EASTERN MEDITERRANEAN UNIVERSITY CIVIL ENGINEERING DEPARTMENT CONSTRUCTION MANAGEMENT - I PROJECT NUMBER 01 Prof. Dr. TAHİR ÇELİK Student Names Student Numbers BILAL MOHAMMED PIROT 145292 TWANA OTHMAN M.AMIN 145291 SEVAR DILKHAZ SALAHADDIN 145233 REBIN SARDAR HUSAIN 145281 1 RANIYAH 132/33/11 kv SUBSTATION

Construction m.emu master student project1

Embed Size (px)

Citation preview

EASTERN MEDITERRANEAN UNIVERSITY

CIVIL ENGINEERING DEPARTMENT

CONSTRUCTION MANAGEMENT - IPROJECT NUMBER 01

Prof. Dr. TAHİR ÇELİK

Student Names Student Numbers

BILAL MOHAMMED PIROT 145292

TWANA OTHMAN M.AMIN 145291

SEVAR DILKHAZ SALAHADDIN 145233

REBIN SARDAR HUSAIN 145281

1

RANIYAH 132/33/11 kv SUBSTATION

Raniyah 132/33/11 Kv Substation In our project we have a two-flatted building which is specialized for a specific work that is (changing the electrical power from 132 kv to -33 and 11-kv).

2

DESCRIPTION OF THE PROJECT

• The area of the building is 711.36 m2 (with dimensions of 68.4m*10.4m), so the building is divided into two joints in the longitudinal direction.

• The project located in Raniyah where is a city in Kurdistan therefore in the calculation of the project cost we used the prices in the markets of Kurdistan with US Dollars.

• We calculated Durations for all items with regarding to output per crew (and sometimes we used more than one crew per day for a specific item to speed up the progress of the item).

3

STEPS OF CALCULATION

QUANTITY CALCULATIONAfter obtaining all DWG files for the project we began to calculate the Quantities for items.

4

Details for Excavation ( As an example )5

In our project we had 41 items, but here we will take Excavation as an example to show how all calculations have done.

6

The Plan of The Footings

OBTAINING COSTS7

In our country ( Kurdistan ) the cost of excavation is 4.00 US Dollars per one cubic meter of Excavation for substations.

Then we calculated all the ( quantities and costs ) for the other items, and the total cost of the project reached 543,145.76 US Dollars.

DURATION CALCULATIONS

8

And also based on the ( Quantities and standards of productivity per crew ) we calculated the Durations for each item, as some examples shown below:

9

Ground Floor Columns

Ground Floor slab

10First Floor columns

The Roof

11Roof Drain

Side Walk Ways

We calculated the reinforcement for the concrete items from the foundation to the roof slab. We will take the foundation reinforcement as an example.

12REINFORCEMENT CALCULATION

13Typical Section of the Footings

14Total Reinforcement for the Project

15

Ground Floor Columns

Ground Floor Beams

Ground Floor Slabs

Just like the reinforcement we calculated the formwork for the concrete items from the foundation to the roof slab.

And also we will take the foundation formwork as an example.

16FORMWORK CALCULATION

17FORMWORK CALCULATION

18Total Formwork for the Project

19

Pedestals and Tie beams

20

First Floor Columns

Ground Floor Columns

21

Ground Floor Slab-as an example of slabs

22Method of Statement

23THE PROJECT WITH

MICROSOFT PROJECT & PREMAVERA • Based on the durations we calculated the previously for each item we planned for

the project by using MS Project & Primavera.• And also we made the proceedings of activities based on our engineering

experience.

For 100% CompleteI. MS PROJECT

24THE PROJECT WITH

MICROSOFT PROJECT & PREMAVERA, continued.

For 75% Complete

25

THE PROJECT WITH MICROSOFT PROJECT & PREMAVERA, continued.

For 50% Complete

26

THE PROJECT WITH MICROSOFT PROJECT & PREMAVERA, continued.

For 25% & 0.0% Complete

27

THE SUMMERY OF THE WHOLE PROJECT WITH MS PROJECT

28II. PRIMAVERA

29II. PRIMAVERA, continued

30II. PRIMAVERA, continued

31II. PRIMAVERA, continued

32II. PRIMAVERA, continued

33Network Diagram and Critical Path

Thank YouAnd Hope This Been Useful