22
1 Review of PTSB Issues Henry Sullivan Chief Maintenance Officer NYCT Department of Buses / MTA Bus / LI Bus November 2011 CONFIDENTIAL, PROPRIETARY AND NOT FOR DISTRIBUTION

00 Review of PTSB Issues Henry Sullivan Chief Maintenance Officer NYCT Department of Buses / MTA Bus / LI Bus November 2011 CONFIDENTIAL, PROPRIETARY AND

Embed Size (px)

Citation preview

Page 1: 00 Review of PTSB Issues Henry Sullivan Chief Maintenance Officer NYCT Department of Buses / MTA Bus / LI Bus November 2011 CONFIDENTIAL, PROPRIETARY AND

11

Review of PTSB Issues

Henry SullivanChief Maintenance OfficerNYCT Department of Buses / MTA Bus / LI BusNovember 2011

CONFIDENTIAL, PROPRIETARY AND NOT FOR DISTRIBUTION

Page 2: 00 Review of PTSB Issues Henry Sullivan Chief Maintenance Officer NYCT Department of Buses / MTA Bus / LI Bus November 2011 CONFIDENTIAL, PROPRIETARY AND

222

Agenda

Statistics

Overview

Actions Taken

Current Status

Maintaining the Improvements

Detailed Explanation of Failure Modes and Retrofits

Conclusion

1

2

3

4

5

6

7

Page 3: 00 Review of PTSB Issues Henry Sullivan Chief Maintenance Officer NYCT Department of Buses / MTA Bus / LI Bus November 2011 CONFIDENTIAL, PROPRIETARY AND

33

PTSB CasesPTSB Bus Reportable Accidents

12

4

15

10

5

17

35

19

5

9

4

3

66

32

40

0

10

20

30

40

50

60

70

2010 (all) 2010 (to June) 2011 (to June)

0

10

20

30

40

50

60

70

Fatality

Multiple Injury

Mechanical Failure

Fire

Page 4: 00 Review of PTSB Issues Henry Sullivan Chief Maintenance Officer NYCT Department of Buses / MTA Bus / LI Bus November 2011 CONFIDENTIAL, PROPRIETARY AND

4

Overview

• Increase in PTSB cases in first half of 2011.

• In June, met with Office of System Safety (OSS) and PTSB to explain the rise in PTSB cases.

• After meeting, established procedures to prevent accidents and sustain a lower rate of PTSB cases.

• Complexity of fleet is a major issue in resolving problems.

– 3 types of propulsion systems• Diesel• CNG• Hybrid

– 3 types of vehicles• 40-foot local• 60-foot artic• Express

– 6 different bus manufacturers

– Fleets range in age from 1995 to 2011, resulting in 23 variations in production models.

Page 5: 00 Review of PTSB Issues Henry Sullivan Chief Maintenance Officer NYCT Department of Buses / MTA Bus / LI Bus November 2011 CONFIDENTIAL, PROPRIETARY AND

5

Actions Taken

• Established AGM Committee.

• Meetings to explain the causes and effects of the PTSB cases, as well as the procedures to prevent them.

• Made instructional CDs of the presentations for Depot Training Supervisors (DTSs) to hold training at all the depots (“PTSB Shop Gates”).

Page 6: 00 Review of PTSB Issues Henry Sullivan Chief Maintenance Officer NYCT Department of Buses / MTA Bus / LI Bus November 2011 CONFIDENTIAL, PROPRIETARY AND

6

Fires – Current Status

1

2

1 1

3

2

1 11 1

3 3

5

4

1

3

2 2

0

1

2

3

4

5

6Ja

nu

ary

Fe

bru

ary

Ma

rch

Ap

ril

Ma

y

Jun

e

July

Au

gu

st

Se

pte

mb

er

Oct

ob

er

No

vem

be

r

De

cem

be

r

2010

2011

Page 7: 00 Review of PTSB Issues Henry Sullivan Chief Maintenance Officer NYCT Department of Buses / MTA Bus / LI Bus November 2011 CONFIDENTIAL, PROPRIETARY AND

7

Mechanical Failures – Current Status

2

1

2

1 1

3

1 1

5

3

6

2

5

2

1

0

1

2

3

4

5

6

7Ja

nu

ary

Fe

bru

ary

Ma

rch

Ap

ril

Ma

y

Jun

e

July

Au

gu

st

Se

pte

mb

er

Oct

ob

er

No

vem

be

r

De

cem

be

r

2010

2011

Page 8: 00 Review of PTSB Issues Henry Sullivan Chief Maintenance Officer NYCT Department of Buses / MTA Bus / LI Bus November 2011 CONFIDENTIAL, PROPRIETARY AND

88

Maintaining the Improvements

• AGM Committee meets weekly.

– Identifies short- and long-term solutions for issues.

– Identifies modifications to policies and procedures.

– Performs campaign tracking and updates.

• Depot management conducts a Quality Control check geared towards PTSB cases.

– 10 buses are checked per day at each depot.

• “Report Card” audits held at each depot.

– At the end of the audit, all depot management personnel ride a bus to look at it from the customer’s point of view.

• Customer Services conducts audits of PTSB issues at each depot to ensure that critical safety campaigns are completed.

• Bus Merger Team conducts quality audits.

• S.O. Re-Rack Audits are held each day and documented in SPEAR (1 bus per day per depot).

• Random inspections of depots are held jointly by the PTSB, OSS, and ACMO, Customer Services.

Page 9: 00 Review of PTSB Issues Henry Sullivan Chief Maintenance Officer NYCT Department of Buses / MTA Bus / LI Bus November 2011 CONFIDENTIAL, PROPRIETARY AND

9

Detailed Explanation of Failure Modes and Retrofits

Page 10: 00 Review of PTSB Issues Henry Sullivan Chief Maintenance Officer NYCT Department of Buses / MTA Bus / LI Bus November 2011 CONFIDENTIAL, PROPRIETARY AND

10

OEM Installation in Orion VII Bus

Page 11: 00 Review of PTSB Issues Henry Sullivan Chief Maintenance Officer NYCT Department of Buses / MTA Bus / LI Bus November 2011 CONFIDENTIAL, PROPRIETARY AND

11

Issues with OEM UnitLoosening of Mounting to Panel

Page 12: 00 Review of PTSB Issues Henry Sullivan Chief Maintenance Officer NYCT Department of Buses / MTA Bus / LI Bus November 2011 CONFIDENTIAL, PROPRIETARY AND

12

Issues with OEM UnitAssembly Components Falling Apart

Page 13: 00 Review of PTSB Issues Henry Sullivan Chief Maintenance Officer NYCT Department of Buses / MTA Bus / LI Bus November 2011 CONFIDENTIAL, PROPRIETARY AND

13

Issues with OEM UnitMissing Rivets Securing Plate to Assembly

Page 14: 00 Review of PTSB Issues Henry Sullivan Chief Maintenance Officer NYCT Department of Buses / MTA Bus / LI Bus November 2011 CONFIDENTIAL, PROPRIETARY AND

14

Issues with OEM UnitCracks in Blower Housing

Page 15: 00 Review of PTSB Issues Henry Sullivan Chief Maintenance Officer NYCT Department of Buses / MTA Bus / LI Bus November 2011 CONFIDENTIAL, PROPRIETARY AND

15

NYCT Retrofit Kit

Frame Mount Bracket

Blower Assy. Mount Bracket

Cover-plate

Panel reinforcement Bracket (Upper)

Panel reinforcement Bracket (Lower)

Retainer Brackets

U-Clamp

Blower Assy.

Page 16: 00 Review of PTSB Issues Henry Sullivan Chief Maintenance Officer NYCT Department of Buses / MTA Bus / LI Bus November 2011 CONFIDENTIAL, PROPRIETARY AND

16

ReworkShop Rebuilt Unit with Pre-Assembled Bracketry

New or repaired blower housing and blower plate

Page 17: 00 Review of PTSB Issues Henry Sullivan Chief Maintenance Officer NYCT Department of Buses / MTA Bus / LI Bus November 2011 CONFIDENTIAL, PROPRIETARY AND

17

ReworkStep 1: Mount Bracket to Frame

Page 18: 00 Review of PTSB Issues Henry Sullivan Chief Maintenance Officer NYCT Department of Buses / MTA Bus / LI Bus November 2011 CONFIDENTIAL, PROPRIETARY AND

18

ReworkStep 2: Reinforce Panel

Page 19: 00 Review of PTSB Issues Henry Sullivan Chief Maintenance Officer NYCT Department of Buses / MTA Bus / LI Bus November 2011 CONFIDENTIAL, PROPRIETARY AND

19

ReworkStep 3: Mount Blower Assembly

Page 20: 00 Review of PTSB Issues Henry Sullivan Chief Maintenance Officer NYCT Department of Buses / MTA Bus / LI Bus November 2011 CONFIDENTIAL, PROPRIETARY AND

20

ReworkStep 4: Install Upgraded Coverplate

Page 21: 00 Review of PTSB Issues Henry Sullivan Chief Maintenance Officer NYCT Department of Buses / MTA Bus / LI Bus November 2011 CONFIDENTIAL, PROPRIETARY AND

21

ReworkStep 5: Install Grille & Retainer Brackets

Page 22: 00 Review of PTSB Issues Henry Sullivan Chief Maintenance Officer NYCT Department of Buses / MTA Bus / LI Bus November 2011 CONFIDENTIAL, PROPRIETARY AND

22

Conclusion

• In order to keep focus and maintain the results we have achieved so far we will continue with:

– Depot management conducts Quality Control check geared towards PTSB cases.

– “Report Card” audits held at each depot.

– Customer Services conducts audits of PTSB issues at each depot to ensure that critical safety campaigns are completed.

– S.O. Re-Rack Audits held each day and documented in SPEAR.

– Random inspections of depots held jointly by the PTSB, OSS, and ACMO, Customer Services.