PROPOSED CORRIDOR ALIGNMENT CHARACTERISTICS At-grade Metrorail – 20 miles from Dadeland South Metrorail Station

to SW 344th St along existing Transitway

14 stations

Transit-Oriented Developments (TOD) and Park-and-Rides

Considering grade separations at major intersections

136 new Metrorail cars will be retrofitted with a pantograph

No new railyard facility required

EXISTING TYPICAL SECTIONS FOR THE TRANSITWAY

3

POTENTIAL TYPICAL SECTIONS FOR TRANSITWAY

4

Transitway US - 1

LA SYSTEM METRORAIL SYSTEM

5

LA TO SANTA MONICA – EXPO LINE

6

Opened 2012; Daily ridership = 43,200; 15.2 miles; 19 stations; 12 minute peak headways

LA TO LONG BEACH – BLUE LINE

7

Opened 1990; Daily ridership = 83,600; 22 miles; 22 stations; 10 minute peak headways

Downtown Long Beach Station

LA TO NORTH HOLLYWOOD – GOLD LINE

8

Civic Center Station

Opened 1993; Daily ridership = 149,000; 17.4 miles; 14 stations; 10 minute peak headways

HOUSTON TEXAS – RED LINE

9

Opened 2004; Daily ridership = 48,000; 12.8 miles; 24 stations; 12 minute peak headways

DALLAS TEXAS – BLUE LINE

10

Garland Station

Opened 1996; Daily ridership = 96,200; 19 miles; 21 stations; 15 minute peak headways

CHARLOTTE, NC – BLUE LINE

11

Opened 2007; Daily ridership = 16,700; 9.6 miles; 15 stations; 10 minute peak headways