1.0 PURPOSE

This specification describes the minimum requirements for drawings for mechanical, piping and services. The requirements for producing drawings for piping and mechanical services must be evaluated on an individual basis for each project.

2.0 GENERAL

Mechanical and Piping Services drawings must show:

all piping, pressure vessels, pumps, valves and related equipment.

all heating, ventilation, air conditioning and air supply ductwork, process vent ducts and related equipment.

all dust collection ductwork and related equipment.

all trays for electrical and instrumentation cables. Ideally, mechanical and piping are shown on the same drawings. The piping layout drawing must be read in conjunction with the Flow Diagrams, (PFD and P&ID) and the Piping Line list. The piping line list identifies the operating parameters of each pipe line, and defines the pipe specification that is used for each pipe line. The Flow Diagrams, Piping Layouts and the Pipeline List, must all be cross-referenced with each other, and work together as a complete package.

3.0 EXISTING PLANTS

Show all modifications and new piping, ductwork and cable trays on existing grids; grid plans have been established in some plants covering sections of the entire plant at 1/4" or 3/8" scale, on which piping and services are shown.

4.0 NEW PLANTS

Show all piping, ductwork and cable trays in plan-view and on the same set of drawings. Utilize the same grid system and match lines established on the plant layout drawings and divide the plant, area or building into an appropriate and sufficient number of areas and levels to adequately show all piping and services. Be sure to establish a sufficient number of vertical levels; experience has shown that 10'-0" from floor to floor, or from floor to platform level, is a desirable maximum. For example, if main floors are

Page 2: ENGINEERING STANDARD SPECIFICATION Ontario - …extportal.vale.com/eng/Sud/standards/pdf/SPEC-08007.pdf · ENGINEERING STANDARD SPECIFICATION Ontario TITLE ADMINISTRATIVE DESIGN AND

ENGINEERING STANDARD SPECIFICATION Ontario

TITLE ADMINISTRATIVE DESIGN AND DRAFTING DRAWINGS – TECHNICAL REQUIREMENTS MECHANICAL and PIPING

VALE #

SPEC-08007 PAGE

2/15 Last Revision

2017/10/27

REV.

4

spaced at a vertical distance of 20'-0", provide two area plans within this "cube" to ensure an adequate coverage of the services. The plan drawings may be sufficient and it may not be necessary to draw full sections through the entire building, however, produce any large scale details required for local dense areas on separate drawings; do not draw details on the grid plans.

5.0 PIPELINE NUMBERING

All piping colour codes, labeling and identification must be consistent with the requirements of SPEC-35001.

5.1 LINE NUMBER

All process and utility pipelines are to be numbered. Assign each line from terminating point to terminating point a different number (i.e. from "tank to pump", from "pump to discharge point", etc.). Each branch line is to be assigned its own number. The numbers shall first be applied on the flow diagrams and followed through on plans, sections and details. Label each pipeline as shown in the example below:

Refer to Appendix ‘C’ for a listing of Fluid Code abbreviations.

5.2 PIPELINE LIST

Prepare and maintain a “Pipeline List” for each building or a group of buildings within a plant area. The Pipeline list will define the correct piping specification and insulation, if applicable, to be used for each pipeline. The template used for the Pipeline list is in Microstation V8 format (Template T-08007LL) and available on the Vale Engineering web page. Each Pipeline List is assigned a drawing number and is cross referenced to flowsheets, piping layout drawings, and to previous and subsequent drawing sheet(s) as applicable.

Assign the pipeline numbers in a consecutive manner, continuing from previous sequence

where applicable, regardless of fluid code for each predetermined area or building throughout the life of the facility. Where applicable, continue with the existing pipeline list.

Page 3: ENGINEERING STANDARD SPECIFICATION Ontario - …extportal.vale.com/eng/Sud/standards/pdf/SPEC-08007.pdf · ENGINEERING STANDARD SPECIFICATION Ontario TITLE ADMINISTRATIVE DESIGN AND

ENGINEERING STANDARD SPECIFICATION Ontario

TITLE ADMINISTRATIVE DESIGN AND DRAFTING DRAWINGS – TECHNICAL REQUIREMENTS MECHANICAL and PIPING

VALE #

SPEC-08007 PAGE

3/15 Last Revision

2017/10/27

REV.

4

The pipeline list has a cross-reference listing of pipe Specification Code and the

corresponding Specification to be used for each pipeline.

5.3 SPECIFICATION OF PIPELINE INSULATION

Identify all insulated lines on the flow diagram, sections and details. The insulation type, thickness, temperature, etc is specified on the pipeline list.

Refer to Specifications SPEC-35042 and SPEC-35043 for description of piping insulations and insulation finishes.

5.4 PLUMBING SERVICES

Line numbers are not required for plumbing, i.e. water distribution, storm and sanitary sewer collecting systems for offices, change houses, warehouses, shops, head frames, laboratories and similar structures or service parts of plants. Give line numbers to mains and headers going to and/or coming from such service centres as those mains and headers become part of the plant system.

However, identify the plumbing system pipelines with an appropriate designation such as;

sanitary sewer, or potable water etc.

6.0 MECHANICAL/PIPING DRAWINGS

6.1 GENERAL

Ensure that all specifications and references are properly cross-referenced to the system, flow diagrams and the Pipeline list; the installation drawings must show the same corresponding line and valve numbers.

Manual valves that are not listed within piping specifications, require an associated manual valve data sheet (Template T-08007MV), or can be specified on the project drawings.

Do not show material lists on mechanical services drawings.

Show pipe support locations and label supports as described below. The Engineer/Designer must determine if painting of the piping is required using the SPEC-35001 as a guideline. If a pipeline is to be painted, it is specified on the pipeline list, or in the piping general notes, or the Scope of Work for the project.

Page 4: ENGINEERING STANDARD SPECIFICATION Ontario - …extportal.vale.com/eng/Sud/standards/pdf/SPEC-08007.pdf · ENGINEERING STANDARD SPECIFICATION Ontario TITLE ADMINISTRATIVE DESIGN AND

ENGINEERING STANDARD SPECIFICATION Ontario

TITLE ADMINISTRATIVE DESIGN AND DRAFTING DRAWINGS – TECHNICAL REQUIREMENTS MECHANICAL and PIPING

VALE #

SPEC-08007 PAGE

4/15 Last Revision

2017/10/27

REV.

4

6.2 DRAFTING

Show all piping, up to and including 12" dia., as single bold-solid-lines. All piping 14" dia. and over, is shown as double solid-lines complete with conventional centerlines.

Show pipe supports on all lines of 2-1/2" dia. and larger and, regardless of size, on all hot lines of 250°F (120°C) and above. Pipelines 2" dia. and below are normally field-run and supported accordingly; the only exception being pipelines carrying Category M fluids as defined by ASME B31.3. Typical pipe hanger, support, anchor and guide configurations are shown on drawings 99-999-G-004245 through 004248, 99-999-G-004511, and 99-999-004512. (SPEC-35002) Hangers are labeled on the piping drawings in plan as follows:

The following shows the typical methodology for showing pipe supports on drawings:

Page 5: ENGINEERING STANDARD SPECIFICATION Ontario - …extportal.vale.com/eng/Sud/standards/pdf/SPEC-08007.pdf · ENGINEERING STANDARD SPECIFICATION Ontario TITLE ADMINISTRATIVE DESIGN AND

ENGINEERING STANDARD SPECIFICATION Ontario

TITLE ADMINISTRATIVE DESIGN AND DRAFTING DRAWINGS – TECHNICAL REQUIREMENTS MECHANICAL and PIPING

VALE #

SPEC-08007 PAGE

5/15 Last Revision

2017/10/27

REV.

4

Piping installed in mining drifts is normally field run and located. Drift piping is generally supported by chains and no detailing of these supports is required. Typical pipe support configurations are shown on drawing 99-999-G-004249 and 99-999-G-004511 (SPEC-35002).

Special pipe anchors, thrust blocks, etc. shall be clearly located and fully detailed.

Show all ductwork for heating, ventilation and dust collection as double solid-lines complete with conventional centerlines.

Show cable trays on mechanical drawings for reference as required.

4.3 DIMENSIONING

Dimension all pipes, ducts and trays in continuous strings to the grid lines; indicate any changes in direction and dimension appropriately. Indicate the elevation of each service at the match lines and at every fall-point and rise-point.

Dimension piping to its centerline unless conditions dictate dimensioning to the "bottom-of-pipe" elevation, (B/P elevation).

Dimension round ductwork to its centerline; dimension rectangular ductwork to its "bottom-of-ductwork" elevation (B/D elevation), or to its "top-of-ductwork" elevation (T/D elevation).

Dimension cable tray to its "bottom-of-tray" elevation (B/T elevation).

For machine design drafting, geometric tolerancing is implemented when specific tolerance conditions are required. The permissible range upper and lower limit will be shown in the dimension. For inside dimensions (ie: holes) the low limit is placed above the high limit. For outside dimensions (ie: shafts) the high limit is placed above the low limit. See the following example:

Page 6: ENGINEERING STANDARD SPECIFICATION Ontario - …extportal.vale.com/eng/Sud/standards/pdf/SPEC-08007.pdf · ENGINEERING STANDARD SPECIFICATION Ontario TITLE ADMINISTRATIVE DESIGN AND

ENGINEERING STANDARD SPECIFICATION Ontario

TITLE ADMINISTRATIVE DESIGN AND DRAFTING DRAWINGS – TECHNICAL REQUIREMENTS MECHANICAL and PIPING

VALE #

SPEC-08007 PAGE

6/15 Last Revision

2017/10/27

REV.

4

7.0 REFERENCE DOCUMENTATION

The following documents are related to this specification and shall be used to their latest revision:

SPEC-08002 Drawings – Administrative Requirements

SPEC-08003 Drawings – Technical Requirements - General

SPEC-08004 Drawings – Technical Requirements – Flow Diagrams

SPEC-35001 Piping – Identification and Classification

SPEC-35002 Piping – General Requirements

99-999-G-004245 Pipe Support Systems – Hanger Details

99-999-G-004246 Pipe Support Systems – Support Details

99-999-G-004247 Pipe Support Systems – Anchors, Guides and Notes

99-999-G-004248 Pipe Support Systems – HDPE Piping

99-999-G-004249 Pipe Supports - Underground

99-999-G-004511 Standard Multiple Pipe Hanger Details

99-999-G-004512 Rabbit Ear Installation Details

99-999-G-004252 Pipeline Symbology

99-999-G-004254 Fire Water Piping Details

99-999-G-004255 Piping Rubber Lined Fittings and Details

99-999-G-004262 Oxygen Flange Bonding

99-999-G-004263 Typical Water Hose Station (100 psi Rated)

T-08007MV Manual Valve Data Sheet (MS Word Template)

T-08007LL Piping Line list (Microstation – available as a CADD Template)

Page 7: ENGINEERING STANDARD SPECIFICATION Ontario - …extportal.vale.com/eng/Sud/standards/pdf/SPEC-08007.pdf · ENGINEERING STANDARD SPECIFICATION Ontario TITLE ADMINISTRATIVE DESIGN AND

ENGINEERING STANDARD SPECIFICATION Ontario

TITLE ADMINISTRATIVE DESIGN AND DRAFTING DRAWINGS – TECHNICAL REQUIREMENTS MECHANICAL and PIPING

VALE #

SPEC-08007 PAGE

7/15 Last Revision

2017/10/27

REV.

4

8.0 REVISION AND TRANSITION NOTES

Revision notes describe: what was changed, and if applicable, why it was changed, and the plan to implement the change, including whether changes are retroactive. Note: The revision notes are a summary of the changes and may not necessarily be a complete list. A risk code is entered for each revision and if applicable, the revision notes will describe how risk was addressed for the revision.

Risk Code

Risk Category

A This revision is a minor change and/or introduces no risk.

B Risk has been addressed for this revision by the reviewer and approver. Low risk or no new hazards identified.

C For this revision, a PHR or other risk management tool has been used to address risk and minimize hazards. This risk assessment has been documented and is available through Central Engineering.

Rev Revision Notes Risk Code

Approved by

Reviewed by

Issue Date YYYY/MM/DD

1

Document format and number changed per Vale Engineering Document Program changes in 2011. Previous Standard Number was 0803-30.01.011 Rev 3. This specification is part of a set of specifications that define the administrative and technical requirements for drawings. Some administrative content has been removed from this specification and inserted into the appropriate specification. Content from the following former standards has been incorporated into this document: 0803-00.10.011 Rev 2 Drafting – Machine Parts 0803-35.02.011 Rev 6 Drafting – Piping - Underground Mining 0804-35.01.011-R4 Piping Drawings – Identification 0804-35.04.011-R4 Pipe Line Number Symbols - All Plants 0804-35.05.011-R4 Pipe Line Number Symbols – IPC 0804-35.06.011-R3 Pipe Line Number Symbols - CCCR & CRED Electrowinning Standard number 0804-35.07.011 Rev. 4. Pipe Line Number Symbols – IORP Leaching and Recovery Bldg has been eliminated as the IORP plant no longer exists.

--- MF AD/SF 2012/09/28

2 Standard drawings are now part of SPEC-35002 only. (This is only an administrative change) No change to technical requirements.

--- MF AD 2014/12/23

3 Document Reviewed – Format updated – Minor changes, template numbers, references added, clarification added regarding manual valve data sheets.

A C. Marshall A. Delost 2016/08/26

4 Added reference to new multi-pipe hanger and anchor drawings. 99-999-G-004511 & 99-999-G-004512. Full review was not completed.

A C. Marshall B. Lavers 2017/10/27

Page 8: ENGINEERING STANDARD SPECIFICATION Ontario - …extportal.vale.com/eng/Sud/standards/pdf/SPEC-08007.pdf · ENGINEERING STANDARD SPECIFICATION Ontario TITLE ADMINISTRATIVE DESIGN AND

ENGINEERING STANDARD SPECIFICATION Ontario

TITLE ADMINISTRATIVE DESIGN AND DRAFTING DRAWINGS – TECHNICAL REQUIREMENTS MECHANICAL and PIPING

VALE #

SPEC-08007 PAGE

8/15 Last Revision

2017/10/27

REV.

4

9.0 APPENDICES

Appendix A: Fluid Code Abbreviations – General Appendix B: Fluid Code Abbreviations – CCNR – IPC Plant Appendix C: Fluid Code Abbreviations – CCNR/CCCR Electrowinning Plant

Page 9: ENGINEERING STANDARD SPECIFICATION Ontario - …extportal.vale.com/eng/Sud/standards/pdf/SPEC-08007.pdf · ENGINEERING STANDARD SPECIFICATION Ontario TITLE ADMINISTRATIVE DESIGN AND

ENGINEERING STANDARD SPECIFICATION Ontario

TITLE ADMINISTRATIVE DESIGN AND DRAFTING DRAWINGS – TECHNICAL REQUIREMENTS MECHANICAL and PIPING

VALE #

SPEC-08007 PAGE

9/15 Last Revision

2017/10/27

REV.

4

Appendix A: Fluid Code Abbreviations - General

NOTE: For All Plants excluding the following: CCNR-IPC Plant CCNR/CCCR Electrowinning

Steam & Boilers

15S Steam - 15 PSI C Condensate - Pressure (e.g. 300C)

30S Steam - 30 PSI BBD Boiler Blow Down

60S Steam - 60 PSI BCF Boiler Chemical Feed

125S Steam - 125 PSI BCW Boiler Circulating Water

185S Steam - 185 PSI BFW Boiler Feedwater

300S Steam - 300 PSI BSS Boiler Steam Sampling

550S Steam - 550 PSI ST Steam Tracing

Air & Gases

BA Breathing Air HYD Hydrogen

IA Instrument Air FG Flue Gas

PA Plant Air IG Inert Gas

PUA Purge Air NT Nitrogen

VAC Vacuum OX Oxygen

CD Carbon Dioxide PNEU Pneumatic Conveying

CO Carbon Monoxide

Water & Drainage

BWS Bosh Water Supply LD Laboratory Drains

BWR Bosh Water Return MW Mine Water (Raw)

CWS Cooling Water Supply MWT Mine Water (Treated)

CWR Cooling Water Return POT Potable Water

FCU Floor Clean Up PW Process Water

FW Fire Water SAN Sanitary Drains

GW Gland Water STO Storm Drains

HWS Hot Water (Sanitary) TW Tailings Water

HWP Hot Water (Process) TRW Treated Water

IWE Industrial Waste Effluent VW Vermilion Water

KW Kelly Lake Water WW Whitson Water

Page 10: ENGINEERING STANDARD SPECIFICATION Ontario - …extportal.vale.com/eng/Sud/standards/pdf/SPEC-08007.pdf · ENGINEERING STANDARD SPECIFICATION Ontario TITLE ADMINISTRATIVE DESIGN AND

ENGINEERING STANDARD SPECIFICATION Ontario

TITLE ADMINISTRATIVE DESIGN AND DRAFTING DRAWINGS – TECHNICAL REQUIREMENTS MECHANICAL and PIPING

VALE #

SPEC-08007 PAGE

10/15 Last Revision

2017/10/27

REV.

4

Slurries

SLBA Bone Ash SLMK MK Copper

SLCN Concentrates SLNS Nickel Sulphide

SLLI Lime SLPY Pyrrhotite

SLMA Magnetite SLS Sand

SLME Metallics SLSF Sand Fill (Including Cement)

SLNC Nickel Copper Sulphide SLTA Tailings

SLSM Nickel Copper Sulphide Metallics SLCP Copper - pm (IPC Residue)

Fuels

GSL Gasoline NAP Naptha

K Kerosene NG Natural Gas

LIO Fuel Oil #2 PR Propane

Miscellaneous

HFL Hydraulic Fluid LO Lubricating Oil

GLY Glycol RF Refrigeration Fluid

LG Lubricating Grease

Chemicals

AMI Amine HS Hydrogen Sulphide

A Ammonia LI Lime

AA Aqueous Ammonia NS NaHS

AGA Anhydrous Ammonia - Gaseous NA Nitric Acid

ALA Anhydrous Ammonia - Liquid PO Pine Oil

CS Caustic Soda SE Separan

CEM Cement SF Slimes Feed

CLL Chlorine - Liquid SR Slimes Return

CLDG Chlorine - Dry Gas SA Soda Ash

CLWG Chlorine - Wet Gas SBS Sodium-Bi-Sulfide

CAS Concentrated Ammonia Solution SC Sodium Carbonate

CUS Copper Sulphate Solution SOS Sodium Silicate

DA Dissociated Ammonia (H2 + N2) SDG Sulphur Dioxide Gas

ELR Electrolyte Return SDL Sulphur Dioxide Liquid

ELS Electrolyte Supply SUA Sulphuric Acid

FS Formate Solution XAN Xanthate

HA Hydrochloric Acid

Page 11: ENGINEERING STANDARD SPECIFICATION Ontario - …extportal.vale.com/eng/Sud/standards/pdf/SPEC-08007.pdf · ENGINEERING STANDARD SPECIFICATION Ontario TITLE ADMINISTRATIVE DESIGN AND

ENGINEERING STANDARD SPECIFICATION Ontario

TITLE ADMINISTRATIVE DESIGN AND DRAFTING DRAWINGS – TECHNICAL REQUIREMENTS MECHANICAL and PIPING

VALE #

SPEC-08007 PAGE

11/15 Last Revision

2017/10/27

REV.

4

Process - General

ASV Air - Steam Purge Vent MLP Minor Leak Protection

CAC Calcine - Cold (< 150 Deg. F.) PW Process Water

CAH Calcine - Hot (> 150 Deg. F.) PV Process Vent

FD Flue Dust SF Slimes Feed

FG Flue Gas SR Slimes Return

IGV Inert Gas Vent

Page 12: ENGINEERING STANDARD SPECIFICATION Ontario - …extportal.vale.com/eng/Sud/standards/pdf/SPEC-08007.pdf · ENGINEERING STANDARD SPECIFICATION Ontario TITLE ADMINISTRATIVE DESIGN AND

ENGINEERING STANDARD SPECIFICATION Ontario

TITLE ADMINISTRATIVE DESIGN AND DRAFTING DRAWINGS – TECHNICAL REQUIREMENTS MECHANICAL and PIPING

VALE #

SPEC-08007 PAGE

12/15 Last Revision

2017/10/27

REV.

4

Appendix B: Fluid Code Abreviations - CCNR-IPC Plant only

Process Piping

A Ammonia IGV Inert Gas Vent

AA Aqueous Ammonia LG Low Temp. Process Gas – L.P.

AL Pellets "A" PL Unit LO Lube Oil

ASV Air - Steam Purge Vent LT Low Temp. Process H.P. Gas/Liquid

BG Blow-Back Gas MLP Minor Leak Protection

CG Conveying Gas (Air or Inert Gas) MT Medium Temp. Process Water

CS Caustic Soda (50%) PC Contaminated Process Waste

CV Conveying Lines PDAV Product Dry Air Vent

DA Dissociated Ammonia PG Process Gas – L.P. & Vent

DAV Purge Air Vent PL Process Liquid Low Press. & High Concentration Toxic Gas

DH Dry Handling - Process PT Process Gas L.P. High Temp.

DT Dry Handling High Temp. PVH Process Vent Header

DP Drains - Pump Pans R Residue - Wet

FG Flue Gas RC Residue Recycle

FS Formate Solution RHD Relief Header

GH Hot Glycol RL Residue Low Press. - Wet

GY Glycol RP Med. Temp Process H.P.Gas/Liquid

HD Hydraulic Drive (Reactor) RPH Reactor Purge Header

HT High Temp Process H.P.Gas/Liquid SD Sulphur Dioxide Gas

HW Hot Process Water TG Treated Gas

Utility Piping

BA Breathing Air HC High Pressure Condensate

CU Cooling Water Underground HS High Pressure Steam

CW Cooling Water Above Ground IA Instrument Air

CWR Cooling Water Return Above Ground

IG Inert Gas

DO Diesel Oil (#2 Fuel Oil) LC Low Pressure Condensate

DU Potable Water Underground LS Low Pressure Steam

DW Potable Water Above Ground MC Medium Pressure Condensate

FU Fire Water Underground MS Medium Pressure Steam

FW Fire Water Above Ground N Nitrogen

GW Granulated Water Above Ground

Utility Piping (continued next page)

Page 13: ENGINEERING STANDARD SPECIFICATION Ontario - …extportal.vale.com/eng/Sud/standards/pdf/SPEC-08007.pdf · ENGINEERING STANDARD SPECIFICATION Ontario TITLE ADMINISTRATIVE DESIGN AND

ENGINEERING STANDARD SPECIFICATION Ontario

TITLE ADMINISTRATIVE DESIGN AND DRAFTING DRAWINGS – TECHNICAL REQUIREMENTS MECHANICAL and PIPING

VALE #

SPEC-08007 PAGE

13/15 Last Revision

2017/10/27

REV.

4

Utility Piping (continued)

NG Natural Gas Above Ground PW Process Water Above Ground

NU Natural Gas Underground PWH Process Quench Water – H.P.

NW Non-Contaminated Waste PWL Process Quench Water, L.P.

NWU Non-Contaminated Waste – U/G PWU Process Water Underground

OX Oxygen (Outdoors) SA Sulphuric Acid

P Purge Air ST Steam Tracing

PA Plant Air TW Treated Cooling Water Above Ground

PAS Plant Air - Compressor Suction VG Vents General

PE Utilities @ Process Exchangers, Open Loop (High Concentration)

VU Vermilion Water Underground

PEL Utilities @ Process Exchangers, Open Loop (Low Concentration)

VW Vermilion Water Above Ground

Plumbing & Drainage

WP Cold Water - Potable (Above Ground, Ambient Temp.)

WPH Hot Water - Potable (Above Ground, 125 PSIG @ 200 deg.F.)

LD Laboratory Drains (Above Ground, Indoors)

PDU Process Drains - Non-Corrosive (Under Floor Slabs)

SS Sanitary Soil & Waste (Under Floor Slabs)

SP Sanitary Soil & Waste (Above Ground)

SW Sanitary Waste - Pumped (Above Ground, 20 PSIG @ 100 deg.F.)

SWU Sanitary Waste - Pumped (Underground, 20 PSIG @ 100 deg.F.)

SDU Storm Drains (Under Floor Slabs)

SD Storm Drains (Roof Leaders Above Ground)

Page 14: ENGINEERING STANDARD SPECIFICATION Ontario - …extportal.vale.com/eng/Sud/standards/pdf/SPEC-08007.pdf · ENGINEERING STANDARD SPECIFICATION Ontario TITLE ADMINISTRATIVE DESIGN AND

ENGINEERING STANDARD SPECIFICATION Ontario

TITLE ADMINISTRATIVE DESIGN AND DRAFTING DRAWINGS – TECHNICAL REQUIREMENTS MECHANICAL and PIPING

VALE #

SPEC-08007 PAGE

14/15 Last Revision

2017/10/27

REV.

4

Appendix C: Fluid Code Abreviations – CCNR/CCCR Electrowinning Plant only

Process Piping

AD Process - Additives PPH Process - 316 S.S. - 300 PSIG

CA Caustic - Nickel - Outdoors PR Process - Bondstrand and Kynar

CE Caustic - Epoxy - Indoors PS Process - 304 Stainless Steel

CL Chlorine Gas - Dry PTL Process - Titanium - 150 PSIG

CP Process - Teflon Lined PTH Process - Titanium - 300 PSIG

E Process - Epoxy PCS Process - Carbon Steel

EC Process - Composite RL Residue - Low Pressure

FA Filter Aid R Residue

HF Hydrogen Fluoride RC Residue Recycle

HW Hot Process Water SC Sodium Carbonate

LM Lime SE Separan

NA Naptha SG Sulphur Dioxide Gas

NS Nash SJ Molten Sulphur - Jacketed

NW Distilled Water SL Sulphur Dioxide Liquid

OR Organic Make-Up SM Process Carpenter 20 - jacketed

PB Process Slurry - 316 S.S.- 150PSIG VH Vacuum Header - Stainless Steel

PK Process - 316 S.S. - 150 PSIG VC Vacuum System - Carbon Steel

PN Process - Carpenter 20 WD Waste Product

PP Process - 316 S.S. - 150 PSIG

Utility Piping

CD Corrosive Drains (304 S.S.) IA Instrument Air

CDS Corrosive Drains (316 S.S.) LC Low Pressure Condensate

CU Cooling Water Underground LS Low Pressure Steam

CW Cooling Water Above Ground MC Medium Pressure Condensate

CWR Cooling Water Return (Above grd) MS Medium Pressure Steam

DA Dry Air NG Natural Gas Above Ground

DE Drains Epoxy OX Oxygen (Outdoors) (600#)

DO Diesel Oil (#2 Fuel Oil) OM Oxygen- (250 PSIG) (After O2 Htr)

DW Potable Water Above Ground PA Plant Air

DWH Hot Potable Water Above Ground PD Process Drains Gen - Non-Corrosive

FU Fire Water Underground PW Process Water Above Ground

FW Fire Water Above Ground PWU Process Water Underground

HS High Pressure Steam SA Sulphuric Acid - Stainless Steel

Utility Piping (continued next page)

Page 15: ENGINEERING STANDARD SPECIFICATION Ontario - …extportal.vale.com/eng/Sud/standards/pdf/SPEC-08007.pdf · ENGINEERING STANDARD SPECIFICATION Ontario TITLE ADMINISTRATIVE DESIGN AND

ENGINEERING STANDARD SPECIFICATION Ontario

TITLE ADMINISTRATIVE DESIGN AND DRAFTING DRAWINGS – TECHNICAL REQUIREMENTS MECHANICAL and PIPING

VALE #

SPEC-08007 PAGE

15/15 Last Revision

2017/10/27

REV.

4

Utility Piping (continued)

SAS Sulphuric Aid - Carpenter 20 WC Chilled Water

ST Steam Tracing WS Seal Water

VG Vents General - Non-Corrosive ZW Soft Water

VU Vermilion Water Underground SWS Scrubber Water Supply

VW Vermilion Water Above Ground SWR Scrubber Water Return


Recommended