It’s not all metal boxes on wheels. It’s about people… And how they deal with the roadways the MPO and the FDOT put before them.

MPO Bypass presentation Jan 23 2012

Embed Size (px)

DESCRIPTION

Five min presentation to the Sarasota Manatee MPO board advocating FHWA promoted "wide nodes, narrow road" as today's best practice for safer, lower cost, better mobility than “widen it” - by focusing on intersection management with modern roundabouts where geography allows. Presented by Rod Warner, Sarasota County representative to the MPO Citizens Advisory Commiittee.

Citation preview

Page 1: MPO Bypass presentation Jan 23 2012

It’s not all metal boxes on wheels. It’s about people…And how they deal with the roadways the MPO and the FDOT put before them.

Page 2: MPO Bypass presentation Jan 23 2012

So widen the US41 Venice Bypass to relieve congestion?Like 2-3 p.m. “peak hour” last Friday – East/West backup at Venice Ave and Center Rd.

Page 3: MPO Bypass presentation Jan 23 2012

PEER consultant says go ahead – build Center Rd and Venice Ave to nine lanes wide –BUT WAIT, he then says, You can’t build your way out of congestion there.See above what 9+ lanes do to current width of Venice ave Bypass intersection.

Page 4: MPO Bypass presentation Jan 23 2012

Because the North/South flow will have to stop at those Bypass RED lights...to letEast/West volume take its turn to cross…even if the Bypass was 14 lanes wide.> “Crossing Traffic Defeats Widening” Simple Truth #2 at www.US41SimpleTruths.com

Page 5: MPO Bypass presentation Jan 23 2012

Mobility engineers know the axiom: Intersections Determine Capacity, not the widthof the road between. Why mess with what’s between when it’s the crossing traffictaking its turn that brings North/South flow to repeated stops for red lights.?

Page 6: MPO Bypass presentation Jan 23 2012

Venice officials believe widening the Bypass will keep traffic away from US41Bus andPinebrook.

Page 7: MPO Bypass presentation Jan 23 2012

But Wait! … Sarasota County will widen Pinebrook to four lanes up to Laurel Rd.

Page 8: MPO Bypass presentation Jan 23 2012

County connects from Pinebrook/Laurel Rd to Honore extended.

Page 9: MPO Bypass presentation Jan 23 2012

Or choose to drive a widened I-75.

Page 10: MPO Bypass presentation Jan 23 2012

PEER Report says in AIM Doc #1: If Pinebrook is four laned, the Bypass as it is todayat four lanes will “accommodate 2035 volume”

Page 11: MPO Bypass presentation Jan 23 2012

Six lane Bypass capital cost $68-72 million/ Pinebrook about half that...What a bargain with Pinebrook widened and Bypass staying four lanes!

Page 12: MPO Bypass presentation Jan 23 2012

Nine laned unrelieved congestion at Venice Ave and Center Rd will aggravate.Frustrated drivers, and aging Venice drivers intimated by speed and multi-lanes,will choose US41Bus or Pinebrook, or other routes, doing what Venice officialsthought Bypass widening would avert.

Page 13: MPO Bypass presentation Jan 23 2012

As the PEER wrote, he did, page 23, “Motorists are better served by four-laneroadways rather than six lanes, by roundabouts rather than signalized intersections.

Page 14: MPO Bypass presentation Jan 23 2012

This “Wide Notes/Narrow Road” four-lane concept is promoted by the Federal HighwayAdministration (FHWA)

Page 15: MPO Bypass presentation Jan 23 2012

PEER again: future traffic volume north of Venice Ave allows keeping it four lanes,with modern roundabouts at Albee Farms, Sweet Bay, and Bird Bay. Add, thatwould conserve construction capital if “staged to demand” like theJacaranda/Venice Ave roundabout.

Page 16: MPO Bypass presentation Jan 23 2012

Members of the Institute of Transportation Engineers reviewed the posted PEERdocuments. None endorsed widening what they saw as, not a bypass, but a“conflict of use” commercial corridor experiencing friction from entering andexiting businesses, to and from neighborhood streets and feeder roads mixingwith through traffic. It’s about intersection management.

Page 17: MPO Bypass presentation Jan 23 2012

“Conflict of Use” friction up and down the 2.5 mile Bypass corridor.

Page 18: MPO Bypass presentation Jan 23 2012

But Wait, the FDOT spent money on a six lane design. Will reconfiguring to fourlanes multimodal waste that money? What’s the greater waste? Committingmillions to what won’t work and cost the public dearly and daily in wasted fuel,wasted time, air pollution, and accident risk, year in and year out through 2035.

Page 19: MPO Bypass presentation Jan 23 2012

First priority.: Safety. Safety first. Widening the Bypass will cause injury to someonewho otherwise would not be hurt. Consider, for safety’s sake, keeping the By Passfour-lanes, assuring the millions you are committing will deliver today’s bestintersection management and mobility.... for this Venice area and all of fhe US41“Multimodal Emphasis Corridor” from North Port to Palmetto.