CCCM Cluster Meeting
Kathmandu, 16 Oct 2015
Agenda
• Welcome and introduction• Updating CCCM Strategy including coordination mechanism as
per transition plan• Planned Winterization supports to IDPs – agencies to update
on their planned coverage• Updates from Agencies and hubs on CCCM• AOB
Updating CCCM Strategy
• More in depth analysis of the return needs/intentions through DTM & FGD
• Return support plan (if appropriate & feasible) developed at site level
• Extension of site management coverage across priority districts & increased site improvement works
• District coordination mechanism once cluster deactivates
Winterization supports to IDPs• IDP sites >1500 m asl prioritized for WK• IOM to distribute kits to 3000 HHs in 35 sites• Remaining IDPs not covered – including KTM
Valley districts• Kit Includes blankets, clothing, stove, sealing
foam• Distribution through CCCM partners• Procurement in process• Other agencies???
Winter Kits for Displacement Sites >1500 m asl
Category Item Description Quantity UnitBlanket Fleece Blanket Synthetic fl eece Blanket - fl eece, high
thermal , min IFRC specs5 pcs
Clothes Cash/Voucher (for Clothes)
Value of NPR 2,500 voucher or conditional cash
1 pcs
Foam Sheeting Polyphenylene Ether (PPE), High dens i ty, Closed Cel l Thickness : min.12mm, Width: 1,350mm
15 m
Tarpaul ines 4m x 6m 2 sheet
Rope (Φ8mm) Polypropylene, Φ8mm, twisted, 25m 1 rol l
Tie Wire (Φ1.5mm) Galvanised, Φ1.5 mm, 25m 1 rol l
Wood Cook s tove Metal body s tove, sui table for cooking and heating, low emiss ion
1 pcs
Flu A metal cover and a himney 1 set
Solar Light Solar Torch A smal l and l ightweight portable solar l ight, with an USB phone charging function
1 pcs
Seal ing Off Ki t
Stove
Agency Updates – KTM Valley IOM
• IDP returning to original locations• 3 sites in KTM closed – Bode, Yellow Gumba,
Gokarneshwar• FGD conducted in few sites
• Significant decrease in no.- chuchhepati, Dancchi• May return by Nov, but many without options back home• Schooling of children and livelihood key challenges• Source of water and re-cultivation of land
AOB
• DTM 5 to start 27 October, questions finalized;
CCCM Cluster Contacts
Leelaraj Upadhyay CCCM Coordinator [email protected] 9801009207
Bruce Spires CCCM Programme Manager [email protected]
Kashif Khan Information Manager [email protected] 9801108469
Sujan Poudel, CCCM IM [email protected] 9801108452