site&0landscapeplan a1.0 existing0building0plan a1.1 first0floor0plan a1.2

shad

ow  stud

ydiagrams

a0.2 not for construction

owner:

1819  5th  Street  LLC768  San  Luis  RoadBerkeley,  CA    94707contact:  Frances  Hellman510.642.6135

1819  5th  Street,  LLC

768  San  Luis  Roa

dBe

rkeley,  CA    947

07ap

n:    057

-­‐209

8164

date: phase:

maGhew  strombergArchitect,  LEED  AP

2113  9th  St   Berkeley,  CA    94710510.316.0443  m

[email protected]

architect:

MaKhew  Stromberg2113  9th  StreetBerkeley,  CA    [email protected]

mechanical  engineer:

tbd

contractor  /  esNmator:

Holland  &  Harley  ConstrucNon,  Inc.702  F  Harrison  St.Berkeley,  CA    94710contact:    Chip  Harley510-­‐528-­‐3373  ph510.528.3704  f

structural  engineer:

Jeffrey  Weber  &  Associates,  Inc.1939  Harrison  Street,  Suite  215Oakland,  CA    94612contact:    Jeff  Weber510-­‐251-­‐9578  ph510.251.9580  f

09.08.11 use  permit12.02.11 REV  1   use   permit

electrical  engineer:

Cammisa  and  Wipf  Electrical  ConsulNng  Engineers642  Harrison  StSan  Francisco,  CA    94107contact:    George  PuffeK415-­‐863-­‐5740  ph415.863.5758

civil  engineer:

David  Franco  Civil  Engineer1930  ShaKuck  Avenue,  Suite  ABerkeley,  CA    94704contact:    David  Franco510-­‐848-­‐1930

Copyright   ©   2011  stromberg  architecture,  sole  proprietorship.    This  document,  as  an  instrument  of  service  is  the  property  of  stromberg  architecture.

project  northsunshading  diagrams  -­‐  proposed  structureScale:    n.t.s.1

june  21  (summer  solsNce)

september  8  (date  of  submiKal)

december  21  (winter  solsNce)

2  hours  aber  sunrise noon 2  hours  before  sunset

addiNonal  shadow  cast  by  proposed  scheme

less  shadow  cast  by  proposed  scheme

key  :

all  buildings  being  shadowed  are  shown  in  the  diagram.

verNcal  surfaces  of  neighboring  buildings  are  NOT  shadowed  by  the  proposed  structure  in  any  significant  way.    

there  are  no  windows  on  the  north  side  of  the  building   immediately  to  the  south  of  the  project  site.

at  the  very  end  of  the  day  mid-­‐summer,  shading  occurs  on  the  lower  porNon  of  the  rear  north  elevaNon  of  1820  6th  street.    There  are  two   second-­‐story  windows  in  this  wall  that  are  already  shaded  this  Nme  of  year  by  neighbor  trees  along   the  south  east   property  line  [not  shown].    

general  shadow  study  notes:

1.

2.

3.

4.

ATTACHMENT 1 DRC 02-16-12 Page 3 of 15

Page 4: 1819 REV1 plans 12 02 11 - Berkeley, California · architectural t0.0 titlesheet a0.0 shadowstudies a0.1 site&0landscapeplan a1.0 existing0building0plan a1.1 first0floor0plan a1.2

exis%n

gbu

ilding  plan

a1.0 not for construction

owner:

1819  5th  Street  LLC768  San  Luis  RoadBerkeley,  CA    94707contact:  Frances  Hellman510.642.6135

1819  5th  Street,  LLC

768  San  Luis  Roa

dBe

rkeley,  CA    947

07ap

n:    057

-­‐209

8164

date: phase:

maJhew  strombergArchitect,  LEED  AP

2113  9th  St   Berkeley,  CA    94710510.316.0443  m

[email protected]

architect:

MaKhew  Stromberg2113  9th  StreetBerkeley,  CA    [email protected]

mechanical  engineer:

tbd

contractor  /  es%mator:

Holland  &  Harley  ConstrucNon,  Inc.702  F  Harrison  St.Berkeley,  CA    94710contact:    Chip  Harley510-­‐528-­‐3373  ph510.528.3704  f

structural  engineer:

Jeffrey  Weber  &  Associates,  Inc.1939  Harrison  Street,  Suite  215Oakland,  CA    94612contact:    Jeff  Weber510-­‐251-­‐9578  ph510.251.9580  f

09.08.11 use  permit12.02.11 REV  1  use  permit

electrical  engineer:

Cammisa  and  Wipf  Electrical  ConsulNng  Engineers642  Harrison  StSan  Francisco,  CA    94107contact:    George  PuffeK415-­‐863-­‐5740  ph415.863.5758

civil  engineer:

David  Franco  Civil  Engineer1930  ShaKuck  Avenue,  Suite  ABerkeley,  CA    94704contact:    David  Franco510-­‐848-­‐1930

shop

office office

office

office

office

entry

toilettoilet

toilet

toilet

guKer-­‐0'-­‐5  5/8"

sidewalk+0'-­‐0" +0'-­‐  4  1/2"

+0'-­‐8  7/8" +0'-­‐9  7/8"+0'-­‐9  1/2"

+0'-­‐11  1/2"

+0'-­‐10  3/4"

+0'-­‐11  1/8"

+0'-­‐11  1/8"

+0'-­‐10  1/4"

+0'-­‐11  1/2"+0'-­‐11  1/8"

+0'-­‐9  1/8"

+0'-­‐9  3/4"

+0'-­‐7  1/4" +0'-­‐9  1/4" +0'-­‐10  1/2" +0'-­‐11  3/8" +1'-­‐0  1/4"

+1'-­‐0  1/2"

+1'-­‐0" +1'-­‐0  1/4" +1'-­‐0  3/4"

+1'-­‐2  3/4"

+1'-­‐1  1/8"+1'-­‐0  1/2"+0'-­‐11  7/8"

+0'-­‐11  3/8"

+0'-­‐11"

+0'-­‐10  3/4"

+1'-­‐0"

+1'-­‐0  1/4"+0'-­‐10  1/4"

+0'-­‐8  1/2"

+1'-­‐0  1/2" +0'-­‐11  3/4"

+0'-­‐11  7/8"

+0'-­‐11  7/8"

+0'-­‐11  3/8" +0'-­‐11  3/4"

+0'-­‐11  3/4"+0'-­‐10  3/8"

+1'-­‐1  3/8"

+1'-­‐3  1/4"

+1'-­‐3  1/2"

+1'-­‐3  3/8"

+1'-­‐2  1/2"

+1'-­‐3  3/8"

+1'-­‐1  7/8"

+1'-­‐2  1/4"

20'-­‐3  5/8"20'-­‐0  3/4"

12'-­‐1

1"12

'-­‐7"

16'-­‐2

"16

'-­‐2"

12'-­‐6

"11

'-­‐8"

41'-­‐1  1/4" 30'-­‐3  1/4"

5'-­‐8"

12'-­‐6"

existing in-floorscale

4'6"x6'3"

95'-­‐11  1/2"

15'-­‐2  7/8"13'-­‐1"6'-­‐11  1/4"7'-­‐10"

5'-­‐8"

1'-­‐10"

1'-­‐10"

1'-­‐9"

4'-­‐5  3/4"

4'-­‐2  5/8"

4'-­‐3  3/4" 16'-­‐0  1/2" 4'-­‐2  3/4"

107'-­‐5  1/2"

hall

7

6

5

4

3

2

1

a a.2 b c c.9 da.3 a.4 a.5

c.9 dcb

1/a2.1

2/a2.1

4/a2.1

3/a2.1

3/a3.1

3/a3.1

1/a3.1 1/a3.1

2/a3.1

2/a3.1

4/a3.1

4/a3.1

exisNng  interior  walls  to  be  removed  shown  dashed

truss-­‐supported  roof  above

un-­‐even  slab  surface

exisNng[10,311.25  sq.  e.]

10'-­‐0

"setba

ck2'-­‐11"

28'-­‐8

"

44'-­‐10"

10'-­‐0"setback

(e)  curb  and  guKer  toremain.    exisNng  sidewalk

to  be  replaced  to  meetcurrent  City  of  Berkeley

right-­‐of  way  requirements

(e)   right-­‐of-­‐wayencroachments  (planNngstrips,  steps,  door  swings)

to  be  removed,  typ.

paving  at  exisNngloading  area  to  beremoved,  s.c.d.

project  northexisNng  building  planScale:    1/8"  =  1'-­‐0"note:  spot  eleva,ons  provided  by  Holland  &  Harley  Construc,on  are  approximate

1

ren.  date

C-­‐32401

12.31.2011

Copyright   ©   2011   stromberg   architecture,  sole   proprietorship.    This   document,  as  an   instrument  of   service,  is   the   property  of   stromberg   architecture.

ATTACHMENT 1 DRC 02-16-12 Page 4 of 15

Page 5: 1819 REV1 plans 12 02 11 - Berkeley, California · architectural t0.0 titlesheet a0.0 shadowstudies a0.1 site&0landscapeplan a1.0 existing0building0plan a1.1 first0floor0plan a1.2

up

1'-6"

4'-0

"

5'-0"

3'-8

" m

in.

0'0"sidewalk

0'0"finished

slab

+12"finished

slab

relocated in-floorscale

4'6"x6'3"

pull-ring

sprinkler16"x16"

+12"finished

slab

+9"finished

slab

+15"finishedgrade

+12"finished

slab

3"ramp

3"ramp

3"ramp

ramp up

up

up

up approx.20R @ 7.5"

refuseand

recyclingarea

0'0"sidewalk

+12"finished

slab

5'-0

"

2'-6" 3'-0"

lock

ers

was

h

urinal

lock

ers

7

6

5

4

3

2

1

a a.2 b c c.9 da.3 a.4 a.5

c.9 dcb c.1 c.2 c.3 c.4 c.5

1/a2.1

2/a2.1

4/a2.1

3/a2.1

3/a3.2

3/a3.2

1/a3.2 1/a3.2

2/a3.2

2/a3.2

4/a3.2

4/a3.2

woodshop927 sf

finishing115 sf

grinding162 sf

tool storage110 sf

bathroom303 sf

display565 sf

living room591 sf

electrical54 sf

closet14 sf

closet17 sf

dining852 sf

kitchen

manufacturing2693 sf

machine shop1567 sf

hall686 sf

equipment34 sf

equipment38 sf

equipment37 sf

patio

bath43 sf

sitting701 sf

first  floo

r  plans

a1.1 not for construction

owner:

1819  5th  Street  LLC768  San  Luis  RoadBerkeley,  CA    94707contact:  Frances  Hellman510.642.6135

1819  5th  Street,  LLC

768  San  Luis  Roa

dBe

rkeley,  CA    947

07ap

n:    057

-­‐209

8164

date: phase:

maHhew  strombergArchitect,  LEED  AP

2113  9th  St   Berkeley,  CA    94710510.316.0443  m

[email protected]

architect:

MaMhew  Stromberg2113  9th  StreetBerkeley,  CA    [email protected]

mechanical  engineer:

tbd

contractor  /  esPmator:

Holland  &  Harley  ConstrucPon,  Inc.702  F  Harrison  St.Berkeley,  CA    94710contact:    Chip  Harley510-­‐528-­‐3373  ph510.528.3704  f

structural  engineer:

Jeffrey  Weber  &  Associates,  Inc.1939  Harrison  Street,  Suite  215Oakland,  CA    94612contact:    Jeff  Weber510-­‐251-­‐9578  ph510.251.9580  f

09.08.11 use  permit12.02.11 REV  1  use  permit

electrical  engineer:

Cammisa  and  Wipf  Electrical  ConsulPng  Engineers642  Harrison  StSan  Francisco,  CA    94107contact:    George  PuffeM415-­‐863-­‐5740  ph415.863.5758

civil  engineer:

David  Franco  Civil  Engineer1930  ShaMuck  Avenue,  Suite  ABerkeley,  CA    94704contact:    David  Franco510-­‐848-­‐1930

project  northproposed  first  floor  planScale:    1/8"  =  1'-­‐0"1

ren.  date

C-­‐32401

12.31.2011

Copyright   ©   2011   stromberg   architecture,  sole   proprietorship.    This   document,  as  an   instrument  of   service,  is   the   property  of   stromberg   architecture.

ATTACHMENT 1 DRC 02-16-12 Page 5 of 15

Page 6: 1819 REV1 plans 12 02 11 - Berkeley, California · architectural t0.0 titlesheet a0.0 shadowstudies a0.1 site&0landscapeplan a1.0 existing0building0plan a1.1 first0floor0plan a1.2

second

 floo

rplan

s

a1.2 not for construction

owner:

1819  5th  Street  LLC768  San  Luis  RoadBerkeley,  CA    94707contact:  Frances  Hellman510.642.6135

1819  5th  Street,  LLC

768  San  Luis  Roa

dBe

rkeley,  CA    947

07ap

n:    057

-­‐209

8164

date: phase:

maHhew  strombergArchitect,  LEED  AP

2113  9th  St   Berkeley,  CA    94710510.316.0443  m

[email protected]

architect:

MaKhew  Stromberg2113  9th  StreetBerkeley,  CA    [email protected]

mechanical  engineer:

tbd

contractor  /  esOmator:

Holland  &  Harley  ConstrucNon,  Inc.702  F  Harrison  St.Berkeley,  CA    94710contact:    Chip  Harley510-­‐528-­‐3373  ph510.528.3704  f

structural  engineer:

Jeffrey  Weber  &  Associates,  Inc.1939  Harrison  Street,  Suite  215Oakland,  CA    94612contact:    Jeff  Weber510-­‐251-­‐9578  ph510.251.9580  f

09.08.11 use  permit12.02.11 REV  1  use  permit

electrical  engineer:

Cammisa  and  Wipf  Electrical  ConsulNng  Engineers642  Harrison  StSan  Francisco,  CA    94107contact:    George  PuffeK415-­‐863-­‐5740  ph415.863.5758

civil  engineer:

David  Franco  Civil  Engineer1930  ShaKuck  Avenue,  Suite  ABerkeley,  CA    94704contact:    David  Franco510-­‐848-­‐1930

dn.

open  to  below

open  to  below

open  to  below

open  to  below

open  to  below

dn

up

7

6

5

4

3

2

1

a a.2 b c c.9 da.3 a.4 a.5

c.9 dcb c.1 c.2 c.3 c.4 c.5

1/a2.1

2/a2.1

4/a2.1

3/a2.1

3/a3.2

3/a3.2

1/a3.2 1/a3.2

2/a3.2

2/a3.2

4/a3.2

4/a3.2

alternaNng  tread  stair  to  lo ̂  above

bath41 sf

study114 sf

mezzanine166 sf

bedroom191 sf

kitchen / bfast243

closet9 sf

bath41 sf

deck425 sf

master bedroom402 sf

bonus room113 sf

w/d10 sf

closet63 sf

bathing112 sf

w.c.10 sf

closet8 sf

proposed  second  floor  planScale:    1/8"  =  1'-­‐0"1

project  north

proposed  second  floor  lo^  planScale:    1/8"  =  1'-­‐0"2

project  north

open  to  below

dn.

7

6

c c.1 c.2b

alternaNng  tread  stair  to  below

loft133 sf

deck

guardrail

ren.  date

C-­‐32401

12.31.2011

Copyright   ©   2011   stromberg   architecture,  sole   proprietorship.    This   document,  as  an   instrument  of   service,  is   the   property  of   stromberg   architecture.

ATTACHMENT 1 DRC 02-16-12 Page 6 of 15

Page 7: 1819 REV1 plans 12 02 11 - Berkeley, California · architectural t0.0 titlesheet a0.0 shadowstudies a0.1 site&0landscapeplan a1.0 existing0building0plan a1.1 first0floor0plan a1.2

roof  plan

a1.3 not for construction

owner:

1819  5th  Street  LLC768  San  Luis  RoadBerkeley,  CA    94707contact:  Frances  Hellman510.642.6135

1819  5th  Street,  LLC

768  San  Luis  Roa

dBe

rkeley,  CA    947

07ap

n:    057

-­‐209

8164

date: phase:

maHhew  strombergArchitect,  LEED  AP

2113  9th  St   Berkeley,  CA    94710510.316.0443  m

[email protected]

architect:

MaKhew  Stromberg2113  9th  StreetBerkeley,  CA    [email protected]

mechanical  engineer:

tbd

contractor  /  esPmator:

Holland  &  Harley  ConstrucNon,  Inc.702  F  Harrison  St.Berkeley,  CA    94710contact:    Chip  Harley510-­‐528-­‐3373  ph510.528.3704  f

ren.  date

C-­‐32401

12.31.2011

structural  engineer:

Jeffrey  Weber  &  Associates,  Inc.1939  Harrison  Street,  Suite  215Oakland,  CA    94612contact:    Jeff  Weber510-­‐251-­‐9578  ph510.251.9580  f

09.08.11 use  permit12.02.11 REV  1  use  permit

electrical  engineer:

Cammisa  and  Wipf  Electrical  ConsulNng  Engineers642  Harrison  StSan  Francisco,  CA    94107contact:    George  PuffeK415-­‐863-­‐5740  ph415.863.5758

civil  engineer:

David  Franco  Civil  Engineer1930  ShaKuck  Avenue,  Suite  ABerkeley,  CA    94704contact:    David  Franco510-­‐848-­‐1930

proposed  roof  planScale:    1/8"  =  1'-­‐0"1

project  north

slop

e3/4"  :  1'

slop

e3/4"  :  1'

slope

slop

e5  :  12

slop

e5  :  12

slop

e5  :  12

slop

e5  :  12

slop

e6  :  12

slope3  :  12

slop

e3  :  12

slop

e3  :  12

slope2  :  12

(n)  skylight,  typ.

mechanical  equipment  on  roof  to  be  screened  from  view

(n)  solar  pv  panel,  typ.note:  approx.  30  kW  system  w/  high  efficiency  (SunPower)  modules

(n)  skylight,  typ.

(e)  parapet  to  be  replaced

(e)  parapet  to  be  replaced

cricket,  typ.

steel  and  wood  trellis

(n)  skylight

(n)  standing  seam  metal   roof,  typ.

(n)  cool  roof  roofing  membrane  on  (e)  truss  and  flat   roof,  typ.

Copyright   ©   2011   stromberg   architecture,  sole   proprietorship.    This   document,  as  an   instrument  of   service,  is   the   property  of   stromberg   architecture.

ATTACHMENT 1 DRC 02-16-12 Page 7 of 15

Page 8: 1819 REV1 plans 12 02 11 - Berkeley, California · architectural t0.0 titlesheet a0.0 shadowstudies a0.1 site&0landscapeplan a1.0 existing0building0plan a1.1 first0floor0plan a1.2

exis%n

geleva%

ons

a2.0 not for construction

owner:

1819  5th  Street  LLC768  San  Luis  RoadBerkeley,  CA    94707contact:  Frances  Hellman510.642.6135

1819  5th  Street,  LLC

768  San  Luis  Roa

dBe

rkeley,  CA    947

07ap

n:    059-­‐02332-­‐009

or  057-­‐2098-­‐16-­‐4?

date: phase:

maLhew  strombergArchitect,  LEED  AP

2113  9th  St   Berkeley,  CA    94710510.316.0443  m

[email protected]

architect:

MaKhew  Stromberg2113  9th  StreetBerkeley,  CA    [email protected]

mechanical  engineer:

tbd

contractor  /  es%mator:

Holland  &  Harley  ConstrucNon,  Inc.702  F  Harrison  St.Berkeley,  CA    94710contact:    Chip  Harley510-­‐528-­‐3373  ph510.528.3704  f

ren.  date

C-­‐32401

12.31.2011

structural  engineer:

Jeffrey  Weber  &  Associates,  Inc.1939  Harrison  Street,  Suite  215Oakland,  CA    94612contact:    Jeff  Weber510-­‐251-­‐9578  ph510.251.9580  f

09.08.11 use  permit12.02.11 use  permit  REV  1

electrical  engineer:

Cammisa  and  Wipf  Electrical  ConsulNng  Engineers642  Harrison  StSan  Francisco,  CA    94107contact:    George  PuffeK415-­‐863-­‐5740  ph415.863.5758

civil  engineer:

David  Franco  Civil  Engineer1930  ShaKuck  Avenue,  Suite  ABerkeley,  CA    94704contact:    David  Franco510-­‐848-­‐1930

exisNng  west  elevaNonScale:    1/8"  =  1'-­‐0"1

abc.9d a.1a.2b.1c

(e)  truss  roof  to  remain

(e)  steel  sash  warehousewindows  to  remain

(e)  parapet+16'-­‐7  1/4"

t.o.  exterior  brick+11'-­‐1  3/4"

window  sill+4'-­‐2"

t.o.  roofapprox.  18'-­‐1"

7654321 6.1 6.9

(e)  brick  facade  to  remain

(e)  rolling  door  to  be  replaced

(e)  door  to  be  removed  andopening  re-­‐designed

(e)  chain  link  fence  to  be  removed

(e)  steel  sash  warehouse  windows  to  be  replaced  at  select  locaNons  -­‐  see  proposed  elevaNons

(e)  portland  cement  plaster  parapet  in  disrepair  to  be  replaced

7 6 5 4 3 2 16.16.9

a b c.9 da.1 a.2 b.1 c

(e)  portland  cement  plaster  parapet  indisrepair  to  be  replaced

(e)  brick  facade  to  remain

(e)  steel  sash  warehouse  windows  tobe  replaced  at  select  locaNons

-­‐  see  proposed  elevaNons

exisNng  grade

exisNng  east  elevaNonScale:    1/8"  =  1'-­‐0"2

exisNng  north  elevaNonScale:    1/8"  =  1'-­‐0"3

exisNng  south  elevaNonScale:    1/8"  =  1'-­‐0"4

Copyright   ©   2011   stromberg   architecture,  sole   proprietorship.    This   document,  as  an   instrument  of   service,  is   the   property  of   stromberg   architecture.

ATTACHMENT 1 DRC 02-16-12 Page 8 of 15

Page 9: 1819 REV1 plans 12 02 11 - Berkeley, California · architectural t0.0 titlesheet a0.0 shadowstudies a0.1 site&0landscapeplan a1.0 existing0building0plan a1.1 first0floor0plan a1.2

09.08.11 use  permit12.02.11 REV  1  use  permit

exterio

releva*

ons

a2.1west  eleva7onScale:    1/8"  =  1'-­‐0"1 not for construction

owner:

1819  5th  Street  LLC768  San  Luis  RoadBerkeley,  CA    94707contact:  Frances  Hellman510.642.6135

1819  5th  Street,  LLC

768  San  Luis  Roa

dBe

rkeley,  CA    947

07ap

n:    057-­‐2098-­‐16-­‐4

date: phase:

maIhew  strombergArchitect,  LEED  AP

2113  9th  St   Berkeley,  CA    94710510.316.0443  m

[email protected]

architect:

MaVhew  Stromberg2113  9th  StreetBerkeley,  CA    [email protected]

mechanical  engineer:

tbd

contractor  /  es*mator:

Holland  &  Harley  Construc7on,  Inc.702  F  Harrison  St.Berkeley,  CA    94710contact:    Chip  Harley510-­‐528-­‐3373  ph510.528.3704  f

structural  engineer:

Jeffrey  Weber  &  Associates,  Inc.1939  Harrison  Street,  Suite  215Oakland,  CA    94612contact:    Jeff  Weber510-­‐251-­‐9578  ph510.251.9580  f

electrical  engineer:

Cammisa  and  Wipf  Electrical  Consul7ng  Engineers642  Harrison  StSan  Francisco,  CA    94107contact:    George  PuffeV415-­‐863-­‐5740  ph415.863.5758

civil  engineer:

David  Franco  Civil  Engineer1930  ShaVuck  Avenue,  Suite  ABerkeley,  CA    94704contact:    David  Franco510-­‐848-­‐1930

abc.9d a.1a.2b.1c

wood  siding,  ptd.  typ. metal  siding

standing  seam  metal  roof

(e)  windows  to  remain

clear  anodized  aluminumwindows

(e)  truss  roof  to  remain

smooth  trowel,   integrally  colored  portland  cement  plaster  parapet

plate  stl.  entry  awning  -­‐see  5/a2.4  for  add'l  info

pa7o  and  bbq  area  beyond

sidewalk  &  showroom  finished  floor0'-­‐0"

finished  slab1'-­‐0"

second  floor13'-­‐9"  

wood  siding,   clr.  seal,  typ.

7654321 6.1 6.9

smooth  trowel,   integrally  colored  portland  cement  plaster  parapet

wood  siding,  ptd.  typ.

exterior  light  fixture,  typ.

metal  sunshade,  typ.

exposed  form-­‐7e,  smoothtrowel  concrete  "patch"

dark  bronze  anodized  aluminumwarehouse  replacement  windows

ptd.  sheet  metal  clad  surfacemounted  sliding  warehouse

door

ptd.  sheet  metal  clad  door

ptd.  steel  entry  doors  w/  plate  stl.  awning  above-­‐see  conceptual  drawing  5/a2.4

ptd.  steel  entry  /  security  gate

8'-­‐9"

7'-­‐0"

dark  bronze  anodized  aluminum  warehouse  replacement  windows,  obscured  glass  at  lower  rows

ptd.  sheet  metal  siding

ptd.  sheet  metal  clad  door

solar  PVs  -­‐  see  roof  plan

exis7ng  roof

sidewalk  &  showroom  finished  floor0'-­‐0"

finished  slab1'-­‐0"

second  floor13'-­‐9"  

property  line,  typ.

exposed  form-­‐7e,  smooth  trowel  concrete  "patch"

ptd.  channel  steel  lintel

bench

7 6 5 4 3 2 16.16.9

wood  siding,   clr.  seal,  typ.

standing  seam  metal  roof

smooth  trowel,  integrally  colored  portland  cement  plaster

smooth  trowel,   integrallycolored  portland  cement

plaster

metal  siding,  typ.

bi-­‐fold  pa7o  doors clear  anodized  aluminum  garage  door  w/  lowersolid  panel  and  clear  glass  panels  above

steel  and  woodtrellis

solar  PVs,  typ.-­‐  see  roof  plan

solar  PVs  -­‐  see  roof  plan

wood  siding,  ptd.,typ.

pa7o  bbq  and  benches  showndashed  for  clarity  of  info  beyond

finished  slab1'-­‐0"

second  floor13'-­‐9"

finished  grade1'-­‐3"

sunshade  beyond,  typ.

a b c.9 da.1 a.2 b.1 c

standing  seam  metal  roof

metal  sunshade,  typ.

metal  siding

smooth  trowel,   integrally  coloredportland  cement  plaster  parapet

exis7ng  brick

metal  siding

clear  anodized  aluminum  windows

skylight

wood  siding,   clr.  seal

dark  bronze  anodized  aluminumwarehouse  replacement  windows,

obscured  glass  at  lower  rows

ptd.  steel  guardrailat  deck  to  match

entry  gate

exis7ng  grade

ptd.  sheet  metal  clad  surfacemounted  sliding  warehouse  door

plate  stl.  entry  awning-­‐see  5/a2.4  for  add'l  info

solar  PVs  -­‐  see  roof  plan

pa7o  beyond

sidewalk  &  showroom  finished  floor0'-­‐0"

finished  slab1'-­‐0"

second  floor13'-­‐9"  deck13'-­‐6"  

loh21'-­‐9"

t.o.  roof32'-­‐6"

t.o.  roof25'-­‐6"  

east  eleva7onScale:    1/8"  =  1'-­‐0"2

north  eleva7onScale:    1/8"  =  1'-­‐0"3

south  eleva7onScale:    1/8"  =  1'-­‐0"4

ren.  date

C-­‐32401

12.31.2011

Copyright   ©   2011   stromberg   architecture,  sole   proprietorship.    This   document,  as  an   instrument  of   service,  is   the   property  of   stromberg   architecture.

ATTACHMENT 1 DRC 02-16-12 Page 9 of 15

Page 10: 1819 REV1 plans 12 02 11 - Berkeley, California · architectural t0.0 titlesheet a0.0 shadowstudies a0.1 site&0landscapeplan a1.0 existing0building0plan a1.1 first0floor0plan a1.2

09.08.11 use  permit12.02.11 REV  1  use  permit

strip

eleva*

ons

&  site

sec*on

s

a2.2

west  strip  eleva7on  -­‐  proposedScale:    1/16"  =  1'-­‐0"3

not for construction

owner:

1819  5th  Street  LLC768  San  Luis  RoadBerkeley,  CA    94707contact:  Frances  Hellman510.642.6135

1819  5th  Street,  LLC

768  San  Luis  Roa

dBe

rkeley,  CA    947

07ap

n:    057-­‐2098-­‐16-­‐4

date: phase:

maJhew  strombergArchitect,  LEED  AP

2113  9th  St   Berkeley,  CA    94710510.316.0443  m

[email protected]

architect:

MaVhew  Stromberg2113  9th  StreetBerkeley,  CA    [email protected]

mechanical  engineer:

tbd

contractor  /  es*mator:

Holland  &  Harley  Construc7on,  Inc.702  F  Harrison  St.Berkeley,  CA    94710contact:    Chip  Harley510-­‐528-­‐3373  ph510.528.3704  f

structural  engineer:

Jeffrey  Weber  &  Associates,  Inc.1939  Harrison  Street,  Suite  215Oakland,  CA    94612contact:    Jeff  Weber510-­‐251-­‐9578  ph510.251.9580  f

electrical  engineer:

Cammisa  and  Wipf  Electrical  Consul7ng  Engineers642  Harrison  StSan  Francisco,  CA    94107contact:    George  PuffeV415-­‐863-­‐5740  ph415.863.5758

civil  engineer:

David  Franco  Civil  Engineer1930  ShaVuck  Avenue,  Suite  ABerkeley,  CA    94704contact:    David  Franco510-­‐848-­‐1930

elev.  at  5th  st.25'-­‐6"

elev.  at  mid-­‐lot32'-­‐6"

elev.35'-­‐0"

1805  5th  Streetelev.    +  37'

1801  -­‐  18035th  Streetelev.    +  27'-­‐6"

1801  -­‐  1803    5th  Street project  address:  1819    5th  Street 1823-­‐1827    5th  Street 803  Hearst  Avenue

west  strip  eleva7on  -­‐  exis7ngScale:    1/16"  =  1'-­‐0"4

elev.35'-­‐0"

1805  5th  Streetelev.    +  37'

1805  5th  Streetelev.    +  27'-­‐6"

1801  -­‐  1803    5th  Street project  address:  1819    5th  Street 1823-­‐1827    5th  Street 803  Hearst  Avenue

elev.35'-­‐0"

1805  5th  Streetelev.    +  37'

1805    5th  Street project  address:  1819    5th  Street 1823-­‐1827    5th  Street 811  Hearst  Avenue 809  Hearst  Avenue

site  sec7on  [facing  east]  -­‐  proposedScale:    1/16"  =  1'-­‐0"2

hi-­‐peak  elev.  @  mid  lot32'-­‐6"

1805  5th  Street33'-­‐6"

1812    5th  Street project  address:  1819    5th  Street 1814    6th  Street5th  Street[60'  wide]

elev.  at  5th  st.25'-­‐6"

eq.

eq.

hi-­‐peak  average  elev.27'-­‐11"

site  sec7on  [facing  north]  -­‐  proposedScale:    1/16"  =  1'-­‐0"1

ren.  date

C-­‐32401

12.31.2011

Copyright   ©   2011   stromberg   architecture,  sole   proprietorship.    This   document,  as  an   instrument  of   service,  is   the   property  of   stromberg   architecture.

ATTACHMENT 1 DRC 02-16-12 Page 10 of 15

Page 11: 1819 REV1 plans 12 02 11 - Berkeley, California · architectural t0.0 titlesheet a0.0 shadowstudies a0.1 site&0landscapeplan a1.0 existing0building0plan a1.1 first0floor0plan a1.2

09.08.11 use  permit12.02.11 REV  1  use  permit

materials  &

colors

a2.3west  eleva7on  -­‐  material  and  color  collageScale:    3/16"  =  1'-­‐0"1

not for construction

owner:

1819  5th  Street  LLC768  San  Luis  RoadBerkeley,  CA    94707contact:  Frances  Hellman510.642.6135

1819  5th  Street,  LLC

768  San  Luis  Roa

dBe

rkeley,  CA    947

07ap

n:    057-­‐2098-­‐16-­‐4

date: phase:

maIhew  strombergArchitect,  LEED  AP

2113  9th  St   Berkeley,  CA    94710510.316.0443  m

[email protected]

architect:

MaVhew  Stromberg2113  9th  StreetBerkeley,  CA    [email protected]

mechanical  engineer:

tbd

contractor  /  esPmator:

Holland  &  Harley  Construc7on,  Inc.702  F  Harrison  St.Berkeley,  CA    94710contact:    Chip  Harley510-­‐528-­‐3373  ph510.528.3704  f

structural  engineer:

Jeffrey  Weber  &  Associates,  Inc.1939  Harrison  Street,  Suite  215Oakland,  CA    94612contact:    Jeff  Weber510-­‐251-­‐9578  ph510.251.9580  f

electrical  engineer:

Cammisa  and  Wipf  Electrical  Consul7ng  Engineers642  Harrison  StSan  Francisco,  CA    94107contact:    George  PuffeV415-­‐863-­‐5740  ph415.863.5758

civil  engineer:

David  Franco  Civil  Engineer1930  ShaVuck  Avenue,  Suite  ABerkeley,  CA    94704contact:    David  Franco510-­‐848-­‐1930

smooth   trowel  concrete   "patch"  at  brick  infill  areaowner  fabricated  16  ga.  painted  sheet  steel  doors,  typ.note:  metal  entry  gate  &  railings  to  have  finish  to  match  metal  doors  and  siding

exis7ng  brick bronze  anodized  aluminum  warehouse  replacement  windows obscured  wire  glass  at  lower  rows

painted  steel  channel  lintel smooth   trowel  integrally  colored  portland  cement  plaster1  x  cedar  siding metal  siding  with  charcoal  grey  finish clear  anodized  windows  at   residences  &  east  facing  garage  roll-­‐up  doors;   stainless  steel  window  panels  with  2b  finish

metal  standing  seam  roof  with  light  grey  finish

ren.  date

C-­‐32401

12.31.2011

Copyright   ©   2011   stromberg   architecture,  sole   proprietorship.    This   document,  as  an   instrument  of   service,  is   the   property  of   stromberg   architecture.

owner  fabricated  16  ga.  painted  sheet  steel  siding

ATTACHMENT 1 DRC 02-16-12 Page 11 of 15

Page 12: 1819 REV1 plans 12 02 11 - Berkeley, California · architectural t0.0 titlesheet a0.0 shadowstudies a0.1 site&0landscapeplan a1.0 existing0building0plan a1.1 first0floor0plan a1.2

5th   streetmachine   arts

09.08.11 use  permit12.02.11 REV  1  use  permit

 perspec'v

eph

oto

mon

tage

a2.4 not for construction

owner:

1819  5th  Street  LLC768  San  Luis  RoadBerkeley,  CA    94707contact:  Frances  Hellman510.642.6135

1819  5th  Street,  LLC

768  San  Luis  Roa

dBe

rkeley,  CA    947

07ap

n:    057-­‐2098-­‐16-­‐4

date: phase:

maJhew  strombergArchitect,  LEED  AP

2113  9th  St   Berkeley,  CA    94710510.316.0443  m

[email protected]

architect:

MaNhew  Stromberg2113  9th  StreetBerkeley,  CA    [email protected]

mechanical  engineer:

tbd

contractor  /  es'mator:

Holland  &  Harley  ConstrucQon,  Inc.702  F  Harrison  St.Berkeley,  CA    94710contact:    Chip  Harley510-­‐528-­‐3373  ph510.528.3704  f

structural  engineer:

Jeffrey  Weber  &  Associates,  Inc.1939  Harrison  Street,  Suite  215Oakland,  CA    94612contact:    Jeff  Weber510-­‐251-­‐9578  ph510.251.9580  f

electrical  engineer:

Cammisa  and  Wipf  Electrical  ConsulQng  Engineers642  Harrison  StSan  Francisco,  CA    94107contact:    George  PuffeN415-­‐863-­‐5740  ph415.863.5758

civil  engineer:

David  Franco  Civil  Engineer1930  ShaNuck  Avenue,  Suite  ABerkeley,  CA    94704contact:    David  Franco510-­‐848-­‐1930

rear  lot  perspecQve  [facing  northwest]  -­‐  proposed3

rear  lot  perspecQve  [facing  northwest]  -­‐  exisQng4

5th  street  perspecQve  [facing  northeast]  -­‐  proposed1

5th  street  perspecQve  [facing  northeast]  -­‐  exisQng2

entry  conceptual  perspecQve  [facing  northeast]5

exposed  form-­‐Qe,  smoothtrowel  concrete  "patch"

with  tenant  name

ptd.  plate  steel  bench  with  clearsealed  wd.  seat  and  arm  rests

note:  entry  bench  and  planter  shallnot  extend  more  than  2'  from  theproperty  line  into  the  public   r.o.w.

ptd.  steel  barrier  free  entry  doorsw/  plate  stl.  awning  above

note:  awning  shall  not  projectmore  than  4"  into  the  public

r.o.w.  below  8'-­‐0"  height

ren.  date

C-­‐32401

12.31.2011

Copyright   ©   2011   stromberg   architecture,  sole   proprietorship.    This   document,  as  an   instrument  of   service,  is   the   property  of   stromberg   architecture.

naQve  grasses  in  entryplanQng  strip

new  planQng  strip-­‐see  site  plan

ATTACHMENT 1 DRC 02-16-12 Page 12 of 15

Page 13: 1819 REV1 plans 12 02 11 - Berkeley, California · architectural t0.0 titlesheet a0.0 shadowstudies a0.1 site&0landscapeplan a1.0 existing0building0plan a1.1 first0floor0plan a1.2

09.08.11 use  permit12.02.11 use  permit  REV  1

exis%n

gsec%on

s

a3.1[REV  1  new  sheet] not for construction

owner:

1819  5th  Street  LLC768  San  Luis  RoadBerkeley,  CA    94707contact:  Frances  Hellman510.642.6135

1819  5th  Street,  LLC

768  San  Luis  Roa

dBe

rkeley,  CA    947

07ap

n:    057-­‐2098-­‐16-­‐4

date: phase:

maKhew  strombergArchitect,  LEED  AP

2113  9th  St   Berkeley,  CA    94710510.316.0443  m

[email protected]

architect:

MaQhew  Stromberg2113  9th  StreetBerkeley,  CA    [email protected]

mechanical  engineer:

tbd

contractor  /  es%mator:

Holland  &  Harley  ConstrucSon,  Inc.702  F  Harrison  St.Berkeley,  CA    94710contact:    Chip  Harley510-­‐528-­‐3373  ph510.528.3704  f

structural  engineer:

Jeffrey  Weber  &  Associates,  Inc.1939  Harrison  Street,  Suite  215Oakland,  CA    94612contact:    Jeff  Weber510-­‐251-­‐9578  ph510.251.9580  f

electrical  engineer:

Cammisa  and  Wipf  Electrical  ConsulSng  Engineers642  Harrison  StSan  Francisco,  CA    94107contact:    George  PuffeQ415-­‐863-­‐5740  ph415.863.5758

civil  engineer:

David  Franco  Civil  Engineer1930  ShaQuck  Avenue,  Suite  ABerkeley,  CA    94704contact:    David  Franco510-­‐848-­‐1930

7654321

finished  slab+/-­‐  1'-­‐0"

t.o.  roof+/-­‐  12'-­‐1"

(e)  roof  to  remain

(e)  tji  framed  roof  to  beremoved  and  salvaged (e)  framing  to  be  removed  to  

make  way  for  residence  above

shop

building  secSon  [facing  east]  -­‐  proposedScale:    1/8"  =  1'-­‐0"3

a b c.9 da.1 a.2 b.1 c

5th  Street[60'  wide]

sidewalk  &  displayfinished  floor0'-­‐0"  [datum]

finished  slab+/-­‐  1'-­‐0"

t.o.  roof+/-­‐  18'-­‐1"  

(e)  windows  to  be  replaced-­‐see  a2.1

(e)  parapet  to  be  replaced

exisSng  roof  to  be  removed

building  secSon  [facing  north]  -­‐  proposedScale:    1/8"  =  1'-­‐0"1

ren.  date

C-­‐32401

12.31.2011

Copyright   ©   2011   stromberg   architecture,  sole   proprietorship.    This   document,  as  an   instrument  of   service,  is   the   property  of   stromberg   architecture.

a b c.9 da.1 a.2 b.1 c

sidewalk  &  displayfinished  floor0'-­‐0"  [datum]

finished  slab+/-­‐  1'-­‐0"

(e)  built-­‐up  steel  truss  androof  to  remain

porSon  of  exisSng  roof  to  be  replaced

line  of  parapet  to  be  replaced  beyond

hall

storage  andu%lity  area

shop shopoffice

(e)  parapet  to  be  replaced

(e)  walls  to  be  removed

porSon  of  exisSng  wall  to  beremoved  to  new  accessible

doorway  /  entry

12'-­‐0

"

7654321

finished  slab+/-­‐  1'-­‐0"

t.o.  gable  peak18'-­‐1"  

(e)  roof  to  remain

(e)  parapet  to  be  replaced

(e)  framing  to  be  removed  to  make  way  for  residence  above

10'-­‐6

" office bathroomshop hall bathroom

storage  andu%lity  area

storage  andu%lity  area

office

(e)  walls  to  be  removed,  typ.-­‐see  exisSng  building  plan  a1.0

(e)  truss  to  remain,  typ.

(e)  windows  to  be  replaced-­‐see  a2.1

(e)  wndows  to  remain-­‐see  a2.1

(e)  parapet  to  be  replaced

5'-­‐5  1/2"

building  secSon  [facing  north]  -­‐  proposedScale:    1/8"  =  1'-­‐0"2

building  secSon  [facing  east]  -­‐  proposedScale:    1/8"  =  1'-­‐0"4

notes:

1. see  exisSng  building  plan  for  addiSonal  demoliSon  info.

ATTACHMENT 1 DRC 02-16-12 Page 13 of 15

Page 14: 1819 REV1 plans 12 02 11 - Berkeley, California · architectural t0.0 titlesheet a0.0 shadowstudies a0.1 site&0landscapeplan a1.0 existing0building0plan a1.1 first0floor0plan a1.2

09.08.11 use  permit12.02.11 use  permit  REV  1

prop

osed

sec(on

s

not for construction

owner:

1819  5th  Street  LLC768  San  Luis  RoadBerkeley,  CA    94707contact:  Frances  Hellman510.642.6135

1819  5th  Street,  LLC

768  San  Luis  Roa

dBe

rkeley,  CA    947

07ap

n:    057-­‐2098-­‐16-­‐4

date: phase:

maGhew  strombergArchitect,  LEED  AP

2113  9th  St   Berkeley,  CA    94710510.316.0443  m

[email protected]

architect:

MaNhew  Stromberg2113  9th  StreetBerkeley,  CA    [email protected]

mechanical  engineer:

tbd

contractor  /  es(mator:

Holland  &  Harley  ConstrucQon,  Inc.702  F  Harrison  St.Berkeley,  CA    94710contact:    Chip  Harley510-­‐528-­‐3373  ph510.528.3704  f

structural  engineer:

Jeffrey  Weber  &  Associates,  Inc.1939  Harrison  Street,  Suite  215Oakland,  CA    94612contact:    Jeff  Weber510-­‐251-­‐9578  ph510.251.9580  f

electrical  engineer:

Cammisa  and  Wipf  Electrical  ConsulQng  Engineers642  Harrison  StSan  Francisco,  CA    94107contact:    George  PuffeN415-­‐863-­‐5740  ph415.863.5758

civil  engineer:

David  Franco  Civil  Engineer1930  ShaNuck  Avenue,  Suite  ABerkeley,  CA    94704contact:    David  Franco510-­‐848-­‐1930

7654321 6.1 6.9

finished  slab1'-­‐0"

second  floor13'-­‐9"  

woodshop machine  shop main  residence  livingareas

main  residence  masterbedroom

(e)  parapet  to  bereplaced

proposed  sawtoothroof  with  north  facingclerestory  windows,

typ.

proposed  solar  PVs-­‐see  roof  plan  a1.3

11'-­‐8

" kitchen  soffit

9'-­‐11"

4'-­‐0"

building  secQon  [facing  east]  -­‐  proposedScale:    1/8"  =  1'-­‐0"3

a b c.9 da.1 a.2 b.1 c

t.o.  gable  peak25'-­‐6"

5th  Street[60'  wide] sidewalk  &  display

finished  floor0'-­‐0"  [datum]

finished  slab1'-­‐0"

second  floor13'-­‐9"  deck13'-­‐6"  

hi-­‐peak  elev.  @  mid  lot32'-­‐6"

loh21'-­‐9"

main  residenceliving  area

master  bedroom

loO

bonus  room closet bathromcaretaker  kitchencaretaker  bathcaretakerbedroom

caretaker  livinghall

deck

skylight,  typ,  -­‐see  roof  plan  a1.3

11'-­‐3

"

building  secQon  [facing  north]  -­‐  proposedScale:    1/8"  =  1'-­‐0"1

ren.  date

C-­‐32401

12.31.2011

Copyright   ©   2011   stromberg   architecture,  sole   proprietorship.    This   document,  as  an   instrument  of   service,  is   the   property  of   stromberg   architecture.

a b c.9 da.1 a.2 b.1 c

5

street

m  a  c  h  i  n  e      a  r  t   s

sidewalk  &  displayfinished  floor0'-­‐0"  [datum]

finished  slab1'-­‐0"

t.o.  sawtooth  peak21'-­‐3"

tool  storage showerdisplay

mezzanine storage

manufacturingarea

machineshop

13'-­‐1

"

12'-­‐0

"

trellis-­‐see  a2.1

proposed  accessibleentry  /  awning

garage  door  hardware

13'-­‐1

"

11'-­‐6

"

7654321 6.1 6.9

finished  slab1'-­‐0"

t.o.  gable  peak25'-­‐6"  

storagemezzanine

tool  storage bathroommanufacturing  area machineshop  beyond

caretaker  living  room

stairwell caretakerbathroom

second  floor13'-­‐9"  

9'-­‐0"

8'-­‐5"

3'-­‐6"

(e)  parapet  to  bereplaced

4'-­‐0"

building  secQon  [facing  north]  -­‐  proposedScale:    1/8"  =  1'-­‐0"2

building  secQon  [facing  east]  -­‐  proposedScale:    1/8"  =  1'-­‐0"4

a3.2[REV  1  new  sheet]

ATTACHMENT 1 DRC 02-16-12 Page 14 of 15

Page 15: 1819 REV1 plans 12 02 11 - Berkeley, California · architectural t0.0 titlesheet a0.0 shadowstudies a0.1 site&0landscapeplan a1.0 existing0building0plan a1.1 first0floor0plan a1.2