00 Review of PTSB Issues Henry Sullivan Chief Maintenance Officer NYCT Department of Buses / MTA Bus...

Preview:

Citation preview

11

Review of PTSB Issues

Henry SullivanChief Maintenance OfficerNYCT Department of Buses / MTA Bus / LI BusNovember 2011

CONFIDENTIAL, PROPRIETARY AND NOT FOR DISTRIBUTION

222

Agenda

Statistics

Overview

Actions Taken

Current Status

Maintaining the Improvements

Detailed Explanation of Failure Modes and Retrofits

Conclusion

1

2

3

4

5

6

7

33

PTSB CasesPTSB Bus Reportable Accidents

12

4

15

10

5

17

35

19

5

9

4

3

66

32

40

0

10

20

30

40

50

60

70

2010 (all) 2010 (to June) 2011 (to June)

0

10

20

30

40

50

60

70

Fatality

Multiple Injury

Mechanical Failure

Fire

4

Overview

• Increase in PTSB cases in first half of 2011.

• In June, met with Office of System Safety (OSS) and PTSB to explain the rise in PTSB cases.

• After meeting, established procedures to prevent accidents and sustain a lower rate of PTSB cases.

• Complexity of fleet is a major issue in resolving problems.

– 3 types of propulsion systems• Diesel• CNG• Hybrid

– 3 types of vehicles• 40-foot local• 60-foot artic• Express

– 6 different bus manufacturers

– Fleets range in age from 1995 to 2011, resulting in 23 variations in production models.

5

Actions Taken

• Established AGM Committee.

• Meetings to explain the causes and effects of the PTSB cases, as well as the procedures to prevent them.

• Made instructional CDs of the presentations for Depot Training Supervisors (DTSs) to hold training at all the depots (“PTSB Shop Gates”).

6

Fires – Current Status

1

2

1 1

3

2

1 11 1

3 3

5

4

1

3

2 2

0

1

2

3

4

5

6Ja

nu

ary

Fe

bru

ary

Ma

rch

Ap

ril

Ma

y

Jun

e

July

Au

gu

st

Se

pte

mb

er

Oct

ob

er

No

vem

be

r

De

cem

be

r

2010

2011

7

Mechanical Failures – Current Status

2

1

2

1 1

3

1 1

5

3

6

2

5

2

1

0

1

2

3

4

5

6

7Ja

nu

ary

Fe

bru

ary

Ma

rch

Ap

ril

Ma

y

Jun

e

July

Au

gu

st

Se

pte

mb

er

Oct

ob

er

No

vem

be

r

De

cem

be

r

2010

2011

88

Maintaining the Improvements

• AGM Committee meets weekly.

– Identifies short- and long-term solutions for issues.

– Identifies modifications to policies and procedures.

– Performs campaign tracking and updates.

• Depot management conducts a Quality Control check geared towards PTSB cases.

– 10 buses are checked per day at each depot.

• “Report Card” audits held at each depot.

– At the end of the audit, all depot management personnel ride a bus to look at it from the customer’s point of view.

• Customer Services conducts audits of PTSB issues at each depot to ensure that critical safety campaigns are completed.

• Bus Merger Team conducts quality audits.

• S.O. Re-Rack Audits are held each day and documented in SPEAR (1 bus per day per depot).

• Random inspections of depots are held jointly by the PTSB, OSS, and ACMO, Customer Services.

9

Detailed Explanation of Failure Modes and Retrofits

10

OEM Installation in Orion VII Bus

11

Issues with OEM UnitLoosening of Mounting to Panel

12

Issues with OEM UnitAssembly Components Falling Apart

13

Issues with OEM UnitMissing Rivets Securing Plate to Assembly

14

Issues with OEM UnitCracks in Blower Housing

15

NYCT Retrofit Kit

Frame Mount Bracket

Blower Assy. Mount Bracket

Cover-plate

Panel reinforcement Bracket (Upper)

Panel reinforcement Bracket (Lower)

Retainer Brackets

U-Clamp

Blower Assy.

16

ReworkShop Rebuilt Unit with Pre-Assembled Bracketry

New or repaired blower housing and blower plate

17

ReworkStep 1: Mount Bracket to Frame

18

ReworkStep 2: Reinforce Panel

19

ReworkStep 3: Mount Blower Assembly

20

ReworkStep 4: Install Upgraded Coverplate

21

ReworkStep 5: Install Grille & Retainer Brackets

22

Conclusion

• In order to keep focus and maintain the results we have achieved so far we will continue with:

– Depot management conducts Quality Control check geared towards PTSB cases.

– “Report Card” audits held at each depot.

– Customer Services conducts audits of PTSB issues at each depot to ensure that critical safety campaigns are completed.

– S.O. Re-Rack Audits held each day and documented in SPEAR.

– Random inspections of depots held jointly by the PTSB, OSS, and ACMO, Customer Services.

Recommended