16
8/22/2019 17 OneWkWrapUp Final http://slidepdf.com/reader/full/17-onewkwrapup-final 1/16 © 2001 Six Sigma Academy Course Wrap-Up DFSS One Week Course

17 OneWkWrapUp Final

  • Upload
    sirdba

  • View
    212

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 17 OneWkWrapUp Final

8/22/2019 17 OneWkWrapUp Final

http://slidepdf.com/reader/full/17-onewkwrapup-final 1/16

© 2001 Six Sigma Academy

Course Wrap-Up

DFSS One Week Course

Page 2: 17 OneWkWrapUp Final

8/22/2019 17 OneWkWrapUp Final

http://slidepdf.com/reader/full/17-onewkwrapup-final 2/16

© 2001 Six Sigma Academy

Module Objectives

• By end of module, participant will be able to:

• Articulate major DFSS phases and steps

• Recall tools used in DFSS for business process

Page 3: 17 OneWkWrapUp Final

8/22/2019 17 OneWkWrapUp Final

http://slidepdf.com/reader/full/17-onewkwrapup-final 3/16

© 2001 Six Sigma Academy

What is Design for Six Sigma?

Designing products, services, and processes that satisfyboth client and business needs at six sigma quality.

“Design with the Power of Six Sigma”  

Page 4: 17 OneWkWrapUp Final

8/22/2019 17 OneWkWrapUp Final

http://slidepdf.com/reader/full/17-onewkwrapup-final 4/16

© 2001 Six Sigma Academy

DFSS Phases and Activites

Identify ValidateDesign Optimize

• Secure leadershipcommitment

• Scope project,align resources

• Establish systemof projectmanagement

• Gather the client

requirements(CTS)

• Assess thecompetition

• Establish thefunctionalrequirements

• Generate the designrequirements

• Develop conceptualdesigns

• Develop preliminary

designs• Evaluate alternatives

• Develop detaileddesign

• Establish transfer functions

• Predict designperformance

• Simulate design• Prepare control plan

• Pilot new design• Confirm client

requirements aremet

• Implement newdesign

Page 5: 17 OneWkWrapUp Final

8/22/2019 17 OneWkWrapUp Final

http://slidepdf.com/reader/full/17-onewkwrapup-final 5/16

© 2001 Six Sigma Academy

DFSS Steps & Tollgates

• Tollgates are formal reviews of a DFSS project at conclusion of each DFSS

step

• Cross functional meetings of project decision makers

• Decision point for project continuation

Client

Needs

T  ol  l   g a  t   e 1 

T  ol  l   g a  t   e 2 

T  ol  l   g a  t   e  3 

T  ol  l   g a  t   e 4 

T  ol  l   g a  t   e  5 

• Gather needs

• Translate needs toCTS’s 

• Translate CTS’s to

functionalrequirements

•Assess technology

• Develop plan

• Assess risk 

• Translate functionalrequirements todesign parameters

• Develop/evaluatedesign alternatives

• Resolve designconflicts

• Assess risk 

• Flow down systemdesign to subsystems

• Design for assembly,reliability,maintainability

• Mistake proof design

•Assess risk 

• Develop transfer functions

• Develop systemcapability

• Assess design gaps

• Optimize design

• Assess risk 

• Run pilot/build prototype

• Validate design

• Verify systemcapability

• Assess risk 

T  ol  l   g a  t   e  6 

6 Sigma

Processes

Conceptual

Design

Preliminary

Design

Detail

Design

Pilot/

PrototypePre-Launch Launch

T  ol  l   g a  t   e  7 

Identify ValidateDesign Optimize

• Demonstrate process/ product capability

• Mistake proof process

• Assess risk 

• Monitor systemcapability

• Implement design and process control plans

• Develop transition plan

Page 6: 17 OneWkWrapUp Final

8/22/2019 17 OneWkWrapUp Final

http://slidepdf.com/reader/full/17-onewkwrapup-final 6/16

© 2001 Six Sigma Academy

Tollgate #1

Deliverables Tools 

• Project Charter • Project Plan

• Change Plot

• Gather Client Needs Surveys, Interviews

• Translate Needs to CTS’s QFD (House #1)

• Translate CTS’s to Functional QFD (House #2)

Requirements• Assess Technology Technology Roadmap

• Technology Benchmark Technology Roadmap

• Competitive Benchmark 

• Financial Analysis ROI, DCRR 

• Project Risk Assessment

Page 7: 17 OneWkWrapUp Final

8/22/2019 17 OneWkWrapUp Final

http://slidepdf.com/reader/full/17-onewkwrapup-final 7/16© 2001 Six Sigma Academy

Tollgate #2

Deliverables Tools 

• Concurrent Development Plan Process Checklist• Potential Solutions Identified TRIZ

• Solutions Evaluation Pugh Matrix

• Design FMEA

• Design Scorecard

• Updated Change Plot

• Project Risk Assessment

Page 8: 17 OneWkWrapUp Final

8/22/2019 17 OneWkWrapUp Final

http://slidepdf.com/reader/full/17-onewkwrapup-final 8/16© 2001 Six Sigma Academy

Tollgate #3

Deliverables Tools 

• Systems to Sub-system FlowDown

• Translate Functional Require- QFD (House #3)ments into Design Requirements

• Additive Design

• Reliable Design

• Mistake Proof Design Poka-Yoke• Procurement Strategies Concurrent Checklist

• Updated Design Scorecard

• Updated Change Plot

• Project Risk Assessment

Page 9: 17 OneWkWrapUp Final

8/22/2019 17 OneWkWrapUp Final

http://slidepdf.com/reader/full/17-onewkwrapup-final 9/16© 2001 Six Sigma Academy

Tollgate #4

Deliverables Tools 

• Experimentation DOE• Parameter Design

• Transfer Functions Established

• Requirements Flow Down

• Design Conflicts Resolved

• Capability Flow Up

• Optimized Design

• Statistical Tolerances Established

• Updated Design Scorecard

• Updated Change Plot

• Project Risk Assessment

Design/Optimize

Page 10: 17 OneWkWrapUp Final

8/22/2019 17 OneWkWrapUp Final

http://slidepdf.com/reader/full/17-onewkwrapup-final 10/16© 2001 Six Sigma Academy

Tollgate #5

Deliverables Tools 

• Create Test Environment• Run Pilot/Build Prototype

• Validate Design

• Capability Flow Up

• Updated Design Scorecard

• Updated Change Plot

• Project Risk Assessment

Page 11: 17 OneWkWrapUp Final

8/22/2019 17 OneWkWrapUp Final

http://slidepdf.com/reader/full/17-onewkwrapup-final 11/16© 2001 Six Sigma Academy

Tollgate #6

Deliverables Tools 

• Tolerance Design• Mistake Proof Manufacturing Poka Yoke

• Capability Flow Up

• Updated Design Scorecard

• Updated Change Plot

• Project Risk Assessment

Optimize/Validate

Page 12: 17 OneWkWrapUp Final

8/22/2019 17 OneWkWrapUp Final

http://slidepdf.com/reader/full/17-onewkwrapup-final 12/16© 2001 Six Sigma Academy

Tollgate #7

Deliverables Tools 

• Implement Design Plans• Implement Control Plans

• Transition Plans

• Capability Flow Up

• Updated Design Scorecard

• Updated Change Plot

• Final Project Documentation

• Lessons Learned

Validate

Page 13: 17 OneWkWrapUp Final

8/22/2019 17 OneWkWrapUp Final

http://slidepdf.com/reader/full/17-onewkwrapup-final 13/16© 2001 Six Sigma Academy

DFSS Tips

• Complete project charter early• Leadership and cross functional participation in tollgate reviews

crucial

• Update “living” documents throughout process 

• Design scorecard

• Change plot

• Project risk assessment

•  Adhere to DFSS process

Page 14: 17 OneWkWrapUp Final

8/22/2019 17 OneWkWrapUp Final

http://slidepdf.com/reader/full/17-onewkwrapup-final 14/16

© 2001 Six Sigma Academy

Key Learning Points

•  •  

•  

•  

Page 15: 17 OneWkWrapUp Final

8/22/2019 17 OneWkWrapUp Final

http://slidepdf.com/reader/full/17-onewkwrapup-final 15/16

© 2001 Six Sigma Academy

Module Review

• Participant should now be able to:

• Articulate major DFSS phases and steps

• Recall tools used in DFSS for business process

Page 16: 17 OneWkWrapUp Final

8/22/2019 17 OneWkWrapUp Final

http://slidepdf.com/reader/full/17-onewkwrapup-final 16/16

Trademarks and Service Marks

Six Sigma is a federally registered trademark of Motorola, Inc.

Breakthrough Strategy is a federally registered trademark of Six Sigma Academy.

VISION. FOR A MORE PERFECT WORLD is a federally registered trademark of Six Sigma Academy.

ESSENTEQ is a trademark of Six Sigma Academy.

FASTART is a trademark of Six Sigma Academy.

Breakthrough Design is a trademark of Six Sigma Academy.

Breakthrough Lean is a trademark of Six Sigma Academy.

Design with the Power of Six Sigma is a trademark of Six Sigma Academy.

Legal Lean is a trademark of Six Sigma Academy.

SSA Navigator is a trademark of Six Sigma Academy.

SigmaCALC is a trademark of ix Sigma Academy.

SigmaFlow is a trademark of Compass Partners, Inc.

SigmaTRAC is a trademark of DuPont.

MINITAB is a trademark of Minitab, Inc.