ENERGY FOR OFF-GRID

VILLAGES IN THAILAND

Page 2: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand

ENERGY FOR OFF-GRID VILLAGES IN THAILAND

Remote Microgrids

1. Phu Kradueng National Park

2. Chik Island Village

Pico Hydro Power

3. Kiriwong Village (community of practice)

Package Hybrid Power Supply

4. Tat Mhok National Park

CASE STUDY:

1

2

3

4

Page 3: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand

ENERGY FOR OFF-GRID VILLAGES IN THAILAND Remote Microgrids: Phu Kradueng National Park

Loei Province

Page 4: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand

ENERGY FOR OFF-GRID VILLAGES IN THAILAND Remote Microgrids: Phu Kradueng National Park

Energy System Integration concept

- Fuel

- Electricity

- Water

- Heater

- Data communication

Page 5: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand

ENERGY FOR OFF-GRID VILLAGES IN THAILAND Remote Microgrids: Phu Kradueng National Park

Technology Development

Page 6: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand

ENERGY FOR OFF-GRID VILLAGES IN THAILAND Remote Microgrids: Phu Kradueng National Park

Technology Transfer

Page 7: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand

ENERGY FOR OFF-GRID VILLAGES IN THAILAND Remote Microgrids: Chik Island Village

The culture of the people

Ko Jig Village ,Klung

Distric, Jantraburi Province

Location

Latitude 12O N

Longitude 102 E

Population

512 inhabitants

112 households

Page 8: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand

ENERGY FOR OFF-GRID VILLAGES IN THAILAND Remote Microgrids: Chik Island Village

Old Electrification Systems

Ko Jig Village ,Klung

Distric, Jantraburi Province

Location

Latitude 12O N

Longitude 102 E

Population

512 inhabitants

112 households

Page 9: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand

ENERGY FOR OFF-GRID VILLAGES IN THAILAND Remote Microgrids: Chik Island Village

Participation with the village

Page 10: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand

ENERGY FOR OFF-GRID VILLAGES IN THAILAND Remote Microgrids: Chik Island Village

W W

SB

2x

2.5

kW

5 kW 5 kW

G

192 kWh 47 kWp

SI 15 kWSB

8x6 kW

60 kW192 kWh

SI 15 kW

Implementation

Page 11: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand

ENERGY FOR OFF-GRID VILLAGES IN THAILAND Remote Microgrids: Chik Island Village

Village electrification committee

RESCO :

Rural Energy Service

Company office

RESCO (Rural Energy Service Company) organization

-Set the management system

-Set the regulation

-Set tariff (12 B/kWh)

-Approve the monthly account

9 staffs

Operate the RESCO

system

5 staffs (Have salary)

Page 12: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand

ENERGY FOR OFF-GRID VILLAGES IN THAILAND Remote Microgrids: Chik Island Village

1. The prepaid smart meters have eliminated risk of non-payment that happens in a

traditional billing arrangement.

2. Chik Island success case in the community owned and operated hybrid system owe

largely to the careful community consultation process during the early phase of the

project through several workshops.

3. Although the technician is well-trained and capable of daily system operation and

maintenance, there could be occasions when imported equipment's.

Chik Island lessons learned

Page 13: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand

ENERGY FOR OFF-GRID VILLAGES IN THAILAND Pico Hydro Power: Kiriwong Village (community of practice)

life style and occupation

local-made hydro-power unit

Page 14: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand

ENERGY FOR OFF-GRID VILLAGES IN THAILAND Pico Hydro Power: Kiriwong Village (community of practice)

local-made hydro-power unit

- low level of electric power - unsteadily electricity.

field testing

Page 15: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand

ENERGY FOR OFF-GRID VILLAGES IN THAILAND Pico Hydro Power: Kiriwong Village (community of practice)

Technology Development

Page 16: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand

ENERGY FOR OFF-GRID VILLAGES IN THAILAND Pico Hydro Power: Kiriwong Village (community of practice)

Technology Transfer

Page 17: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand

ENERGY FOR OFF-GRID VILLAGES IN THAILAND Pico Hydro Power: Kiriwong Village (community of practice)

฿/W Household

>100 3

>100 3

35 15

20 >50

locally designed

Performance

investigation

Pelton’s bucket

1 step runner foundry

2014 2009 2006 1992

Page 18: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand

ENERGY FOR OFF-GRID VILLAGES IN THAILAND Pico Hydro Power: Kiriwong Village (community of practice)

1

4 6

2 5

10 9

13 12

3 7

8

11

14

15

16

17

18

18 19 20

25

23

26

20 22

24

21

34

33

32

318

30

27 29

28

37 36 35

18

40

39

38 43 20 42 41

45 46

44

43 48

47

Page 19: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand

1. Community of Practices (CoP).

Several villagers attempted to build a small hydropower unit for generating electricity in

their farm. (fish cans, stair’s heads, cup like blade turbine)

2. Based on concepts of inclusive innovation.

The main objective of this project is to develop a standard design procedure for pico

hydro turbine units that can be manufactured locally in Thailand. (0.3 US$/W)

3. Based on Appropriate technology.

The design is suitable for local geography. (high head>>Pelton’s wheel)

4. Local Change-agents development

ENERGY FOR OFF-GRID VILLAGES IN THAILAND Pico Hydro Power: Kiriwong Village (community of practice)

key to success

Page 20: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand

ENERGY FOR OFF-GRID VILLAGES IN THAILAND Package Hybrid Power Supply: Tat Mhok National Park

Tat Mhok National Park, Phetchabun Province

Page 21: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand

ENERGY FOR OFF-GRID VILLAGES IN THAILAND Package Hybrid Power Supply: Tat Mhok National Park

Package Hybrid Power Supply

Model: 39-25

230/400 V 50 Hz

Power Rated: 39 kW

PV = 5.76 kWp

WECS = 1 kW

DG = 26 kW

Battery = 28 kWh

Converter = 6.6 kW

AC Coupling

Page 22: Kuching | Jan-15 | Energy For Off-grid Villages In Thailand

ENERGY FOR OFF-GRID VILLAGES IN THAILAND Package Hybrid Power Supply: Tat Mhok National Park