Subsea Expro Excellence exprogroup.com / Expro Excellence Expro integrated offering supports delivery of Wintershall Maria Project ahead of schedule and below budget Subsea Contact For further information, please contact: [email protected] www.exprogroup.com/subsea SUF: Subsea umbilical frame WOCS: Workover control system HXT: Horizontal Xmas tree Objectives/background Wintershall approached Expro's Subsea team for full WOS system for the Maria project - this includes the provision of an Expro Landing String Assembly (ELSA) along with a full landing string system consisting of SUF, WOCS, HXT umbilicals and reeler - to include: 7 horizontal Xmas tree run; 7 completions installed with 5 wells cleaned/flowed back Expro Excellence Responsibility for the design, integration and operation of the completion/workover riser system - full service provider supplying all items that make up the system, including: IWOCS, Xmas tree umbilical/reel, subsea umbilicial frame (SUF), landing strings; blafro heave arrester, associated equipment and casing riser etc Delivery of a bespoke, full service package for Wintershall's requirements, with special attention to compliance with ISO 13628-7 (for the design, analysis, materials, fabrication, testing and operation of subsea completion/workover riser systems run from a floating vessel); global riser analysis, system engineering and full SIL 2 certification Delivery of a full-system, allowed Expro to provide a cost-effective solution for Wintershall, contributing to the project being delivered 20% below budget Through excellent project management and well site job execution, Expro delivered the project on time and on budget. This was not just exclusive to the subsea team but also interfacing with wireline equipment for intervention, completion, workover and plug and abandonment functions Zero recordable safety incidents and a job performance score of 92% Value to client Collaboration with a trusted partner and track record of performance with full service provision project managed by one single vendor interface Cost-effective and efficient model for the completion and workover riser system, including an integrated IWOCS to control both the Xmas tree and the landing string functions Expro contributed to achieving first oil one year ahead of schedule Rental of IWOCS provided significant cost savings versus the cost of ownership Expro’s vision is to deliver the highest standards of safety, quality and personalised customer service and we further expanded our proficiency by becoming an SPS provider for Wintershall. This project was an excellent demonstration of our core values and enhances the essence of our company. p a r t n e r s h i p s p e r f o r m a n c e p e o p l e

Expro Excellence Subsea…track record of performance with full service provision project managed by one single vendor interface • Cost-effective and efficient model for the completion

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Expro Excellence Subsea…track record of performance with full service provision project managed by one single vendor interface • Cost-effective and efficient model for the completion

SubseaExpro Exce l lence exprogroup.com

/ Expro Excellence

Expro integrated offering supportsdelivery of Wintershall Maria Projectahead of schedule and below budget

Subsea

ContactFor further information, please contact:[email protected]/subsea

SUF:Subseaumbilical frame

WOCS:Workovercontrol system

HXT:Horizontal Xmastree

Objectives/background

• Wintershall approached Expro's Subseateam for full WOS system for the Mariaproject - this includes the provision of anExpro Landing String Assembly (ELSA)along with a full landing string systemconsisting of SUF, WOCS, HXT umbilicalsand reeler - to include: 7 horizontal Xmastree run; 7 completions installed with 5 wellscleaned/flowed back

Expro Excellence

• Responsibility for the design, integration andoperation of the completion/workover risersystem - full service provider supplying allitems that make up the system, including:IWOCS, Xmas tree umbilical/reel, subseaumbilicial frame (SUF), landing strings; blafroheave arrester, associated equipment andcasing riser etc

• Delivery of a bespoke, full service packagefor Wintershall's requirements, with specialattention to compliance with ISO 13628-7(for the design, analysis, materials,fabrication, testing and operation of subseacompletion/workover riser systems run froma floating vessel); global riser analysis,system engineering and full SIL 2certification

• Delivery of a full-system, allowed Expro toprovide a cost-effective solution forWintershall, contributing to the project beingdelivered 20% below budget

• Through excellent project management andwell site job execution, Expro delivered theproject on time and on budget. This wasnot just exclusive to the subsea team butalso interfacing with wireline equipment forintervention, completion, workover and plugand abandonment functions

• Zero recordable safety incidents and a jobperformance score of 92%

Value to client

• Collaboration with a trusted partner andtrack record of performance with full serviceprovision project managed by one singlevendor interface

• Cost-effective and efficient model for thecompletion and workover riser system,including an integrated IWOCS to controlboth the Xmas tree and the landing stringfunctions

• Expro contributed to achieving first oil oneyear ahead of schedule

• Rental of IWOCS provided significant costsavings versus the cost of ownership

Expro’s vision is todeliver the higheststandards of safety,quality and personalisedcustomer service andwe further expandedour proficiency bybecoming an SPSprovider for Wintershall.

This project was anexcellent demonstrationof our core values andenhances the essenceof our company.

partn

ersh

ips performance

people

SSCS Wintershall_A4 13/09/2018 16:00 Page 1