A narrative Report
Presented to Department of Commerce
St. Xaviers College, Palayamkottai
In Partial fulfillment of the requirement for Degree
Bachelor of Commerce in Corporate
Submitted To
Submitted By:
SoosaiMariyal
June 2011
8/6/2019 Maria - OJT Project
2/5
Acknowledgement
I would like to thank the people who helped me
for this training to be possible.
First and far most I am thankful to
the Lord for giving the strength and good health
to finish this training.
Next, I want to express my sincere gratitude to my family
for supporting me financially, emotionally.
And to my friends who helped me fulfilling this project.
I would also acknowledge the employees of Rajendra Engineering Industries
forgiving me the chance to be part of their work
and share the knowledge of their work.
I would like to thank the professors of Department of Commerce,
St. Xaviers college for conducting
this kind of program that help us to experience and
learn from real world.
Lastly, I would like to acknowledge my OJT coordinator
for the support and guidance for
completing this training
8/6/2019 Maria - OJT Project
3/5
Introduction
On Job Training (OJT) is one of the best training methods because it is planned,
organized and conducted at the employees worksite. OJT will generally be the primary
method used for broadening skills and increasing productivity. It is particularly
appropriate for developing proficiency skills unique to an employees job especially
jobs that are relatively easy to learn and require locally owned equipment and facilities.
Morale, productivity, and professionalism will normally be high in those
organizations that employ a sound OJT program.
An analysis of the major job requirements (identified in the position description
and performance plan) and related knowledge, skills, and abilities form the basis of
setting up an OJT plan.
OJT is dependent upon the trainer having sufficient knowledge and expertise to
import to the trainee. OJT is important and the quality of OJT can be considerably
improved through effective design.
Advantages of using OJT:-
y Training can be delivered at the optimum time: for example immediately before a
job is to be performed for real in workplace
y The trainee will have opportunities to practice immediately.
y The trainee will have immediate feedback.
y Training is delivered by colleagues and can go some way to integrate the trainee
into the team.
8/6/2019 Maria - OJT Project
4/5
Company Profile
Rajendra Engineering Industries was established in 1985 by Mr. Pon Vincent
who is the proprietor as small unit. It has grown to be big engineering industries.
They were initially manufacturing the house hold things like steel Cot, biro, chair, table
etc. then over the time; they started to manufacture steel and iron rods which are used
in building construction. Then they started to take manufacturing orders for hospital bed,
benches, table, chairs for schools and hotels.
In 1997, Rajendra Engineering industries has been modified and brought new
machineries to cope up with growing new needs and to increase the productive
In 2010, it has been shifted to a new location in the outskirts of Pettai, on
Cheranmahadevi road and a bigger facility for manufacturing was built and more
employees were recruited.
The delivery of the manufactured goods is now delivered to the customers by dedicated
delivery team.
8/6/2019 Maria - OJT Project
5/5
Production Process
The products are being manufactured from CR (Cold Rolled) steel. The CR steel
is the raw material for manufacturing cot, biro, table, chair, etc. Rejandra Engineering
Industries would buy the CR steels from steel wholesale dealers in Tirunelveli Town and
along with it the paint, locks for biro, screw & bolt.
The materials will be delivered to Rajendra Engineering Industries. The CR steel
will be cut into different shapes for different products. The cut pieces of the steel will be
bending to make it for the desired shapes.
The shaped pieces will be sent to the welders for joining the pieces to frame the
particular product. Some parts of the product will be joined using screw and bolt.
The framed product will be sent to painting section. The painters will use spray
machines to paint the product. There will be different design pattern frames are
available, using which the painter will make different designs in the product while
painting. The painting will be done in a closed area and the painted product will be
placed in the sun shine for drying.
The parts of the product will be ready now. The parts will be placed and full
product will be made and locks will be attached for the products like biro, table with
locker.