What are they and why are they important? Presented by: Andrew Craig and Chad Cook DNR Nonpoint Source Planning Coordinator and UWEX WI Land and Water

Embed Size (px)

Citation preview

  • Slide 1

What are they and why are they important? Presented by: Andrew Craig and Chad Cook DNR Nonpoint Source Planning Coordinator and UWEX WI Land and Water Conference - March 2015 Nonpoint source pollution continues to be the leading source of water quality impairments throughout the United States. Draft Sect. 319 Grant Guidelines November 2012 Slide 2 What are 9 Key Element Plans? Watershed based (HUC 12 size 35 square miles) Restore impaired waters by reducing nonpoint runoff sources (agriculture and urban) Can also protect non-impaired waters Mimic TMDLs ID sources and reduce pollutant loads to meet water uses (fishable, swimmable, drinkable) Framework to incorporate existing activities/plans: County LW plans, Farmland Preservation Program NR 151 implementation, Ordinances Grants state and federal TRM, NOD, Lakes and Rivers Water Quality and Habitat Monitoring, TMDLs Slide 3 9 Key Elements Identify the causes and sources that need to be controlled to achieve pollutant load reductions Quantify significant sources and background levels Use Maps and Tables Describe management measures that need to be implemented to achieve load reductions Map priority areas for practices Estimate the load reductions expected from selected management measures SWAT, SNAP+, STEPL, EVAAL, BARNY Slide 4 9 Key Elements Estimate amounts of technical and financial assistance, costs and authorities relied upon to implement the plan Long Term Operation and Maintenance of BMPs Monitoring and Evaluation Information/education component to encourage participation and plan implementation Schedule for implementing the management measure 5, 10, 15 or 20 years? Include plan milestones Slide 5 9 Key Elements Interim, measurable milestones to assess if plan is being implemented Set of criteria to determine whether plan objectives are or are not being achieved over time If little progress, how and when will plan be revised? Monitoring component to evaluate the effectiveness of the implementation efforts over time using criteria from above Integrate with schedule and milestones Use WQ and habitat monitoring; WQ modeling Slide 6 Importance of 9KE plans Slide 7 County LW plans ATCP 50 revised in 2014 Revisions to LW plan content and development - ATCP 50.12 Revisions DO NOT REQUIRE meeting 9 Key Elements or EPA approval Revisions are CONSISTENT with 9 Key Elements Over time, some LW plans will meet 9 Key Elements in specific watersheds (TMDLs, etc); not the entire county Slide 8 ATCP 50.12 - Content Element 1 Element 4 Element 2 & 3 Element 1, 3, 6 Element 3 Element 1 & 3 Slide 9 ATCP 50.12 Content Element 4 Element 4, 6, 7 Element 7, 8, 9 Element 1- 9 Element 5 Slide 10 ATCP 50.12 - Development Element 1- 9 Slide 11 County LW plans Two options to address the 9 Key Elements: Develop a separate 9 Key Element plan Use existing information from LW plan, TMDL, WQ data AND Reference the 9 element plan in LW plan Revise LW plan to reflect the 9 Key Elements For specific watersheds, not county wide Slide 12 EPA 2015 grant requirements DNR Nonpoint activities funded with EPA 319 grant funds should be linked to water quality outcomes Focus on restoration of impaired waters via watershed based plans At least 50% of 319 funds must be used in 319 eligible areas 319 eligible area = has a plan consistent with EPAs 9 Key Elements - DNR/EPA review Slide 13 Pink = approved TMDLs Cross-hatch = 319 eligible Expire in 2016-2019 Pink and some cross hatch areas will become ineligible in 2015 w/o 9 element plan Green = Impaired Water Slide 14 Green /Red = Recently Approved Yellow =Expire in 2016 White = Expire in 2019 Green = Impaired Waters Slide 15 EPA & DNR Review of 9 Element Plans EPA regions will annually review a sample of WBPs from each state and provide feedback and recommendations to help ensure the plans lay a good foundation for efforts to restore and/or protect waterbodies. EPA will select the plan(s) for review and conduct each review using a protocol that will be communicated with the states in advance of the reviews. Slide 16 9KE plans under development In 2014, DNR used Federal 319 funds to help develop 9 Key Element plans across the state Provide example plans to help meet the 9 Key Elements 5 projects selected Eau Claire, Marinette, Brown, Outagamie and Marathon Counties Not likely Federal 319 funds can used to develop plans in future Slide 17 9 Element Plan Timeline December 2014 - 319 project $ awarded January September 2015 develop 9 Key Element Plan October November 2015 - submit draft plan to DNR and EPA for review November - December 2015 - revise plan and get approval plan is consistent with 9 Key Elements Slide 18 9KE TMDL plans under development Lafayette County 2 TMDL basins Red Cedar TMDL - Barron and Dunn Counties Rock River TMDL 8 counties Jackson and Mason Creeks Rock River TMDL Walworth County Little Lake Wissota TMDL Chippewa County Wisconsin River Basin?? Milwaukee River Basin?? Upper Fox and Wolf River Basins?? Slide 19 DNR, GLRI grants & 9 Key Elements Slide 20 DNR Grants TRM, NOD, Lakes and River grants are funded with Federal 319 and State $ Multiple funding sources used to increase number of nonpoint projects across the state Projects using 319 Federal funds must have an approved 9 Key Element plan Slide 21 GLRI grants GLRI projects funded with a combination of Federal and local /state funds In 2015, projects using Federal GLRI funds must have an approved 9 Key Element plan EPA and DNR will be reviewing the plans for consistency with 9 Key Elements Slide 22 319 Funds and Grant Structure $4 million dollars per year 50% 50% Program Funds Project Funds Slide 23 Program Funds (est. $2 million) 20 DNR staff used implement Wisconsin NPS Program Management Plan Program administration NPS Monitoring NPS Research TMDL Development All planning-related activities NPS, TMDL, etc. NPS-related staff time Slide 24 Project Funds (est. $2 million) Project #1 Eligible DNR Staff (4 FTEs) NPS Coord, Lakes, WQ Biologists Project #2 DATCP Contract (staff costs) Project #3 TRM and NOD Grants $ 1 million Project #4 Lake and River Protection Grants $200K Project #5 Tier I & III Monitoring (USGS/SLOH/LTE costs) Slide 25 Measuring & Tracking Progress National performance measures for NPS Program WQ-9 - Estimate annual load reductions of nitrogen, phosphorus, and sediment achieved by 319 funded projects WQ-10 - Number of waterbodies primarily NPS- impaired that are partially or fully restored WQ-SP12 - Improve water quality conditions in impaired watersheds using the watershed approach NPS Success Stories: http://water.epa.gov/polwaste/nps/success319/index.cfmhttp://water.epa.gov/polwaste/nps/success319/index.cfm Slide 26 Resources to develop 9 Key Element plans Slide 27 DNR 9 Key Element Web Page dnr.wi.gov - keyword: 9 Key Element Slide 28 Your watershed determines the health of your wetlands, lakes and streams fyi.uwex.edu/watershedplanning Slide 29 Why? Concise, easy to use. Focused on Wisconsin. Restored and protected water resources require good comprehensive planning and management. Certain elements of planning required to meet DNR grant requirements. 29 Slide 30 Good planning Need buy-in and participation from key stakeholders from the start. Meet guidelines, yesbut also be implementable. Not a plan to sit on the shelf. Dynamiccan be modified easily. Leads to restored and protected water bodies. 30 Slide 31 Getting Started (chapter 1) Why and how to create a watershed plan. Geographic scope of your plan. Gathering stakeholders (contacting, meeting, organizing). Education and outreach. 31 Slide 32 What You Need to Know and How to Find It (chapter 2) A Watershed Profile. Water quality standards. Designated uses. Water quality criteria. Watershed assessment. Watershed protection. 32 Slide 33 Creating Your Plan (chapter 3) Prioritizing sources of pollutants. Vision, goals, objectives, action items, cost estimates. US EPAs Nine Elements of a Watershed Plan. Civic engagement. 33 Slide 34 Putting Your Plan into Action (chapter 4) Overseeing implementation. Keeping the momentum going. Defining success. Monitoring progress. Modifying your plan. 34 Slide 35 fyi.uwex.edu/watershedplanning Presentation produced by the UWExrtension Environmental Resources Center Photos by Jeffrey J. Strobel and Kris Stepenuck Chad Cook Natural Resource Educator [email protected] 920-232-1990 Slide 36 EPA Handbook for 9 Key Element Watershed Plans Slide 37 DNR Watershed Plan Guidance http://dnr.wi.gov/topic/surfacewater/documents/Watershed Planning_Guidance_final_2013.pdf Slide 38 DNR Healthy Watersheds Assessment http://dnr.wi.gov/topic/watersheds/hwa.html/ Slide 39 Other Tools and DNR Contact Info Tools to develop LW plans dnr.wi.gov keyword: 9 Key EVAAL STEPL Andrew Craig DNR Nonpoint Source Planning Coordinator [email protected] (608)267-7695