CPEC and Socioeconomics
February 7, 2017 Dr. Nadeem Javaid, Chief Economist,
Government of Pakistan
One Belt One Road Ini.a.ve -‐ OBOR • China’s awakening strategy – Counter measure to manage US-‐led Trans-‐Atlan.c alliance and balance the Trans-‐Pacific containment against China.
• OBOR is going to serve as connec.on of policy, roads, trade, currency and especially of hearts (5 Goals by President Xi)
CPEC-‐ Principal Strategic Component
² 21st Century Mari.me Silk-‐road : An Infrastructure Development Strategy; stretching from Asia to Europe.
² 60 Countries
² 900 deals underway ² Asian Infrastructure Investment Bank -‐100 Billion $
3
CPEC Coopera@on Fields
China Pakistan Economic Corridor Long Term Plan : Timeframe 2014 – 2030 Components: I. Energy (Coal, Hydel, Wind, Solar, LNG , Transmission) II. Infrastructure (Road, Rail, Avia.on, Data connec.vity) III. Gwadar Port (Socio-‐economic development) IV. Industrial Coopera.on (Gwadar Free Zone and other industrial
parks to be finalized)
Nodes: All provincial capitals are included as nodes, the key corner stones of CPEC on which it will be constructed.
1st Target(2020): Period of market cultivation. To develop commercial logistics and other industries with local resources.
2nd Target(2025) : Per iod of expansion and development . Processing and manufacturing industries will be developed.
3rd Target(2030) : Per iod of Maturity. Enlarge the scale and scope of Free Zone.
Development Targets
CPEC PorHolio-‐Projects PROJECTS US$ Millions
Energy 33,793
Transport and Infrastructure Roads 3,500
Rail Network 3,690
Gwadar Port 622
Others 4044
Total 45,649
Other (LNG & Power Transmission) 5000 6
1| CPEC; Energy
Mi@ga@ng Energy Constraints…
Hydel 31%
Gas 22%
Oil 38%
LNG 4%
Other 1% Nuclear
3%
Wind 1%
Current Fuel Mix
Solar 2%
Import 2%
Hydel 26%
Gas 12%
Oil 14%
LNG 13% Coal
Local 4%
Coal Imported
20%
Nuclear 3%
Wind 4%
Fuel Mix 2019-‐20
Improving Fuel Mix
9.69 9.63
9.55
9.17 9.15 9.10
2014-‐15 2015-‐16 2016-‐17 2017-‐18 2018-‐19 2019-‐20
Genera@on Basket Cost
17582
23107
17582
23500
18402
25145
19690
26905
21068
28788
12140
17285 14174
23434 20213
27094 22940
28168 25077
30803
-‐5442 -‐5822 -‐3408
1811 1949 3250 1263
4009 2015
JAN-‐16 JUL-‐16 JAN-‐17 JUL-‐17 JAN-‐18 JUL-‐18 JAN-‐19 JUL-‐19 JAN-‐20 JUL-‐20
Power Demand and Supply
Peak Demand Available Genera.on Gap
-‐3000 MWs FO Plants
2| CPEC; Infrastructure
Western China to Eastern Europe
EUROPE
13845 MILES
16507 MILES Shanghai Port
AFRICA
EUROPE
MIDDLE EAST
WESTERN CHINA
LONG DISTANCE & HIGH COST
11845 MILES
EASTERN EUROPE TO WESTERN CHINA EXISTING DISTANCE 19132 MILES
TRADE ROUTE FROM EUROPE TO CHINA
17820 MILES Central China
19132 MILES Kashgar
CENTRAL ASIA
Exis@ng Distance : 19132 Miles
Distance Saved : 9535 Miles
9597 MILES
SHORT DISTANCE & LOW COST
Pak-China Economic Corridor Intermodal Transport Network
AFRICA
EUROPE
MIDDLE EAST
WESTERN CHINA
INTERMODAL ROUTE FROM EUROPE TO CHINA
10910 MILES
EASTERN EUROPE TO WESTERN CHINA DISTANCE SAVED 9535 MILES
Karachi Port 7847 MILES
Kazakistan Kazakistan
CENTRAL ASIA Kashgar
Central China
Western China to Eastern Europe
Western China to Eastern Europe
Time Saved -‐-‐-‐ 26 to 11
INTERMODAL ROUTE FROM EUROPE TO CHINA EASTERN EUROPE TO WESTERN CHINA
DISTANCE SAVED 9535 MILES
9597 MILES
AFRICA
EUROPE
WESTERN CHINA
Central China
Karachi Port 7847 MILES
Kazakistan Kazakistan
CENTRAL ASIA
EUROPE
13845 MILES
16507 MILES Shanghai Port
11845 MILES
10910 MILES
MIDDLE EAST
Pak-China Economic Corridor Intermodal Transport Network
19132 MILES
17820 MILES
Kashgar
EASTERN EUROPE TO WESTERN CHINA EXISTING DISTANCE 19132 MILES
Indian Occupied Kashmir
INDIA
CHINA
AFGHANISTAN
IRAN
ARABIAN SEA
Pak-China Economic Corridor
M-2 (250 Km)
KKH (335 Km)
M-3 (53 Km)
M-4 (241 Km)
N-85 (835 Km)
N-65 (100 Km)
KLM (387 Km)
KKH (437 Km)
KHUNJERAB
PESHAWAR
LAHORE DI KHAN
QUETTA
FAISALABAD
SUKKUR
MULTAN
Dera Allah Yar
JACOBABAD
KHUZDAR
GWADAR
DG KHAN
ISLAMABAD
Raikot
GILGIT
Pak-China Economic Corridor 1 Highways & Motorways
Gwadar – Kunjrab Total Length: 2,688 km
KLM (296 Km)
KLM (136 Km)
HYDERABAD
KARACHI
China’s Dependence !!! • Its dependence on foreign oil is around 60%. • China imports from; KSA, Iran, Russia, Oman, Iraq, Sudan, Kazakhstan and Kuwait.
• China’s merchandise exports account for 12.6% of the world’s trade merchandise exports and 10.4% Imports.
(i.e. total Trade Volume= US$4,477 Billion)
8% of the Global Trade
• Total Vessels: 17,483
• 998.65 Billion Tons
• Total Revenue 2015 : $ 5.176 Billion (5.3%
Less then 2014)
Source: Suez Canal Traffic Sta1s1cs (2015)
3| CPEC; Gwadar Port
Legend Energy Hub Refinery / Gas Processing
Exis@ng Pipeline Oil Gas
Proposed Pipelines Kazakhstan-‐Turkmenistan-‐Uzbekistan-‐ Tajikistan-‐China-‐Pakistan Oil Pipeline Kazakhstan-‐Uzbekistan-‐Turkmenistan Tajikistan-‐China-‐Pakistan Oil Pipeline Uzbekistan-‐Turkmenistan-‐Afghanistan-‐ Pakistan-‐India Gas Pipeline Iran-‐Pakistan Gas Pipeline with china Qatar-‐Pakistan-‐India gas Pipeline Pakistan-‐China Oil Pipeline
Source: Ministry of Petroleum and Natural Resources
Pakistan: Asia’s Emerging Energy Hub Proposed Energy Pipelines
Gwadar Port City as the Asian
Energy Hub for receipt, storage, processing and
trans-shipment to S.E. Asia, Far East
Free Zone -‐ Incen@ves Long Term Lease for the investor
99 years Lease for Sub-lease / Investors
20 years complete tax holiday from all Federal, Provincial & Local taxes
Exemption from import duties on materials and equipment.*
Exemption from import / export duties on bunker oils.**
Complete suspension of trade union activities.
Opp
ortuni.e
s Packaging Businesses
Distribution Centers
Container Freight Stations / Yards
Warehousing & Cold Chains
Manufacturing / Oil Refineries
Tourism / Old Age Care Institutions
4| CPEC; Industrial Coopera@on
Industrial Parks
Punjab (7) KPK (8)
Sindh (3) Baluchistan (7)
ICT & GB (2)
Industrial Coopera@on Province/ Federa@ng Unit Loca@on for Industrial Zone
KPK Rashakai Economic Zone : Hakar Phase VII Industrial Zone
Sindh Dhabeji : Ke@ Bunder
Balochistan Bostan Industrial Zone : Khuzdar Industrial Zone
Punjab M-‐2 Sheikhupura : M-‐3 Faisalabad
North Area Moqpondass, Gilgit SEZ , Bhimber Zone or Barakot SEZ
Federal Area ICT Model Industrial Zone, Islamabad & PSM-‐Port Qasim
FATA Mohmand Marble City
Pakistan -‐ China FTA
• China managed to export along 57% of the lines in which it had a preference under the FTA.
• Pakistan’s u.liza.on was merely 5% along lines in which Pakistan had managed to “nego.ate concessions”.
• Looming Risk of Deindustrializa.on !!!
Employment Projec@on
Unemployed (Million) 3.77 4.44 4.93 5.25 5.39
Unemployment rate 6.25 7.14 7.69 7.95 7.93
Way forward !!!
• Sufficient Condi.ons a) CPEC Investments b) Infrastructure
• Necessary Condi.ons for tangible dividends ? a) Absorp.ve Capacity (HRD) b) Trickle down mechanism
² Designing high-‐poten.al, cost-‐effec.ve and feasible Policy Solu.ons
32
Thank You