Page 1: CCTNS TN RFP VolI

E-GOVERNANCE MISSION MODE PROJECT (MMP)

CRIME & CRIMINAL TRACKING NETWORK AND SYSTEMS

(CCTNS)

REQUEST FOR PROPOSAL FOR

SELECTION OF SYSTEM INTEGRATOR

FOR

IMPLEMENTATION OF CCTNS

IN

TAMIL NADU

VOLUME – I: TECHNO-FUNCTIONAL

REQUIREMENTS

RELEASED BY

TAMIL NADU POLICE

GOVERNMENT OF TAMIL NADU

Page 2: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 2 of 302

Table of Contents

1. Request for Proposal Datasheet ................................................................................... 8 2. Introduction ..................................................................................................................... 9

2.1 Project Background ................................................................................................. 9 2.2 Background of Police Systems in India ................................................................ 9 2.2.1 Crime and Criminals Information System (CCIS) ........................................... 10 2.2.2 Crime Analysis and Automated Record Update System (CAARUS) ............ 10 2.2.3 Common Integrated Police Application (CIPA) .............................................. 11 2.2.4 Crime and Criminal Tracking Network System (CCTNS) ............................... 12 2.3 CCTNS Implementation Framework .................................................................... 13 2.3.1 Goals of this Request for Proposal (RFP) ....................................................... 13

3. Project Overview ........................................................................................................... 15 3.1 Need for the Project ............................................................................................... 15 3.2 Vision and Objectives of Project .......................................................................... 15 3.3 Stakeholders of Project ........................................................................................ 16

4. State Police Department ............................................................................................... 19 4.1 Organization Structure .......................................................................................... 19 4.2 Existing Legacy Systems ..................................................................................... 23 4.3 Existing Data Center Infrastructure ..................................................................... 23 4.4 Existing WAN Infrastructure ................................................................................. 24 4.5 Existing Client Site Infrastructure ........................................................................ 25 4.6 Existing Capacity Building Infrastructure (DTCs/ RTCs/ PTCs/ Police Academies) ........................................................................................................................ 26 4.7 Core Application Software (CAS) ......................................................................... 26 4.8 CAS (Center) .......................................................................................................... 27 4.9 CAS (State) ............................................................................................................. 28 4.10 Development of CCTNS Core Application Software (CAS) ........................... 31 4.11 Technology Stack for CAS (State) ................................................................... 31

5. Role of NIC in supporting CAS .................................................................................... 32 6. Scope of the Project ..................................................................................................... 35

6.1 Geographical Scope .............................................................................................. 35 6.2 Functional Scope ................................................................................................... 52 6.2.1 CCTNS Functional Modules ............................................................................. 53 6.2.2 Solution & Technology Architecture ............................................................... 59 6.3 Scope of Services during Implementation Phase .............................................. 62 6.3.1 Project Planning and Management .................................................................. 63 6.3.2 Configuration, Customization, and Extension (New Modules) of CAS (State) ………………………………………………………………………………………………………………………………………………………..66 6.4 Infrastructure at the District Training Centers ................................................... 70 6.5 Site Preparation at Police Stations and Higher Offices ..................................... 71 6.6 Infrastructure at the Client Side Locations ......................................................... 71 6.7 Network Connectivity for PS & Higher Offices ................................................... 72 6.8 IT Infrastructure at the Data center and Disaster Recovery Center ................. 72 6.9 Data Digitization & Data Migration ....................................................................... 74 6.10 Migration of Data from CIPA and CCIS to CAS (State) .................................. 80 6.11 Capacity Building .............................................................................................. 80 6.12 Handholding Support ........................................................................................ 93 6.13 Requirement on Adherence to Standards....................................................... 93 6.14 Support to Acceptance Testing, Audit and Certification ............................... 94 6.15 Scope of Services during Post-Implementation Phase ................................. 97

Page 3: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 3 of 302

6.16 Go-Live ............................................................................................................... 97 6.17 Handover and Exit Management ...................................................................... 97 7 Implementation and Roll-out Plan ........................................................................... 99 ANNEXURE I Governance Structure (State Level) ............................................... 105 ANNEXURE II Details of Technology Stacks - CAS (State) and CAS (Center)……….………….......... ....................................................................................................... 110 ANNEXURE III Bill of Quantity – Client Site Locations ........................................ 113 ANNEXURE IV Bill of Quantity – Additional Locations ....................................... 142 ANNEXURE V Post Implementation Support Services ........................................ 157 ANNEXURE VI Service Levels ................................................................................ 162 ANNEXURE VII Network Connectivity Solution ................................................... 182 ANNEXURE VIII Indicative Technical Specifications .......................................... 185 ANNEXURE IX Existing IT Infrastructure .............................................................. 222 ANNEXURE X Training Institutions Infrastructure ............................................... 226 ANNEXURE XI Geographical Coverage ................................................................ 228 ANNEXURE XII Functional Requirements Specifications ................................... 276 ANNEXURE XIII Non-Functional Requirements Specifications ......................... 299

Page 4: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 4 of 302

LIST OF ABBREVIATIONS

S. No Abbreviations Expanded

1 ACOP Additional Commissioner of Police

2 ACP Assistant Commissioner of Police

3 ADoC Anti Dowry Cell

4 ADC Additional Deputy Commissioner

5 ADGP Additional Director General of Police

6 ADSP Additional Superintendent of Police

7 AFIS Automatic Fingerprint Identification System

8 AP Armed Police

9 ARF Accident Record Form

10 AVS Anti Vice Squad

11 C&O Crime & Occurrences

12 CAARUS Crime Analysis and Automated Record Update System

13 CADB Crime Attributes Database

14 CAS Core Application Software

15 CB Crime Branch

16 CCIS Crime and Criminal Information System

17 CCIW Commercial Crime Investigation Wing

18 CCRB City Crime Record Bureau

19 CCTNS Crime and Criminal Tracking and Networking System

20 CID Criminal Investigation Department

21 CIPA Common Integrated Police Application

22 CMS Case Monitoring System

23 CSCID Civil Supplies Criminal Investigation Department

24 CSG Coastal Security Group

25 CSR Community Service Register

26 DC Deputy Commissioner of Police

27 DCB/CCB District Crime Branch

28 CCB City Crime Branch

29 DCRB District Crime Record Bureau

30 DGP Director General of Police

31 DIG Deputy Inspector General of Police

32 DIO District Informatics Officer

Page 5: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 5 of 302

S. No Abbreviations Expanded

33 DMT District Mission Team

34 DSB District Special Branch

35 DSP Deputy Superintendent of Police

36 ELCOT Electronics Corporation of Tamilnadu

37 EOW Economic Offences Wing

38 FACTS Fingerprint Analysis and Crime Tracing System

39 FIR First Information Report

40 FOSS Free and Open Source Solution

41 GD General Diary

42 GIS Geographical Information System

43 GRP Government Railway Police

44 HG Home Guards

45 HIPS Host-based Intrusion Prevention System

46 ICT Information and Communication Technology

47 IGP Inspector General of Police

48 IO Investigating Officer

49 IPS Intrusion Prevention System

50 IRC Indian Road Congress

51 IVRS Integrated Voice Response System

52 JAPU Juvenile Aid Police Unit

53 JC Joint Commissioner of Police

54 LAN Local Area Network

55 MFD Multi Functional Device

56 MHA Ministry of Home Affairs

57 MOB Modus Operandi Bureau

58 MVCS Motor Vehicle Coordination System

59 NCR Non Cognizance Report

60 NCRB National Crime Record Bureau

61 NIC National Informatics Centre

62 NOC No Objection Certificate

63 OCIU Organized Crime and Intelligence Unit

64 PCCC Police Computer Communication Centre

65 PCR Protection of Civil Rights

66 PCW Police Computer Wing

Page 6: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 6 of 302

S. No Abbreviations Expanded

67 PEW Prohibition and Enforcement Wing

68 PS Police Station

69 PSR Prisoner’s Search Register

70 PT Pending Trial

71 PTB Police Telecommunication Branch

72 PTC Police Training College

73 RADMS Road Accident Data Management System

74 RTO Regional Transport Office

75 SB Special Branch

76 SB CID Special Branch Criminal Investigation Department

77 SD CID Special Division Criminal Investigation Department

78 SDA State Designated Agency

79 SDD Software Design Document

80 SDFPB Single Digit Finger Print Bureau

81 SDM Sub Divisional Magistrate

82 SDPO Sub-Divisional Police Office

83 SHO Station House Officer

84 SI Sub Inspector

85 SI System Integrator

86 SIO State Informatics Officer

87 SJ & HR Social Justice and Human Rights

88 SLA Service Level Agreement

89 SMT State Mission Team

90 SP Superintendent of Police

91 SPMC State Programme Management Consultant

92 SPMU State Project Monitoring Unit

93 SRS Software Requirement Specification

94 STF Special Task Force

95 STPC State Traffic Planning Cell

96 SWAN State Wide Area Network

97 TEW Traffic Enforcement Wing

98 TIW Traffic Investigation Wing

99 TNCF Tamil Nadu Commando Force

100 TNFPB Tamilnadu Fingerprint Bureau

Page 7: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 7 of 302

S. No Abbreviations Expanded

101 TNPA Tamilnadu Police Academy

102 TNPHC Tamilnadu Police Housing Corporation

103 TNSDC Tamil Nadu State Data Centre

104 TS Technical Services

105 UI Under Investigation

106 UT Union Territory

107 VPN Virtual Private Network

108 WAN Wide Area Network

Page 8: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 8 of 302

1. Request for Proposal Datasheet S. No Information Details

1. RFP reference No and Date C.No. 20/SCRB/CCTNS/2011 Dated 6th June 2011

2 EMD Rupees Three Crores Only

3. Date of pre-bid conference 17th June 2011 – Time to be informed later

4. Last date for submission of written queries for clarification

13th June 2011

5. Release of response to clarifications 21st June 2011

6. Last date (deadline) for receipt of proposals in response to RFP notice

6th July 2011 - 3:00 PM

7. Place, Time and Date of opening of Technical proposals received in response to the RFP notice

12th July 2011 – Time to be informed later

8. Place, Time and Date of opening of Financial proposals received in response to the RFP notice

25th July 2011 – Time to be informed later

9. Contact Person for queries Additional Director General of Police, State Crime Records Bureau, Tamil Nadu Police

10 Addressee and Address at which proposal in response to RFP notice is to be submitted:

Additional Director General of Police State Crime Records Bureau (SCRB) No. 95, Raja Annamalai Puram Chennai-600028 Tel: 044-24958585 Email: [email protected]

Page 9: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 9 of 302

2. Introduction

2.1 Project Background

Availability of relevant and Timely information is of utmost necessity in conduct of business

by Police, particularly in investigation of crime and in tracking & detection of criminals. Police

organizations everywhere have been handling large amounts of information and huge volume

of records pertaining to crime and criminals. Information Technology (IT) can play a very vital

role in improving outcomes in the areas of Crime Investigation and Criminals Detection and

other functioning of the Police organizations, by facilitating easy recording, retrieval, analysis

and sharing of the pile of Information. Quick and timely information availability about different

facets of Police functions to the right functionaries can bring in a sea change both in Crime &

Criminals handling and related Operations, as well as administrative processes.

Creation and maintenance of databases on Crime & Criminals in digital form for sharing by all

the stakeholders in the system is therefore very essential in order to effectively meet the

challenges of Crime Control and maintenance of public order. In order to achieve this, all the

States should meet a common minimum threshold in the use of IT, especially for crime &

criminals related functions.

CCTNS will cover all the Police Stations in the States/UTs, and also the Sub-Divisions,

District headquarters, Range headquarters, Zonal IG offices and State headquarters.

Necessary Hardware will be provided at all these locations including data centers at State

and National headquarters. All these locations will be networked by providing appropriate

high-speed connectivity for data transfer and sharing of information amongst various

stakeholders.

Additional information can be found on NCRB website (http://ncrb.nic.in)

2.2 Background of Police Systems in India

Several initiatives have been introduced in the past to leverage IT in police functioning. Some

of these initiatives include centrally initiated programs such as the NCRB-led CCIS (Crime

and Criminals Information System) and CIPA (Common Integrated Police Application), and

several state-led initiatives such as CAARUS in Tamil Nadu.

Presently automation in the area of Civil Police is addressed mainly through the two GOI-led

initiatives – CCIS and CIPA – and in Tamil Nadu through State-led initiative, CAARUS.

Page 10: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 10 of 302

This section explores the details of the two GOI-led initiatives and State Specific Application

CAARUS.

2.2.1 Crime and Criminals Information System (CCIS)

CCIS is an NCRB-driven program and has been launched in 1990. Since then, it has been

implemented in 35 states and union territories and spans over 700 locations. Most of the

state police headquarters and district headquarters are covered by CCIS and so are some of

the 14,000+ police stations in the country.

CCIS is primarily an initiative to create crime- and criminals-related database that can be

used for crime monitoring by monitoring agencies such as National Crime Records Bureau

(NCRB), State Crime Records Bureaus (SCRBx) and District Crime Records Bureaus

(DCRBx) and to facilitate statistical analysis of crime and criminals related information with

the States and monitoring agencies. In Tamil Nadu, CCIS and computers were provided to

SCRB and 37 DCRBx in 1996. The CCIS database of all state records is maintained at

present in SCRB.

CCIS data is used for publishing online reports such as Missing Persons report and is also

used as the basis for online query facilities that are available through the NCRB website. In

addition, it is also used by NCRB to publish an annual nation-wide Crime Report. CCIS

focuses exclusively in Crime and Criminals information and does not address the other

aspects of Police functioning.

CCIS was originally built on Unix OS and Ingres database, but has since been ported to

Windows platform and has released its last three versions on Windows (the last release

having taken place in September 2002).

2.2.2 Crime Analysis and Automated Record Update System (CAARUS)

This initiative was aimed at computerizing all manual police station records. It was developed

by the state police department and rolled out in 2006 and as part of this rollout all police

stations were provided with a computer. The various modules available in CAARUS

application are (I) Staff Management, (II) Case Registration, (III) Case Progress & Disposal

(IV) Station Data Bank and (V) Receipts.

Administrative data and data relating to crime in a police station were captured in CAARUS,

and periodicals and returns generated thereafter. Essentially, this was also a standalone

system which contained only data local to a police station with an additional feature to upload

Page 11: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 11 of 302

data to Central server at SCRB at the end of a day.

CAARUS Stand-alone is built on client-server architecture on a Windows platform using

Visual Basic and MS Access database. The patch to upload data from stations to central

server at the end of day is developed in .NET

Benefits realized from CAARUS include the ability to enter registration (FIR) details into the

system and print out copies in format similar to manual records, instant generation of

abstracts and reviews and easier search of criminals using part strings, etc.

2.2.3 Common Integrated Police Application (CIPA)

A feature common to most of the early efforts has been a predominant focus on collection of

data as required by the monitoring agencies and on specific functions such as records

management, statistical analysis and office automation; rather than on police stations, which

are the primary sources of crime- and criminals-related data generation.

In order to provide an application that supports police station operations and the investigation

process, and that is common across all states and union territories, MHA had conceptualized

the Common Integrated Police Application (CIPA) in 2004. It has been initiated as part of the

“Modernization of State Police Forces (MPF)” scheme of the Ministry of Home Affairs. The

aim of CIPA is to bring about computerization and automation in the functioning at the police

station with a view to bringing in efficiency and transparency in various processes and

functions at the police station level and improve service delivery to the citizens. So far about

2,760 police stations, out of a total of 14,000+ police stations across the country, have been

covered under the Scheme. Specific to Tamil Nadu, Computers and software were provided

as part of CIPA to 137 Police Stations in the 6 Commissionerates in 2006.

CIPA is a stand-alone application developed to be installed in police stations and to support

the crime investigation and prosecution functions. CIPA is a centrally managed application:

an application core centrally developed and is installed in police station. Any state-specific

customizations are evaluated and made on a need basis.

The core focus of the CIPA application is the automation of police station operations. Its core

functionality includes the following modules: (i) Registration Module (ii) Investigation Module

(iii) Prosecution Module. There is also a Reporting module that addresses basic reporting

needs.

CIPA is built on client-server architecture on a NIC Linux platform using Java and

PostgreSQL database. NIC also worked on having a central repository of selected station

Page 12: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 12 of 302

data in ELCOT data Centre.

Benefits realized from CIPA include the ability to enter registration (FIR) details into the

system and print out copies and the ability to create and manage police station registers on

the system, etc.

It was felt, however, that a standalone application couldn’t provide the enhanced outcomes in

the areas of Crime Investigation and Criminals Detection that are necessary. And for this

reason, MHA has decided to launch the Crime and Criminal Tracking Network System

(CCTNS) program.

2.2.4 Crime and Criminal Tracking Network System (CCTNS)

The Crime and Criminal Tracking Network Systems (CCTNS) was conceptualized by the

Ministry of Home Affairs in detailed consultation with all stakeholders and will be implemented

as a “Mission Mode Project (MMP)” and will adopt the guidelines of the National e-

Governance Plan (NeGP).

CCTNS aims at creating a comprehensive and integrated system for enhancing the efficiency

and effective policing at all levels and especially at the Police Station level through adoption

of principles of e-Governance, and creation of a nationwide networked infrastructure for

evolution of IT-enabled state of- the-art tracking system around “investigation of crime and

detection of criminals” in real time, which is a critical requirement in the context of the present

day internal security scenario.

The scope of CCTNS spans all 35 States and Union Territories and covers all Police Stations

(14,000+ in number) and all Higher Police Offices (6,000+ in number) in the country. The

CCTNS project includes vertical connectivity of police units (linking police units at various

levels within the States – police stations, district police offices, state headquarters, SCRB and

other police formations – and States, through state headquarters and SCRB, to NCRB at GOI

level) as well as horizontal connectivity, linking police functions at State and Central level to

external entities. CCTNS also provides for a citizen’s interface to provide basic services to

citizens.

There has been a strong feeling that the computer work is a burden which has to be done in

addition to normal course of work. Keeping this aspects in view, it was decided that there is a

need for expanding the functional applications, widening the territorial spread, and building in

networking capabilities in the system, both from the angle of Management Information

Systems (MIS) requirements and storage, collation, analysis and transmission/sharing of

crime and criminals related information at the police station, District, State and Central levels.

Page 13: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 13 of 302

In this background, the Crime and Criminal Tracking Networking and Systems (CCTNS)

Scheme was conceived and incorporated in the Eleventh Five Year Plan.

2.3 CCTNS Implementation Framework

CCTNS would be implemented in a way where the States and UTs play a major role. CCTNS

would be implemented in alignment with the NeGP principle of “centralized planning and de-

centralized implementation”. MHA and NCRB would play a key role in planning the program

in collaboration with the Police leadership within States, in the development of a few core

components and in monitoring and reviewing the program. It is, however, the States and UTs

that would drive the planning and implementation at the State level.

The role of the Centre (MHA and NCRB) focuses primarily around planning, providing the

core application software (to be configured, customized, enhanced and deployed in States),

managing (from a high level) and monitoring the program. States would drive the

implementation at the state level and would continue to own the system after deployment.

With respect to the Core Application Software for the state, Tamil Nadu intends to position its

own software, CAARUS, as the Core Application Software (State). The state has got a

positive note from MHA to proceed with upgradation of CAARUS to a newer technological

platform. Up-scaled CAARUS would be the foundation on which configuration; customization

and state specific enhancements would be developed by the SI. Thus, in case of Tamil Nadu,

Core Application Software (State) and CAARUS would be synonymous.

The implementation of CCTNS would be taking an “integrated service delivery” approach

rather than that of procurement of hardware and software.

The central feature of CCTNS implementation at the State level is the “bundling of services”

concept. According to this, each States selects one (or a maximum of two) System

Integrators (SI) who would be the single point of contact for the State for all the components

of CCTNS. These components include the application (the changes made to the core

application provided by MHA), hardware, communications infrastructure, associated services

such as Capacity Building and Handholding, etc.

2.3.1 Goals of this Request for Proposal (RFP)

The primary goal of this RFP is to serve as a framework or a model for the RFP to be

released by States and UTs to select SI for their state through a competitive bidding process.

This volume of RFP intends to bring out all the details with respect to solution and other

requirements that are deemed necessary to share with the potential bidders. The goals of

RFP are further elaborated below:

Page 14: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 14 of 302

To seek proposals from potential bidders for providing the “bundle of services” in

implementing and managing the CCTNS solution in Tamil Nadu. The “bundle of

services” include the following:

Configurationand deployment of CAS (State) at the state level

Development and implementation of additional modules on top of CAS (State)

Hardware (PCs, multi-functional devices, digital cameras, fingerprint scanners,

etc.)

Communication infrastructure such as Network connectivity and Data Center

Capacity Building and Handholding

Digitization of historical records in CAARUS

Change Management

Provisioning of any specialized infrastructure identified by the state

To understand from the bidders how they propose to meet the technical and

operational requirements of CCTNS.

To ascertain how potential bidders propose to deliver the services and sustain

the demand and growth in the requirements.

To ascertain from bidders on how they will ensure scalability and upgradeability

of the infrastructure and solution proposed to be deployed.

To understand from the bidders as to how they intend to innovate further on this

service delivery model.

State of Tamil Nadu through CCTNS Apex Committee and Empowered Committee shall be

the final authority with respect to qualifying a bidder through this RFP. Their decision with

regard to the choice of the SI who qualifies through this RFP shall be final and the State

reserves the right to reject any or all the bids without assigning any reason. The State further

reserves the right to negotiate with the selected agency to enhance the value through this

project and to create a more amicable environment for the smooth execution of the project.

Page 15: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 15 of 302

3. Project Overview

3.1 Need for the Project

The Ministry of Home Affairs has conceptualized the Crime & Criminals Tracking Network

and Systems (CCTNS) project as a Mission Mode Project under the National e-Governance

Plan (NeGP). This is an effort of the Government of India to modernize the police force

giving top priority to citizen services, information gathering, and its dissemination among

various police organizations and units across the country.

A need has been felt to adopt a holistic approach to address the requirements of the police,

mainly with relation to functions in the police station and traffic management. With a strong

focus on making police citizen friendly, there is an increasing need to strengthen the citizen

interface. Police functioning requires interaction with various departments to ensure a

process or service is brought to a conclusion. In light of this, interfaces need to be built with

external agencies such as courts, transport authorities, hospitals, and municipal authorities

etc to be able to share information between departments. Therefore, it becomes critical that

information and communication technologies are made an integral part of policing in order to

enhance the efficiency and effectiveness of the Police Department.

In order to realize the benefits of e-Governance fully, it is essential that a holistic approach is

adopted that includes re-engineering and standardizing key functions of the police and

creating a sustainable and secure mechanism for sharing critical crime information across all

Police Formations. The CCTNS has been conceptualized in response to the need for

establishing a comprehensive e-Governance system in police stations across the country.

3.2 Vision and Objectives of Project

Vision: To transform the police force into a knowledge-based force and improve the delivery

of citizen-centric services through enhancing the efficiency and effectiveness of the police

stations by creating a platform for sharing crime and criminal information across the police

stations in the country.

The overall objective of the MMP is based on enhancing the operational efficiency and

effectiveness of the police force in delivering the services.

The broad objectives of the project are as follows:

a) Improve Service Delivery to the Public

Citizens should be able to access police services through multiple, transparent, and

easily accessible channels in a citizen-friendly manner. The focus is not only to

improve the current modes of the service delivery but also provide alternate modes

such as internet/mobile for the public to communicate with the police.

b) Enhance Outcomes in Investigation

Page 16: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 16 of 302

CCTNS is expected to provide the Investigating Officers with the tools, technologies

and information to facilitate faster and more accurate investigation of crime and

detection of criminals.

c) Provide Enhanced Tools for Law & Order Maintenance, Investigation, Crime

Prevention, & Traffic Management

Law & Order Maintenance, Investigation, Crime Prevention, and Traffic Management

are core components of policing work. Information technology can both enable and

improve the effectiveness and efficiency of the core activities of the police. Police

should be provided with data amenable for easier and faster analysis in order to

enable them to make better and informed decisions.

d) Increase Operational Efficiency

Police should spend more time on the public facing functions. Information technology

solutions should help in reducing the repetitive paperwork/records and making the

back-office functions more efficient.

e) Create a platform for sharing crime & criminal information across the country

There is a critical need to create a platform for sharing crime and criminal information

across police stations within and between the different states in order to increase the

effectiveness in dealing with criminals across the state borders. CCTNS is expected to

facilitate collection, storage, retrieval, analysis, transfer and sharing of data and

Information among Police Stations, Districts, State headquarters and other

organisations/agencies, including those at Government of India level.

f) Make the Police functioning citizen friendly, transparent, accountable, effective

and efficient by automating the processes and functions at the level of the

Police Stations and other police offices at various levels.

g) Improve the Police functioning in various other areas such as curbing

organised crimes, resource management, etc

h) Keep track of the progress of the crime and criminal investigation and

prosecution Cases, including progress of cases in the Courts.

3.3 Stakeholders of Project

The impact of the police subject being sensitive, a consultative and a bottom-up approach

has to be adopted in designing the MMP impacting the following stakeholders:

Citizens/ Citizens groups

MHA/NCRB/Others

State Police department

External Departments of the State

Non-Government/Private sector organizations

The impact of the police subject being sensitive, a consultative and a bottom-up approach

has to be adopted in designing the MMP impacting the different stakeholders. An analysis of

key issues faced by different stakeholders and their expectations from the CCTNS project is

presented below.

Page 17: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 17 of 302

Within the State Police Department, there are several stakeholders involved in this project. It

includes lower level officials at police stations for whom the key issues faced are reduced

operational efficiency due to duplicate entry of records in both software and in manual

registers. Also, IT support and maintenance of the computers is a major issue plaguing the

field level personnel. The higher level officials are more interested in knowing about status of

entry in software, receiving the abstracts and returns regularly. They are of the firm opinion

that the data entry consumes most of the time of the field level personnel which could

instead be used to do their core job more efficiently. The higher officials have expressed

interest in devices which would aid in police performing their core functions better.

The citizens expect the system to help reduce multiple visits to police premises to push their

application for further processing or for providing an easy option to know the status of their

complaints. The agencies/departments which regularly link up with police are more

interested in sharing data and assistance in tracking applications that cut across

departments. The MHA and NCRB as nodal agency are interested in sharing of intelligence

and data across states and ease of collecting nation wide crime data in a standardized

manner.

The following are the expected benefits envisaged from successful implementation of the

MMP by various stakeholders

Benefits to Citizens

i) Multiple channels to access services from police

ii) Simplified process for registering and tracking incidents, petitions and FIRs

iii) Simplified process for accessing general services such as requests for

certificates, verifications, and permissions

iv) Simplified process for registering grievances against police

v) Simplified process for tracking the progress of the case during trials

vi) Simplified access to view/report unclaimed/recovered vehicles and property

vii) Improved relationship management for victims and witnesses

viii) Ability to view and pay pending traffic challans from multiple access points

ix) Faster and assured response from police to any emergency calls for

assistance

Benefits to Police Department

i) Enhanced tools for investigation

ii) Centralized crime and criminal information repository along with the images

of the criminals and fingerprints with advanced search capabilities

iii) Enhanced ability to analyze crime patterns, modus operandi

iv) Enhanced ability to analyze accidents and other road incidents

v) Faster turnaround time for the analysis results (crime and traffic) to reach the

officers on the field

vi) Reduced workload of the police station back-office activities such as

Page 18: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 18 of 302

preparation of regular and ad-hoc reports and station records management

vii) Enhanced tools to optimize resource allocation for patrols, emergency

response, petition enquiries, and other general duties

viii) A collaborative knowledge-oriented environment where knowledge is shared

across the different regions and units

ix) Better coordination and communication with external stakeholders through

implementation of electronic information exchange systems

x) Advanced tools for traffic regulation and enforcement

Benefits to Ministry of Home Affairs (NCRB)

i) Standardized means of capturing the crime and criminal data across the

police stations in the country

ii) Faster and easier access to crime and criminal information across the

country in a manner amenable for trend and pattern analysis

iii) Enhanced ability to detect crime patterns and modus operandi across the

states and communicate to the state police departments for aiding in crime

prevention

iv) The ability to respond faster and with greater accuracy to inquiries from the

parliament, citizens and citizens groups; and to RTI queries.

Benefit to External Departments (example: Jails, Courts, Passports Office, Transport

Department, and Hospitals)

i) Seamless integration with police systems for better citizen service delivery

and improved law enforcement

Page 19: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 19 of 302

4. State Police Department

4.1 Organization Structure

The Tamil Nadu Police has strength of about a lakh plus and is headed by the Director

General of Police (DGP). There are 2 other officers of the rank of DGP, 15 officers of the

rank of Additional Director General of Police (ADGP), 41 officers of the rank of Inspector

General of Police (IGP), 20 officers of the rank of Deputy Inspector General of Police (DIG),

101 officers of the rank of Superintendent of Police (SP), 103 officers of the rank of

Additional Superintendent of Police (ADSP) and a very large number of other police officers.

For the purpose of providing efficient policing and better administration, the state has been

divided into 4 zones, 12 ranges, 31 districts and 7 commissionerates. There are police

stations providing different types of services stationed at each of these districts. The Police

Station is the basic operating unit while the District Police Office is the basic unit from the

viewpoint of administration.

There are 4 officials of the rank of Director General of Police, viz., DGP (Law & Order), DGP

(Fire & Rescue Services), DGP (Police Housing) and DGP (Vigilance & Anti-corruption).

DGP (Law & Order) is the head of the State Police Department and there are ADGPs of

different units reporting to the DGP as mentioned below:

Economic Offences Wing (EOW): This unit deals with White collared offences with

respect to Non Banking Financial Corporations (NBFCs)

Coastal Security Guard (CSG): This unit deals with protection of state’s coastal

borders

State Transport Planning Cell (STPC): This unit is in charge of analyses of traffic

accidents and suggesting measures for improving road safety.

Civil Supplies Criminal Investigation Department (CBCID): This unit handles crimes

done with respect to Essential Commodities act

Armed Police (AP): This unit deals with the deployment and maintenance of armed

police force in the state

Administration: This unit deals with the administrative affairs of the entire state police

department

Enforcement, Training, Crime Bureau and Criminal Investigation Department (CBCID),

Welfare, Uniform Services Recruitment Board (USRB) are some of the other functional

wings that are headed by ADGP in the state Police Headquarters.

In some cases the head of a unit may be the IGP. For instance, the Technical Section (TS)

is headed by the IGP.

The Law & Order unit caters to maintenance of law & order across the state and all 1452

police stations in the state report to the ADGP, Law & Order. There are IGPs reporting to

Page 20: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 20 of 302

these unit ADGPs. In the Law & Order hierarchy, the state is separated further into zones

and then into districts and commissionerates.

Each zone is headed by an officer of the rank of IGP and each range by a DIG. There are a

number of districts in a range and each district is headed by the SP who is responsible for

regularly monitoring the performance of each police station in his/her district. The SPs have

Deputy Superintendent of Police (DSP) reporting to them. The DSPs are responsible for

monitoring a limited set of stations under their control frequently. The DSP sits out of the

sub-divisional office. Apart from cases which require DSP to act as the investigating officer,

this office works more as an administrative unit collating case progress details and station

administrative records. Each police station is headed by an inspector/sub-inspector. In case

a station is headed by a sub-inspector, it is attached to another station closer geographically

where inspector heads that station. This inspector headed station in such instances

becomes the circle office. This type of set-up is rare in the state at present with most of the

police stations being headed by an inspector.

There are also 7 commissionerates and 2 railway districts in addition to the 31 districts. The

law & order hierarchy is illustrated in the figure below:

Law & Order Hierarchy in Tamil Nadu Police

From the figure we see that there are units under the control of SP and commissioner at

district and commissionerate which deal with cases pertaining to specific areas such as

Protection of Civil Rights (PCR), Prohibition & Enforcement wing (PEW), etc. There

constitute the special units serving different purposes. The list of Special Units is mentioned

below:

Intelligence Wing

District Special Branch

SB CID

SD CID

Page 21: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 21 of 302

Q Branch CID

Security Branch, Core Cell & OCIU

Coastal Security Group (CSG)

Crime Branch CID

Crime (S.I.T)

Economic Offences Wing (EOW)

Commercial Crime Investigation Wing (CCIW)

Idol Wing

Tamil Nadu Police Academy (TNPA)

Police Training College (PTC)

Police Recruit School (PRS)

In-service Training Centre (ISTC)

Armed Police (AP)

Prohibition Enforcement Wing (PEW)

Home Guards

Special Task Force (STF)

State Traffic Planning Cell (STPC)

TN Commando Force (TNCF)

Government Railways

Technical Services (TS)

Social Justice & Human Rights (SJ & HR)

State Crime Records Bureau (SCRB)

Forensic Science Lab (FSL)

DCRBx/CCRBx

District/City - Crime Branch (DCB/CCB)

Civil Supply CID (CSCID)

Traffic Investigation Wing (TIW)

Traffic Enforcement Wing (TEW)

Juvenile Aid Police Unit (JAPU)

Anti Vice Squad (AVS)

Anti Dowry Cell (ADC)

Unit Offices of these Special units are usually located at the district HQ and

commissionerate are under the control of the district SP and commissioner respectively. At a

functional level, they report to their headquarters in the State Headquarters. For instance,

Security Branch Criminal Investigation Department (SBCID) branch at district helps the

district SP in giving intelligence on suspicious movements or on wanted suspects. At a

functional level, they report to the Intelligence & Internal Security unit in State Headquarters,

Chennai. The various functional units in Tamil Nadu Police are illustrated in the figure below:

Page 22: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 22 of 302

Functional Units of Tamil Nadu Police

In the commissionerate setup, the ultimate authority is the Commissioner. Under the

commissioner, there are additional commissioners, joint commissioners, deputy

commissioners, assistant commissioners, inspectors, sub-inspectors and constables who

make up the hierarchical set-up in the urban police setup. With respect to rural policing SP is

the ultimate authority and under him, there are DSPs responsible for the sub-division. Each

DSP has a number of inspectors managing different police stations reporting to him. The

general hierarchical set-up in Tamil Nadu Police is shown below:

Tamil Nadu Police: General Hierarchical Set-up

DGP, TN

L&O

SCRB

CB CIDWELFARE

OPERATION

AP

EOW

CSG

ADMIN

TS

STPC

COP/CN

HQRS

SJ/HR

CRIME

STF

HG

INT

ENF

CS CID

DGP, Training DGP, TNUSRB DGP, Police Housing

Page 23: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 23 of 302

4.2 Existing Legacy Systems

The State is advanced in terms of usage of software for Police Stations. There is a

reasonably good penetration of IT in terms of hardware and awareness in the Police

Stations across the state. The State Application CAARUS has been aimed at automating

Case data entry and Station Records. As on date, more than 1100 Police Stations have

been provided with CAARUS and data entry in CAARUS is being monitored on a daily basis

by the department. State proposes to use CAARUS as the core engine software for the

state. The software would be upgraded to latest technology and compliant to NCRB/MHA

specifications and then used. The state has got a provisional approval from MHA/NCRB to

use CAARUS as Core Application.

Apart from CAARUS, the state already has a host of other IT applications in place, including

MOB Software and SWIFT. The application study was done as part of the Assessment

phase and the details of IT applications were gathered from client offices including SCRB,

Technical Section and Police Stations studied during field visits.

4.3 Existing Data Center Infrastructure

ELCOT is the implementing agency for Tamil Nadu State Data Centre (TNSDC). The

proposed Data Centre near ELCOT’s Office in Perungudi has been implemented and

inaugurated by government. The Disaster Recovery Centre attached to TNSDC, to be set up

in Madurai, is expected to take another year to complete. The specifications of TNSDC are

given below:

The TNSDC Data Center Operator (DCO) would be providing the following services to

facilitate application hosting at TNSDC:

Physical Infrastructure for hosting the CCTNS Servers

UPS and Power back-up

Security – Physical Security and Common Firewall

Monitoring & Management to the extent of informing the department in the event of

server or sub-system failure

Power, cooling & other basic infrastructure requirement

The TNSDC DCO shall also make available the SAN Switch as part of Storage

infrastructure. SAN Hardware, Tape Library, Backup & Archival would be responsibility of

the System Integrator. The system integrator (SI) who shall be selected for implementation

of the project shall be responsible for sourcing, supplying and deploying server hardware

and solution specific software; developing and installing solution. SI shall provide a Bill of

Material/ Bill of Quantity that specifies all the hardware, software and any additional

networking components of solution, both for Primary Data Center and Disaster Recovery

Page 24: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 24 of 302

Data Center, in detail so as to facilitate sizing of common Data Center infrastructure such as

Racks, Storage Solution, etc. among other components.

The indicative specifications for the IT infrastructure and detailed information pertaining to

Data Centre and Disaster Recovery Centre are described in Annexure VIII.

4.4 Existing WAN Infrastructure

Tamil Nadu Police is currently having a diverse set of networks to connect its locations

across the State. They are described as below.

Zonal Connectivity

Tamil Nadu State has been divided into 5 Zones- North, Greater Chennai, Western

(Coimbatore), South (Madurai) and Central (Trichy). Chief Office Server also acts as North

Chennai Server and is located at Chief Office. From the Chief Office the Microwave Links

are connected to each Zonal Office (ZO) as well as District Police Offices (DPO) as shown

below. Lease Line between these locations act as backups for the Microwave links. In each

ZO / DPO there are various user connected on the LAN.

The Microwave Link between the HQ and the ZO / DPO is of 2mbps capacity. The Zonal

connectivity is depicted in the illustration below:

Existing WAN Infrastructure - Zonal Connectivity

Police Station Connectivity

Police Stations in the state are provided with 256kbps Broadband Connectivity from BSNL.

Around 25 police stations do not have this broadband connectivity (as mentioned in

Page 25: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 25 of 302

Annexure VII) because of feasibility issues and Department has asked the Service Provider

to explore options to provide this connectivity on a priority basis.

Department has a 4 Mbps Ethernet radio link between the SCRB premises and Chief Office.

Department also has a 2mbps Connectivity at Chief Office form BSNL and a VPN cum

Firewall setup. This Setup is used by the Police Stations across the state to connect to the

Server based at SCRB. The present connectivity at police stations is shown in the illustration

below:

Existing WAN Infrastructure – HQ, SCRB and Police Station connectivity

The VPN cum Firewall Box authenticates the users connecting from Police Stations, with a

login id and password and allows them to upload the daily transactions recorded in the

CAARUS desktop application at the Police Station.

The 2 Mbps link from BSNL currently limits the number of concurrent users to 25, but a

proposal has been sent by the Department to Government of Tamil Nadu for increasing this

to 34 Mbps as a short term measure till the CCTNS Connectivity for the state is rolled out.

4.5 Existing Client Site Infrastructure

Computers were provided as part of various schemes such as CCIS, CIPA and CAARUS to

the police stations and DCRBx/CCRBx. The CCIS computers were provided as part of

software roll out in 1996. The machines are obsolete and they are not even compatible with

the recent version of CCIS such as MLE01. Similarly, the machines provided as part of

Page 26: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 26 of 302

CAARUS are also obsolete in configuration and is in bad shape. Computers were provided

as part of CIPA in 2006. These computers have been provided as part of CIPA roll out in

137 police stations spread across 6 commissionerates. The details of existing client site

infrastructure at these offices are described in Annexure IX.

4.6 Existing Capacity Building Infrastructure (DTCs/ RTCs/ PTCs/ Police

Academies)

Capacity building infrastructure has been developed at all districts and commissionerates to

train personnel of various ranks. The details of Centres established at different districts for

DTCs have been described in Annexure X. Funds have been earmarked for this capacity

building infrastructure development. The funds have also been utilized for upgrading the

Capacity Building Infrastructure at SCRB. The infrastructure that has been provided to these

institutions is described in Appendix XI.

4.7 Core Application Software (CAS)

The CCTNS application software will contain a “core” for the States/ UTs that is common

across all 35 States and UTs. The CCTNS Core Application Software (henceforth referred to

as CAS) will be developed at NCRB premises and provided to States and UTs for

deployment. There would be two parts of CAS with one part containing modules specific to

NCRB. These would be referred to as CAS (Centre). There would be state specific modules

included in other part. This would be referred to as CAS (State). Each State would

customize the CAS (State) according to their unique requirements and thereafter

commission the same. States and UTs also have an option to develop and deploy additional

applications over and above the customized CAS (State). The choice of such applications

lies exclusively with the State. In case of Tamil Nadu, the state has got the approval from

Centre for using its own legacy application software CAARUS for commissioning across the

state. CAARUS is at present being upgraded by NIC to comply with standards mandated by

MHA/NCRB such as 3-tier Services Oriented Architecture based with offline mode. The

upgraded application to be called as Common Integrated Police Record Update System

(CIPRUS) would be provided to the System Integrator who would build additional

applications and customizations on top of this CIPRUS application. Thus for Tamil Nadu,

CIPRUS would be CAS (State). Henceforth, CAS (State) and CIPRUS would be used

interchangeably. There would be a need to provide interfaces to enable reading and transfer

of data from/to CIPRUS to/from CAS (Centre) modules operating at NCRB.

CAS (State) (CIPRUS in case of Tamil Nadu), in the client-server architecture would be ready by August 2011. Development of web-enabled services of consolidated CAS (State) data and interactive web-enabled services would be made available in August, 2012. The services would be implemented in a phased manner as and when services are being developed by NIC.

Page 27: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 27 of 302

This section provides the details of the CAS (State) and CAS (Center) that will be developed

by the Software Development Agency at the Center. The details provided here should be

read in conjunction with the RFP and the associated addendums issued by NCRB for the

selection of the Software Development Agency for the Design, Development and

Management of CCTNS Core Application Software (CAS).

The CCTNS application software can be conceptualized as comprising different services

that fall under two broad categories, CAS (Center) and CAS (State).

4.8 CAS (Center)

CAS (Centre) would reside at NCRB and would cater to the functionality that is required at

the GOI level (by MHA and NCRB). Like CAS (State), CAS (Centre) would also be

developed by NCRB. CAS (Centre) would enable NCRB to receive crime and criminals’

related data from States/UTs in order to organize it suitably to serve NCRB’s requirements

and to provide NCRB with the analysis and reporting abilities to meet their objective as the

central level crime and criminals’ data repository of the nation. This would address the

crime- and criminals-related information needs of MHA, NCRB, the Parliament, and central

government ministries and agencies, citizens and citizen groups. CAS (Centre) also

facilitates the flow if crime and criminals information across States/UTs on a need-basis.

CAS (Centre) will be developed and deployed at NCRB. Also, CAS (Centre) is expected to

interface with external agencies such as passports, transport authorities, etc.

Overview of Services for CAS (Center)

State-SCRB-NCRB Data Transfer and Management

The service shall enable the NCRB to receive, transform, and collate the crime, criminal,

and related data from States/UTs, to organize it suitably to serve NCRB requirements.

Crime and Criminal Reports

The service shall enable authorized personnel to generate the reports and perform analysis

on the central crime, criminals, and related data repository of the nation.

Crime and Criminal Records and Query Management

The service shall enable the authorized personnel to view various registers and perform

basic and advanced queries on the central crime, criminals, and related data repository of

the nation.

Talaash Service

The service will enable the user to search for missing persons across a central/ national

database.

Person of Interest

The service will enable the user to search for persons of interest such as persons wanted on

outstanding warrants, accused, charged habitual offenders, convicts, etc. across the

national database.

Registered Vehicle and Vehicle of Interest Service

Page 28: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 28 of 302

The service will enable the user to search for registered vehicles and vehicles of interest

such as, missing / stolen vehicles, abandoned / unclaimed vehicles, and vehicles involved in

traffic incidents across the national database.

Publication Service

This functionality will help the NCRB to publish the periodic crime reviews to the NCRB

portal.

NCRB Citizen Interface

The service shall enable the citizens to access/ search the NCRB National Database on the

data (ex, Stolen Vehicles / Property, Missing Persons, etc.) that is approved to be made

accessible to public.

NCRB Interface for RTI

Due to the sensitivity of the information that pertains to national security and harmony, this

service shall enable a limited and restricted access to the authorized external stakeholders

to search the NCRB National Database, upon submission of any RTI requests.

4.9 CAS (State)

CAS (State) or CIPRUS in the case of Tamil Nadu covers functionality that is central to the

goals of CCTNS and is tailored to the state of Tamil Nadu while meeting the minimum

standards mandated by Centre. It would focus primarily on functionality at police station with

special emphasis on crime investigation and criminals’ detection. This part would be

developed by NIC and provided to the Tamil Nadu Police for Implementation and Roll out.

Tamil Nadu Police would determine the requirements for configuration, customization and

enhancements / extensions. The following are the main function blocks that would comprise

CAS (State):

Registration

Investigation

Prosecution

Records Management

Search and Basic Reporting

CAS (State) will also include the functionality required at Higher Offices such as State Police

HQ, Range Offices, District HQ, Commissionerates, Sub-division Police Offices and SCRB.

It is envisioned that CAS (State), once operational, will significantly enhance

the outcomes in core police functions at Police Stations. It will do so primarily

through its role- and event-orientation, providing role based user access and controls

and an event driven interface that helps police personnel (playing different roles)

in more effectively performing their core functions and that relieves police personnel

from repetitive tasks that claim much of their time while returning low or no value.

In order for CAS (State) to achieve the above goals, it is envisaged to meet the following

requirements:

Page 29: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 29 of 302

It will lay special emphasis on the functions at police stations with focus on

usability and ease of use of the application

It will be designed to provide clear and tangible value to key roles at the

Police Station: specifically the SHO (Station House Officer), the IO

(Investigation Officer) and the Station Writer.

It will be event and role-driven. Access controls will be developed and role

based access will be provided in the application.

It will be content/forms-based, with customized forms based on requirements

It will be a flexible application, event and role-driven system where actions on a

case can be taken as required without rigid sequence / workflows

It will eliminate the need for duplicate and redundant entry of data, and the

need for repetitive, manual report preparation – this freeing valuable time and

resources for the performance of core police functions

It will be intelligent and help police perform their roles by providing alerts,

highlighting key action areas, etc.

Ability to view and exchange information amongst Police Stations, between

Police Stations and other Police formations and with external entities including

citizens

Reporting and data requirements of higher offices must be met at the State

Data Centre/SCRB level and not percolate to the police station level

Central facilitation and coordination; but primarily driven and owned by

States/UTs where States/UTs can configure and customize the CAS

for their unique requirements without the intervention of the central entity

Services in CAS (State)

Citizens Portal Service

This service shall enable Citizens to request services from Police through online petitions and track status of registered petitions and requests online. Citizens requests/services include passport verification services, general service petitions such as No Objection Certificate (NOC) for job, NOC for vehicle theft, NOC for lost cell phone/passport, Licenses for arms, processions etc. Petition Management Service

The service shall enable the police personnel to register and process the different kinds of

general service petitions and complaints.

Unclaimed/Abandon Property Register Service

The service shall enable the police personnel to record and maintain unclaimed/abandoned property registers and match unclaimed/ abandoned property with property in lost/stolen registers. Complaint and FIR Management Service

The service shall enable the police personnel to register and process the complaints (FIR for cognizable complaints, Non-Cognizable Report for non-cognizable, Complaint Report for general complaints, etc.) reported by the public. Investigation Management Service

Page 30: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 30 of 302

The service shall enable the police personnel to process the complaints through capturing

the details collected during the investigation process that are required for the investigation

officer to prepare a final report.

Court and Jail Interface and Prosecution Management Service

The service shall enable the police personnel to interface with the courts and jails during the

investigation process (for producing evidence, producing arrested, remand etc) and during

the trial process.

Crime and Criminal Records and Query Management Service

The service shall enable the police personnel to view various registers and perform basic

and advanced queries on the crime and criminal information.

Police Email and Messaging Service

The service shall enable the police personnel to send / receive official as well as personal

correspondence. Integration with existing WAN email System would be done by NIC.

Periodic Crime, and Law & Order Reports and Review Dashboard Service

The service shall enable the police personnel to view relevant reports and dashboards and

to conduct periodic crime, and law & order reviews of the police station(s) under the officer’s

jurisdiction.

Notification of Alerts, Important Events, Reminders and Activity Calendar or

Tasks Service

The service shall capture / generate the required alerts, important events, reminders, activity

calendar and tasks.

State-SCRB-NCRB Data Transfer and Management Service

The service shall enable the Tamil Nadu Police to collate, transform and transfer the crime,

criminal, and other related data from state to NCRB.

State CAS Administration and Configuration Management Service

The service shall enable the Tamil Nadu Police to configure/ customize the application to

suit to their unique requirements.

User Help and Assistance Service

The service shall enable the end user to view the help manuals of the application and in

guiding the end user in using the application.

User Feedback Tracking and Resolution Service

The service shall enable the police personnel in logging the issues/defects occurred while

using the system.

Activity Log Tracking and Audit Service

The service shall capture the audit trail resulting from execution of a business process or

system function.

User Access and Authorization Management Service

The service shall enable the administrative user in setting the access privileges and will

provide authentication and authorization functionality.

Page 31: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 31 of 302

4.10 Development of CCTNS Core Application Software (CAS)

CAS (Centre) will be developed at NCRB under the overall guidance and supervision of

MHA, and a dedicated team from NCRB. NCRB, on behalf of MHA, engaged a professional

software development agency (SDA) to design and develop CAS (Centre) and offer

associated services. The SDA would enhance and maintain CAS (Centre) until the end of

the engagement with NCRB and subsequent to that, CAS (Centre) would be managed by

NCRB under the guidance of NIC, DIT and MHA and CAS (State) would be managed by the

State under guidance of the State IT Department.

CAS (State) or CIPRUS would be developed by NIC at SCRB. CAS (State) would be built as

a platform to address the core requirements of the Police Station to provide a basic

framework to capture and process crime and criminal information at the police station while

providing the state the flexibility to build their state specific applications around it and in

addition to it. Post development, NIC would provide the application to the selected SI for

commissioning. The SI would add customization/ extensions to the application as desired by

the states without compromising on the sharing of data to be done with NCRB.

In order to achieve the above stated goals of simultaneously ensuring consistency and

standardization across States/UTs (where necessary and possible), and enabling

States/UTs to meet their unique requirements, CAS will be built as a highly configurable and

customizable application. CAS would therefore be a product-like application that could be

centrally managed and at the same time customized to meet the unique requirements of

the States/UTs and deployed in all States/UTs. The following sections provide details of the

configuration and customization requirements of CAS.

In order to achieve the key CCTNS goal of facilitating the availability of real time information

across police stations and between police stations and higher offices, CAS would be built

as a web application. However, given the connectivity challenges faced in a number of

police stations, especially rural police stations, the application must be built to provide off-

line availability in police stations with unreliable connectivity.

4.11 Technology Stack for CAS (State) CIPRUS which is positioned as CAS (State) would be developed in Free and Open Source

Solution (FOSS) stack by the NIC at the State. The interface to enable transfer of data

between this application and CAS Centre would be done by the System Integrator (SI). The

SI is expected to bid with FOSS Stack in response to this RFP. SI shall procure all

necessary underlying solution components required to successfully implement CCTNS

solution for the Tamil Nadu Police meeting their requirements as per this RFP. The details of

the Technology Stack are provided in Annexure-II of this RFP.

Page 32: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 32 of 302

5. Role of NIC in supporting CAS

NIC shall offer the Application Management Services for CAS (State). Also NIC will provide

Technical Program Management of Implementation of CAS (State) in Tamil Nadu.

Each of these activities is detailed out below.

Application Management Services for CAS (State) NIC shall provide Application Management services to the CAS (State). The application

management services include the following:

Provision of bug fixes, minor changes, error resolutions and minor

enhancements. Minor enhancements (the usual run-of-the-mill enhancements and not the Ones

identified as part of Continuous Improvement).

Change request management based on feedback from the users.

Release Management; Version control of CAS (State) to be managed centrally,

with state-specific configuration incorporated.

Routine functional changes without affecting the base structure.

Any changes to CAS code that may be required because of patches to licensed

software being used (if any).

Updating and maintenance of all project documents.

All planned changes to the application, especially major enhancements and changes in

functionality that are deviations from the signed-off FRS/SRS, shall be coordinated within

established Change control processes to ensure that:

Appropriate communication on change required has taken place.

Proper approvals have been received from CAS Core Group/CTT/CPMU.

NIC will define the Software Change Management and version control process and obtain

approval for the same from SCRB. For all proposed changes to the application, NIC will prepare

detailed documentation including proposed changes, impact on the system in terms of functional

outcomes/additional features added to the system, etc.

Technical Program Management of Implementation of CAS (State)

After successful 3rd party Security Audit certification, NIC will handover the certified CAS (State)

to SCRB. During the period of CAS Solution Design and Development and the Operations and

Maintenance Phase following that, NIC shall provide technical program management services in

implementing CAS in the State. Through the Technical Program Management, NIC shall extend

all the necessary support to the State SI and ensure that the SI successfully configures, and

deploys CAS (State) in the state. NIC’s Technical Program Management responsibilities include:

Preparation of technical manuals to enable the SI to configure and deploy CAS in the

State; to be made available to SI online.

Page 33: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 33 of 302

Preparation of “CAS Implementation toolkits” that comprehensively covers details on all

the aspects of the CAS (State applications including technical details of CAS,

configuration, customization, and extension details, infrastructure sizing details,

installation, commissioning, maintenance, infrastructure environment turning, and

performance tuning details that are required for the SI to successfully commission the

CAS (State) application in the State, integrate CAS (State) with external agencies and

third party solutions in the State and integrate CAS (State) with CAS (Centre) to

seamlessly transfer the required data to NCRB. The implementation toolkit shall also

include the following:

o All completed and updated training and support material needed for configuring

and deploying CAS

o All completed and updated project documents including FRS, SRS, and Test

Plans would be provided to SI with requisite approval from SCRB

o Relevant software assets/artefacts (including configuration utilities / tools,

deployment scripts to state SI to deploy CAS (State) in the

State)

o Relevant standards and design guidelines to the SI for enhancements, and

integration of the application with external systems and third party components

that will be implemented by the SI at the State

Conduct of direct knowledge transfer through regular contact sessions at SCRB with the

State SI during the contract period of the SI. During the contact sessions, the NIC shall

conduct need based structured training sessions on the CAS Implementation Toolkit

prepared by NIC.

Dedicated State Points of Contact: Members of NIC’s team shall act as points of

contacts for the state level SI. The point of contact will be responsible for addressing

queries from an SI and in meeting SLA targets (in responding to the State’s needs).

Helpdesk Support: NIC shall provide Helpdesk support to the State SI during

deployment and stabilization phases with 8 contact hours (during normal business hours

of 10 AM to 6 PM), 6 days (Monday through Saturday, both included).

Deployment Scripts: NIC shall develop the necessary deployment scripts to deploy CAS

(State) in the State and provide the same to State SI.

Data Migration Utility: NIC shall develop a Data Migration Utility/application with all the

formats and tools to load the data into the state databases. This will be provided to the

State which will enable the State SI to migrate data from legacy systems to the CAS

databases.

Language Localization Support: Proving interface in local languages is a key

requirement of CAS (State). NIC shall build CAS (State) with interfaces in English and

Tamil.

Supporting the SI to ensure that the CAS (State) that is configured and

o Successfully passes the User Acceptance Testing (UAT).

o Data Migration of CAS (State) related data from the legacy systems to CAS

(State)

o Infrastructure Sizing related to CAS (State)

Page 34: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 34 of 302

o Commissioning and Deployment of CAS (State)

o Infrastructure Environment Performance Tuning related to CAS (State)

o Integration of CAS (State) with external agency solutions

o Integration of CAS (State) with additional solutions being integrated by the SI at

the State

o Seamless data transfer from CAS (State) to CAS (Centre)

Troubleshooting, resolution and escalation with State SI; and ownership of end-to-end

data exchange between the CAS (State) and CAS (Centre) needs to ensure seamless

and real-time data exchange.

Page 35: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 35 of 302

6. Scope of the Project

6.1 Geographical Scope

The scope of CCTNS in the State of Tamil Nadu spans across all the police stations and all higher

police unit offices including Sub-Divisional Offices, District Headquarters, Commissionerates, Range

Headquarters, Police Headquarter, State Crime Record Bureau, and other Special Police Units and

their corresponding Headquarters.

The CCTNS project involves connectivity of police units (linking police units at all levels within the

States). CCTNS also provides a citizens’ interface to provide Police services to citizens. Indicative

numbers of locations within the State to be covered for implementing CCTNS project are as follows:

The locations to be covered under this project include the following:

S.No. Client Site Locations Number of Offices 1 Non CIPA Police Stations 1345

2 CIPA Police Stations 137

3 AC Range Office/SDPO 258

4 Range/Zone 16

5 SCRB 1

6 TN Finger Print Bureau/ Forensic Science Lab 2

7 District Control Room 40

8 State Control Room 1

9 DPO 33

10 Commissionerate 7

11 ADC/DC/JC/ACOP Offices 53

12 ADSP Office 62

13 Police HQ Office 1

FIR Registering Special Unit Offices

14 Coastal Security Group 11

15 CBCID 43

16 Crime (SIT) 34

17 CCIW 31

18 EOW 16

19 PEW 94

20 DCB/CCB 38

21 CSCID 20

22 TIW 44

23 TEW 148

24 JAPU 9

Page 36: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 36 of 302

S.No. Client Site Locations Number of Offices 25 AVS 3

26 ADoC 2

Sub-total 493

FIR Registering Special Unit HQ 6

27 CSG 1

28 CBCID 3

29 Crime (SIT) 1

30 Idol Wing 1

Sub-total 6

Total 2441 Note: SCRB reserves the right to consider in part or omit all the requirements mentioned

The scope of project would also include the following additional locations:

S.No Additional Locations Number of Offices

1 Intelligence HQ 1

Intelligence Offices

2 Q-Branch 30

3 SBCID 42

4 Special Division 6

5 Security Branch & Core Cell 10 6 Organized Crime and Intelligence Unit 19 7 SIT 5 Sub-total 112

8 Outposts 69

9 Jails (includes sub-jails, Borstal school, district jails, special sub-jails and central prisons)

129

10 District Level SDFPB and FSL 74

Other Special Unit Offices

11 Technical Services 114

12 District Special Branch 40

13 Armed Police 17

14 Social Justice & Human Rights 15

15 Special Task Force 2

Sub-total 179

Other Special Unit HQ

16 Technical Services 1

17 Armed Police 1

18 Social Justice & Human Rights 1

19 Home Guards (HG) 1

20 State Traffic Planning Cell 1

21 Tamil Nadu Commando Force 1

Sub-total 6

Total 570 Note: SCRB reserves the right to consider in part or omit all the requirements mentioned

Page 37: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 37 of 302

The aforementioned locations would be covered for implementing CCTNS project including but not

limiting to, Site Preparation, procurement, deployment and commissioning of requisite Hardware,

Network connectivity, deployment and commissioning of CAS (State) and additional modules (with

proper integration) as per the requirement of Tamil Nadu Police, training & handholding support and

further provisioning of the all the services mentioned as per scope of work of this RFP.

The bill of materials for above client locations and additional offices is available in Annexure- III and

IV respectively.

Networking Connectivity required at each of these locations is described in Annexure VII of this RFP

The indicative state map with all the districts/ Commissionerates depicting the location of all Police

Units to be covered under the scope of CCTNS is attached as Annexure XI.

In the pilot phase, the following locations are planned to be covered

1 State Headquarters

2 SCRB

3 State FPB

4 State FSL

5 FIR Registering Special Unit Headquarters

6 Additional Other Special Unit Headquarters

7 Client site locations in Pilot Phase districts

8 Additional locations in Pilot Phase districts

The below table presents the list of client site locations and additional locations to be covered at the

headquarters:

S.No Pilot Phase at Headquarters Number of Offices

Client Site Locations

1 Police HQ 1

2 SCRB 1

3 State Fingerprint Bureau 1

4 State Forensic Science Lab 1

5 State Control Room 1

6 SCRB 1

7 FIR Registering Special Unit Headquarters (CBCID – 3, EOW – 1, Idol Wing – 1, CSG – 1)

6

Additional Locations

8 Other Special Unit Headquarters (TS-1, Home Guard -1, Armed Police -1, STPC -1, SJ & HR -1, TN Commando Force - 1)

6

Page 38: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 38 of 302

S.No Pilot Phase at Headquarters Number of Offices

9 Intelligence Headquarters 1 Note: SCRB reserves the right to include in part or omit all the requirements put under this section

The below table presents the list of client site locations to be covered in the pilot districts:

S.No Districts in

Roll Out

Phase I

Zone Range DPO/

Comm*

ADC/DC/

JC/ACOP

Offices

SDPO/

AC

Range

Office

Control

Room

PS Justification

1 Sivagangai 1 1 1 5 1 39 A rural set-up with

good compliance in

filling CAARUS

entries, the feedback

would be helpful in

rolling out to other

rural districts.

Represents the

Southern Zone

2 Thanjavur 1 1 1 8 1 51 A semi-urban set-up

with good awareness

levels of state IT

applications, feedback

would be helpful in

rolling out to similar

districts. Represents

the Central Zone

3 Chennai Sub-urban

0 1 3 10 13 1 47 Commissionerate set-

up with large number

of Police Stations

4 Coimbatore City

5 14 1 18 Commissionerate set-

up with good record in

filling CAARUS entries Note: SCRB reserves the right to include in part or omit all the requirements put under this section

* - Would include DCRB/CCRB

The following additional offices are also expected to be covered in Pilot Phases:

Page 39: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 39 of 302

S.No Districts in

Pilot Phase

Intelligence

Unit Offices

TIW/

TEW

Units

District

FSL/

SDFPB

FIR

Registering

Special Unit

Offices

Other

Special

Unit

Offices

Total

1 Sivagangai 3 3 2 4 4 16

2 Thanjavur 2 5 3 8 7 25

3 Chennai Sub-urban

0 15 1 5 19 40

4 Coimbatore City

3 18 1 4 2 28

8 41 7 21 32 109 Note: SCRB reserves the right to include in part or omit all the requirements put under this section

For the pilot phase, a tentative list of activities and timeline as part of the implementation plan is

mentioned below:

Unit Name Activity Timeline ( in Months)

State HQ (includes HQ, SCRB, State Control Room, TNFPB and TNFSL)

Setting up Date Centre T+3

Setting up DR Centre T+3

Data Digitization/Migration for all state HQ higher offices

T+12

ICT Hardware and Site Preparation at SHQ and SCRB

T1=T+4

Pilot A - CAS (State) - Availability of Police Intranet

T2=T1+4

Pilot B - Crime Analysis Suite T3=T2+1

Pilot C - Knowledge Base Suite T4=T3+1

Pilot D - Communication Suite T5=T4+1

Pilot E - Constable Suite T6=T4+2

Pilot F - Law & Order Suite T7=T6+2

Pilot G - Traffic Suite (for SCRB) T8=T7+2

Police Stations Data Digitization/Migration for all Police Stations

T+12

ICT Hardware and Site Preparation T1=T+4

Pilot A - Installation of CAS (State) of NIC T2=T1+4

Pilot C - Knowledge Base Suite T4=T2+2

Pilot D - Communication Suite T5=T4+1

Pilot E - Constable Suite T6=T4+2

Pilot F - Law & Order Suite T7=T6+2

Pilot G - Traffic Suite T8=T7+2

Page 40: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 40 of 302

Unit Name Activity Timeline ( in Months)

SDPO/AC Range Offices Data Digitization/Migration for all SDPO/AC Range Offices

T+12

ICT Hardware and Site Preparation T1=T+4

Pilot A - Installation of CAS (State) of NIC T2=T1+4

Pilot C - Knowledge Base Suite T4=T2+2

Pilot D - Communication Suite T5=T4+1

Pilot E - Constable Suite T6=T4+2

Pilot F - Law & Order Suite T7=T6+2

Pilot G - Traffic Suite T8=T7+2

ADC/DC/JC/ACOP Offices Data Digitization/Migration T+12

ICT Hardware and Site Preparation T1=T+4

Pilot A - CAS (State) - Availability of Police Intranet

T2=T1+4

Pilot B - Crime Analysis Suite T3=T2+1

Pilot C - Knowledge Base Suite T4=T3+1

Pilot D - Communication Suite T5=T4+1

Pilot E - Constable Suite T6=T4+2

Pilot F - Law & Order Suite T7=T6+2

Pilot G - Traffic Suite T8=T7+2

Commissionerate Data Digitization/Migration for all commissionerates

T+12

ICT Hardware and Site Preparation T1=T+4

Pilot A - CAS (State) - Availability of Police Intranet

T2=T1+4

Pilot B - Crime Analysis Suite T3=T2+1

Pilot C - Knowledge Base Suite T4=T3+1

Pilot D - Communication Suite T5=T4+1

Pilot E - Constable Suite T6=T4+2

Pilot F - Law & Order Suite T7=T6+2

Pilot G - Traffic Suite T8=T7+2

DPO Data Digitization/Migration for all DPOs T+12

ICT Hardware and Site Preparation

T1=T+4

Pilot A - CAS (State) - Availability of Police Intranet

T2=T1+4

Pilot B - Crime Analysis Suite T3=T2+1

Pilot C - Knowledge Base Suite T4=T3+1

Pilot D - Communication Suite T5=T4+1

Page 41: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 41 of 302

Unit Name Activity Timeline ( in Months)

Pilot E - Constable Suite T6=T5+2

Pilot F - Law & Order Suite T7=T6+2

Pilot G - Traffic Suite T8=T7+2

Range Data Digitization/Migration for all ranges T+12

ICT Hardware and Site Preparation T1=T+4

Pilot A - CAS (State) - Availability of Police Intranet

T2=T1+4

Pilot B - Crime Analysis Suite T3=T2+1

Pilot C - Knowledge Base Suite T4=T3+1

Pilot D - Communication Suite T5=T4+1

Pilot G - Traffic Suite T8=T5+6

Zone Data Digitization/Migration for all zones T+12

ICT Hardware and Site Preparation T1=T+4

Pilot A - CAS (State) - Availability of Police Intranet

T2=T1+4

Pilot B - Crime Analysis Suite T3=T2+1

Pilot C - Knowledge Base Suite T4=T3+1

Pilot D - Communication Suite T5=T4+1

Pilot G - Traffic Suite T8=T5+6

District Control Room Data Digitization/Migration for all district control rooms

T+12

ICT Hardware and Site Preparation T1=T+4

Pilot A - CAS (State) - Availability of Police Intranet

T2=T1+4

Pilot B - Crime Analysis Suite T3=T2+1

Pilot D - Communication Suite T4=T3+1

Pilot E - Constable Suite T5=T4+1

Pilot F - Law & Order Suite T7=T6+2

Pilot G - Traffic Suite T8=T7+2

FIR Registering Special Unit HQ (CCIW, CSG, CBCID, Crime (SIT), PEW, DCB, CBCID, EOW, Idol Wing)

ICT Hardware and Site Preparation T1=T+4

Pilot A - CAS (State) - Availability of Police Intranet

T2=T1+4

Other Special Unit HQ (AP, Home Guard, TS, SJ & HR, TNCF, STPC)

ICT Hardware and Site Preparation T1=T+4

Pilot A - CAS (State) - Availability of Police Intranet

T2=T1+4

Intelligence HQ Data Digitization/Migration for Intelligence Units

T+12

ICT Hardware and Site Preparation T1=T+4

Page 42: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 42 of 302

Unit Name Activity Timeline ( in Months)

Pilot A - CAS (State) - Availability of Police Intranet

T2=T1+4

Other Special Unit Offices ICT Hardware and Site Preparation T1=T+4

Pilot A - Installation of CAS (State) of NIC T2=T1+4

FIR registering Special Unit Offices ICT Hardware and Site Preparation T1=T+4

Pilot A - Installation of CAS (State) of NIC T2=T1+4

Traffic Enforcement and Investigation Wing

ICT Hardware and Site Preparation T1=T+4

Pilot A - Installation of CAS (State) of NIC T2=T1+2

Pilot G – Traffic Suite T8=T2+9

Intelligence Unit Offices ICT Hardware and Site Preparation T1=T+4

Pilot A - Installation of CAS (State) of NIC T2=T1+2

District Training Centres Capacity Building to identified Personnel in each of the districts

T+15

Note: The Software module rollout would happen sequentially after CAS State core software is piloted. Following are the

milestones as denoted in the table above:

T=Date of signing the agreement between department and SI

T1= Time when ICT hardware and site preparation is complete

T2= Time when CAS State base roll out is complete

T3= Time when Pilot A roll out is complete

T4= Time when Pilot B roll out is complete

T5= Time when Pilot C roll out is complete

T6= Time when Pilot D roll out is complete

T7= Time when Pilot E roll out is complete

T8= Time when Pilot F roll out is complete

It is assumed that only when the all the pilots are rolled out and capacity building activities for the

district to cover all the functionalities are done and feedback is gathered. The above mentioned plan

is indicative and the SI is expected to interact with the department to arrive at the exact

implementation plan

CCTNS Roll-out Phase-I

During Roll out Phase-I of CCTNS, coastal and border districts and commissionerate set-up from

Police Stations till DPO/Commissionerate will be covered for the installation and commissioning of

hardware, connectivity and other infrastructure and the other services as mandated by MHA

guidelines. The details of client site locations are provided in the table below.

S.No Districts in Roll

Out Phase I

Zone Range DPO/

Comm*

ADC/DC

/JC/ACOP

Offices

SDPO/

AC

Range

Office

Control

Room

PS

1 Dharmapuri 1 1 5 3 1 26

Page 43: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 43 of 302

S.No Districts in Roll

Out Phase I

Zone Range DPO/

Comm*

ADC/DC

/JC/ACOP

Offices

SDPO/

AC

Range

Office

Control

Room

PS

2 Cuddalore 1 1 8 7 1 50

3 Nagapattinam 0 1 4 1 30

4 Ramanathapuram 0 1 6 1 46

5 Theni 1 1 5 1 34

6 Vellore 1 1 8 1 63

7 Thoothukudi 1 1 8 1 54

8 Kanniyakumari 0 1 4 1 38

9 Tirunelveli 0 1 9 1 65

10 Coimbatore 1 1 5 1 35

11 Nilgiris 0 1 5 1 30

12 Tiruvallur 1 1 5 1 32

13 Krishnagiri 1 1 5 1 34

14 Villupuram 1 1 7 1 54

15 Kancheepuram 0 1 5 1 41

16 Tirunelveli City 1 8 8 1 7

17 Pudukottai 1 1 3 1 39

Note: SCRB reserves the right to include in part or omit all the requirements put under this section

* - Would include DCRB/CCRB

The details of additional locations to be covered are provided in the table below.

Page 44: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 44 of 302

S.No Districts in Roll

Out Phase I

Intelligence

Unit Offices

TIW/

TEW

Units

District

FSL/

SDFPB

FIR

Registering

Special Unit

Offices

Other

Special

Unit

Offices

Total

1 Dharmapuri 2 1 2 3 2 10

2 Cuddalore 3 3 2 7 2 17

3 Nagapattinam 3 4 2 9 3 21

4 Ramanathapuram 3 2 4 4 3 16

5 Theni 2 1 2 5 2 12

6 Vellore 2 2 3 7 5 19

7 Thoothukudi 3 1 2 8 3 17

8 Kanniyakumari 2 4 2 9 5 22

9 Tirunelveli 3 3 2 8 5 21

10 Coimbatore 4 3 3 8 5 23

11 Nilgiris 2 3 2 3 2 12

12 Tiruvallur 2 2 2 4 2 12

13 Krishnagiri 2 3 2 4 3 14

14 Villupuram 2 5 2 5 4 18

15 Kancheepuram 2 4 2 5 3 16

16 Tirunelveli City 1 7 1 2 3 14

17 Pudukottai 2 2 2 3 2 11

Total 40 50 37 93 52 282

Note: SCRB reserves the right to include in part or omit all the requirements put under this section

Page 45: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 45 of 302

For the rollout phase-I, a tentative list of activities and timeline as part of the implementation plan is

mentioned below:

Unit Name Activity Timeline ( in Months)

Police Stations ICT Hardware and Site Preparation D1=D+9

Installation of CAS (State) of NIC D2=D1+9

Knowledge Base Suite

Communication Suite

Constable Suite

Law & Order Suite

Traffic Suite

SDPO/AC Range Offices ICT Hardware and Site Preparation D1=D+9

Installation of CAS (State) of NIC D2=D1+9

Knowledge Base Suite

Communication Suite

Constable Suite

Law & Order Suite

Traffic Suite

ADC/DC/JC/ACOP Offices ICT Hardware and Site Preparation D1=D+9

Availability of Police Intranet and Web-services based on Consolidated Data

D2=D1+9

Crime Analysis Suite

Knowledge Base Suite

Communication Suite

Constable Suite

Law & Order Suite

Traffic Suite

Commissionerate ICT Hardware and Site Preparation D1=D+9

Availability of Police Intranet and Web-services based on Consolidated Data

D2=D1+9

Crime Analysis Suite

Knowledge Base Suite

Communication Suite

Constable Suite

Law & Order Suite

Traffic Suite

DPO ICT Hardware and Site Preparation D1=D+9 Availability of Police Intranet and Web-services based on Consolidated Data

D2=D1+9

Page 46: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 46 of 302

Unit Name Activity Timeline ( in Months)

Crime Analysis Suite

Knowledge Base Suite

Communication Suite

Constable Suite

Law & Order Suite

Traffic Suite

Range ICT Hardware and Site Preparation D1=D+9

Availability of Police Intranet and Web-services based on Consolidated Data

D2=D1+9

Crime Analysis Suite

Knowledge Base Suite

Communication Suite

Traffic Suite

Zone ICT Hardware and Site Preparation D1=D+9

Availability of Police Intranet and Web-services based on Consolidated Data

D2=D1+9

Crime Analysis Suite

Knowledge Base Suite

Communication Suite

Traffic Suite

District Control Room ICT Hardware and Site Preparation D1=D+9

Availability of Police Intranet and Web-services based on Consolidated Data

D2=D1+9

Crime Analysis Suite

Communication Suite

Constable Suite

Law & Order Suite

Traffic Suite

Other Special Unit Offices ICT Hardware and Site Preparation D1=D+9

Availability of Police Intranet and Web-services based on Consolidated Data

D2=D1+9

FIR registering Special Unit Offices ICT Hardware and Site Preparation D1=D+9

Installation of CAS (State) of NIC D2=D1+9

Traffic Enforcement and Investigation Wing

ICT Hardware and Site Preparation D1=D+9

Installation of CAS (State) of NIC D2=D1+9

Traffic Suite

Intelligence Unit Offices ICT Hardware and Site Preparation D1=D+9

Page 47: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 47 of 302

Unit Name Activity Timeline ( in Months)

Availability of Police Intranet and Web-services based on Consolidated Data

D2=D1+9

District Training Centres Capacity Building to identified Personnel in each of the districts

D+12

Note: Following are the milestones as denoted in the table above:

D=Date of beginning Rollout Phase-I, should be within 1 month of completion of Pilot Phase I

D1= Date of ICT hardware rollout completion

It is expected that the software and ICT hardware rollout would happen in a rolling manner and the SI is expected to interact

with the department to arrive at the priority list of districts from which the roll out for this phase will begin

The above mentioned plan is indicative and the SI is expected to interact with the department to arrive at

the exact implementation plan

CCTNS Roll Out Phase – II

During the roll-out Phase-II of the application, CCTNS hardware rollout would be complete with the roll

out happening to all other locations. Outposts, Jails and all ADSP Offices would be covered in this

Phase. Any further services the state wishes to provide to the citizen would be covered in this phase. In

this phase, the remaining identified personnel would also be trained in the concerned modules to bring

all the regions in the state to become ready for using the CCTNS application.

The details of client site locations and additional locations to be covered across the state are mentioned

below:

S.No Pilot Phase at Headquarters Number of Offices

Client Site Locations

1 ADSP Offices 62

Additional Locations

2 Jails (including central jails, sub-jails and Borstal Schools)

129

3 Outposts 69

4 Intelligence Unit Offices (OCIU and SIT) 24

The details of client site locations to be covered in this phase are mentioned below:

S.No Districts in Roll Out

Phase II

Zone Range DPO/

Comm*

ADC/DC/

JC/ACOP

Offices

SDPO/

AC

Range

Office

PS

1 Tiruvannamalai 1 1 6 45

2 Namakkal 1 4 29

Page 48: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 48 of 302

S.No Districts in Roll Out

Phase II

Zone Range DPO/

Comm*

ADC/DC/

JC/ACOP

Offices

SDPO/

AC

Range

Office

PS

3 Salem 1 6 38

4 Erode 1 1 7 48

5 Tiruppur 1 6 30

6 Karur 1 1 3 18

7 Ariyalur 1 2 18

8 Perambalur 1 1 9

9 Trichy 1 5 32

10 Thiruvarur 1 4 28

11 Dindigul 1 7 42

12 Madurai 1 1 7 47

13 Virudhunagar 1 7 53

14 Railway Chennai 1 1 17

15 Railway Trichy 1 1 35

16 Salem City 1 5 8 14

17 Madurai City 1 5 9 20

18 Trichy City 1 5 8 16

19 Greater Chennai 1 15 29 110

Note: SCRB reserves the right to include in part or omit all the requirements put under this section

* - Would include DCRB/CCRB

The details of additional locations to be covered in this phase are mentioned below:

Page 49: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 49 of 302

S.No Districts in Roll Out

Phase II

Intelligence

Unit Offices

TIW/

TEW

Units

District

FSL/

SDFPB

FIR

Registering

Special Unit

Offices

Other

Special

Unit

Offices

Total

1 Tiruvannamalai 2 2 2 4 1 11

2 Namakkal 1 3 2 4 3 13

3 Salem 2 3 2 8 4 19

4 Erode 2 3 2 6 6 19

5 Tiruppur 2 4 2 1 1 10

6 Karur 2 1 2 4 2 11

7 Ariyalur 1 0 2 1 2 6

8 Perambalur 2 0 2 3 2 9

9 Trichy 5 2 2 8 10 27

10 Thiruvarur 2 3 2 3 1 11

11 Dindigul 2 6 2 7 7 24

12 Madurai 5 4 2 9 6 26

13 Virudhunagar 2 6 2 6 4 20

14 Salem City 1 3 0 1 2 7

15 Madurai City 2 10 0 5 2 19

16 Trichy City 2 8 2 3 2 17

17 Greater Chennai 31 43 2 26 48 150

Total 66 101 30 99 103 399

Note: SCRB reserves the right to include in part or omit all the requirements put under this section

For the roll out phase-II, a tentative list of activities and timeline as part of the implementation plan is

Page 50: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 50 of 302

mentioned below:

Unit Name Activity Timeline ( in Months)

Police Stations ICT Hardware and Site Preparation E1=E+9

Installation of CAS (State) of NIC E2=E1+9

Knowledge Base Suite

Communication Suite

Constable Suite

Law & Order Suite

Traffic Suite

SDPO/AC Range Offices ICT Hardware and Site Preparation E1=E+9

Installation of CAS (State) of NIC E2=E1+9

Knowledge Base Suite

Communication Suite

Constable Suite

Law & Order Suite

Traffic Suite

ADC/DC/JC/ACOP Offices ICT Hardware and Site Preparation E1=E+9

Availability of Police Intranet and Web-services based on Consolidated Data

E2=E1+9

Crime Analysis Suite

Knowledge Base Suite

Communication Suite

Constable Suite

Law & Order Suite

Traffic Suite

Commissionerate ICT Hardware and Site Preparation E1=E+9

Availability of Police Intranet and Web-services based on Consolidated Data

E2=E1+9

Crime Analysis Suite

Knowledge Base Suite

Communication Suite

Constable Suite

Law & Order Suite

Traffic Suite

DPO ICT Hardware and Site Preparation E1=E+9 Availability of Police Intranet and Web-services based on Consolidated Data

E2=E1+9

Crime Analysis Suite

Page 51: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 51 of 302

Unit Name Activity Timeline ( in Months)

Knowledge Base Suite

Communication Suite

Constable Suite

Law & Order Suite

Traffic Suite

Range ICT Hardware and Site Preparation E1=E+9

Availability of Police Intranet and Web-services based on Consolidated Data

E2=E1+9

Crime Analysis Suite

Knowledge Base Suite

Communication Suite

Traffic Suite

Zone ICT Hardware and Site Preparation E1=E+9

Availability of Police Intranet and Web-services based on Consolidated Data

E2=E1+9

Crime Analysis Suite

Knowledge Base Suite

Communication Suite

Traffic Suite

District Control Room ICT Hardware and Site Preparation E1=E+9

Availability of Police Intranet and Web-services based on Consolidated Data

E2=E1+9

Crime Analysis Suite

Communication Suite

Constable Suite

Law & Order Suite

Traffic Suite

Other Special Unit Offices ICT Hardware and Site Preparation E1=E+9

Availability of Police Intranet and Web-services based on Consolidated Data

E2=E1+9

FIR registering Special Unit Offices ICT Hardware and Site Preparation E1=E+9

Installation of CAS (State) of NIC E2=E1+9

Traffic Enforcement and Investigation Wing

ICT Hardware and Site Preparation E1=E+9

Installation of CAS (State) of NIC E2=E1+9

Traffic Suite

Intelligence Unit Offices ICT Hardware and Site Preparation E1=E+9

Installation of CAS (State) of NIC E2=E1+9

Page 52: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 52 of 302

Unit Name Activity Timeline ( in Months)

Outposts ICT Hardware and Site Preparation E1=E+9

Installation of CAS (State) of NIC E2=E1+9

ADSP Offices ICT Hardware and Site Preparation E1=E+9

Availability of Police Intranet and Web-services based on Consolidated Data

E2=E1+9

Crime Analysis Suite

Knowledge Base Suite

Communication Suite

Traffic Suite

Jails ICT Hardware E1=E+9

Availability of Police Intranet and Web-services based on Consolidated Data

E2=E1+9

District Training Centres Capacity Building to identified Personnel in each of the districts

E+12

Note: Following are the milestones as denoted in the table above:

E=Date of beginning Rollout Phase-II, should be within 2 month2 of completion of Rollout Phase I

E1= Date of ICT hardware rollout completion

It is expected that the software and ICT hardware rollout would happen in a rolling manner and the SI is expected to interact

with the department to arrive at the priority list of districts from which the roll out for this phase will begin

The above mentioned plan is indicative and the SI is expected to interact with the department to arrive at

the exact implementation plan

Operate & Maintain Phase

Operate and Maintain phase would commence in a rolling manner after the successful =implementation

of CCTNS in the specific districts belonging to a phase as per the scope of work mentioned in this RFP.

In addition to activities relating to operate and maintain of the comprehensive CCTNS solution, the

phase would also include the implementation of subsequent versions, upgrades, patches of CAS as

released by NCRB and the other initiatives of Tamil Nadu Police as part of MMP CCTNS.

6.2 Functional Scope

CCTNS intends to enable improving efficiency and effectiveness of police processes and also aid in

crime investigation through sharing of information pertaining to crime and criminal across police offices.

Apart from collating and maintaining data on crime and criminals, Police Officials and Personnel render a

variety of services in area of maintenance of law and order, crime investigation, major events monitoring

VIP bandobust, traffic enforcement and investigation, prosecution and witness trial management,

intelligence gathering and crime prevention, etc. Police stations also serves as front-end of the entire

police department in dealing with public complaints and requests, and at the same time they occupy a

pivotal place as the primary source of collection of information for the other functions/wings within the

department such as Intelligence. Thus, the functional scope of the application for CCTNS Tamil Nadu

would include:

Page 53: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 53 of 302

a) Modules specific to Crime and Criminal data

b) Modules pertaining to state specific requirements

The list of functional modules is mentioned below:

6.2.1 CCTNS Functional Modules

The following table illustrates the services to be developed as part of Core Application Software (CAS)

State by NIC. This includes core services and support services as mentioned below:

S.No CCTNS Module/Service Description

Core Services mandated to be part of CAS (State)

1 Citizen Interface This would provide an interface for citizens to access

Police services online and know the status of their

complaint by keying in the Service Request Number. Also,

this would allow downloading copies of documents such as

FIR as .pdf format

2 Complaint & FIR

Management Service

This would enable capturing of FIR and complaint details in

the application and would also provide ability to store

images, voice and video pertaining to the case. The screen

would also be presented differently based upon the type of

complaint. Based upon approval by concerned superior

official, acknowledgment would be provided

3 Petition Management

Service

This would enable capturing of petition details in the

application and would also provide ability to store images,

voice and video pertaining to the case. The screen would

also be presented differently based upon the type of

petition. Based upon approval by concerned superior

official, acknowledgment or certificate would be provided

4 Investigation

Management Service

This provides facility to update case progress and store

images, voice and video pertaining to case investigation.

This would provide dashboard relating to cases under

investigation and facility to print arrest card

5 Unclaimed/Abandoned

Property Register

Service

This provides ability to search database of abandoned and

unclaimed property across stations and also has a feature

to show an alert in case a newly registered case’s vehicle

number matches with the number already in database

6 Notification of Alerts,

Important Events,

Reminders and Activity

Calendar or Tasks

Service

This module would assist the police personnel’s to get

notification of alerts; important events, reminders and

activity calendar to help them get latest information about

arrest, vehicles recovered, un-known dead bodies, Date of

VIP bandobust etc.

Page 54: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 54 of 302

S.No CCTNS Module/Service Description

7 Police email and

Messaging Service

The Police Messaging system is role based

communication system to help the police personnel send

“Faster” and “Secure” official correspondence within /

across the multiple wings within / across the Police

departments. Integration with existing WAN Mail System

would be done by NIC

8 Periodic Crime & Law &

Order Reports and

Review Dashboard

Service

This functionality will help the police personnel to view the

snapshot of the various statistics within and across police

stations on petitions/ complaints, cases, NCR, FIR,

warrants, wanted offenders/suspects etc.,. This will also be

used by the higher officers at all levels/roles to conduct

periodic reviews of the police stations in their jurisdiction.

9 Court & Jail Interface

and Prosecution

Management Service

System would provide an interface for entering the data on

People releasing from jail, people coming on bail and

parole. System would allow entry of case trial details to the

database.

10 Crime & Criminal

Records and Query

Management Service

This module will help the police personnel in searching

(Quick & Advanced) any person of interest (missing

persons, arrested, released from jails, convicted,

acquitted), property of interest, complaint, crime, ,

abandoned / unclaimed property, stolen / lost property ,

pending warrants, pending summons and other

investigation-toolkit-data (Vehicle Registration, Driver

License, Cell Phone Numbers, Voter Details, Education

Data etc.). Search facility would be integrated with all the

modules proposed in this document. This module would

work as a one stop search facility for anything stored in the

information/ knowledge base of Tamil Nadu Police.

11 State SCRB- NCRB

Data Transfer and

Management Service

This functionality will enable the states to transfer the crime

and criminal data from the state, organize it suitably to

serve the NCRB requirements.

Support Services mandated to be part of CAS (State)

12 State CAS

Administration and

Configuration

Management Service

This would be in-built in the CAS State application that is

being developed by NIC.

13 User Help and

Assistance Service

This would be in-built in the CAS State application that is

being developed by NIC.

14 User Feedback

Tracking and Resolution

Service

This functionality would be in-built in the CAS State

Application that is being developed by NIC. This will help

the police personnel in logging the issues/defects occurred

Page 55: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 55 of 302

S.No CCTNS Module/Service Description

while using the system on to Issue tracking system.

15 Activity Log Tracking

and Audit Service

This functionality would be in-built in the CAS State

Application that is being developed by NIC. This

functionality will maintain an unalterable Audit Trail, which

is a sequence of audit records, each of which contains

evidence directly pertaining to and resulting from execution

of a business process or system function.

16 User Access and

Authorization

Management Service

The service shall enable the administrative user in setting the

access privileges and will provide authentication and

authorization functionality.

There would be enhancements and additional functionalities to be developed on top of CAS State

by the SI. The following table illustrates the additional functionalities to be developed on top of CAS

(State):

S.No CCTNS Module/Service Description

Additional Functionality to be developed on top of CAS (State)

Crime Analysis Suite

1 Visual Representation

of Data

The system would allow presentation of graphical analyses

of data drawn from various databases

2 Geographic Information

System (GIS) Maps

The system would allow plotting of details such as crime

and accidents on GIS map. This would be useful to get an

accurate picture of which areas crime is more concentrated

in and suitable measures can be taken accordingly.

3 Missing persons and

Unidentified Dead

Bodies - Collation and

Feeding Data to CAS

(Centre in prescribed

database format),

Development of APIs

for interfacing with CAS

(Centre) functionality

such as Talaash,

MVCS, etc.

Missing persons and Unidentified Dead Bodies, Stolen and

Recovered Property - Collation and Feeding Data to CAS

(Centre in prescribed database format), Development of

APIs for interfacing with CAS (Centre) functionality such as

Talaash, MVCS, etc.

4 Tagging fingerprint data

to crime and criminal

data

The system would allow attaching fingerprints related to

criminal and case to the already entered case details

wherever available

5 Global Positioning

System

This module would help in monitoring and locating the

location of patrol cars and police officers using GPS

technology.

Page 56: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 56 of 302

Knowledge Base Suite

6 Media Monitoring

Module

System would make facilitate generation of reports from

media news releases based on defined keywords: The

system should facilitate capture of information from various

newspapers and other media release based on keywords

such as murder, dacoity from editions of various districts in

various newspapers and prepare a daily report based on

the same.

7 Police Intranet Website Development of a Police Intranet Website containing

department specific content including sharing of data on

missing persons, officials' transfers, etc. System would

facilitate development and maintenance of an intranet

website: This would facilitate uploading of important

documents including Police Standing Order, staff manuals,

important GOs, important transfers, details of sensitive

cases which would be scrolled on the web home page. The

home page would be reached on authentication of officers’

login. Depending on the rank of officer and location, the

items that would be displayed on the homepage would

differ. The locally important data would be flashed to a

district SP vis-à-vis an IG sitting in the headquarters.

Communication Suite

8 Social Networking Development of Interface between Police Website and

Social Networking for sharing of information such as

photos of traffic accidents, etc.

9 Mobile Interface and

Services

Development of mobile/SMS software for sending and

receiving information by and to citizens

Law & Order Suite

10 Mass Event Monitoring System would facilitate monitoring of resources during

mass deployment: The system would allow provision to

maintain the details of resources, their home base, vehicle

details, contact details including mobile number, place they

are deputized to work and so on. This would enable

tracking of the resources as and when needed.

11 CCTV Cameras Develop systems which will link up with CAS State

database for storing images captured in CCTV cameras

installed in critical places and images captured during

monitoring of large public gatherings

Traffic Suite

Page 57: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 57 of 302

12 RTO Database Access Develop interface to access data maintained by RTO in

databases such as Vaahan and Sarathy. System would aid

traffic police personnel in crime prevention: The system

would support traffic personnel by providing a GPRS based

interface to access Transport Database(s)

13 Spot Fine Issue Ascertaining ownership of vehicle and issue spot fines for

traffic violations. There would be a facility to issue spot fine

receipts through a hand-held device which would also

enable GPRS based access to Transport database(s).

Constable Suite

14 Beats Management

System

System would aid in noting down beat activities from spot:

The System would allow transfer of beat tickets to

handheld terminals. An application would be residing on

the terminal on which completed beat activities can be

updated by police personnel and this data should be

synchronized with station database at the end of beat duty.

System would provide a mobile interface of functions such

as beat tickets so that it can be accessed by Police

Personnel from the field.

System would have ability to store data fields of voice,

video and images: The Handheld device would be used to

take in details in the form of audio, video or images. The

System’s database should be designed to have these fields

as part of the database structure.

15 Prisoner Escort Module This would present activities to be done by each escort

taking prisoner for court hearing including which route to

take and where to stay overnight if journey is long and so

on.

16 Explosives Check System would provide interface for entering and storing

details of explosives maintained at various shops in a sub-

district. This would be checked periodically by higher

officers.

17 Develop Interface to

access Passport e-seva

module

System would provide interface to access passport e-seva

module and automate the role of police department in

police verification and report submission

Note: Detailed Functional Requirement Specifications are attached as Annexure XII to this RFP

SI will be required to customize the CAS (State) as received from NIC and shall also be responsible for

developing/ deploying other additional Modules meeting the functional requirements mentioned in the

Page 58: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 58 of 302

Functional Requirement Specifications attached as Annexure-XII to this document and other integration

requirements.

SI will be required to develop the following suites modules and functionality in each suite as mentioned

above:

Knowledge Base Suite

Constable Suite

Communication Suite

Traffic Suite

Law & Order Suite

The detailed functional requirements specifications of the above mentioned modules and

services are mentioned in Annexure XII.

Page 59: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 59 of 302

6.2.2 Solution & Technology Architecture

National Crime Record Bureau, Ministry of Home Affairs, Government of India is the driving group

behind the development of Core Application Software at the Central level, therefore Solution and

Technology Architecture has been defined centrally by this group. However, a detailed TO BE state for

the ICT Hardware and solution & technology architecture has been developed for Tamil Nadu Police with

a focus on how the solution will enable the Tamil Nadu Police to provide a consolidated suite of

applications that can seamlessly interface with external sources such as other States, Centre, and other

external agencies.

CCTNS is deployed on a centralized architecture wherein application would be deployed at the State

Data Center and various offices of Police Department will connect to the system through MPLS VPN

Connectivity Option suggested centrally. The overall technology solution would be based upon most

relevant and suitable architecture standards including standards for Service Oriented Architecture

(SOA), XML services & necessary protocols for internet applications, Data Center standards etc.

Deployment Architecture

The proposed overall solution framework for the Department is presented in this section depicting the

overall ‘Big Picture’ of the key target areas of IT initiatives and their inter-relationships. This blue print

would be used as a communication tool that provides a snapshot of the overall goal/ direction to be

taken up for implementation of CCTNS project to which all the stakeholders could relate to, without

getting into the complex details of the internal workings of each of these initiatives. All the modules

depicted in the overall solution framework and explained in detail as part of the Functional Requirement

Specification – provides the overall goal of the Department, including the adoption of core applications

modeled under the CCTNS scheme. It is required that all the additional modules to be developed by SI

should be compliant to DIT, GoI standards and guidelines for open standards. This would enable ease of

interoperability and also be significantly more economical for the Tamil Nadu Police. It is recommended

that SI will opt for Service Oriented Architecture (SOA) for implementing CCTNS application modules.

The SI shall choose the technology such that:

It can help businesses (Police functions) respond more quickly and cost-effectively to changing

market conditions.

It shall promote reuse at the macro (service) level rather than micro (classes) level. It can also

simplify interconnection to - and usage of - existing IT (legacy) assets.

It shall also support the principles of good design: Granularity, interoperability and modularity.

The issues related to performance, manageability, and scalability shall be well addressed and

system shall provide a more manageable system and less contention for resources.

The overall Solution Blue-print of Tamil Nadu CCTNS is depicted in the figure below:

Page 60: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 60 of 302

Users

The users of the application will cut across the hierarchy of the department and would also include

special unit offices. The type of communication shared between the basic unit, viz., police station and the

higher offices including DPO, Range Office and Zonal office would be periodic reviews and abstracts

depicting progress of cases and other activities at the specific police station. Similarly, such reports for

entire district would be prepared by the DCRBx/CCRBx and sent to SCRB or Headquarters for their

review. For special units such as Intelligence, CAARUS could be provided to the individual unit offices

and HQs. The software can be used to enter details of crime cases registered at Q-branch, updation of

case status, etc.

Core Function Business Application Layer

The application would have a core function business application layer which would include the basic

services and functions provided by the CAS (State) application.

Support Function Business Application Layer

The support function business application layer would include the user management and other

administrator level services.

BPR Component Business Layer

Page 61: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 61 of 302

BPR component business layer would include the additional components that would be suggested as

part of process re-engineering which would be loaded in top of state specific CAARUS up-scaled

application.

Database

For the purpose of easier understanding the databases have further been divided into the important

databases. The databases including Missing Persons, Unclaimed Property, FIR/CSR, PCR Call and

Prosecution which would enable the department to provide the core and BPR services in a much more

efficient manner to the various stakeholders.

Security Components

CAS (State) is based on centralized architecture. The various users of the application will be given a role

based access. The users would be able to login to the application using the User ID and password

assigned to them. As this is a web based application the password would not be authenticated on the

users’ system but would be authenticated at the central location. This access would be governed by the

group policy as decided by the department. Therefore the users at a particular level of hierarchy would

get similar screens. The policy would be administered at the centralized location by the administrator of

the application. This role based access would give the users the screens based on their roles. The

application would maintain activity logs and audit trail of each user. The logs would enable senior officers

to find out unauthorized changes to the complaints/FIR. Senior Officer would also be able to see the

entries made by his/her juniors to guide them on the course to be taken for a particular investigation etc.

The functional architecture of the proposed system is illustrated in the figure below:

Page 62: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 62 of 302

6.3 Scope of Services during Implementation Phase

The scope of the “bundled services” to be offered by the SI includes the following:

Project planning and management

Configuration, Rolling out of CAS (State) and Extension (New Modules) of CAS (State), Enable

Data Transfer to CAS (Centre). CAS (State) will be developed for Tamil Nadu in Free and Open

Source Solution (FOSS) Stack by National Informatics Centre (NIC) which would also provide

services to the state police department in a manner similar to that of Software Development

Agency (SDA) engaged by NCRB/MHA at the Centre. The SI is expected to bid with FOSS stack

in the response to this RFP. SI shall procure all the necessary underlying solution components

required to deploy the CAS (State) solution for the State.

Site preparation at the Client site locations (Police Stations, AC Range Offices, Higher Offices of

Commissionerates (ADC,DC,JC,ACOP Offices), Commissionerates, District Police Offices,

ADSP Offices, Range offices, Zones, SCRB, SDPOs, State Forensic Science Lab, State

Fingerprint Bureau, State Police Control Room, District Police Control Room, District HQ and

State HQ) and Data Center.

Site preparation at the Additional Client site locations (Special Unit Police Stations, Special Unit

Police Station HQ, Special Unit Non Police Station Offices, Special Unit Police Station HQ,

Outposts, Intelligence Unit Offices, Intelligence HQ, District Forensic Science Lab, District Single

Digit Fingerprint Bureau and Prisons).

IT Infrastructure at the Client site locations (Police Stations, AC Range Offices, Higher Offices of

Commissionerates (ADC,DC,JC,ACOP Offices), Commissionerates, District Police Offices,

ADSP Offices, Range offices, Zones, SCRB, SDPOs, State Forensic Science Lab, State

Fingerprint Bureau, State Police Control Room, District Police Control Room, District HQ and

State HQ).

IT Infrastructure at the Additional Client site locations (Special Unit Police Stations, Special Unit

Police Station HQ, Special Unit Non Police Station Offices, Special Unit Police Station HQ,

Outposts, Intelligence Unit Offices, Intelligence HQ, District Forensic Science Lab, District Single

Digit Fingerprint Bureau and Prisons).

IT infrastructure at the Data Center and Disaster Recovery Center including the necessary

hardware, software and other networking components.

Data migration and Digitization of Historical Data including digitization of data for Special Unit

Offices

Migration of data from CIPA and CCIS to CAS (State)

Capacity building

Handholding Support

Support to 3rd party acceptance testing, audit and certification

National Service Delivery Gateway (NSDG)/ State Service Delivery Gateway (SSDG): The

System Integrator at the state level shall register as a Service Provider with the NSDG

Or SSDGs on behalf of the respective State Government and provide CCTNS based

Page 63: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 63 of 302

services.Initially if NSDG/SSDG services are not available the CCTNS application shall

access servicesthrough the existing broadband networks and SDA shall develop APIs for

the required departments during CAS development to enable interoperability and

interconnectivity for its eventual integration with NSDG/SSDG. C‐DAC as Gateway

Service Provider of NSDG/SSDG shall provide connectors/Adapters and guidelines for

hosting services through NSDG/SSDG after the SI register as a Service Provider on behalf

of the Tamil Nadu Government.

In implementing the above, the SI shall strictly adhere to the standards set by the MHA, NCRB, and

State.

The project will be managed out of State Nodal Officer’s office in State HQ. At all points in the execution

of the project, key senior resources including the project manager must be based at State Nodal Officer’s

office in State HQ.

6.3.1 Project Planning and Management

This project is a geographically spread initiative involving multiple stakeholders. Its implementation is

complex and though its ultimate success depends on all the stakeholders; the role of SI is key and hence

SI is required to design and implement a comprehensive and effective project management methodology

together with efficient & reliable tools.

To have an effective project management system in place, it is necessary for the SI to use a Project

Management Information System (PMIS). The SI shall address at the minimum the following using

PMIS:

a. Create an organized set of activities for the project

b. Establish and measure resource assignments and responsibilities

c. Construct a project plan schedule including milestones

d. Measure project deadlines, budget figures, and performance objectives

e. Communicate the project plan to stakeholders with meaningful reports

f. Provide facility for detecting problems and inconsistencies in the plan

g. During the project implementation the SI shall report to the State Nodal Officer, on following

items:

(i) Results accomplished during the period;

(ii) Cumulative deviations to date from schedule of progress on milestones as specified in

this RFP read with the agreed and finalized Project Plan;

(iii) Corrective actions to be taken to return to planned schedule of progress;

(iv) Proposed revision to planned schedule provided such revision is necessitated by

reasons beyond the control of the SI;

(v) Other issues and outstanding problems, and actions proposed to be taken;

h. Progress reports on a fortnightly basis

i. Interventions which the SI expects to be made by the State Nodal Officer and/or actions to be

taken by the State Nodal Officer before the next reporting period;

Page 64: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 64 of 302

j. Project quality assurance reports

k. As part of the project management activities, the SI shall also undertake:

i. Issue Management to identify and track the issues that need attention and resolution

from Tamil Nadu Police.

ii. Scope Management to manage the scope and changes through a formal management

and approval process

iii. Risk Management to identify and manage the risks that can hinder the project progress

The Project plan prepared by the SI would be reviewed by the Governance Structure in the State and

approved by the Committee on the advice of the State Mission Team and State Project Management

Unit.

The SI would update and maintain the Project Plan throughout the duration of the engagement. All

changes are to be reviewed and approved by the CAS Core Group.

Requirements Traceability Matrix

The SI would ensure that developed solution is fully compliant with the requirements and specifications

provided in the RFP such as functional, non-functional and technical requirements. For ensuring this, the

SI shall prepare a Requirements Traceability Matrix on the basis of Functional Requirements

Specifications (FRS), Non Functional Requirements Specification, and Technical Requirements provided

by State (updated, expanded and fine-tuned by the SI as necessary) and the System Requirements

Specifications (SRS) prepared by the SI. This matrix would keep track of the requirements and trace

their compliance through different stages of the project including software design, coding, unit testing

and acceptance testing. The Requirements Traceability Matrix would be a live document throughout the

project, with the SI team updating the matrix at every stage to reflect the meeting of each specification at

every stage.

Through the duration of the project, the State Mission Team will periodically review the Traceability

Matrix. State Governance Structure would provide the final approval on the advice of the State Mission

Team and SPMU once they are satisfied that all requirements are met.

Project Documentation

The SI shall create and maintain all project documents that would be passed on to State as deliverables

as per the agreed project timelines. The documents created by the SI will be reviewed and approved by

the Governance Structure Setup in the State. State Mission Team would also approve any changes

required to these documents during the course of the project. State will finally sign-off on the documents

on the recommendation of State Mission Team / SPMU.

Project documents include but are not limited to the following:

Detailed Project Plan

Updated/vetted FRS

SRS document

SDD document

Page 65: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 65 of 302

o HLD documents (including but not limited to)

Application architecture documents

ER diagrams and other data modeling documents

Logical and physical database design

Data dictionary and data definitions

Application component design including component deployment views, control

flows, etc.

o LLD documents (including but not limited to)

Application flows and logic including pseudo code

GUI design (screen design, navigation, etc.)

All Test Plans

Requirements Traceability Matrix

Change Management and Capacity Building Plans

SLA and Performance Monitoring Plan

Training and Knowledge Transfer Plans

Issue Logs

Source Code document and Troubleshooting documents

The SI shall prepare the SDD Document in accordance with the ANSI/IEEE Std 1016-1987

Recommended Practice for Software Design Description.

The SI shall submit a list of deliverables that they would submit based on the methodology they propose.

The SI shall prepare the formats/templates for each of the deliverables upfront based upon industry

standards and the same will be approved by State prior to its use for deliverables.

All project documents are to be kept up-to-date during the course of the project. The SI shall maintain a

log of the internal review of all the deliverables submitted. The logs shall be submitted to State Nodal

Officer on request.

All project documentation shall conform to the highest standards of software engineering documentation.

Procure, Commission and maintain Project Management, Configuration Management and Issue Tracker

Tools at State HQ / SCRB

Project Management Tool: The SI shall keep the project plan and all related artefacts up-to-date during

the course of the project. In order to help with the project management, the SI shall use a suitable

standard, proven off-the-shelf project management tool (preferably with unrestricted redistribution

licenses). The SI shall install the project management software at State’s premises right at the beginning

of the project. The tool shall provide the dashboard view of the progress on project milestones by the

Nodal Officer and other Supervisory Officers of CCTNS.

Configuration Management Tool: The SI shall keep all project documents up-to-date during the course

of the project. In order to help with the version/configuration management for all documents (including

Page 66: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 66 of 302

source code and all other project artefacts), the SI shall use a suitable standard, proven off-the-shelf

configuration management tool (preferably with unrestricted redistribution licenses). The SI shall install

the configuration management software at State’s premises right at the beginning of the project.

Issue Tracker: The SI shall employ a suitable and proven tool for tracking issues (preferably with

unrestricted redistribution licenses) through the execution of the project. The SI shall install the Issue

Tracking System at State’s premises to enable State’s users to access and use the same.

The SI shall procure and commission the required infrastructure (software, servers) for Project

Management Tool, Configuration Management Tool and Issue Tracker tool and maintain the same

through the duration of the project. These tools along with the servers on which they are deployed will

become property of the State and will be used by State even beyond the contract period.

The SI would setup an online repository on PMIS / Configuration Management Tool for providing

centralized access to all project documents including manuals and other materials. The online repository

would be maintained by the SI through the engagement period. The SI should ensure that the repository

is built on appropriate security features such as role- and necessity-based access to documents.

6.3.2 Configuration, Customization, and Extension (New Modules) of CAS (State)

System Study, Design, Application Development and Integration

The SI shall carry out a detailed systems study to refine the Functional Requirements Specifications

provided as Annexure to this RFP and formulate the System Requirements Specifications (SRS)

incorporating the standards and functional specifications provided by the NCRB and the state-specific

requirements. The SI shall also study CAS (State) and CAS (Center) being developed at NIC and NCRB

respectively during the system study phase. The SRS preparation shall take into account the BPR

recommendations suggested by the NCRB / State. The SI should also prepare a detailed document on

the implementation of CAS (State) with respect to configuration and rolling-out of CAS (State) and

extension of new modules as per the requirement of state.

1. Conduct of System Study at the locations earmarked for Pilot Phase. The locations are

mentioned in Implementation Plan in Annexure-XI.

2. Preparation of System Requirements Specifications (SRS) for additional functionalities and

different integration points with CAS (Center), CAS (State) and External agencies.

3. Preparation of CAS (State) implementation document with respect to Configuration, rolling

out and extension of new modules as per the requirement of state.

4. Preparation of the Solution Design

5. Solution Development and/or Configuration and/or Extension as required

6. Development of reports

7. Formulation of test plans and test cases for additional functionalities and different

integrations with external agencies including CAS (Center)

8. Testing of the configured solution (CAS) and additional functionalities.

Enhancements of functions / additions of new modules / services to CAS-State as per state specific

Page 67: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 67 of 302

requirements / integration requirements to various interfaces / SSDGs shall also be incorporated in the

SRS and shall form the scope of work for the SI.

Creation of Test Plans: Once the SRS is approved and design is started, the SI would prepare all

necessary Test Plans (including test cases), i.e., plans for Unit Testing, Integration and System Testing

and User Acceptance Testing. Test cases for UAT would be developed in collaboration with domain

experts identified at state headquarters. The Test Plans also include planning for the testing any

integration with MOB Software, Case Monitoring System, 3rd party COTS solutions, CAS (Center), any

external agencies. The Test Plans should also specify any assistance required from State and should be

followed upon by the SI. The SI should have the Test Plans reviewed and approved by the State Mission

Team/SPMU. The State headquarters will sign off on the test plans on the advice of State Mission

Team/SPMU.

High Level Design (HLD): Once the SRS is approved, the SI would complete the HLD and all HLD

documents of the additional functionalities, integration with CAS Center and external agencies upon the

approved SRS. The SI would prepare the HLD and have it reviewed and approved by the State mission

team/SPMU. The State will sign off on the HLD documents on the advice of State Mission Team/ SPMU.

Detailed (Low Level) Design (LLD): The LLD would interpret the approved HLD to help application

development and would include detailed service descriptions and specifications, application logic

(including “pseudo code”) and UI design (screen design and navigation). The preparation of test cases

will also be completed during this stage. The SI would have the design documents reviewed and

approved by the State Mission Team/SPMU. State headquarters/Nodal officer will sign off on the LLD

documents upon the advice of State Mission Team/SPMU.

Application Development and Unit Testing: The SI would develop the application in accordance with

the approved requirements specifications and design specifications and according to the approved

Project Plan; and carry out the Unit Testing of the application in accordance with the approved test

plans. The SI shall utilize the local language support available in CAS (State) and prepare necessary

configuration files for both CAS and additional functionalities/modules developed as part of CAS.

The SI would also implement the changes proposed in the Change/Reference document to Core

Application Software and carry out a thorough regression testing including running some of the

previously executed scripts for the functionality from the traceability matrix provided by NCRB/State.

The SI shall also develop a Data Migration Utility/application for the additional functionalities with all the

formats and tools to load the data into the state databases. This will migrate data from legacy systems of

the new modules to the CAS databases. This would be in addition to Migration utility developed by NIC

for migration of data as mandated by MHA requirements.

The user acceptance testing and fine-tuning of the application would be at State Headquarters premises.

Also, the key senior resources would continue to be based onsite at State Headquarter premises.

Page 68: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 68 of 302

Configuration of CAS (State): The SI shall configure CAS (State) to the requirements of the State that

include but not limited to:

1. Configuring users

2. Configuring Police Stations / Higher Offices

The collection and validation of the data required for the configuration of the CAS (State) shall be the

responsibility of the SI.

Setup of Technical Environment at State Headquarters: The SI shall procure, setup and maintain the

required software and the infrastructure for systems testing, functional testing and User Acceptance

Testing; and training activities within State Headquarter premises; and for any other activities that may

be carried out of State Headquarter premises such as issue management (Issue Tracker), document

repository (configuration management tool), etc.

Regression, Integration, System and Functional Testing: After successful unit testing of all

components, the SI would conduct full-fledged integration testing, system testing and functional testing in

accordance with the approved Test Plans for the configured/customized CAS (State), additional

functionalities and also integration with CAS (Center) and external agencies. This would include

exhaustive testing including functional testing, performance testing (including load and stress), scalability

testing and security testing. Functional testing will be led by the SI’s experts.

A thorough regression testing should be conducted for those functionalities identified in

Change/Reference document to provide a general assurance that no additional errors have cropped up

in the process of addressing the customizations and/or Extensions. Customized CAS (State) Integrations

with CAS (Center) and with any external agencies should be thoroughly tested.

Making all necessary arrangements for testing including the preparation of test data, scripts if necessary

and setup of test environment (across multiple platforms) shall be the responsibility of the SI.

The SI along with State Mission Team/ SPMU should take the responsibility in coordinating with NCRB

and other external agencies for a smooth integration.

Test Reports: The SI shall create test reports from testing activities and submit to State Mission

Team/SPMU for validation

Test Data Preparation: The SI shall prepare the required test data and get it vetted by State Mission

Team/SPMU. The test data shall be comprehensive and address all scenarios identified in the test

cases. The SI should also prepare the test data for all required integrations including CAS (Center) and

external agencies.

User Acceptance Testing (UAT): Test Plans for UAT would be prepared by the SI in collaboration with

the State Mission Team /SPMU domain experts. The SI will plan all aspects of UAT (including the

preparation of test data) and obtain required assistance from State Headquarters to ensure its success.

State Mission Team/SPMU will assemble representatives from different user groups based on inputs

Page 69: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 69 of 302

from the SI and would facilitate UAT. The SI would make the necessary changes to the application to

ensure that CAS successfully goes through UAT.

It is mandatory for SI to incorporate/consider test cases as part of UAT test cases for those customized

and/or extensions and/or configured functionalities identified from traceability matrix provided by NCRB /

State.

Page 70: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 70 of 302

6.4 Infrastructure at the District Training Centers

District Training Centres have been set up in each of the District Headquarters by SCRB through

provision of the necessary infrastructure required to provide training to the identified district personnel.

Similarly, training infrastructure has been provided at SCRB Training Centre and 15 other Training

institutions in the state including Police Recruit Schools, Police Computer Communications Centre,

Police Training Headquarters and Police Academy. The details of infrastructure that have been

provided in each of these training institutions are mentioned below:

Infrastructure at Training Institutions in Tamil Nadu District Training Centre

Item Qty

Desktop PCs 11

MFP 1

UPS (5 kVA) 1

LCD Projector and Screen mounted 1

Site Preparation (LAN) 1Air Conditioner 1

Computer Table 10

Computer Chair 11

White Board 1

1.5 Tonne Split Air conditioner 1Broad band connectivity with 1 year rent (with rent free land line) without static IP

1

Mike and amplifier with two speaker 1Plastic Chair 15

Digicam (10 MP) 1

External hard disk 1

Vacuum Cleaner 1

SCRB Training Centre

Item Qty

Desktop PCs 10

Laptop 6

MFP 1

UPS (5 kVA) 1

LCD Projector and Screen mounted 1

Site Preparation (LAN) 1

Air Conditioner 1

Computer Table 10

Computer Table (Big) 1

Computer Chair 11

Book Shelves 1

White Board 1

Page 71: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 71 of 302

LCD 50 inch TV 1

Other State Training Institutes

Item Qty

Desktop computers 20

Laptop 1

High end Server 1

External hard Disk (500 GB) 1

Multifunction Printer 1

UPS (5 KVA) 2

LCD Projector and screen mounted 1

Air Conditioner (Split 2 ton) 1

Computer Table 21

Computer Table (Big) 1

Computer Chair 21

Book Shelves 1

Electronic Clock 1

Biometric Device 1

White Board 1

Site preparation (LAN) 1

6.5 Site Preparation at Police Stations and Higher Offices

The SI is expected to prepare the client sites for setting up the necessary client site infrastructure. Site

preparation at Police Stations & Higher Offices will include but not limited to:

a) Provision of Local area network (LAN cables, LAN ports, etc.)

b) Provision of computer furniture for Police Stations

c) Ensure adequate power points in adequate numbers with proper electric-earthling

d) Earthing and electric cabling as required at the site

In addition to the above Supply and fixing of furniture like computer tables, chairs and other item shall

be carried out to ensure successful site preparation and installation of CCTNS at every access location.

Site Preparation shall cover all the activities necessary to enable the Police Station to setup the client

side infrastructure and operate on CCTNS. The SI would have to do site preparation for the client site

locations and additional locations, requirements of which are described in Annexure-XI

6.6 Infrastructure at the Client Side Locations

The premises for offices will be provided by the department at respective locations. The list of Police

Stations, Sub-divisions, and other locations where the infrastructure is required is provided under the

Geographical Scope Section. SI shall procure the CCTNS infrastructure required at the locations

statewide.

Page 72: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 72 of 302

At each such location the following shall be carried out.

1. Supply of the hardware, software, networking equipments, UPS, inverter to the location

as per the requirements

2. Redundant Network Connectivity - Ensuring last mile connectivity and testing. (At some

locations SWAN may be available. SI shall ensure there is redundancy in the

connection)

3. Installation, Testing and Commissioning of UPS, Inverter

4. Physical Installation of Desktops, Printer, Scanner, MFD, Switch- Connecting

peripherals, devices, Plugging in

5. Operating System Installation and Configuration

6. Installation of Antivirus and other support software if any

7. Configuring the security at the desktops, switch and broadband connection routers

8. Network and browser Configuration

9. Test accessibility and functionality of CCTNS application from the desktops

10. Ensuring all the systems required are supplied, installed, configured, tested and

commissioned and declaring the site to be operational.

11. In addition to the above supply and fixing of furniture like computer tables, chairs

and other items shall be carried out to ensure successful site preparation and installation

of CCTNS at every location

CCTNS application will be accessed and used at various access locations across the state like

Police Stations, Sub Division office, District Office and other higher offices. The Bill of Materials for

client site locations and additional locations are described in Annexure-III and IV respectively.

6.7 Network Connectivity for PS & Higher Offices

The WAN connectivity for the CCTNS project will be provided by BSNL through MPLS VPN

connectivity at select offices till district headquarters level and VPN on Broadband for rest of the offices

beyond district. However, SI will be responsible for setting up and maintenance of LAN at the individual

offices.

The SI shall provide the connectivity to the Police Stations / Higher Offices in coordination with BSNL.

Guidelines on Network architecture and details provided by BSNL with respect to connectivity are

provided in Annexure-VII.

The scope of network connectivity and the technical bill of materials are provided in Annexure-VII and

VIII respectively.

6.8 IT Infrastructure at the Data center and Disaster Recovery Center

The SI shall provide system integration services to procure and commission the required software and

infrastructure at the State Data Centre and Disaster Recovery Centre, deploy the configured and

Page 73: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 73 of 302

customized CAS (State), additional modules developed, and integrate with CAS (Centre) and any

External Agencies as provided in the functional scope.

The SI shall be completely responsible for the sourcing, installation, commissioning, testing and

certification of the necessary software licenses and infrastructure required to deploy the Solution at the

State Data Centre and at the Disaster Recovery Centre (DRC).

CAS (State) will be developed in FOSS stack by NIC. NIC is also expected to develop interface to

enable data transfer between CAS State and CAS Centre. SI shall procure all the necessary

underlying solution components required to deploy the CAS (State) solution for the State.

Tamil Nadu State Data Centre would be the premises for the Primary Data Centre (DC) which would

host the solution. The corresponding Disaster Recovery Centre (DRC) would be positioned at Kerala

SDC, Trivandrum. The SI would work with BSNL to provide connectivity between the DC and DRC and

also provide connectivity from DC to NCRB Data Centre. The SI is responsible for sizing the hardware to

support the scalability and performance requirements of the solution. The SI shall ensure that the

servers and storage are sized adequately and redundancy is built into the architecture that is required to

meet the service levels mentioned in the RFP.

The SI shall be responsible for the sizing of necessary hardware and determining the specifications of

the same in order to meet the requirements of State.

SI shall provide a Bill of Material that specifies all the hardware, software and any additional networking

components of solution for the State Data Centre and DRC, in detail so as to facilitate sizing of common

Data Centre and DRC infrastructure such as Racks, Power and Cooling, Bandwidth among other

components. The common DC and DRC infrastructure shall be provided by State.

SI shall ensure that effective Remote Management features exist in solution so that issues can be

addressed by the SI in a timely and effective manner; and frequent visits to Data Centre /DRC can be

avoided.

After commissioning and testing of the entire system at State Data Center / DRC, the SI shall support the

State in getting the system certified by a 3rd party agency identified by State.

The following common data Centre services will be available to the SI through the Data Centre Operator

/ Data Centre Service Provider (DCO):

1. Power and Cooling

2. UPS, Inverter Back-up

3. Common Firewall

4. Fire prevention

5. Physical security & Surveillance

6. Network Operation Centre

7. Data Centre Physical Maintenance and Support

Page 74: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 74 of 302

The SI is responsible for the below at the Data Centre / DRC:

1. Racks

2. Servers (Web, Application, Database, Backup, Antivirus, EMS, etc.)

3. Enterprise Management System (EMS) Licenses

4. Licenses for Compliance Management, Web Access Management, Privileges Users

Management for Server Access Control

5. Antivirus Software

6. SAN Storage

7. Tape Library

8. Separate VPN for CCTNS Servers

9. All necessary software components including but not limited to Operating System, Backup

Software, and SAN Storage Management Software

10. IT Management of CCTNS Servers

SI shall procure licenses for the EMS tool that monitors / manages the entire enterprise wide application,

infrastructure and network related components. The SI shall also deploy a backup software to

periodically backup all data and software.

The indicative specifications for the Web Server, Application Server, Database Server and Networking

components are provided in Annexure-VII.

6.9 Data Digitization & Data Migration

Data Migration

Migrating the data from the other systems/manual operations to the new system will include identification

of data migration requirements, collection and migration of user data, collection and migration of master

data, closing or migration of open transactions, collection and migration of documentary information, and

migration of data from the legacy systems.

The SI shall perform the data digitization & migration from manual and/or the existing systems to

the new system. The Data digitization & migration to be performed by the SI shall be preceded by an

appropriate data migration need assessment including data quality assessment.

The Data migration strategy and methodology shall be prepared by SI and approved by State. In case

these have already been prepared by the SPMC, the SI can take the SPMC’s documents as inputs and

add / modify as necessary. Though State is required to provide formal approval for the Data Migration

Strategy, it is the ultimate responsibility of SI to ensure that all the data sets which are required for

operationalization of the agreed user requirements are digitized or migrated.

Any corrections identified by SCRB, Tamil Nadu, during Data Quality Assessment and Review, in the

data digitized/ migrated by SI, shall be addressed by SI at no additional cost to Tamil Nadu Police. So far

as the legacy data is concerned, they are either available as structured data in the IT systems that are

Page 75: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 75 of 302

currently used by Tamil Nadu Police for related work or in the form of paper documents (Cases

Documents and Police Station Registers). Almost all of such data items relevant for a Police Station are

maintained at the same Police Station.

Data Migration Requirements

i. Since there could be structural differences in the data as stored currently from the new

system there should be a mapping done between the source and target data models

that should be approved by the Nodal Officer, CCTNS

ii. Carry out the migration of legacy electronic data

iii. Carry out the migration of the data available in the existing registers, reports, case

files, etc.(Physical Copies)

iv. Scan images and pictures within the case file in color and store them in the digital

format.

v. Provide checklists from the migrated data to State Nodal Officer for verification, including

number of records, validations (where possible), other controls / hash totals. Highlight

errors, abnormalities and deviations.

vi. Incorporate corrections for the errors discovered during verification process, as

proposed

vii. Get final sign off from State Nodal Officer/ Empowered Committee for migrated /

digitized data

viii. At the end of migration, all the data for old cases and registers must be available in the

new system

Scope of Data Migration: The state requirements for data migration can be classified into 2 types:

a. Migrate Legacy data from legacy State Specific Applications to CAS( State) database

using the Migration Tool to be provided by NIC

b. Transfer data from CAS (State) database to CAS (Centre) in the prescribed format using

the Migration Tool to be provided by NIC

Recommended Methodology of Data Migration: Data migration methodology will comprise the

following steps, explained as below. However this is just a guideline for data migration effort and the SI

will be required to devise his own detailed methodology and get it approved by State Nodal Officer.

1. Analysis

Analysis of the legacy data and its creation, conversion, migration and transfer to the proposed new

data base schema will be started during the scoping phase and shall take a parallel path during the

design and development phase of the application. It will cover the following steps:

a. Analyze the existing procedures, policies, formats of data in lieu of the new proposed

system to understand the amount of the data and the applicability in CCTNS

b. Write a specification to create, transfer and migrate the data set

c. Document all exceptions, complex scenarios of the data

d. This phase will generate the specification for Data Take–On routines

Page 76: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 76 of 302

2. Transformation

Transformation phase can be commenced after integration testing phase. It will entail the following

steps:

a. Identify the fields, columns to be added/deleted from the existing system

b. Identify the default values to be populated for all ‘not null’ columns

c. Develop routines to create (Entry if any by data entry operators), migrate, convert the

data from hard copies, old database (if any), computer records to the new database

d. Develop test programs to check the migrated data from old database to the new

database

e. Test the migration programs using the snapshot of the production data

f. Tune the migration programs & iterate the Test cycle

g. Validate migrated data using the application by running all the test cases

h. Test the success of the data take-on by doing system test

3. Data Take–On

Take–On phase will be initiated when the proposed solution is ready to be deployed. It will entail the

following steps:

a. Schedule data transfer of the computerized data that has been newly created by the

data entry operators based on the hard copy records.

b. Schedule data transfer of the existing digital data in the proposed new format

c. Migrate the data from an old system (legacy) to the envisaged database

d. Test on the staging servers after the data take-on with testing routines

e. Migrate from staging servers to production servers

f. Deploy and rollout the system as per the project plan

Additional Guidelines for Data Migration

1. SI shall migrate/convert/digitize the data at the implementation sites of State.

2. SI shall formulate the “Data Migration Strategy document” which will also include internal

quality assurance mechanism. This will be reviewed and signed–off by State prior to

commencement of data migration.

3. SI shall incorporate all comments and suggestions of State in the Data Migration Strategy

and process documents before obtaining sign–off from State.

4. SI shall perform mock data migration tests to validate the conversion programs.

5. SI shall ensure complete data cleaning and validation for all data migrated from the

legacy systems to the new application.

6. SI shall validate the data before uploading the same to the production environment.

7. SI shall generate appropriate control reports before and after migration to ensure

accuracy and completeness of the data.

8. SI shall convey to State in advance all the mandatory data fields required for functioning

of the proposed solution and which are not available in the legacy systems and are

required to be obtained by State.

9. In the event State is unable to obtain all the mandatory fields as conveyed by SI, SI shall

suggest the most suitable workaround to State. SI shall document the suggested

Page 77: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 77 of 302

workaround and sign-off will be obtained from State for the suggested workaround.

10. SI shall develop data entry programs / applications that may be required for the purpose

of data migration in order to capture data available with / obtained by State in non –

electronic format.

11. SI shall conduct the acceptance testing and verify the completeness and accuracy of the

data migrated from the legacy systems to the proposed solution.

12. State may, at its will, verify the test results provided by SI.

Data Digitization

In addition to the data migration SI would also digitize the historical data (covering the last 10 years).

The historical data to be digitized would include crime (case/incident) data, criminals’ data, the

data from the 7 IIFs and relevant historical information parameters/data used to generate registers

and reports. The unit of data digitization shall be one case file. Each case file shall consist of

information pertaining to all 7 IIFs, information parameters relevant to generate specific registers from

that case file and information parameters relevant to generate specific reports from that particular

case file.

Scope of Data Digitization: The state requirements for digitization can be classified into 2 types:

a. Digitization of Case Files: The following number of records pertaining to case files

maintained at Police Stations across the state should be digitized

S.No Registers/Form Name Number of Records

1 Number of Case Files(All types) 34,84,815

b. Digitization of Registers: The following registers maintained at different offices should be

digitized on a page basis. The mode of digitization could be data entry of scanning and the

SI would have to digitize the specific records in the specified mode. The list of registers to be

digitized across offices is mentioned below:

S.No Office Registers/Form Name Number of Pages

Type

1 DPO/CPO/Chief Office/Special Units

Sanctioned strength Permanent Estt. Register Temporary Estt. Register

10,000 Data Entry

2 Post Sanction G.O.s 10,000 Scanning

3 Personnel Data Service Book

10,00,00 Data Entry

4 M.T.Register 12,000 Data Entry 5 Vehicle Sanction G.O.s and

allotment order 15,000 Scanning

6 Personal files 2,50,000 Scanning

7 Line Hut, Land / Building Registers

10,000 Data Entry

8 Land / Building - Sanction G.O.s

10,000 Scanning

Page 78: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 78 of 302

S.No Office Registers/Form Name Number of Pages

Type

9 Govt. Property Register for Furniture, Equipments, Arms and Ammunitions

10,000 Data Entry

10 Long Rolls 25,00,000 Scanning

11 Recorded Disposals 25,00,000 Scanning

12 R.Dis / D.Dis only 10,000 Scanning

13 Police Stations FIR Index 9,00,000 Data Entry

14 Crime Abstract Data Entry

15 Part I 3,00,000 Data Entry

16 Part II 2,000 Scanning

17 Part III 1,05,000 Data Entry

18 Part IV 30,000 Data Entry

19 15,00,000 Scanning

20 Part V 45,000 Data Entry

21 13,50,000 Scanning

22 General Conviction Register 1,40,000 Scanning

23 Station Information Register 30,000 Scanning

24 Circle Office Circle Information Register 30,000 Scanning

25 Circle Map 300 Scanning

26 Government Property Register 600 Data Entry

27 SDO/Range Office

Information Register 25,000 Scanning

28 Govt. Property Register 250 Data entry

29 GCR [Grave Crime Report] 25,000 Data entry

30 Explosive Register 416 Data entry

31 Cracker Shop Register 416 Data entry

32 P.R. Register 4,160 Data entry

33 SP Camp Office Records

Correction Nos.1 to 4 to the distribution list of officers using the Civil Cipher System – 1981 Copy No.1457.

Scanning

34 Cryptographic Regulations, Part-IV-Miscellaneous Crypto Systems Vol.-I –Civil Cipher. Copy No.1739.

Scanning

35 Consolidated General instructions for the Civil Cipher System (CCS) Part-I For all sholders. Copy No.1641.

Scanning

36 Rules and instructions for the protection of the president When in Delhi and on tour 1977 – Copy No.231.

Scanning

37 State War Book (Tamil Nadu) Revised in 1996 PREFACE AND APPENDICES. Copy

Scanning

Page 79: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 79 of 302

S.No Office Registers/Form Name Number of Pages

Type

No.70.

38 Guidelines for personal security, Escort personnel and drivers, driving vehicles of persons with security Threats and Check lists for the Security arrangements for the Prime Minister and Chief Minister of Tamil Nadu. Copy No.29.

Scanning

39 Circular Memorandum in C.no. SCA 1 No.8430 Dated:- 13.08.1999 for VVIP Security – Booklet on Security arrangements to VVIPs/VIPs. Copy No.29.

Scanning

40 Tamil Nadu Railway Protection Scheme-2003. Copy No.40.

Scanning

41 Social Justice CID, Chennai – Manual for use in the Districts – Copy No.000011.

Scanning

42 Security Arrangements for protection of individuals (YELLOW BOOK) Copy No.1327.

Scanning

43 Rules and Instructions for the Protection of the Prime Minister When on Tour and Travel. Copy No.459.

Scanning

44 Circular Memorandum in C.no. C1 No. 5500/X/2006/C Dated:- 29.03.2006, AND OVERVIEW OF THE LEFT WING EXTREMISM – 2005. Copy No.58.

Scanning

45 Distribution List of Officers Using the Civil Cipher System – 2004. Copy No.525

Scanning

46 Government Mobile phone Nokia – Model No.6610.

Scanning

47 CIVIL CIPHER SYSTEM – Introduction of Tamil Nadu State Keyword No.1/2007 of the Civil Cipher System from 1.6.2007.

Scanning

48 CIVIL CIPHER SYSTEM – Introduction of “Tamil Nadu State Keyword No.1/2008 of the Civil Cipher System from 01.06.2008.

Scanning

49 The Tamil Nadu Political who’s who – 2005.

Scanning

Page 80: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 80 of 302

S.No Office Registers/Form Name Number of Pages

Type

50 New Southern Railway Strike Scheme-2007 ( Copy No. 483)

Scanning

51 DIN series documents No.2 & 3 of WAR WATCHING STATIONS (COPY NO. 157 & 207)

Scanning

52 A Study of security arrangements for protection of individuals. (Copy No.734

Scanning

Note: SCRB reserves the right to consider in part or omit all the requirements mentioned under additional locations to be covered

6.10 Migration of Data from CIPA and CCIS to CAS (State)

The SI is also responsible for migrating the Police Stations and Higher Offices currently

operational on CIPA and CCIS to CAS (State) as part of the CCTNS implementation in the State. SI

shall validate the data in the CIPA systems and migrate the data to CCTNS. In addition, the State may

also decide to cover other applications currently being used under this data migration and

integration effort if felt necessary.

Detailed list of Police Stations running CIPA along with the data to be migrated is enclosed as

Annexure-IX for the list of CIPA Police Stations

6.11 Capacity Building

The following steps are postulated for identifying trainers for providing capacity building to the identified

work force involving officials across all levels:

Identification of Trainers (Internal)

SCRB, Tamil Nadu shall identify qualified Trainers with relevant IT experience and training

competency within each District Mission Team and State Mission Team who will be directly

trained by the System Integrator and will be responsible for interfacing with the System Integrator for all

the Capacity Building Initiatives. These Trainers will be responsible for implementing the Capacity

Building interventions beyond the scope of the System Integrator.

Identification of Trainers (Police Training Colleges)

SCRB shall identify the Trainers within each of the Police Training Colleges in the State who will

be directly trained by the System Integrator. These trainers will be responsible for including training on

CCTNS within the training college curriculum and impart the training on CCTNS to the new recruits and

current personnel (refresher training) at the Police Training Colleges.

Identification of Trainees

Based on the nature of their responsibilities and their requirements from CCTNS, police staff can be

classified into the following categories for training purposes:

Page 81: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 81 of 302

Group I:

o Identify the key senior officers (ADGP, IG, DIG) responsible for Crime, Law and

Order, who are directly impacted by the CCTNS with respect to receiving/analyzing

the reports through CCTNS.

o Role-based training will be carried out for these officers at suitable location in the

State Headquarters by the System Integrator

Group II:

o Identify the key officers (IG, DIG, SP, DCP, ACP) in charge of a

zone/range/district/sub-division who are directly impacted by the CCTNS with respect

to reviewing the police station performance through CCTNS, reviewing the

reports generated by the system, carrying out the required analysis using CCTNS

and providing the necessary guidance to the officers at the cutting edge.

o Role-based training will be carried out for these officers at suitable location in the

State Headquarters and respective Districts/Commissionerates by the System

Integrator

Group III:

o Identify the key officers (SHO, SI) in the Police Stations and Higher Offices who

will use CCTNS for police station management, filing the necessary investigation

forms, and utilize the basic and advance search features of CCTNS to facilitate their

investigation process.

o In addition to the computer awareness training, role-based training will be carried out

for these officers at District Training Centers in the respective Districts/

Commissionerates by the System Integrator

o Refresher training can be carried out by the internal trainers subsequent to the

System Integrator trainings

Group IV:

o Identify at least 2-3 key officers/constables (Station Writers, Court Duty, Head

Constables, Constables,) in each of the Police Stations and Higher Offices who will

use CCTNS for capturing the data/investigation forms, generating the reports and

utilize the basic and advance search features of CCTNS to service the general

service requests and aid in investigation process.

o Role-based training will be carried out for the identified officers at District Training

Centers in the respective Districts/Commissionerates by the System Integrator

o Refresher training, subsequent training to the remaining officers/constables in the

Police Station and Higher Offices can be carried out by the internal trainers

subsequent to the System Integrator trainings

Group V:

o Identify 2 constables for each Sub-division/Circle Office that can provide the basic

computer operation support to the police stations within the Sub-division/Circle.

o Technical training will be carried out for the identified constables at District

Training Centers in the respective Districts/Commissionerates by the System

Integrator

Page 82: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 82 of 302

The main challenges to be addressed effectively by the SI are the geographically dispersed

trainee base, wide variability in education and computer proficiency and minimal availability of time.

The SI holds the responsibility for creation of a detailed and effective training strategy, user groups and

classifications, training plan and guidelines, detailed training material, training program designed

their delivery to the target groups.

The SI holds the responsibility for creation of training material, designing the training programs and

their delivery to the target group. The State SI shall be responsible for the following activities as part of

the End User and Train the Trainer Training:

Develop Overall Training Plan

SI shall be responsible for finalizing a detailed Training Plan for the program in consultation with SCRB,

Tamil Nadu covering the training strategy, environment, training need analysis and role based training

curriculum. SI shall own the overall Training plan working closely with the SCRB, Tamil Nadu Training

team. SI shall coordinate overall training effort.

Develop District-Wise Training Schedule and Curriculum

SI shall develop and manage the District-Wise training schedule in consultation with SCRB, Tamil

Nadu, aligned with the overall implementation roadmap of the project and coordinate the same with

all parties involved. Training schedule shall be developed by solution and shall be optimized to reduce

business impact and effective utilization of Training infrastructure and capacities. The training

curriculum for the CCTNS training program should be organized by modules and these should be

used to develop the training materials. The training curriculum outlines the mode of delivery, module

structure and outline, duration and target audience. These sessions should be conducted such that the

users of the application/modules are trained by the time the application “goes-live” in the District with

possibly no more than a week’s gap between completion of training and going live of modules.

Continuous reporting (MIS) and assessment should be an integral function of training. SI shall also

identify the languages to be used by the end-user for entering data and ensuring multi-language

training to the end users as per requirement.

Develop Training Material

Based on their needs and the objectives of CCTNS, training programs could be organized under the

following themes:

1. Role-based training on the CCTNS application – Basic and Advanced. This training

should be in a role based, benchmarked and standardized format, multi-lingual and lead

to learning completion and assessment. It should also allow for self-learning and

retraining. Training would include mechanism for demonstration using

audio/video/simulated/demo practice exercises and evaluation of trainees.

2. “Train the Trainer” programs, where members of the police staff would be trained to

enable them to conduct further training programs, thus helping build up scalability in the

training program and also reducing the dependency on external vendors for training.

3. System Administrator training: a few members of the police staff with high aptitude

would be trained to act as system administrators and troubleshooters for CCTNS.

Page 83: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 83 of 302

4. Customization of the Training Manuals, User Manuals, Operational and Maintenance

Manuals provided along with the CCTNS CAS Software

5. Design and development of the Training Manuals, User Manuals, Operational and

Maintenance Manuals for the modules developed at the State level.

In cases where the training material may be made available by MHA/NCRB, it is the SI’s

responsibility to ensure the relevance of the material to the State, customize if necessary and own up

the delivery and effectiveness.

SI shall ensure that the training content meets all the objectives of the training course. The

material shall be developed in English and Tamil. SI shall also develop the training material for delivery

through Computer Based Training, Instructor Led Training, Online User Material/Help Manuals and Job

Aids.

SI shall provide detailed training material providing step-by-step approach in soft and hard copies to all

police stations and offices for reference.

Deliver Training to End Users

SI shall deliver training to the end users utilizing the infrastructure at the District Training Centers. Role-

based training for the Senior Officers will be carried out for at suitable location in the State

Headquarters by the System Integrator.

SI shall also impart simulated training on the actual CAS (State) with some real life like database. The

SI should create case studies and simulation modules that would be as close to the real life scenario as

possible. The objective of conducting such trainings would be to give first had view of benefits of using

CAS system. Such specialized training should also be able to provide the participant a clear

comparison between the old way of crime and criminal investigation against the post CCTNS

scenario. This training needs to be conducted by the SI at the very end when all the other trainings

are successfully completed. This training may seem similar to role play training mentioned in the

section above however, in this simulated training, the SI would ensure that the IO’s are provided an

environment that would be exactly similar at a Police Station post CAS (State) implementation.

Most of the training would be an Instructor-Led Training (ILT) conducted by trained and qualified

instructors in a classroom setting. To maintain consistency across CCTNS trainings, standard

templates should be used for each component of a module.

An ILT course will have the following components:

Course Presentation (PowerPoint)

Instruction Demonstration (CAS - Application training environnent)

Hands-on Exercices (CAS - Application training environnent)

Application Simulations: Miniature version of CAS Application with dummy data providing

exposure to the IOs to a real life scenario post implementation of CAS

Job Aids (if required)

Page 84: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 84 of 302

Course Evaluations (Inquisition)

In addition to the ILT, for the modules that may be more appropriate to be conducted through a

Computer Based Training (CBT), a CBT should be developed for them. CBT should involve training

delivered through computers with self instructions, screenshots, simulated process walk- through and

self assessment modules.

Select set of police staff with high aptitude group and/or relevant prior training, are to be imparted with

the training/skills to act as system administrators and also as troubleshooters with basic systems

maintenance tasks including hardware and network.

Deliver Training to Trainers (Internal and Trainers from the Training Colleges)

SI shall help SCRB, Tamil Nadu in assessing and selecting the internal trainers as well as the

trainers at training colleges who can conduct the end user training subsequent to the training by the SI.

SI shall coordinate the ‘Train the Trainer’ session for the identified trainers to ensure that they have the

capability to deliver efficient training.

In addition to the training delivered to the end-users, the trainers should also be trained on effectively

facilitate and deliver training to end users. Also, it is advisable to always run pilots for any training

program before deployment. This training will hence serve as the pilot and as a training session for

trainers as well. In addition the end-user training sessions, ToT training will consist of three segments:

1. The first segment will be set of workshops covering effective presentation skills and

coaching techniques and discussing the benefits and structure of the trainer model.

2. The second segment will be the formal CCTNS training which will consist of all modules of

CCTNS relevant for their role.

3. The third segment will be a teach-back session where trained trainers will present course

content and receive feedback regarding content, flow, and presentation techniques. This will

also include a feedback session where trainers can provide feedback on the training materials,

flow, comprehension level, and accuracy.

Training Effectiveness Evaluation

SI shall evaluate the effectiveness of all end users trainings using electronic or manual surveys. SI

shall be responsible for analyzing the feedback and arrange for conducting refresher training, wherever

needed.

State will periodically monitor the training effectiveness through the performance metrics and Service

levels and the SI shall comply with the same.

SI shall help the State with complete Change Management exercise needed to make this project a

success. In fact Change Management will have to subsume ‘training’ as a key enabler for change.

Following outlines the responsibilities of SI with respect to designing and implementation of change

management plan for the Project.

Change management

Page 85: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 85 of 302

Stakeholder groups can be categorized into below categories, based on their influence and role in

managing the change and making it successful:

Group I: Identify the key senior officers (ADGP, IG, DIG) responsible for Crime, Law

and Order, who are directly impacted by the CCTNS with respect to receiving/analyzing

the reports through CCTNS.

Group II: Identify a few of the key officers (IG, DIG, DCP, ACP, SP) in charge of

a zone/range/district/sub-division who are directly impacted by the CCTNS with respect

to reviewing the police station performance through CCTNS, reviewing the reports

generated by the system, carrying out the required analysis using CCTNS and providing

the necessary guidance to the officers at the cutting edge.

Group III: Identify a few of the key officers (SHO, SI,…) in the Police Stations and

Higher Offices who will use CCTNS for police station management, filing the necessary

investigation forms, and utilize the basic and advance search features of CCTNS

to facilitate their investigation process.

Group IV: Identify a few of the key officers/constables (Station Writers, Court Duty,

Head Constables,etc.) in the Police Stations and Higher Offices who will use

CCTNS for capturing the data/investigation forms, generating the reports and utilize the

basic and advance search features of CCTNS to service the general service requests

and aid in investigation process.

Communication and Awareness

Communication & Awareness campaigns will be conducted throughout the duration of the

implementation of the CCTNS project across the State at Project, Program level as well as for

General awareness. SI shall work with the identified internal change agents (identified from the

District and State Mission Teams) for all the Communication and Awareness Programs. SI shall utilize

existing channels of communication and at the same time use innovative methods of communication

for effectiveness. SI should ensure that the communication messages are consistent, continuous and

easy to understand and wherever possible in Tamil using all available channels. SI shall align

communication content, timing and delivery to the deployment phases/plan of each solution.

S. No

Activities Details Frequency

1 Develop detailed communication plan

SI shall prepare a detailed communication plan for the program in line with the implementation timelines of each solution

SI shall ensure that all the impacted audience is covered in the communication plan and the most appropriate mode of communication is being used to deliver the messages to the target audience

Once

Page 86: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 86 of 302

S. No

Activities Details Frequency

2 Develop Communication Content

SI shall be responsible for developing the content for communication material in English and Tamil.

SI shall ensure that the communication is simple, continuous and consistent.

Recurring Activity over the entire duration of the SI

3 Deliver Communication Events

Prior to implementing the plan, the SI shall obtain the necessary sign-offs from State on the Communication Strategy & plan and make necessary changes as recommended by State.

SI shall determine who needs to approve communications prior to dissemination, who is responsible for distributing the message, and who is responsible for ensuring that those accountable for specific elements of the plan follow through on their responsibilities.

SI shall organize the communication events or interventions for the target audience.

• SI shall ensure consistency between messages delivered via different interventions, since the engagement of a key individual stakeholder or stakeholder group is an integrated effort, aiming at the same objective.

Recurring Activity (once a month) over the entire duration of the SI

Change Management Workshops SI shall conduct Change Management workshops, build appreciation of change management and

develop change leadership across the stakeholder groups. SI shall design the necessary content

(reading material, presentations) in English and Tamil for the Change Management Workshops. SI

shall conduct at least three Change Management Workshops (minimum of one-day) in the State

Headquarters and at least one Change Management Workshop (minimum of one-day) all of the

Districts (at the District Headquarters) covering at least 3 officers/constables (SHO, SI/HC, and

Station Writer) from each police station in the district.

The SI is required to conduct the Change Management Workshops for all the identified Police

personnel in a phased manner in line with the overall implementation plan. These workshops

shall be conducted at the locations provided by the State. The workshop content & material shall be

designed with specific focus on the requirements of the personnel. SI shall conduct workshops for

Page 87: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 87 of 302

each group of personnel in sync with the training plan and as part of the training module. SI is

required to provide the necessary material for the workshops including presentations, training material

etc in both soft and hard copy formats.

SI shall also associate and train the identified internal change agents (identified from the District and

State Mission Teams) during these workshops so that subsequent workshops can be conducted by

the internal change agents. It is recommended that a change management team be formed to own, facilitate and execute change

management intervention. The change management structure will consist of a two-tier governance

structure, Viz., Top level governance structure – Steering committee and task force and Operational

Team

Change Management Organization

The Operational team would be entrusted with carrying our change management activities in the

districts. The team would comprise of change management experts, to be identified and deployed by

SI, District Mission Teams and Range DIG who would monitor the process and would be responsible

for the change management implementation in the concerned districts. There would be a Change

Management team of SI, one for each zone, which would be responsible for carrying out Change

management activities in all districts under the zone. The Operational team structure is shown in the

figure below:

Page 88: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 88 of 302

Change Management Operational Team

Top Level Governance Committee: The top-level governance structure shall comprise the steering

committee and the task force:

Steering Committee

The strategic decision making will be carried out by the steering committee which will comprise the

Secretary of State Home Department and DGP.

Task Force

The task force would be responsible for monitoring the work of the operational team and taking

operational decisions as and when required.

Operational Structure: The operational level decision making as well as execution of the change

management initiative will be carried out by change management operational team which will comprise

the change management specialist as the head. The change management specialist will monitor the

committee and will supervise the work of communication lead and training lead.

Page 89: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 89 of 302

Roles and responsibilities

The roles and responsibilities of the members with respect to Change Management interventions

implementation is described in the following table below:

Roles & Responsibilities (Change Management Strategy) Committee

name

Position name Role and Responsibilities

Change

Management

Steering

committee

CM Steering

Committee

Member

Take strategic decisions related to the project

from change management standpoint

Take ownership of, manage, and implement the

vision for change management

Clarify expectations from the various change

management phases. The expectations will

include matters related to scope, time and

deliverables

Ensure that the project meets the goals and

expectations of the MHA by reviewing the project

milestones achieved on a periodic basis and

suggesting necessary modifications and course

corrections

Influence and ensure that there is commitment

from the key stakeholders (such as Courts,

Passport Office) to the project

Resolve any conflicts and issues that may arise

during the implementation of the change

management plan

Identify the resources required for

implementation of various change management

interventions based on requests from the Task

Force and Operational Team.

Task Force Task force

members Assist in execution of the vision for change

management

Regular monitoring of the progress of change

management implementation

Clarify expectations from the various change

management phases. The expectations will

include matters related to scope, time and

deliverables

Resolve any conflicts and issues that may arise

Page 90: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 90 of 302

Committee

name

Position name Role and Responsibilities

during the implementation of the change

management plan

Report to Change Management Steering

Committee about progress made regarding

Change Management interventions

Escalate those issues to Steering Committee

that may require strategic decision making

Change

Management

Operational

Team

Change

management

specialist1

Allocate resources to implement various

change management interventions

The change management specialist would

identify the bottlenecks in the change

management roll out and identify the ways and

means to address the same

Promote self-responsibility, agree on the

project scope, objectives and success criteria

with the change management team

Clarify expectations from the various change

management phases. The expectations will

include matters related to scope, time and

deliverables

Manage the operational risks arising during the

roll out of the change interventions.

Undertake operational decisions related to the

project from change management standpoint

Report to Range DIG and Task Force

periodically on progress made on change

management interventions

Review the work with respect to the change

intervention, allocate responsibilities to the

change agents, review the progress on a day to

day basis

Ensure that the facilitation and implementation

of the change interventions for each stakeholder

is carried out effectively within the planned time,

resources, budget as per the plan

Coordinate with communication and training

leads to ensure dependencies across the

Services/ phases are identified and tasks are

1 Members would be part of the System Integrator

Page 91: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 91 of 302

Committee

name

Position name Role and Responsibilities

coordinated

Prepare and send status progress reports to

the Range DIG periodically highlighting the

project progress, risks/ issues/ delays Implement

the decisions taken by the steering committee

and change management specialist

Escalate difficulty in implementation of

interventions to Range DIG

Change

management

committee

Communication

lead1 Review the work programme with respect to the

communication strategy and plan, allocate

responsibilities to the communication agents and

review the progress on a day to day basis

Prepare and send status progress reports to

the change management specialist periodically

highlighting the project progress, risks/ issues/

delays

Implement the decisions taken by the steering

committee and change management specialist in

coordination with district mission team

Escalate difficulty in rolling out communication

plan and periodic status updates to Change

Management Specialist

Change

management

committee

Training lead1 Get buy in of all stakeholders to facilitate

effective implementation of training plan

Review the work project with respect to the

training interventions, allocate responsibilities to

the training agents and review the progress on a

day to day basis

Ensure that the facilitation and implementation

of the training intervention for each stakeholder is

carried out effectively within the planned time,

resources, budget as per the plan

Coordinate with communication and change

leads to ensure dependencies across the

Services/ phases are identified and tasks are

coordinated;

Prepare and send status progress reports to

the change management specialist periodically

highlighting the project progress, risks/ issues/

delays and interventions required

Page 92: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 92 of 302

Committee

name

Position name Role and Responsibilities

Implement the decisions taken by the steering

committee and change management specialist

Escalate difficulty in rolling out training plan

and send periodic status updates to Change

Management Specialist

Change

management

team

Training

agents1 Execute the assigned tasks and assist the

training lead in ensuring successful

implementation of the training related intervention

Facilitating implementation of all the training

activities and reporting to the training lead

Assist in development of training plan, training

schedule and training course content

Responsible for creation of training material

either using in-house resources or outsourced

ones

Assist in selection of vendor, trainers etc and

reviewing that the overall training related plan is

adhered to

Facilitate conducting training program,

evaluating training effectiveness and creating

knowledge repository

Responsible for facilitating training

interventions by working in collaboration with

change and communication agents

Prepare and send status progress reports to

the training lead periodically

Change

management

team

Communication

agents1 Execute the assigned tasks and assist the

communication lead in ensuring successful

implementation of the communication plan and

strategy

Facilitate implementation of all the

communication interventions and reporting to the

communication lead

Assist in preparation of communication content,

message design and other communication

related activity

Responsible for creation of all communication

material either using in-house resources or

outsourced ones

Page 93: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 93 of 302

Committee

name

Position name Role and Responsibilities

Assist in selection of vendor if required and

reviewing that the overall communication plan is

adhered to

Facilitate communication interventions by

working in collaboration with training and change

agents

Prepare and send status progress reports to

the communication lead periodically 6.12 Handholding Support

The System Integrator will provide one qualified and trained person per police station for a period of six months to handhold the staff in the police station and ensure that the staffs in those police stations are able to use CCTNS on their own by the end of the handholding period. SI must provide the project team as per details and eligibility qualifications given in this RFP. Handholding and project support would be required only after the successful commissioning of Core Application (CAS) State and the necessary infrastructure and completion of capacity building and change management initiatives in respective districts. Information of all Police locations regarding engagement of handholding personnel has been provided in Geographical scope in this RFP. Code of Conduct for Handholding personnel at Police Stations are as mentioned below:

The person to be engaged by SI for Handholding support should work as six days per week.

Handholding personnel should give 100% availability on all working days.

The qualification required for handholding personnel is described in Vol II, Section 5.11

The scheduling and requirement for handholding personnel would be in line with the implementation phases of the project roll out as described in Section 6.1.1

6.13 Requirement on Adherence to Standards

CCTNS system must be designed following open standards, to the extent feasible and in line with

overall system requirements set out in this RFP, in order to provide for good inter-operability with

multiple platforms and avoid any technology or technology provider lock-in.

Compliance with Industry Standards

In addition to above, the proposed solution has to be based on and compliant with industry standards

(their latest versions as on date) wherever applicable. This will apply to all the aspects of solution

including but not limited to design, development, security, installation, and testing. There are many

standards that are indicated throughout this volume as well as summarized below. However the list

Page 94: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 94 of 302

below is just for reference and is not to be treated as exhaustive.

Portal development W3C specifications

Information access/transfer protocols

SOAP, HTTP/HTTPS

Interoperability Web Services, Open standards

Photograph PNG (minimum resolution of 640 x 480 pixels)

Scanned documents TIFF (Resolution of 600 X 600 dpi)

Biometric framework BioAPI 2.0 (ISO/IEC 19784-1:2005) specification

Finger print scanning IAFIS specifications

Digital signature RSA standards

Document encryption PKCS specifications

Information Security CCTNS system to be ISO 27001 certified

Operational integrity & security management

CCTNS system to be ISO 17799 compliant

IT Infrastructure management ITIL / EITM specifications

Service Management ISO 20000 specifications

Project Documentation IEEE/ISO specifications for documentation

The SI shall adhere to the standards published by the Department of Information Technology,

Government of India.

6.14 Support to Acceptance Testing, Audit and Certification

The primary goal of Acceptance Testing, Audit & Certification is to ensure that the system meets

requirements, standards, and specifications as set out in this RFP and as needed to achieve the desired

outcomes. The basic approach for this will be ensuring that the following are associated with clear and

quantifiable metrics for accountability:

1. Functional requirements

2. Test cases and Requirements Mapping

3. Infrastructure Compliance Review

4. Availability of Services in the defined locations

5. Performance and Scalability

6. Security / Digital Signatures

7. Manageability and Interoperability

8. SLA Reporting System

Page 95: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 95 of 302

9. Project Documentation

10. Data Quality Review

As part of Acceptance testing, audit and certification, performed through a third party agency, State shall

review all aspects of project development and implementation covering software, hardware and

networking including the processes relating to the design of solution architecture, design of systems and

sub-systems, coding, testing, business process description, documentation, version control, change

management, security, service oriented architecture, performance in relation to defined requirements,

interoperability, scalability, availability and compliance with all the technical and functional

requirements of the RFP and the agreement. Here it is important to mention that there may be two

agencies selected by State, one for audit & certification of security and control aspect of the system and

the other for audit & certification of overall application software.

State will establish appropriate processes for notifying the SI of any deviations from defined

requirements at the earliest instance after noticing the same to enable the SI to take corrective action.

Such an involvement of the Acceptance Testing & Certification agencies, nominated by State, will not,

however, absolve the operator of the fundamental responsibility of designing, developing, installing,

testing and commissioning the various components of the project to deliver the services in perfect

conformity with the SLAs.

Following discusses the acceptance criteria to be adopted for system as mentioned above:

1. Functional Requirements Review

The system developed/customized by SI shall be reviewed and verified by the agency against the

Functional Requirements signed-off between State and SI. Any gaps, identified as a severe or critical

in nature, shall be addressed by SI immediately prior to Go-live of the system. One of the key inputs

for this testing shall be the traceability matrix to be developed by the SI from system. Apart from

Traceability Matrix, agency may develop its own testing plans for validation of compliance of system

against the defined requirements. The acceptance testing with respect to the functional requirements

shall be performed by both independent third party agency (external audit) as well as the select

internal department users (i.e. User Acceptance Testing).

2. Infrastructure Compliance Review

As mentioned above, an independent third party agency (external audit) shall perform the Infrastructure

Compliance Review to verify the conformity of the Infrastructure supplied by the SI against the

requirements and specifications provided in the RFP and/or as proposed in the proposal submitted by

SI. Compliance review shall not absolve SI from ensuring that proposed infrastructure meets the SLA

requirements. The SI would provide the specifications of the hardware supplied which would be checked

against the actual hardware supplied and hardware as described in the Bill of Materials in this volume of

RFP.

3. Security Review

The software developed/customized for system shall be audited by the agency from a security & controls

Page 96: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 96 of 302

perspective. Such audit shall also include the IT infrastructure and network deployed for system.

Following are the broad activities to be performed by the Agency as part of Security Review. The

security review shall subject the system for the following activities:

a. Audit of Network, Server and Application security mechanisms

b. Assessment of authentication mechanism provided in the application

/components/ modules

c. Assessment of data encryption mechanisms implemented for the solution

d. Assessment of data access privileges, retention periods and archival

mechanisms

e. Server and Application security features incorporated etc

4. Performance

Performance is another key requirement for system and agency shall review the performance of the

deployed solution against certain key parameters defined in SLA described in this RFP and/or

agreement between State and SI. Such parameters include request-response time, work- flow

processing time, concurrent sessions supported by the system, Time for recovery from failure,

Disaster Recovery drill etc. The performance review also includes verification of scalability provisioned in

the system for catering to the requirements of application volume growth in future.

5. Availability

The system should be designed to remove all single point failures. Appropriate redundancy shall be built

into all the critical components to provide the ability to recover from failures. The agency shall perform

various tests including network, server, security, DC/DR fail-over tests to verify the availability of the

services in case of component/location failures. The agency shall also verify the availability of services to

all the users in the defined locations.

6. Manageability Review

The agency shall verify the manageability of the system and its supporting infrastructure deployed using

the Enterprise Management System (EMS) Licenses procured by the SI. The manageability

requirements such as remote monitoring, administration, configuration, inventory management, fault

identification etc. shall have to be tested out.

7. SLA Reporting System

SI shall procure Licenses for the Enterprise Management System (EMS) deployed at Tamil Nadu State

Data Centre and shall develop any additional tools required to monitor the performance indicators listed

under SLA prescribed in this RFP. The Acceptance Testing & Certification agency shall verify the

accuracy and completeness of the information captured by the SLA monitoring system implemented by

the SI and shall certify the same. The EMS deployed for system, based on SLAs, shall be configured to

calculate the monthly transaction-based payout by State to SI.

8. Project Documentation

The Agency shall review the project documents developed by SI including requirements, design, source

code, installation, training and administration manuals, version control, etc. Any issues/gaps identified by

Page 97: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 97 of 302

the Agency, in any of the above areas, shall be addressed to the complete satisfaction of State.

9. Data Quality

The Agency shall perform the Data Quality Assessment for the Data digitized/ migrated by SI to the

system. The errors/gaps identified during the Data Quality Assessment shall be addressed by SI before

moving the data into production environment, which is a key mile stone for Go-live of the solution.

6.15 Scope of Services during Post-Implementation Phase

The SI shall be responsible for the overall management of the system including the application and

entire related IT Infrastructure. The details of the post implementation support services are provided as

an Annexure V to this RFP. SI shall procure and deploy an EMS License that monitors / manages the

entire enterprise wide application, infrastructure and network related components.

SI shall provide the Operations and Maintenance Services for period of 5 years following the

deployment and “Go-Live” of the solution in the State. In case each District is declared as “Go-Live” at

different instances during the project roll-out, the Operations and Maintenance Services for the District

will start following the deployment and “Go-Live” of the solution in the District and SI shall continue

to provide the Operations and Maintenance Support for a period of 5 years following the deployment

and “Go-Live” of the solution in the last District.

6.16 Go-Live

Go-Live is defined as a milestone in the implementation plan which requires Completion and Acceptance of

the following activities in at least 85% of the Police Stations / Higher Offices in each of the Districts

targeted under the Phase

Data Migration / Digitization

Capacity Building Program covering the targeted personnel

Change Management Initiatives covering the targeted personnel

Site Preparation

Delivery and Commissioning of Client Side Infrastructure

Networking

Commission of the Configured, Customized, and Extended CAS (State)

The PS / HO have completely migrated to the new application and the police station and the

higher offices’ personnel are successfully conducting the intended functions through the

application

6.17 Handover and Exit Management

a) Exit management shall involve the complete handover of the CCTNS to the team identified by

the SCRB, Tamil Nadu, which would take care of CCTNS project after the tenure of the System

Page 98: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 98 of 302

Integrator ends. Exit Plan has to be submitted by the System Integrator. Exit procedure needs to

be carried out as per approved Exit Plan. Exit Plan would include transfer of Intellectual property

rights, transfer of assets, knowledge transfer and smooth transition to new team selected by

SCRB, Tamil Nadu.

b) During the exit management period, the System Integrator shall use its best efforts to deliver the

services. Payments during the Exit Management period shall be made in accordance with the

Terms of Payment Schedule.

c) This Exit Management plan shall be furnished in writing to the SCRB, Tamil Nadu as part of the

Technical Proposal

d) SCRB, Tamil Nadu shall also provide all kind of technical support to designated agency while

transferring the project and hand hold the project for one month to enable designated agency

develop sufficient skills for smooth maintenance and operations of the project.

e) At the end of the contract period, the System Integrator shall transfer the ownership of all

equipments, Software etc in the Name of SCRB, Tamil Nadu and after transfer handover all the

equipments/software/Components supplied and installed under the project as per Purchase

order along with media, manuals, documentation to the SCRB, Tamil Nadu or its nominee in up

and running condition with a site wise Stock Registers.

Page 99: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 99 of 302

7 Implementation and Roll-out Plan Detailed Project Plan for Implementation and Roll-out is given below:

Detailed Project Plan

Phase Suggested Activities Responsibilities Time Line (Month)

Pilot Phase - (T=Date of Signing the Agreement)

Setting up Data Centre

Installation and Testing of UPS SI T+3 Supply of the Hardware, Software, License & Networking equipments

SI, NIC

Installation and Testing of Equipments SI, SPMU, SMT Redundant Network Connectivity SI / BSNL 24*7 Support system in case of break down

SI

Setting up Disaster Recovery Centre T+3 Installation and Testing of UPS SI Supply of the Hardware, Software, License & Networking equipments

SI, NIC

Installation and Testing of Equipments SI, SPMU, SMT Redundant Network Connectivity SI / BSNL 24*7 Support system in case of break down

SI

Installation of CAS (State) of NIC SI, NIC T1=T+4 Customization of CAS (State) and CAS (State) Integration with Identified applications (T1 – Date of completion of CAS State Rollout)

SRS preparation SI T1+1 Approval from SPMU & Department and Change Incorporation in case of suggestions

SI, SPMU & Department Constituted Committee

T1+1

Development of Crime Analysis Suite SI & Department Constituted Committee

T2=T1+2

Development of Knowledge Base Suite SI & Department Constituted Committee

T3=T2+2

Development of Communication Suite SI & Department Constituted Committee

T4=T3+2

Development of Constable Suite SI & Department Constituted Committee

T5=T4+1

Development of Law & Order Suite SI & Department Constituted Committee

T6=T5+1

Development of Traffic Suite SI & Department Constituted

T7=T6+1

Page 100: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 100 of 302

Detailed Project Plan

Phase Suggested Activities Responsibilities Time Line (Month)

Committee User Acceptance Testing SI, SPMU, SMT,

DMT T8=T7+2

Change Request SI, SMT, DMT Final Implementation at 2 Pilot Districts, 2 Commissionerates, HQ and SCRB

SI, DMT, SMT T9=T8+1

Collection of feedback from users in Pilot Districts

SI, DMT T10=T9+1

Data Digitization/Data Migration Analysis of Data to be digitized SI T+2 Collection & Consolidation of Data SI T+3 Data Digitization SI T+9 Data Validation & Re-entry SI T+10 Certification from Department about authenticity of digitized data

SI & Department Assigned Official

T+11

Data Porting to the Servers (Centre and State)

SI T+12

ICT Hardware/Site Preparation Site survey for the user level Hardware and Network installation

SI, DMT, SMT T+1

Preliminary inspection of Hardware and Network components

SMT, DMT, SPMU T+1

Network & Hardware Installation & commissioning at Pilot Districts and other Locations (Refer Section 6.1.1)

SI,BSNL T+2

Acceptance tests for the network, hardware and application

SI, SPMU, BSNL, SMT, DMT

T+3

Onsite inspection and verification of the inspection

SPMU, SMT, DMT T+3

Issue of final acceptance certificate for the network, application and hardware

SMT, DMT, SPMU T+4

Hardware and network installation completion report

SI, SPMU, SMT, DMT

T+4

Capacity Building and Training Creating Awareness and Sensitization through Seminars, Meetings and Workshops

SI, SMT, DMT T+3

Preparation and approval of training material

SI, SMT T+4

Preparation and approval of training plan SI, SMT, SPMU T+5 Implementation of training plan at six pilot districts (Role-based Application Training, Training of Trainers and Administrator Training)

SI, DMT T+9

Incorporation of feedback from Pilot SI T+10 Training Completion report and sign offs SI, DMT, SMT,

SPMU

Page 101: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 101 of 302

Detailed Project Plan

Phase Suggested Activities Responsibilities Time Line (Month)

Handholding & Helpdesk Establishment

Starting of Handholding Support to PS for six months & Establishment of Helpdesk for PS & DC entire project period, Providing Technical Staff for DC

SI T1+6

Roll-out Phase I (D=T+12)

Enhancement of CAS (State) Evaluation of feedback and bugs by Department

SI, Department constituted Committee, SPMU

D+1

Prioritisation of Changes required SI, SPMU, Department Constituted Committee

D+1

Incorporation of Change Requests and Customizations as per feedback

SI, NIC D+2

User Acceptance Testing SI, SPMU,DMT D+3 User Acceptance Testing Completion Report

SI, SPMU, DMT D+4

Installation and Configuration of Servers for Testing

SI, NIC D+4

Unit and Integration Testing SI D+5 Installation and Configuration of Production Servers

SI, NIC D+6

Beta version implementation report and sign off

SI, SMT, DMT, SPMU

D+7

Launching the Beta Version SI D+8 Acceptance of the Beta Version Department

Constituted Committee

D+9

Go Live and Launch of the enhancements to the application in Roll out Phase I locations on top of CAS (State) (Refer Section 6.1.1)

SI D+10

ICT Hardware/Site Preparation Site survey for the user level Hardware and Network installation

SI, DMT, SMT D+1

Preliminary inspection of Hardware and Network components

SMT, DMT, SPMU D+2

Network & Hardware Installation & commissioning at Roll-out Phase I Districts (Refer Section 6.1.1)

SI,BSNL D+4

Acceptance tests for the network, hardware and application

SI, SPMU, BSNL, SMT, DMT

D+5

Onsite inspection and verification of the inspection

SPMU, SMT, DMT D+6

Issue of final acceptance certificate for the SMT, DMT, SPMU D+6

Page 102: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 102 of 302

Detailed Project Plan

Phase Suggested Activities Responsibilities Time Line (Month)

network, application and hardware Hardware and network installation completion report

SI, SPMU, SMT, DMT

D+7

Installation of CAS (State) SI, NIC D1=D+8 Capacity Building and Training Creating Awareness and Sensitization through Seminars, Meetings and Workshops

SI, SMT, DMT D+1

Preparation and approval of training material

SI, SMT D+2

Preparation and approval of training plan SI, SMT, SPMU D+5 Implementation of training plan at Roll-out Phase-I districts (Role-based Application Training, Training of Trainers and Administrator Training)

SI, DMT D+9

Incorporation of feedback SI D+10

Training Completion report and sign offs SI, DMT, SMT, SPMU

D+11

Handholding & Helpdesk Establishment (D1 = Date at which installation of network and hardware is completed at all offices)

Starting of Handholding Support to PS for six months & Establishment of Helpdesk for PS & DC entire project period, Providing Technical Staff for DC

SI D1+6

Roll-out II (E=D+12)

ICT Hardware/Site Preparation Site survey for the user level Hardware and Network installation

SI, DMT, SMT E+1

Preliminary inspection of Hardware and Network components

SMT, DMT, SPMU E+2

Network & Hardware Installation & commissioning at Roll-out Phase II Districts (Refer Section 6.1.1)

SI,BSNL E+4

Acceptance tests for the network, hardware and application

SI, SPMU, BSNL, SMT, DMT

E+5

Onsite inspection and verification of the inspection

SPMU, SMT, DMT E+6

Issue of final acceptance certificate for the network, application and hardware

SMT, DMT, SPMU E+6

Hardware and network installation completion report

SI, SPMU, SMT, DMT

E+7

Installation of CAS (State) of NIC SI, NIC E1=E+8 Capacity Building and Training Creating Awareness and Sensitization through Seminars, Meetings and

SI, SMT, DMT E+1

Page 103: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 103 of 302

Detailed Project Plan

Phase Suggested Activities Responsibilities Time Line (Month)

Workshops Preparation and approval of training material

SI, SMT E+2

Preparation and approval of training plan SI, SMT, SPMU E+5 Implementation of training plan at Roll-out Phase-II districts (Role-based Application Training, Training of Trainers and Administrator Training)

SI, DMT E+9

Incorporation of feedback SI E+10

Training Completion report and sign offs SI, DMT, SMT, SPMU

E+11

Handholding & Helpdesk Establishment

Starting of Handholding Support to PS for six months & Establishment of Helpdesk for PS & DC entire project period, Providing Technical Staff for DC

SI E1+6

The above implementation plan is tentative and the detailed implementation plan would be worked out

by the SI in coordination with the department. It has been suggested that the solution be piloted in all

offices in two districts and two commissionerates representing each of the 4 zones and the feedback

incorporated before rolling out across the State. The rollout plan shall be defined date-wise, location-

wise, module-wise and training completion and change management completion wise. A detailed

rollout checklist should be maintained for migrating application to production as well as for location

readiness.

SI shall prepare a detailed roll-out plan for each of the Districts in the Phase and get the same

approved by the department. SI is also responsible for conducting workshops for the key officers (State

Mission Team, District Mission Team, and District Core Team) of the Districts / State for presenting the

District-Wise roll-out plan and get the approval from the District Teams before getting the final approval

of the State Nodal Officer. The SI shall also provide the necessary assistance for the key officers (State

Mission Team, District Mission Team, and District Core Team) of the Districts / State during the roll-out

and implementation of CAS (State) in Tamil Nadu.

Page 104: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 104 of 302

List of Indicative Deliverables:

1. Overall Project Plan

2. CAS Configuration / Roll-out / Extension of new modules

a. Requirements Traceability Matrix

b. Refined Functional Requirements Specification

c. Systems Requirement Specification

d. Design Document (High Level Design and Low Level Design)

e. Test Plans

f. CAS Configuration / roll-out/ Extension of new modules Document

3. Data Migration Strategy and Methodology including Detailed Data Migration Plan

4. Change Management and Capacity Building

a. Overall Change Management Plan

b. Content for Change Management including Awareness and Communications

Program

c. Overall Capacity Building Plan and District-wise Training Schedule and

Curriculum

d. Training Material

5. District-wise Roll-out / Implementation Plans

Service Levels This section describes the service levels to be established for the Services offered by the SI to State.

The SI shall monitor and maintain the stated service levels to provide quality service to State. The

Service levels are provided in Annexure VI of this RFP.

Page 105: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 105 of 302

ANNEXURE I Governance Structure (State Level)

As prescribed by DIT, the following committees formed at the state would continue to actively play a role

in implementation and monitoring of the project in various stages.

State Apex Committee

State Empowered Committee

State Mission Team

District Mission Team

The Overall Governance Structure for the project is illustrated below:

Overall Governance Structure for CCTNS Implementation

The structures of State Mission Team and District Mission Teams as mentioned in the MHA guidelines

are illustrated below:

Page 106: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 106 of 302

State Mission Team Structure

District Mission Team Structure

Page 107: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 107 of 302

The roles and responsibilities of each of the committees/teams are described in the table below:

Roles and Responsibilities of Committees/Teams

Committee/Team Roles and Responsibilities

State Apex Committee

Frequency of Meeting:

Quarterly

Reviewing progress of the Project

Overseeing utilization of funds

Policy Directions and Guidance for successful

execution of the Project

Ensuring continuance of Mission Leader for sufficient

duration

Creating a supporting environment for the success of

the project

State Empowered Committee

Frequency of Meeting: Monthly

Disbursement of funds to Districts and other

units/agencies

Approval of BPR proposals

Sanction for various project components, as may be

specified, including the Hardware/Software

procurement as per the specifications from NIC

Approval of various Project Components and

Functionalities to be covered in the Project

Review progress of the Project

Ensure proper Training arrangements

Ensure deployment of appropriate handholding

personnel

Other important policy and procedural issues

Guidance to State/District Mission Teams

State Mission Team

Frequency of Meeting: Monthly

Operational responsibility for the Project

Formulating Project Proposals

Getting sanction of GOI for various projects Hardware

rollout and operationalisation

Co-ordination with various agencies

Resolution of all software related issues, including

customization

Resolution of all other issues hindering the Project

Progress

Any other decision to ensure speedy implementation of

the project

Assist the State Apex and Empowered Committees

District Mission Team

Frequency of Meeting: Monthly

Prepare District Project Proposal

Ensure proper Rollout of the Project in each selected

Police Station

Page 108: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 108 of 302

Committee/Team Roles and Responsibilities

Ensure hardware and software installation, and

operationalisation of the Project

Training of all police personnel in the District

Site preparation and availability of all utilities

Ensure separate account keeping for the Project

The composition of committees/teams is described in the Tables below:

Composition of State Apex Committee

Sr. No Designation

1 Chief Secretary (Chair-Person)

2 Principal Home Secretary (Co-chair)

3 DGP

4 ADGP, SCRB (Convenor & Nodal Officer, CCTNS)

5 Secretary, Finance

6 IT Secretary

7 Representative from NIC

8 MHA Representative

9 MD, ELCOT

Composition of State Empowered Committee

Sr. No Designation

1 DGP (Chair-Person)

2 ADGP, SCRB (Co-chair)

3 Representative from NCRB

4 Special Secretary, Home Department

5 Special Secretary, Finance Department

6 MD, ELCOT

7 Representative from NIC

8 IGP, TNPHC, SDA

9 IGP, Training, PTC

Page 109: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 109 of 302

Composition of State Mission Team

Sr. No Designation

1 ADGP, SCRB (Mission Leader)

2 IGP, TNPHC

3 SIO, NIC

4 Inspector, PCW

Composition of District Mission Team

Sr. No Designation

1 District SP (Chairperson)

2 Official from DCRB

3 DIO, District NIC

4 Official from PCW or official from other department with computer knowledge

5 DSP from one of the Law & Order Sub-division with sound domain knowledge

and computer awareness

6 Inspector from one of the Law & Order Sub-division with sound domain

knowledge and computer awareness

Page 110: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 110 of 302

ANNEXURE II Details of Technology Stacks - CAS (State) and CAS (Center) CAS (State) will be developed in FOSS stack by NIC.

The Technical Details for CAS (State) based on Free and Open Source Stack (FOSS), CAS (State) Offline solution, CAS (Centre) Solution is provided in subsequent tables:

CAS (State) Online Solution

The below list is

indicative only

Proposed Solution by NIC

Version and Year of Release

Original Supplier

Description (include major features/ services only)

Support Provided By

Webserver Apache 2.0 or above Apache HTTP Server Apache

Application Server

Tomcat 6.5 or above Apache HTTP Server

Apache

Database PostgreSQL 9.0 or above PostgreSQL ORDBMS PostgreSQL Community

Operating System

Ce ntOS 2.0 or above Community OS Community

Others

Reporting Engine

Jasper/PDF Reports 3.7 or above Jasper Reporting Services

Search Engine

Search: Unstructured data: using Open CMS search features Structured Data: PostgreSQL DB Search Engine & Custom application interface

N/a N/a N/a N/a

Page 111: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 111 of 302

The below list is

indicative only

Proposed Solution by NIC

Version and Year of Release

Original Supplier

Description (include major features/ services only)

Support Provided By

Portal Server FOSS stack NA Community HTTP Server Community

Workflow Engine

FOSS Stack Com munity Community

Rules Engine Custom Built N/a N/a N/a N/a

Directory Services

FOSS 7.0 SUN LDAP SUN

DMS/CMS Joomla/Drupal 7.5 or abov e

Email/Messa ging

Squirrel Mail

Security

Physical Security, Network Security, DB Encryption (PostgreSQL), DB Access Controls, Role Based Access Control (Custom Developed), FOSS)

N/a N/a N/a N/a

Identity Management

FOSS N/a N/a N/a Community

Audit Custom Built N/a N/a N/a N/a

ETL + Data Quality

Custom Built N/A N/a N/a Community

Page 112: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 112 of 302

CAS (State) Offline Solution

The below list is

indicative only

Proposed Solution by Software Development Agency

Version and Year of Release

Original Supplier

Description (include major features/ services only)

Support Provided By

Synchronization Solution

Custom Built N/a N/a N/a N/a

Application Container

Apache Tomcat

6.0 Apache Foundation

J2EE/PHP Application Container

Database PostgreSQL 9.0 Community

-- NIC

Page 113: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 113 of 302

ANNEXURE III Bill of Quantity – Client Site Locations

Scope of Hardware Supply, Installation, Commission, Testing and Maintenance System integrator is responsible for supply, install, commission, testing and maintenance of Hardware and other peripheral to all police stations and higher offices as mentioned below:

S.No. Client Site Locations Number of Offices 1 Non CIPA Police Stations 1345

2 CIPA Police Stations 137

3 AC Range Office/SDPO 258

4 Range/Zone 16

5 SCRB 1

6 TN Finger Print Bureau/ Forensic Science Lab 2

7 District Control Room 33

8 State Control Room 1

9 DPO 33

10 Commissionerate 7

11 ADC/DC/JC/ACOP Offices 53

12 ADSP Office 62

13 Police HQ Office 1

FIR Registering Special Unit Offices

14 Coastal Security Group 11

15 CBCID 43

16 Crime (SIT) 34

17 Commercial Crime Investigation Wing 31

18 Economic Offenses Wing 16

19 Prohibition Enforcement Wing 94

20 District Crime Branch /City Crime Branch 38

21 Civil Supplies CID 20

22 Traffic Investigation Wing 44

23 Traffic Enforcement Wing 148

24 Juvenile Aid Police Uunit 9

25 Anti Vice Squad 3

26 Anti Dowry Cell 2

Sub-total 493

FIR Registering Special Unit HQ 6

27 CSG 1

28 CBCID 3

29 Crime (SIT) 1

30 Idol Wing 1

Sub-total 6

Total 2441

Page 114: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 114 of 302

Note: SCRB reserves the right to consider in part or omit all the requirements mentioned

Location wise distribution of hardware and peripherals is given below: Police Station Hardware and Site Preparation Requirements (1345 Non CIPA PS, 137 CIPA PS Locations): SI has to supply, install, commission, testing of below hardware and peripherals at each of the 1482 Police Stations:

PS Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 4

HDD 160 GB 1

Duplex Laser Printer 1

Multi-function Laser (Print/Scan/Copy) 1

UPS 2 KVA 1

3 KVA Inverter 1

Network Switch 16 Ports 10/100 Un-managed 1

Fingerprint Reader 1

Digital Camera 1

Electronic Pen 1

Site Preparation

Adequate Furniture 1

Electrical Cabling 1

Earthing & Earth Pit 1

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 6

Cat 6 Cable with Cabling (In Meters) 120

Patch Cords 1 Mtr. CAT 6 6

Patch Cords 2 Mtr. CAT 6 6

Operational Expenses Each PS (In Years)

5

Software

NIC Linux (to be provided by NIC) 4

LibreOffice 3.3 (to be provided by NIC) 4

Client Antivirus (5 Years) (Free to use) 4

Application Patch Management Software (to be provided by NIC)

4

Asset Management Software (to be part of EMS)

4

SDPO/ AC Range Office Hardware and Site Preparation Requirements (174 SDPO, 84 AC Range

Page 115: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 115 of 302

Office Locations): SI has to supply, install, commission, testing of below hardware and peripherals at each of the 258 SDPO/ AC Range Offices:

SDPO/ AC Range Office Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 3

Multi-function Laser (Print/Scan/Copy) 1

UPS 2 KVA 1

Network Switch 16 Ports 10/100 Un-managed 1

Site Preparation

Adequate Furniture 1

Electrical Cabling 1

Earthing & Earth Pit 1

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 4

Cat 6 Cable with Cabling (In Meters) 120

Patch Cords 1 Mtr. CAT 6 4

Patch Cords 2 Mtr. CAT 6 4

Operational Expenses Each Location (In Years)

5

Software

NIC Linux (to be provided by NIC) 3

LibreOffice 3.3 (to be provided by NIC) 3

Client Antivirus (5 Years) (Free to Use) 3

Application Patch Management Software (to be provided by NIC)

3

Asset Management Software (to be part of EMS)

3

Range/Zone Office Hardware and Site Preparation Requirements (12 Range and 4 Zone Office Locations): SI has to supply, install, commission, testing of below hardware and peripherals at each of the 16 Range/Zone Offices:

Range/Zone Office Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 4

Multi-function Laser (Print/Scan/Copy) 1

UPS 2 KVA 1

Network Switch 16 Ports 10/100 Un-managed

1

Site Preparation

Page 116: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 116 of 302

Range/Zone Office Hardware and Site Preparation Requirements Item Description Qty Make Model

Adequate Furniture 1

Electrical Cabling 1

Earthing & Earth Pit 1

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 5

Cat 6 Cable with Cabling (In Meters) 120

Patch Cords 1 Mtr. CAT 6 5

Patch Cords 2 Mtr. CAT 6 5

Operational Expenses Each Location (In Years)

5

Software

UBUNTU LINUX 10.04 LTS or openSUSE 11.3 or FEDORA 13

4

LibreOffice 3.3 (to be available with the above mentioned OS)

4

Client Antivirus (5 Years) (Free to Use) 4

Application Patch Management Software (to be provided by NIC)

4

Asset Management Software (to be part of EMS)

4

SCRB Hardware and Site Preparation Requirements (1 Location): SI has to supply, install, commission, testing of below hardware and peripherals at SCRB:

SCRB Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 4

Multi-function Laser (Print/Scan/Copy) 1

UPS 5 KVA 1

Network Switch 16 Ports 10/100 Managed 1

Site Preparation

Adequate Furniture 1

Electrical Cabling 1

Earthing & Earth Pit 1

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 5

Cat 6 Cable with Cabling (In Meters) 120

Patch Cords 1 Mtr. CAT 6 5

Patch Cords 2 Mtr. CAT 6 5

Operational Expenses Each Location (In 5

Page 117: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 117 of 302

SCRB Hardware and Site Preparation Requirements Years)

Software

UBUNTU LINUX 10.04 LTS or openSUSE 11.3 or FEDORA 13

4

Libre Office 3.3 Office (to be available with the above mentioned OS)

4

Client Antivirus for Linux OS (5 Years) (Free to Use)

4

Application Patch Management Software (to be provided by NIC)

4

Asset Management Software (to be part of EMS)

4

State Fingerprint Bureau/State Forensic Science Lab Hardware and Site Preparation Requirements (2 Locations): SI has to supply, install, commission, testing of below hardware and peripherals at the state level Finger Print Bureau (FPB) and Forensic Science Lab (FSL):

State FPB/FSL Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 2

Multi-function Laser (Print/Scan/Copy) 1

Network Switch 16 Ports 10/100 Un-managed

1

Site Preparation

Adequate Furniture 1

Patch Cords 2 Mtr. CAT 6 3

Operational Expenses Each Location (In Years)

5

Software

UBUNTU LINUX 10.04 LTS or openSUSE 11.3 or FEDORA 13

2

Libre Office 3.3 Office (to be available with the above mentioned OS)

2

Client Antivirus for Linux OS (5 Years) (Free to Use)

2

Application Patch Management Software (to be provided by NIC)

2

Asset Management Software (to be part of EMS)

2

District Control Room Hardware and Site Preparation Requirements (33 Locations): The set-up for control rooms would be established in each of the districts headquarters would consist of the below items:

Page 118: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 118 of 302

District Control Room Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 3

Multi-function Laser (Print/Scan/Copy) 1

Network Switch 16 Ports 10/100 Un-managed

1

Site Preparation

Adequate Furniture 1

Patch Cords 2 Mtr. CAT 6 4

Operational Expenses Each Location (In Years)

5

Software

UBUNTU LINUX 10.04 LTS or openSUSE 11.3 or FEDORA 13

3

Libre Office 3.3 Office (to be available with the above mentioned OS)

3

Client Antivirus for Linux OS (5 Years) (Free to Use)

3

Application Patch Management Software (to be provided by NIC)

3

Asset Management Software (to be part of EMS)

3

State Control Room Hardware and Site Preparation Requirements (1 Location): The below mentioned items would be catering to Chennai Police Control Room which handles large volume of traffic.

State Control Room Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 5

Multi-function Laser (Print/Scan/Copy) 1

Network Switch 16 Ports 10/100 Un-managed

1

Site Preparation

Adequate Furniture 1

Patch Cords 2 Mtr. CAT 6 6

Operational Expenses Each Location (In Years)

5

Software

UBUNTU LINUX 10.04 LTS or openSUSE 11.3 or FEDORA 13

5

Libre Office 3.3 Office (to be available with the above mentioned OS)

5

Client Antivirus for Linux OS (5 Years) (Free to Use)

5

Page 119: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 119 of 302

State Control Room Hardware and Site Preparation Requirements Item Description Qty Make Model

Application Patch Management Software (to be provided by NIC)

5

Asset Management Software (to be part of EMS)

5

District Police Office Hardware and Site Preparation Requirements (33 Locations): SI has to supply, install, commission, testing of below hardware and peripherals at each of the 33 District Police Offices:

District Police Office Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 10

Multi-function Laser (Print/Scan/Copy) 10

UPS 5 KVA 1

Network Switch 16 Ports 10/100 Managed 1

Site Preparation

Adequate Furniture 3

Electrical Cabling 1

Earthing & Earth Pit 1

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 11

Cat 6 Cable with Cabling (In Meters) 220

Patch Cords 1 Mtr. CAT 6 11

Patch Cords 2 Mtr. CAT 6 11

Operational Expenses Each Location (In Years)

5

Software

UBUNTU LINUX 10.04 LTS or openSUSE 11.3 or FEDORA 13

10

Libre Office 3.3 Office (to be available with the above mentioned OS)

10

Client Antivirus for Linux OS (5 Years) (Free to Use)

10

Application Patch Management Software (to be provided by NIC)

10

Asset Management Software (to be part of EMS)

10

Commissionerate Hardware and Site Preparation Requirements (7 Locations): SI has to supply, install, commission, testing of below hardware and peripherals at each of the 7 Commissionerates:

Page 120: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 120 of 302

Commissionerate Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 25

Multi-function Laser (Print/Scan/Copy) 25

UPS 5 KVA 3

Network Switch 16 Ports 10/100 Managed 2

Site Preparation

Adequate Furniture 6

Electrical Cabling 1

Earthing & Earth Pit 1

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 25

Cat 6 Cable with Cabling (In Meters) 500

Patch Cords 1 Mtr. CAT 6 25

Patch Cords 2 Mtr. CAT 6 25

Operational Expenses Each Location (In Years)

5

Software

UBUNTU LINUX 10.04 LTS or openSUSE 11.3 or FEDORA 13

25

Libre Office 3.3 Office (to be available with the above mentioned OS)

25

Client Antivirus for Linux OS (5 Years) (Free to Use)

25

Application Patch Management Software (to be provided by NIC)

25

Asset Management Software (to be part of EMS)

25

ACOP/JC/DC/ADC Offices Hardware and Site Preparation Requirements (53 Locations): SI has to supply, install, commission, testing of below hardware and peripherals at 53 offices of Additional Commissioners, Joint Commissioners, Deputy Commissioners and Additional Deputy Commissioners: ACOP/JC/DC/ADC Offices Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 3

Multi-function Laser (Print/Scan/Copy) 1

UPS 2 KVA 1

Network Switch 16 Ports 10/100 un-managed

1

Site Preparation

Adequate Furniture 1

Electrical Cabling 1

Page 121: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 121 of 302

ACOP/JC/DC/ADC Offices Hardware and Site Preparation Requirements Item Description Qty Make Model

Earthing & Earth Pit 1

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 4

Cat 6 Cable with Cabling (In Meters) 120

Patch Cords 1 Mtr. CAT 6 4

Patch Cords 2 Mtr. CAT 6 4

Operational Expenses Each Location (In Years)

5

Software

UBUNTU LINUX 10.04 LTS or openSUSE 11.3 or FEDORA 13

3

Libre Office 3.3 Office (to be available with the above mentioned OS)

3

Client Antivirus for Linux OS (5 Years) (Free to Use)

3

Application Patch Management Software (to be provided by NIC)

3

Asset Management Software (to be part of EMS)

3

ADSP Offices Hardware and Site Preparation Requirements (62 Locations): SI has to supply, install, commission, testing of below hardware and peripherals at 62 ADSP offices:

ADSP Offices Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 2

Multi-function Laser (Print/Scan/Copy) 1

UPS 2 KVA 1

Network Switch 16 Ports 10/100 un-managed 1

Site Preparation

Adequate Furniture 1

Electrical Cabling 1

Earthing & Earth Pit 1

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 3

Cat 6 Cable with Cabling (In Meters) 120

Patch Cords 1 Mtr. CAT 6 3

Patch Cords 2 Mtr. CAT 6 3

Operational Expenses Each Location (In Years)

5

Page 122: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 122 of 302

ADSP Offices Hardware and Site Preparation Requirements Item Description Qty Make Model

Software

UBUNTU LINUX 10.04 LTS or openSUSE 11.3 or FEDORA 13

2

Libre Office 3.3 Office (to be available with the above mentioned OS)

2

Client Antivirus for Linux OS (5 Years) (Free to Use)

2

Application Patch Management Software (to be provided by NIC)

2

Asset Management Software (to be part of EMS)

2

Police Headquarters Hardware and Site Preparation Requirements (1 Location): SI has to supply, install, commission, testing of below hardware and peripherals at the Police Headquarters:

Police HQ Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 50

Multi-function Laser (Print/Scan/Copy) 50

UPS 5 KVA 4

Network Switch 16 Ports 10/100 Managed 4

Site Preparation

Adequate Furniture 12

Electrical Cabling 1

Earthing & Earth Pit 1

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 50

Cat 6 Cable with Cabling (In Meters) 1150

Patch Cords 1 Mtr. CAT 6 50

Patch Cords 2 Mtr. CAT 6 50

Operational Expenses Each Location (In Years)

5

Software

UBUNTU LINUX 10.04 LTS or openSUSE 11.3 or FEDORA 13

50

Libre Office 3.3 Office (to be available with the above mentioned OS)

50

Client Antivirus for Linux OS (5 Years) (Free to Use)

50

Application Patch Management Software (to be provided by NIC)

50

Page 123: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 123 of 302

Police HQ Hardware and Site Preparation Requirements Item Description Qty Make Model

Asset Management Software (to be part of EMS)

50

CSG Unit Office Hardware and Site Preparation Requirements (11 Locations):

SI has to supply, install, commission, testing of below hardware and peripherals at each of the 11

Coastal Security Group Unit Offices:

CSG Unit Office Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 4

HDD 160 GB 1

Duplex Laser Printer 1

Multi-function Laser (Print/Scan/Copy) 1

UPS 2 KVA 1

3 KVA Inverter 1

Network Switch 16 Ports 10/100 Un-managed 1

Fingerprint Reader 1

Digital Camera 1

Electronic Pen 1

Site Preparation

Adequate Furniture 1

Electrical Cabling 1

Earthing & Earth Pit 1

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 6

Cat 6 Cable with Cabling (In Meters) 120

Patch Cords 1 Mtr. CAT 6 6

Patch Cords 2 Mtr. CAT 6 6

Operational Expenses Each Location (In Years)

5

Software

NIC Linux (to be provided by NIC) 4

LibreOffice 3.3 (to be provided by NIC) 4

Client Antivirus for Linux OS (5 Years) (Free to Use)

4

Application Patch Management Software (to be provided by NIC)

4

Asset Management Software (to be part of EMS)

4

Page 124: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 124 of 302

CBCID Unit Offices Hardware and Site Preparation Requirements (44 Locations):

SI has to supply, install, commission, testing of below hardware and peripherals at each of the 44 CBCID

Unit Offices:

CBCID Unit Offices Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 4

HDD 160 GB 1

Duplex Laser Printer 1

Multi-function Laser (Print/Scan/Copy) 1

UPS 2 KVA 1

3 KVA Inverter 1

Network Switch 16 Ports 10/100 Un-managed 1

Fingerprint Reader 1

Digital Camera 1

Electronic Pen 1

Site Preparation

Adequate Furniture 1

Electrical Cabling 1

Earthing & Earth Pit 1

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 6

Cat 6 Cable with Cabling (In Meters) 120

Patch Cords 1 Mtr. CAT 6 6

Patch Cords 2 Mtr. CAT 6 6

Operational Expenses Each Location (In Years)

5

Software

NIC Linux (to be provided by NIC) 4

LibreOffice 3.3 (to be provided by NIC) 4

Client Antivirus for Linux OS (5 Years) (Free to Use)

4

Application Patch Management Software (to be provided by NIC)

4

Asset Management Software (to be part of EMS)

4

Crime (SIT) Unit Offices Hardware and Site Preparation Requirements (34 Locations):

SI has to supply, install, commission, testing of below hardware and peripherals at each of the 34 Crime

(SIT) Unit Offices:

Page 125: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 125 of 302

Crime (SIT) Unit Offices Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 4

HDD 160 GB 1

Duplex Laser Printer 1

Multi-function Laser (Print/Scan/Copy) 1

UPS 2 KVA 1

3 KVA Inverter 1

Network Switch 16 Ports 10/100 Un-managed 1

Fingerprint Reader 1

Digital Camera 1

Electronic Pen 1

Site Preparation

Adequate Furniture 1

Electrical Cabling 1

Earthing & Earth Pit 1

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 6

Cat 6 Cable with Cabling (In Meters) 120

Patch Cords 1 Mtr. CAT 6 6

Patch Cords 2 Mtr. CAT 6 6

Operational Expenses Each Location (In Years)

5

Software

NIC Linux (to be provided by NIC) 4

LibreOffice 3.3 (to be provided by NIC) 4

Client Antivirus for Linux OS (5 Years) (Free to Use)

4

Application Patch Management Software (to be provided by NIC)

4

Asset Management Software (to be part of EMS)

4

CCIW Unit Offices Hardware and Site Preparation Requirements (31 Locations):

SI has to supply, install, commission, testing of below hardware and peripherals at each of the 31 CCIW

Unit Offices:

CCIW Unit Offices Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 4

HDD 160 GB 1

Duplex Laser Printer 1

Page 126: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 126 of 302

CCIW Unit Offices Hardware and Site Preparation Requirements Item Description Qty Make Model

Multi-function Laser (Print/Scan/Copy) 1

UPS 2 KVA 1

3 KVA Inverter 1

Network Switch 16 Ports 10/100 Un-managed 1

Fingerprint Reader 1

Digital Camera 1

Electronic Pen 1

Site Preparation

Adequate Furniture 1

Electrical Cabling 1

Earthing & Earth Pit 1

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 6

Cat 6 Cable with Cabling (In Meters) 120

Patch Cords 1 Mtr. CAT 6 6

Patch Cords 2 Mtr. CAT 6 6

Operational Expenses Each Location (In Years)

5

Software

NIC Linux (to be provided by NIC) 4

LibreOffice 3.3 (to be provided by NIC) 4

Client Antivirus for Linux OS (5 Years) (Free to Use)

4

Application Patch Management Software (to be provided by NIC)

4

Asset Management Software (to be part of EMS)

4

EOW Unit Offices Hardware and Site Preparation Requirements (16 Locations):

SI has to supply, install, commission, testing of below hardware and peripherals at each of the 16 EOW

Unit Offices:

EOW Unit Offices Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 4

HDD 160 GB 1

Duplex Laser Printer 1

Multi-function Laser (Print/Scan/Copy) 1

Page 127: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 127 of 302

EOW Unit Offices Hardware and Site Preparation Requirements Item Description Qty Make Model

UPS 2 KVA 1

3 KVA Inverter 1

Network Switch 16 Ports 10/100 Un-managed 1

Fingerprint Reader 1

Digital Camera 1

Electronic Pen 1

Site Preparation

Adequate Furniture 1

Electrical Cabling 1

Earthing & Earth Pit 1

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 6

Cat 6 Cable with Cabling (In Meters) 120

Patch Cords 1 Mtr. CAT 6 6

Patch Cords 2 Mtr. CAT 6 6

Operational Expenses Each Location (In Years)

5

Software

NIC Linux (to be provided by NIC) 4

LibreOffice 3.3 (to be provided by NIC) 4

Client Antivirus for Linux OS (5 Years) (Free to Use)

4

Application Patch Management Software (to be provided by NIC)

4

Asset Management Software (to be part of EMS)

4

PEW Unit Offices Hardware and Site Preparation Requirements (94 Locations):

SI has to supply, install, commission, testing of below hardware and peripherals at each of the 94 PEW

Unit Offices:

PEW Unit Offices Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 4

HDD 160 GB 1

Duplex Laser Printer 1

Multi-function Laser (Print/Scan/Copy) 1

UPS 2 KVA 1

3 KVA Inverter 1

Page 128: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 128 of 302

PEW Unit Offices Hardware and Site Preparation Requirements Item Description Qty Make Model

Network Switch 16 Ports 10/100 Un-managed 1

Fingerprint Reader 1

Digital Camera 1

Electronic Pen 1

Site Preparation

Adequate Furniture 1

Electrical Cabling 1

Earthing & Earth Pit 1

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 6

Cat 6 Cable with Cabling (In Meters) 120

Patch Cords 1 Mtr. CAT 6 6

Patch Cords 2 Mtr. CAT 6 6

Operational Expenses Each Location (In Years)

5

Software

NIC Linux (to be provided by NIC) 4

LibreOffice 3.3 (to be provided by NIC) 4

Client Antivirus for Linux OS (5 Years) (Free to Use)

4

Application Patch Management Software (to be provided by NIC)

4

Asset Management Software (to be part of EMS)

4

DCB/CCB Unit Offices Hardware and Site Preparation Requirements (38 Locations):

SI has to supply, install, commission, testing of below hardware and peripherals at each of the 38 District

and City Crime Branch Unit Offices:

DCB/CCB Unit Offices Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 4

HDD 160 GB 1

Duplex Laser Printer 1

Multi-function Laser (Print/Scan/Copy) 1

UPS 2 KVA 1

3 KVA Inverter 1

Network Switch 16 Ports 10/100 Un-managed 1

Fingerprint Reader 1

Page 129: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 129 of 302

DCB/CCB Unit Offices Hardware and Site Preparation Requirements Item Description Qty Make Model

Digital Camera 1

Electronic Pen 1

Site Preparation

Adequate Furniture 1

Electrical Cabling 1

Earthing & Earth Pit 1

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 6

Cat 6 Cable with Cabling (In Meters) 120

Patch Cords 1 Mtr. CAT 6 6

Patch Cords 2 Mtr. CAT 6 6

Operational Expenses Each Location (In Years)

5

Software

NIC Linux (to be provided by NIC) 4

LibreOffice 3.3 (to be provided by NIC) 4

Client Antivirus for Linux OS (5 Years) (Free to Use)

4

Application Patch Management Software (to be provided by NIC)

4

Asset Management Software (to be part of EMS)

4

CSCID Unit Offices Hardware and Site Preparation Requirements (20 Locations):

SI has to supply, install, commission, testing of below hardware and peripherals at each of the 20 Civil

Supplies Unit Offices:

CSCID Unit Offices Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 4

HDD 160 GB 1

Duplex Laser Printer 1

Multi-function Laser (Print/Scan/Copy) 1

UPS 2 KVA 1

3 KVA Inverter 1

Network Switch 16 Ports 10/100 Un-managed 1

Fingerprint Reader 1

Digital Camera 1

Electronic Pen 1

Site Preparation

Page 130: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 130 of 302

CSCID Unit Offices Hardware and Site Preparation Requirements Item Description Qty Make Model

Adequate Furniture 1

Electrical Cabling 1

Earthing & Earth Pit 1

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 6

Cat 6 Cable with Cabling (In Meters) 120

Patch Cords 1 Mtr. CAT 6 6

Patch Cords 2 Mtr. CAT 6 6

Operational Expenses Each Location (In Years)

5

Software

NIC Linux (to be provided by NIC) 4

LibreOffice 3.3 (to be provided by NIC) 4

Client Antivirus for Linux OS (5 Years) (Free to Use)

4

Application Patch Management Software (to be provided by NIC)

4

Asset Management Software (to be part of EMS)

4

TIW Unit Offices Hardware and Site Preparation Requirements (43 Locations):

SI has to supply, install, commission, testing of below hardware and peripherals at each of the 43 Traffic

Investigation Wing Unit Offices:

TIW Unit Offices Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 4

HDD 160 GB 1

Duplex Laser Printer 1

Multi-function Laser (Print/Scan/Copy) 1

UPS 2 KVA 1

3 KVA Inverter 1

Network Switch 16 Ports 10/100 Un-managed 1

Fingerprint Reader 1

Digital Camera 1

Electronic Pen 1

Site Preparation

Adequate Furniture 1

Electrical Cabling 1

Earthing & Earth Pit 1

Page 131: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 131 of 302

TIW Unit Offices Hardware and Site Preparation Requirements Item Description Qty Make Model

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 6

Cat 6 Cable with Cabling (In Meters) 120

Patch Cords 1 Mtr. CAT 6 6

Patch Cords 2 Mtr. CAT 6 6

Operational Expenses Each Location (In Years)

5

Software

NIC Linux (to be provided by NIC) 4

LibreOffice 3.3 (to be provided by NIC) 4

Client Antivirus for Linux OS (5 Years) (Free to Use)

4

Application Patch Management Software (to be provided by NIC)

4

Asset Management Software (to be part of EMS)

4

TEW Unit Offices Hardware and Site Preparation Requirements (178 Locations):

SI has to supply, install, commission, testing of below hardware and peripherals at each of the 178

Traffic Enforcement Wing Unit Offices:

TEW Unit Offices Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 4

HDD 160 GB 1

Duplex Laser Printer 1

Multi-function Laser (Print/Scan/Copy) 1

UPS 2 KVA 1

3 KVA Inverter 1

Network Switch 16 Ports 10/100 Un-managed 1

Fingerprint Reader 1

Digital Camera 1

Electronic Pen 1

Site Preparation

Adequate Furniture 1

Electrical Cabling 1

Earthing & Earth Pit 1

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 6

Page 132: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 132 of 302

TEW Unit Offices Hardware and Site Preparation Requirements Item Description Qty Make Model

Cat 6 Cable with Cabling (In Meters) 120

Patch Cords 1 Mtr. CAT 6 6

Patch Cords 2 Mtr. CAT 6 6

Operational Expenses Each Location (In Years)

5

Software

NIC Linux (to be provided by NIC) 4

LibreOffice 3.3 (to be provided by NIC) 4

Client Antivirus for Linux OS (5 Years) (Free to Use)

4

Application Patch Management Software (to be provided by NIC)

4

Asset Management Software (to be part of EMS)

4

JAPU Unit Offices Hardware and Site Preparation Requirements (9 Locations):

SI has to supply, install, commission, testing of below hardware and peripherals at each of the 9 Juvenile

Aid Police Unit Offices:

JAPU Unit Offices Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 4

HDD 160 GB 1

Duplex Laser Printer 1

Multi-function Laser (Print/Scan/Copy) 1

UPS 2 KVA 1

3 KVA Inverter 1

Network Switch 16 Ports 10/100 Un-managed 1

Fingerprint Reader 1

Digital Camera 1

Electronic Pen 1

Site Preparation

Adequate Furniture 1

Electrical Cabling 1

Earthing & Earth Pit 1

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 6

Cat 6 Cable with Cabling (In Meters) 120

Patch Cords 1 Mtr. CAT 6 6

Patch Cords 2 Mtr. CAT 6 6

Page 133: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 133 of 302

JAPU Unit Offices Hardware and Site Preparation Requirements Item Description Qty Make Model

Operational Expenses Each Location (In Years)

5

Software

NIC Linux (to be provided by NIC) 4

LibreOffice 3.3 (to be provided by NIC) 4

Client Antivirus for Linux OS (5 Years) (Free to Use)

4

Application Patch Management Software (to be provided by NIC)

4

Asset Management Software (to be part of EMS)

4

AVS Unit Offices Hardware and Site Preparation Requirements (3 Locations):

SI has to supply, install, commission, testing of below hardware and peripherals at each of the 3 Anti

Vice Squad Unit Offices:

AVS Unit Offices Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 4

HDD 160 GB 1

Duplex Laser Printer 1

Multi-function Laser (Print/Scan/Copy) 1

UPS 2 KVA 1

3 KVA Inverter 1

Network Switch 16 Ports 10/100 Un-managed 1

Fingerprint Reader 1

Digital Camera 1

Electronic Pen 1

Site Preparation

Adequate Furniture 1

Electrical Cabling 1

Earthing & Earth Pit 1

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 6

Cat 6 Cable with Cabling (In Meters) 120

Patch Cords 1 Mtr. CAT 6 6

Patch Cords 2 Mtr. CAT 6 6

Operational Expenses Each Location (In Years)

5

Software

Page 134: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 134 of 302

AVS Unit Offices Hardware and Site Preparation Requirements Item Description Qty Make Model

NIC Linux (to be provided by NIC) 4

LibreOffice 3.3 (to be provided by NIC) 4

Client Antivirus for Linux OS (5 Years) (Free to Use)

4

Application Patch Management Software (to be provided by NIC)

4

Asset Management Software (to be part of EMS)

4

ADoC Unit Offices Hardware and Site Preparation Requirements (2 Locations):

SI has to supply, install, commission, testing of below hardware and peripherals at each of the 2 Anti

Dowry Cell Unit Offices:

ADoC Unit Offices Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 4

HDD 160 GB 1

Duplex Laser Printer 1

Multi-function Laser (Print/Scan/Copy) 1

UPS 2 KVA 1

3 KVA Inverter 1

Network Switch 16 Ports 10/100 Un-managed 1

Fingerprint Reader 1

Digital Camera 1

Electronic Pen 1

Site Preparation

Adequate Furniture 1

Electrical Cabling 1

Earthing & Earth Pit 1

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 6

Cat 6 Cable with Cabling (In Meters) 120

Patch Cords 1 Mtr. CAT 6 6

Patch Cords 2 Mtr. CAT 6 6

Operational Expenses Each Location (In Years)

5

Software

NIC Linux (to be provided by NIC) 4

LibreOffice 3.3 (to be provided by NIC) 4

Client Antivirus for Linux OS (5 Years) (Free 4

Page 135: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 135 of 302

ADoC Unit Offices Hardware and Site Preparation Requirements Item Description Qty Make Model

to Use)

Application Patch Management Software (to be provided by NIC)

4

Asset Management Software (to be part of EMS)

4

CSG Headquarters Hardware and Site Preparation Requirements (1 Location):

SI has to supply, install, commission, testing of below hardware and peripherals at the Coastal Security

Group Headquarters:

CSG HQ Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 10

Multi-function Laser (Print/Scan/Copy) 10

UPS 5 KVA 1

Network Switch 16 Ports 10/100 Managed 1

Site Preparation

Adequate Furniture 3

Electrical Cabling 1

Earthing & Earth Pit 1

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 11

Cat 6 Cable with Cabling (In Meters) 220

Patch Cords 1 Mtr. CAT 6 11

Patch Cords 2 Mtr. CAT 6 11

Operational Expenses Each Location (In Years)

5

Software

UBUNTU LINUX 10.04 LTS or openSUSE 11.3 or FEDORA

10

LibreOffice 3.3 (to be available with the above mentioned OS)

10

Client Antivirus for Linux OS (5 Years) (Free to Use)

10

Application Patch Management Software (to be provided by NIC)

10

Asset Management Software (to be part of EMS)

10

CBCID Headquarters Hardware and Site Preparation Requirements (3 Locations):

SI has to supply, install, commission, testing of below hardware and peripherals at the 3 CBCID

Headquarters:

Page 136: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 136 of 302

CBCID HQ Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 10

Multi-function Laser (Print/Scan/Copy 10

UPS 5 KVA 1

Network Switch 16 Ports 10/100 Managed 1

Site Preparation

Adequate Furniture 3

Electrical Cabling 1

Earthing & Earth Pit 1

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 11

Cat 6 Cable with Cabling (In Meters) 220

Patch Cords 1 Mtr. CAT 6 11

Patch Cords 2 Mtr. CAT 6 11

Operational Expenses Each Location (In Years)

5

Software

UBUNTU LINUX 10.04 LTS or openSUSE 11.3 or FEDORA 13

10

LibreOffice 3.3 (to be available with the above mentioned OS)

10

Client Antivirus for Linux OS (5 Years) (Free to Use)

10

Application Patch Management Software (to be provided by NIC)

10

Asset Management Software (to be part of EMS)

10

Idol Wing Hardware and Site Preparation Requirements (1 Location):

SI has to supply, install, commission, testing of below hardware and peripherals at the Idol Wing:

Idol Wing Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 10

Multi-function Laser (Print/Scan/Copy 10

UPS 5 KVA 1

Network Switch 16 Ports 10/100 Managed 1

Site Preparation

Adequate Furniture 3

Electrical Cabling 1

Earthing & Earth Pit 1

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 11

Page 137: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 137 of 302

Idol Wing Hardware and Site Preparation Requirements Item Description Qty Make Model

Cat 6 Cable with Cabling (In Meters) 220

Patch Cords 1 Mtr. CAT 6 11

Patch Cords 2 Mtr. CAT 6 11

Operational Expenses Each Location (In Years)

5

Software

UBUNTU LINUX 10.04 LTS or openSUSE 11.3 or FEDORA 13

10

LibreOffice 3.3 (to be available with the above mentioned OS)

10

Client Antivirus for Linux OS (5 Years) (Free to Use)

10

Application Patch Management Software (to be provided by NIC)

10

Asset Management Software (to be part of EMS)

10

Crime (SIT) HQ Hardware and Site Preparation Requirements (1 Location):

SI has to supply, install, commission, testing of below hardware and peripherals at the Crime (SIT)

Headquarters:

Crime (SIT) HQ Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 10

Multi-function Laser (Print/Scan/Copy 10

UPS 5 KVA 1

Network Switch 16 Ports 10/100 Managed 1

Site Preparation

Adequate Furniture 3

Electrical Cabling 1

Earthing & Earth Pit 1

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 11

Cat 6 Cable with Cabling (In Meters) 220

Patch Cords 1 Mtr. CAT 6 11

Patch Cords 2 Mtr. CAT 6 11

Operational Expenses Each Location (In Years)

5

Software

UBUNTU LINUX 10.04 LTS or openSUSE 11.3 or FEDORA 13

10

Libre Office 3.3 Office (to be available with the above mentioned OS)

10

Page 138: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 138 of 302

Crime (SIT) HQ Hardware and Site Preparation Requirements Item Description Qty Make Model

Client Antivirus for Linux OS (5 Years) (Free to Use)

10

Application Patch Management Software (to be provided by NIC)

10

Asset Management Software (to be part of EMS)

10

Note: The detailed specifications for hardware including desktops and furniture are described in Annexure VIII. Adequate Furniture: 2 Large Computer tables, 2 Small Computer Tables, 4 Chairs comprise a Set, where Furniture is provisioned under this project. The exact requirement for each office should be decided by the SI based on discussion with the department. Specifications for the furniture are provided in the Annexure VIII Operation expense: This includes free of cost replacement of toner cartridge for Laser and Multifunction printer. The frequency of cartridge replacement shall be quarterly, i.e. every 3 months one cartridge to be replaced in each printer. Free of cost replacement of Teflon paper of each laser & multifunction printer on yearly basis is also a part of Operational expense. However cost of stationery item is not included in this head. Consumption of cartridges may vary based on usage of individual police locations, although SI shall strictly supply total number of cartridges as per quantity mentioned above. Spare cartridges of any location may be used at other location on need basis. All the supplied cartridges must be of the same original printer manufactures only and must follow standards of printer manufacturer. Refilling of cartridges is not permitted. Data Centre and Disaster Recovery Site Hardware and Software Requirements:

Item Description Qty Make Model

Data Centre Storage with SAN Management Software, Backup Software and SAN Switch

1

Disaster Recovery Centre Storage with SAN Management Software, Backup Software and SAN Switch

1

Data Centre Server Components

Application Server 2

Database Server 2

Web Server 2 Antivirus server 2

Mail & EMS Server 1

Load Balancer 1

Disaster Recovery Centre Server Components

Application Server 2

Page 139: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 139 of 302

Item Description Qty Make Model

Database Server 2

Web Server 2

Anti-virus Server 2 Mail & EMS Server 1

Load Balancer 1

Automated Tape Library (ATL) for Data Centre with backup Software

1

Fibre Cabling and Network Items for Data Centre and Disaster Recovery Centre

Internet Routers 2

Core switch L3 Gigabit 48 Port 2

Application Switches 2

UTM Firewall with VPN and IPS 2

Server racks 2

Open racks 2

8 port KVM switches 2

KVM over IP (Network Racks) 2

Host Intrusion Prevention System (HIPS)

18

Patch Panel 24 Ports CAT 6 2

Information Outlet CAT 6 36

CAT 6 Cable (305 Mtr. Box) 3

Patch Cord 1 Mtr CAT 6 36

Patch Cord 2 Mtr CAT 6 36

Data Centre and Disaster Recovery Centre Software

Data Center Software (Server OS with CAL, Server Management, Intranet Portal, MIS & Reporting Dashboard etc.)

18

Antivirus Software for Servers 4+14 CAL

Email Server Security Software 2

Enterprise Management System (EMS)

18 CAL

TNSDC Compliance Management Unified License to

cover large number of

department users

TNSDC Privileges Users Management for Server Control

18 CAL

TNSDC Web Access Management 4 CAL

Out Sources manpower for datacenters 2 nos. × 3 shifts for 4

216

Page 140: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 140 of 302

Item Description Qty Make Model

Years (216 Man Months)

The minimum outsourced manpower details for datacenter are given below: Technical Support and Project Team Item Description Number of Persons

System and Network Administrator at Data Centre 3

Technical Support Staff at Data Centre 3

The overall Bill of material for above mentioned requirements at client and server side for client site locations is listed as follows:

Client Side - Total Bill of Materials

Desktop Systems 9868

HDD 160 GB 2005

Duplex Laser Printer 2005

Multi-function Laser Printer ( Print/Scan/Copy) 2523

Network Switch 16 Ports 10/100 Un-managed 2430

Network Switch 16 Ports 10/100 Managed 58

Fingerprint Reader 2005

Digital Camera 2005

Electronic Pen 2005

UPS 2 KVA 2394

UPS 5 KVA 65

3 KVA Inverter 2005

Server Side – Total Bill of Materials Required Qty

Data Centre Storage with SAN Management Software, Backup Software and SAN Switch

1

Disaster Recovery Centre Storage with SAN Management Software, Backup Software and SAN Switch

1

Data Centre Server Components

Application Server 2

Database Server 2

Web Server 2 Antivirus server 2

Mail & EMS Server 1

Load Balancer 1

Disaster Recovery Centre Server Components

Application Server 2

Page 141: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 141 of 302

Server Side – Total Bill of Materials Required Qty

Database Server 2

Web Server 2

Anti-virus Server 2Mail & EMS Server 1

Load Balancer 1

Automated Tape Library (ATL) for Data Centre with backup Software

1

Fibre Cabling and Network Items for Data Centre and Disaster Recovery Centre Internet Routers 2

Core switch L3 Gigabit 48 Port 2

Application Switches 2

UTM Firewall with VPN and IPS 2

Server racks 2

Open racks 2

8 port KVM switches 2

KVM over IP (Network Racks) 2

Host Intrusion Prevention System (HIPS) 18Patch Panel 24 Ports CAT 6 2

Information Outlet CAT 6 36

CAT 6 Cable (305 Mtr. Box) 3

Patch Cord 1 Mtr CAT 6 36

Patch Cord 2 Mtr CAT 6 36

Data Centre and Disaster Recovery Centre Software

Data Center Software (Server OS with CAL, Server Management, Intranet Portal, MIS & Reporting Dashboard etc.)

18

Antivirus Software for Servers 4+14 CAL

Email Server Security Software 2

Enterprise Management System (EMS) 18 CAL

TNSDC Compliance Management Unified License to cover large number of

department usersTNSDC Privileges Users Management for Server Control 18 CAL

TNSDC Web Access Management 4 CAL

Out Sources manpower for datacenters 2 nos. × 3 shifts for 4 Years (216 Man Months)

216

Page 142: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 142 of 302

ANNEXURE IV Bill of Quantity – Additional Locations

Scope of Hardware Supply, Installation, Commission, Testing and Maintenance System integrator is responsible for supply, install, commission, testing and maintenance of Hardware and other peripherals to the additional special unit offices and higher offices as mentioned below: S.No Additional Locations Number of Offices

1 Intelligence HQ 1

Intelligence Offices

2 Q-Branch 30

3 SBCID 42

4 Special Division 6

5 Security Branch & Core Cell 10 6 Organized Crime and Intelligence Unit 19 7 SIT 5 Sub-total 112

8 Outposts 69

9 Jails (includes sub-jails, Borstal school, district jails, special sub-jails and central prisons)

129

10 District Level SDFPB and FSL 74

Other Special Unit Offices

11 Technical Services 114

12 District Special Branch 40

13 Armed Police 17

14 Social Justice & Human Rights 15

15 Special Task Force 2

Sub-total 179

Other Special Unit HQ

16 Technical Services 1

17 Armed Police 1

18 Social Justice & Human Rights 1

19 Home Guards (HG) 1

20 State Traffic Planning Cell 1

21 Tamil Nadu Commando Force 1

Sub-total 6

Total 570 Note: SCRB reserves the right to consider in part or omit all the requirements mentioned

Page 143: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 143 of 302

Intelligence Headquarters Hardware and Site Preparation Requirements (1 Location):

SI has to supply, install, commission, testing of below hardware and peripherals at the Intelligence

Headquarters:

Intelligence HQ Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 35

Multi-function Laser (Print/Scan/Copy 35

UPS 5 KVA 3

Network Switch 16 Ports 10/100 Managed 3

Handheld Device for data access and communication

7

Site Preparation

Adequate Furniture 9

Electrical Cabling 1

Earthing & Earth Pit 1

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 35

Cat 6 Cable with Cabling (In Meters) 700

Patch Cords 1 Mtr. CAT 6 35

Patch Cords 2 Mtr. CAT 6 35

Operational Expenses Each Location (In Years)

5

Software

UBUNTU LINUX 10.04 LTS or openSUSE 11.3 or FEDORA 13

35

LibreOffice 3.3 (to be available with the above mentioned OS)

35

Client Antivirus for Linux OS (5 Years) (Free to Use)

35

Application Patch Management Software (to be provided by NIC)

35

Asset Management Software (to be part of EMS)

35

Intelligence Unit Offices Hardware and Site Preparation Requirements (112 Locations):

SI has to supply, install, commission, testing of below hardware and peripherals at the Intelligence Unit

Offices:

Intelligence Unit Offices Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 5

Multi-function Laser (Print/Scan/Copy) 5

UPS 5 KVA 1

Page 144: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 144 of 302

Intelligence Unit Offices Hardware and Site Preparation Requirements Item Description Qty Make Model

Network Switch 16 Ports 10/100 Managed 1

Handheld Devices for data access and communication

1

Site Preparation

Adequate Furniture 1

Electrical Cabling 1

Earthing & Earth Pit 1

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 6

Cat 6 Cable with Cabling (In Meters) 120

Patch Cords 1 Mtr. CAT 6 6

Patch Cords 2 Mtr. CAT 6 6

Operational Expenses Each Location (In Years)

5

Software

NIC Linux (to be provided by NIC) 5

LibreOffice 3.3 (to be provided by NIC) 5

Client Antivirus for Linux OS (5 Years) (Free to Use)

5

Application Patch Management Software (to be provided by NIC)

5

Asset Management Software (to be part of EMS)

5

Outposts Hardware and Site Preparation Requirements (69 Locations):

SI has to supply, install, commission, testing of below hardware and peripherals at each of the 69

outposts:

Outposts Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 4

Multi-function Laser (Print/Scan/Copy) 1

UPS 2 KVA 1

3 KVA Inverter 1

Network Switch 16 Ports 10/100 Un-managed 1

Site Preparation

Adequate Furniture 1

Electrical Cabling 1

Earthing & Earth Pit 1

Wall Mountable Network Rack - 9 U 1

Page 145: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 145 of 302

Outposts Hardware and Site Preparation Requirements Item Description Qty Make Model

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 6

Cat 6 Cable with Cabling (In Meters) 120

Patch Cords 1 Mtr. CAT 6 6

Patch Cords 2 Mtr. CAT 6 6

Operational Expenses Each Location (In Years)

5

Software

NIC Linux (to be provided by NIC) 4

LibreOffice 3.3 (to be provided by NIC) 4

Client Antivirus for Linux OS (5 Years) (Free to Use)

4

Application Patch Management Software (to be provided by NIC)

4

Asset Management Software (to be part of EMS)

4

Jail Hardware Requirements (129 locations) SI has to supply, install, commission, testing of computers at the jails including including sub-jails, Borstal school, district jails, special sub-jails and central Prisons: Jail Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 1

Operational Expenses Each Location (In Years)

5

Software

UBUNTU LINUX 10.04 LTS or openSUSE 11.3 or FEDORA 13 with LibreOffice 3.3

1

LibreOffice 3.3 (to be available with the above mentioned OS)

1

Client Antivirus for Linux OS (5 Years) (Free to Use)

1

Application Patch Management Software (to be provided by NIC)

1

Asset Management Software (to be part of EMS)

1

Page 146: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 146 of 302

District Forensic Science Lab /Single Digit Fingerprint Bureau Hardware and Site Preparation Requirements (74 Locations): SI has to supply, install, commission, testing of below hardware and peripherals at the state level Finger Print Bureau (FPB) and Forensic Science Lab (FSL):

District FPB/FSL Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 2

Multi-function Laser (Print/Scan/Copy) 1

Network Switch 16 Ports 10/100 Un-managed 1

Site Preparation

Adequate Furniture 1

Patch Cords 2 Mtr. CAT 6 3

Operational Expenses Each Location (In Years)

5

Software

UBUNTU LINUX 10.04 LTS or openSUSE 11.3 or FEDORA 13

2

LibreOffice 3.3 (to be available with the above mentioned OS)

2

Client Antivirus for Linux OS (5 Years) (Free to Use)

2

Application Patch Management Software (to be provided by NIC)

2

Asset Management Software (to be part of EMS)

2

Technical Services Unit Offices Hardware and Site Preparation Requirements (114 Locations):

SI has to supply, install, commission, testing of below hardware and peripherals at each of the 114 Unit

Offices of Technical Services:

Technical Services Unit Offices Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 4

HDD 160 GB 1

Duplex Laser Printer 1

Multi-function Laser (Print/Scan/Copy) 1

UPS 2 KVA 1

3 KVA Inverter 1

Network Switch 16 Ports 10/100 Un-managed 1

Fingerprint Reader 1

Digital Camera 1

Electronic Pen 1

Page 147: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 147 of 302

Technical Services Unit Offices Hardware and Site Preparation Requirements Item Description Qty Make Model

Site Preparation

Adequate Furniture 1

Electrical Cabling 1

Earthing & Earth Pit 1

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 6

Cat 6 Cable with Cabling (In Meters) 120

Patch Cords 1 Mtr. CAT 6 6

Patch Cords 2 Mtr. CAT 6 6

Operational Expenses Each Location (In Years)

5

Software

UBUNTU LINUX 10.04 LTS or openSUSE 11.3 or FEDORA 13

4

LibreOffice 3.3 (to be available with the above mentioned OS)

4

Client Antivirus for Linux OS (5 Years) (Free to Use)

4

Application Patch Management Software (to be provided by NIC)

4

Asset Management Software (to be part of EMS)

4

District Special Branch Unit Offices Hardware and Site Preparation Requirements (40 Locations):

SI has to supply, install, commission, testing of below hardware and peripherals at each of the 40 DSB

Unit Offices:

DSB Unit Offices Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 4

HDD 160 GB 1

Duplex Laser Printer 1

Multi-function Laser (Print/Scan/Copy) 1

UPS 2 KVA 1

3 KVA Inverter 1

Network Switch 16 Ports 10/100 Un-managed 1

Fingerprint Reader 1

Digital Camera 1

Electronic Pen 1

Site Preparation

Adequate Furniture 1

Page 148: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 148 of 302

DSB Unit Offices Hardware and Site Preparation Requirements Item Description Qty Make Model

Electrical Cabling 1

Earthing & Earth Pit 1

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 6

Cat 6 Cable with Cabling (In Meters) 120

Patch Cords 1 Mtr. CAT 6 6

Patch Cords 2 Mtr. CAT 6 6

Operational Expenses Each Location (In Years)

5

Software

UBUNTU LINUX 10.04 LTS or openSUSE 11.3 or FEDORA 13

4

LibreOffice 3.3 (to be available with the above mentioned OS)

4

Client Antivirus for Linux OS (5 Years) (Free to Use)

4

Application Patch Management Software (to be provided by NIC)

4

Asset Management Software (to be part of EMS)

4

Armed Police Unit Offices Hardware and Site Preparation Requirements (17 Locations):

SI has to supply, install, commission, testing of below hardware and peripherals at each of the 17 Unit

Offices of Armed Police:

Armed Police Unit Offices Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 4

HDD 160 GB 1

Duplex Laser Printer 1

Multi-function Laser (Print/Scan/Copy) 1

UPS 2 KVA 1

3 KVA Inverter 1

Network Switch 16 Ports 10/100 Un-managed 1

Fingerprint Reader 1

Digital Camera 1

Electronic Pen 1

Site Preparation

Adequate Furniture 1

Electrical Cabling 1

Earthing & Earth Pit 1

Page 149: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 149 of 302

Armed Police Unit Offices Hardware and Site Preparation Requirements Item Description Qty Make Model

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 6

Cat 6 Cable with Cabling (In Meters) 120

Patch Cords 1 Mtr. CAT 6 6

Patch Cords 2 Mtr. CAT 6 6

Operational Expenses Each Location (In Years)

5

Software

UBUNTU LINUX 10.04 LTS or openSUSE 11.3 or FEDORA 13

4

LibreOffice 3.3 (to be available with the above mentioned OS)

4

Client Antivirus for Linux OS (5 Years) (Free to Use)

4

Application Patch Management Software (to be provided by NIC)

4

Asset Management Software (to be part of EMS)

4

SJ & HR Unit Offices Hardware and Site Preparation Requirements (15 Locations):

SI has to supply, install, commission, testing of below hardware and peripherals at each of the 15 Unit

Offices of Social Justice and Human Rights:

SJ & HR Unit Offices Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 4

HDD 160 GB 1

Duplex Laser Printer 1

Multi-function Laser (Print/Scan/Copy) 1

UPS 2 KVA 1

3 KVA Inverter 1

Network Switch 16 Ports 10/100 Un-managed 1

Fingerprint Reader 1

Digital Camera 1

Electronic Pen 1

Site Preparation

Adequate Furniture 1

Electrical Cabling 1

Earthing & Earth Pit 1

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Page 150: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 150 of 302

SJ & HR Unit Offices Hardware and Site Preparation Requirements Item Description Qty Make Model

Information Outlet CAT 6 6

Cat 6 Cable with Cabling (In Meters) 120

Patch Cords 1 Mtr. CAT 6 6

Patch Cords 2 Mtr. CAT 6 6

Operational Expenses Each Location (In Years)

5

Software

UBUNTU LINUX 10.04 LTS or openSUSE 11.3 or FEDORA 13

4

LibreOffice 3.3 (to be available with the above mentioned OS)

4

Client Antivirus for Linux OS (5 Years) (Free to Use)

4

Application Patch Management Software (to be provided by NIC)

4

Asset Management Software (to be part of EMS)

4

Special Task Force Unit Offices Hardware and Site Preparation Requirements (2 Locations):

SI has to supply, install, commission, testing of below hardware and peripherals at each of the 2 Unit

Offices of Special Task Force:

Special Task Force Unit Offices Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 4

HDD 160 GB 1

Duplex Laser Printer 1

Multi-function Laser (Print/Scan/Copy) 1

UPS 2 KVA 1

3 KVA Inverter 1

Network Switch 16 Ports 10/100 Un-managed 1

Fingerprint Reader 1

Digital Camera 1

Electronic Pen 1

Site Preparation

Adequate Furniture 1

Electrical Cabling 1

Earthing & Earth Pit 1

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 6

Cat 6 Cable with Cabling (In Meters) 120

Page 151: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 151 of 302

Special Task Force Unit Offices Hardware and Site Preparation Requirements Item Description Qty Make Model

Patch Cords 1 Mtr. CAT 6 6

Patch Cords 2 Mtr. CAT 6 6

Operational Expenses Each Location (In Years)

5

Software

UBUNTU LINUX 10.04 LTS or openSUSE 11.3 or FEDORA 13

4

LibreOffice 3.3 (to be available with the above mentioned OS)

4

Client Antivirus for Linux OS (5 Years) (Free to Use)

4

Application Patch Management Software (to be provided by NIC)

4

Asset Management Software (to be part of EMS)

4

Technical Services Headquarters Hardware and Site Preparation Requirements (1 Location):

SI has to supply, install, commission, testing of below hardware and peripherals at the Technical

Services Headquarters:

Technical Services HQ Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 10

Multi-function Laser (Print/Scan/Copy 10

UPS 5 KVA 1

Network Switch 16 Ports 10/100 Managed 1

Site Preparation

Adequate Furniture 3

Electrical Cabling 1

Earthing & Earth Pit 1

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 11

Cat 6 Cable with Cabling (In Meters) 220

Patch Cords 1 Mtr. CAT 6 11

Patch Cords 2 Mtr. CAT 6 11

Operational Expenses Each Location (In Years)

5

Software

UBUNTU LINUX 10.04 LTS or openSUSE 11.3 or FEDORA 13

10

LibreOffice 3.3 (to be available with the above mentioned OS)

10

Client Antivirus for Linux OS (5 Years) (Free to Use)

10

Page 152: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 152 of 302

Technical Services HQ Hardware and Site Preparation Requirements Item Description Qty Make Model

Application Patch Management Software (to be provided by NIC)

10

Asset Management Software (to be part of EMS) 10

Armed Police Headquarters Hardware and Site Preparation Requirements (1 Location):

SI has to supply, install, commission, testing of below hardware and peripherals at the Armed Police

Headquarters:

Armed Police HQ Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 10

Multi-function Laser (Print/Scan/Copy 10

UPS 5 KVA 1

Network Switch 16 Ports 10/100 Managed 1

Site Preparation

Adequate Furniture 3

Electrical Cabling 1

Earthing & Earth Pit 1

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 11

Cat 6 Cable with Cabling (In Meters) 220

Patch Cords 1 Mtr. CAT 6 11

Patch Cords 2 Mtr. CAT 6 11

Operational Expenses Each Location (In Years)

5

Software

UBUNTU LINUX 10.04 LTS or openSUSE 11.3 or FEDORA 13

10

LibreOffice 3.3 (to be available with the above mentioned OS)

10

Client Antivirus for Linux OS (5 Years) (Free to Use)

10

Application Patch Management Software (to be provided by NIC)

10

Asset Management Software (to be part of EMS)

10

SJ & HR Headquarters Hardware and Site Preparation Requirements (1 Location):

SI has to supply, install, commission, testing of below hardware and peripherals at the Social Justice &

Human Rights Headquarters:

Page 153: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 153 of 302

SJ & HR HQ Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 10

Multi-function Laser (Print/Scan/Copy 10

UPS 5 KVA 1

Network Switch 16 Ports 10/100 Managed 1

Site Preparation

Adequate Furniture 3

Electrical Cabling 1

Earthing & Earth Pit 1

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 11

Cat 6 Cable with Cabling (In Meters) 220

Patch Cords 1 Mtr. CAT 6 11

Patch Cords 2 Mtr. CAT 6 11

Operational Expenses Each Location (In Years)

5

Software

UBUNTU LINUX 10.04 LTS or openSUSE 11.3 or FEDORA 13

10

LibreOffice 3.3 (to be available with the above mentioned OS)

10

Client Antivirus for Linux OS (5 Years) (Free to Use)

10

Application Patch Management Software (to be provided by NIC)

10

Asset Management Software (to be part of EMS)

10

Home Guards Headquarters Hardware and Site Preparation Requirements (1 Location):

SI has to supply, install, commission, testing of below hardware and peripherals at the Home Guards

Headquarters:

Home Guards HQ Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 10

Multi-function Laser (Print/Scan/Copy 10

UPS 5 KVA 1

Network Switch 16 Ports 10/100 Managed 1

Site Preparation

Adequate Furniture 3

Electrical Cabling 1

Earthing & Earth Pit 1

Page 154: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 154 of 302

Home Guards HQ Hardware and Site Preparation Requirements Item Description Qty Make Model

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 11

Cat 6 Cable with Cabling (In Meters) 220

Patch Cords 1 Mtr. CAT 6 11

Patch Cords 2 Mtr. CAT 6 11

Operational Expenses Each Location (In Years)

5

Software

UBUNTU LINUX 10.04 LTS or openSUSE 11.3 or FEDORA 13

10

LibreOffice 3.3 (to be available with the above mentioned OS)

10

Client Antivirus for Linux OS (5 Years) (Free to Use)

10

Application Patch Management Software (to be provided by NIC)

10

Asset Management Software (to be part of EMS)

10

STPC Headquarters Hardware and Site Preparation Requirements (1 Location):

SI has to supply, install, commission, testing of below hardware and peripherals at the State Transport

Planning Cell Headquarters:

STPC HQ Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 10

Multi-function Laser (Print/Scan/Copy 10

UPS 5 KVA 1

Network Switch 16 Ports 10/100 Managed 1

Site Preparation

Adequate Furniture 3

Electrical Cabling 1

Earthing & Earth Pit 1

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 11

Cat 6 Cable with Cabling (In Meters) 220

Patch Cords 1 Mtr. CAT 6 11

Patch Cords 2 Mtr. CAT 6 11

Operational Expenses Each Location (In Years)

5

Software

Page 155: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 155 of 302

STPC HQ Hardware and Site Preparation Requirements Item Description Qty Make Model

UBUNTU LINUX 10.04 LTS or openSUSE 11.3 or FEDORA 13

10

LibreOffice 3.3 (to be available with the above mentioned OS)

10

Client Antivirus for Linux OS (5 Years) (Free to Use)

10

Application Patch Management Software (to be provided by NIC)

10

Asset Management Software (to be part of EMS)

10

TNCF Headquarters Hardware and Site Preparation Requirements (1 Location):

SI has to supply, install, commission, testing of below hardware and peripherals at the Tamil Nadu

Commando Force Headquarters:

TNCF HQ Hardware and Site Preparation Requirements Item Description Qty Make Model

Desktop Systems 10

Multi-function Laser (Print/Scan/Copy 10

UPS 5 KVA 10

Network Switch 16 Ports 10/100 Managed 1

Site Preparation

Adequate Furniture 3

Electrical Cabling 1

Earthing & Earth Pit 1

Wall Mountable Network Rack - 9 U 1

Patch Panel 12 Ports CAT 6 1

Information Outlet CAT 6 11

Cat 6 Cable with Cabling (In Meters) 220

Patch Cords 1 Mtr. CAT 6 11

Patch Cords 2 Mtr. CAT 6 11

Operational Expenses Each Location (In Years)

5

Software

UBUNTU LINUX 10.04 LTS or openSUSE 11.3 or FEDORA 13

10

LibreOffice 3.3 (to be available with the above mentioned OS)

10

Client Antivirus for Linux OS (5 Years) (Free to Use)

10

Application Patch Management Software (to be provided by NIC)

10

Asset Management Software (to be part of EMS)

10

Page 156: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 156 of 302

Note: The detailed specifications for hardware including desktops and furniture are described in Annexure VIII. Adequate Furniture: 2 Large Computer tables, 2 Small Computer Tables, 4 Chairs comprise a Set, where Furniture is provisioned under this project. The exact requirement for each office should be decided by the SI based on discussion with the department. Specifications for the furniture are provided in the Annexure VIII. Operation expense: This includes free of cost replacement of toner cartridge for Laser and Multifunction printer. The frequency of cartridge replacement shall be quarterly, i.e. every 3 months one cartridge to be replaced in each printer. Free of cost replacement of Teflon paper of each laser & multifunction printer on yearly basis is also a part of Operational expense. However cost of stationery item is not included in this head. Consumption of cartridges may vary based on usage of individual police locations, although SI shall strictly supply total number of cartridges as per quantity mentioned above. Spare cartridges of any location may be used at other location on need basis. All the supplied cartridges must be of the same original printer manufactures only and must follow standards of printer manufacturer. Refilling of cartridges is not permitted. The overall Bill of material for above mentioned requirements at client side for additional locations is listed as follows:

Client Side - Total Bill of Materials

Desktop Systems 1795

HDD 160 GB 179

Duplex Laser Printer 179

Multi-function Laser Printer ( Print/Scan/Copy) 698

Network Switch 16 Ports 10/100 Un-managed 434

Network Switch 16 Ports 10/100 Managed 13

Fingerprint Reader 179

Digital Camera 179

Electronic Pen 179

UPS 2 KVA 248

UPS 5 KVA 121

3 KVA Inverter 179

Handheld Device for Data access and communication 119

Page 157: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 157 of 302

ANNEXURE V Post Implementation Support Services As part of the post implementation services, the SI shall provide support for the software, hardware,

and other infrastructure provided as part of this RFP. SI shall provide five (5) years of

comprehensive AMC that includes

1. Warranty support

2. Annual Technical Support (ATS)

3. Handholding Services

a. Operations and maintenance services for the server and related infrastructure supplied

and commissioned by the SI for the application at the Data Center and Disaster

Recovery Center.

b. Central Helpdesk from the State designated premises.

c. Support for the end users at each of the locations including deployment of one

competent person at each police station for a period of six months to handhold the staff

after the Core application and the necessary infrastructure are successfully

commissioned in the police stations.

d. Software maintenance and support services.

e. Application functional support services

The services shall be rendered onsite from the State designated premises. To provide the support for the

police stations, circle offices, sub‐divisional offices, district headquarters/ Commissionerates, ranges,

zones, State police headquarters and other locations across the State where the software, hardware,

and other infrastructure will be rolled out, SI is expected to provide experienced and skilled personnel at

each location. The SI will also ensure that there is a Service Center available or setup at each district or

a group of districts of the State, as per mutual understanding between State and the SI.

As part of the warranty services SI shall provide:

1. SI shall provide a comprehensive warranty and on-site free service warranty for 5 years from the

date of Go Live.

2. SI shall obtain the five year product warranty and five year onsite free service warranty on all

licensed software, computer hardware and peripherals, networking equipments and other

equipment.

3. SI shall provide the comprehensive manufacturer's warranty in respect of proper design,

quality and workmanship of all hardware, equipment, accessories etc. covered by the RFP. SI

must warrant all hardware, equipment, accessories, spare parts, software etc. procured and

implemented as per this RFP against any manufacturing defects during the warranty period.

4. SI shall provide the performance warranty in respect of performance of the installed hardware

and software to meet the performance requirements and service levels in the RFP.

5. SI is responsible for sizing and procuring the necessary hardware and software licenses as

per the performance requirements provided in the RFP. During the warranty period SI shall

replace or augment or procure higher-level new equipment or additional licenses at no

additional cost to the State in case the procured hardware or software is not adequate to meet

Page 158: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 158 of 302

the service levels.

6. Mean Time between Failures (MTBF) If during contract period, any equipment has a

hardware failure on four or more occasions in a period of less than three months or six times in

a period of less than twelve months, it shall be replaced by equivalent or higher-level new

equipment by the SI at no cost to State. However, if the new equipment supplied is priced

lower than the price at which the original item was supplied, the differential cost should be

refunded to State. For any delay in making available the replacement and repaired equipments

for inspection, delivery of equipments or for commissioning of the systems or for acceptance

tests / checks on per site basis, State reserve the right to charge a penalty.

7. During the warranty period SI shall maintain the systems and repair / replace at the installed

site, at no charge to State, all defective components that are brought to the SI's notice.

8. The SI shall as far as possible repair the equipment at site.

9. In case any hard disk drive of any server, SAN, or client machine is replaced during warranty/

AMC the unserviceable HDD will be property of State and will not be returned to SI.

10. Warranty should not become void, if State buys, any other supplemental hardware from a third

party and installs it within these machines under intimation to the SI. However, the warranty will

not apply to such supplemental hardware items installed.

11. The SI shall carry out Preventive Maintenance (PM) once in a quarter, including cleaning

of interior and exterior, of all hardware and testing for virus, if any, and should maintain proper

records at each site for such PM. Failure to carry out such PM will be a breach of warranty and

the warranty period will be extended by the period of delay in PM.

12. SI shall monitor warranties to check adherence to preventive and repair maintenance terms and

conditions.

13. The SI shall ensure that the warranty complies with the agreed Technical Standards, Security

Requirements, Operating Procedures, and Recovery Procedures.

14. SI shall have to stock and provide adequate onsite and offsite spare parts and spare

component to ensure that the uptime commitment as per SLA is met.

15. Any component that is reported to be down on a given date should be either fully repaired or

replaced by temporary substitute (of equivalent configuration) within the time frame indicated in

the Service Level Agreement (SLA).

16. The SI shall develop and maintain an inventory database to include the registered hardware

warranties.

As a part of the ATS services SI shall provide:

1. SI shall maintain data regarding entitlement for software upgrades, enhancements, refreshes,

replacements and maintenance.

2. If the Operating System or additional copies of Operating System are required to be installed /

reinstalled / de-installed, the same should be done as part of ATS.

3. SI should carry out any requisite adjustments / changes in the configuration for implementing

different versions of Application Software.

4. Updates/Upgrades/New releases/New versions: The SI shall provide from time to time the

Updates/Upgrades/New releases/New versions of the software and operating systems as

required. The SI should provide free upgrades, updates & patches of the software and tools to

Page 159: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 159 of 302

State as and when released by OEM.

5. SI shall provide patches to the licensed software including the software, operating system,

databases and other applications.

6. Software License Management: The SI shall provide for software license management and

control. SI shall maintain data regarding entitlement for software upgrades, enhancements,

refreshes, replacements, and maintenance.

7. SI shall provide complete manufacturer’s technical support for all the licensed software problems

and/or questions, technical guidance, defect and non-defect related issues. SI shall provide a

single-point-of-contact for software support and provide licensed software support including but

not limited to problem tracking, problem source identification, problem impact (severity)

determination, bypass and recovery support, problem resolution, and management reporting.

8. The manufacturer’s technical support shall at a minimum include online technical support and

telephone support during the State’s business hours (Business hours in State will be from

0830 hours to 2030 hours on all days (Mon-Sun)) with access for State and SI to the

manufacturer’s technical support staff to provide a maximum of 4 hour response turnaround

time. There should not be any limits on the number of incidents reported to the manufacturer.

State shall have access to the online support and tools provided by the manufacturer. State shall

also have 24x7 access to a variety of technical resources including the manufacturer’s

knowledge base with complete collections of technical articles.

As a part of the Handholding services to provide Operations and maintenance support for the

server and related infrastructure supplied and commissioned by the SI for the application at the Data

Center and Disaster Recovery Center SI shall provide:

1. The scope of the services for overall IT infrastructure management as per ITIL framework

shall include 365x24x7 on site Monitoring, Maintenance and Management of the server and

related infrastructure supplied and commissioned by the SI for the application at the Data

Center and Disaster Recovery Center. The business hours in State will be from 0830 hours to

2030 hours on all days (Mon-Sun). SI will plan these services accordingly. The SI shall provide

the MIS reports for all the devices installed in the Data Center and Disaster Recovery Center in

format and media as mutually agreed with the State on a monthly basis. Whenever required by

State, SI should be able to provide additional reports in a pre-specified format. The indicative

services as part of this support are as below:

a) System Administration, Maintenance & Management Services

b) Application Monitoring Services

c) Network Management Services

d) Backend Services (Mail, messaging, etc)

e) Storage Administration and Management Services

f) IT Security Administration Services and Services for ISO 27001 and ISO 20000

compliance

g) Backup and Restore Services

As a part of the Handholding services to provide Centralized Helpdesk and Support for end users at

each location SI shall provide:

Page 160: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 160 of 302

1. The service will be provided in the local language of the State, viz., Tamil.

2. The help desk service that will serve as a single point of contact for all ICT related incidents and

service requests. The service will provide a Single Point of Contact (SPOC) and also resolution

of incidents. State requires the SI to provide Help Desk services to track and route requests for

service and to assist end users in answering questions and resolving problems related to the

software application, network, Data Center, Disaster Recovery Center, Client side

infrastructure, and operating systems at all locations. It becomes the central collection point for

contact and control of the problem, change, and service management processes. This includes

both incident management and service request management.

3. SI shall provide a second level of support for application and technical support at police

stations, sub-divisional offices, district headquarters / Commissionerates, range offices, zonal

offices, State police headquarters and other locations across the State where the software,

hardware, and other infrastructure will be rolled out.

4. For all the services of State within the scope of this RFP, SI shall provide the following

integrated customer support and help.

5. Establish 16X6 Help Desk facility for reporting issues/ problems with the software, hardware and

other infrastructure.

6. SI shall maintain and support to all client side infrastructure including hardware, networking

components, and other peripherals.

7. SI shall provide maintenance of Hardware, including preventive, scheduled and predictive

Hardware support, as well as repair and / or replacement activity after a problem has

occurred.

8. SI shall track and report observed Mean Time Between Failures (MTBF) for Hardware.

9. SI shall provide functional support on the application components to the end users.

10. SI shall also provide system administration, maintenance and management services, LAN

management services, and IT security administration services.

As a part of the Handholding services to provide software maintenance and support services SI

shall provide:

1. The Software Maintenance and Support Services shall be provided for all software procured and

implemented by the SI. The SI shall render both on-site and off-site maintenance and support

services to State to all the designated locations. The Maintenance and Support Services will

cover, all product upgrades, modifications, and enhancements.

2. Updates/Upgrades/New releases/New versions: The SI will implement from time to time the

Updates/Upgrades/New releases/New versions of the software and operating systems as

required after necessary approvals from State about the same.

3. Tuning of application, databases, third party software’s and any other components provided as

part of the solution to optimize the performance.

4. The SI shall apply regular patches to the licensed software including the operating system

and databases as released by the OEMs.

5. Software Distribution: SI shall formulate a distribution plan prior to rollout and distribute/install

the configured and tested software as per the plan.

6. Software License Management: The SI shall provide for software license management and

Page 161: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 161 of 302

control. SI shall maintain data regarding entitlement for software upgrades, enhancements,

refreshes, replacements, and maintenance. SI should perform periodic audits to measure license

compliance against the number of valid End User software licenses consistent with the terms

and conditions of site license agreements, volume purchase agreements, and other mutually

agreed upon licensed software terms and conditions and report to State on any exceptions to SI

terms and conditions, to the extent such exceptions are discovered.

7. The SI shall undertake regular preventive maintenance of the licensed software.

As part of the Handholding services to provide application functional support services SI shall provide:

1. The Application Functional Support Services shall be provided for all software procured and

implemented by the SI. The SI shall render both on-site maintenance and support services to

State from the development center in State.

2. Enhancements and defect fixes. SI shall incorporate technological changes, and provide

enhancements as per the requests made by State. SI shall perform minor changes, bug fixes,

error resolutions and minor enhancements that are incidental to proper and complete working of

the application.

3. Routine functional changes that include user and access management, creating new report

formats, and configuration of reports.

4. SI shall provide user support in case of technical difficulties in use of the software, answering

procedural questions, providing recovery and backup information, and any other requirement

that may be incidental/ancillary to the complete usage of the application.

5. The SI shall migrate all current functionality to the new / enhanced version at no additional

cost to State and any future upgrades, modifications or enhancements.

6. The SI shall perform user ID and group management services.

7. The SI shall maintain access controls to protect and limit access to the authorized End Users of

the State.

8. The services shall include administrative support for user registration, creating and

maintaining user profiles, granting user access and authorization, providing ongoing user

password support, announcing and providing networking services for users and providing

administrative support for print, file, directory and e-mail servers.

Exit Management and Transition – Capacity Building at State

After the exit of the SI, State shall take up the management of CAS (State). Therefore before the exit of

the SI, State must be strengthened and capacity must be developed for State to manage CAS. The SI

must plan the capacity building initiative to enable State manage CAS, and will collaborate with

State to implement the plan.

The SI shall create a detailed plan for Capacity Building (CB) required at State to manage CAS and a

Transition Plan (implemented over a minimum period of three months) to affect the handover to State;

and implement the same in collaboration with State before the completion of their engagement.

Page 162: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 162 of 302

ANNEXURE VI Service Levels

1. This document describes the service levels to be established for the Services offered by the SI

to the State. The SI shall monitor and maintain the stated service levels to provide quality

service to the State.

2. Definitions.

a. “Scheduled Maintenance Time” shall mean the time that the System is not in service due

to a scheduled activity as defined in this SLA. The scheduled maintenance time would not

be during 16X6 timeframe. Further, scheduled maintenance time is planned downtime with

the prior permission of the State.

b. “Scheduled operation time” means the scheduled operating hours of the System for the

month. All scheduled maintenance time on the system would be deducted from the total

operation time for the month to give the scheduled operation time. The total operation time

for the systems and applications within the Primary DC, DRC and critical client site

infrastructure will be 24X7X365. The total operation time for the client site systems shall

be 18 hours.

c. “System or Application downtime” means accumulated time during which the System is

totally inoperable within the Scheduled Operation Time but outside the scheduled

maintenance time and measured from the time the State and/or its employees log a call

with the SI team of the failure or the failure is known to the SI from the availability

measurement tools to the time when the System is returned to proper operation.

d. “Availability” means the time for which the services and facilities are available for

conducting operations on the State system including application and associated

infrastructure. Availability is defined as:

(Scheduled Operation Time – System Downtime) / (Scheduled Operation Time) * 100%

e. “Helpdesk Support” shall mean the 16x6 basis support centre which shall handle Fault

reporting, Trouble Ticketing and related enquiries during this contract.

f. “Incident” refers to any event / abnormalities in the functioning of the Data Centre

Equipment / Services that may lead to disruption in normal operations of the Data Centre,

System or Application services.

g. “Incident” refers to any event / abnormalities in the functioning of the Data Centre

Equipment / Services that may lead to disruption in normal operations of the Data Centre,

System or Application services.

3. Interpretations.

a. The business hours are 8:30AM to 4:30PM on all working days (Mon-Sat) excluding Public

Holidays or any other Holidays observed by the State. The SI however recognizes the fact

that the State offices will require to work beyond the business hours on need basis.

b. "Non-Business Hours" shall mean hours excluding “Business Hours”.

c. 18X7 shall mean hours between 06:00AM -12.00 midnight on all days of the week.

Page 163: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 163 of 302

d. If the operations at Primary DC are not switched to DRC within the stipulated

timeframe (Recovery Time Objective), it will be added to the system downtime.

e. The availability for a cluster will be the average of availability computed across all the

servers in a cluster, rather than on individual servers. However, non compliance with

performance parameters for infrastructure and system / service degradation will be

considered for downtime calculation.

f. The SLA parameters shall be monitored on a monthly basis as per the individual SLA

parameter requirements. However, if the performance of the system/services is degraded

significantly at any given point in time during the contract and if the immediate measures

are not implemented and issues are not rectified to the complete satisfaction of the

State or an agency designated by them, then the State will have the right to take

appropriate disciplinary actions including termination of the contract.

g. A Service Level violation will occur if the SI fails to meet Minimum Service Levels, as

measured on a half yearly basis, for a particular Service Level. Overall Availability and

Performance Measurements will be on a monthly basis for the purpose of Service

Level reporting. An “Availability and Performance Report” will be provided by the SI on

monthly basis in the State suggested format and a review shall be conducted based on

this report. A monthly Availability and Performance Report shall be provided to the State at

the end of every month containing the summary of all incidents reported and associated SI

performance measurement for that period. The monthly Availability and Performance

Report will be deemed to be accepted by the State upon review and signoff by both SI and

the State. Where required, some of the Service Levels will be assessed through audits or

reports e.g. utilization reports, measurements reports, etc., as appropriate to be provided

by the SI on a monthly basis, in the formats as required by the State The tools to perform

the audit will need to be provided by the SI. Audits will normally be done on regular basis

or as required by the State and will be performed by the State or the State appointed third

party agencies.

h. EMS system shall play a critical role in monitoring the SLA compliance and hence will

have to be customized accordingly. The 3rd party testing and audit of the system shall put

sufficient emphasis on ensuring the capability of EMS system to capture SLA compliance

correctly and as specified in this RFP. The selected System Integrator (SI) must deploy

EMS tool and develop additional scripts (if required) for capturing the required data for

SLA report generation in automated way. This tool should generate the SLA Monitoring

report in the end of every month which is to be shared with the State on a monthly basis.

The tool should also be capable of generating SLA reports for a half-year. The State will

audit the tool and the scripts on a regular basis.

i. The Post Implementation SLAs will prevail from the start of the Operations and

Maintenance Phase. However, SLAs will be subject to being redefined, to the extent

necessitated by field experience at the police stations / higher offices and the

developments of technology practices globally. The SLAs may be reviewed on an

annual/bi-annual basis as the State decides after taking the advice of the SI and other

agencies. All the changes would be made by the State in consultation with the SI.

Page 164: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 164 of 302

j. The SI is expected to provide the following service levels. In case these service levels

cannot be achieved at service levels defined in the tables below, it shall result in a breach

of contract and invoke the penalty clause. Payments to the SI are linked to the compliance

with the SLA metrics laid down in the tables below. The penalties will be computed and

calculated as per the computation explained in this Annexure. During the contract period, it

is envisaged that there could be changes to the SLA, in terms of addition, alteration or

deletion of certain parameters, based on mutual consent of both the parties i.e. the State

and SI.

k. Following tables outlines the key service level requirements for the system, which needs

be ensured by the SI during the operations and maintenance period. These requirements

shall be strictly imposed and either the State or a third party audit/certification agency shall

be deployed for certifying the performance of the SI against the target performance

metrics as outlined in the tables below.

Implementation Phase SLAs

1. Capacity Building

Service Level Description Measurement

Capacity Building At least 80% of the trainees within the training program should give a rating of satisfactory or above. Severity of Violation: High This service level will be monitored and measured on a per District basis through feedback survey to be provided to each attendee within the program. If the training quality in the program falls below the minimum service level, it will be treated as one (1) violation. The total number of violations for the payment period will be the cumulative number of violations across all the programs across all Districts in the payment period.

Page 165: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 165 of 302

2. Data Migration / Digitization

Service Level Description Measurement

Data Migration Error rate in a batch should be less than 0.5%. Severity of Violation: High This service level will be measured on a monthly basis for each Police Station / Higher Office. If the data migration service level in a police station / higher office falls below the minimum service level, it will be treated as one (1) violation. The total number of violations for the payment period will be the cumulative number of violations across all the police stations / higher offices in the payment period.

Digitization Error rate in a batch during verification should be less than 0.5%. Severity of Violation: High This service level will be measured on a monthly basis for each Police Station / Higher Office. If error rate is between 0.5% and 1%, it is considered as lower performance and if error rate exceeds 1% it will be treated as one (1) violation. The total number of violations for the payment period will be the cumulative number of violations across all the police stations / higher offices in the payment period.

Page 166: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 166 of 302

Delivery Related Service Level Agreement (SLA) Criteria

Explanation: The deduction mentioned in this table shall be made from the next due payment to the vendor for services provided on Statewide basis.

S. No.

Service Metrics Parameters

Baseline Lower Performance Violation of Service level agreement

Basis of Measurement

Remarks

Metric Metric Deduction Metric Deduction

1 Delivery of the reports/ deliverables due for this section

As per the dates as mentioned in the contract

One week after the due date

Rs. 10,000 >1 week after the due date

Rs. 20,000 for every week of delay

Dates for delivery of reports as mentioned in the contract

Delivery Related Service Level Agreement (SLA) Criteria

Explanation: The deduction mentioned in this table shall be made from the next due payment to the vendor for services provided on Statewide basis.

S. No.

Service Metrics Parameters

Baseline Lower Performance Violation of Service level agreement

Basis of Measurement

Remarks

Metric Metric Deduction Metric Deduction

1. Supply, installation and Commissioning of hardware at offices

3 months 3-4 months For non- compliance at each point of deployment: Rs. 30,000

> 4 months For non- compliance at each point of deployment: Rs. 45,000

Months after taking over of the office site for project

The deduction shall be made per site basis, where criterion is not satisfied

2. Supply, installation and Commissioning of the Data Center Equipment

6 months from the date of signing of contract

6-7 months Rs. 100,000 More than 7 months

Rs.100,000 for every month of delay

Months taken after beginning of the assignment

State / UT may conduct independent Audit to verify that the data center is as per the specifications.

Page 167: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator Page 167 of 302

3. Capacity building At least 80% of the training audience should give a rating of satisfactory or above

Less than 80% and more than 60% attendees find the training satisfactory

Rs. 15,000 / training session

Less than 60% of the attendees Find the training satisfactory

Rs. 25,000 per training session

Feedback survey to be provided to each attendee

The feedback of the attendees must be taken after every training session and this feedback should be leveraged for improving the capacity building program

4. Data Digitization Error rate in a batch during verification should be less than 5%

Error rate between 5%- 10%

Rs. 5,000/ batch and correction of records

Error rate of over 10%.

Rs. 10,000 / batch and the entire batch to be re-done

Error rate in a batch during verification

Error rate is measured by percentage of the records with corrections marked by designated officials

5. Maintenance phase

All the issues reported regarding hardware, software etc. should be resolved within 24 hours (within 1 working day)

Resolution of issues within 2 working days of reporting

Rs. 500 Resolution of the issue after 2 working days

Rs. 1000 for every day delay over and above beyond

Time and date of reporting of the issue

Page 168: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 168 of 302

3. Violations and Associated Penalties

a) The primary intent of Penalties is to ensure that the system performs in

accordance with the defined service levels. Penalties are not meant to be punitive or,

conversely, a vehicle for additional fees.

b) Penalty Calculations. The framework for Penalties, as a result of not meeting the

Service Level Targets are as follows:

i. The performance will be measured for each of the defined service level metric

against the minimum / target service level requirements and the violations will

be calculated accordingly.

ii. The number of violations in the reporting period for each level of severity will

be totaled and used for the calculation of Penalties.

iii. Penalties applicable for each of the high severity violations are 0.1% of

respective payment-period payment to the SI.

iv. Penalties applicable for each of the medium severity violations are 0.05% of

respective payment-period payment to the SI.

Post Implementation Phase SLAs

1. Primary DC/DRC Site Infrastructure Systems and Application Availability and

Performance

a) Production CAS Systems. The failure or disruption has a direct impact on the state/

UT’s ability to service its police stations / higher offices, ability to perform critical back-

office functions or a direct impact on the organization. This includes but not limited to:-

i. Storage and related switches at Primary DC and DRC.

ii. Web, Application, Database, and Backup Servers at Primary DC and DRC.

iii. Primary DC to DRC connectivity.

iv. Primary DC and DRC network infrastructure

v. Primary DC and DRC security infrastructure.

b) Non-CAS Systems in Production and Non Production Systems (Development, QA, and

Training). The failure or disruption has no direct impact on the State’s ability to serve its

police stations / higher offices, or perform critical back-office functions.

i. Production Non CAS Servers

ii. Test, QA and Training Servers

iii. Helpdesk infrastructure & applications.

iv. EMS Infrastructure.

c) CAS Solution Components. The failure or disruption has a direct impact on the State’s

ability to service its police stations / higher offices, ability to perform critical back-office

functions or a direct impact on the organization.

d) Non ERP Solution Components. The failure or disruption has no direct impact on the

State’s ability to serve its police stations / higher offices, or perform critical back- office

functions.

e) These service levels will be monitored on a monthly basis.

Page 169: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 169 of 302

f) The below tables gives details on the Service Levels the SI should maintain.

Service Level Description

Measurement

Infrastructure Availability

Availability of production CAS systems shall be at least 99% Severity of Violation: High

Availability over the six- month period

Violations for calculation of penalty

< 99% & >= 98.5% 1

< 98.5% & >= 98% 2

< 98% 3

In addition to the above, if the service level in any month in the six- month period falls below 98%, one (1) additional violation will be added for each such month to the overall violations for this service level.

Availability of non-CAS systems in production and non-production systems shall be at least 97%. Severity of Violation: Medium

Availability over the six- month period

Violations for calculation of penalty

< 97% & >= 96.5% 1

< 96.5% & >= 96% 2

< 96% 3

In addition to the above, if the service level in any month in the six- month period falls below 96%, one (1) additional violation will be added for each such month to the overall violations for this service level.

RTO shall be less than or equal to six (6) hours. Severity of Violation: High Each instance of non-meeting this service level will be treated as one (1) violation.

RPO (zero data loss in case of failure of Primary DC) should be zero minutes Severity of Violation: High

Infrastructure Performance

Sustained period of peak CPU utilization of any server crossing 70% (with the exception of batch processing) shall be less than or equal to 30 minutes. Severity of Violation: High Each occurrence where the peak CPU utilization of any server crosses 70% (with the exception of batch processing) and stays above 70% for time more than 30 minutes will be treated as one (1) instance.

Page 170: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 170 of 302

Service Level Description

Measurement

Number of instances over the six month period

Violations for calculation of penalty

>0 & <=3 1

> 3 2

In addition to the above, if the number of instances in any month in the six-month period exceeds 3, one (1) additional violation will be added for each such month to the overall violations for this service level.

Sustained period of peak I/O utilization of any server crossing 70% (with the exception of batch processing) shall be less than or equal to 30 minutes. Severity of Violation: High Each occurrence where the peak I/O utilization of any server crosses 70% (with the exception of batch processing) and stays above 70% for time more than 30 minutes will be treated as one (1) instance.

Number of instances over the six month period

Violations for calculation of penalty

>0 & <=3 1 > 3 2 In addition to the above, if the number of instances in any month in the six-month period exceeds 3, one (1) additional violation will be added for each such month to the overall violations for this service level.

Infrastructure Availability

Sustained period of peak memory utilization of any server crossing 70% (with the exception of batch processing) shall be less than or equal to 30 minutes. Severity of Violation: High Each occurrence where the peak memory utilization of any server crosses 70% (with the exception of batch processing) and stays above 70% for time more than 30 minutes will be treated as one (1) instance.

Number of instances over the six month period

Violations for calculation of penalty

>0 & <=3 1

> 3 2

In addition to the above, if the number of instances in any month in the six-month period exceeds 3, one (1) additional violation will be added for each such month to the overall violations for this service level.

Page 171: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 171 of 302

Service Level Description

Measurement

Application Availability

Availability of non-CAS solution components measured within the Data Center shall be at least 97% Severity of Violation: Medium This service level will be monitored on a monthly basis.

Availability over the six- month period

Violations for calculation of penalty

< 97% & >= 96% 1

< 96% 2

In addition to the above, if the service level in any month in the six- month period falls below 96%, one (1) additional violation will be added for each such month to the overall violations for this service level.

Application Performance

Average application response time during peak usage hours as measured from a client terminal within the Data Center shall not exceed 4 seconds. Severity of Violation: High The list of critical business functions and peak usage hours will be identified by the State during the Supply and System Integration Phase.

This service level will be monitored on a monthly basis.

Average application response time over the six-month period

Violations for calculation of penalty

> 4s & <= 5s 2

> 5s & <= 6s 4

> 6s 5

In addition to the above, if the average turnaround time in any month in the six-month period goes beyond 6s, one (1) additional violation will be added for each such month to the overall violations for this service level.

2. Client Site Infrastructure Systems

a) Critical Client Site Systems. The failure or disruption results in inability of the police

station / higher offices to service its dependent offices or perform critical back-office

functions. Critical client site infrastructure means the IT infrastructure at client site

which are shared by multiple users i.e., Core Switch, Core Routers, etc.

b) This service level will be measured on a monthly basis for each implementation site.

The below tables gives details on the Service Levels the SI should maintain.

Page 172: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 172 of 302

Service Level Description

Measurement

Client Site Systems Availability

Availability of the critical client site infrastructure components at all the implementation sites shall be at least 99% Severity of Violation: High This service level will be measured on a monthly basis for each implementation site. If the availability in a month for an implementation site falls below the minimum service level, it will be treated as one (1) violation. The total number of violations for the six-month period will be the cumulative number of violations across all the months across all sites in the six-month period.

3. Handholding Support: Client Site Support

a) Level 1 Incident. The incident has an immediate impact on the State’s ability to service

its police stations / higher offices, to perform critical back-office functions or has a direct

impact on the organization.

b) Level 2 Incidents. The incident has an impact on the State’s ability to service its police

stations / higher offices that while not immediate, can cause service to degrade if not

resolved within reasonable time frames

c) The severity of the individual incidents will be mutually determined by the State and SI.

d) The scheduled operation time for the client site systems shall be the business hours of

the State.

e) This service level will be measured on a monthly basis for each implementation site.

f) The tables below give details of the Service Levels the SI is required to maintain.

Service Level Description

Measurement

Client Site Support Performance

80% of the Level 1 Incidents at each site should be resolved within 2 business hours from the time call is received / logged which ever is earlier. The maximum resolution time for any incident of this nature shall not exceed 8 business hours. Severity of Violation: Medium This service level will be measured on a monthly basis for each implementation site. If the performance in a month for an implementation site falls below the minimum service level, it will be treated as one (1) instance. The total number of instances for the six-month period will be the cumulative number of instances across all the months across all sites in the six- month period. Average number of instances per month = (Total number of instances for the six-month period) / 6

Average number of instances per month

Violations for calculation of penalty

Page 173: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 173 of 302

Service Level Description

Measurement

>0 & <=4 1

>4 & <=8 2

>8 & <=12 3

>12 4

80% of the Level 2 Incidents at each site should be resolved within 6 business hours from the time a call is received / logged which ever is earlier. The maximum resolution time for any incident of this nature shall not exceed 48 hours. Severity of Violation: Medium

This service level will be measured on a monthly basis for each implementation site. If the performance in a month for an implementation site falls below the minimum service level, it will be treated as one (1) instance. The total number of instances for the six-month period will be the cumulative number of instances across all the months across all sites in the six- month period. Average number of instances per month = (Total number of instances for the six-month period) / 6

Average number of instances per month

Violations for calculation of penalty

>0 & <=4 1

>4 & <=8 2

>8 & <=12 3

>12 4

Replacement of hardware equipment shall be done within 7 days of notification by the State. These equipments would have failed on four or more occasions in a period of less than three months or six times in a period of less than twelve months. (Mean Time Between Failure Condition) Severity of Violation: High Each instance of non-meeting this service level will be treated as one (1) violation.

4. Handholding Support: Application Support

a) Level 1 Defects. The failure to fix has an immediate impact on the State’s ability to

service its police stations / higher offices, inability to perform critical back-office

functions or a direct impact on the organization.

b) Level 2 Defects. The failure to fix has an impact on the State’s ability to service its

police stations / higher offices that while not immediate, can cause service to degrade if

not resolved within reasonable time frames.

Page 174: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 174 of 302

c) Level 3 Defects. The failure to fix has no direct impact on the State’s ability to serve its

police stations / higher officers, or perform critical back-office functions.

d) The severity of the individual defects will be mutually determined by the State and SI.

e) This service level will be monitored on a monthly basis.

f) The below tables gives details on the Service Levels the SI should maintain.

Service Level Description

Measurement

Application Support Performance

95% of the Level 1 defects shall be resolved within 4 business hours from the time of reporting full details. Severity of Violation: High This service level will be monitored on a monthly basis.

Performance over the six- month period

Violations for calculation of penalty

< 95% & >= 90% 1

< 90% & >= 85% 2

< 85% 3

In addition to the above, if the service level in any month in the six- month period falls below 85%, one (1) additional violation will be added for each such month to the overall violations for this service level.

95% of the Level 2 defects shall be resolved within 72 hours from the time of reporting full details. Severity of Violation: High This service level will be monitored on a monthly basis.

Performance over the six- month period

Violations for calculation of penalty

< 95% & >= 90% 1

< 90% & >= 85% 2

< 85% 3

In addition to the above, if the service level in any month in the six- month period falls below 85%, one (1) additional violation will be added for each such month to the overall violations for this service level.

100% of the Level 3 defects shall be resolved within 120 hours from the time of reporting full details. Severity of Violation: High This service level will be monitored on a monthly basis.

Performance over the six- month period

Violations for calculation of penalty

Page 175: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 175 of 302

Service Level Description

Measurement

< 100% & >= 90% 1

< 90% & >= 80% 2

< 80% 3

In addition to the above, if the service level in any month in the six- month period falls below 80%, one (1) additional violation will be added for each such month to the overall violations for this service level.

Up to date of the documentation of the design, modifications, enhancements, and defect-fixes in the half-yearly period. Severity of Violation: Medium This service level will be measured on a half-yearly basis. Each instance of non-meeting this service level will be treated as one (1) violation.

5. Handholding Support: Helpdesk and Data Center Support

a) Level 1 Calls. The failure to fix has an immediate impact on the State’s ability to service

its police stations / higher offices, inability to perform critical back-office functions or a

direct impact on the organization.

b) Level 2 Calls. The failure to fix has an impact on the State’s ability to service its police

stations / higher offices that while not immediate, can cause service to degrade if not

resolved within reasonable time frames.

c) Level 3 Calls. The failure to fix has no direct impact on the State’s ability to serve its

police stations / higher offices, or perform critical back-office functions.

d) This service level will be monitored on a monthly basis.

e) The below tables gives details on the Service Levels the SI should maintain.

Service Level Description

Measurement

Helpdesk Performance

98% of the calls shall be answered within 45 seconds. Severity of Violation: High This service level will be monitored on a monthly basis.

Performance over the six- Violations for calculation of

month period Penalty

< 98% & >= 90% 1

< 90% & >= 80% 2

< 80% 3

Page 176: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 176 of 302

Service Level Description

Measurement

In addition to the above, if the service level in any month in the six- month period falls below 80%, one (1) additional violation will be added for each such month to the overall violations for this service level.

98% of the incidents within helpdesk resolution capacity shall be resolved in a cycle time of 24 hours Severity of Violation: High This service level will be monitored on a monthly basis.

Performance over the six- month period

Violations for calculation of penalty

< 98% & >= 90% 1

< 90% & >= 80% 2

< 80% 3

In addition to the above, if the service level in any month in the six- month period falls below 80%, one (1) additional violation will be added for each such month to the overall violations for this service level.

98% of the non SI supported incidents shall be routed to the appropriate service provider within 30 minutes. Severity of Violation: Medium This service level will be monitored on a monthly basis.

Performance over the six- month period

Violations for calculation of penalty

< 98% & >= 90% 1

< 90% & >= 80% 2

< 80% 3

In addition to the above, if the service level in any month in the six- month period falls below 80%, one (1) additional violation will be added for each such month to the overall violations for this service level.

80% of the Level 1 calls shall be resolved within 2 hours from call received / logged which ever is earlier. The maximum resolution time for any incident of this nature shall not exceed 8 business hours. Severity of Violation: High This service level will be monitored on a monthly basis.

Performance over the six- month period

Violations for calculation of penalty

< 80% & >= 70% 1

< 70% & >= 60% 2

Page 177: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 177 of 302

Service Level Description

Measurement

< 60% 3

In addition to the above, if the service level in any month in the six- month period falls below 60%, one (1) additional violation will be added for each such month to the overall violations for this service level. 80% of the Level 2 calls shall be resolved within 6 hours from call received / logged which ever is earlier. The maximum resolution time for any incident of this nature shall not exceed 48 hours. Severity of Violation: High This service level will be monitored on a monthly basis.

Performance over the six- month period

Violations for calculation of penalty

< 80% & >= 70% 1

< 70% & >= 60% 2

< 60% 3

In addition to the above, if the service level in any month in the six- month period falls below 60%, one (1) additional violation will be added for each such month to the overall violations for this service level.

80% of the Level 3 calls shall be reported on status and action to be communicated within 24 hours from call received / logged which ever is earlier. The maximum resolution time for any incident of this nature shall not exceed 72 hours. Severity of Violation: High This service level will be monitored on a monthly basis.

Performance over the six- month period

Violations for calculation of penalty

< 80% & >= 70% 1

< 70% & >= 60% 2

< 60% 3

In addition to the above, if the service level in any month in the six- month period falls below 60%, one (1) additional violation will be added for each such month to the overall violations for this service level.

Page 178: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 178 of 302

Service Level Description

Measurement

Datacenter Support Performance

Replacement of hardware equipment shall be done within 15 days of notification by the State. These equipments would have failed on four or more occasions in a period of less than three months or six times in a period of less than twelve months. (Mean Time Between Failure Condition) Severity of Violation: High Each instance of non-meeting this service level will be treated as one (1) violation.

Datacenter Support Performance

Up to date of the documentation of the design, modifications, enhancements, and fixes. Severity of Violation: Medium This service level will be measured on a half-yearly basis. Each instance of non-meeting this service level will be treated as one (1) violation.

6. Reporting

a) The below table gives details on the Service Levels the SI should maintain for client site

systems availability.

Service Level Description

Measurement

Availability and Performance Report

Provide monthly SLA compliance reports, monitoring and maintenance related MIS reports by the 5th of the following month. Severity of Violation: Medium This service level will be monitored on a monthly basis. If the monthly SLA compliance report related to the service level metrics is not provided in the given timeframe, it will be treated as one (1) instance. The total number of instances for the six-month period will be the cumulative number of instances across all the months in the six-month period.

Total number of instances over the six month period

Violations for calculation of penalty

>0 & <=3 1

> 3 2

7. Credits for Successful Application Uptake

The below table gives details of the credits that can be gained by the SI for successful uptake of the application in the State. The credits will not be calculated for the first reporting period.

Page 179: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 179 of 302

Service Level Description

Measurement

CCTNS Uptake The following metrics will be measured at the end of each reporting period for each District that has been declared as “Go Live”: 1. Number of key transactions carried through internet (ex: Transactional such as submitting an application for a no- objection certificate and Informational such a requesting the status of a case) 2. Number of active users profiles in State CAS 3. Number of read-write transactions on State CAS system 4. Number of Searches carried out on data in State CAS 5. Total number of FIRs prepared through State Cas 6. Total number of Crime Details Forms prepared through State CAS 7. Total number of Key Investigation Forms prepared through State CAS 8. Total number of Arrest Cards prepared through State CAS 9. Total number of Charge Sheets prepared through State CAS 10. Quality (recency and accuracy) of information available in State CAS 11. Number of cases reported to be solved because of the availability of State CAS 12. Number of ad-hoc requests successfully responded to using State CAS 13. Turnaround Time for submitting the monthly and annual crime/criminal information to NCRB from the State A credit will be gained for each of the above parameters if the uptake for that parameter shows significant improvement. The following table applies for each of the above parameters:

% increase over the measurement in the last reporting period

Credits

>5 & <=10% 2

>10 & <=15% 3

> 15% 4

Page 180: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 180 of 302

8. Violations and Associated Penalties

a) The primary intent of Penalties is to ensure that the system performs in

accordance with the defined service levels. Penalties are not meant to be punitive or,

conversely, a vehicle for additional fees.

b) A six monthly performance evaluation will be conducted using the six monthly reporting

periods of that period.

c) Penalty Calculations.: The framework for Penalties, as a result of not meeting the

Service Level Targets is as follows:

i. The performance will be measured for each of the defined service level

metric against the minimum / target service level requirements and the

violations will be calculated accordingly.

ii. The number of violations in the reporting period for each level of severity

will be totaled and used for the calculation of Penalties.

iii. If the total number of credits gained by the SI is lower than the total

number of high severity violations in the reporting period, the total

number of credits will be subtracted from the total number of High

Severity Violations in the reporting period for the calculation of Penalties.

iv. If the total number of credits gained by the SI is higher than the total

number of high severity violations in the reporting period, the resultant total

number of high severity violations in the reporting period for calculation of

penalties will be considered as zero (0).

v. Penalties applicable for each of the high severity violations are two (2) % of

respective half yearly payment to the SI.

vi. A penalty applicable for each of the medium severity violations is one (1%)

of respective half yearly payment to the SI.

vii. Penalties applicable for each of the low severity violations is half

percentage (0.5%) of respective half yearly payment to the SI.

viii. Penalties applicable for not meeting a high (H) critical performance target

in two consecutive half years on same criteria shall result in additional

deduction of 5% of the respective half yearly payment to the SI

Penalty shall be applicable separately for each such high critical activity

ix. Penalties applicable for not meeting a medium (M) critical performance

target in two consecutive half yearly periods on same criteria shall result in

additional deduction of 3% of the respective half yearly payment to the SI.

Penalty shall be applicable separately for each such medium critical

activity

x. Penalties applicable for not meeting a low (L) critical performance target in

two consecutive half yearly periods on same criteria shall result in

additional deduction of 2% of the respective half yearly payment to the SI.

Penalty shall be applicable separately for each such medium critical

activity

xi. It is to be noted that if the overall penalty applicable for any of the review

period during the currency of the contract exceeds 25% or if the overall

penalty applicable for any of the successive half year periods during the

Page 181: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 181 of 302

currency of the contract is above 15%; then the State shall have the right

to terminate the contract.

Page 182: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 182 of 302

ANNEXURE VII Network Connectivity Solution

The Networking solution of CCTNS project shall be based on a Hybrid Model which will consist of

Tamil Nadu State Wide Area Network (TNSWAN) operated by ELCOT under SWAN scheme and

Data network operated by Bharat Sanchar Nigam Limited (BSNL) which consists of Point to point

leased lines, VPNoBB and MPLS technologies. BSNL shall be providing the Networking &

Connectivity services along with Operations & Maintenance for all the locations implemented by

BSNL in Tamil Nadu.

BSNL shall also provide connectivity on MPLS VPN network for aggregated bandwidth at the Tamil

Nadu State Data Center (TNSDC) for the locations connected on VPNoBB and also provide

connectivity for TNSDC at Chennai to the National Data Centre (NDC) of NCRB. Further BSNL

shall provide MPLS VPN network for connecting TNSDC and Disaster Recovery Centre (DRC) for

CCTNS Project to be positioned at State Data Centre, Kerala, located in Trivandrum.

Scope of work for BSNL: The details of scope of work of BSNL are as under:

a) Provisioning of 256 kbps/512 kbps VPNoBB connectivity to Police Stations

including the 25 remote and inaccessible Police Stations which presently do not

have broadband connection available. The list of these inaccessible locations is

as mentioned below:

Page 183: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 183 of 302

S.No DISTRICT POLICE STATION

1. Vellore Panamadangai

2. Thiruvalam

3. Kavalur

4. Villupuram Thirupalaipandal

5. Cuddalore Thukkanampakkam

6. Maruthur

7. Coimbatore Pillur Dam

8. Tiruppur Tiruppur Rural

9. Erode Burgur

10. Kadambur

11. Salem Kariyakovil

12. Perambalur Venganur

13. Karur Balaviruthi

14. Pudukottai Udayallipatti

15. Theni Kurangani

16. Tirunelveli Vijanarayanapuram

17. Manjolai

18. Kuruvikulam

19. Sivanthipatti

20. Thirukkankudi

21. Sivalaperi

22. Thoothukudi Kadalkudi

23. SP, PTC, Perurani

24. Manimutharu TSP-X Battalian

25. TSP-XII Battalian

b) Provisioning of the Routers (at CCTNS site) and Modems for locations to be

connected directly with MPLS VPN and all other hardware and network

infrastructure provided for VPNoBB connectivity.

c) Provisioning of Aggregated bandwidth on MPLS VPN network at each

Page 184: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 184 of 302

States/UTs SDC for the locations connected on VPNoBB network.

d) Provisioning of MPLS VPN connectivity between TNSDC and DRC.

e) Provisioning of MPLS VPN connectivity between NDC and TNSDC

f) Maintaining the network including hardware supplied for minimum period of 3

years.

SLA of 99% uptime would be provided for MPLS VPN connectivity. SLA for the sites

connected through VPN on Broadband will be 97%

Role of System Integrator: The SI shall coordinate with BSNL and the State/UT Police

Department for implementation of the Network and Connectivity solution of CCTNS

project.

The following are the key responsibilities of the SI with respect to Networking and

Connectivity.

i. Site preparation at all locations for establishment and installation of

networking and connectivity solution.

ii. Coordination with the State Police Department and nominated

officials of BSNL for Installation, Configuration, Testing and

Commissioning of BSNL’s 2Mbps MPLS VPN links and 256/512

kbps VPNoBB links.

iii. Coordination with BSNL for ensuring Operations and Maintenance of

networking hardware to ensure compliance to the SLAs as offered

by BSNL.

iv. The SI will also be coordinating with BSNL and State Police

Department for SLA Monitoring, Fault Reporting & Troubleshooting

of the links for meeting the Service levels and Master Service

Agreement.

v. SI shall also coordinate with State CCTNS Nodal Officer (ADGP,

SCRB) for finalizing Police stations lists for the connectivity options,

issuing commissioning report for demand note/payment clearance,

reporting SLA and providing for link status updates.

Note: The process of finalization for signing of contract with BSNL as Service provider for CCTNS

project is in progress and detailed guidelines on implementation of Networking and Connectivity will

be sent to all States/UTs.

Page 185: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 185 of 302

ANNEXURE VIII Indicative Technical Specifications

Personal Computer for each of the police stations: Personal Computers Features Specifications Processor Intel Core i5 2400 (3.10 Ghz, 6MB L3 Cache) 4 core processor Chipset Intel Q67 Express Chipset Motherboard OEM Motherboard

RAM 2 GB DDR3 PC3- 6400 (1066 Mhz) Non ECC RAM expandable up to 16 GB (4 DIMM Slots minimum)

Hard Disk Drive & controller

250 - GB SATA 3.0 Gb/s Hard Drive (16 MB Cache, 7200 RPM, NCQ Smart -IV)

Optical Drive Serial Advanced Technology Attachment (SATA) Super Multi Light Scribe DVD Writer Drive

Graphics Intel HD Graphics 2000 - Integrated Audio Inel HD Audio - Integrated

Ethernet Gigabit 10/100/1000 Network card with remote booting facility

Bays External : 2 * 5.25" drive bays ; Internal : 2* 3.5" drive bays

Slots Minimum 3 PCI / PCI express slots

Ports Ports :6 * USB 2.0 (4 in front + 2 in rear), 1* VGA, 1* Line in , 1* Line out, 1* RJ 45

Power Supply 300-watt ATX Power Supply – PFC (Active Power Factor Correction (PFC) power supply). Surge Tolerance of upto 2000V

Keyboard PS/2 104 keys keyboard (Same make as PC) Monitor 18.5 ‘’ LCD monitor with TCO 5.0 Certification Mouse PS/2 2 Button Optical Scroll Mouse(Same make as PC) Operating System NIC Linux – To Be Provided by NIC Office Productivity Application

LibreOffice 3.3 3 / Star Office / Libre Office

Compliance And Certification

As per industry standard for Monitor and PC

Drivers for different Operating systems

Drivers should be supplied along with the PC

OEM Certifications ISO 9001-14001, ISO 9001-2008, Greenpeace International, Should be in the in the list of top 5 desktop brands as per IDC report published for India during year 2010.

Warranty 5 years comprehensive onsite replacement warranty.

Page 186: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 186 of 302

Duplex Laser Printers Feature Specification Speed (min.) 20 PPM / 23PPM (A4) Memory(min.) 32 MB / 64 MB Resolution 1200x1200 dpi Interface USB, Ethernet (UTP) with respective cables

Monthly Duty Cycle 10000 Pages Language PCL6 / PS2 or higher Print Mode Automatic Duplex Mode Cartridge Full Cartridge- Starter Cartridge not acceptable Drivers Windows 2000, Windows XP, Windows Vista, Windows 7, MAC OS

9.0, MAC OS X, Linux Kernel 2.6 or later Multi - function Laser (Print/Scan/Copy) Feature SpecificationSpeed (min.) 20 PPM / 23PPM (A4) Memory(min.) 32 MB / 64 MB Resolution 1200x1200 dpi Interface USB, Ethernet (UTP) with respective cables Monthly Duty Cycle 10000 Pages Language PCL6 / PS2 or higher Accessories Copier, Scanner with ADF Drivers Windows 2000, Windows XP, Windows Vista, Windows 7, MAC OS

9.0, MAC OS X, Linux Kernel 2.6 or later Digital Pad & Pen Feature SpecificationPad Size 336mm (length) x 245mm (width) Writing Area 210mm x 279mm Notepad holder 210mm x 300mm Built-in memory 32MB or more Memory slot Secure Digital Digital pen size 134mm x 11.3mm (diameter) Digital page file formats

DHW; DND

OS Supported Windows 2000, Windows XP, Windows Vista, Windows 7, MAC OS 9.0, MAC OS X, Linux Kernel 2.6 or later

Interface USB 1.0 & 2.0 Finger print reader Feature SpecificationSensor Type Optoelectronic Prism Architecture Dual Prism Size of Window minimum 45mm x 45mm preferable up to 45mm x 48mm Glass Thickness 25mm Resolution 500 PPI or higher Image grey scale 256 level Dynamic Scanning time 0.01Sec. Distortion rate 0.1% Computer interface USB2.0, USB Powered Operating temperature

0-55 Degree C

Page 187: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 187 of 302

Environmental humidity

Up to 90%

Optical/Film Coating Hygroscopic Operating system Support

Linux

Compliant P. I. V Digital Camera Feature SpecificationEffective Megapixels 10 megapixels or Higher Image sensor CMOS / CCD Image sensor size 0.400 inches or larger Image format JPEG /RAW White balance Auto & Manual Image Stabilization Hardware Maximum Optical Zoom

4 X or Higher

Maximum Wide Angle 28 mm Minimum aperture 8 Maximum aperture 2 LCD screen size 3 inches or higher Has live preview Yes Maximum shutter speed

2500

Minimum shutter speed

15

ISO Low 100 ISO High 3200 Exposure settings Aperture Priority & Shutter Priority Memory Capacity Minimum 2 GB Memory type SD Memory Card / SDHC Memory Card / SDXC Memory Card Flash characteristics Built-in Auto Flash Flash Slow Sync / Red-Eye Reduction Maximum video capture resolution

1280 x 720 pixels

Maximum frame rate 30 Frames per Second Video capture format MOV/AVI Interface connection USB 1.0 & 2.0 Battery Type Lithium Ion/ AA Battery Rechargeable Yes Windows 2000, Windows XP, Windows Vista, Windows 7, MAC OS

9.0, MAC OS X, Linux Kernel 2.6 or later

Page 188: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 188 of 302

160 GB External Hard Disk Drive Feature Specification Capacity 160 GB Type External Interface USB 2.0 & USB 1.1 Spindle Speed 5400 RPM Buffer Size 8 MB Seek Time 12 ms Transfer Rate 60 Mega Bytes /s Form Factor 2.5" OS Support Windows 2000, Windows XP, Windows Vista, Windows 7, MAC OS

9.0, MAC OS X, Linux Kernel 2.6 or later 16 Port Switch – Unmanaged Feature Specification Standards IEEE 802.3 10BASE-T Ethernet

IEEE 802.3u 100BASE-TX Fast Ethernet ANSI/IEEE 802.3 NWay auto negotiation

Protocol CSMA/CD Data Transfer Rates Ethernet

10Mbps (half-duplex) 20Mbps (full-duplex) Fast Ethernet: 100Mbps (half-duplex) 200Mbps (full-duplex)

Network Cables

10BASE-T: UTP Cat. 3, 4, 5 (100 m) EIA/TIA-586 100-ohm STP (100 m) 100BASE-TX: UTP Cat. 5 (100 m) EIA/TIA-568 100-ohm STP (100m max.)

Number of Ports 10/100Mbps port x 16 Twisted-pair Rx Reverse Polarity

Auto-correction for each port

MAC Address Learning

Automatic update

RAM Buffer 4MBits per device Power Supply 100 - 240 VAC, 50/60 Hz 0.3A Internal power supply 16 Port Switch - Managed Feature SpecificationInterface Ports 16 10/100/1000BASE-T Auto-negotiating, Auto-MDI/MDI-X ports

with 802.3x Flow Control Performance Switch Capacity

32Gbps

Packet Forwarding Rate

23.8Mpps or above

MAC Address Table Size

8K

MAC Address Update Up to 256 static MAC entries Enable/disable auto-learning of MAC addresses

Packet Buffer 512KB Power Input 100 to 240 VAC 50/60Hz Internal power supply Port Standards and Functions

IEEE 802.3 10BASE-T Ethernet IEEE 802.3u 100BASE-TX Fast Ethernet IEEE 802.3ab 1000BASE-T Gigabit Ethernet

Page 189: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 189 of 302

IEEE 802.3z Gigabit Ethernet (fiber) ANSI/IEEE 802.3 IEEE 802.3x Flow Control Auto-Negotiation 802.3af Power over Ethernet

LAYER 2 Features IGMP v1/2 Snooping: supports 64 multicast groups 802.1D Spanning Tree Static Port Trunk (Link Aggregation): up to 6 groups per device, up to 8 ports per group

VLAN 802.1Q VLAN (VLAN Tagging) Up to 256 static VLAN groups Management VLAN Asymmetric VLAN

Quality of Service (QoS)

802.1p Priority Queues Up to 4 queues per port DSCP-based QoS

Security 802.1X Port-based Access Control Broadcast Storm Control Trusted Host Cable Diagnostics function

Management Web-based GUI SNMP v1 support DHCP Client Trap setting for destination IP, system events, fiber port events, twisted-pair port events Port Access Control Web-based: Configuration backup/restoration Web-based: Firmware backup/upload System Reboot using web-based interface

UPS – 2 KVA online UPS (for each police station) Feature SpecificationPower Rating 2 kVA/ 1.6 kW/ 0.8 PF with 60 min backup Technology True On-Line Double Conversion Architecture Nominal input voltage (Vac)

220/230/240 Vac

Input voltage Range

160-288 VAC

Operating Frequency

50/60 Hz auto sensing

Nominal output Voltage

208/220/230/240 VAC

Output voltage Regulation

+/-3% online; +/-3% on battery mode

Overload Capacity

Up to 110 % for 2 minute, 111-150% for 30 sec

Efficiency 85% (On-Line mode) >93% (High efficiency mode)

Load Crest Factor

3 : 1

LED 3 LEDs indicating UPS status 5 Alarm/Bar Graph indicators

Standard Communication ports

RS232

Optional Slots SNMP, Multiserver card, relay card , Modbus card Form Factor Dual Form Factor – Should be placed either as Rack mount or

Page 190: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 190 of 302

Tower. Height Should not exceed 2U for rack mount purpose Battery Type Sealed, lead-acid, maintenance-free Battery Runtime The system must be capable of providing 60 minutes of battery

Back-up time. (Minimum VAH= 2952 AH for 60 minutes back up) Exide / Amaron / Luminous Total number of batteries offered should be clearly mentioned. Voltage of each battery offered should be clearly mentioned Ampere-Hour rating of each battery offered should be clearly mentioned. Total Volt-Ampere-Hour rating of the Battery Bank Offered should be clearly mentioned.

Battery Replacement

Modular, hot-swappable, user-replaceable

Start-On-Battery Should allow startup of UPS without utility input Operating Temperature

0°C - +40°C

Storage Temp Recommended 0°C - +25°C Altitude < 3000 M Audible Noise <45 dB battery mode RoHS Compliance

Should be EU RoHS / WEEE Compliant

Markings CE Safety EN 50091-1 / equivalent EMC EN 50091-2 /equivalent Quality ISO 9001, ISO 14001 UPS – 5 KVA online UPS (for each District SP Office and Higher Offices) Feature Specification Power Rating 5 kVA/ 4 kW/ 0.8 PF with 60 min backup Technology True On-Line Double Conversion Architecture Nominal input voltage (Vac)

220/230/240 Vac

Input voltage Range

160-288 VAC

Operating Frequency

50/60 Hz auto sensing

Nominal output Voltage

208/220/230/240 VAC

Output voltage Regulation

+/-3% online; +/-3% on battery mode

Overload Capacity

Up to 110 % for 2 minute, 111-150% for 30 sec

Efficiency 85% (On-Line mode) >93% (High efficiency mode)

Load Crest Factor

3 : 1

LED 3 LEDs indicating UPS status 5 Alarm/Bar Graph indicators

Standard communication ports

RS232

Optional Slots SNMP, Multiserver card, relay card , Modbus card Form Factor Dual Form Factor – Should be placed either as Rack mount or

Tower. Height Should not exceed 2U for rack mount purpose Battery Type Sealed, lead-acid, maintenance-free

Page 191: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 191 of 302

Battery Runtime The system must be capable of providing 60 minutes of battery Back-up time. (Minimum VAH= 7800 AH for 60 minutes back up) Exide / Amaron / Luminous Total number of batteries offered should be clearly mentioned. Voltage of each battery offered should be clearly mentioned Ampere-Hour rating of each battery offered should be clearly mentioned. Total Volt-Ampere-Hour rating of the Battery Bank Offered should be clearly mentioned.

Battery Replacement

Modular, hot-swappable, user-replaceable

Start-On-Battery Should allow startup of UPS without utility input Operating Temperature

0°C - +40°C

Storage Temp Recommended 0°C - +25°C Altitude < 3000 M Audible Noise <45 dB battery mode RoHS Compliance

Should be EU RoHS / WEEE Compliant

Markings CE Safety EN 50091-1 / equivalent EMC EN 50091-2 /equivalent Quality ISO 9001, ISO 14001

Page 192: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 192 of 302

Specifications for Sine Inverter (3 KVA) (for each Police Station)

INPUT Under Voltage 100 +/- 10 V Over Voltage 285 +/- 10 V

OUTPUT

Voltage (INVERTER Mode) 230 V Nominal Voltage (Mains Mode) Same as Input

Frequency (INVERTER Mode) 50 Hz. +/- 2% Frequency (Mains Mode) Same as Input (45-55 Hz.)

Overload > 110 % Transfer Time (typical a.s) 10 ms.

BATTERY

Type 12V/135 AH Tubular Number 4 in series

Typical Recharge Time 10-12 Hrs.

Protection Battery Deep Discharge,

Reverse Polarity, DC Overvoltage

LED DISPLAY

Inverter ON Battery Low Mains On

Battery Charged Overload No Load

Over Temperature

Short Circuit under Battery

Mode

MCB Trip or Short Circuit under

Mains Mode

ALARMS

Low Battery Pre-Alarm Low Battery

Overload No Load Shut Down

Short Circuit

ENVIRONMENTAL Operating Temperature 0-45o C (32-113 o F) Storage Temperature 0-45o C (32-113 o F)

Humidity 0-95 % RH non -condensing Specifications for Tubular Battery (for each Police Station)

Nominal Voltage

Capacity Electrolyte Volume in

Litres (Minimum)

BOOST MODE TRICKLE MODE

Starting Rate

Finishing Rate

Min Max

12 135AH 11.0 12.0 6.0 108 432

Page 193: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 193 of 302

Specifications for Handheld Device for Data Access and Communication (for Intelligence Unit Office and Intelligence Headquarters)

S.No Details Specification

1 System Software Win 6.5 or latest, Linux or Android (minimum 2.1) 2 CPU Arm 9 core 32 bit (500 MHz or Higher )OR Latest Intel PXA270

(520 MHz or higher)

3 Monitor Basic Screen parameter TFT, Color screen, 320*240 pix, 4:3 aspect ratio, 3.5 inch QVGA, high-definition capacitive touch screen, At least 64K color (65,536 colors)

4 Full Radio Communication

GSM

GPRS

EDGE

3G/W-CDMA

Should work with 2.5G/3G data services being offered / to be

launched by various mobile service providers in India.

Bluetooth Class 2.0

Wi-Fi 802.11 b/g

Integrated GPS

5 Battery Rechargeable Li-ion / Li-Po 3.7V or higher upto 7.2V 1500mAH or higher with 230V AC Adaptor & Vehicle Cigarette Lighter Charging Adaptor Device should have Minimum 8 hrs Battery backup with GPRS activated.

6 ROM/NAND Flash 256 MB Minimum 128 MB Minimum user space available,

7 RAM 256 MB Minimum configured scalable to 512 MB 8 SD card Slot SDIO support/SD Card Support 9 Input Full QWERTY with Stylus for Touch screen Input 10 Interface Data Cable Support, USB 2.0 Host & Client 11 Ruggedness IP 67

Should be able to withstand at least 4 feet drops on concrete floors on all edges and on screen. The TFT screen and device should be scratch resistant.

12 Java Java Support 13 Messaging SMS

MMS E-Mail Push E-Mail

14 GPS Channels:20,,Reqcquire:0.1sec avg. Sensitivity:159DBm Reqcquire:0.1sec avg. Hot Start :1 Sec, average Warm Start:38 Sec, average Cold Start: 42 sec, average

15 Camera Camera 5 mega-pixel (Minimum) Image Format - JPEG Auto focus Lens Facility to shoot video (24fps minimum) Video Format – AVI/MP4/WMV

16 Finger Print Scanner for Biometric Access

500 dpi or higher Optical Sensor

Page 194: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 194 of 302

S.No Details Specification

Effective Area :14mm x 20

Minex compliant ISO templates

FAR:0.0001%

FRR:0.01%

UIDAI compliant

17 Signature Pad Integrated Pad & Stylus

18 Voice Recorder Standard Voice recorder facility

19 Additional Accessories

Rugged carrying case with belt clip and with all required connecting cable and vehicle charger. An existing Screen protector along with an additional one.

20 Warranty 5 Years

21 Kill Option In case of a lost mobile, facility to destroy data from remote location

22 Environmental Parameter

Operating Temperature 0°C to 50°C Storage Temp 0°C to 60°C Operating Humidity 10-90% non-condensing

23 Certification ISO 9001

24 Agency Approvals FCC,ICS, CSA,IEC

25 Real time clock & Network Time Protocol (NTP) support

Device should have real time clock so that time of device will not change even if battery is removed. The device should also support time synchronization using NTP or SNTP.

26 Security Feature Facility to create guest account at device so that user will not be able to do any unnecessary modifications

27 Diagnostic features Device should have network diagnostic features like PING, TRACE ROUTE etc.

28 Antivirus protection Device should have licensed Antivirus Software.

b. Application Platform, Operating System and Server Hardware

S. No. Server description Hardware OS Application 1 Web Server internet users x86 family Ubuntu /

CentOS PHP/J2EE

2 Web server intranet users X86 family Ubuntu / CentOS

Apache HTTP Server

3 Directory Server Access Manager with DNS & client authentication license server

X86 Ubuntu / CentOS

Free Open Source Solution (FOSS)

4 Application Server/Portal X86 Ubuntu / CentOS

FOSS

5 Data Base server X 86 Ubuntu/ CentOS

PostgreSQL

i. Technical Specification for Network Equipment:

Page 195: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 195 of 302

Core Distribution switch: For Distribution Layer, two numbers of Distribution Multilayer switch proposal should come

with the standard architecture with Firewall service module with Active & standby units. Should have at least 6 modules.

Feature SpecificationSwitch Architecture Distribution data switch consisting of One Management

module Core data switch consisting of One Management module All modules should be provided with distributed forwarding

capability. 3x48 port 10/100/1000 module. 2x24 Gigabit Fiber interfaces modules with support of

100BASE FX (Multi Mode) & 100BASE-BX (Single Mode) Redundant power source to meet the full power

requirements including the expanded load in future. The Core Data / Distribution Data Switch should have the

following features & requirements and Scalable with full expansion capability, Number of Slots – Minimum of 6 slots.

Performance Specifications Backplane Bandwidth should be minimum 600 Gbps in a Single chassis.

Layer 3 Forwarding Performance of up to 350 Mpps Redundant Management Modules with stateful failover.

Failure of one CPU should not affect the performance of the switch. Redundant module of similar capacity.

The Security features should support port filtering, enabling of individual ports to access only selected nodes, IP permit lists to prevent unauthorized access to the switch, Access Control Lists (ACL) to secure networks from unauthorized users, authentication and secure communications over un -secure channels for access to the network

Layer 2 Features

802.1Q, Centralized VLAN management and configuration.

Number of VLANS: - >=4000 802.1 p/q - VLAN Tagging 802.3x - Flow Control Support for features like Uni-Directional Link Detection. In

case of one of the Cores fiber cut, the switch should detect uni -directional transmission and shut down the port to avoid loops and help bring up the backup links.

Ethernet IEEE 802.3, 10 Base T Fast Ethernet (IEEE802.3u, 10/100 Base-TX, 100 Base

FX, 1000 Base FX) Gigabit Ethernet-(IEEE 802.3z, 802.3ab) Support for 10 Gigabit Ethernet ( IEEE 802.3ae)

Layer 3 Features

Layer 3 or 4 switching and routing Port Mirroring L2, L3 and L4 access control filters. L3/L4 frame

classification VRRP or equivalent for High Availability Rapid Spanning Tree Protocol (RSTP)(802.1w) Rapid convergence Layer 3 protocols 802.1s - Per-VLAN Group Spanning Tree Protocol Support for IP routing features for Static,RIPv1,

Page 196: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 196 of 302

Feature Specification BGPv4,OSPFv2,IS-IS, IGMP v1,v2,v3

IGMP v1,v2,v3 Protocol-Independent Multicast (PIM)-SM RFC 1075 - DVMRP v3-07, PIM (Protocol Independent Multicast) IP Version 6 (IPv6) support in hardware.

Quality of Service Features Enterprise wide QoS management: LAN to WAN integration

Traffic Classification: Physical Port, IP DA/SA, IP DA/SA/L4 Port

Admission Control: IP DA/SA, IP DA/SA L4, RSVP Traffic Marking: Diffserv, IEEE 802.1Q/P COS, IPv4 ToS,

via ACLs Congestion Avoidance: WRED, multiple Queue

Thresholds Scheduling IP precedence, 802.1p and ISL priority, three

transmit queues on a per port basis, WRR, Strict Priority Queue TOS<->COS mapping

Micro-Flow Policing (limits BW of specific user/application) Aggregate-Flow Policing (dedicated BW per customer

SLA) Excess-Rate Policing (permits traffic bursts, enables

granular priority Values/service-level) Strict-Priority Queue (protects mission-critical, delay-

sensitive traffic) Security Features Port based and policy based VLAN & Spanning tree

Network ingress filtering - RFC 2267 IP broadcast forwarding control Rate limiting using ACLs Uni cast Reverse Path Forwarding (RPF) SYN attack protection Session control RADIUS Support for Server load balancing with Layer 3 and Layer

4 protection No impact on packet forwarding performance

Page 197: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 197 of 302

Feature Specification Wire rate Access Control Lists Standard/Extended

Reflexive (stateful) Dynamic (time of day) IP permit lists MAC address filtering based on Source and Destination

Address Bi-directional VACL per VLAN Community Traps and Syslog messages sent on security violations Private VLAN support 802.1x Network Security and Authentication. Support for the 802.1x standard allows users to be

authenticated regardless of which LAN port they are accessing, and provides unique benefits to customers who have a large base of mobile (wireless) users accessing the network.

802.1x with VLAN assignment allows a dynamic VLAN assignment a specific user regardless of where the user is connected.

802.1x with voice VLAN to permit an IP phone access to the voice VLAN Irrespective of the authorized or unauthorized state of the port.

802.1x with port security for authenticating the port and managing network access for all MAC addresses, including that of the client.

IP Access Lists to limit telnet and SNMP access. SSH, RADIUS, AAA for login authentication Support for Local Command Accounting and logging. DHCP and BOOTP relay Standard DNS support Per port broadcast, Unicast and Multicast storm control Dynamic trunking protocol for the automatic configuration

of required trunking Protocol on the ports, without manually configuring it

Network Management features Web based Telnet and TFTP access RMON - Remote Monitoring (RMON) with 4 RMON groups

(history, statistics, Alarms and events). SNMP agent – SNMPv1, SNMPv2c, SNMPv3, Port

snooping and connection steering Layer 2 switch Feature SpecificationGeneral Features The switch should have minimum 24 x 10/100/1000

Gigabit Ethernet Ports & 4 X dual –purpose Uplinks (four SFP-based Gigabit Ethernet ports).

Support for Redundant Power supply. Performance 16 Gbps switching fabric

Wire-speed forwarding rate - 6.5 Mpps Configurable up to 8000 MAC addresses

Layer-2 Features

IEEE 802.1Q VLAN encapsulation. Up to 255 VLANs should be supported. Support for 4000 VLAN IDs.

Support for Automatic Negotiation of Trunking Protocol, to help minimize the configuration & errors.

Page 198: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 198 of 302

Feature Specification

Support for Centralized VLAN Management. Spanning-tree Enhancements for fast convergence IEEE 802.1d, 802.1s, 802.1w, 802.3ad Spanning-tree feature to prevent other edge switches

becoming the root bridge. IGMP snooping v3, Support for upto 255 IGMP Groups.

IGMP filtering. Link Aggregation Protocol (LACP) Support for Detection of Unidirectional Links (in case of

fiber cut) and to disable them to avoid problems such as spanning-tree loops.

The Switch should be able to discover the neighboring device of the same vendor giving the details about the platform, IP Address, Link connected through etc, thus helping in troubleshooting connectivity problems.

Per-port broadcast, multicast, and storm control to prevent faulty end stations from degrading overall systems performance.

Local Proxy Address Resolution Protocol (ARP) to work in conjunction with Private

VLAN Edge to minimize broadcasts and maximize available bandwidth

Quality of Service (QoS) & Control

Standard 802.1p CoS and DSCP Control- and Data-plane QoS ACLs Four egress queues per port to enable differentiated

management of up to four traffic types across the stack. Weighted tail drop (WTD) to provide congestion avoidance Strict priority queuing mechanisms There should not be any performance penalty for highly

granular QoS functions. Rate Limiting function should guarantee bandwidth in

increments as small as 1Mbps. Management Superior manageability features.

Command Line Interface (CLI) support for configuration & troubleshooting purposes.

For enhanced traffic management, monitoring, and analysis, upto four RMON groups (History, statistics, alarms, and events) must be supported.

Layer 2 trace route to ease troubleshooting by identifying the physical path that a packet takes from source to destination.

Domain Name System (DNS) support to provide IP address resolution with user-defined device names.

Trivial File Transfer Protocol (TFTP) to reduce the cost of administering software upgrades by downloading from a centralized location.

Network Timing Protocol (NTP) to provide an accurate and consistent timestamp to all intranet switches.

SNMP v1, v2c, and v3 and Telnet interface support delivers comprehensive in –band management, and a CLI-based management console provides detailed out -of-band management.

RMON I and II standards SNMPv1, SNMPv2c, and SNMPv3

Page 199: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 199 of 302

Core Router: Feature Specification Architecture Should be chassis based & modular architecture for

scalability and should be a single Box configuration for ease of management.

Architecture should be modular / distributed and should be a single box configuration for ease of management.

Multi Service Router (Data, Voice, Video) Should have power supply redundancy. A single power

supply should be able to support a fully loaded chassis. The offered platform should be able to support the

following interface types – Serial port with synchronous speed up to 2

Mbps with interface V.35/G.703, Channelized E1 interfaces for provisioning nx64Kbps connectivity

E3 & DS3, STM1 for high speed interface requirements, Channelized STM -1 Interfaces for aggregating multiple 2Mbps interfaces onto a single Channelized Interface.

Ethernet Interfaces –GE (1000 Base X) as per IEEE 802.3z and 802.3ab, FE as IEEE 802.3u,

512 MB RAM and should be upgradeable to 1GB Should have 256 MB Flash Should have adequate memory to support all OS feature Should have IPSEC VPN (3DES/AES) Encryption

Features. Interface Requirements 6 x V.35/G703 Serial Interfaces (along with necessary

cables) to Aggregate WAN links from Districts & Aggregation Buildings.

8X1 Channelized E1 Interfaces. 4 x 1 Gigabit Ethernet Interfaces for LAN connectivity. Single channel wire speed shall be minimum of 15 Mpps

and router throughput should be minimum 10 GBPS. Should support performance services like NAT, GRE

tunneling, ACL (Standard & Extended) , all industry standard routing protocol.

Shall have MLPPP for link aggregation Shall have Voice traffic optimization

Performance

Shall support at least 150 Kpps forwarding performance Shall support variety of interfaces like

V.35 Sync Serial, (2 Mbps), E1 G.703, Ch -E1 GE as per IEEE 802.3z and 802.3ab, FE as per

IEEE 802.3u, ISDN BRI and PRI and Router should have auto

dial Backup capability for ISDN when primary Lease line is down.

Shall support DSL connectivity using ADSL, G.SHDSL for Horizontal office connectivity.

Shall have support performance enhancement through hardware based encryption

Shall support other IP Services like ACLs. Shall support Voice traffic optimization with features like

Page 200: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 200 of 302

Feature Specification LFI

High Availability

Router should have redundant CPU & Shall support Redundant Power supply

Shall support On-line insertion and removal for cards. Shall support Non-Stop forwarding for fast re-convergence

of routing protocols (BGP, OSPF, IS-IS) Should support VRRP. Shall support redundant connection to LAN Shall support VRRP or equivalent

Protocol Support

Shall support Routing protocols like RIP ver1 (RFC1058) & 2 (RFC 1722 and 1723), OSPF ver2 (RFC2328), BGP4 (RFC1771), IS-IS (RFC1195).

Multicast routing protocols support: IGMPv1, v2 (RFC 2236), PIM -SM (RFC2362).

Should have Dual Stack IPv4 & IPv6 protocols. Shall have IPv6 features Shall have RIPng and OSPFv3 for IPv6.

QoS Features

Classification and Marking: Policy based routing, IP Precedence, DSCP.

Congestion Management: WRED, Priority queuing, Traffic Conditioning: Committed Access Rate/Rate limiting Signaling: RSVP for Bandwidth reservation Link efficiency mechanisms: cRTP/LFI/DiffServ MLPPP

Security Features

Should have GRE Tunneling, NAT without any major performance impact.

Support for Firewall, MD-5 route authentication for RIP, OSPF, IS-IS and BGP SNMPv3 authentication AAA support using Radius PAP / CHAP authentication for P-to-P links Support for DoS prevention, DoS protection IP Access list to limit Telnet and SNMP access to router Shall support multi-level of access. Multiple privilege

authentications for Console and telnet access through local database or through a separate AAA Server.

Debug, Alarms & Diagnostics

Support for monitoring of Traffic flows for Network planning and Security Purposes.

Display of input and output error statistics on all interfaces Display of Dynamic ARP table Trace-route, Ping and extended Ping for testing &

troubleshooting connectivity. Should have extensive support for SLA monitoring for

metrics like delay, latency, Jitter, packet loss, Management

Shall have support for Web based management, C LI, Telnet and SNMPv3

Shall support Secure Shell for secure connectivity. Embedded RMON support for four groups – history,

statistics, alarms and events Interface Requirements

2 * E1 4 * Gigabit Ethernet Interfaces (1000 Base X) to connect to

the LAN. (That will be used for Broadband peer connectivity)

Page 201: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 201 of 302

Feature Specification

4 * V.35 / G703 Serial (2 Mbps) Interfaces (along with necessary cables).

1* console port. 1* BRI for ISDN backup with auto Dial – backup

Performance

Shall support at least 150 Kbps forwarding performance Shall support variety of interfaces like

V.35 Sync Serial, (2 Mbps), E1 G.703, Ch -E1 GE as per IEEE 802.3z and 802.3ab, FE as per

IEEE 802.3u, ISDN BRI and PRI and Router should have auto

dial Backup capability for ISDN when primary Lease line is down.

Shall support DSL connectivity using ADSL, G.SHDSL for Horizontal office connectivity.

Shall have support performance enhancement through hardware based encryption

Shall support other IP Services like ACLs. Shall support Voice traffic optimization with features like

LFI Server Load Balancer Feature Specification 10/100/1000Mbps Ethernet Ports minimum 2 ports upgradeable to 4 ports

Memory Minimum 1 GB upgradeable to 8 GB Minimum of 2 Gbps throughput Minimum of 1 Gbps SSL throughput

Connections Minimum of 4000 SSL connections scalable to 7500 SSL connections

Server Load Balancing Mechanism

Cyclic, Hash, Least numbers of users Weighted Cyclic, Least Amount of Traffic NT Algorithm / Private Algorithm / Customizable Algorithm

/ Response Time Redundancy Features Supports Active-Active and Active-Standby Redundancy

Segmentation / Virtualization support along with resource allocation

Server Load Balancing Features Server and Client process coexist UDP Stateless Service Failover Backup/Overflow Direct Server Return Client NAT Port Multiplexing-Virtual Ports to Real Ports Mapping DNS Load Balancing

Load Balancing Applications Application/ Web Server, MMS, RTSP, Streaming Media DNS, FTP- ACTIVE & PASSIVE, REXEC, RSH, LDAP, RADIUS

SLB should support Management options

Secure Web Based Management SSH TELNET SNMP v1, 2, 3 Based GUI Command Line

Page 202: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 202 of 302

ii. Specifications for Data Centre Infrastructure

Blade Chassis Specification

Single blade chassis should accommodate minimum 6 (Quad core Processor) / 8

(Dual core Processor) or higher hot pluggable blades.

Processor should be latest series/generation for the server model being quoted

6U to 12U Rack-mountable

Dual network connectivity for each blade server for redundancy should be

provided. Backplane should be completely passive device. If it is active, dual

backplane should be provided for redundancy

Should accommodate Intel, AMD, RISC / EPIC Processor based Blade Servers for

future applications

Should have the capability for installing industry standard flavours of Windows,

Linux, Unix, Solaris for x86 Operating Environments

Single console for all blades in the enclosure or KVM Module DVD ROM can be

internal or external, which can be shared by all the blades allowing remote

installation of S/W and OS

Minimum 2 external USB connections functionality

Two hot-plug, redundant 1Gbps Ethernet module with minimum 10 ports

(cumulative), which enable connectivity to Ethernet via switch. Switch should be

(Internal/external) having Layer 3 functionality - routing, filtering, traffic queuing etc

Two hot-plugs, redundant 4 Gbps Fiber Channel for connectivity to the external

Fiber channel Switch and ultimately to the storage device.

Power Supplies

o Hot Swap redundant power supplies to be provided

o Power supplies should have N+N. All Power Supplies modules should be

populated in the chassis

Hot Swappable and redundant Cooling Unit

Management

o Systems Management and deployment tools to aid in Blade Server

configuration and OS deployment,

o Remote management capabilities through internet browser

o It should provide Secure Sockets Layer (SSL) 128 bit encryption and

Secure Shell (SSH) Version 2 and support VPN for secure access over

internet.

o Ability to measure power historically for servers or group of servers for

optimum power usage

o Blade enclosure should have provision to connect to display console /

central console for local management like trouble shooting, configuration,

system status / health display

Built in KVM switch or Virtual KVM feature over IP.

Dedicated management network port should have separate path for management

Support heterogeneous environment: AMD, Xeon and RISC/EPIC CPU blades must be in same chassis with scope to run Win2003/2008 Server, Red Hat Linux/ 64 Bit UNIX, Suse Linux / 64 Bit UNIX / Solaris x86

Page 203: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 203 of 302

Blade Server Hardware for Date Center location & Disaster recovery (Web, Portal, Application) Features Specifications Form Factor 6U to 12U Rack-mountable Processor 2 Quad core @ 2.0 GHz or above with 4 MB shared L2 cache, 1066

MHz / 2000 MT/s FSB Max CPU support Server should have 2 CPU at least. RAM Std / Max Min 64 GB FBD RAM with min 8 Nos. free slots for future

expandability to 256 GB. Drive controller SAS/SCSI NIC 2 X (1000BASE-T) Tx Gigabit LAN ports with TCP / IP offload engine

support /dedicated chipset for network I/O on blade server Hard Drive 4 X 146 GB SAS 10K RPM SAS or better Hot Plug Drives with RAID5

I/O expansion Slots

At least two expansion slots for FC or additional Gigabit cards

OS Certification Required Operating system CentOS

The Operating System for all the servers should have the following features: Unlimited virtualized guests. Multiple operating systems, multiple versions, multiple performance and security settings, all running on the same server. Storage virtualization: Multiple guests, running on the same or different servers, access and share logical storage volumes and file systems. High availability clustering and failover: Application and guest operating system failover. Management: Includes comprehensive management capabilities. Support: Unlimited incident support on Telephone, Email & Web with 4 hours response time directly from OS vendor. Upgrades: Free upgrade during support period Apart from the above the authentication server shall have these additional features: Centralizes management of people and their profiles, thus

reducing administrative costs; Should act as a central repository for user profiles and

preferences, enabling personalization; Should allows 4-way multi-master replication of data across

the enterprise, providing a centralized, consistent data source available to enterprise applications

Should enables single sign-on access with a partner solution Should be able to provide scalability for massive numbers of

users by containing the information control required for developing extranet applications

OEM Certification ISO 9001-14001, ISO 9001-2008, Greenpeace International, Should be in the in the list of top 5 desktop brands as per IDC report published for India during year 2010.

Page 204: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 204 of 302

Blade Server Hardware for Date Center location & Disaster recovery (Infrastructure Services like EMS, Backup, DNS, Antivirus) Features Specifications Form Factor 6U to 12U Rack-mountable Processor 2 Quad core @ 2.0 GHz or above with 4 MB shared L2 cache, 1066

MHz / 2000 MT/s FSB Max CPU support Server should have 2 CPU at least. RAM Std / Max Min 32 GB FBD RAM with min 8 Nos. free slots for future

expandability to 256 GB. Drive controller SAS/SCSI NIC 2 X (1000BASE-T) Tx Gigabit LAN ports with TCP / IP offload engine

support /dedicated chipset for network I/O on blade server Hard Drive 4 X 146 GB SAS 10K RPM SAS or better Hot Plug Drives with RAID5

I/O expansion Slots

At least two expansion slots for FC or additional Gigabit cards

OS Certification Required Operating system CentOS

The Operating System for all the servers should have the following features: Unlimited virtualized guests. Multiple operating systems, multiple versions, multiple performance and security settings, all running on the same server. Storage virtualization: Multiple guests, running on the same or different servers, access and share logical storage volumes and file systems. High availability clustering and failover: Application and guest operating system failover. Management: Includes comprehensive management capabilities. Support: Unlimited incident support on Telephone, Email & Web with 4 hours response time directly from OS vendor. Upgrades: Free upgrade during support period Apart from the above the authentication server shall have these additional features: Centralizes management of people and their profiles, thus

reducing administrative costs; Should act as a central repository for user profiles and

preferences, enabling personalization; Should allows 4-way multi-master replication of data across

the enterprise, providing a centralized, consistent data source available to enterprise applications

Should enables single sign-on access with a partner solution Should be able to provide scalability for massive numbers of

users by containing the information control required for developing extranet applications

OEM Certification ISO 9001-14001, ISO 9001-2008, Greenpeace International, Should be in the in the list of top 5 desktop brands as per IDC report published for India during year 2010.

Blade Server Hardware for Date Center location & Disaster recovery (Database) Features SpecificationsForm Factor 6U to 12U Rack-mountable

Page 205: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 205 of 302

Features Specifications Processor Minimum 4x Quad core processor with 2.1GHz or above with

1066Mhz FSB / 2000 MT /s expandable to 4 physical processor with min 4 MB L3 cache per processor

Max CPU support Server should have 4 CPU at least. RAM Std / Max Min 64 GB FBD RAM with min 8 Nos. free slots for future

expandability to 256 GB. Drive controller SAS/SCSI NIC At least 4 x 10/100/1000 Mbps Ethernet ports or more Hard Drive 4 X 146 GB SAS 10K RPM SAS or better Hot Plug Drives with RAID5

I/O expansion Slots

At least two expansion slots for FC or additional Gigabit cards

OS Certification Required Operating system CentOS

The Operating System for all the servers should have the following features: Unlimited virtualized guests. Multiple operating systems, multiple versions, multiple performance and security settings, all running on the same server. Storage virtualization: Multiple guests, running on the same or different servers, access and share logical storage volumes and file systems. High availability clustering and failover: Application and guest operating system failover. Management: Includes comprehensive management capabilities. Support: Unlimited incident support on Telephone, Email & Web with 4 hours response time directly from OS vendor. Upgrades: Free upgrade during support period Apart from the above the authentication server shall have these additional features: Centralizes management of people and their profiles, thus

reducing administrative costs; Should act as a central repository for user profiles and

preferences, enabling personalization; Should allows 4-way multi-master replication of data across

the enterprise, providing a centralized, consistent data source available to enterprise applications

Should enables single sign-on access with a partner solution Should be able to provide scalability for massive numbers of

users by containing the information control required for developing extranet applications

OEM Certification ISO 9001-14001, ISO 9001-2008, Greenpeace International, Should be in the in the list of top 5 desktop brands as per IDC report published for India during year 2010.

iii. Cabling CAT6, Fiber MM/ SM Technical Specs CAT-6 U/UTP Cable 4 Pair Cable, 23 AWG Copper with integral cross -member pair separator for uniform

characteristic impedance.

Page 206: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 206 of 302

Standardization: ISO/IEC 11801 2nd Ed.; IEC 61156-5 2nd Ed.; EN 50173-1; EN 50288-6-

1; EIA/TIA 568B.2.1

Cable overall diameter 6.3 mm.

Cable jacket material : PVC

Should have tensile strength of 100N.

The cable should have 100ohm impedance and data transmission frequencies up to

250MHz.

It should be certified by independent test labs like 3P/Delta to meet Cat -6 Standards.

The cable should be supplied in 500m reel.

Mechanical Test

Ultimate Breaking Strength >400 N (90 lbf)

Minimum Bend Radius ≥35mm without load, ≥55mm with load

Electrical Test

DC Resistance ≤14.5Ω/100 m

DC Resistance Unbalance ≤2%

Mutual Capacitance 4.4pF/100m max.

Capacitance Unbalance ≤150pF/100m max.

Propagation Velocity 67% Connection Module/Information Outlet RJ45 connection module of Category 6, for the establishing of transmission channels of

class E with up to 4 plugged connections, complies with Category 6 requirements of the

standards ISO/IEC 11801:2002, EN 50173-1: May 2007, DIN EN 50173-1: Dec. 2007 as

well as ANSI/TIA/EIA 568-B.2-1, de-embedded tested in acc. with IEC 60603-7-4,

interoperable and backwards compatible with Cat.5e and Cat.5.

Suitable for 10GBase-T applications in acc. with IEEE 802.3an up to 500 MHz and 55 m.

Parallel pair termination without crossover in acc. with EIA/TIA 568-A/B, gold-plated bronze

contacts for >1000 mating cycles, IDC contacts with single-wire strain relief and >20

insertion cycles, contact resistance <50 m Ohm, dielectric strength >1000 Veff..

Maximum reliability through special contact design without internal transfer points.

Should have integral dust cover and integrated bend-limiting strain -relief unit for cable

entry.

Should have IDC to hold conductor without using any tool for termination of cable.

Outlets should be of single metal piece design without any PCB to support the IDC /

Contacts.

Should be reusable and tool less in design in terms of termination of solid wire installation

cable AWG22-24 as well as stranded cables AWG 22/7 – 26/7

Should be made of halogen free material and should be certified by third party like 3P or

Delta or GHMT.

Patch Panel 24 port- Straight Patch panel with integrated cable tie shelf, 19" fastening kit, labeling field, accepting the

snap-in type color coding clips in 8 colors.

Material: sub-rack made of sheet steel (DC01A) 1.5 mm, color blue achromatized, screen

made of plastic (ABS), halogen-free, color medium gray (NCS 2502-B)

Page 207: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 207 of 302

Complies with Category 6 requirements of the standards ISO/IEC 11801:2002, EN 50173-

1: May 2007, DIN-EN 50173-1: Dec. 2007 as well as ANSI/TIA/EIA 568-B.2-1, de-

embedded tested in acc. with IEC 60603-7-4, interoperable and backwards compatible with

Cat.5e and Cat.5.

Suitable for 10GBase-T applications in acc. with IEEE 802.3an up to 500 MHz and 55 m in

case of unshielded.

Each port should be individually terminated i.e. each Port should be individually

replaceable & provide consistent port-to-port performance.

Each port should have an integral dust cover and integrated bend-limiting strain relief unit

for cable entry.

Patch panels shall be modular in design and capable of supporting Cat 6 UTP/FTP and

S/FTP modules on same port. The same panel should have the capability of terminating

multimode and single mode fibers alongside the copper terminations.

Patch Cord UTP Standardization: Compliant with Cat.6, Class E (250 MHz) requirements: ISO/IEC 11801

2nd Edition Compliant with Cat.6 component standards IEC 60603-7-4 and 60603-7-5

Patch Cords should have PVC jacket with conductor diameter copper strand AWG26.

Patch cords to use IDC contact technology for all the conductor terminations for better

performance and not piercing type contact technology.

Cat 6 patch cord plug to have metal screening & round cable holder and strain relief boot to

avoid bending.

Plug to have two physically separated levels and all 8 wires need to be separated by

dielectrically.

Should support optional locking mechanism for security purpose wherein the patch cords

can be locked on servers and all RJ45 ports and required Mechanical key to open patch

Cord.

All the conductors should be IDC based termination at the RJ-45 plugs without directly

crimping the plug on cable.

iv. Networking & Server Rack

Feature Required specificationFeature 42U 800W X 800D Modular Structures made from aluminum extruded

profile, minimum extrusion wall thickness at all sides and corner- 2mm. along with following items: Top and Base Cover with cable enter Black Color

Front/Rear Door

Front, Glass door, 800mm Wide, 42U, with Lock and hexagonal vent on the trims for thermal Management/ air cooling. 42U , 800mm W, Rear Steel Door, with 1/3 hexagonal vent at the base to allow proper air flow and thermal control, with Lock

Mounting Angles

19” Mounting Angles, 19” mounting angles powder coated along with “U” marking

SIDE PANELS 2 Nos. of Removable Side Panels along with slam latch. 4 nos. of 100mm W, Reducing Cable channels on the sides to allow better cable management

Castors Castors - For providing mobility to the rack. Two with foot operated brakes and Two without brakes, having a load carrying capacity of 100kg

Fan 230V AC 90CFM Fan (4 nos. for each Rack) with Fan Housing Unit

Page 208: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 208 of 302

Cable Manager 19”, 1U, Horizontal Cable Manager, to allow proper cable routing Cable Loops 24U to help route the cable vertically Power Supply 10X 5 amps or 6 X 5 amps socket as per requirement Castors Castors as needed Cable Storage 2U cable storage shelf supported with 4 bobbins Power Consumption Not more than 5 KVA Redundancy Mechanical Devices such as Hard Disks, Fans and Power Units should

be completely Hot Swappable and Redundant to ensure High Availability

Power Guaranteeing complete availability even on failure of any 2 power units across the enclosure. Sufficient Power to run a fully loaded enclosure in N+N redundant mode.

KVM/CD/USB/Floppy To be enabled Virtually over IP for Remote Access or Provided Locally. Multi-platform Support

Enclosure should support Xeon & RISC/EPIC blade on the Same chassis. Enclosure should also support Unix, Linux and Windows Operating environment

1. Enterprise Management and Monitoring Solution (EMS) Basic Requirements

Solution should be inclusive with hardware, OS, patches, etc.

Solution should provide for future scalability of the whole system without major

architectural changes.

Should be SNMP v1, v2, v3 and MIB-II compliant.

Filtering of events should be possible, with advance sort option based on

components, type of message, time etc.

Should support Web / Administration Interface.

Should provide compatibility to standard RDBMS.

Solution should be open, distributed, and scalable and open to third party

integration.

Should provide fault and performance management for multi-vendor TCP/IP

networks.

Security

Should be able to provide secured windows based consoles / secured web- based

consoles for accessibility to EMS.

Should have web browser interface with user name

and Password Authentication.

Administrator/ Manager should have privilege to create/modify/delete user

Polling Cycle

Support discriminated polling

Should be able to update device configuration changes such as re-indexing of ports

Fault Management

Should be able to get fault information in real time and present the same in alarm

window with description, affected component, time stamp etc.

Should be able to get fault information from heterogeneous devices — routers,

switches, servers etc.

Page 209: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 209 of 302

Event related to servers should go to a common enterprise event console where a

set of automated tasks can be defined based on the policy.

Should have ability to correlate events across the entire infrastructure

components of DC/DR.

Discovery

Should support automatic event correlation in order to reduce events occurring in

DC/DR.

Should support advanced filtering to eliminate extraneous data / alarms in Web

browser and GUI.

Should be configurable to suppress events for key systems/devices that are down

for routine maintenance or planned outage.

Should be able to monitor on user-defined thresholds for warning/ critical states and

escalate events to event console of enterprise management system.

Should provide out of the box root cause analysis with multiple root cause

algorithms inbuilt for root cause analysis.

Should have self-certification capabilities so that it can easily add support for new

traps and automatically generate alarms.

Should provide sufficient reports pertaining to asset and change management,

alarms and availability of critical network resources as well as network response

times for critical links.

The tool shall integrate network, server and database performance information and

alarms in a single console and provide a unified reporting interface for network and

system components. The current performance state of the entire network and

system infrastructure shall be visible in an integrated console.

Should provide an integrated performance view for all the managed systems and

networks along with the various threshold violations alarms in them. It should be

possible to drill-down into the performance view to execute context specific

reports

Should provide the following reports for troubleshooting, diagnosis, analysis and

resolution purposes: Trend Reports, At-A-Glance Reports, & capacity prediction

reports

Should provide accurate discovery of layer 3 and heterogeneous LAN and

Presentation

Should be able to discover links with proper colour status propagation for

complete network visualization.

Should support dynamic object collections and auto discovery. The topology of the

entire Network should be available in a single map.

Should give user option to create his /or her map based on certain group of devices

or region.

Agents

Should provide custom visual mapping of L2 and L3 devices connectivity and

relationships.

Page 210: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 210 of 302

Should monitor various operating system parameters such as processors, memory,

files, processes, file systems etc. where applicable using agents on the servers to

be monitored.

Provide performance threshold configuration for all the agents to be done from a

central GUI based console that provide a common look and feel across various

platforms in the enterprise. These agents could then dynamically reconfigure them

to use these threshold profiles they receive.

System Monitoring

Should be able to monitor/manage large heterogeneous systems environment

continuously.

Windows

o Should monitor / manage following:

Event log monitoring

Virtual and physical memory statistics

Paging and swap statistics

Operating system

Memory

Logical disk

Physical disk

Process

Processor

Paging file

IP statistics

ICMP statistics

Network interface traffic

Cache

Active Directory Services

o Should be capable of view/start/stop the services on windows servers

Unix / Linux

o Should monitor with statistics :

CPU Utilization, CPU Load Averages

System virtual memory (includes swapping and paging)

Disk Usage

No. of Nodes in each file system

Network interface traffic

Critical System log integration

Infrastructure Services

o IIS / Tomcat / Apache / Web server statistics

o HTTP service

o HTTPS service

o FTP server statistics

o POP/ SMTP Services

o ICMP services

o Database Services – Monitor various critical relational database management

Page 211: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 211 of 302

system (RDBMS) parameters such as database tables / table spaces, logs

etc.

Application Performance Management

o End to end Management of applications (J2EE/.NET based)

o Determination of the root cause of performance issues whether inside the

Java application in connected back-end systems or at the network layer.

o Automatic discovery and monitoring of the web application environment

o Ability to monitor applications with a dashboard.

o Ability to expose performance of individual SQL statements within

problem transactions

o Monitoring of third-party applications without any source code

change requirements.

o Proactive monitoring of all end user transactions; detecting failed

transactions; gathering evidence necessary for problem diagnose.

o Storage of historical data is for problem diagnosis, trend analysis etc.

o Monitoring of application performance based on transaction type

o Ability to identify the potential cause of memory leaks.

Reporting

Should able to generate reports on predefined / customized hours.

o Should be able to present the reports through web and also generate “pdf” /

CSV/ reports of the same.

o Should provide user flexibility to create his /or her custom reports on the

basis of time duration, group of elements, custom elements etc.

o Should provide information regarding interface utilization and error statistics

for physical and logical links.

o Should create historical performance and trend analysis for capacity

planning.

o Should be capable to send the reports through e-mail to pre-defined user with

pre defined interval.

o Should have capability to exclude the planned-downtimes or downtime

outside SLA.

o Should be able to generate all sorts of SLA Reports.

o Should be able to generate web-based reports, historical data for the

systems and network devices and Near Real Time reports on the local

management console.

o Should be able to generate the reports for Server, Application, infrastructure

services and Network devices in DC/DR environment.

Availability Reports

o Availability and Uptime – Daily, Weekly, Monthly and Yearly Basis

o Trend Report

o Custom report

o MTBF and MTTR reports

Performance Reports

o Device Performance – CPU and Memory utilized

Page 212: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 212 of 302

o Interface errors

o Server and Infrastructure service statistics

o Trend report based on Historical Information

o Custom report

o SLA Reporting

o Computation of SLA for entire DC/DR Infrastructure

o Automated Daily, Weekly, Monthly, Quarterly and Yearly SLA reports

Data collection

o For reporting, required RDBMS to be provided with all licenses.

o Should have sufficient Storage capacity should to support all reporting data

for 5 Years of DC/DR operation.

Integration

o Should be able to receive and process SNMP traps from infrastructure

components such as router, switch, servers etc.

o Should be able integrate with Helpdesk system for incidents.

o Should be able to send e-mail or Mobile –SMS to pre-defined users for pre-

defined faults.

o Should trigger automated actions based on incoming events / traps. These

actions can be automated scripts/batch files.

Network Management

The Network Management function must monitor performance across heterogeneous

networks from one end of the enterprise to the other.

It should proactively analyze problems to improve network performance.

The Network Management function should create a graphical display of all

discovered resources.

The Network Management function should have extensive reporting facility,

providing the ability to format and present data in a graphical and tabular display

The Network Management function should collect and analyze the data. Once

collected, it should automatically store data gathered by the NMS system in a

database. This enterprise-wide data should be easily accessed from a central

location and used to help with capacity planning, reporting and analysis.

The Network Management function should also provide information on

performance of Ethernet segments, including capacity utilization and error statistics

for the segment, WAN links and routers.

Alerts should be shown on the Event Management map when thresholds are

exceeded and should subsequently be able to inform Network Operations Center

(NOC) and notify concerned authority using different methods such as pagers,

emails, etc.

It should be able to automatically generate a notification in the event of a link failure

to ensure proper handling of link related issues.

The Systems and Distributed Monitoring (Operating Systems) of EMS should be able

to monitor:

o Processors: Each processor in the system should be monitored for

CPU utilization. Current utilization should be compared against user-

Page 213: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 213 of 302

specified warning and critical thresholds.

o File Systems: Each file system should be monitored for the amount of

file system space used, which is compared to user-defined warning and

critical thresholds.

o Log Files: Logs should be monitored to detect faults in the

operating system, the communication subsystem and in applications.

The function should also analyze the files residing on the host for

specified string patterns.

o System Processes: The System Management function should

provide real-time collection of data from all system processes. This

should identify whether or not an important process has stopped

unexpectedly. Critical processes should be automatically restarted

using the System Management function.

o Memory: The System Management function should monitor memory

utilization and available swap space.

o Event Log: User-defined events in the security, system, and

application event logs must be monitored.

SLA Monitoring

The SLA Monitoring function of the EMS is by far the most important requirement

of the DC/DR Project. The SLA Monitoring component of EMS will have to

possess the following capabilities:

o EMS should integrate with the application software component of

portal software that measures performance of system against the

following SLA parameters:

Response times of Portal;

Uptime of data centre;

Meantime for restoration of Data Centre etc;

Reporting

The EMS should compile the performance statistics from all the IT systems

involved and compute the average of the parameters over a quarter, and

compare it with the SLA metrics laid down in the RFP.

The EMS should compute the weighted average score of the SLA

metrics and arrive at the quarterly service charges payable to the Agency after

applying the system of penalties and rewards.

The SLA monitoring component of the EMS should be under the control of the

authority that is nominated to the mutual agreement of Director, the partner so

as to ensure that it is in a trusted environment.

The SLA monitoring component of the EMS should be subject to random third

party audit to vouchsafe its accuracy, reliability and integrity.

The Reporting and Analysis tool should provide a ready-to-use view into

the wealth of data gathered by Management system and service management

tools. It should consolidate data from all the relevant modules and transform

it into easily accessible business-relevant information. This information, should

be presented in a variety of graphical formats can be viewed interactively

Page 214: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 214 of 302

The tool should allow customers to explore the real-time data in a variety

of methods and patterns and then produce reports to analyze the associated

business and service affecting issues.

The presentation of reports should be in an easy to analyze graphical

form enabling the administrator to put up easily summarized reports

to the management for quick action (Customizable Reports). The software

should be capable of supporting the needs to custom make some of the reports

as per the needs of the organization.

Provide Historical Data Analysis: The software should be able to provide a

time snapshot of the required information as well as the period analysis of the

same in order to help in projecting the demand for bandwidth in the future.

ITIL based Helpdesk System

Helpdesk system would automatically generate the incident tickets and log the

call. Such calls are forwarded to the desired system support personnel deputed

by the Implementation Agency. These personnel would look into the problem,

diagnose and isolate such faults and resolve the issues timely. The helpdesk

system would be having necessary workflow for transparent, smoother and

cordial DC/DR support framework.

The Helpdesk system should provide flexibility of logging incident manually via

windows GUI and web interface.

The web interface console of the incident tracking system would allow viewing,

updating and closing of incident tickets.

The trouble-ticket should be generated for each complaint and given to asset

owner immediately as well as part of email.

Helpdesk system should allow detailed multiple levels/tiers of categorization on

the type of security incident being logged.

It should provide classification to differentiate the criticality of the security incident

via the priority levels, severity levels and impact levels.

It should allow SLA to be associated with a ticket based on priority, severity,

incident type, requestor, asset, location or group individually as well as

collectively.

It should maintain the SLA for each item/service. The system should be able to

generate report on the SLA violation or regular SLA compliance levels.

It should be possible to sort requests based on how close are the requests to

violate their defined SLA’s.

It should support multiple time zones and work shifts for SLA & automatic ticket

assignment.

It should allow the helpdesk administrator to define escalation policy, with

multiple levels & notification, through easy to use window GUI / console.

System should provide a knowledge base to store history of useful incident

resolution.

It should have an updateable knowledge base for technical analysis and further

help end-users to search solutions for previously solved issues.

Page 215: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 215 of 302

The web-based knowledge tool would allow users to access his / her knowledge

article for quick references.

It should provide functionality to add / remove a knowledge base solution based

on prior approval from the concerned authorities

Provide seamless integration to generate events/incident automatically from NMS

/ EMS.

Each incident could be able to associate multiple activity logs entries manually or

automatically events / incidents from other security tools or EMS / NMS.

Allow categorization on the type of incident being logged.

Provide audit logs and reports to track the updating of each incident ticket.

Proposed incident tracking system would be ITIL compliant.

It should be possible to do any customizations or policy updates in flash with zero

or very minimal coding or down time.

It should integrate with Enterprise Management System event management and

support automatic problem registration, based on predefined policies.

It should be able to log and escalate user interactions and requests.

It should support tracking of SLA (service level agreements) for call requests

within the help desk through service types.

It should be capable of assigning call requests to technical staff manually as well

as automatically based on predefined rules, and should support notification and

escalation over email, web etc.

It should provide status of registered calls to end-users over email and through

web.

The solution should provide web based administration so that the same can be

performed from anywhere.

It should have a customized Management Dashboard for senior executives with

live reports from helpdesk database.

NOTE: EMS tools deployed shall have the ability to manage the entire IT infrastructure proposed

by the SI

2. Compliance Management, Web Access Management & Privileges Users

Management for Server Access Control

Privileges Users Management for Server Access Control

Tamil Nadu State Data Centre currently has Privileged User Management Solution for Server Access

Control. SI needs to procure additional licenses of Privileges User Management Solution to secure

the critical infrastructure under the current project scope.

Web Access Management

Tamil Nadu State Data Centre currently has Access Manager as the Web Access Management and

Web Single Sign on Solution. SI needs to procure additional licenses to secure the critical

infrastructure under the current project scope.

Compliance Management

Tamil Nadu State Data Centre currently has Compliance Management Suite as the Role,

Page 216: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 216 of 302

Compliance and Identity Management and Access Management Solution .SI needs to procure

additional licenses of Compliance Management Suite to secure the critical infrastructure under the

current project scope.

3. Storage and Backup Solution

SAN Switches – 2 nos.

Minimum 16 Active ports (each with minimum port speed 4 GB) within same

switch upgradeable to 32 ports with minimum 2 Nos. of additional 10 Gbps FC

ports

All cable of length of 10 meter each and accessories for connecting Servers

/Devices to SAN.

Should have capability of ISL trunking of minimum 8 ports.

Should support multiple OS.

Non disruptive subsystem maintenance.

Should have dual Fans and Hot plug power supplies switching and service

modules.

Should have web based management software for administration and

configuration.

Non disruptive microcode / firmware upgrades and hot code activation.

Switch shall support in built diagnostics, power on self test, command level

diagnostics, online and offline diagnostics.

Should support hardware ACL based Port security, Port Zoning and LUN Zoning

Should support Secure Shell (SSH) encryption to provide additional security for

Telnet sessions to the switch.

Should support multilevel security on console access prevent unauthorized users

from altering the switch configuration

Should support Fibre Channel trace route and Fibre Channel Ping for ease

of troubleshooting and fault isolation

Should support the following diagnostics:

o Online Diagnostics

o Internal Loopbacks

o FC Debug

o Syslog

o Online system health

o Power on self test (POST) diagnostics

Should support Applications for device management and full fabric

management. The management software shall be able to perform following:

o Fabric View

o Summary View

o Physical View

o Discovery and Topology Mapping

o Network Diagnostics

o Monitoring and Alerts

Storage Area Network – 1 no.

Technical Specification for SAN

Page 217: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 217 of 302

The storage Box to be connected with the servers through SAN switches.

Redundant SAN switches

Separated Tape library.

Intel based processor.

SAN cabling with on direct OM3 Fiber patch cords.

SAN controller

o Dual Active Active Controller

Cache

o 8 GB Total Mirrored Cache for Disk IO Operations scalable to min 16 GB

Host interface

o 4 host ports per controller, Fibre Channel (FC),4 Gbps per port

Drive interface

o 4 drive ports per controller—Fibre Channel (FC) Switched or FC Arbitrated

Loop

(FC-AL) standard per controller, 4 Gbps per port

RAID levels Supported

o The Storage Box should have RAID Support of 0, 1, 3, 5 & 10 [Hardware

based (XOR) RAID engine].

Fans and power supplies

o Dual redundant, hot-swappable

SAN support

o Box should be compatible of SAN environment

SAN specifications shall have the following

o The storage array shall be configured with at least 8 GB cache scalable to

min 16GB mirrored across two storage controllers for disk I/O operations.

o Storage subsystem shall support 146GB, 300GB 15K RPM disks and 1TB or

higher 10 K RPM Fiber channel drives & 750GB, 1TB SATA or higher SATA /

equivalent drives in the same device array

o Presently, the storage sub system shall be configured with 300 GB of

Performance drives and 1 TB or higher on SATA / equivalent for archiving

purpose.

o The storage Box should have 4 TB usable spaces after RAID-5

implementation, using 146/300 GB, 4Gbps 15K RPM FC disks.

o The storage system must provide upgrade path to larger or future array

controller and software technology while maintaining the existing investment.

o The storage array proposed should have an upgrade path from the

earlier generation product to the current generation product.

o All the necessary software to configure and manage the storage space, RAID

configuration, logical drives allocation, virtualization, snapshots (including

snap clones and snap mirrors) for entire capacity etc.

o Load balancing must be controlled by system management software tools.

o The multi-path software should not only support the supplied storage

and operating systems but should also support heterogeneous storage and

operating systems from different OEMs.

o The storage array must have complete cache protection mechanism either by

Page 218: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 218 of 302

de- staging data or providing complete cache data protection with battery

backup for up to 72 hours or more.

o The storage array should support Operating System Platforms & Clustering

including: Windows Server 2003 (Enterprise Edition), Sun Solaris, HP-UX,

IBM- AIX, Linux / Solaris for x86.

o Storage should support non-disruptive online firmware upgrade for

both Controllers and disk drives.

o The storage array should support hardware based data replication at the

Block level across all models of the offered family.

o The storage should provide automatic rerouting of I/O traffic from the host in

case of primary path failure.

o Should provision for LUN masking, fiber zoning and SAN security (as disk

based encryption.

o Should support storage virtualization, i.e. Easy logical drive expansion.

o Should support hot-swappable physical drive raid array expansion with

the addition of extra hard disks

o Should be able to support clustered and individual servers at the same time.

o Should be able to take "snapshots" of the stored data to another logical drive

on a different Disk/RAID Group for backup purposes

o Should be configured with "snapshots and clone"

o Vendor should also offer storage performance monitoring and management

software.

o The vendor must provide the functionality of proactive monitoring of Disk

drive and Storage system for all possible hard or soft disk failure

Tape Library - 1

Tape drives

Minimum 2 latest generation LTO drives. The State can size for more as per their requirements.

Interface

Fiber Channel Interface

Other Specifications Should have sufficient speed backup to Tape Library in High Availability

for backing up data from the SAN without any user intervention.

Should be able to backup 50% of the entire production landscape in 8 hours window.

Should support latest generation LTO drives or latest technology based library with at least 2 latest generation LTO drives tape drives (>=4), rack mountable with redundant power supplies.

Cartridges should have physical capacity up to 1600 GB per cartridge compressed; 800 GB native.

At least 50 latest generation LTO drive Media Cartridges with 5 Cleaning Cartridges, Barcode labels shall also be provided

Backup Software

The proposed Backup Solution should be available on various OS platforms

Page 219: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 219 of 302

such as Windows and UNIX platforms and be capable of supporting SAN based backup / restore from various platforms including UNIX, Linux, and Windows etc.

Centralized, web-based administration with a single view of all back up servers within the enterprise. Single console must be able to manage de-duplicated and traditional backups.

The proposed backup solution should allow creating tape clone facility after the backup process.

The proposed Backup Solution has in-built frequency and calendar based scheduling system.

The proposed backup Solution supports the capability to write multiple data streams to a single tape device or multiple tape devices in parallel from multiple clients to leverage the throughput of the Drives using Multiplexing technology.

The proposed backup solution support de-multiplexing of data cartridge to another set of cartridge for selective set of data for faster restores operation to client/servers

The proposed backup solution should be capable of taking back up of SAN environment as well as LAN based backup.

The proposed backup solution shall be offered with 4 Nos. UNIX based licenses, 26 Nos. Windows based licenses and the rest 20 Nos. LINUX based licenses for both SAN based backup and the LAN based backup.

The proposed solution also supports advanced Disk staging.

The proposed Backup Solution has in-built media management and supports cross platform Device & Media sharing in SAN environment. It provides a centralized scratched pool thus ensuring backups never fail for media.

Backup Software is able to rebuild the Backup Database/Catalog from tapes in the event of catalog loss/corruption.

The proposed Backup Software should offer online backup for all the Operating Systems i.e. UNIX, Windows & Linux etc

The proposed Backup Solution has online backup solution for different type of Databases such as Oracle, MS SQL, and Sybase / DB2 etc. on various OS.

The Proposed backup solution shall provide granularity of single file restore.

The Proposed backup solution shall be designed in such a fashion so that every client / server in a SAN can share the robotic tape library.

Backup Solution shall be able to copy data across firewall.

The backup software must also be capable of reorganizing the data onto tapes within the library by migrating data from one set of tapes into another, so that the space available is utilized to the maximum. The software must be capable of setting this utilization threshold for tapes

The backup software should be able to support versioning and should be applicable to individual backed up object’s

Should have the ability to retroactively update changes to data management policies that will then be applied to the data that is already being backed up or

Page 220: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 220 of 302

archived

All software licenses should be in the name of ……… and should be a perpetual license, i.e. the software license should not expire after the contract period. The software Licenses should be comprehensive and no further licenses should be required for DC/DR operations. The software installed should necessarily be the latest version at the time of actual implementation.

FC-IP Router – 2 nos.

Fibre Channel Ports

o min 4 FC ports

FC Port Speed

o Autosensing 1/2/4 Gb/s

iSCSI (Ethernet) Ports

o min 8 Ethernet ports

iSCSI (Ethernet) Port Speed

o 1 Gigabit Ethernet

Aggregate Bandwidth

o min 125 MB/s

Protocol Support

o FCP

o iSCSI

High-Availability Features

o Two-way active/active clustering with failover and failback capabilities

o Multiple iSCSI connections provide multipathing support from a single gateway to as many as 100 servers.

Management Features

o CLI (by Telnet, SSH, or console)

iSCSI Gateway Manager

o SNMP

Allows for monitoring traffic statistics on each storage and network interface, fan and temperature and iSCSI session details.

4. Furniture Specifications

1) Specs of Computer Table 1 (Large): Size L1200mm x W600mm x H745mmTop & Understructure 18mm to 28mm thick top of PLB (Prelaminated Board). Edges

sealed with PVC beading. Understructure of MS (Metal Steel) duly powder coated with 35 microns minimum. Comprising of plastic KBPT (Keyboard Pull out Tray) fitted under the table top

Load Bearing Capacity 40 KG for the Table Top & 15 KG for the shelf Hardware Comprising of Glide screws & self-tapping screws

Page 221: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 221 of 302

2) Specs of Computer Table 2 (Small): Size L900mm x W440mm x H745mmTop & Understructure 18mm to 28mm thick top of PLB (Prelaminated Board). Edges

sealed with PVC beading. Understructure of MS (Metal Steel) duly powder coated with 35 microns minimum. Comprising of plastic KBPT (Keyboard Pull out Tray) fitted under the table top

Load Bearing Capacity 40 KG for the Table Top & 15 KG for the shelf Hardware Comprising of Glide screws & self-tapping screws

3) Specs of Computer Chair: OVERALL SIZE Width: at least 70cm

Depth: at least 70cm Height: 84 – 96.5cm Seat height: 46.6 – 59cm

SEAT/BACK ASSEMBLY The seat and back should be made up of at least 1.2cm thick hot pressed plywood, upholstered with fabric and moulded Polyurethane foam with PVC (Poly Vinyl Chloride) lipping all around. Back Size – W 49cm x H 47cm

Seat Size – W 49cm x D 44cm FOAM The polyurethane foam should have density and

hardness suitable for heavy usage (at least 80 Kgs load)

ARMRESTS The chair should have robust armrests CENTRE PIVOT MECHANISM The centre pivot mechanism should have the

following features: 360 degree revolving type. 17-20 degree maximum tilt on pivot at

centre. Tilt tension adjustment. Upright locking.

PNEUMATIC HEIGHT ADJUSTMENT The pneumatic height adjustment facility should be there.

TELESCOPIC BELLOW ASSEMBLY The bellow should be of 3 piece telescopic type and injection moulded in black Polypropylene

PEDESTAL ASSEMBLY The pedestal should be fabricated from at least 0.2cm thick CR (Cold Rolled) Steel and powder coated. Twin wheel castors (castors with diameter 5.0cm) are required

Page 222: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 222 of 302

ANNEXURE IX Existing IT Infrastructure

# City Police Station Client

PC Duplex Laser

Printer

Multifunction product (print/scan/

copy)

16 - port

unmanaged

switch

Modem/Fax cards

(additional item)

Additional HDD 160 GB

DVD Writer/DVD Rom

drive

UPS 2KVA online

1 Salem City Ammapet 3 1 1 1 2 2 2 1

2 Annadanapatty 4 1 1 1 2 2 2 1

3 Fairlands 4 1 1 1 2 2 2 1

4 Govt.HQRS Hospital 3 1 1 1 2 2 2 1

5 Hasthampatty 4 1 1 1 2 2 2 1

6 Kannankurichi 3 1 1 1 2 2 2 1

7 Kitchipalayam 4 1 1 1 2 2 2 1

8 Pallapatty 4 1 1 1 2 2 2 1

9 Salem Town Crime 4 1 1 1 2 2 2 1

10 Shevapet 4 1 1 1 2 2 2 1

11 Sooramangalam 4 1 1 1 2 2 2 1

12 Coimbatore City

Bazaar 5 1 1 1 2 2 2 1

13 Kattur 5 1 1 1 2 2 2 1

14 Peelamedu 4 1 1 1 2 2 2 1

15 Race course 4 1 1 1 2 2 2 1

16 R s puram 4 1 1 1 2 2 2 1

17 Ramanathapuram 4 1 1 1 2 2 2 1

18 Singanallur 4 1 1 1 2 2 2 1

19 Selvapuram 3 1 1 1 2 2 2 1

20 Saibaba colony 4 1 1 1 2 2 2 1

21 Saravanapatti 4 1 1 1 2 2 2 1

22 Ukkadam 4 1 1 1 2 2 2 1

23 Variety hall road 4 1 1 1 2 2 2 1

24 Chennai City Koyambedu 5 1 1 1 2 2 2 1

25 Adayar 5 1 1 1 2 2 2 1

26 Aminjikarai 5 1 1 1 2 2 2 1

27 Annanagar 5 1 1 1 2 2 2 1

28 Ayyanavaram 5 1 1 1 2 2 2 1

29 Chintadripet 5 1 1 1 2 2 2 1

30 Egmore 5 1 1 1 2 2 2 1

31 Elephant gate 5 1 1 1 2 2 2 1

32 Esplanade 5 1 1 1 2 2 2 1

33 Flower bazaar 5 1 1 1 2 2 2 1

34 Fort st george 5 1 1 1 2 2 2 1

35 General section 4 1 1 1 2 2 2 1

Page 223: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 223 of 302

# City Police Station Client PC

Duplex Laser

Printer

Multifunction product (print/scan/

copy)

16 - port

unmanaged

switch

Modem/Fax cards

(additional item)

Additional HDD 160 GB

DVD Writer/DVD Rom

drive

UPS 2KVA online

36 Harbour 5 1 1 1 2 2 2 1

37 Ice house 5 1 1 1 2 2 2 1

38 Guindy 5 1 1 1 2 2 2 1

39 Zam bazar 5 1 1 1 2 2 2 1

40 Kasimedu 5 1 1 1 2 2 2 1

41 Kodambakkam 5 1 1 1 2 2 2 1

42 Korukkupet 5 1 1 1 2 2 2 1

43 Kothavalchavadi 5 1 1 1 2 2 2 1

44 Mambalam 5 1 1 1 2 2 2 1

45 Anna salai/mount road 5 1 1 1 2 2 2 1

46 Muthialpet 5 1 1 1 2 2 2 1

47 Mylapore 5 1 1 1 2 2 2 1

48 Ashok nagar 5 1 1 1 2 2 2 1

49 New washermanpet 5 1 1 1 2 2 2 1

50 North beach 5 1 1 1 2 2 2 1

51 Numgambakkam 5 1 1 1 2 2 2 1

52 Otteri 5 1 1 1 2 2 2 1

53 Periamet 5 1 1 1 2 2 2 1

54 Pulianthoppu 5 1 1 1 2 2 2 1

55 Royapettah 5 1 1 1 2 2 2 1

56 Royapuram 5 1 1 1 2 2 2 1

57 Saidapet 5 1 1 1 2 2 2 1

58 Sembiam 5 1 1 1 2 2 2 1

59 Seven wells 5 1 1 1 2 2 2 1

60 Teynampet 5 1 1 1 2 2 2 1

61 Tondiarpet 5 1 1 1 2 2 2 1

62 Triplicane 5 1 1 1 2 2 2 1

63 Vepery 5 1 1 1 2 2 2 1

64 Vyasarpadi 5 1 1 1 2 2 2 1

65 Washermanpet 5 1 1 1 2 2 2 1

66 Basin bridge 5 1 1 1 2 2 2 1

67 Thousand lights 5 1 1 1 2 2 2 1

68 Anna square 5 1 1 1 2 2 2 1

69 Govt. General hospital 5 1 1 1 2 2 2 1

70 Abiramapuram 5 1 1 1 2 2 2 1

71 Choolaimedu 5 1 1 1 2 2 2 1

72 I.C.F. Colony 5 1 1 1 2 2 2 1

73 Chetpet 5 1 1 1 2 2 2 1

Page 224: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 224 of 302

# City Police Station Client PC

Duplex Laser

Printer

Multifunction product (print/scan/

copy)

16 - port

unmanaged

switch

Modem/Fax cards

(additional item)

Additional HDD 160 GB

DVD Writer/DVD Rom

drive

UPS 2KVA online

74 Kotturpuram 5 1 1 1 2 2 2 1

75 T.p.chatram 5 1 1 1 2 2 2 1

76 Secretariat colony 5 1 1 1 2 2 2 1

77 Sastri nagar 5 1 1 1 2 2 2 1

78 Foreshore estate 5 1 1 1 2 2 2 1

79 Arumbakkam 4 1 1 1 2 2 2 1

80 Kumaran nagar 4 1 1 1 2 2 2 1

81 Peravalur 4 1 1 1 2 2 2 1

82 Govt. Estate 4 1 1 1 2 2 2 1

83 Dr. R. Krishnan nagar 5 1 1 1 2 2 2 1

84 M.k.b. Nagar 4 1 1 1 2 2 2 1

85 Marina 5 1 1 1 2 2 2 1

86 Pondy bazaar 5 1 1 1 2 2 2 1

87 Kilpauk mental hospital 5 1 1 1 2 2 2 1

88 Fishing harbour 4 1 1 1 2 2 2 1

89 K.k. Nagar 4 1 1 1 2 2 2 1

90 Thiruvanmiyur 4 1 1 1 2 2 2 1

91 Velacheri 4 1 1 1 2 2 2 1

92 Villivakkam 4 1 1 1 2 2 2 1

93 Virugambakkam 4 1 1 1 2 2 2 1

94 Govt. Rsrm hospital 3 1 1 1 2 2 2 1

95 High court 5 1 1 1 2 2 2 1

96 J.j. Nagar 5 1 1 1 2 2 2 1

97 Kodungaiyur 5 1 1 1 2 2 2 1

98 Kolathur 5 1 1 1 2 2 2 1

99 Rajamangalam 5 1 1 1 2 2 2 1

100 Thirumangalam 5 1 1 1 2 2 2 1

101 Thiruvotriyur 5 1 1 1 2 2 2 1

102 Thiru vika nagar 5 1 1 1 2 2 2 1

103 Madurai City Sri meenakshi amman 3 1 1 1 2 2 2 1

104 Mathichayam 4 1 1 1 2 2 2 1

105 Madurai town east 4 1 1 1 2 2 2 1

106 Madurai town north 4 1 1 1 2 2 2 1

107 Madurai town south 4 1 1 1 2 2 2 1

108 Jaihindpuram 4 1 1 1 2 2 2 1

109 Keeraithurai 4 1 1 1 2 2 2 1

110 Sellur 4 1 1 1 2 2 2 1

Page 225: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 225 of 302

# City Police Station Client PC

Duplex Laser

Printer

Multifunction product (print/scan/

copy)

16 - port

unmanaged

switch

Modem/Fax cards

(additional item)

Additional HDD 160 GB

DVD Writer/DVD Rom

drive

UPS 2KVA online

111 Somasundaram colony 4 1 1 1 2 2 2 1

112 Subramaniapuram 4 1 1 1 2 2 2 1

113 Thideernagar 4 1 1 1 2 2 2 1

114 K. Pudur 4 1 1 1 2 2 2 1

115 Thallakulam traffic 5 1 1 1 2 2 2 1

116 Town traffic ii 4 1 1 1 2 2 2 1

117 Karimedu traffic iii 4 1 1 1 2 2 2 1

118 Annanagar traffic vi 5 1 1 1 2 2 2 1

119 Tiruchirapalli Woraiyur 4 1 1 1 2 2 2 1

120 Tirunelveli City

Melapalayam 4 1 1 1 2 2 2 1

121 Palayamkottai 5 1 1 1 2 2 2 1

122 Perumlpuram 4 1 1 1 2 2 2 1

123 Pettai 3 1 1 1 2 2 2 1

124 Thatchanallur 3 1 1 1 2 2 2 1

125 Tirunelveli junction 5 1 1 1 2 2 2 1

126 Tirunelveli town 3 1 1 1 2 2 2 1

127 Tiruchirapalli City

Airport 3 1 1 1 2 2 2 1

128 Ariyamangalam 3 1 1 1 2 2 2 1

129 Contonment 4 1 1 1 2 2 2 1

130 Edamalaipattipudur 3 1 1 1 2 2 2 1

131 Fort 4 1 1 1 2 2 2 1

132 Gandhi market 4 1 1 1 2 2 2 1

133 Golden rock 3 1 1 1 2 2 2 1

134 K.k.nagar 4 1 1 1 2 2 2 1

135 Palakkarai 4 1 1 1 2 2 2 1

136 Srirangam 4 1 1 1 2 2 2 1

137 Thillai nagar 3 1 1 1 2 2 2 1

Total 606 137 137 137 274 274 274 137

Page 226: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 226 of 302

ANNEXURE X Training Institutions Infrastructure

The following locations were identified at various districts and commissionerates and the District

Training Centres were established. The locations of District Training Centres, Police Recruit

School, Police Academy is mentioned below:

S.No City / District Place Area

1 CHENNAI CITY 2nd Floor, C5-Kothavalchavadi PS, Chennai 480 Sq.Ft. 2 CHENNAI CITY C-Class Room, Ground Floor, Old Building,

PCCC, R.A.Puram, Chennai-28 500 Sq.Ft.

3 CHENNAI SUB-URBAN Chennai Sub-Urban Commissionerate Complex, St. Thomas Mount

504 Sq.Ft.

4 CUDDALORE Unused Elementary School, AR, Cuddalore. 450 Sq.Ft.

5 KANCHEEPURAM In-Service Training Centre, DPO, Kanchipuram 448 Sq.Ft.

6 THIRUVALLUR Training Hall, DPO, Thiruvallur, 518 Sq.Ft.

7 THIRUVANNAMALAI Conference Hall, Armed-HQ, Tiruvannamalai 608 Sq.Ft.

8 VELLORE A Hall, DPO, Vellore 800 Sq.Ft.

9 VILLUPURAM 1st Floor, In-service Centre, DPO, Villupuram 520 Sq.Ft.

10 ARIYALUR CCTNS Training Centre, Ragavan Complex, Trichy Main Rd, Ariyalur

550 Sq. Ft.

11 KARUR Training Hall, New DPO, Karur. 530 Sq.Ft.

12 NAGAPATTINAM DPO, 2nd Floor, Nagapattinam 470 Sq.Ft.

13 PERAMBALUR 2nd Floor, DPO, Perambalur 458 Sq.Ft.

14 PUDUKKOTTAI Conference Hall, Pudukottai 600 Sq.Ft.

15 THANJAVUR Control Room, Tanjavur. 570 Sq.Ft.

16 TIRUVARUR AR Campus, Tiruvarur. 416 Sq.Ft.

17 TRICHY Training Hall, 2nd Floor, DPO, Trichy 375 Sq.Ft. 18 TRICHY CITY Old Control Room, Contonment PS Campus 608 Sq.Ft.

19 DINDIGUL Women's Waiting Hall, AR, Dindigul 390 Sq.Ft.

20 KANYAKUMARI DPO, Kanniyakumari 675 Sq.Ft.

21 MADURAI 1st Floor, Conference Hall, Ty. PRS, AR, Madurai

783 Sq.Ft.

22 MADURAI CITY Tallakulam PS Campus, Madurai City. 620 Sq.Ft. 23 RAMANATHAPURAM Women Police Rest Room, A.R campus,

Ramnad 416 Sq.Ft.

24 SIVAGANGAI Community Hall, 2nd Floor, DPO, Sivagangai 768 Sq.Ft. 25 THENI Training Hall, DPO, Theni 928 Sq.Ft.

26 THIRUNELVELI Conference Hall, DPO, Tirunelveli 979 Sq.Ft.

27 THOOTHUKUDI Nearby DPO, Thoothukudi 854 Sq.Ft.

28 TIRUNELVELI CITY PRS Admin Building, AR, Tirunelveli City. 900 Sq.Ft.

29 VIRUDHUNAGAR 1st Floor, In-service Centre, DPO, Villupuram 600 Sq.Ft.

30 COIMBATORE Campus of Mahalingapuram PS, Pollachi S.D. 1100 Sq.Ft.

31 COIMBATORE CITY AIMS Building hall, Coimbatore city 800 Sq.Ft.

32 DHARMAPURI AR old Kalyanamandapam, Dharmapuri 1250 Sq.Ft.

Page 227: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 227 of 302

S.No City / District Place Area

33 ERODE AR Complex, Erode 1000 Sq.Ft.

34 KRISHNAGIRI New DPO, Krishnagiri 858 Sq.Ft.

35 NAMAKKAL Training Hall, AR Complex, Namakkal 999 Sq.Ft.

36 NILGIRIS TN Home Guards & Civil Defence Trg. Centre, The Nilgirish

595 Sq.Ft.

37 SALEM New DPO, Salem. 1110 Sq. Ft.

38 SALEM CITY Control Room, Salem City. 810 Sq.Ft.

39 TIRUPUR District Police Office, Tiruppur functioning at 2/69 Angeripalayam road, Tiruppur – 641602.

600 Sq.Ft.

40 CHENNAI RAILWAY Back side of RPO,Meeting Hall, 8- varatharajulu street, egmore, chennai

400 Sq. Ft.

41 SCRB 95, Santhome High Road, R.A.Puram, Chennai-28

550 Sq. Ft.

42 TAMILNADU POLICE ACADEMY,OONAMANCHERY

Technology Block,Tamilnadu Police Acadamy, Oonamanchery, Chennai-48

500 Sq. Ft.

43 POLICE TRAINING COLLEGE,ASHOK NAGAR, CHENNAI

Cyber Hall, Police Training Head quarter, 6, Natesan Salai, Ashok Nagar, Chennai - 600 083.

500 Sq. Ft.

44 POLICE COMPUTER COMMUNICATION CENTRE, R.A.PURAM, CHENNAI

Police Computer Communication Center, R.A.Puram, Santhome High Road, Chennai - 28

500 Sq. Ft.

45 DGP's OFFICE, CHENNAI

Hall No-310 (Half portion) second floor, DGP office, Mylapore , Chennai - 4

1212 Sq. Ft.

46 PRS - VELLORE Law Class Room, Police Recruit School, Vellore Fort, Vellore, Tamil Nadu. Ph:- 0416-2220065.

500 Sq. Ft.

47 PRS – TRICHY Class Room - 'A' , Police Training School, Batallion Ground, Trichy I Batallion, Tamil Nadu. Ph:- 0431-2472695.

500 Sq. Ft.

48 PRS - COIMBATORE First Floor of the Library Hall, Police Recruit School, Papanayakanpalayam, Coimbatore

440 Sq. Ft.

49 PRS - THOOTHUKUDI LCD Projector Room, Police Training School, Perurani, Thoothukudi, Tamil Nadu. Ph:- 04162-271070.

712 Sq. Ft.

Page 228: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 228 of 302

ANNEXURE XI Geographical Coverage

This presents the geographic coverage for the CCTNS Project in Tamil Nadu. The districts and

commissionerates are represented in the Tamil Nadu map as shown below:

The project would be rolled out in the following higher offices in the state headquarters:

Tamil Nadu Police Headquarters

State Crime Records Bureau

These offices would be covered in Pilot Phase of Implementation. Along with these, the districts

and offices in each district to be covered in different phases are described below. The geographical

coverage described in the tables below reflecting the phases of implementation as mentioned in

Section 6.1.1

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Pilot Phase

South/

Ramanathapur

am

Sivagangai NA Sivagangai Aravayal Alagappapuram

Manamadurai AWPS Devakottai Mithravayal

Karaikudi AWPS Manamadurai Velayuthapattinam

Devakottai. AWPS-Karaikudi

Thiruppathur AWPS-Sivagangai

Page 229: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 229 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

AWPS-Thiruppathur

Chettinadu

Devakottai Taluk

Devakottai Town

Elayangudi

Kalaiyarkoil

Kallal

Kandavarayanpatti

Karaikudi North

Karaikudi South

Keelasevalpatti

Kundrakudi

Madagupatti

Manamadurai

Nachiyapuram

Nerkuppai

Palayanur

Pallathur

Poolamguruchi

Poovanthi

Pulithipatty

S.S.Kottai

S.V.Mangalam

Sakkottai

Salaigramam

Singampunari

SIPCOT

Sivagangai Taluk

Sivagangai Town

Somanathapuram

Thiruppachethi

Thiruppathur Town

Thiruppuvanam

Thiruvegampet

Page 230: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 230 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Thiukostiyur

Ulagampatti

Central/

Thanjavur

Thanjavur NA Thanjavur Town Adiramapattinam

Vallam Ammapet

Thiruvaiyaru AWPS papanasam

Thanjavur Rural AWPS pattukottai

Kumbakonam AWPS Thiruvaiyaru

Thiruvidaimarudur AWPS-kumbakonam

Pattukottai AWPS- Thanjavur

Orathanadu Ayyampet

Budalur

Hariduvaramangalam

Kabisthalam

Kallaperambur

Kumbakonam North

Kumbakonam South

Kumbakonam Taluk

Madukkur

Maruvoor

Melathur

Nachiyarkoil

Nadukaveri

Orathanadu

Pandanallur

Papanadu

Papanasam

Patteswaram

Pattukottai

Peravorani

Sengipatty

Sethubavachathiram

Swamimalai

Thanjavur Med.Col

Thanjavur Taluk

Page 231: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 231 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Thanjavur Tamil Univ

Thanjavur Town East

Thanjavur Town South

Thanjavur Town West

Thiruchitrambalam

Thirukattupalli

Thiruneelakudi

Thiruppanandal

Thiruvaiyaru

Thiruvidaimarudur

Thiruvonam

Thogur

Valangaiman

Vallam

Vattathikottai

Chennai Sub-

urban

St. Thomas Mount DCP, St. Thomas

Mount

Ambattur Adambakkam

DCP, Ambattur Avadi Airport

DCP,

Madhavaram

Ennore Ambattur

Madavaram Ambattur Estate

Madipakkam Avadi

Maduravoyal AWPS - Ambattur

Meenambakkam AWPS - Avadi

Pattabiram AWPS - Ennore

Poonamallee AWPS - Madhavaram

Puzhal AWPS - Madipakkam

Selaiyur AWPS - Poonamallee

St. Thomas Mount AWPS - St Thomas Mount

Tambaram AWPS - Tambaram

Chitlapakkam

Chrompet

Ennore

Korattur

Kunrathur

Page 232: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 232 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Madhavaram

Madipakkam

Maduravoyal

Manali

Manali New Town

Mangadu

Meenambakkam

Milk Colony

Muthapudupet

Nandampakkam

Nasaratpet

Palavanthangal

Pallavaram

Pallikaranai

Pattabiram

Peerkankaranai

Poonamallee

Puzhal

Redhills

Sankar Nagar

Sathangadu

Selaiyur

SRMC

St. Thomas Mount

Tambaram

Tank Factory

Thirumullaivoyal

Thirunindravur

Thiruverkadu

Coimbatore

City

Coimbatore City DCP, L & O, City

Police Office

Coimbatore West AWPS Central

DCP, Crime &

Traffic, City Police

Office

Coimbatore East Bazaar

DCP,

Headquarters,

Coimbatore Central

Coimbatore

Page 233: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 233 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

City Police Office

DCP, Armed

Reserve, PRS,

Coimbatore

Coimbatore South Kattur

ADC, PEW, City

Police Office

Kuniamuthur

Peelamedu

Poddanur

R S Puram

Race Course

Ramanathapuram

Rathinapuri

Saibaba Colony

Saravanapatti

Selvapuram

Singanallur

Ukkadam

Variety Hall Road

Roll-out Phase I

West/Salem Dharmapuri Dharmapuri A.Pallipatti

Harur Adiyamankottai

Pennagaram AWPS Harur

AWPS Pennagaram

AWPS Dharmapuri

Bommidi

Dharmapuri

Eriyur

Harur

Hogenakkal

Indur

Kadathur

Kambainallur

Karimangalam

Kottapatti

Krishnapuram

Page 234: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 234 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Mahendramangalam

Marandahalli

Mathikonpalayam

Morappur

Palacode

Paparapatti

Pappireddipatti

Pennagaram

Pouchenpalli

Thoppur

North/

Villupuram

Cuddalore Cuddalore Annamalainagar

Panruti Avinankudi

Chidambaram AWPS - Neyveli

Sethiyathope AWPS - Panruti

Neyveli AWPS Sethiyathope

Virudhachalam AWPS Vridhachalam

Thittakudi AWPS-Chidambaram

AWPS- Cuddalore

Bhuvanagiri

Chidambaram Taluk

Chidambaram Town

Cuddalore NT

Cuddalore OT

Cuddalore port

Devanampattinam

Kadampuliyur

Kammapuram

Karuveppilankurichi

Kattumannarkoil

Killai

Kullanchavadi

Kumaratchi

Kurinjipadi

Mandharakuppam

Page 235: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 235 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Mangalampet

Maruthur

Muthandikuppam

Naduveerapattu

Nellikuppam

Neyveli Township

Neyveli Thermal

Oomangalam

Orathur

Panruti

Pennadam

Porto novo

Puduchatram

Pudupettai

Puthur

Ramanatham

Reddichavadi

Sethiyathope

Sirupakkam

Sozhatharam

Srimushnam

Thiruppapuliyur

Thookkanampakkam

Titakudi

Vadalur

Veppur

Virudhachalam

Central/

Thanjavur

Nagapattinam Nagapattinam Anaikaranchatram Vettaikaranirrup

pu

Vedaranyam AWPS - Sirkali

Mayiladuthurai AWPS - Vedaranyam

Sirkali AWPS -Mayiladuthurai

AWPS -Nagapattinam

Kariyapattinam

Page 236: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 236 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Keelaiyur

Keevalur

Kuthalam

Manalmedu

Mayiladuthurai

Nagapattinam

Nagoor

Palaiyur

Perambur

Poompuhar

Poraiyar

Pudupattinam

Sembanarkoil

Sirkali

Thalainayar

Thirukuvalai

Thiruvenkadu

Thittachery

Vaitheswaran Koil

Valivalam

Vedaranyam

Velankanni

Velipalayam

Voimedu

South/Ramana

thapuram

Ramanathapuram Kamuthi Abiramam Jetty

Keelakarai AWPS - Keelakarai

Paramakudi AWPS - Paramakudi

AWPS - Rameswaram

AWPS - Thiruvadanai

AWPS- Kamuthi

AWPS -Ramanathapuram

Chatrakudi

Devipattinam

Elanjambur

Page 237: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 237 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Emaneswaram

Eravadi Dharga

Kadaladi

Kamuthi

Keelakarai

Keelaselvanoor

Keelathooval

Kenikkarai

Kovilangulam

Mandala Manickam

Mandapam

Mudukulathur

Nainarkoil

Pamban

Paramakudi Taluk

Paramakudi Town

Parthibanoor

Peraiyur

Perunali

R.S.Mangalam

Ramanathapuram Bazaar

Ramanathapuram Town

Rameswaram Temple

Rameswaram Town

S.P.Pattinam

Sayalkudi

Sikkal

Thangachimadam

Thanushkodi

Theriruveli

Thirupalaikudi

Thirupullani

Thiruvadanai

Thondi

Page 238: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 238 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Uchipuli

Uthirakosamangai

Valinokkam

South/Dindigul Theni Theni Allinagaram Vaigai

Periyakulam Andipatti Ethakovil

Andipatti AWPS Andipatti Kanniyapillaipatti

Bodinayakanur AWPS Bodi

Uthamapalayam AWPS Uthamapalayam

AWPS- Theni

Bodinayakkanur rural

Bodinayakkanur Town

Chinnamanur

Cumbum North

Cumbum South

Devadanapatti

Gandamanur

Gandamanur Vilakku

Gudalur North

Gudalur South

Highways

Jayamangalam

Kadamalaikundu

Kombai

Kumuli

Kurangani

Mayiladumparai

Odaipatti

Palanichettypatti

Periyakulam

Rajathanai

Rayappanpatti

Theni

Thenkarai

Thevaram

Page 239: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 239 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Uthamapalayam

Varasanadu

Veerapandi

North/Vellore Vellore Vellore Alangayam Avalur

Katpadi Ambalur Thimmampet

Ranipet Ambur Taluk

Arakkonam Ambur Town

Gudiyatham Anaicut

Ambur Arakonam Taluk

Vaniyambadi Arakonam Town

Thiruppathur Arcot Taluk

Arcot Town

AWPS - Ambur Town

AWPS Gudiyatham

AWPS- Ranipet

AWPS - Vaniyambadi

AWPS - Vellore North

AWPS- Arakonam

AWPS- Thirupathur

AWPS- Vellore

Bagayam

Banavaram

Ealagiri

Gudiyatham Taluk

Gudiyatham Town

Jolarpet

K.V.Kuppam

Kalavai

Kandili

Katpadi

Kavalur

Kaveripakkam

Kondampalayam

Kurisilapet

Page 240: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 240 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Latheri

Melpadi

Melpatti

Natrampalli

Nemili

Omerabad

Pallikonda

Panamadangi

Paradarami

Pernampet

Ponnai

Ranipet

Ranipet SIPCOT

Sathuvacheri

Sholinghur

Thakkolam

Thirupathur Taluk

Thirupathur Town

Thiruvalam

Timiri

Valapandal

Vaniyambadi Taluk

Vaniyambadi Town

Vellore North

Vellore South

Vellore Taluk

Veppankuppam

Virinchipuram

Virudampet

Walajapet

South/

Tirunelveli

Thoothukudi Thoothukudi Town

Alwarthirunagiri Serakulam

Thoothukudi Rural

Arumuganeri Sankaralingapuram

Maniyachi Authoor

Kovilpatti AWPS Srivaikundam

Page 241: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 241 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Vilathikulam AWPS Srivaikundam

Srivaikundam AWPS Thiruchendur

Thiruchendur AWPS Vilathikulam

Sattankulam AWPS-Kadambur

AWPS-Kovilpatti

AWPS-Pudukottai

AWPS-Tuticorin

Eppodumvendran

Eral

Ettayapuram

Kadalkudi

Kadambur

Kalugumalai

Kayathar

Koppampatti

Kovilpatti East

Kovilpatti West

Kulasekarapattinam

Kulathur

Kurumbur

Maniyachi

Masarpatti

Meignanapuram

Murappanad

Muthiahpuram

Nalatinpudur

Naraikinaru

Nazareth

Ottapidaram

Pasuvanthanai

Pudukkottai

Pudur

Puliyampatti

Puthiam Puthur

Page 242: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 242 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Sattankulam

Sayarpuram

Seidunganallur

SIPCOT

Soorankudi

Srivaikundam

Thalamuthunagar

Tharuvaikulam

Thattaparai

Thattarmadam

Thermalnagar

Thiruchendur

Tiruchendur Temple

Tuticorin Central

Tuticorin North

Tuticorin South

Vilathikulam

South/Tirunelv

eli

Kanniyakumari Nagercoil Anju gramam Lower kothaiyar

Kanniyakumari Aralvoimozhi Upper kothaiyar

Thuckkalai Arugani

Colachel Arumanai

Asaripallam

AWPS Colachel

AWPS Kanniyakumari

AWPS Kuzhithurai

AWPS- Nagercoil

Boothapandy

Colachel

Eraniel

Ethamozhi

Kadaiyalumoodu

Kaliyakkavilai

Kanya Kumari

Karungal

Page 243: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 243 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Keeriparai

Kollancode

Kottar

Kottiyode

Kulasekaram

Kuzhithurai

Manavalakurichi

Mandaikadu

Nesamani Nagar

Nithiravilai

Pazhugal

Pechiparai

Puthukadai

Rajakkamangalam

South Thamaraikulam

Suchindram

Thiruvattar

Thuckkalai

Vadaseri

Vellichanthai

South/Tirunelv

eli

Tirunelveli Tirunelveli rural Achanpudur Servalar

Ambasamudram Alankulam Lower dam

Cheranmahadevi Alwarkurichi Manimuthar

Alangulam Ambasamudram Seethaparpanallur

Tenkasi AWPS - Alankulam Ayyapuram

Sankarankoil AWPS - Ambasamudram

Puliyangudi AWPS - Nanguneri

Valliyoor AWPS -Sankarankoil

Nanguneri AWPS - Tirunelveli Rural

AWPS - Valliyoor

AWPS- Tenkasi

Ayikudi

Cheranmahadevi

Chinnakoilankulam

Page 244: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 244 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Courtallam

Devarkulam

Eruvadi

Gangaikondan

Kadayam

Kadayanallur

Kalakkad

Kallidaikurichi

Karivalamvanthanallur

Koodankulam

Kuruvikulam

Manjolai

Manur

Moolaikaraipatty

Moontradaippu

Mukkudal

Munneerpallam

Nanguneri

Ovari

Palavoor

Panagudi

Panavadalichatram

Pappakudi

Pathamadai

Pavoorchatram

Puliangudi

Puliarai

Radhapuram

Sambavarvadakarai

Sankarankoil Taluk

Sankarankoil Town

Seevalaperi

Senthamaram

Shenkottai

Page 245: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 245 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Sivagiri

Sivanthipatti

Surandai

Suthamalli

Thalaiyuthu

Thenkasi

Thirukkurungudi

Thiruvengadam

Thisayanvilai

Tirunelveli Taluk

Uthumalai

Valliyoor

Vasudevanallur

Veerakeralampudur

Veeravanallur

Vickramasingapuram

Vijayanarayanam

West/

Coimbatore

Coimbatore Pollachi Alandurai Aliyar

Valparai Anamalai Kadambarai Water Falls

Periyanaicken Palayam

Annur Sheikalmudis

Perur AWPS - Perur

AWPS - Thudiyalur

AWPS - Pollachi

Chettipalayam

Gomangalam

K.G. Chavadi

Kadambarai

Karamadai

Karumathampatty

Karunyanagar

Kinathukadavu

Koilapalayam

Kottur

Madukkarai

Page 246: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 246 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Mahalingapuram

Mettupalayam

Mudis

Negamam

Periyanaickenpalayam

Perur

Pillurdam

Pollachi Bazaar

Pollachi Taluk

Pollachi Town

Sirumugai

Sulur

Thondamuthur

Thudialur

Vadavalli

Valparai

Vedakkipalayam

West/

Coimbatore

Nilgiris Udhagamandalam Town

Ambalamoola

Udhagamandalam Rural

Aruvankadu

Coonur AWPS - Coonur

Gudalur AWPS - Devala

Devala AWPS - Gudalur

AWPS -Udhagamandalam

AWPS -Udhagamandalam Rural

Cherambadi

Coonoor Town

Denaducombai

Devala

Devarsholai

Emerald

Erumad

Gudalur

Ketti

Page 247: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 247 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Kolacombai

Kothagiri

Manjur

Masinagudi

Naduvattam

Nellakottah

Newhope

Pudumand

Sholurmattam

Udhagamandalam Rural

Udmlm Town Central

Udmlm Town West

Uppercoonoor

Wellington

West/Salem Krishnagiri Krishnagiri Anchetty

Bargur AWPS - Bargur(Dpi)

Uthangarai AWPS - Denkalaikottai(Dpi)

Hosur AWPS - Hosur(Dpi)

Denkanikottai AWPS - Krishnagiri(Dpi)

Bagalur

Bargur

Barur

Berigai

Denkanikottai

Gurubarapalli

Hosur

Hudco

Kallavi

Kandhikuppam

Kaveripattinam

Kelamangalam

Krishnagiri Taluk

Krishnagiri Town

Krp Dam

Page 248: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 248 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Maharajakadai

Mathigiri

Mathur

Nagarasampatti

Pochampalli

Rayakottai

Samalpatti(Dpi)

Shoolagiri

Singarapettai

SIPCOT

Thally

Uthanapalli

Uthangarai

Veppanapalli

North/Villupura

m

Villupuram Gingee Anandapuram

Kallakurichi Arakandanallur

Kottakuppam Auroville

Tindivanam Avalurpet

Thirukoilur AWPS - Gingee

Ulundurpet AWPS - Kallakurichi

Viluppuram AWPS Kottakuppam

AWPS Tindivanam

AWPS-Thirukoilur

AWPS-Villupuram

Brammadesam

Chinnasalem

Elavanasurkottai

Gingee

Kachirapalayam

Kallakurichi

Kandachipuram

Kandamangalam

Kanjanur

Kanni

Page 249: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 249 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Kariyalur

Kedar

Kikuppam

Kiliyanoor

Kottakuppam

Mailam

Manalurpet

Marakanam

Moongi Thuraipattu

Nallan Pillai Petral

Olakkur

Pagandaikuttusalai

Periyathatchur

Rishivandiam

Roshanai

Sankarapuram

Sathiyamangalam

Thirukoilur

Thirunavalur

Thirupalapandal

Thiyagadurgam

Tindivanam

Tiruvennainallur

Ulundur Pet

Vadaponparappi

Valathy

Valavanur

Vanur

Varanjaram

Vellimedupettai

Vikravandi

Villupuram Taluk

Villupuram Town

Villupuram West

Page 250: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 250 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

North/

Kancheepura

m

Thiruvallur Thiruvallur Arambakkam Periyakuppam

Uthukottai Arani

Thiruthani AWPS Ponneri

Ponneri AWPS Thiruvallur

Gummidipoondi AWPS Uthukottai

AWPS-Thiruthani

Gummudipoondi

Kadambathur

Kanakamma Chatram

Kattur

Kavarapettai

Manavala Nagar

Mappedu

Minjur

Pallipet

Pathirivedu

Pennalurpet

Periyapalayam

Ponneri

Pothattur Pet

R.K.Pet

Sevvapet

Sholavaram

Sipcot

Thirupalaivanam

Thiruthani

Thiruvalangadu

Thiruvallur Taluk

Thiruvallur Town

Uthukottai

Vellavedu

Vengal

North/Kanchee

puram

Kancheepuram Chengalpattu Achirapakkam Anaicut

Kancheepuram AWPS Chengalpattu

Page 251: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 251 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Maduranthagam AWPS Mahabalipuram

Mamallapuram AWPS Melmaruvathur

Sriperumbudur AWPS Sriperumbudur

AWPS-Kancheepuram

Baluchettychatram

Chengalapattu Tn

Chengalpattu Taluk

Cheyyur

Chittamur

Chunambedu

Guduvancheri

Kalpakkam

Kanchi Taluk

Kelampakkam

Koovathur

Maduranthakam

Magaral

Mamallapuram

Manampathi

Manimangalam

Maraimalai Nagar

Melmaruvathur

Oragadam

Orathi

Otteri

Padalam

Palur

Sadras

Salavakkam (G5)

Sivakanchi

Somangalam

Sriperumbudur

Sunguvarchatram

Thalambur

Page 252: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 252 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Thirukalukundram

Thiruporur

Uthiramerur

Vishnukanchi

Walajabad (K3)

Central/ Trichy Pudukottai Pudukottai Alangudy Malaiyur

Alangudi

Annavasal Vellanoor

Aranthangi Aranthangi

Kottaipattinam Arimalam

Keeranur Athanakottai

Ponnamaravathy Avudaiyarkoil

AWPS - Alangudi

AWPS - Keeranur

AWPS - Ponnamaravathy

AWPS -Aranthangi

AWPS - Pudukottai

AWPS - Thirumayam

Embal

Gandharvakottai

Ganeshnagar

Illupur

Jagadapattinam

K.Pudupatty

Karaiyur

Karambakudy

Karur

Keeramangalam

Keeranur

Kottaipattinam

Manamelgudy

Mandaiyur

Mathur

Mimisal

Nagudy

Page 253: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 253 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Namana Samudram

Panayappatty

Ponnamaravathy

Pudukottai Town

Regunathapuram

Sampathuvidthi

Thirugokarnam

Thirumayam

Thiruppunavasal

Udayalipatti

Vadakadu

Viralimalai

Tirunelveli City Tirunelveli City DCP, L & O,

Kokirakulam,

Tirunelveli City

Tirunelveli Town AWPS - Tirunelveli Junction

DCP, Crime &

Traffic ,

Kokirakulam,

Tirunelveli City

Palayamkottai AWPS -Palayamkottai

ADC, PEW,

Tirunelveli City

Melapalayam

Palayamkottai

Perumalpuram

Pettai

Thatchanallur

Tirunelveli Junction

Tirunelveli Town

Roll-out Phase-II

North/Vellore Tiruvannamalai Arni Annakkvur

Chengam Arni Taluk

Cheyyar Arni Town

Polur AWPS Chengam

Tiruvannamalai Town

AWPS Cheyyar

Tiruvannamalai Rural

AWPS Polur

Vandavasi AWPS Vandavasi

AWPS-Arni

Page 254: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 254 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

AWPS-Tiruvannamalai

Brammadesam

Chengam

Chetpet

Cheyyar

Desur

Dusi

Jamuna Marudur

Kadaladi

Kalambur

Kalasapakkam

Kannamangalam

Kilcodungalore

Kilpennathur

Mangalam

Melchengam

Moranam

Pachalf

Pernamallur

Polur

Ponnur

Pudupalayam

Santhavasal

Sathanurdam

Thachampet

Thandrampet

Thanipadi

Thellar

Thiruvannamalai East

Thiruvannamalai Taluk

Thiruvannamalai Town

Thiruvannamalai Town Crime

Vadavanakkambadi

Vanapuram

Page 255: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 255 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Vandavasi North

Vandavasi South

Veraiyur

Vettavalam

West/Salem Namakkal Namakkal AWPS Rasipuram

Tiruchengode AWPS - Tiruchengode

Rasipuram AWPS Velur

Vellur AWPS-Namakkal

Ayilpatty

Belukurichi

Elachipalayam

Erumapatty

Jedarpalayam

Komarapalayam

Mallasamudram

Mangalapuram

Mohanur

Molasai

Nallipalayam

Nallur

Namagiripet

Namakkal

Pallipalayam

Paramathi

Puduchatram

Rasipuram

Sendamangalam

Thiruchengodu Rural

Thiruchengodu Town

Valavandhinadu

Velagoundanpatti

Velur

Vennandur

West/Salem Salem Salem Rural Attaiyanpatti

Page 256: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 256 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Sankari Attur

Mettur AWPS Athur

Omalur AWPS Mettur

Athur AWPS Omalur

Valappady AWPS Salem Rural

AWPS Sankari

Deevattipatti

Edapady

Ethappur

Gangavalli

Jalakandapuram

Karipatty

Kariyakoil

Karumalaikoodal

Karumandurai

Kolathur

Kondalampatti

Macdonalds Choultry

Malliyakarai

Mallur

Mechery

Mettur

Nangavalli

Omalur

Panamarathupatty

Poolampatti

Sankari

Steel Plant

Thalaivasal

Thammampatty

Tharamangalam

Thevoor

Tholasampatty

Valapady

Page 257: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 257 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Veeraganur

Veeranam

Yercaud

West/Coimbat

ore

Tiruppur Tirupur Alangiyam

Avinashi Anupparpalayam

Palladam Avinashi

Udumalpet Avinashipalayam

Kangeyam AWPS Avinashi

Dharapuram AWPS Dharmapuram

AWPS Kangeyam

AWPS Palladam

AWPS Tiruupur

AWPS Udumalpet

Cheyur

Dhally

Dharapuram

Gudimangalam

Kamachinaickenpalayam

Kangeyam

Komaralingam

Kundadam

Kunnathur

Madathukulam

Mahalingapuram

Mangalam

Mulanur

Palladam

Perumanallur

Tiruppur Rural

Trippur North

Trippur South

Udumalpet

Uthiyur

Uthukuli

Page 258: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 258 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Vellakoil

West/Coimbat

ore

Erode Erode Town Ammapet Govt. Hospital, Erode

Perunthurai Andhiyur

Bhavani Appakoodal

Gobichettipalayam

Arachalur

Sathyamangalam AWPS Bhavani

AWPS Gobochettipalayam

AWPS Sathyamangalam

AWPS-Erode

Bangalapudur

Bargur Hills

Bhavani

Bhavanisagar

Chennimalai

Chithode

Erode North

Erode South

Erode Taluk

Erode Town

Gobichettipalayam

Hassanur Hills

J.R.S.Puram/Kadambur

Kadathur

Kanjikoil

Karungalpalayam

Kavandapadi

Kodumudi

Malayampalayam

Modakuruchi

Nambiyur

Perundurai

Puliampatti

Sathyamangalam

Siruvalur

Page 259: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 259 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Sivagiri

Thalavadi

Thingalur

Varappalayam

Vellitiruppur

Vellode

Central/Trichy Karur Karur Town Aravakurichi

Karur Rural AWPS Kulithalai

Kulithalai AWPS-Karur

Chinnadharapuram

Chinnathamanipatty

K.Paramathi

Karur

Kulithalai

Lalpettai

Mayanoor

Palaviduthi

Pasupathipalayam

Thennilai

Thogamalai

Velayuthanpalayam

Velliyanai

Vengal

Vengamedu

Central/Trichy Ariyalur Ariyalur Andimadam

Jeyankondam Ariyalur

AWPS Ariyalur

AWPS Jeyankondam

Bikkiramangalam

Irunbulikurichi

Jeyankondam

Kairalabad

Keelapalur

Kuvagam

Page 260: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 260 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Meensurity

Sendurai

T. Palur

Thalovai

Thirumanur

Thoothur

Udayarpalayam

Venganur

Central/Trichy Perambalur Arumbavur Arumbavoor

Mangalamedu AWPS-Perambalur

Kaikalathur

Kunnam

Mangalamedu

Maruvathur

Padalur

Perambalur

V.Kalathur

Central/Trichy Trichy Thiruverumbur AWPS Lalgudi

Jeeyapuram AWPS Manaparai

Lalgudi AWPS Musiri

Musiri AWPS Thiruverambur

Manapparai Bhel

Inamkulathur

Jeeyapuram

Kallakudi

Kattuputhur

Kollidam

Lalgudi

Manachanallur

Manapparai

Manikandan

Musiri

Navalpattu

Pulivalam

Page 261: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 261 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Puthanatham

Ramji Nagar

Samayapuram

Siruganur

Somarasampet

Thathaiyangar Pet

Thiruverambur

Thottiyam

Thuraiyur

Thuvagudi

Thuvarankurichi

Uppiliyapuram

Vaiyampatty

Valanadu

Vathalai

Central/

Thanjavur

Thiruvarur Thiruvarur Alivalam

Thiruturaipoondi AWPS Nannilam

Nannilam AWPS Thiruthuraipoondi

Mannargudi AWPS-Mannargudi

Muthupet AWPS-Tiruvarur

Edaiyur

Eravanchery

Kalappal

Kodavasal

Koothanallur

Koradachery

Kottur

Mannargudi

Mannargudi Taluk

Muthupettai

Nannilam

Needamangalam

Pamani

Paravakottai

Page 262: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 262 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Peralam

Perugavalanthan

Thalayamangalam

Thirukkalar

Thirumakottai

Thiruthuraipoondi

Tiruvarur Taluk

Tiruvarur Town

Vadapathimangalam

Vaduvoor

Vaipur

South/

Dindigul

Dindigul Dindigul Town Ambadurai

Dindigul Rural Ambilikkai

Vedasandur Ammayanaickanur

Palani AWPS Kodaikanal

Oddanchatram AWPS Nilakottai

Nilakottai AWPS Ottanchatram

Kodaikanal AWPS Vadamadurai

AWPS-Dindigul

AWPS-Palani

Ayakudi

Batlagundu

Chatrapatti

Chinnalapatti

Dindigul Taluk

Dindigul Town North

Dindigul Town South

Dindigul Town West

Edayakottai

Eriodu

Guzilamparai

Kallimandayam

Kannivadi

Keeranur

Page 263: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 263 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Kodaikkanal

Koombur

Natham

Nilakottai

Oddanchatram

Palani Adivaram

Palani Taluk

Palani Town

Pattiveeranpatti

Reddiyarchatram

Sempatti

Shanarpatti

Swaminathapuram

Thadicombu

Thandikudi

Vadamadurai

Vedasandur

Vilampatti

Viruveedu

South/Madurai Madurai Melur Alanganallur

Samayanallur Appanthirupathy

Usilampatti Avaniyapuram

Thirumangalam AWPS Melur

Peraiyur AWPS- Samayanallur

Thirupparankundram

AWPS- Thirumangalam

Oomachikulam AWPS Usilampatti

AWPS-Thirupparankun

Balamedu

Chatrapatti

Checkanurani

Elumalai

Kadupatty

Kallikudi

Karuppayoorani

Page 264: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 264 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Keelavalavu

Koodakovil

Koodal Pudur

Kottampatti

M.Kallupatti

Melavalavu

Melur

Nagaiahpuram

Nagamalaipudukottai

Oomachikulam

Othakadai

Peraiyur

Perungudi

Samayanallur

Saptur L2

Sedapatty

Sholavandan

Silaiman

Sindupatty H3

T.Kallupatti

T.Ramanathapuram

Thirumangalam Taluk

Thirumangalam Town

Thirunagar

Thirupparangundram

Usilampatty Taluk

Usilampatty Town

Uthappanaickanur

Vadipatty

Valandur

Vikkaramangalam

Villoor

South/Madurai Virudhunagar Virudhunagar A.Mukkulam

Sattur Alankulam

Page 265: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 265 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Sivakasi Amathur

Rajapalayam Ammapatti

Srivilliputhur Appanaickkanpatty

Aruppukottai Aruppukottai Taluk

Thiruchuli Aruppukottai Town

Aviyur

AWPS Aruppukottai

AWPS Sathur

AWPS Sivakasi

AWPS Srivilliputhur

AWPS-Rajapalayam

AWPS-Virudhunagar

Elayirampannai

Irukkangudi

Kariappatti

Kathanoor

Keelaparalachi

Keelarajakularaman

Koomapatty

Krishnan Kovil

M.Pudupatti

M.Reddiapatti

Mallan Kinaru

Malli

Mamsapuram

Maraneri

Narikudi

Nathampatti

Pandalkudi

Rajapalayam North

Rajapalayam South

Sattur

Sattur Taluk

Seithur

Page 266: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 266 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Seithur Rural

Sivakasi East

Sivakasi Town

Soolagarai

Srivilliputhur Taluk

Srivilliputhur Town

Thalavaipuram

Thiruchuli

Thiruthangal

Vachakarapatti

Vanniyampatti Vilakku

Veeracholan

Vembakkottai

Virudhunagar Bazaar

Virudhunagar East

Virudhunagar Rural

Virudhunagar West

Watrap

Madurai City Madurai City DCP, L & O,

Madurai City

Anna Nagar Annanagar

DCP, Crime,

Madurai City

Madurai Town AWPS Madurai North(Thilagar Thidal)

DCP, Traffic,

Madurai City

Thilagar Thidal AWPS Madurai Town

DCP,

Headquarters,

Madurai City

Thallakulam AWPS-Madurai South

DCP, Armed

Reserve, Madurai

City

Govt. Rajaji Hospita

ADC, PEW,

Madurai City

Jaihindpuram

K.Pudur

Karaimedu

Keeraithurai

Madurai Town Ctrl (Vilakhuthoon)

Madurai Town East (Theppakulam)

Page 267: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 267 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Madurai Town North (Thilagar Thidal)

Madurai Town South (South Gate)

Mathichayam

Sellur

Somasundaram Colony

Sri Meenakshi Amman

Subramaniapuram

Thallakulam

Thideernagar

Trichy City Trichy City DCP, L & O,

Trichy

Cantonment Airport

DCP, Crime &

Traffic, Trichy

Golden Rock Ariyamangalam

ADC, PEW,

Trichy

Fort AWPS Cantonment

Srirangam AWPS Fort Range

AWPS Golden Rock

AWPS-Srirangam

Contonment

Edamalaipattipudur

Fort

Gandhi Market

Golden Rock

K.K.Nagar

Palakkarai

Srirangam

Thillai Nagar

Uraiyur

Salem City Salem City DCP, L & O,

Hanging Garden,

Salem

ACP, West, Sooramangalam

Ammapet

ACP, West- Crime, Fairlands

Annadanapatty

ACP, South – Salem Town

AWPS Ammapet

ACP, South Crime - Annathapatti

AWPS Sooramangalam

AWPS-Salem

Fairlands

Page 268: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 268 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Govt.Hqrs Hospital

Hasthampatty

Kannankuruchi

Kitchipalayam

Pallapatty

Salem Town

Shevapet

Sooramangalam

Chennai City Chennai City Adyar Abiramapuram Akkarai Check Post

Anna Nagar Adyar CMBT - Koyambedu

Ashok Nagar Aminjikarai Karampakkam Check Post

Ayanavaram Anna Nagar KMC Hospital - Kilpauk

Egmore Anna Salai Komaleswaranpet - Pudupet

Flower Bazaar Anna Square Koyambedu Check Post

Guindy Arumbakkam Luz Corner

Harbour Ashok Nagar Market - Koyambedu

High Court AWPS Adyar Naathamuni Check Post

Kilpauk AWPS Anna Nagar New Secretariat

MKB Nagar AWPS Ashok Nagar Retteri Check Post

Mylapore AWPS Ayanavaram RSRM Hospital - Royapuram

Nungambakkam AWPS Egmore Thevar Statue - Tenyampet

Port Marina AWPS Flower Bazar Thiruvanmiyur Check Post

Pulianthope AWPS Guindy Velachery Check Post

Royapettah AWPS Harbour

Royapuram AWPS High Court

Saidapet AWPS Kilpauk

Sembium AWPS Mambalam

T.Nagar AWPS Mkb Nagar

Teynampet AWPS Mylapore

Thirumangalam AWPS Peravallore

Thiruvotriyur AWPS Pulianthope

Thuraipakkam AWPS Royapettah

Triplicane AWPS Royapuram

Page 269: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 269 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Vadapalani AWPS Saidapet

Vepery AWPS Teynampet

Villivakkam AWPS Thirumangalam

Washermenpet AWPS Thiruvottiyur

AWPS Thousand Lights

AWPS Triplicane

AWPS Vadapalani

AWPS Vepery

AWPS Villivakkam

AWPS Washermenpet

Ayyanavaram

Basin Bridge

Chetpet

Chintadripet

Choolaimedu

Dr. R.K. Nagar

Egmore

Elephant Gate

Esplanade

Fishing Harbour

Flower Bazar

Foreshore Estate

Fort St. George

Govt. Estate

Govt. Hospital

Govt. KG Hospital

Govt. Royapettah Hospital

Govt. RSRM Hospital

Govt. Women & Children Hospital

Guindy

Harbour

High Court

I.C.F Colony

Ice House

Page 270: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 270 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

J.J Nagar

K.K. Nagar

Kasimedu

Kilpauk

Kilpauk Medical College Hospital

Kodambakkam

Kodungaiyur

Kolathur

Korukkupet

Kothavalchavadi

Kotturpuram

Koyambedu

Kumaran Nagar

M.K.B. Nagar

Mambalam

Marina

MGR Nagar

Museum

Muthialpet

Mylapore

Neelankarai

New Washermenpet

Nolambur

North Beach

Nungapakkam

Otteri

Peravalur

Peripheral

Periyamet

Pondy Bazar

Port Marine

Pulianthoppu

Rajamangalam

Royapettah

Page 271: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 271 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Royapuram

RSRM

Saidapet

Sastri Nagar

Secretariat Colony

Semanchery

Sembium

Seven Wells

Stanley Hospital

T.P. Chatram

Teynampet

Thiru Vi Ka Nagar

Thiruvanmiyur

Thiruvottiyur

Thousand Lights

3 Thuraipakkam

Tirumangalam

Tondiarpet

Triplicane

Vadapalani

Valasaravakkam

Velachery

Vepery

Villivakkam

Virugambakkam

Vyasarpadi

Washermenpet

Zam Bazar

GRP Chennai GRP Chennai Chennai Central Arakkonam Basin Bridge

Chennai Egmore Avadi Tiruvallur

Coimbatore Chengalpattu Tondaiarpet

Chennai Central Rayapuram

Coimbatore Walajah

Coonur Vellore

Page 272: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 272 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Dharmapuri Thirupathur

Egmore Morappur

Erode Hosur

Jolarpet Mettupalayam

Katpadi Pollachi

Korrukkupettai Coonoor

Mettupalayam

Perambur

Podhanur

Pollachi

Royapuram

Salem

Salt Coatur

Tambaram

Thiruvallur

Tirupathur

Tirupur

Tondiarpet

Udhagamandalam

Vellore

Walajah

GRP Trichy GRP Trichy Trichy Junction Ariyalur Cuddalore

Madurai Junction Bodi Ariyalur

Chidambaram Ponmalai

Cuddalore Karur

Dindigul Pudukottai

Golden Rock Kumbakonam

Karaikudi Nagapattinam

Karur Putukottai

Kodai Road Bodi

Kumbakonam Kodairoad

Madurai Manamadurai

Manamadurai Thenkasi

Maniyachi Maniyatchi

Page 273: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 273 of 302

Zone/

Range Or City

DPO/CPO ACOP/JC/DC/AD

C Offices

ADSP Office SDPO/AC Range

Offices

Police Stations Outposts*

Mayiladuthurai Srivillipudur

Nagapattinam

Nagercoil

Palani

Pattukottai

Pudukottai

Rameswaram

Srivilliputhur

Tenkasi

Thanjavur

Tiruchirapalli

Tirunelveli

Tiruvarur

Tuticorin

Villupuram

Virudhachalam

Virudhunagar

*- SCRB has the full right to implement in part or omit all requirements put under this head

The implementation would also cover special units in each of the districts along with their

headquarters. These locations by districts are described in the table below for each district Phase

wise. This should be seen together with the implementation plan described in Section 6.1.1.

District Q-

Branch CSG CBCID Crime

(SIT) CCIW EOW Idol

Wing PEW DCB CSCID TIW TEW JAPU AVS ADoC

Pilot Phase

Special Unit HQ 1 3 1 0 0 1 0 0 0 0 9 3 2

Sivagangai 2 1 1 1 1 3

Thanjavur 1 4 1 1 1 1 2 3

Chennai Sub-urban

0 4 1 3 12

Coimbatore City 1 2 1 1 3 15

Sub-total 4 5 7 7 2 0 1 14 4 1 8 33 9 3 2

Roll-out Phase-I

Dharmapuri 1 1 1 1 1

Cuddalore 1 1 1 1 1 1 1 1 3

Nagapattinam 1 4 1 1 1 1 1 1 3

Ramanathapuram 1 1 1 1 1 2

Theni 1 1 1 1 1 1 1

Vellore 1 2 1 1 1 1 1 1

Page 274: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 274 of 302

District Q-Branch

CSG CBCID Crime (SIT)

CCIW EOW Idol Wing

PEW DCB CSCID TIW TEW JAPU AVS ADoC

Thoothukudi 1 3 1 1 1 1 1 1

Kanniyakumari 1 3 1 1 1 1 1 1 1 3

Tirunelveli 1 2 2 1 1 1 1 1 3

Coimbatore 1 2 2 1 1 1 1 3

Nilgiris 1 1 1 1 3

Tiruvallur 1 1 1 1 1 2

Krishnagiri 1 1 1 1 1 1 2

Villupuram 1 1 1 1 1 1 5

Kancheepuram 1 1 1 1 1 1 4

Tirunelveli City 1 1 1 6

Pudukottai 1 1 1 1 2

Sub-total 15 13 18 14 16 7 0 35 17 10 9 41 0 0 0

Roll-out Phase-II

Tiruvannamalai 1 1 1 1 1 2

Namakkal 1 1 1 1 3

Salem 1 2 2 1 1 1 1 3

Erode 1 1 1 1 1 2 3

Tiruppur 1 4

Karur 1 1 1 1 1 1

Ariyalur 1

Perambalur 1 1 1 1

Trichy 1 2 2 1 1 1 1 2

Thiruvarur 1 1 1 1 3

Dindigul 1 1 2 1 1 1 1 6

Madurai 1 2 3 1 1 1 1 2 2

Virudhunagar 1 1 1 1 1 1 1 6

Salem City 1 1 2

Madurai City 1 2 1 1 1 3 7

Trichy City 1 1 1 2 6

Greater Chennai 5 2 1 1 1 1 1 13 30

Sub-total 11 0 22 14 13 9 1 45 17 9 26 74

Total 30 18 47 35 31 16 1 94 38 20 43 148 9 3 2

*- SCRB has the full right to implement in part or omit all requirements put under this table

District SBCID OCIU SIT SB &

Core Cell

SDCID DSB

TS AP SJ & HR

HG STF STPC TNCF Jails District FSL/FPB

Intelligence Unit Offices Special Unit Non PS Offices

Pilot Phase

Special Unit Non PS HQ

1 1 1 1 1 1

Sivagangai 1 1 3 3 2

Thanjavur 1 1 5 1 6 3

Chennai Sub-urban

1 1 9 9 1

Coimbatore City 1 1 1 1 7 1

Sub-total 3 2 0 4 19 9 2 1 0 1 1 16 7

Page 275: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 275 of 302

Roll-out Phase-I

Dharmapuri 1 1 1 2 2

Cuddalore 1 1 1 1 6 2

Nagapattinam 1 1 1 1 1 5 2

Ramanathapuram 1 1 1 1 1 2 4

Theni 1 1 1 3 2

Vellore 1 1 1 3 1 10 3

Thoothukudi 1 1 1 2 4 2

Kanniyakumari 1 1 4 4 2

Tirunelveli 1 1 1 2 1 1 5 2

Coimbatore 1 1 1 1 2 1 1 7 3

Nilgiris 1 1 1 2 2

Tiruvallur 1 1 1 1 2

Krishnagiri 1 1 1 1 2 2

Villupuram 1 1 1 1 1 6 2

Kancheepuram 1 1 1 1 2 2

Tirunelveli City 1 1 1 1 1

Pudukottai 1 1 1 5 2

Sub-total 17 5 3 17 25 3 9 0 0 0 0 66 37

Roll-out Phase-II

Tiruvannamalai 1 1 3 2

Namakkal 1 1 2 4 2

Salem 1 1 2 1 5 2

Erode 1 1 3 2 6 2

Tiruppur 2 1 3 2

Karur 1 1 1 3 2

Ariyalur 1 1 1 1 2

Perambalur 1 1 1 1 2

Trichy 2 1 1 2 4 3 1 7 2

Thiruvarur 1 1 2 2

Dindigul 1 1 4 1 1 5 2

Madurai 2 1 1 1 3 1 1 5 2

Virudhunagar 1 1 2 1 2 2

Salem City 1 1 1

Madurai City 1 1 1

Trichy City 1 1 1 1 1

Greater Chennai 3 19 5 1 2 45 1 1

Sub-total 22 19 5 3 3 19 71 6 5 0 2 0 0 47 30

Total 42 19 5 10 6 40 115 18 1 1 2 1 1 129 74

Page 276: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 276 of 302

ANNEXURE XII Functional Requirements Specifications

S.No. Functional Requirements

Knowledge Base

1 Media Monitoring – At present, the information from print media and visual media

are manually gathered and maintained as links in excel sheet at each district. These

information are analyzed, grouped under specific keywords and sent to higher

officers on request from district level. It is intended to install a media monitoring

functionality tool which would be able to collate, analyse and prepare dossiers on

specific keywords such as religious extremism from various print and visual media

sources which can help higher offices make useful analyses.

Intended Users: Officials from District SP and above could get dossiers on topics

pertaining to their jurisdiction

FR01 Should facilitate automatic aggregation of related information based on conceptual

understanding by retrieving them from varied sources such as newspapers,

magazines, emails and other physical media and electronic media including news

channel videos, phone calls, e-newspapers and other multimedia available in

English and Tamil from various districts centrally in SCRB

FR02 Should facilitate automatic extraction of meaning, analyze the data and hyperlink

related fields and events present across multiple media sources

FR03 Should enable integration with other unstructured data available in the department

FR04 Should facilitate contextual data search of the integrated database

FR05 Should be able to facilitate querying unstructured data

FR06 Should be able to prepare reports based on automatic meaning extraction and

analyses to pre-defined set of officials who may be interested in the specific topic

FR07 Should be able to mail the results of query and contextual search to the official

concerned

FR08 Should be able to alert through emails/SMS, investigators and agencies to breaking

news which may still not have reached the department before the press

FR09 Should facilitate analyzing scenes and recognize faces and vehicle number plates

in areas where videos captured through CCTV Cameras are available.

2 Police Intranet – There is no department specific web enabled repository of

knowledge at the moment. It is proposed to develop an intranet website which

would also have a log-in feature for personnel. The portal would hold details on

Police Acts, Rules, Helpline/Checklist for case registration, Investigation,

prosecution for various types of cases, official promotions and transfers and so on.

Intended Users: Personnel from Constabulary till DGP

FR10 The existing TN Police Intranet should be upgraded to a website based on suitable

content management system

FR11 The Intranet System should support role based content creation and distribution

Page 277: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 277 of 302

FR12 The Intranet System should support automatic email alerts based on roles assigned

in the system

FR13 The Intranet System should have PSO, circulars, conduct rules, Acts, etc. for easy

reference

FR14 The Intranet System should allow role based updation of PSO, circulars, conduct

rules, Acts etc

FR15 The Intranet System should allow users to login to the HRMS provided by NIC for

updation and retrieval of records

FR16 The Intranet System should allow police personnel to register their grievances

FR17 The Intranet System should provide with online help manual to assist in using the

Intranet System, CAS (State) and other modules developed.

FR18 The Intranet System should provide search facility to access specific information

from the databases e.g area specific information, crime & criminal information,

victim details, lost / found property, unidentified dead bodies etc.

Traffic Suite

3 Patrol and Police Control Room Call Interface – The Complaints are also

registered through the Central Police Control Room at the State Headquarters that

is accessible to the public through Emergency Contact number (100) and Women

and Child Helplines.

Intended Users: Police Control Room Operators at Districts and

Commissionerates, Police Station Users such as SHO, Highway Patrol Vehicles

FR19 The system should display all the unanswered calls and the call/caller details to the

user. In case some calls are unanswered due to unavailability of personnel, the

head of the PCR would get the details of the unanswered calls. It would also allow

them to call back the number to ascertain the details of the calls.

FR20 System should arrange the incoming calls in the order that come in. The system

would arrange the calls on FIFO (First-In-First-Out) basis and the calls would be

allotted to the first available personnel.

FR21 The system should allow the user to answer /respond to the call through the user

interface. The user interface would be designed in such a manner that the PCR

personnel need to use only the interface to respond to calls.

FR22 The system should allow the user to record the call along with timestamp and

capture it in the system,

FR23 In case the call(s) comes in for an already registered complaint, the system should

allow the user to link the call(s) to the registered complaint.

FR24 System should provide an interface to the Police Control Room (PCR) to capture

the details of the complaint and the caller / complainant through a “quick capture

complaint form” relevant for a complaint that is reported in through a phone call,

email, walk-ins in emergency or a non-emergency situation.

FR25 In case the caller reports a complaint that is within the jurisdiction of the Police

Control Room (either State HQ or District), the system should allow the user to

identify the appropriate police station or available patrol vehicle and transfer the call

Page 278: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 278 of 302

to the same for response.

FR26 In case the caller reports a complaint that is outside the jurisdiction of the PCR

(either State HQ or District HQ), the system should allow the user to transfer the

calls to the appropriate police control room that has the jurisdiction.

FR27 The system should allow the user to record the details of complaint assignment and

the action taken by the responder on the complaint.

FR28 Should provide the reports and search capabilities on the call registered/logged

FR29 Should allow facility to pass on information/complaint lodged/provided by citizen to

the concerned Police Station so that IO can follow up accordingly for enquiry.

FR30 Should allow facility to receive SMS from citizens sent and respond to their queries

with respect to status of case or permission request, etc.

FR31 Should store details of calls logged and action taken in the Police Control Room

Call database server located at each Police Control Room

FR32 Should allow separate interface for storing details of calls logged regarding VIP

movements, law & order situation in the Police Control Room Call database

FR33 Should allow listening to feed from the highway patrol devices, for converting the

feed into readable format for control room and for generating various reports.

FR34 Should allow display of complete fleet information of vehicles on Highway Patrol in

one screen for each District Control Room

FR35 Should allow capture details of the following in the form of a Report from each

Highway Patrol vehicle through a handheld device and store the data in the Control

Room Call Database:

Distance Traveled Report

Vehicle Productivity Report

Customized distance report – provides information on time periods defined

by the user between any dates

Night Drive Report

Entry and Exit Report at pre-mapped locations

Route Deviation Report

FR36 Should present route map for each of the highway patrol vehicle for its assigned

route in the handheld device

FR37 Should program the boundary for each of the highway patrol vehicle in the

handheld device and in case of any deviation from the fencing, it should be

communicated to the District Control Room

FR38 Should be able to maintain log of Movement (including direction) and/or Halt of

patrol vehicles communicated automatically form handheld device in the application

in the District Control Room

FR39 Should be able to send alerts automatically from handheld device to the District

Control Room in case of violations relating to Speed monitoring, halt duration

monitoring, route deviation and emergency. These should be captured in the

application in District Control Room

FR40 Should be able to send Trip Sheet details to District Control Room using handheld

device in the patrol vehicle

Page 279: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 279 of 302

FR41 Should allow all reports to be downloadable to Excel

FR42 Should have the capability to extract victim /accused details from CAS (State)

database and transmit the same to Patrol Vehicle device on request

4 RC Book/DL Verification, Spot Fine – There is no instant access to checking

driver/vehicle credentials by traffic policemen. It is proposed to empower field level

traffic policemen to enable them to check credentials on the spot and issue spot

fines.

Intended Users: Additional Commissioner, Traffic and DCP in cities and SPs in

district under whose jurisdiction Traffic enforcement and Traffic investigation

falls.SCRB will access the resources for the purpose of statistics

FR43 The System should facilitate knowing about the status of vehicle – whether it is

stolen or involved in crime or otherwise.

FR44 The System should provide information on the previous history of involvement of

vehicle or driver in accident(s)

FR45 The Handheld Device/Mobile Data Terminal should facilitate search on the basis of

a variety of parameters including vehicle number/chassis number/engine number

and name of driver.

FR46 The System should facilitate automatic transfer of data (E.g., Printed Challans of

traffic violation) from the Hand-Held Device/ Mobile Data Terminal to the Back-end

Server Database; The System should also provide the team managing the traffic

management challans with the necessary reports, statistics and aid in the

monitoring and control of money collection and reconciliation of payments against

the challans issued. The System should also ensure expansion history of past

offences of a particular person.

Crime Analysis Suite

5 Fingerprint – At present, there is no automation of linking the crime data captured

in FIR to previous fingerprint data. Also, fingerprint database enters criminal data

again along with entry already done for FIR. It is proposed to tag fingerprint to crime

and criminal data wherever available and also facilitate capturing of fingerprint

images and tag it to crime data for new criminals so that it will be integrated as one

database:

Intended Users: Beat Constables, TNFPB

FR47 The Handheld Device/ Mobile Data Terminal should be capable of retrieving

relevant data relating to the Public violators, Bad characters & Ex-Convicts from the

database of the Tamil Nadu Police Department located at State Fingerprint Bureau.

FR48 The Handheld Device/ Mobile Data Terminal should allow Beat Officers to perform

a quick verification of an individual against an ID card or Database or Finger Print

Verification

FR49 The Handheld Device/ Mobile Data Terminal should facilitate Police personnel to

identify unconscious victims against the database Tamil Nadu Police Department

located at State Fingerprint Bureau and also compare with the UID Database (as

and when it is made available)

Page 280: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 280 of 302

FR50 The Handheld Device/ Mobile Data Terminal should facilitate search on the basis of

the finger print identification of the suspect/culprit

FR51 The Handheld Device/ Mobile Data Terminal should be able to capture and store

finger print of violators, register new suspects etc

6 Business Intelligence - The system would allow presentation of graphical

analyses of data drawn from various databases.

Separate dashboards would be presented to higher officials based on their

jurisdiction ranging from SP till Headquarter level higher officials

Separate dashboards would be presented to field level staff for their jurisdiction for

different type of crimes ranging from station level officer to sub-divisional/range

officer

Separate Dashboards should be made available at functional level for different level

of officers specific to the special units.

FR52 The system should allow the user to create visual presentations like pie charts,

graphs and thematic maps.

FR53 The system should allow user to select the data fields from the data base of State

CAS.

FR54 The system should allow user to select different geographical entities like Police

Stations, Districts, and Ranges etc. and generate thematic maps based on the data

sets selected.

FR55 The system should generate thematic maps based on different colour codes to

differentiate between different entities selected for display

FR56 The system should have the capability to drill down to the lower levels from the

generated graphs to see the individual values of the data set.

FR57 The system should have the facility to generate adhoc, dynamic and regular reports

from the State CAS

Communication Suite

1 Social Networking – There is a need to harness the power of social networking for

efficient information sharing between citizens and department. It is proposed to

establish a link between the Police Intranet website and the Tamil Nadu/Chennai

Community home page in Social networking sites such as Facebook, Orkut and

Twitter through which important notifications can be issued to the public such as

traffic diversions, election duty announcements. Also, citizens may be able to post

messages or photos on hit and run cases, thefts on this portal which would be

checked at SCRB for suggesting suitable course of action

Intender Users: Citizens and all department personnel from constable to DGP

FR58 A dedicated page should be created on one of the popular Social Networking

websites for TN Police.

FR59 The choice of the website should be in consultation with TN Police

Page 281: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 281 of 302

FR60 The dedicated page should display the important contact numbers of each district

control room and SP Offices in the state.

FR61 The dedicated page should have the facility to for the citizens to upload

photographs of traffic incidents / violations

FR62 The dedicated page should provide the choice of displaying / hiding the name of

uploader of photograph and this choice should be made available to the citizen who

is uploading the photograph.

FR63 The dedicated page should also provide the update and the action taken by TN

Police on the photographs of traffic incidents / violations

FR64 The dedicated page should mention clearly on the landing page that fraudulent /

mischieveous uploading of photographs would amount to misusing of the facilty and

liable for action by TN Police

FR65 The dedicated page should be able to store the IP address of the uploader and the

same should be mentioned clearly on the landing page so that fraudulent /

mischieveous use of this facility would be reduced.

2 Mobile Interface – There is a need to facilitate instant communication between

officials to ensure quick action on situations such as additional reinforcement during

bandobust. It is proposed to set-up an SMS server through which pre-defined

messages may be communicated to enable swift action to be taken.

Intended Users: Citizens, Officers from SHO to Zonal IG, DCP, Police Control

Room

FR66 The System should be able to communicate the details of a traffic violator to the

concerned Police Control room over SMS so that they would inform the next Police

men on that route over phone so that the offender can be tracked, stopped and

apprehended

FR67 The System should provide Position verification of resources during bandobust to

the coordinator. There should be a facility to send SMS from a bandobust sub-

group member to concerned DC asking for more reinforcements to handle a Law &

Order Situation

FR68 The System should provide a fully customizable module wherein a superior officer

can register his mobile numbers and those of his sub-ordinate officers. The SMS

Server will send reminder SMS 2 days before due date for sending MIS reports

such as status reports and abstracts pertaining to CAS Functionalities to both the

Police Station personnel and the higher official who has to review these reports to

enable timely submission and approval of these report.

FR69 The System should provide facility to know status of the complaint/FIR by keying in

the acknowledgement number

FR70 The System should provide facility to send bulk SMS from Police Control Room to

public on matters of public interest such as helpline numbers during emergency and

special alerts in case of events such as elections

Law & Order Suite

1 Mass Event Monitoring – There are events happening around the year for which

Page 282: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 282 of 302

the department has to design bandobust schemes, identify places for positioning

resources, identify resources, acquire the resources, deploy and monitor them.

System would facilitate developing schemes of bandobust and specify

corresponding resource requirement for positions defined on the scheme. The

System would allow looking for resources for plotting by contacting various district

SPs, armed police units and home guard offices. The resource assigned would be

monitored during mass deployment using GIS and/or CCTV Cameras set up in

temporary control rooms in the event spot as maybe the case. The system would

allow provision to maintain the details of resources, their home base, vehicle

details, contact details including mobile number, place they are deputized to work

and so on. This would enable tracking of the resources as and when needed.

Intended Users: DC,SP, Special Units such as Armed Police, Armed Reserve and

Commando Force, Security Forces and L & O Constables, Special Battalions,

Home Guards

FR71 Should provide a calendar of events for the year which would be used to mobilize

resources for event monitoring

FR72 System would facilitate developing schemes of bandobust for the event, e.g, cricket

match bandobust and specify corresponding resource requirement for positions

defined on the scheme.

FR73 Should allow planning for bandobust activities and help identify resources from

across districts for deployment. For identified resources, system should allow

sending emails to concerned district SP for permission

FR74 Should allow positioning resource in a specific area in a bandobust and monitor the

position of the resource using messages transmitted through the handheld device

which would be sent to the SP Office where the application should analyse the

position and send back message in case resource is not in his designated area

FR75 Should allow maintaining the details of resources, their home base, vehicle details,

contact details including mobile number, place they are deputized to work and so

on. This would enable tracking of the resources as and when needed.

2 Prisoner Escort - This would present activities to be done by each escort during

handling prisoners in the movement of prisoners from

1) Police Station to Court

2) Jail/Home to Court

3) Court to Jail/Home

4) Jail to Jail

5) Court to Police Station in case of police custody

Intended Users: Armed Reserve Constables.act as escorts, DC (AR),

Commandants send escorts

FR76 The system would be based on Beats Management System above.

FR77 The system should allow the head of the police station to feed in the details of

prisoner, location of pickup, location of destination (court, hospital, transit stay in

another jail, transfer to another prison etc) , shortest route to be undertaken,

Page 283: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 283 of 302

estimated time of pickup and estimated time of arrival at destination.

FR78 The system should update the location of the escort party on a predetermined

interval to the server.

FR79 The system should generate alerts in case the escorting party deviates from the pre

assigned route.

FR80 The system should have the facility fo the escorting party to initiate the journey at

the time of pickup and close the journey after arriving at the destination.

FR81 The system should generate alerts in case there is no initiation of journey details by

the escorting party. A slack can be allocated for delays during travel.

FR82 The system should generate alerts in case there is no closure of journey by the

escorting party. A slack can be allocated for delays during travel.

FR83 The system should generate these alerts in the form of popups in the State CAS

Application at the source and destination police stations.

FR84 The system should maintain logs of each journey performed for a minimum period

of Six Months.

FR85 The police team escorting the prisoners should be intimated to the control room

before hand. The System should allow entry of details of team members, their

name, rank, phone number and unit where belongs which should be made available

to the Control room before escort takes place.

FR86 There would be facility to intimate concerned control room on departure of escort

over SMS with details so that traffic police on that route would be staying alert.

FR87 In case of any halts in between, the system should facilitate corresponding

message communication to the concerned control room over SMS.

FR88 The system should have the capability to inform the users in form of reminders for

the upcoming Prisoner Escort for atleast 2 days in advance.

3 CCTV Solution – It is proposed to develop systems which will link up with CAS

State database for storing images captured in CCTV cameras installed in critical

places and images captured during monitoring of large public gatherings and main

traffic points in the city

Intended Users: From Commissioners till Jurisdiction/ Bandobust In-charge Officers

in Commissionerates, From SP till Jurisdiction Officer in Districts

FR89 The system should be deployed at al the important traffic junctions in the 7

commissionerates of the State.

FR90 The system should have the capacity to store the images received from each

camera at the Monitoring Unit located at the Police Control Room of each

commissionerate.

FR91 The system should deploy Pan-Tilt-Zoom (PTZ) platform for each of the cameras

FR92 The (PTZ) platform for each camera should be controlled from the Monitoring Unit

FR93 The system should use Automatic Number Plate Reading(ANPR) Cameras to allow

users to record the number plate of the traffic violators

FR94 The ANPR Cameras provided in the system should have the capability of local

storage.

Page 284: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 284 of 302

FR95 The system should have wireless connectivity between the cameras at the traffic

junctions and the Monitoring Unit.

FR96 The system should have a one way audio transmission capability from the

Monitoring Unit to the Traffic Junction for important announcements.

FR97 The system should have capability to search thru the archived recording based on

time of the day and name of location.

Constable Suite

1 Beats Management – This is a regular activity at the police station performed by

the constables in their designated area, viz. beat and broadly covers the following

activities:

1) Service of Process

2) Enquiry of BC/KD/DC/HO/Ex convict

3) Enquiry about strangers, suspects, receivers of stolen property, criminals,

antisocial elements, fundamentalists

4) Enquiry about Contraband, gambling, prostitution, illegal money collection,

lottery tickets, drug trafficking, idol thefts, sand quarry, etc.

5) Enquiry about group clashes w.r.to Caste, communal and religious conflicts

6) Enquiry about SB Activities

7) Enquiry about Explosive Stocking

8) Inspection of Vital Installations

9) Monitor Fairs and Festivals

10) Locked Houses’ Check

11) Check Wanted Criminals

12) Check Spread of Communicable Diseases and Effects of Natural

Calamities

Intended Users: From Beat Constables to SP/DSP/DC. Higher Officers review the

beat activities done

FR98 The Handheld Device/ Mobile Data Terminal should facilitate recording the action

taken by the Beat officer at the spot which should be entered/submitted to the

database along with all details and action taken, including arrest of suspect,

impounding of vehicle, etc.

FR99 The Handheld Device/ Mobile Data Terminal should be able to capture photographs

of crimes/ evidences to be forwarded to the court for certain category of offences.

FR100 The Handheld Device/ Mobile Data Terminal should be enabled with GPS system

for capturing the Geographical locations of spots visited and checked during a Beat.

FR101 The Handheld Device/ Mobile Data Terminal should have layers of Beat and Police

Station along with vital installation, bad characters, important landmarks, etc.

embedded on the GPS map. The layers may be added on top of the maps at the

GIS server at the database end and this could be read by the Handheld Device/

Mobile Data Terminal. The System should also provide facility to create beats and

modify set beats

FR102 The System (Refers to the Core Application Software) should cover and register all

details pertaining to the respective Police Station and allow modification of the

same. This enhancement is expected to be done by System Integrator

Page 285: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 285 of 302

FR103 The System (Refers to the Core Application Software) should enable the user to

add any activity; for ex. Passport verification, Bad Character verification, Summon

issuance, etc. This enhancement is expected to be done by System Integrator.

FR104 The System (Refers to the Core Application Software) should enable

Synchronization of data in the desktop, server application and the handheld

application through a separate module developed for this purpose. This

enhancement is expected to be done by System Integrator

FR105 The Beat System (Refers to the Handheld Device, application and the backend

database pertaining to beats) should facilitate performance of surveillance and

monitoring of the locations and public assets maintained in the Part IV (Village

Database) of the respective Police Station.

FR106 The Beat System (Refers to the Handheld Device and the backend application

pertaining to beats) should facilitate creation of Beat & Allocation of Beat Duties as

per the specified roster of the respective Police Stations after taking into account

availability of personnel after accounting for leaves, pre-decided bandobust duty,

etc. Any modifications in the roster such as transfer of personnel or non-availability

of personnel due to an emergency should be reflected in the beat system

automatically.

FR107 The Handheld Device/ Mobile Data Terminal should be able to access from the

main database Server and display upon request, details such as Pop-up

tables/codes, vehicle and license details, all types of offences, fines, offence types,

incident details etc., in order to minimize the amount of data to be inserted by the

Beat Police Officer.

FR108 The System (Refers to the Handheld Device, application and the back-end

Database Server pertaining to traffic data) should provide features wherein when a

criminal’s name is entered the database server should be able to send all the

details relating to the criminal including previous offence history.

2 Explosives Checking – This would be done by Station Officers to check whether

permissible levels of explosives are maintained

Intended Users: Station House Officers

FR109 Should provide a facility to enter details of name and license number of shops,

quantity of explosives, past history in explosive related violations for shops in each

Sub-division jurisdiction and store it in the database

FR110 Should allow setting safe limits of explosives for shops and should alert whenever

quantity entered exceeds this limit to District SP and DSP

FR111 Should allow preparation of monthly reports on explosives checks done and

statistics related to explosive shops for each of the sub-division which can be

aggregated at District level, Range Level, Zonal Level and State Level

3 Passport Verification - Application comes from RPO to IS. From IS, it is sent to IS constables in Police Station. After verification, the report is sent to Passport Inspector at Commissionerate. Passport Inspector through DC, IS sends the verified application to RPO. In districts, it goes to DCRB. From DCRB, the application is sent to SB constable at

Page 286: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 286 of 302

local police station. The police station sends report after verification to DCRB who sends it back to RPO through Collector/SP. It is intended to receive applications online from RPO through passport e-seva. The verified application and report are intended to be sent back online to Passport Office. The interface for receiving and sending the verification is expected to be developed by SI. Intended Users: SB/IS Constables, SP, DC(IS), Passport Inspector

FR112 The system should interface with the Passport Seva System which is currently

undergoing Pilot Testing in Bengaluru and Pune.

FR113 The system should take the Personal Particulars form from the Passport Application

and forward it to the respective Police Station.

FR114 The system should allow user to take a printout of the Personal Particulars form.

FR115 After the physical verification of the Passport Applicant, the system should allow the

police station user to fill in the required details and comments if any.

FR116 The verification form should automatically fill in the required details from the

Personal Particulars form received.

FR117 The system should maintain records of all passport verification request received

/verified / rejected.

FR118 The system should forward the verification form back to the Regional Passport

Office from where the Personal Particulars Form was originally received.

The envisaged To-be scenarios for the following functionalities are illustrated below:

Knowledge Base

o Media Monitoring

o Intranet Portal

Traffic Suite

o Patrol and Police Control Room Interface

o RC Book/ DL Verification, Spot Fine

Crime Analysis Suite

o Fingerprint

o Business Intelligence

Communication Suite

o Social Networking

o Mobile Interface

Law & Order Suite

o Mass event Monitoring

o Prisoners Escort

Constable Suite

o Beats Management

o Explosive checking

o Passport Verification

Page 287: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 287 of 302

It is expected that this would give the SI a fair idea of the process envisaged with the inclusion of

these new functionalities

Patrol and Control Room Module

Process Description

Department Law & Order and Police

Control Room Service Requestor Citizen, Police Personnel

Stakeholder Involved Citizens, Police Department, Government

Input

Details of the caller and

their complaint and

Crime Scene details

Output Complaint Management

and effective action

Objective The Objective is to effectively manage the PCR Complaints and Patrolling Activities

Main Scenario

Sr.No Activity Steps Actor

1

PCR receives call from Citizen or Police Personnel and will capture the

details of caller and complaint. System checks the PCR Call Interface

database for similar complaint

Police Control Room

1a If the system could find similar complaint, it will give the option to link the

call to the previously registered complaint. Police Control Room

1b

If it is new complaint, then the Control Room Personnel will find out the

required details and enquires if it need to send the Patrolling unit to the

crime scene and informs accordingly.

Police Control Room

2 Nearest Patrolling Unit will go to the crime scene and informs the details of

the crime scene to PCR along with backup requirement. Patrolling Unit

3

PCR captures the details given by the onsite Patrolling Unit and will refer

the Complaint to the Police Station under whose jurisdiction the Crime has

occurred.

Police Control Room

4 Police Station receives the complaint and will proceeds for registration/

investigation Police Station

5 Highway Patrol vehicles send reports of distance and area covered and

specific accident related information, if any to the District control room Highway Patrol Vehicle

6 Police Control Room receives report and in event of any route deviation

alerts highway patrol vehicle accordingly to retrace to correct path Control Room

Page 288: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 288 of 302

The process overview of the Patrol and PCR Call Interface System is illustrated below:

Patrol and Police Control Room Module Process Overview

Page 289: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 289 of 302

Media Monitoring

Process Description

Department Police Department Service Requestor

Inspectors till DSP, SP

and Above, Other

Department, Assembly

and RTI

Stakeholder Involved Police Department, Government

Input Inputs relating to fetching

and searching Output

Generation of information

in a report format

Objective

The Objective is to have an effective search mechanism of unstructured data

including media sources for effective usage of Police Department data especially in

the investigation process

Main Scenario

Sr.No Activity Steps Actor

1

Information sought from various stakeholders (keyword specific search,

MO specific search, name specific search or area specific search) is

received at SCRB

Police Personnel

2

SCRB searches the repository of media monitoring dossiers, crime data

residing on central server, CCTV footage using the media monitoring

application front end to generate report on possible leads, statistics or

investigation aids

SCRB

3 System provides the information in the report format through mail and

SMS to concerned user who had raised the request SCRB

4 Report is used to answer assembly questions or prepare for monthly

review meeting and so on

DSP and Above,

Assembly

Page 290: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 290 of 302

The process overview of the Media Monitoring Functionality is illustrated below:

Media Monitoring Process Overview

Page 291: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 291 of 302

RC Book/DL Verification, Spot Fine and Finger Print

Process Description

Department Traffic Police Service Requestor Traffic Police

Stakeholder Involved Citizens, Police Department, Government

Input Offence committed by

any driver, details are

captured by Traffic

Police

Output Issue of Challans,

Verification of

Antecedence using

Fingerprint

Objective The Objective is to verify RC Book/ DL Verification and issue spot fine to the traffic

Violator

Main Scenario

Sr.No Activity Steps Actor

1 Violates traffic rule / General verification Traffic Police

2 Traffic policeman verifies the RC Book/ DL and finger print( if necessary)

with the help of Handheld device

Traffic Police

3a If the vehicle is not stolen and verifies deviates/ traffic violation, the traffic

police will issue Challan

Traffic Police

3b If the vehicle is stolen, the system will alert the Police Control Room,

nearest Police Station and nearest Patrolling Unit

Other Agencies

4 The appropriate action is taken is to catch the accused Other Agencies

5 Informs the on-field officer about the action taken Traffic Police

6 Traffic Policeman deposits fine with details of fines handed out in the

Commissioner/SP Office at end of his daily duty hours

Traffic Police

7 SP Office/Commissioner Traffic Section stores details of fines collected by

each policeman in the application

SP

Office/Commissionerate

The process overview of RC Book/DL Verification and Spot Fine Issuance is illustrated below:

RC Book/DL Verification, Spot Fine and Finger Print Process Details

Page 292: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 292 of 302

Mass Event Monitoring

Process Description

Department Police Department Service Requestor

SP, DC, L & O

Constables, Special

Units such as Home

Guard, Armed Police

Stakeholder Involved Police Department, Government

Input

Creation of mass event

and entering the details

of mass event activities

Output

Scheme development,

Resource deployment for

scheme and Event

Monitoring, alerting and

generation of report

Objective The Objective is to monitor the Mass events which takes place in the state for

smooth flow of the event and public safety

Main Scenario

Sr.No Activity Steps Actor

1 SP Office will take stock of bandobusts, create schemes and identify

resources for deployment. SP/DC Office

2 The approved orders is sent to all the involved Police Personnel SP/DC Office

3 If any changes are needed to be incorporated, change request is raised for

modifications SP/DC Office

4 Identified resources are called on board after obtaining requisite approvals SP/DC Office

5 Stores the details of personnel, mobile number, home base, vehicle

number and other inventory details SP/DC Office

6 Positions of resources in scheme and any troublesome situation is sent via

handheld device On field personnel

7 SP/DC orders for backup or asks for repositioning to right location SP/DC Office

Page 293: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 293 of 302

The process overview of the Mass Event Monitoring Functionality is illustrated below:

Mass Event Monitoring Process Overview

Page 294: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 294 of 302

Prisoners Escort

Process Description

Department Police Department Service Requestor

Armed Police, DC (AR),

AR Constables,

Commandants and

Escorts

Stakeholder Involved Police Department, Government

Input

Inputs regarding the

prisoners escort for

following situations:

1) Police

Station to

Court

2) Jail/Home to

Court

3) Court to

Jail/Home

4) Jail to Jail

5) Court to

Police

Station in

case of

police

custody

Output Generation of report and

alerting services

Objective The Objective is to successfully transfer the prisoners from one location to other

Main Scenario

Sr.No Activity Steps Actor

1

Head of the Police Station will enter the details of Prisoners Escort which

includes, prisoners detail, police personnel escorting, source, destination,

travelling route, inventories etc

Police Station

2 System should be able to track the vehicle constantly checking with the

travelling route, and will inform in case of any discrepancies

3 If there is any discrepancy, alert the PCR, nearest Police Station and

nearest Patrolling Unit. Other Units

4 Enter the details of discrepancy Police Station

5 After the completion of the activity, report is generated.

Page 295: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 295 of 302

The process overview of the Prisoners Escort Functionality is illustrated below:

Prisoners Escort Module Process Overview

Page 296: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 296 of 302

Beats Management

Process Description

Department Police Department Service Requestor Police Personnel

Stakeholder Involved Police Department, Government

Input

Inputs of the activities

performed, action taken,

Part IV Village Database

Output

Generation of report and

alerting services,

Updation of KD/DC

Check Register

Objective The Objective is to enter the action taken by the On-field officer at any crime/ illegal

activity place.

Main Scenario

Sr.No Activity Steps Actor

1 On-field Officer enters the details of any crime scene he come across

during patrolling/ other duties On-field Officer

2 If there is any backup requirement or major criminal activity is going on,

the system will send alert to other units Other Units

3 Sends the review report to the superiors regarding the usage of system,

most similar search etc Other Units

4 The appropriate action is taken is to catch the accused Other Agencies

5 Informs the on-field officer about the action taken On-field Officer

6 Update the situation with the action taken On-field Officer

7 Report is generated on the activity

The process overview of the Beats Management Functionality is illustrated below:

Beats Management Process Details

Page 297: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Government of Tamil Nadu Request for Proposal for Selection of System Integrator 297 of 302

Explosive Checking

Process Description

Department Police Department Service Requestor Police Personnel

Stakeholder Involved Police Department, Government

Input

Inputs of the license

shops, quantities of

explosives etc

Output Generation of report and

alerting services

Objective The Objective is to effective checking of explosive shops and transaction in

explosives

Main Scenario

Sr.No Activity Steps Actor

1 Police Station registers the new explosive shops, quantities of explosives,

its transactions etc Police Station

2 If the quantities of explosives cross the safe limit, it will alert the SP/DSP

3 Update the system with the action taken, upload any permissions etc SP/DSP

The process overview of the Explosives Checking Functionality is illustrated below:

Explosive Checking Process Overview

Page 298: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Ministry of Home Affairs RFP for Tamil Nadu 298 of 302

Passport Verification

Process Description

Department Police Department Service Requestor Police Personnel

Stakeholder Involved Police Department, Government

Input Inputs of verification

details Output Generation of report

Objective The Objective is to verify the passport applications and inform the same to Passport

department

Main Scenario

Sr.No Activity Steps Actor

1 SP Office will receives the request of passport verification from RPO and

on request the system will direct it to respective Police Station SP Office

2 The field-officer updates the verification details and sends it for approval to

SP Office Police Station

3 SP Office approves it and send it to Passport Department SP Office

4 Details of Police Verifications and its status is saved in the station

database using the application developed Police Station

5 Details of successful verifications done at each district would be passed on

as feed to Passport e-seva application SP Office

The process overview of the Passport Verification Functionality is illustrated below:

Passport Verification Process Overview

Page 299: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Ministry of Home Affairs RFP for Tamil Nadu 299 of 302

ANNEXURE XIII Non-Functional Requirements Specifications

S. No. Non-functional Requirements

I. Technical Solution Architecture Requirements

NFR 1 The System Solution needs to be architected using robust and proven software and

hardware technologies like Service-Oriented Architecture (SOA) and open standards.

The solution architecture should be built on sound architectural principles enabling

fault-tolerance, high-performance, and scalability both on the software and hardware

levels. The proposed solution should support a drag and drop GUI based process

modeler for constructing business flows.

It is desired to have a service bus for message broking between various applications.

NFR 2 The proposed products should be certified to run on Linux 2.6.

The proposed system should comply to open standards that is published and adopted

by the worldwide vendors & industry forums.

The underlying operating system should have inherent (without any add-on or plug-in

software) capability to resist from virus attacks

All software products proposed for middleware and database must run in Active-Active

(High availability) configuration mode.

II. Software Architecture Requirements

NFR 3 Software architecture must support web services standards including XML, SOAP,

UDDI and WSDL etc.

NFR 4 Software architecture must support flexibility in adding functionalities or applications.

NFR 5 Software architecture components should utilize the high availability, clustering, and

load balancing features available in the proposed hardware architecture to increase

system performance and scalability features.

NFR 6 Software architecture must support trace logging, error notification and resolution and

exception handling and auto roll back during batch failures. Software architecture

should also notify the technical users of the application on the memory utilization by

providing the auto alert mechanism.

III. Hardware Architecture Requirements

NFR 7 Hardware architecture must provide redundancy and high availability capabilities at the

hardware level; this includes servers, network components, and storage system.

NFR 8 All servers and systems must be configured with no single point of failure.

NFR 9 Hardware architecture should be capable of consolidating several applications /

workloads in a number of servers as required.

NFR 10 Hardware architecture servers must be placed within proper network locations to

Page 300: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Ministry of Home Affairs RFP for Tamil Nadu 300 of 302

satisfy the security requirements of the Solution.

NFR 11 Hardware architecture must include Storage Area Network (SAN) and backup solution

to support all portal hardware and software components.

NFR 12 SI is required to deliver sound and complete technical solution architecture for System

Solution with high performance, redundancy and scalability. SIs are required protect

critical information architecture and cater to technical perspective, business

perspective, law enforcement prospective and national security perspective.

IV. Development, Testing, Staging, and Production Requirements

NFR 13 SI is required to provide appropriate development, test, and staging hardware

environments and explain how they are related to production environment. SI is

required to explain how the development, test, and staging environment support the

implementation activities of System Solution. Development, test and staging

environment will be different from Production environment. At the end of the term these

environment will belong to the department.

NFR 14 Development and test environment should include configuration management

capabilities and tools for system configuration, versioning scheme, documentation,

change control processes and procedures to manage deployment of solution

deployment.

NFR 15 The test, development and staging environment should include required workstations,

desktops and tools appropriate to support development, testing, staging and

deployment.

NFR 16 The development, test and staging environments must include similar operating

systems, software components, products, and tools to those of production

environment.

NFR 17 The development, test, and staging environments should be independent logically and

physically from the production environment and of each other.

NFR 18 The development environment should be used for development and should be

configured to allow access for developers’ workstations.

NFR 19 The staging environment should be used for functional and user acceptance testing,

stress testing, and performance benchmarking.

NFR 20 The test environment should be used as a testing environment of System Solution and

its software components and products.

V. Security Requirements

NFR 21 It should have a secure solution at the hardware infrastructure level, software level,

and access level.

NFR 22 Authentication, Authorization & Access Control

It is required to implement necessary security mechanisms to enable secure login and

authorized access to portal information and services.

NFR 23 Encryption: It is required to ensure confidentiality of sensitive information and data of

Page 301: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Ministry of Home Affairs RFP for Tamil Nadu 301 of 302

users and portal information.

NFR 24 It is required to implement mechanisms, protocols, and algorithms necessary to protect

sensitive and confirmation data and information both during communication and

storage. Virtual Directory should be used for single sign on, as meta directory or

synchronization between directories creates un necessary duplication of user

information.

Must provide password management capabilities like, password resets, password

synchronization: The tool must also allow users to reset their passwords on those

applications that they have accounts on without the intervention of the administrators /

helpdesk. This will improve efficiency at the same time reduce the workload of the

administrator / help desk groups. Ability to generate audit reports without all of the

target resources being available. Historical data should be readily available – no

customization should be required. Diagnosing the cause of the problem, and resolve it

with minimal to no down time.

VI. Monitoring and Management Requirements

NFR 25 The Central System Solution should provide monitoring and management of the entire

Solution including all software components and application.

VII. Performance and Scalability Requirements

NFR 26 SI is required to design the overall System Central Solution with high performance and

scalability to handle increasing number of users.

NFR 27 SI is required to deliver System Solution that provides measurable and acceptable

performance requirements for various user groups, channels and bandwidths.

VIII. General Non Functional Requirements

NFR 28 The System should provide User ID and Password for facilitating entry.

NFR 29 The System would facilitate access to the system only through user ID and password

NFR 30 The System (Refers to the Core Application Software) should facilitate logging in

through web and generating desired MIS reports.

NFR 31 The System (Refers to the Core Application Software) should facilitate provision of

varied information to the higher officials on a regular basis and also on a need basis.

NFR 32 The System (Refers to the Core Application Software) should provide the facility to

generate various statutory reports, reviews and abstracts for the smooth functioning of

the Department.

NFR 33 The Handheld Device/Mobile Data Terminal should have a software application

connecting to the database server.

NFR 34 The System (Refers to the System involving the Handheld Device and Server

accessed by the device) should have uninterrupted network connectivity with the

Central Database server which should be established by the System Integrator through

GPRS/GSM.

NFR 35 The Handheld Device/Mobile Data Terminal should facilitate finger print verification of

Page 302: CCTNS TN RFP VolI

E-Governance Mission Mode Project: Crime & Criminal Tracking Network and Systems

Ministry of Home Affairs RFP for Tamil Nadu 302 of 302

the user based on proper authentication. There could be multiple departmental users

intending to use the device

NFR 36 The Handheld Device/Mobile Data Terminal should have sufficient memory to

effectively handle the processes in an off-line mode in the event of a GPRS/GSM

connectivity failure It should push the data to database as and when the GPRS

connectivity/ Wire connectivity to the system is restored.

NFR 37 The Software System (Refers to the System involving the Handheld Device and Server

accessed by the device) should work in Client-Server architecture where in the

Handheld Device/Mobile Data Terminal shall serve as a client.

NFR 38 The Software (Refers to Software for Handheld Device/Mobile Data Terminal) should

be intuitive and should facilitate usage with minimal training.

NFR 39 The Software (Refers to Software for Handheld Device/Mobile Data Terminal) should

provide comprehensive data back-up and restoration capability.

NFR 40 The Software (Refers to Software for Handheld Device/Mobile Data Terminal) should

be device independent.

NFR 41 The System (Refers to the Core Application Software) should have an audit trail facility

maintained at the server end. Trails of users currently logged in and inactive users at a

time as well as user history should be maintained.

NFR 42 The System (Refers to the Core Application Software) should have a firewall, access

control system, password policies, audit trail etc. from the security point of view.

NFR 43 The Handheld Device/ Mobile Data Terminal should have GPRS/GSM based software

connected to the database server. The client should be provided with a facility to

search on the basis of Criminal Name, Nature of Offence, etc.

NFR 44 The Software (Refers to the Core Application Software) should also be able to

generate dynamic reports based on any of the fields as per the user's requirement as

well as standardized MIS Reports, Statistical reports.

NFR 45 The software (Refers to Software for Handheld Device/Mobile Data Terminal) should

be customized as per user requirement.

NFR 46 The System (Refers to the Core Application Software) should enable selecting options

using dropdown menu and the administrator should be able to modify the master

tables as and when required.

NFR 47 The System should allow upgradation of software versions (Refers to the Core

Application Software and Handheld Device Software) from time to time as per

available technology.

NFR 48 The Software (Refers to the Core Application Software and Handheld Device

Software) should provide menu based help to the user.