  • Pearl GTL Project

    LINDE ENGINEERING

    Contractor Project No: 5887 Shell Project No: HP-3000-QAT

    Project Document Number: T- 4.234.574 Project Rev.:A Page 2 of 4

    Purchase Order Number:

    2MH127

    N/A Tag/Item Number(s):

    ASU Unit(s):

    Z PCWBS:

  • QATAR SHELL GTL PROJECT (PEARL) C2 AIR SEPARATION UNITS CONSTRUCTION

    D A 14.02.2008 Ready for construction SB UA MC/ZG RFC

    C O 01.10.2007 Issued for company comments IO MC ZG ICC

    B Issued for review IO MC ZG IFR

    A Issued for internal review MS MC ZG IIR

    GAMA Rev.

    Project Rev Date Description

    Prepared By

    Checked By

    Approved By Status

    No. No. ORIGINATOR

    LINDE ENGINEERING AG

    Document Title:

    ITP FOR FENCE AND GATE INSTALLATION

    Document No.

    GAM ITP QAC GTL 022 D LOC470

    Contractor

    Gama Qatar Co. W. L. L. Org.

    Code Doc. Type

    Disc. Code

    Geogr. Area

    Seq. No

    Rev. No Vendor Code

    Project Document Number: T-4.234.574 Rev No: A

  • QSGTL PEARL PROJECT C2 ASU Construction Works

    Document No.: GAM-ITP-QAC-GTL-022

    ITP FOR FENCE AND GATE

    INSTALLATION DATE: 14.02.08 REV. D

    S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. THIRD PARTY (TPI)

    I: INSPECTION / TEST R: DOCUMENT REVIEW S: SURVEILANCE H: HOLD POINT. W: WITNESS

    Item Activity Characteristic to be Verified Control Procedure

    Reference Responsible

    Party Acceptance Criteria Verifying Documents S X C A

    T-4.234.574 REV-A PAGE 4 of 4

    1.0 Survey and setting out Location

    Project Drawings

    As per drawing GAM-QCR-QAC-GTL-134 I W S

    2.0 Excavate/drill holes for foundation of fence/gate posts

    a. Distance between posts b. Dimensions (size/depth)

    Project Drawings As per drawings GAM-QCR-QAC-GTL-134 I S S

    3.0 Install fence/gate posts prior to concreting

    a. Materials b. Distance between posts c. Elevation of posts/fence foundation

    As per drawings GAM-QCR-QAC-GTL-134 & Material Approval Requests

    I S S

    4.0 Pour concrete for fence/gate post foundations

    a. Type of mix b. Materials, mix and construction

    Project concreting specs As per drawings GAM-QCR-QAC-GTL-134 I S S

    5.0 Install fencing / gate materials

    a. Materials b. Elevation and straightness

    Project Drawings

    As per drawings GAM-QCR-QAC-GTL-134 & Material Approval Requests

    W S S

    6.0 Install grounding (if required) Design and construction Project Drawings Electrical specifications GAM-QCR-QAC-GTL-104 I W S

    7.0 Final inspection Workmanship Project Drawings & Manufacturer recommendations

    Site Engineer QC Inspector

    Installation instructions GAM-QCR-QAC-GTL-134 I H S