Featured Project:
Seattle Tunnel State Route 99, U.S.A | US $1.4B Value
Trusted by the world’s largest projects
Global Trends in delivering projects
CONFIDENTIAL | 2
The world’s most widely-used platform for project delivery
500thousandusers worldwide
$1.0trillionin projects
1.1billiondocuments
48thousand
companies served
70countries
around the world
43offices
globally
Eureka TowerMelbourne $ 470m
Debrogea WindfarmRomania $1 bn
Victoria SquareBelfast $ 670m
Battersea Redevelopment London $ 10 bn
AbuDhabi Financial CenterUAE, $ 2,2 bn
Horizon Nuclear PlantWylfa Newydd, Wales $18bn
CONFIDENTIAL | 3
Featured Project:
Indira Gandhi International Airport, Terminal 3, New Delhi, India | US $2B Value
Trusted by the world’s largest projects
Trends in Project Delivery
CONFIDENTIAL | 4
Global Trends• Longer decision times (approval, permits, contested awards etc)
• But once decide – Fast start, Fast mobilization, Fast execution• Challenges not only for staffing but also information systems
• Consistent processes – internal AND external• Same processes and data structure across all projects• Allows staff movement / transfers
• Digitization and Data centric • More digital models (BIM) and data, not just files and drawings• Reporting and analytics of your processes and projects• Less paper/hardcopies
• Mobil and mobility. • Work is not desk based. Tools must be mobile
• Data security• Higher demands in a never ending game
• Commissioning, Handover and Operations• Now more important (not just focus on completing the project)
CONFIDENTIAL | 5
All modules available with 1 clickBIM is now for everyoneVia Web + Mobile & Pads, 1192/CDE compliant No need to buy SW !
CONFIDENTIAL | 6
All about the model ?
CONFIDENTIAL | 7
All about the model ?How many “D” ?ie data about the objects
- Dimensions- Color- Weight- Size- Deliver time- Installation time- Cost
CONFIDENTIAL | 8
All about the model ?How many “D” ?Ie data about the objects
- Dimensions- Color- Weight- Size- Deliver time- Installation
time- Cost
What about other infoie content associated to the object
Example Turbine
- Turbine drawings 349 in total- Turbine Spec- Turbine Calculation sheets- Spare parts list
CONFIDENTIAL | 9
All about the model ?How many “D” ?Ie data about the objects
- Dimensions- Color- Weight- Size- Deliver time- Installation time- Cost
What about other infoie content associated to the object
Example Turbine
- Turbine drawings 349 in total
- Turbine Spec- Turbine
Calculation sheets- Spare parts list
What about other processes related information
Example Turbine
- Approvals - Installation photos by team- RFIs/TQs/NCRs- Inspections- Any issues closed out/open ?- Commissioning reports- Handover- Client acceptance
CONFIDENTIAL | 10
So is it really all about the model ? One example
CONFIDENTIAL | 11
Example – Large scale Metro project
In design phase we had 240 users 650 Models over 1 Tb !
But… over the following 36 months we had 2500 user 6 m drawings and document 25 Tb !!And 300,000 digital forms processed (TQs/RFIs/NCRs/Change Orders)And 48,000 inspection requests, inspections, commissioning reports
=> Communication is the REAL value of BIM
CONFIDENTIAL | 14
TQ or RFI As a standard text form
Most common response when you use Text based forms ?
Normal process
CONFIDENTIAL | 15
TQ or RFI As a standard text form
About 45 % response is:
I don’t understand, please clarify and explain
Normal process
CONFIDENTIAL | 16
Normal process – now improved with a photo
Most common response with photo?
CONFIDENTIAL | 17
Normal process – now improved with a photo
Ca 22 % response is:
I Still don’t understand. Where in the building is it? Which floor? Which apartment? You say too close - too close to WHAT ?
CONFIDENTIAL | 18
Digital TQ/RFI form –now related to the object in BIM Model
Ah, now I get it. Fully understand
I see WHERE in the building
I see what else is near or conflicting
I can now respond in knowing the issue and the context of the issue
The true power of BIM - communication
CONFIDENTIAL | 19
Forms Requiring Response
48,188Avg. Response Time
8 days
Managing Processes – Response times of Forms (TQ, RFI, NCR, etc)
Observation: We get better over time – staff and partners need time to get used to new processes and tools
Process time dropping even if volume is increasing. Processes are volume independent = great
0
500
1000
1500
2000
2500
2014 1st Half 2014 2nd Half 2015 1st Half 2015 2nd Half
Half Years
Avg. Time last 6 month
5,5 days
CONFIDENTIAL | 20
Results with Aconex
Process Industry Standard Avg. Aconex Project Avg.
Drawing Reviews 15-18 days 7-9 days
Close out RFIs/NCRs 14-16 days 6 – 8 days
Snagging/Punch list 10-14 days 3 – 4 days
Handover Process 16-24 weeks 8 - 9 weeks
• FULL transparency • COMPLETE Audit possibilities • NO ONE can remove and delete files, forms or letters
CONFIDENTIAL | 21
• PAS/ISO 1192, CDE
• IFC
• COBie
• BCF
Aconex also support Open Standards
CONFIDENTIAL | 22
Workflow processes
How do you get workFLOW ?
and not WORKflow ?
Drawing ApprovalWorkflow
ClientContractorsSubContractor
CONFIDENTIAL | 23
Rev 1
Latest ApprovedIssued For ConstructionIs Rev 2
Approved 2014-12-03
1. Scan code with mobile 2. Check if you have latest Rev
Version Control at the site – using QR codes to check latest Rev
CONFIDENTIAL | 24
Mobile Inspections/Issues/Checks/Commisioning
Mobile: Anywhere, Anytime. Also Off line
All Devices: iOS, Android, Win 8. Smartphones & Pads
Collaborative Processes: Not only ease of access to
content and drawings, but also processes like: Snagging,
Inspections, Commissioning and Reporting
CONFIDENTIAL | 25
Aconex Data Integrity and Security• Aconex is ISO 27001 and SSAE 16 SOC 2 certified
• In progress for IRAP and FedRAMP certification (Sponsored by US Dept of Energy/Nuclear)
• Aconex offers sensitive clients streaming real time log data (for internal client analysis)
• 8 production data centers globally (6 Production data centers and 2 Disaster centers)
• Aconex Disaster centers are “Hot Stand-by” (No need to re-install SW or load data)
• Aconex has both a 24/7 NOC (Network Operations Center) as well as a 24/7 SOC (Security Operations Center) with stand-by Incident Management procedures
Example of Aconex highly sensitive projects/clients:Horizon Nuclear Power Plant, Wales, UK
Nuclear Waste Treatment Plants
Australian Department of Defense
Singapore Air Force
Saudi National Guards (several projects)
Ministry of Defense, Saudi Arabia
New Zeeland Royal Navy
US Weapon Storage Project
Plus hundreds of other highly sensitive projects .