Agenda

• Welcome and introduction• Updating CCCM Strategy including coordination mechanism as

per transition plan• Planned Winterization supports to IDPs – agencies to update

on their planned coverage• Updates from Agencies and hubs on CCCM• AOB

Page 3: CCCM Cluster Meeting Kathmandu, 16 Oct 2015. Agenda Welcome and introduction Updating CCCM Strategy including coordination mechanism as per transition

Updating CCCM Strategy

• More in depth analysis of the return needs/intentions through DTM & FGD

• Return support plan (if appropriate & feasible) developed at site level

• Extension of site management coverage across priority districts & increased site improvement works

• District coordination mechanism once cluster deactivates

Page 4: CCCM Cluster Meeting Kathmandu, 16 Oct 2015. Agenda Welcome and introduction Updating CCCM Strategy including coordination mechanism as per transition

Winterization supports to IDPs• IDP sites >1500 m asl prioritized for WK• IOM to distribute kits to 3000 HHs in 35 sites• Remaining IDPs not covered – including KTM

Valley districts• Kit Includes blankets, clothing, stove, sealing

foam• Distribution through CCCM partners• Procurement in process• Other agencies???

Page 5: CCCM Cluster Meeting Kathmandu, 16 Oct 2015. Agenda Welcome and introduction Updating CCCM Strategy including coordination mechanism as per transition

Winter Kits for Displacement Sites >1500 m asl

Category Item Description Quantity UnitBlanket Fleece Blanket Synthetic fl eece Blanket - fl eece, high

thermal , min IFRC specs5 pcs

Clothes Cash/Voucher (for Clothes)

Value of NPR 2,500 voucher or conditional cash

1 pcs

Foam Sheeting Polyphenylene Ether (PPE), High dens i ty, Closed Cel l Thickness : min.12mm, Width: 1,350mm

15 m

Tarpaul ines 4m x 6m 2 sheet

Rope (Φ8mm) Polypropylene, Φ8mm, twisted, 25m 1 rol l

Tie Wire (Φ1.5mm) Galvanised, Φ1.5 mm, 25m 1 rol l

Wood Cook s tove Metal body s tove, sui table for cooking and heating, low emiss ion

1 pcs

Flu A metal cover and a himney 1 set

Solar Light Solar Torch A smal l and l ightweight portable solar l ight, with an USB phone charging function

1 pcs

Seal ing Off Ki t

Stove

Page 6: CCCM Cluster Meeting Kathmandu, 16 Oct 2015. Agenda Welcome and introduction Updating CCCM Strategy including coordination mechanism as per transition

Agency Updates – KTM Valley IOM

• IDP returning to original locations• 3 sites in KTM closed – Bode, Yellow Gumba,

Gokarneshwar• FGD conducted in few sites

• Significant decrease in no.- chuchhepati, Dancchi• May return by Nov, but many without options back home• Schooling of children and livelihood key challenges• Source of water and re-cultivation of land

Page 7: CCCM Cluster Meeting Kathmandu, 16 Oct 2015. Agenda Welcome and introduction Updating CCCM Strategy including coordination mechanism as per transition

AOB

• DTM 5 to start 27 October, questions finalized;

Page 8: CCCM Cluster Meeting Kathmandu, 16 Oct 2015. Agenda Welcome and introduction Updating CCCM Strategy including coordination mechanism as per transition

CCCM Cluster Contacts

Leelaraj Upadhyay CCCM Coordinator [email protected] 9801009207

Bruce Spires CCCM Programme Manager [email protected]

Kashif Khan Information Manager [email protected] 9801108469

Sujan Poudel, CCCM IM [email protected] 9801108452

Page 9: CCCM Cluster Meeting Kathmandu, 16 Oct 2015. Agenda Welcome and introduction Updating CCCM Strategy including coordination mechanism as per transition

THANK YOU!HAPPY DASHAIN TO YOU ALL