Sanjay Sahay,ADGP, Police Computer Wing, Bangalore
Police Department
CCTNS Karnataka Overview
GOVERNMENT OF KARNATAKA
Agenda
• Computerization at KSP• Where we are• Where we want to be• What support do we need
Presentation Structure
• Chronology• Enterprise Model• CCTNS Update – Software, Core Infrastructure, Capacity Building• Implementation Issues• Fund Utilization• Integration• Future Plans• Support Required from MHA
Chronology of Computerization
P r e - C C T N S C C T N S
M/s HP Signs MSA on Dec 7, 2011 as SI
M/s GT Signs MSA on Jun 21, 2012 as SPMU
Where we arePolice Computer Wing – Karnataka State Police
KSP Computerization Model
Enterprise ModelPeople Process Technology Infrastructure Governance
• Internal Champions
• Capacity Building
• Nodal Officers
• Sys Admins• Handholding
• BPR• Integration• Automation
• ERP• Web Service• Active
Directory• SMS
Gateway• e-Pen
• KSP DC• KSP WAN• DR Centre• EMS• Centralized
AV• Automated
Backup
• Core Team• SCRB Nodal
Officer• District Nodal
Officer• Central NOC• Helpdesk
Police IT - CCTNS
CCTNS Software Status
Legends: Completed Yet to be completed
Core Functionalities•Crime•Law & Order•Traffic
Administration•Administration•Finance•StoresAncillary support•Armed Reserve•Motor Transport•TrainingTechnical Modules•Wireless•Forensic Science •Laboratory
11Modules
64Roles
522Screen
417Reports MIS
Police IT - ERP
CONFEDENTAIL : INTERNAL USE ONLY
Core Infrastructure
Disaster Recovery Center
• Disaster Recovery Center for KSP is located
at NIC Data Center, Shastri Park, New Delhi.
• NIC has provided 4 racks and Infrastructure
facility to host the DR site.
• The Network connectivity between DC and
DR has been established through 4 Mbps
MPLS Link.
• The DR Implementation is in progress and
DR will be made operational in next 3
months.
• Timely Replication requires one-time
bandwidth augmentation
Sl. No. Name of Device Capacity Quantity
1. Server 10
2 Storage 32 TB 1
3 Network Switches 2
4 SLB / GSLB 1
5 Firewall 1
6 NIPS 1
14 FCIP Router 2
15 FC Switch 1
Karnataka State Police Wide Area Network
Type of Network Number of Links at Initiation
Number of Links at Present
MPLS 39 45
VPNoBB 1350 1458
ILL 2 2
Type of Network
Initial Bandwidth
Present Bandwidth
MPLS (Aggregation)
10 Mbps 45 Mbps
• Karnataka State Police Wide Area Network, (KSPWAN) was created in the year 2009 with BSNL
• This was successfully implemented jointly by BSNL and the Karnataka State Police.
• This Network is a combination of 45 MPLS and 1458 VPNoBB connections
• Connects all police station and higher offices across the state.
• Fixed IP has been implemented on VPNoBB connection
• In addition 16 Mbps Internet leased line has also been provided.
Network Availability
Capacity Building at KSP
Training InfrastructureTraining Infrastructure
Mapping of End-UsersMapping of End-Users
Deployment of TrainersDeployment of Trainers
Training for 75 System Training for 75 System AdministratorsAdministrators
Basic Training for Basic Training for End-UsersEnd-Users
Training Curriculum Training Curriculum Basic IT & Police ITBasic IT & Police IT
Training for Training for Nodal Officers Nodal Officers
of all Unitsof all Units
Training for Training for Technical TeamsTechnical Teams
of all Unitsof all Units
Police IT Training Police IT Training for End-Users for End-Users & Handholding& Handholding
Capacity Building under CCTNS
Pre-CCTNS Training
Project Implementation DelaysProject Tracks Deliverable Timelines as per MSA
(in weeks)Actual Time
Status/Expected Closure
Software Go-Live for complete CCTNS Solution 52 130 20-05-2014
DC-DR Deployment and Installation of Hardware 34 47 Completed
DR Completion 52 134 15-06-2014
Capacity Building Police IT Training 38 156 07-12-2014
Capacity Building and Change Management 38 156 07-12-2014
Data Digitization Get final sign off from State Nodal Officer for migrated / digitized data
52 156 07-12-2014
Site Preparation Site Survey 8 35 Completed
Site Preparation 35 55 Completed
Client Site Hardware
Supply and Commissioning of Hardware for 1370 Locations
36 55 Completed
Handholding Deployment of 205 Resources 11 120 07-04-2014
Project Challenges
Sl. No.
Cost Components
Funds ReleasedTill date (in Lakhs)
Utilization during the
reporting Month
(in Lakhs)
Total Utilization Till Date
(in Lakhs)
Balance funds available (in
Lakhs)
1 2 3 (4=1-3)
1 Capacity Building
Training 78.5 0 135.4432 -56.9432Infrastructure 298 0 278.9223 19.0777
2
Project Management Consultancy
SPMC 93.75 0 90.446 3.304SPMU 91.42 0 207.53276 -116.11276
3 System Integrator - 1676.47 0 1708.40081 -31.930814 Networking - 919.18 0 708.22156 210.958445 Additional Funds
released for Advanced States
Hand Holding 79.73 0 93.29744 -13.56744
6 *Others *Head wise Breakup Not provided by
MHA1432.97905 0 0 1432.97905
Total 4670.02905 0 3222.26407 1447.76498
FUND UTILIZATION STATUS AS ON 28 FEB 2014
Hardware InventorySl.
No. Computers & Peripherals Total
1 Desktops 82332 Thin Clients 15853 Laptop 6144 Laser Jet Printers 14785 MFPs 14196 Dot Matrix Printer 14477 Servers 1988 UPS 44649 Scanner 1235
10 Web Camera 88211 LCD TV 3712 Switches 218013 Projector 7412 Digital Cameras 90613 Electronic Pens 90614 External Hard disk 1317
Total Hardware 26975
Total Hardware
Hardware at each Unit
Integration: SMS and e-Pen
SMS Integration Citizen can track status of his/her
application on website of 'Sakala'/KSP using GSC number
Citizen to get SMS update at every stage of FIR lifecycle
• Registration• A-Report, B-Report, C-Report• Disposal
e-Pen Integration FIR copy to be signed electronically at
time of filing• By Complainant• By Processing Officer Greater assurance to citizens for service
delivery Transparency in process Authenticity of information No scope for Suppression of facts /Denial
of service
Integration: Service Delivery Scheme under 'Sakala'
15 digit unique GSC number through SMS
Track status on website of 'Sakala'/KSP
Status Update Through SMS
Sl. Service Name (Under Karnataka Guarantee Of Services to Citizen Act - Sakala)Maximum no. of days to get service delivered
1 Arms License Issue and Renewal Verification 302 Certification of Finger Print 203 Issue of copy of FIR to the complainant 14 License for Amplified Sound System 35 License for Amusement 156 Missing Report of documents, Mobile phone etc. 17 No objection to return to India permission in respect of Tibetans 208 No obligation to return to India (NORI) Certificate 209 NOC for Passport Verification 20
10 NOC for petrol pump, gas-agency, hotel, bar etc. 711 NOC for Residential Permit Extension 712 Permission for Peaceful Assembly and procession 1513 Police Clearance Certificate 2014 Police verification Certificate for Coolies/Loader/Class IV Security Staff/Supervisor at Airport 20
15 Police Verification Certificate for domestic servants/house keeping 2016 Police Verification Certificate for Institutions/ Companies 2017 Police verification Certificate for Marriage Alliances 20
18Police verification Certificate for Training Apprenticeship at PSUs/trainees/Workers at Govt. Institutions
20
19 PVC for Central /State Govt. employees if request is received directly by the employee 2020 Receipt and Disposal of Petitions 4521 Service Verification 20
Citizen Centric Services Under 'Sakala'
• Integration using web-service
• Electronic FIR Transfer
• Electronic Charge-sheet Transfer
• Online Acknowledgment from Courts
Integration:Court
KSP-DC
High Court Server
Jurisdictional Courts
Jurisdictional PS
e-Court
Police-IT
Legacy Systems
Where we want to bePolice Computer Wing – Karnataka State Police
Future Plans
Advanced Solutions CCTNS Phase II• Crime Analytics • Mobile Data Terminal • CAD based PCR • AVLS• Traffic Management system• Business Intelligence
Future Plans
Integration with Police IT External System Integration• Finger Print Unit • Traffic Management• Court• Jail • RTO• RPO • UID
Future Plans
Future Plans
Partnership with e-Governance Department
Future Plans
• ISO 27001 Security Policy
• Building Redundant link at all levels for failover protection
• Switch over to fibre based connectivity from copper based
• Any time any ware access with data, voice and Video over SSL VPN
• Bandwidth optimization and prioritization.
• Video Conference between jails and courts for trials
What support we need to realize the vision?Police Computer Wing – Karnataka State Police
Support Required from MHA
• Sharing of Technical Data and documentation to expedite on-going implementation
• Funding for advanced solutions (to start post June 2014)• Additional fund for capacity building – Technical certification programs• Funding for full network infrastructure• 'On Demand' Bandwidth Augmentation between DC-DR• Fund to take up Change Requests
CONFEDENTAIL : INTERNAL USE ONLY
Internal Resources for CCTNS Project
Resources Number
SCRB Nodal Officers 26
District / City / Units Nodal Officers 94
System Administrators (MCSE and CCNA) 75
Police IT Operators 3000
External Resources
SPMU (GT India) Role Qualifications
Project Manager B. Tech + MBA
Infrastructure Specialist B. Tech
Database and Application Specialist
B. Tech
Operation Manager B. Com + Domain Expert
Consultant MCA
SI (HP India) Team Number
Core Management 2
Team leads 5
Software Team 30
DC Operations 6
Trainers 35
Hand-holder 115