China-Pak Economic Corridor

Page 2: China-Pak Economic Corridor (CPEC)_Complete Project

Introduction

May 2013 by china President 3000 KM Network Of Road, Rail,

Pipeline and Optical Fibers. Linking kashgar northwest china’s

Xinxiang Uyghur autonomous region and southwest Pakistan’s gawadar port.

Page 3: China-Pak Economic Corridor (CPEC)_Complete Project

Introduction

1+4 Corporation structure Transport infrastructure Energy Projects Industrial Corporations Gawadar Port

Page 4: China-Pak Economic Corridor (CPEC)_Complete Project

Introduction

China Is Providing $45.6 Billion $11.8 For Infrastructure $33.8 Billion For Power Projects Majority Of Projects Will Completed

At The End of 2017

Page 5: China-Pak Economic Corridor (CPEC)_Complete Project
Page 6: China-Pak Economic Corridor (CPEC)_Complete Project
Page 7: China-Pak Economic Corridor (CPEC)_Complete Project
Page 8: China-Pak Economic Corridor (CPEC)_Complete Project
Page 9: China-Pak Economic Corridor (CPEC)_Complete Project

Major Projects

Energy ($33.8 bil-lion)Infrastructure ($11.8 billion)Communication ($44 Million)Cotton biotech research

Page 10: China-Pak Economic Corridor (CPEC)_Complete Project

Power Projects

Zonergy Solar Power Plant

Karot hydro Power plant

Suki Kunari hydro Power Plant

Port Qasim Coal-Fired Power Plant

Wind Power Projects

Page 11: China-Pak Economic Corridor (CPEC)_Complete Project

Zonergy Solar Power Plant

Page 12: China-Pak Economic Corridor (CPEC)_Complete Project

Zonergy Solar Power Plant

Located At Bhawalpur

World Largest solar Power Plant

$1.5 Billion Project

900 MV Production Expected

Build In 3 Phases

Complete At The end Of 2016

By Zonergy Company

Page 13: China-Pak Economic Corridor (CPEC)_Complete Project
Page 14: China-Pak Economic Corridor (CPEC)_Complete Project
Page 15: China-Pak Economic Corridor (CPEC)_Complete Project

Karot hydro Power plant

Page 16: China-Pak Economic Corridor (CPEC)_Complete Project

Karot hydro Power plant

By Three Goreges Corporation

Produce 720 MW

$1.65 Billion Project

Complete in 2020

Page 17: China-Pak Economic Corridor (CPEC)_Complete Project
Page 18: China-Pak Economic Corridor (CPEC)_Complete Project

Suki Kinari Hydro Power Plant

Page 19: China-Pak Economic Corridor (CPEC)_Complete Project

Suki Kinari Hydro Power Plant

In KPK

870 MW Produce

Started In 2014

End In 2020

Page 20: China-Pak Economic Corridor (CPEC)_Complete Project
Page 21: China-Pak Economic Corridor (CPEC)_Complete Project

Port Qasim Coal-Fired Power Plant

Page 22: China-Pak Economic Corridor (CPEC)_Complete Project

Port Qasim Coal-Fired Power Plant

$2.085 Billion Project

By China Resource Limited

Complete By The End Of 2017

2*660 MW = 1320MW

Page 23: China-Pak Economic Corridor (CPEC)_Complete Project

Wind Power Projects

Page 24: China-Pak Economic Corridor (CPEC)_Complete Project

Wind Power Projects

Thatta Project (100 MW)

Sachal Project (50 MW)

Hydro China Project (50 MW)

Page 25: China-Pak Economic Corridor (CPEC)_Complete Project

Transport infrastructure

Karachi-Lahore Motorway Karakorum Highway Realignment

Gwadar-Ratodero Motorway Railway Projects

Page 26: China-Pak Economic Corridor (CPEC)_Complete Project

Karachi-Lahore Motorway

Page 27: China-Pak Economic Corridor (CPEC)_Complete Project

Karachi-Lahore Motorway

6 Lane Motorway

1,152 KM Long

$6.6 Billion Project

Scheduled To Be Completed on sept, 2017

Cities Connected : Karachi, Hyderabad, Sukkur, Rahim Yar Khan, Multan, Faisalabad and Lahore

Page 28: China-Pak Economic Corridor (CPEC)_Complete Project
Page 29: China-Pak Economic Corridor (CPEC)_Complete Project
Page 30: China-Pak Economic Corridor (CPEC)_Complete Project

Karakorum Highway Realignment

Page 31: China-Pak Economic Corridor (CPEC)_Complete Project

Karakorum Highway Realignment

Attabad Barrier Lake

$275 million Project

24 KM Bypass

5 KM Worth Of Tunnels

2 Large Bridges

78 Small bridges

Page 32: China-Pak Economic Corridor (CPEC)_Complete Project
Page 33: China-Pak Economic Corridor (CPEC)_Complete Project

Gwadar-Ratodero Motorway

Page 34: China-Pak Economic Corridor (CPEC)_Complete Project

Gwadar-Ratodero Motorway

$238 Million Project

4-Lanes Motorway

892 kilometers Long

556 kilometers have already been constructed 

Page 35: China-Pak Economic Corridor (CPEC)_Complete Project
Page 36: China-Pak Economic Corridor (CPEC)_Complete Project

Railway Projects

Page 37: China-Pak Economic Corridor (CPEC)_Complete Project
Page 38: China-Pak Economic Corridor (CPEC)_Complete Project

Karachi–Peshawar main railway lineOver Haul and Reconstruction Of Rail.

$3.65 billion Project.

train travel at up to 160 kilometers per hour.

First Stage Peshawar to Multan

Second Stage Multan to Hyderabad

Third Stage Hyderabad to Karachi

expected completion by December 2019

Page 39: China-Pak Economic Corridor (CPEC)_Complete Project
Page 40: China-Pak Economic Corridor (CPEC)_Complete Project

Other Upgrading In Railway

Approximately $5 billion

Initial 250 new passenger coaches

Reconstruction of 21 train stations

180 of the coaches are to be built in Pakistan Railways Carriage

Page 41: China-Pak Economic Corridor (CPEC)_Complete Project

Gawadar Projects

Gawadar International Airport

Gawadar City And Port

Page 42: China-Pak Economic Corridor (CPEC)_Complete Project
Page 43: China-Pak Economic Corridor (CPEC)_Complete Project
Page 44: China-Pak Economic Corridor (CPEC)_Complete Project

Gwadar International Airport

Page 45: China-Pak Economic Corridor (CPEC)_Complete Project

Gwadar International Airport

$230 million Project

On 3000 acres

Connects Gwadar to Karachi, Turbat and Muscat

Operational by December 2017

Page 46: China-Pak Economic Corridor (CPEC)_Complete Project

Gwadar City And Port

Page 47: China-Pak Economic Corridor (CPEC)_Complete Project

Gwadar City And Port

Gawadar Coal Power Project (360 million dollars)

construction of breakwaters (130 million dollars)

water treatment plant (114 million dollars)

state-of-the-art hospital (100 million dollars)

Free Economic Zones (35 million dollars)

technical and vocational institute (10 million dollars)

Page 48: China-Pak Economic Corridor (CPEC)_Complete Project
Page 49: China-Pak Economic Corridor (CPEC)_Complete Project

Benefit Of China

China Easy trade Between Middle east And Africa

China Direct Access To the Indian Ocean

Chinese industries are facing problems to compete in global market due to high transportation cost and delivery time.

Page 50: China-Pak Economic Corridor (CPEC)_Complete Project

Benefit Of China

It would decrease 10,000 km travel distance and cost greatly from China to Gulf.

Even if China uses PCEC for 50% of its Oil supplies then it will save $6 Million every day, almost $2 billion every year.

Independent path from India and USA’s interference.

New business market in another country.

Page 51: China-Pak Economic Corridor (CPEC)_Complete Project

Benefit Of China

Page 52: China-Pak Economic Corridor (CPEC)_Complete Project

Benefits Of Pakistan

Pakistan economy will Boost

Pakistan can avail great opportunities from chine’s expert in various sectors like energy ,Technology and Education sector.

Development of Infrastructure.

Connect all the Province.

Development of Fata, KPK and Baluchistan.

Page 53: China-Pak Economic Corridor (CPEC)_Complete Project
Page 54: China-Pak Economic Corridor (CPEC)_Complete Project
Page 55: China-Pak Economic Corridor (CPEC)_Complete Project

Benefits Of Pakistan

Create new employment opportunities

Pakistan and china both collectively target the half of the population of the world ,it will provide great opportunity for both countries to expend their market.

Page 56: China-Pak Economic Corridor (CPEC)_Complete Project

Other Projects

China-Pakistan Joint Cotton Biotech Laboratory

China-Pak Joint Marine Research Center

Gawadar-Nawabshah LNG Terminal And Pipeline Project

Lahore Orange Train Matro

Page 57: China-Pak Economic Corridor (CPEC)_Complete Project
Page 58: China-Pak Economic Corridor (CPEC)_Complete Project

Other Projects

Thar Block II 3.8 Million Tons Of Coal Per Anum

Thar Block II 2*330 MW = 660 MW

Rawalpindi-Islamabad Metro Bus