45
Middle Potomac Watershed Plan Implementation Turkey Run at Langley High School Stream Restoration Project Public Meeting September 16, 2014 Stormwater Planning Division Department of Public Works and Environmental Services

Turkey Run at Langley High School Stream Restoration Public Meeting

Embed Size (px)

DESCRIPTION

Turkey Run at Langley High School Stream Restoration Public Meeting Sept. 16, 2014

Citation preview

Page 1: Turkey Run at Langley High School Stream Restoration Public Meeting

Middle Potomac Watershed Plan Implementation

Turkey Run at Langley High School

Stream Restoration Project

Public Meeting

September 16, 2014

Stormwater Planning Division

Department of Public Works and Environmental Services

Page 2: Turkey Run at Langley High School Stream Restoration Public Meeting

Meeting Outline

• Fairfax County Stormwater Management

• Countywide Watershed Plan Implementation

• Project Introduction and Objectives

• Existing Conditions

• Proposed Improvements - Options

• Example Projects

• Questions?

Page 3: Turkey Run at Langley High School Stream Restoration Public Meeting

Fairfax County Department of Public Works

and Environmental Services (DPWES)Department of Public Works and Environmental Services

Land Development

Services

CapitalFacilities

Solid Waste Stormwater

Stormwater Planning Division

Maintenance and Stormwater

Management Division

Wastewater

Page 4: Turkey Run at Langley High School Stream Restoration Public Meeting

Stormwater Infrastructure

• Conveyance System

– 1,600 miles pipe and

paved channel

– 43,000 structures

– 6,800 outfalls

• Management Facilities

– 1,540 County Maintained

– 3,720 Privately Maintained

• State Regulated Dams

Page 5: Turkey Run at Langley High School Stream Restoration Public Meeting

Service Drivers

In response to The Clean Water Act of 1972…

National Pollutant Discharge Elimination System (NPDES)

Virginia Stormwater Management Program (VSMP)

Regulations

Municipal Separate Storm Sewer Permit (MS4)

Total Maximum Daily Loads (TMDLs)

Chesapeake Bay

Local Streams

Page 6: Turkey Run at Langley High School Stream Restoration Public Meeting

Countywide Watershed Planning

“Healthy Watersheds,

Healthy Communities”

• 30 Designated

Watersheds

• All 15 watershed plans

have been adopted by

Fairfax County

http://www.fairfaxcounty.gov/dpwes/watersheds/

Page 7: Turkey Run at Langley High School Stream Restoration Public Meeting

Middle Potomac Watershed Plan

• Watershed

Characterization

– Water Quality Monitoring

– Land Use Change

– Pollutant Loading

• Structural Project

– 25 year plan

• Non-Structural Practices

– Policy and Regulations

http://www.fairfaxcounty.gov/dpwes/watersheds/

Page 8: Turkey Run at Langley High School Stream Restoration Public Meeting

Turkey Run Watershed Plan

• Turkey Run has a drainage

area of 1.95 mi2

• Projects identified in the

watershed management plan

• Pond retrofits

• LID Stormwater Enhancements

• Stream Restoration

• Neighborhood Stormwater

Improvements

http://www.fairfaxcounty.gov/dpwes/stormwater

/projects/project_list.htm

Page 9: Turkey Run at Langley High School Stream Restoration Public Meeting

Before

Wakefield Run Stream Restoration

After

Page 10: Turkey Run at Langley High School Stream Restoration Public Meeting

Wakefield Run Stream Restoration

Before After

Page 11: Turkey Run at Langley High School Stream Restoration Public Meeting

Rabbit Branch Stream Restoration

Before After

Page 12: Turkey Run at Langley High School Stream Restoration Public Meeting

Turkey Run Stream

Restoration

Page 13: Turkey Run at Langley High School Stream Restoration Public Meeting

Next Steps

• Conceptual Design

• Land Acquisition/Coordination

• Preliminary Design

• Public Meeting

• Final Design

• Project Construction

• Funding FY2016 or FY2017

• Community Coordination: Pardon our Dust

• Maintenance and Operation

Page 14: Turkey Run at Langley High School Stream Restoration Public Meeting

Natural Channel Design

Background and Design Approach

Page 15: Turkey Run at Langley High School Stream Restoration Public Meeting
Page 16: Turkey Run at Langley High School Stream Restoration Public Meeting

Stream Design Approaches

Natural Channel Design

3 design approaches

1)Analog

2)Empirical

3)Analytical

Page 17: Turkey Run at Langley High School Stream Restoration Public Meeting
Page 18: Turkey Run at Langley High School Stream Restoration Public Meeting
Page 19: Turkey Run at Langley High School Stream Restoration Public Meeting
Page 20: Turkey Run at Langley High School Stream Restoration Public Meeting

Turkey Run at Langley High School

Stream Restoration

Concept Design

Page 21: Turkey Run at Langley High School Stream Restoration Public Meeting
Page 22: Turkey Run at Langley High School Stream Restoration Public Meeting
Page 23: Turkey Run at Langley High School Stream Restoration Public Meeting
Page 24: Turkey Run at Langley High School Stream Restoration Public Meeting
Page 25: Turkey Run at Langley High School Stream Restoration Public Meeting
Page 26: Turkey Run at Langley High School Stream Restoration Public Meeting
Page 27: Turkey Run at Langley High School Stream Restoration Public Meeting
Page 28: Turkey Run at Langley High School Stream Restoration Public Meeting
Page 29: Turkey Run at Langley High School Stream Restoration Public Meeting
Page 30: Turkey Run at Langley High School Stream Restoration Public Meeting
Page 31: Turkey Run at Langley High School Stream Restoration Public Meeting
Page 32: Turkey Run at Langley High School Stream Restoration Public Meeting
Page 33: Turkey Run at Langley High School Stream Restoration Public Meeting
Page 34: Turkey Run at Langley High School Stream Restoration Public Meeting
Page 35: Turkey Run at Langley High School Stream Restoration Public Meeting

Examples

Page 36: Turkey Run at Langley High School Stream Restoration Public Meeting

Looking upstream at boulder

rock toe and constructed

riffle

Looking upstream at boulder

rock toe – 2 and 3 courses

Page 37: Turkey Run at Langley High School Stream Restoration Public Meeting

Modified Cross Vane

Page 38: Turkey Run at Langley High School Stream Restoration Public Meeting

Modified Cross Vane

Page 39: Turkey Run at Langley High School Stream Restoration Public Meeting

Cross Vane Cross Vane

Cross Vane

Page 40: Turkey Run at Langley High School Stream Restoration Public Meeting

Step Pool

Page 41: Turkey Run at Langley High School Stream Restoration Public Meeting

Infill mix comprised of

cobbles, gravels, sand, silt,

topsoil

Larger material, usually

cobble

Constructed Riffle

(aka Reinforced Streambed)

Page 42: Turkey Run at Langley High School Stream Restoration Public Meeting

Riffle

Page 43: Turkey Run at Langley High School Stream Restoration Public Meeting

Access

Page 44: Turkey Run at Langley High School Stream Restoration Public Meeting

During

May 2010

Before

Feb. 2010

After

Sept. 2010

Page 45: Turkey Run at Langley High School Stream Restoration Public Meeting

Ratna Pottumuthu, [email protected]

Matt Meyers, [email protected]

Stormwater Planning Division

Department of Public Works and Environmental Services

Fairfax County12000 Government Center Parkway, Suite 449

Fairfax, Virginia 22035

www.fairfaxcounty.gov/dpwes/stormwater

Questions ?

• Contact Information

A Fairfax County Publication, April 2014

ADA Statement: To request this information in an alternate format call 703-324-5500, TTY 711