Transcript
Page 1: Expro Excellence Subsea…track record of performance with full service provision project managed by one single vendor interface • Cost-effective and efficient model for the completion

SubseaExpro Exce l lence exprogroup.com

/ Expro Excellence

Expro integrated offering supportsdelivery of Wintershall Maria Projectahead of schedule and below budget

Subsea

ContactFor further information, please contact:[email protected]/subsea

SUF:Subseaumbilical frame

WOCS:Workovercontrol system

HXT:Horizontal Xmastree

Objectives/background

• Wintershall approached Expro's Subseateam for full WOS system for the Mariaproject - this includes the provision of anExpro Landing String Assembly (ELSA)along with a full landing string systemconsisting of SUF, WOCS, HXT umbilicalsand reeler - to include: 7 horizontal Xmastree run; 7 completions installed with 5 wellscleaned/flowed back

Expro Excellence

• Responsibility for the design, integration andoperation of the completion/workover risersystem - full service provider supplying allitems that make up the system, including:IWOCS, Xmas tree umbilical/reel, subseaumbilicial frame (SUF), landing strings; blafroheave arrester, associated equipment andcasing riser etc

• Delivery of a bespoke, full service packagefor Wintershall's requirements, with specialattention to compliance with ISO 13628-7(for the design, analysis, materials,fabrication, testing and operation of subseacompletion/workover riser systems run froma floating vessel); global riser analysis,system engineering and full SIL 2certification

• Delivery of a full-system, allowed Expro toprovide a cost-effective solution forWintershall, contributing to the project beingdelivered 20% below budget

• Through excellent project management andwell site job execution, Expro delivered theproject on time and on budget. This wasnot just exclusive to the subsea team butalso interfacing with wireline equipment forintervention, completion, workover and plugand abandonment functions

• Zero recordable safety incidents and a jobperformance score of 92%

Value to client

• Collaboration with a trusted partner andtrack record of performance with full serviceprovision project managed by one singlevendor interface

• Cost-effective and efficient model for thecompletion and workover riser system,including an integrated IWOCS to controlboth the Xmas tree and the landing stringfunctions

• Expro contributed to achieving first oil oneyear ahead of schedule

• Rental of IWOCS provided significant costsavings versus the cost of ownership

Expro’s vision is todeliver the higheststandards of safety,quality and personalisedcustomer service andwe further expandedour proficiency bybecoming an SPSprovider for Wintershall.

This project was anexcellent demonstrationof our core values andenhances the essenceof our company.

partn

ersh

ips performance

people

SSCS Wintershall_A4 13/09/2018 16:00 Page 1

Recommended