ID Task Name Duration 1 MOQ Mobilization 5.25 days 2 Permits/ Survey/ Tempacil 14 days 3 Excavation 14 days 4 Soil Poisoning 1.75 days 5 Rebar Fabrication 105 days 6 Installation of Footing and Grade Beam Rebar 5.25 days 7 Installation of Ground Floor Column Rebar 5.25 days 8 Footing Concrete Footing 3.5 days 9 Installation of Grade Beam Rebar & CHB Vert. bar 5.25 days 10 Installation of Grade Beam Form Works 3.5 days 11 Installation of Ground FloorColumn Form works 5.25 days 12 Grade Beam Concrete Pouring 3.5 days 13 Pipe Trenching for Pipes 3.5 days 14 Installation of Pipes and Fittings for Soil Pipes and waterline Ground Floor 5.25 days 15 Ground Floor Column Concrete Pouring 1.75 days 16 Curing Time 12.25 days 17 CuringTime 12.25 days 18 Installation of 2nd Flr Beam Rebar 8.75 days 19 Installation of Ground Floor CHB Wall 5.25 days 20 Removal of Gr Flr Concrete Formworks 1.75 days 21 Installation of 2nd Floor Formworks 5.25 days 22 Concrete Pouring 2nd Flr Beams 3.5 days 23 Curing Time 8.75 days 24 Elevator Footing Rebar Installation 5.25 days 25 Elevator Footing Concrete Pouring 1.75 days 26 Fabrication & Installation of Elevator Wall Rebar 5.25 days 27 Curing Time 12.25 days 28 Elavator Wall Formworks 3.5 days 29 Elevator Wall Concrete Pouring 1.75 days 30 Curing Time 12.25 days 31 installation of 2nd Flr Column Rebar & Formworks & Scaffolding 5.25 days 32 Installation of Slab C-joist 1 day 33 Instllation of 2nd Flr CHB Wall 5.25 days 34 Curing Time 12.25 days 35 Removal of 2nd Floor Beam formworks and Scaffolding 1.75 days 36 Installation of3rd FlrBeam Rebar 8.75 days 37 Installation of Soil Pipes and wate Pipes & Storm Drainage at 2nd Flr 5.25 days 38 Installation of Electrical Rough-ins at 2nd Flr 8.75 days 39 Removal of 2nd Flr Concrete Form works 1.75 days 40 Installation of 3rd Flr Formworks 5.25 days 41 Installation of Soil pipes and water pipes & Storm Drainage at 3rd Flr 8.75 days 42 Installation of Electrical Roughing-in 2nd Flr 7 days 43 Concrte pouring 3rd Flr Beams 1.75 days 44 Curing Time 8.75 days 45 Installation of 3rd Flr Column Rebar & Form Works Scaffolding 7 days 46 Installation of C-Joist 5.25 days 47 Curing Time 12.25 days 48 Installation of 3rd Flr CHB wall 5.25 days 49 Installation of 4th Flr Beam Rebar 8.75 days 50 removal of 3rd Flr Concrete Forms 3.5 days 51 Concrete Pouring of 4th Flr Beams 1.75 days 52 Concrete Poruing 2nd Flr Column 1.75 days 53 Concrete Pouring 3rd Flr Column 3.5 days 54 Installation of Soil Pipes, Water Line & Storm Drainage 4th Flr 7 days 55 Installation of Electrical Roughing-Ins 3rd Floor 12.25 days 56 Curing Time 8.75 days 57 Installation of CHB Wall at 4th Flr 14 days 58 Installation of C-Joist@ 4th Flr 5.25 days 59 Installation of 4th Flr Column Rebar Form works & Scaffolding 8.75 days 60 Concfrete Pouring 4th Flr Column 1.75 days 61 Curing Time 12.25 days 62 removal of 4th Flr Concrete Forms 1.75 days 63 Installation of Soil Pipes, Water Pipes & Storm Drainage 5th Flr 14 days 64 Installation of Electrical Roughing -Ins 5th Flr 14 days 65 Installation of Rebar5th Flr Beams 8.75 days 66 Installation of 5th Flr Formworks & Scaffolding 8.75 days 67 Concrete Pouring of 5th Flr Beams 1.75 days 68 Curing Time 12.25 days 69 Removal of Beam & Column Formworks & Scaffolding 3.5 days 70 Installation of C-Joist 5th Flr 5.25 days 71 Installation of Water Proofing 7 days 72 Installation of Plumbing Fixtures 5.25 days 73 Installation of Tiles 2nd-5th Flr 35 days 74 Plastering of all walls 5.25 days 75 Installation of External Tubular Frame Aesthetic 10.5 days 76 Installation of Exterior Canopy 10.5 days 77 Construction of Catch basin 10.5 days 78 painting of all external & internal walls 26.25 days 79 installation of all doors and windows and Hardwares 14 days 80 Installation of Elevated tank & Frames And Pipes Fittings 5.25 days 81 Construction of Septic Tank 21 days 82 Construction of Underground Reservoir & Fittings & Pumps 21 days 83 Construction of Genset Foundation 17.5 days 84 Punch Listing Substantial Turnover 5.25 days 85 MOQ Turn Over 14 days 86 Construction of slab on fill 3.5 days 87 Installation of elevator machine 5.25 days 88 Mobilization 3.5 days 89 Demolition Works 15.75 days 90 Clearing and Grabbing 8.75 days 91 Hauling of unsuitable materials 5.25 days 92 Site Grading Cut and Fill 12.25 days 93 Road Tracing/ Survey Works 7 days 94 Pipe Trenching Storm Drainage 35 days 95 Pipe Trenching Sanitary Sewer Line 24.5 days 96 Pipe Trenching Water Line 29.75 days 97 Installation of Drainage Pipes and manholes & Beddings 60.01 days 98 Installation of Water Pipelines Gate valves, Pipe Fittings Thrust Blocks & Beddings 50.75 days 99 Installation of Fire Hydrants, Air release Valve and Blow off Vlave 12.25 days 100 Installation of Water Service Connection 14 days 101 Installation of Drainage Service Connection 8.75 days 102 Installation of Sanitary Sewer Service Connection 12.25 days 103 Installation of Sanitary Sewer Pipes and manholes & Beddings/ Force Main 26.25 days 104 BackFilling & Compaction Drainage Line 7 days 105 BackFilling & Compaction Water Line 10.5 days 106 backfilling & Compaction Sewer Line 5.25 days 107 Installation of Outfall Drainage Line 8.75 days 108 Installation of Outfall Drainage Structure 10.5 days 109 Preparation of Sub-base Course 8.75 days 110 Preparation of base Course 8.75 days 111 Preparation of Road Concrete Carriage way 35 days 112 installation of Kerb & Gutter & Kerb Inlet 29.75 days 113 Preparation of Base Course Sidewalk 12.25 days 114 Preparation of Sub-base Course Sidewalk 12.25 days 115 Installation of Sidewalk Concrete 21 days 116 Construction of Sanitary Sewage Treatment Plant (STP) 45.5 days 117 Construction of Lift Station 21 days 118 Installation of Lift Pumps & COntroller 5.25 days 119 Leak Testing of Drainage Pipes 1.75 days 120 Leak Testing of Sewer Pipes 1.75 days 121 hauling of excess Materials 8.75 days 122 WCQ Mobilization 5.25 days 123 Construction of Tempacil & Utilities Facilities 12.25 days 124 Demolition of Existing Structure 5.25 days 125 Clearing & Grabbing 3.5 days 126 Layout / Survey 3.5 days 127 Structure Excavation 5.25 days 128 Soil Poisoning & Granel Bedding 5.25 days 129 Fabrication and Installation of Footing Rebars and Fedestal 3.5 days 130 Installation of Grade Beam Rebars 5.25 days 131 Installation of Electrical Roughing-Ins For Gr. Flr 5.25 days 132 Installation of the Soil Pipes & WaterLine and Drainage Pipes 5.25 days 133 Concrete Pouring for Foting & Grade Beams 3.5 days 134 Installationof Pedestal and Column Formworks 3.5 days 135 Slab On fill Gravel Bedding 1.75 days 136 Concrete Pouring of Slab on Fill 1.75 days 137 Concrete Pouring of Pedestal & Column 1.75 days 138 Concrete Curing Time 12.25 days 139 Removal of Formworks column 1 day 140 Installation of Gr. Flr. CHB Wall 5.25 days 141 Installation of Suspended Beam Formworks & scaffolding for 2nd flr 5.25 days 142 Installation of Suspended slab Rebars 2nd flr 7 days 143 Installation of C-Joist 2nd flr 7 days 144 Concrete Pouring for Slab Topping 2nd flr 1.75 days 145 Installation of 2nd Flr Column Rebars 5.25 days 146 Installaton of Column forms and Scaffolding 3.5 days 147 Concrete Pouring 1.75 days 148 installation of Electrical wires, PVC pipes,Switches & Accessories for 2nd Flr 7 days 149 Installation of Electrical Roughing-ins for2 nd Flr 5.25 days 150 Curing Time 12.25 days 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground flr 8.75 days 154 Installation of trusses baseplate & anchor bolts 5.25 days 155 Fabrication of Trusses 17.5 days 156 installation of trusses 10.5 days 157 Installation of Roofings gutter &facia board 7 roof drains 7 days 158 punch listing & substantial turn-over 3.5 days 159 Plastering of walls 8.75 days 160 Installation of Septic tanks & Catch basin 12.25 days 161 painting of all walls & installation of all balcony 14 days S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17 Week 18 Week 19 Week 20 Week 21 Week 22 Week 23 Week 24 Task Critical Task Progress Milestone Summary Rolled Up Task Rolled Up Critical Task Rolled Up Milestone Rolled Up Progress Split External Tasks Project Summary Group By Summary Deadline Page 1 Project: Site Development Phase 1 Date: Wed 7/8/15

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

Embed Size (px)

Citation preview

Page 1: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

ID Task Name Duration

1 MOQ Mobilization 5.25 days

2 Permits/ Survey/ Tempacil 14 days

3 Excavation 14 days

4 Soil Poisoning 1.75 days

5 Rebar Fabrication 105 days

6 Installation of Footing and Grade Beam Rebar 5.25 days

7 Installation of Ground Floor Column Rebar 5.25 days

8 Footing Concrete Footing 3.5 days

9 Installation of Grade Beam Rebar & CHB Vert. bar 5.25 days

10 Installation of Grade Beam Form Works 3.5 days

11 Installation of Ground FloorColumn Form works 5.25 days

12 Grade Beam Concrete Pouring 3.5 days

13 Pipe Trenching for Pipes 3.5 days

14 Installation of Pipes and Fittings for Soil Pipes and waterline Ground Floor 5.25 days

15 Ground Floor Column Concrete Pouring 1.75 days

16 Curing Time 12.25 days

17 CuringTime 12.25 days

18 Installation of 2nd Flr Beam Rebar 8.75 days

19 Installation of Ground Floor CHB Wall 5.25 days

20 Removal of Gr Flr Concrete Formworks 1.75 days

21 Installation of 2nd Floor Formworks 5.25 days

22 Concrete Pouring 2nd Flr Beams 3.5 days

23 Curing Time 8.75 days

24 Elevator Footing Rebar Installation 5.25 days

25 Elevator Footing Concrete Pouring 1.75 days

26 Fabrication & Installation of Elevator Wall Rebar 5.25 days

27 Curing Time 12.25 days

28 Elavator Wall Formworks 3.5 days

29 Elevator Wall Concrete Pouring 1.75 days

30 Curing Time 12.25 days

31 installation of 2nd Flr Column Rebar & Formworks & Scaffolding 5.25 days

32 Installation of Slab C-joist 1 day

33 Instllation of 2nd Flr CHB Wall 5.25 days

34 Curing Time 12.25 days

35 Removal of 2nd Floor Beam formworks and Scaffolding 1.75 days

36 Installation of3rd FlrBeam Rebar 8.75 days

37 Installation of Soil Pipes and wate Pipes & Storm Drainage at 2nd Flr 5.25 days

38 Installation of Electrical Rough-ins at 2nd Flr 8.75 days

39 Removal of 2nd Flr Concrete Form works 1.75 days

40 Installation of 3rd Flr Formworks 5.25 days

41 Installation of Soil pipes and water pipes & Storm Drainage at 3rd Flr 8.75 days

42 Installation of Electrical Roughing-in 2nd Flr 7 days

43 Concrte pouring 3rd Flr Beams 1.75 days

44 Curing Time 8.75 days

45 Installation of 3rd Flr Column Rebar & Form Works Scaffolding 7 days

46 Installation of C-Joist 5.25 days

47 Curing Time 12.25 days

48 Installation of 3rd Flr CHB wall 5.25 days

49 Installation of 4th Flr Beam Rebar 8.75 days

50 removal of 3rd Flr Concrete Forms 3.5 days

51 Concrete Pouring of 4th Flr Beams 1.75 days

52 Concrete Poruing 2nd Flr Column 1.75 days

53 Concrete Pouring 3rd Flr Column 3.5 days

54 Installation of Soil Pipes, Water Line & Storm Drainage 4th Flr 7 days

55 Installation of Electrical Roughing-Ins 3rd Floor 12.25 days

56 Curing Time 8.75 days

57 Installation of CHB Wall at 4th Flr 14 days

58 Installation of C-Joist@ 4th Flr 5.25 days

59 Installation of 4th Flr Column Rebar Form works & Scaffolding 8.75 days

60 Concfrete Pouring 4th Flr Column 1.75 days

61 Curing Time 12.25 days

62 removal of 4th Flr Concrete Forms 1.75 days

63 Installation of Soil Pipes, Water Pipes & Storm Drainage 5th Flr 14 days

64 Installation of Electrical Roughing -Ins 5th Flr 14 days

65 Installation of Rebar5th Flr Beams 8.75 days

66 Installation of 5th Flr Formworks & Scaffolding 8.75 days

67 Concrete Pouring of 5th Flr Beams 1.75 days

68 Curing Time 12.25 days

69 Removal of Beam & Column Formworks & Scaffolding 3.5 days

70 Installation of C-Joist 5th Flr 5.25 days

71 Installation of Water Proofing 7 days

72 Installation of Plumbing Fixtures 5.25 days

73 Installation of Tiles 2nd-5th Flr 35 days

74 Plastering of all walls 5.25 days

75 Installation of External Tubular Frame Aesthetic 10.5 days

76 Installation of Exterior Canopy 10.5 days

77 Construction of Catch basin 10.5 days

78 painting of all external & internal walls 26.25 days

79 installation of all doors and windows and Hardwares 14 days

80 Installation of Elevated tank & Frames And Pipes Fittings 5.25 days

81 Construction of Septic Tank 21 days

82 Construction of Underground Reservoir & Fittings & Pumps 21 days

83 Construction of Genset Foundation 17.5 days

84 Punch Listing Substantial Turnover 5.25 days

85 MOQ Turn Over 14 days

86 Construction of slab on fill 3.5 days

87 Installation of elevator machine 5.25 days

88 Mobilization 3.5 days

89 Demolition Works 15.75 days

90 Clearing and Grabbing 8.75 days

91 Hauling of unsuitable materials 5.25 days

92 Site Grading Cut and Fill 12.25 days

93 Road Tracing/ Survey Works 7 days

94 Pipe Trenching Storm Drainage 35 days

95 Pipe Trenching Sanitary Sewer Line 24.5 days

96 Pipe Trenching Water Line 29.75 days

97 Installation of Drainage Pipes and manholes & Beddings 60.01 days

98 Installation of Water Pipelines Gate valves, Pipe Fittings Thrust Blocks & Beddings 50.75 days

99 Installation of Fire Hydrants, Air release Valve and Blow off Vlave 12.25 days

100 Installation of Water Service Connection 14 days

101 Installation of Drainage Service Connection 8.75 days

102 Installation of Sanitary Sewer Service Connection 12.25 days

103 Installation of Sanitary Sewer Pipes and manholes & Beddings/ Force Main 26.25 days

104 BackFilling & Compaction Drainage Line 7 days

105 BackFilling & Compaction Water Line 10.5 days

106 backfilling & Compaction Sewer Line 5.25 days

107 Installation of Outfall Drainage Line 8.75 days

108 Installation of Outfall Drainage Structure 10.5 days

109 Preparation of Sub-base Course 8.75 days

110 Preparation of base Course 8.75 days

111 Preparation of Road Concrete Carriage way 35 days

112 installation of Kerb & Gutter & Kerb Inlet 29.75 days

113 Preparation of Base Course Sidewalk 12.25 days

114 Preparation of Sub-base Course Sidewalk 12.25 days

115 Installation of Sidewalk Concrete 21 days

116 Construction of Sanitary Sewage Treatment Plant (STP) 45.5 days

117 Construction of Lift Station 21 days

118 Installation of Lift Pumps & COntroller 5.25 days

119 Leak Testing of Drainage Pipes 1.75 days

120 Leak Testing of Sewer Pipes 1.75 days

121 hauling of excess Materials 8.75 days

122 WCQ Mobilization 5.25 days

123 Construction of Tempacil & Utilities Facilities 12.25 days

124 Demolition of Existing Structure 5.25 days

125 Clearing & Grabbing 3.5 days

126 Layout / Survey 3.5 days

127 Structure Excavation 5.25 days

128 Soil Poisoning & Granel Bedding 5.25 days

129 Fabrication and Installation of Footing Rebars and Fedestal 3.5 days

130 Installation of Grade Beam Rebars 5.25 days

131 Installation of Electrical Roughing-Ins For Gr. Flr 5.25 days

132 Installation of the Soil Pipes & WaterLine and Drainage Pipes 5.25 days

133 Concrete Pouring for Foting & Grade Beams 3.5 days

134 Installationof Pedestal and Column Formworks 3.5 days

135 Slab On fill Gravel Bedding 1.75 days

136 Concrete Pouring of Slab on Fill 1.75 days

137 Concrete Pouring of Pedestal & Column 1.75 days

138 Concrete Curing Time 12.25 days

139 Removal of Formworks column 1 day

140 Installation of Gr. Flr. CHB Wall 5.25 days

141 Installation of Suspended Beam Formworks & scaffolding for 2nd flr 5.25 days

142 Installation of Suspended slab Rebars 2nd flr 7 days

143 Installation of C-Joist 2nd flr 7 days

144 Concrete Pouring for Slab Topping 2nd flr 1.75 days

145 Installation of 2nd Flr Column Rebars 5.25 days

146 Installaton of Column forms and Scaffolding 3.5 days

147 Concrete Pouring 1.75 days

148 installation of Electrical wires, PVC pipes,Switches & Accessories for 2nd Flr 7 days

149 Installation of Electrical Roughing-ins for2 nd Flr 5.25 days

150 Curing Time 12.25 days

151 Installation of CHB Wall 2nd Flr 5.25 days

152 Removal of formworks 1.75 days

153 Installation of ceiling in ground flr 8.75 days

154 Installation of trusses baseplate & anchor bolts 5.25 days

155 Fabrication of Trusses 17.5 days

156 installation of trusses 10.5 days

157 Installation of Roofings gutter &facia board 7 roof drains 7 days

158 punch listing & substantial turn-over 3.5 days

159 Plastering of walls 8.75 days

160 Installation of Septic tanks & Catch basin 12.25 days

161 painting of all walls & installation of all balcony 14 days

S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F SWeek 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17 Week 18 Week 19 Week 20 Week 21 Week 22 Week 23 Week 24

Task Critical Task Progress Milestone Summary Rolled Up Task Rolled Up Critical Task Rolled Up Milestone Rolled Up Progress Split External Tasks Project Summary Group By Summary Deadline

Page 1

Project: Site Development Phase 1Date: Wed 7/8/15

Page 2: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

ID Task Name Duration

162 Installation of doors & windows 5.25 days

163 installation of Tiles 8.75 days

164 installation of stair rebars & formworks 2ndflr 3.5 days

165 Pouring of Concrete Stair 2 2ndflr 3.5 days

166 Curing time 12.25 days

167 Removal of Stair Formworks 1.75 days

168 Installation of stairrebar @ gr flr 7 days

169 installation of formworks stair 5.25 days

170 Conrete pouring stair gr 1.75 days

171 curing time 12.25 days

172 Removal of conrete stair formworks 1.75 days

173 installation of railing and watr proofing 5.25 days

174 testing & commission of plumbing & electrical works 10.5 days

175 installation of ceilings @ gr,2nd flr 12.25 days

176 WCQ TURNOVER 12.25 days

177 SOQ Mobilization 5.25 days

178 Construction of Tempacil & Utilities Facilities 12.25 days

179 Demolition of Existing Structure 5.25 days

180 Clearing & Grabbing 3.5 days

181 Layout / Survey 3.5 days

182 Structure Excavation 5.25 days

183 Soil Poisoning & Granel Bedding 5.25 days

184 Fabrication and Installation of Footing Rebars and Fedestal 3.5 days

185 Installation of Grade Beam Rebars 5.25 days

186 Installation of Electrical Roughing-Ins For Gr. Flr 5.25 days

187 Installation of the Soil Pipes & WaterLine and Drainage Pipes 5.25 days

188 Concrete Pouring for Foting & Grade Beams 3.5 days

189 Installationof Pedestal and Column Formworks 3.5 days

190 Slab On fill Gravel Bedding 1.75 days

191 Concrete Pouring of Slab on Fill 1.75 days

192 Concrete Pouring of Pedestal & Column 1.75 days

193 Concrete Curing Time 12.25 days

194 Removal of Formworks column 1 day

195 Installation of Gr. Flr. CHB Wall 5.25 days

196 Installation of Suspended Beam Formworks & scaffolding for 2nd flr 5.25 days

197 Installation of Suspended slab Rebars 2nd flr 7 days

198 Installation of C-Joist 2nd flr 7 days

199 Concrete Pouring for Slab Topping 2nd flr 1.75 days

200 Installation of 2nd Flr Column Rebars 5.25 days

201 Installaton of Column forms and Scaffolding 3.5 days

202 Concrete Pouring 1.75 days

203 installation of Electrical wires, PVC pipes,Switches & Accessories for 2nd Flr 7 days

204 Installation of Electrical Roughing-ins for2 nd Flr 5.25 days

205 Curing Time 12.25 days

206 Installation of CHB Wall 2nd Flr 5.25 days

207 Removal of formworks 1.75 days

208 Installation of ceiling in ground flr 8.75 days

209 Installation of trusses baseplate & anchor bolts 5.25 days

210 Fabrication of Trusses 17.5 days

211 installation of trusses 10.5 days

212 Installation of Roofings gutter &facia board 7 roof drains 7 days

213 punch listing & substantial turn-over 3.5 days

214 Plastering of walls 8.75 days

215 Installation of Septic tanks & Catch basin 12.25 days

216 painting of all walls & installation of all balcony 14 days

217 Installation of doors & windows 5.25 days

218 installation of Tiles 8.75 days

219 installation of stair rebars & formworks 2ndflr 3.5 days

220 Pouring of Concrete Stair 2 2ndflr 3.5 days

221 Curing time 12.25 days

222 Removal of Stair Formworks 1.75 days

223 Installation of stairrebar @ gr flr 7 days

224 installation of formworks stair 5.25 days

225 Conrete pouring stair gr 1.75 days

226 curing time 12.25 days

227 Removal of conrete stair formworks 1.75 days

228 installation of railing and watr proofing 5.25 days

229 testing & commission of plumbing & electrical works 10.5 days

230 installation of ceilings @ gr,2nd flr 12.25 days

231 SOQ TURN OVER 12.25 days

232 EPQ Mobilization 5.25 days

233 Construction of Tempacil & Utilities Facilities 12.25 days

234 Demolition of Existing Structure 5.25 days

235 Clearing & Grabbing 3.5 days

236 Layout / Survey 3.5 days

237 Structure Excavation 5.25 days

238 Soil Poisoning & Granel Bedding 5.25 days

239 Fabrication and Installation of Footing Rebars and Fedestal 3.5 days

240 Installation of Grade Beam Rebars 5.25 days

241 Installation of Electrical Roughing-Ins For Gr. Flr 5.25 days

242 Installation of the Soil Pipes & WaterLine and Drainage Pipes 5.25 days

243 Concrete Pouring for Foting & Grade Beams 3.5 days

244 Installationof Pedestal and Column Formworks 3.5 days

245 Slab On fill Gravel Bedding 1.75 days

246 Concrete Pouring of Slab on Fill 1.75 days

247 Concrete Pouring of Pedestal & Column 1.75 days

248 Concrete Curing Time 12.25 days

249 Removal of Formworks column 1 day

250 Installation of Gr. Flr. CHB Wall 5.25 days

251 Installation of Suspended Beam Formworks & scaffolding for 2nd flr 5.25 days

252 Installation of Suspended slab Rebars 2nd flr 7 days

253 Installation of C-Joist 2nd flr 7 days

254 Concrete Pouring for Slab Topping 2nd flr 1.75 days

255 Installation of 2nd Flr Column Rebars 5.25 days

256 Installaton of Column forms and Scaffolding 3.5 days

257 Concrete Pouring 1.75 days

258 installation of Electrical wires, PVC pipes,Switches & Accessories for 2nd Flr 7 days

259 Installation of Electrical Roughing-ins for2 nd Flr 5.25 days

260 Curing Time 12.25 days

261 Installation of CHB Wall 2nd Flr 5.25 days

262 Installation of Suspended Beam formworks & Scaffolding for 3rd flr 7 days

263 Installation of suspended slab rebars 3rd flr 5.25 days

264 installation of C- Joist 3rd flr 5.25 days

265 installation of Electrical ires,PVC pipes, Switches& accessoriesfor 3rd flr 7 days

266 Installation of Elecrical Rouughing-ins for 3rd flr 7 days

267 Concrete pouring for slab topping 3rd flr 1.75 days

268 Removal of formworks 1.75 days

269 installation of CHB wall at 3rd flr 8.75 days

270 Installation of trusses baseplate & anchor bolts 5.25 days

271 Fabrication of Trusses 17.5 days

272 installation of trusses 10.5 days

273 Installation of Roofings gutter &facia board 7 roof drains 7 days

274 punch listing & substantial turn-over 3.5 days

275 Plastering of walls 8.75 days

276 Installation of Septic tanks & Catch basin 12.25 days

277 painting of all walls & installation of all balcony 14 days

278 Installation of doors & windows 5.25 days

279 installation of Tiles 8.75 days

280 installation of stair rebars & formworks 2ndflr 3.5 days

281 Pouring of Concrete Stair 2 2ndflr 3.5 days

282 Curing time 12.25 days

283 Removal of Stair Formworks 1.75 days

284 installation 2nd flr rebars @ formworks 5.25 days

285 pouring of concrete stair 3rd flr 1.75 days

286 curing time 12.25 days

287 Removal of formworks 1.75 days

288 Installation of stairrebar @ gr flr 7 days

289 installation of formworks stair 5.25 days

290 Conrete pouring stair gr 1.75 days

291 curing time 12.25 days

292 Removal of conrete stair formworks 1.75 days

293 installation of railing and watr proofing 5.25 days

294 testing & commission of plumbing & electrical works 10.5 days

295 installation of ceilings @ gr,2nd & 3rd flr 12.25 days

296 EPQ TURN OVER 12.25 days

297 BOQ Mobilization 5.25 days

298 Construction of Tempacil & Utilities Facilities 12.25 days

299 Demolition of Existing Structure 5.25 days

300 Clearing & Grabbing 3.5 days

301 Layout / Survey 3.5 days

302 Structure Excavation 5.25 days

303 Soil Poisoning & Granel Bedding 5.25 days

304 Fabrication and Installation of Footing Rebars and Fedestal 3.5 days

305 Installation of Grade Beam Rebars 5.25 days

306 Installation of Electrical Roughing-Ins For Gr. Flr 5.25 days

307 Installation of the Soil Pipes & WaterLine and Drainage Pipes 5.25 days

308 Concrete Pouring for Foting & Grade Beams 3.5 days

309 Installationof Pedestal and Column Formworks 3.5 days

310 Slab On fill Gravel Bedding 1.75 days

311 Concrete Pouring of Slab on Fill 1.75 days

312 Concrete Pouring of Pedestal & Column 1.75 days

313 Concrete Curing Time 12.25 days

314 Removal of Formworks column 1 day

315 Installation of Gr. Flr. CHB Wall 5.25 days

316 Installation of Suspended Beam Formworks & scaffolding for 2nd flr 5.25 days

317 Installation of Suspended slab Rebars 2nd flr 7 days

318 Installation of C-Joist 2nd flr 7 days

319 Concrete Pouring for Slab Topping 2nd flr 1.75 days

320 Installation of 2nd Flr Column Rebars 5.25 days

321 Installaton of Column forms and Scaffolding 3.5 days

322 Concrete Pouring 1.75 days

S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F SWeek 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17 Week 18 Week 19 Week 20 Week 21 Week 22 Week 23 Week 24

Task Critical Task Progress Milestone Summary Rolled Up Task Rolled Up Critical Task Rolled Up Milestone Rolled Up Progress Split External Tasks Project Summary Group By Summary Deadline

Page 2

Project: Site Development Phase 1Date: Wed 7/8/15

Page 3: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

ID Task Name Duration

323 installation of Electrical wires, PVC pipes,Switches & Accessories for 2nd Flr 7 days

324 Installation of Electrical Roughing-ins for2 nd Flr 5.25 days

325 Curing Time 12.25 days

326 Installation of CHB Wall 2nd Flr 5.25 days

327 Removal of formworks 1.75 days

328 Installation of ceiling in ground flr 8.75 days

329 Installation of trusses baseplate & anchor bolts 5.25 days

330 Fabrication of Trusses 17.5 days

331 installation of trusses 10.5 days

332 Installation of Roofings gutter &facia board 7 roof drains 7 days

333 punch listing & substantial turn-over 3.5 days

334 Plastering of walls 8.75 days

335 Installation of Septic tanks & Catch basin 12.25 days

336 painting of all walls & installation of all balcony 14 days

337 Installation of doors & windows 5.25 days

338 installation of Tiles 8.75 days

339 installation of stair rebars & formworks 2ndflr 3.5 days

340 Pouring of Concrete Stair 2 2ndflr 3.5 days

341 Curing time 12.25 days

342 Removal of Stair Formworks 1.75 days

343 Installation of stairrebar @ gr flr 7 days

344 installation of formworks stair 5.25 days

345 Conrete pouring stair gr 1.75 days

346 curing time 12.25 days

347 Removal of conrete stair formworks 1.75 days

348 installation of railing and watr proofing 5.25 days

349 testing & commission of plumbing & electrical works 10.5 days

350 installation of ceilings @ gr,2nd flr 12.25 days

351 BOQ TURN OVER 12.25 days

352 MEQ Mobilization 5.25 days

353 Permits/ Survey/ Tempacil 14 days

354 Excavation 21 days

355 Soil Poisoning 1.75 days

356 Rebar Fabrication 113.75 days

357 Installation of Footing and Grade Beam Rebar 5.25 days

358 Installation of Ground Floor Column Rebar 8.75 days

359 Footing Concrete Footing 7 days

360 Installation of Grade Beam Rebar & CHB Vert. bar 5.25 days

361 Installation of Grade Beam Form Works 7 days

362 Installation of Ground FloorColumn Form works 8.75 days

363 Grade Beam Concrete Pouring 3.5 days

364 Pipe Trenching for Pipes 5.25 days

365 Installation of Pipes and Fittings for Soil Pipes and waterline Ground Floor 8.75 days

366 Ground Floor Column Concrete Pouring 1.75 days

367 Curing Time 12.25 days

368 CuringTime 12.25 days

369 Installation of 2nd Flr Beam Rebar 15.75 days

370 Installation of Ground Floor CHB Wall 5.25 days

371 Removal of Gr Flr Concrete Formworks 1.75 days

372 Installation of 2nd Floor Formworks 8.75 days

373 Concrete Pouring 2nd Flr Beams 3.5 days

374 Curing Time 8.75 days

375 Elevator Footing Rebar Installation 8.75 days

376 Elevator Footing Concrete Pouring 1.75 days

377 Fabrication & Installation of Elevator Wall Rebar 5.25 days

378 Curing Time 12.25 days

379 Elavator Wall Formworks 3.5 days

380 Elevator Wall Concrete Pouring 1.75 days

381 Curing Time 12.25 days

382 installation of 2nd Flr Column Rebar & Formworks & Scaffolding 10.5 days

383 Installation of Slab C-joist 8.75 days

384 Instllation of 2nd Flr CHB Wall 5.25 days

385 Curing Time 12.25 days

386 Removal of 2nd Floor Beam formworks and Scaffolding 1.75 days

387 Installation of3rd FlrBeam Rebar 8.75 days

388 Installation of Soil Pipes and wate Pipes & Storm Drainage at 2nd Flr 5.25 days

389 Installation of Electrical Rough-ins at 2nd Flr 12.25 days

390 Removal of 2nd Flr Concrete Form works 1.75 days

391 Installation of 3rd Flr Formworks 8.75 days

392 Installation of Soil pipes and water pipes & Storm Drainage at 3rd Flr 8.75 days

393 Installation of Electrical Roughing-in 2nd Flr 10.5 days

394 Concrte pouring 3rd Flr Beams 1.75 days

395 Curing Time 12.25 days

396 Installation of 3rd Flr Column Rebar & Form Works Scaffolding 12.25 days

397 Installation of C-Joist 5.25 days

398 Curing Time 12.25 days

399 Installation of 3rd Flr CHB wall 8.75 days

400 Installation of 4th Flr Beam Rebar 12.25 days

401 removal of 3rd Flr Concrete Forms 3.5 days

402 Concrete Pouring of 4th Flr Beams 1.75 days

403 Concrete Poruing 2nd Flr Column 1.75 days

404 Concrete Pouring 3rd Flr Column 3.5 days

405 Installation of Soil Pipes, Water Line & Storm Drainage 4th Flr 10.5 days

406 Installation of Electrical Roughing-Ins 3rd Floor 12.25 days

407 Curing Time 12.25 days

408 Installation of CHB Wall at 4th Flr 19.25 days

409 Installation of C-Joist@ 4th Flr 5.25 days

410 Installation of 4th Flr Column Rebar Form works & Scaffolding 14 days

411 Concfrete Pouring 4th Flr Column 1.75 days

412 Curing Time 12.25 days

413 removal of 4th Flr Concrete Forms 1.75 days

414 Installation of Soil Pipes, Water Pipes & Storm Drainage 5th Flr 17.5 days

415 Installation of Electrical Roughing -Ins 5th Flr 17.5 days

416 Installation of Rebar5th Flr Beams 14 days

417 Installation of 5th Flr Formworks & Scaffolding 8.75 days

418 Concrete Pouring of 5th Flr Beams 1.75 days

419 Curing Time 12.25 days

420 Removal of Beam & Column Formworks & Scaffolding 3.5 days

421 Installation of C-Joist 5th Flr 8.75 days

422 Installation of Water Proofing 10.5 days

423 Installation of Plumbing Fixtures 8.75 days

424 Installation of Tiles 2nd-5th Flr 35 days

425 Plastering of all walls 10.5 days

426 Installation of External Tubular Frame Aesthetic 10.5 days

427 Installation of Exterior Canopy 10.5 days

428 Construction of Catch basin 10.5 days

429 painting of all external & internal walls 61.25 days

430 installation of all doors and windows and Hardwares 17.5 days

431 Installation of Elevated tank & Frames And Pipes Fittings 5.25 days

432 Construction of Septic Tank 21 days

433 Construction of Underground Reservoir & Fittings & Pumps 21 days

434 Construction of Genset Foundation 17.5 days

435 Punch Listing Substantial Turnover 5.25 days

436 MEQ TURN OVER 14 days

437 DEMOBILIZATION 14 days

438 Construction of slab on fill 3.5 days

439 Installation of elevator machine 5.25 days

440 SITE DEVELOPMENT TURN OVER 1.75 days

441 Punch listing & Substantial turnover 5.25 days

442 Final Turn over 3.5 days

S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F SWeek 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17 Week 18 Week 19 Week 20 Week 21 Week 22 Week 23 Week 24

Task Critical Task Progress Milestone Summary Rolled Up Task Rolled Up Critical Task Rolled Up Milestone Rolled Up Progress Split External Tasks Project Summary Group By Summary Deadline

Page 3

Project: Site Development Phase 1Date: Wed 7/8/15

Page 4: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T FWeek 25 Week 26 Week 27 Week 28 Week 29 Week 30 Week 31 Week 32 Week 33 Week 34 Week 35 Week 36 Week 37 Week 38 Week 39 Week 40 Week 41 Week 42 Week 43 Week 44 Week 45 Week 46 Week 47 Week 48 Week 49 Week 50 Week 51 Week 52

Task Critical Task Progress Milestone Summary Rolled Up Task Rolled Up Critical Task Rolled Up Milestone Rolled Up Progress Split External Tasks Project Summary Group By Summary Deadline

Page 4

Project: Site Development Phase 1Date: Wed 7/8/15

Page 5: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T FWeek 25 Week 26 Week 27 Week 28 Week 29 Week 30 Week 31 Week 32 Week 33 Week 34 Week 35 Week 36 Week 37 Week 38 Week 39 Week 40 Week 41 Week 42 Week 43 Week 44 Week 45 Week 46 Week 47 Week 48 Week 49 Week 50 Week 51 Week 52

Task Critical Task Progress Milestone Summary Rolled Up Task Rolled Up Critical Task Rolled Up Milestone Rolled Up Progress Split External Tasks Project Summary Group By Summary Deadline

Page 5

Project: Site Development Phase 1Date: Wed 7/8/15

Page 6: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T FWeek 25 Week 26 Week 27 Week 28 Week 29 Week 30 Week 31 Week 32 Week 33 Week 34 Week 35 Week 36 Week 37 Week 38 Week 39 Week 40 Week 41 Week 42 Week 43 Week 44 Week 45 Week 46 Week 47 Week 48 Week 49 Week 50 Week 51 Week 52

Task Critical Task Progress Milestone Summary Rolled Up Task Rolled Up Critical Task Rolled Up Milestone Rolled Up Progress Split External Tasks Project Summary Group By Summary Deadline

Page 6

Project: Site Development Phase 1Date: Wed 7/8/15

Page 7: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W TWeek 53 Week 54 Week 55 Week 56 Week 57 Week 58 Week 59 Week 60 Week 61 Week 62 Week 63 Week 64 Week 65 Week 66 Week 67 Week 68 Week 69 Week 70 Week 71 Week 72 Week 73 Week 74 Week 75 Week 76 Week 77 Week 78 Week 79 Week 80

Task Critical Task Progress Milestone Summary Rolled Up Task Rolled Up Critical Task Rolled Up Milestone Rolled Up Progress Split External Tasks Project Summary Group By Summary Deadline

Page 7

Project: Site Development Phase 1Date: Wed 7/8/15

Page 8: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W TWeek 53 Week 54 Week 55 Week 56 Week 57 Week 58 Week 59 Week 60 Week 61 Week 62 Week 63 Week 64 Week 65 Week 66 Week 67 Week 68 Week 69 Week 70 Week 71 Week 72 Week 73 Week 74 Week 75 Week 76 Week 77 Week 78 Week 79 Week 80

Task Critical Task Progress Milestone Summary Rolled Up Task Rolled Up Critical Task Rolled Up Milestone Rolled Up Progress Split External Tasks Project Summary Group By Summary Deadline

Page 8

Project: Site Development Phase 1Date: Wed 7/8/15

Page 9: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W TWeek 53 Week 54 Week 55 Week 56 Week 57 Week 58 Week 59 Week 60 Week 61 Week 62 Week 63 Week 64 Week 65 Week 66 Week 67 Week 68 Week 69 Week 70 Week 71 Week 72 Week 73 Week 74 Week 75 Week 76 Week 77 Week 78 Week 79 Week 80

Task Critical Task Progress Milestone Summary Rolled Up Task Rolled Up Critical Task Rolled Up Milestone Rolled Up Progress Split External Tasks Project Summary Group By Summary Deadline

Page 9

Project: Site Development Phase 1Date: Wed 7/8/15

Page 10: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

PLANNED % ACCOMPLISHMENT

PER WEEK (%) 4.82 3.78

PLANNED CUMMULATIVE %

ACCOMPLISHMENT 4.82 8.6

7.66

22.0414.38

5.78

Page 11: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

8.84 6.12

30.88 37.00

Page 12: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

2.11 16.55 9.29

39.11 55.66 64.96

Page 13: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

5.91 3.14 12.8 2.45 2.88

70.87 86.81 89.2674.01 92.14 99.02

Page 14: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

6.9 0.98 TOTAL = 100.00 %

TOTAL = 100.00 %99.02 100.00

Page 15: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

PLANNED % ACCOMPLISHMENT

PER WEEK (%) 4.82 3.78

PLANNED CUMMULATIVE %

ACCOMPLISHMENT 4.82 8.6

7.66

22.0414.38

5.78

Page 16: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

8.84 6.12

30.88 37.00

Page 17: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

2.11 16.55 9.29

39.11 55.66 64.96

Page 18: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

5.91 3.14 12.8 2.45

70.87 86.81 89.2674.01

Page 19: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

2.88 6.88 0.98 TOTAL = 100.00 %

TOTAL = 100.00 %92.14 99.02 100.00

Page 20: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

PLANNED % ACCOMPLISHMENT

PER WEEK (%) 1.15 0.63 6.45 4.16 6.13

PLANNED CUMMULATIVE %

0.38

Page 21: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

3.38 3.91 4.12 2.94 3.47 1.11 0.91 1.36 1.67 2.12

Page 22: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

2.275.184.67

Page 23: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

7.43 6.94 5.34 3.89 2.5

Page 24: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

1.18 2.04 3.52 2.21 1.08

Page 25: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

2.34 1.64 0.21 0.26 0.141.41

Page 26: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

0.19 1.67 %100.00

Page 27: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

PLANNED % ACCOMPLISHMENT

PER WEEK (%) 1.25 0.63 6.45

PLANNED CUMMULATIVE %

ACCOMPLISHMENT 1.25 1.88 8.74

0.41

2.29

Page 28: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

5.98 3.25 4.42 3.91 5.4 4.8 3.8 1.4 0.8 2.45

14.72 17.97 22.39 26.30 31.7 36.5 40.3 41.7 42.5 44.95

Page 29: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

8.56 1.45

53.5 54.96

6.8

61.76

Page 30: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

4.83 7.21

74.81 82.02

2.255.97

67.73 69.98

Page 31: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

5.34 1.26 3.5

87.36 88.62 92.12

Page 32: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

2.31 1.7 0.3 1.8 1.5

94.43 96 96 98.22 100

Page 33: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

0.26 100.00 %

100 100.00 %

Page 34: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

PLANNED % ACCOMPLISHMENT

PER WEEK (%) 2.77 0.544 1.2 8.78 2.27

PLANNED CUMMULATIVE %

ACCOMPLISHMENT 2.77 3.312 4.5 13.3 15.6

Page 35: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

5.09 6.01 16.6 9.3 6.057

20.7 27.8 44.4 54 59.71

1.12566

21.7981

Page 36: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

8.875876 2.43 17.24

68.59 89.1069.43

0.8433

71.87

Page 37: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

1.45 8.47 0.98 TOTAL =

90.55 99.02 100.00

100

Page 38: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

PLANNED % ACCOMPLISHMENT

PER WEEK (%) 4.82 3.78

PLANNED CUMMULATIVE %

ACCOMPLISHMENT 4.82 8.6

7.66

22.0414.38

5.78

Page 39: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

8.84 6.12

30.88 37.00

Page 40: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

2.11 16.55 9.29

39.11 55.66 64.96

Page 41: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

5.91 3.14 12.8 2.45 2.88 6.9

70.87 86.81 89.2674.01 92.14 99.02

Page 42: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

0.98 TOTAL = 100.00 %

TOTAL = 100.00 %100.00

Page 43: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

PLANNED % ACCOMPLISHMENT

PER WEEK (%) 4.82 3.78

PLANNED CUMMULATIVE %

ACCOMPLISHMENT 4.82 8.6

7.66

22.0414.38

5.78

Page 44: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

8.84 6.12

30.88 37.00

Page 45: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

2.11 16.55 9.29

39.11 55.66 64.96

Page 46: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

5.91 3.14 12.8 2.45 2.88

70.87 86.81 89.2674.01 92.14

Page 47: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

6.88 0.98 TOTAL = 100.00 %

TOTAL = 100.00 %99.02 100.00

Page 48: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

ID Task Name Duration Predecessors

1 Mobilization 3 days2 Construction of Tempacil & Utilities Facilities 7 days 13 Demolition of Existing Structure 3 days 24 Clearing & Grabbing 2 days 35 Layout / Survey 2 days 36 Structure Excavation 3 days 47 Soil Poisoning & Granel Bedding 3 days 6,58 Fabrication and Installation of Footing Rebars and Fedestal 2 days 79 Installation of Grade Beam Rebars 3 days 710 Installation of Electrical Roughing-Ins For Gr. Flr 3 days 711 Installation of the Soil Pipes & WaterLine and Drainage Pipes 3 days 712 Concrete Pouring for Foting & Grade Beams 2 days 8,913 Installationof Pedestal and Column Formworks 2 days 1214 Slab On fill Gravel Bedding 1 day 10,1115 Concrete Pouring of Slab on Fill 1 day 1416 Concrete Pouring of Pedestal & Column 1 day 1317 Concrete Curing Time 7 days 16,1518 Removal of Formworks column 0.57 days 1719 Installation of Gr. Flr. CHB Wall 3 days 1520 Installation of Suspended Beam Formworks & scaffolding for 2nd flr 3 days 1921 Installation of Suspended slab Rebars 2nd flr 4 days 2022 Installation of C-Joist 2nd flr 4 days 2123 Concrete Pouring for Slab Topping 2nd flr 1 day 22,27,2824 Installation of 2nd Flr Column Rebars 3 days 1825 Installaton of Column forms and Scaffolding 2 days 24,23,4626 Concrete Pouring 1 day 2527 installation of Electrical wires, PVC pipes,Switches & Accessories for 2nd Flr 4 days 2028 Installation of Electrical Roughing-ins for2 nd Flr 3 days 2029 Curing Time 7 days 2630 Installation of CHB Wall 2nd Flr 3 days 2331 Removal of formworks 1 day 2932 Installation of ceiling in ground flr 5 days 3133 Installation of trusses baseplate & anchor bolts 3 days 3234 Fabrication of Trusses 10 days 2035 installation of trusses 6 days 33,34,38,39,41,42,5436 Installation of Roofings gutter &facia board 7 roof drains 4 days 3537 punch listing & substantial turn-over 2 days 36,5338 Plastering of walls 5 days 3039 Installation of Septic tanks & Catch basin 7 days 3040 painting of all walls & installation of all balcony 8 days 3541 Installation of doors & windows 3 days 3042 installation of Tiles 5 days 3043 installation of stair rebars & formworks 2ndflr 2 days 20,5144 Pouring of Concrete Stair 2 2ndflr 2 days 4345 Curing time 7 days 4446 Removal of Stair Formworks 1 day 4547 Installation of stairrebar @ gr flr 4 days 1448 installation of formworks stair 3 days 4749 Conrete pouring stair gr 1 day 4850 curing time 7 days 4951 Removal of conrete stair formworks 1 day 5052 installation of railing and watr proofing 3 days 4053 testing & commission of plumbing & electrical works 6 days 5254 installation of ceilings @ gr,2nd flr 7 days 3255 Cleaning turn over& demob 7 days 37

S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S MWeek 1 Week 2 Week 3 Week 4 Week 5 Week 6 Wee

Task

Critical Task

Progress

Milestone

Summary

Rolled Up Task

Rolled Up Critical Task

Rolled Up Milestone

Rolled Up Progress

Split

External Tasks

Project Summary

Group By Summary

Deadline

Page 1

Project: EPQ 3 storey Bldg.Date: Tue 6/30/15

Page 49: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17 Week 18 Week 19

Task

Critical Task

Progress

Milestone

Summary

Rolled Up Task

Rolled Up Critical Task

Rolled Up Milestone

Rolled Up Progress

Split

External Tasks

Project Summary

Group By Summary

Deadline

Page 2

Project: EPQ 3 storey Bldg.Date: Tue 6/30/15

Page 50: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

ID Task Name Duration Predecessors

1 Mobilization 3 days2 Construction of Tempacil & Utilities Facilities 7 days 13 Demolition of Existing Structure 3 days 24 Clearing & Grabbing 2 days 35 Layout / Survey 2 days 36 Structure Excavation 3 days 47 Soil Poisoning & Granel Bedding 3 days 6,58 Fabrication and Installation of Footing Rebars and Fedestal 2 days 79 Installation of Grade Beam Rebars 3 days 710 Installation of Electrical Roughing-Ins For Gr. Flr 3 days 711 Installation of the Soil Pipes & WaterLine and Drainage Pipes 3 days 712 Concrete Pouring for Foting & Grade Beams 2 days 8,913 Installationof Pedestal and Column Formworks 2 days 1214 Slab On fill Gravel Bedding 1 day 10,1115 Concrete Pouring of Slab on Fill 1 day 1416 Concrete Pouring of Pedestal & Column 1 day 1317 Concrete Curing Time 7 days 16,1518 Removal of Formworks column 0.57 days 1719 Installation of Gr. Flr. CHB Wall 3 days 1520 Installation of Suspended Beam Formworks & scaffolding for 2nd flr 3 days 1921 Installation of Suspended slab Rebars 2nd flr 4 days 2022 Installation of C-Joist 2nd flr 4 days 2123 Concrete Pouring for Slab Topping 2nd flr 1 day 22,27,2824 Installation of 2nd Flr Column Rebars 3 days 1825 Installaton of Column forms and Scaffolding 2 days 24,23,5226 Concrete Pouring 1 day 2527 installation of Electrical wires, PVC pipes,Switches & Accessories for 2nd Flr 4 days 2028 Installation of Electrical Roughing-ins for2 nd Flr 3 days 2029 Curing Time 7 days 2630 Installation of CHB Wall 2nd Flr 3 days 2331 Installation of Suspended Beam formworks & Scaffolding for 3rd flr 4 days 3032 Installation of suspended slab rebars 3rd flr 3 days 3133 installation of C- Joist 3rd flr 3 days 3234 installation of Electrical ires,PVC pipes, Switches& accessoriesfor 3rd flr 4 days 3135 Installation of Elecrical Rouughing-ins for 3rd flr 4 days 3136 Concrete pouring for slab topping 3rd flr 1 day 33,34,3537 Removal of formworks 1 day 2938 installation of CHB wall at 3rd flr 5 days 36,37,5639 Installation of trusses baseplate & anchor bolts 3 days 3840 Fabrication of Trusses 10 days 2041 installation of trusses 6 days 39,40,44,45,47,48,6442 Installation of Roofings gutter &facia board 7 roof drains 4 days 4143 punch listing & substantial turn-over 2 days 42,6344 Plastering of walls 5 days 3645 Installation of Septic tanks & Catch basin 7 days 3646 painting of all walls & installation of all balcony 8 days 4147 Installation of doors & windows 3 days 3648 installation of Tiles 5 days 3649 installation of stair rebars & formworks 2ndflr 2 days 20,6150 Pouring of Concrete Stair 2 2ndflr 2 days 4951 Curing time 7 days 5052 Removal of Stair Formworks 1 day 5153 installation 2nd flr rebars @ formworks 3 days 3154 pouring of concrete stair 3rd flr 1 day 5355 curing time 7 days 5456 Removal of formworks 1 day 5557 Installation of stairrebar @ gr flr 4 days 1458 installation of formworks stair 3 days 5759 Conrete pouring stair gr 1 day 5860 curing time 7 days 5961 Removal of conrete stair formworks 1 day 6062 installation of railing and watr proofing 3 days 4663 testing & commission of plumbing & electrical works 6 days 6264 installation of ceilings @ gr,2nd & 3rd flr 7 days 3865 Cleaning turn over& demob 7 days 43

S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W TWeek 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7

Task

Critical Task

Progress

Milestone

Summary

Rolled Up Task

Rolled Up Critical Task

Rolled Up Milestone

Rolled Up Progress

Split

External Tasks

Project Summary

Group By Summary

Deadline

Page 1

Project: EPQ 3 storey Bldg.Date: Tue 6/30/15

Page 51: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T WWeek 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17 Week 18 Week 19

Task

Critical Task

Progress

Milestone

Summary

Rolled Up Task

Rolled Up Critical Task

Rolled Up Milestone

Rolled Up Progress

Split

External Tasks

Project Summary

Group By Summary

Deadline

Page 2

Project: EPQ 3 storey Bldg.Date: Tue 6/30/15

Page 52: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

ID Task Name Duration Predecessors

1 Mobilization 3 days2 Construction of Tempacil & Utilities Facilities 7 days 13 Demolition of Existing Structure 3 days 24 Clearing & Grabbing 2 days 35 Layout / Survey 2 days 36 Structure Excavation 3 days 47 Soil Poisoning & Granel Bedding 3 days 6,58 Fabrication and Installation of Footing Rebars and Fedestal 2 days 79 Installation of Grade Beam Rebars 3 days 710 Installation of Electrical Roughing-Ins For Gr. Flr 3 days 711 Installation of the Soil Pipes & WaterLine and Drainage Pipes 3 days 712 Concrete Pouring for Foting & Grade Beams 2 days 8,913 Installationof Pedestal and Column Formworks 2 days 1214 Slab On fill Gravel Bedding 1 day 10,1115 Concrete Pouring of Slab on Fill 1 day 1416 Concrete Pouring of Pedestal & Column 1 day 1317 Concrete Curing Time 7 days 16,1518 Removal of Formworks column 0.57 days 1719 Installation of Gr. Flr. CHB Wall 3 days 1520 Installation of Suspended Beam Formworks & scaffolding for 2nd flr 3 days 1921 Installation of Suspended slab Rebars 2nd flr 4 days 2022 Installation of C-Joist 2nd flr 4 days 2123 Concrete Pouring for Slab Topping 2nd flr 1 day 22,27,2824 Installation of 2nd Flr Column Rebars 3 days 1825 Installaton of Column forms and Scaffolding 2 days 24,23,4626 Concrete Pouring 1 day 2527 installation of Electrical wires, PVC pipes,Switches & Accessories for 2nd Flr 4 days 2028 Installation of Electrical Roughing-ins for2 nd Flr 3 days 2029 Curing Time 7 days 2630 Installation of CHB Wall 2nd Flr 3 days 2331 Removal of formworks 1 day 2932 Installation of ceiling in ground flr 5 days 3133 Installation of trusses baseplate & anchor bolts 3 days 3234 Fabrication of Trusses 10 days 2035 installation of trusses 6 days 33,34,38,39,41,42,5436 Installation of Roofings gutter &facia board 7 roof drains 4 days 3537 punch listing & substantial turn-over 2 days 36,5338 Plastering of walls 5 days 3039 Installation of Septic tanks & Catch basin 7 days 3040 painting of all walls & installation of all balcony 8 days 3541 Installation of doors & windows 3 days 3042 installation of Tiles 5 days 3043 installation of stair rebars & formworks 2ndflr 2 days 20,5144 Pouring of Concrete Stair 2 2ndflr 2 days 4345 Curing time 7 days 4446 Removal of Stair Formworks 1 day 4547 Installation of stairrebar @ gr flr 4 days 1448 installation of formworks stair 3 days 4749 Conrete pouring stair gr 1 day 4850 curing time 7 days 4951 Removal of conrete stair formworks 1 day 5052 installation of railing and watr proofing 3 days 4053 testing & commission of plumbing & electrical works 6 days 5254 installation of ceilings @ gr,2nd flr 7 days 3255 Cleaning turn over& demob 7 days 37

S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S SWeek 1 Week 2 Week 3 Week 4 Week 5 Week 6 W

Task

Critical Task

Progress

Milestone

Summary

Rolled Up Task

Rolled Up Critical Task

Rolled Up Milestone

Rolled Up Progress

Split

External Tasks

Project Summary

Group By Summary

Deadline

Page 1

Project: EPQ 3 storey Bldg.Date: Tue 6/30/15

Page 53: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W Tek 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17 Week 18 Week 19

Task

Critical Task

Progress

Milestone

Summary

Rolled Up Task

Rolled Up Critical Task

Rolled Up Milestone

Rolled Up Progress

Split

External Tasks

Project Summary

Group By Summary

Deadline

Page 2

Project: EPQ 3 storey Bldg.Date: Tue 6/30/15

Page 54: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

ID Task Name Duration Predecessors

1 Mobilization 3 days2 Permits/ Survey/ Temfacil 8 days 13 Excavation 12 days 24 Soil Poisoning 1 day 35 Rebar Fabrication 65 days 36 Installation of Footing and Grade Beam Rebar 3 days 4,57 Installation of Ground Floor Column Rebar 5 days 68 Footing Concrete Footing 4 days 79 Installation of Grade Beam Rebar & CHB Vert. bar 3 days 6

10 Installation of Grade Beam Form Works 4 days 911 Installation of Ground FloorColumn Form works 5 days 812 Grade Beam Concrete Pouring 2 days 1013 Pipe Trenching for Pipes 3 days 314 Installation of Pipes and Fittings for Soil Pipes and waterline Ground Floor 5 days 1315 Ground Floor Column Concrete Pouring 1 day 1116 Curing Time 7 days 1217 CuringTime 7 days 1518 Installation of 2nd Flr Beam Rebar 9 days 1719 Installation of Ground Floor CHB Wall 3 days 1620 Removal of Gr Flr Concrete Formworks 1 day 1721 Installation of 2nd Floor Formworks 5 days 18,2022 Concrete Pouring 2nd Flr Beams 2 days 38,37,2123 Curing Time 5 days 2224 Elevator Footing Rebar Installation 5 days 1925 Elevator Footing Concrete Pouring 1 day 2426 Fabrication & Installation of Elevator Wall Rebar 3 days 2427 Curing Time 7 days 2528 Elavator Wall Formworks 2 days 26,2729 Elevator Wall Concrete Pouring 1 day 2830 Curing Time 7 days 2931 installation of 2nd Flr Column Rebar & Formworks & Scaffolding 6 days 2232 Installation of Slab C-joist 5 days 2233 Instllation of 2nd Flr CHB Wall 3 days 2234 Curing Time 7 days 32,5235 Removal of 2nd Floor Beam formworks and Scaffolding 1 day 2236 Installation of3rd FlrBeam Rebar 5 days 23,33,3537 Installation of Soil Pipes and wate Pipes & Storm Drainage at 2nd Flr 3 days 1838 Installation of Electrical Rough-ins at 2nd Flr 7 days 1839 Removal of 2nd Flr Concrete Form works 1 day 2340 Installation of 3rd Flr Formworks 5 days 36,39,3441 Installation of Soil pipes and water pipes & Storm Drainage at 3rd Flr 5 days 3642 Installation of Electrical Roughing-in 2nd Flr 6 days 3643 Concrte pouring 3rd Flr Beams 1 day 40,41,4244 Curing Time 7 days 4345 Installation of 3rd Flr Column Rebar & Form Works Scaffolding 7 days 4346 Installation of C-Joist 3 days 4347 Curing Time 7 days 46,5348 Installation of 3rd Flr CHB wall 5 days 3649 Installation of 4th Flr Beam Rebar 7 days 44,4850 removal of 3rd Flr Concrete Forms 2 days 4451 Concrete Pouring of 4th Flr Beams 1 day 49,5052 Concrete Poruing 2nd Flr Column 1 day 3153 Concrete Pouring 3rd Flr Column 2 days 4554 Installation of Soil Pipes, Water Line & Storm Drainage 4th Flr 6 days 5355 Installation of Electrical Roughing-Ins 3rd Floor 7 days 5356 Curing Time 7 days 51,5557 Installation of CHB Wall at 4th Flr 11 days 5658 Installation of C-Joist@ 4th Flr 3 days 51,5459 Installation of 4th Flr Column Rebar Form works & Scaffolding 8 days 51,4760 Concfrete Pouring 4th Flr Column 1 day 5961 Curing Time 7 days 58,60,6262 removal of 4th Flr Concrete Forms 1 day 5663 Installation of Soil Pipes, Water Pipes & Storm Drainage 5th Flr 10 days 5764 Installation of Electrical Roughing -Ins 5th Flr 10 days 5765 Installation of Rebar5th Flr Beams 8 days 6166 Installation of 5th Flr Formworks & Scaffolding 5 days 6567 Concrete Pouring of 5th Flr Beams 1 day 6668 Curing Time 7 days 67,70,8069 Removal of Beam & Column Formworks & Scaffolding 2 days 6770 Installation of C-Joist 5th Flr 5 days 67,63,6471 Installation of Water Proofing 6 days 68,6972 Installation of Plumbing Fixtures 5 days 1473 Installation of Tiles 2nd-5th Flr 20 days 7274 Plastering of all walls 6 days 14,75,76,7375 Installation of External Tubular Frame Aesthetic 6 days 1476 Installation of Exterior Canopy 6 days 1477 Construction of Catch basin 6 days 1478 painting of all external & internal walls 35 days 7479 installation of all doors and windows and Hardwares 10 days 78,71,8680 Installation of Elevated tank & Frames And Pipes Fittings 3 days 7481 Construction of Septic Tank 12 days 1482 Construction of Underground Reservoir & Fittings & Pumps 12 days 1483 Construction of Genset Foundation 10 days 1484 Punch Listing Substantial Turnover 3 days 79,8785 Turn Over & Demob 8 days 8486 Construction of slab on fill 2 days 81,83,82,7787 Installation of elevator machine 3 days 30

S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W TWeek 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17

Task

Critical Task

Progress

Milestone

Summary

Rolled Up Task

Rolled Up Critical Task

Rolled Up Milestone

Rolled Up Progress

Split

External Tasks

Project Summary

Group By Summary

Deadline

Page 1

Project: MOQ Work Schedule AFP CDDate: Tue 6/30/15

Page 55: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S SWeek 18 Week 19 Week 20 Week 21 Week 22 Week 23 Week 24 Week 25 Week 26 Week 27 Week 28 Week 29 Week 30 Week 31 Week 32 Week 33 Week 34 Week 35 Week 36 Week 37 Week 38 Week 39 Week 40

Task

Critical Task

Progress

Milestone

Summary

Rolled Up Task

Rolled Up Critical Task

Rolled Up Milestone

Rolled Up Progress

Split

External Tasks

Project Summary

Group By Summary

Deadline

Page 2

Project: MOQ Work Schedule AFP CDDate: Tue 6/30/15

Page 56: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

ID Task Name Duration Predecessors

1 Mobilization 3 days2 Permits/ Survey/ Tempacil 8 days 13 Excavation 8 days 24 Soil Poisoning 1 day 35 Rebar Fabrication 60 days 36 Installation of Footing and Grade Beam Rebar 3 days 4,57 Installation of Ground Floor Column Rebar 3 days 68 Footing Concrete Footing 2 days 79 Installation of Grade Beam Rebar & CHB Vert. bar 3 days 6

10 Installation of Grade Beam Form Works 2 days 911 Installation of Ground FloorColumn Form works 3 days 812 Grade Beam Concrete Pouring 2 days 1013 Pipe Trenching for Pipes 2 days 314 Installation of Pipes and Fittings for Soil Pipes and waterline Ground Floor 3 days 1315 Ground Floor Column Concrete Pouring 1 day 1116 Curing Time 7 days 1217 CuringTime 7 days 1518 Installation of 2nd Flr Beam Rebar 5 days 1719 Installation of Ground Floor CHB Wall 3 days 1620 Removal of Gr Flr Concrete Formworks 1 day 1721 Installation of 2nd Floor Formworks 3 days 18,2022 Concrete Pouring 2nd Flr Beams 2 days 38,37,2123 Curing Time 5 days 2224 Elevator Footing Rebar Installation 3 days 1925 Elevator Footing Concrete Pouring 1 day 2426 Fabrication & Installation of Elevator Wall Rebar 3 days 2427 Curing Time 7 days 2528 Elavator Wall Formworks 2 days 26,2729 Elevator Wall Concrete Pouring 1 day 2830 Curing Time 7 days 2931 installation of 2nd Flr Column Rebar & Formworks & Scaffolding 3 days 2232 Installation of Slab C-joist 0.57 days 2233 Instllation of 2nd Flr CHB Wall 3 days 2234 Curing Time 7 days 32,5235 Removal of 2nd Floor Beam formworks and Scaffolding 1 day 2236 Installation of3rd FlrBeam Rebar 5 days 23,33,3537 Installation of Soil Pipes and wate Pipes & Storm Drainage at 2nd Flr 3 days 1838 Installation of Electrical Rough-ins at 2nd Flr 5 days 1839 Removal of 2nd Flr Concrete Form works 1 day 2340 Installation of 3rd Flr Formworks 3 days 36,39,3441 Installation of Soil pipes and water pipes & Storm Drainage at 3rd Flr 5 days 3642 Installation of Electrical Roughing-in 2nd Flr 4 days 3643 Concrte pouring 3rd Flr Beams 1 day 40,41,4244 Curing Time 5 days 4345 Installation of 3rd Flr Column Rebar & Form Works Scaffolding 4 days 4346 Installation of C-Joist 3 days 4347 Curing Time 7 days 46,5348 Installation of 3rd Flr CHB wall 3 days 3649 Installation of 4th Flr Beam Rebar 5 days 44,4850 removal of 3rd Flr Concrete Forms 2 days 4451 Concrete Pouring of 4th Flr Beams 1 day 49,5052 Concrete Poruing 2nd Flr Column 1 day 3153 Concrete Pouring 3rd Flr Column 2 days 4554 Installation of Soil Pipes, Water Line & Storm Drainage 4th Flr 4 days 5355 Installation of Electrical Roughing-Ins 3rd Floor 7 days 5356 Curing Time 5 days 51,5557 Installation of CHB Wall at 4th Flr 8 days 5658 Installation of C-Joist@ 4th Flr 3 days 51,5459 Installation of 4th Flr Column Rebar Form works & Scaffolding 5 days 51,4760 Concfrete Pouring 4th Flr Column 1 day 5961 Curing Time 7 days 58,60,6262 removal of 4th Flr Concrete Forms 1 day 5663 Installation of Soil Pipes, Water Pipes & Storm Drainage 5th Flr 8 days 5764 Installation of Electrical Roughing -Ins 5th Flr 8 days 5765 Installation of Rebar5th Flr Beams 5 days 6166 Installation of 5th Flr Formworks & Scaffolding 5 days 6567 Concrete Pouring of 5th Flr Beams 1 day 6668 Curing Time 7 days 67,70,8069 Removal of Beam & Column Formworks & Scaffolding 2 days 6770 Installation of C-Joist 5th Flr 3 days 67,63,6471 Installation of Water Proofing 4 days 68,6972 Installation of Plumbing Fixtures 3 days 1473 Installation of Tiles 2nd-5th Flr 20 days 7274 Plastering of all walls 3 days 14,75,76,7375 Installation of External Tubular Frame Aesthetic 6 days 1476 Installation of Exterior Canopy 6 days 1477 Construction of Catch basin 6 days 1478 painting of all external & internal walls 15 days 7479 installation of all doors and windows and Hardwares 8 days 78,71,8680 Installation of Elevated tank & Frames And Pipes Fittings 3 days 7481 Construction of Septic Tank 12 days 1482 Construction of Underground Reservoir & Fittings & Pumps 12 days 1483 Construction of Genset Foundation 10 days 1484 Punch Listing Substantial Turnover 3 days 79,8785 Turn Over & Demob 8 days 8486 Construction of slab on fill 2 days 81,83,82,7787 Installation of elevator machine 3 days 30

S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T FWeek 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14

Task

Critical Task

Progress

Milestone

Summary

Rolled Up Task

Rolled Up Critical Task

Rolled Up Milestone

Rolled Up Progress

Split

External Tasks

Project Summary

Group By Summary

Deadline

Page 1

Project: MOQ Work Schedule AFP CDDate: Tue 6/30/15

Page 57: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S MWeek 15 Week 16 Week 17 Week 18 Week 19 Week 20 Week 21 Week 22 Week 23 Week 24 Week 25 Week 26 Week 27 Week 28 Week 29 Week 30 Week 31 Week 32 Week 33 Wee

Task

Critical Task

Progress

Milestone

Summary

Rolled Up Task

Rolled Up Critical Task

Rolled Up Milestone

Rolled Up Progress

Split

External Tasks

Project Summary

Group By Summary

Deadline

Page 2

Project: MOQ Work Schedule AFP CDDate: Tue 6/30/15

Page 58: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

ID Task Name Duration Predecessors

1 Mobilization 2 days

2 Demolition Works 9 days 1

3 Clearing and Grabbing 5 days 2

4 Hauling of unsuitable materials 3 days 2

5 Site Grading Cut and Fill 7 days 3,4

6 Road Tracing/ Survey Works 4 days 5

7 Pipe Trenching Storm Drainage 20 days 6

8 Pipe Trenching Sanitary Sewer Line 14 days 6

9 Pipe Trenching Water Line 17 days 6

10 Installation of Drainage Pipes and manholes & Beddings 34.29 days 7

11 Installation of Water Pipelines Gate valves, Pipe Fittings Thrust Blocks & Beddings 29 days 9

12 Installation of Fire Hydrants, Air release Valve and Blow off Vlave 7 days 13

13 Installation of Water Service Connection 8 days 11

14 Installation of Drainage Service Connection 5 days 10

15 Installation of Sanitary Sewer Service Connection 7 days 16

16 Installation of Sanitary Sewer Pipes and manholes & Beddings/ Force Main 15 days 8

17 BackFilling & Compaction Drainage Line 4 days 14,32

18 BackFilling & Compaction Water Line 6 days 12

19 backfilling & Compaction Sewer Line 3 days 15

20 Installation of Outfall Drainage Line 5 days 21

21 Installation of Outfall Drainage Structure 6 days 17

22 Preparation of Sub-base Course 5 days 6

23 Preparation of base Course 5 days 22

24 Preparation of Road Concrete Carriage way 20 days 25

25 installation of Kerb & Gutter & Kerb Inlet 17 days 23

26 Preparation of Base Course Sidewalk 7 days 27

27 Preparation of Sub-base Course Sidewalk 7 days 22

28 Installation of Sidewalk Concrete 12 days 26

29 Construction of Sanitary Sewage Treatment Plant (STP) 26 days 31

30 Construction of Lift Station 12 days 19,33

31 Installation of Lift Pumps & COntroller 3 days 30

32 Leak Testing of Drainage Pipes 1 day 14

33 Leak Testing of Sewer Pipes 1 day 15

34 hauling of excess Materials 5 days 20

35 Demob 1 day 37

36 Punch listing & Substantial turnover 3 days 34,29,18,24,28

37 Final Turn over 2 days 36

M T T F S S M T T F S S M T T F S S M T T F S S M T T F S S M TWeek 1 Week 2 Week 3 Week 4 Week 5 W

Task

Critical Task

Progress

Milestone

Summary

Rolled Up Task

Rolled Up Critical Task

Rolled Up Milestone

Rolled Up Progress

Split

External Tasks

Project Summary

Group By Summary

Deadline

Page 1

Project: Site Development Phase 1Date: Tue 6/30/15

Page 59: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

T F S S M T T F S S M T T F S S M T T F S S M T T F S S M T T F S S M T T F S S M T T F S S M T T F S S M T T F S S M T T F S S M T T F S S M T T F S S M T T F S S M Tek 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17 Week 18 Week 19 W

Task

Critical Task

Progress

Milestone

Summary

Rolled Up Task

Rolled Up Critical Task

Rolled Up Milestone

Rolled Up Progress

Split

External Tasks

Project Summary

Group By Summary

Deadline

Page 2

Project: Site Development Phase 1Date: Tue 6/30/15

Page 60: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

ID Task Name Duration Predecessors

1 Mobilization 3 days2 Construction of Tempacil & Utilities Facilities 7 days 13 Demolition of Existing Structure 3 days 24 Clearing & Grabbing 2 days 35 Layout / Survey 2 days 36 Structure Excavation 3 days 47 Soil Poisoning & Granel Bedding 3 days 6,58 Fabrication and Installation of Footing Rebars and Fedestal 2 days 79 Installation of Grade Beam Rebars 3 days 710 Installation of Electrical Roughing-Ins For Gr. Flr 3 days 711 Installation of the Soil Pipes & WaterLine and Drainage Pipes 3 days 712 Concrete Pouring for Foting & Grade Beams 2 days 8,913 Installationof Pedestal and Column Formworks 2 days 1214 Slab On fill Gravel Bedding 1 day 10,1115 Concrete Pouring of Slab on Fill 1 day 1416 Concrete Pouring of Pedestal & Column 1 day 1317 Concrete Curing Time 7 days 16,1518 Removal of Formworks column 0.57 days 1719 Installation of Gr. Flr. CHB Wall 3 days 1520 Installation of Suspended Beam Formworks & scaffolding for 2nd flr 3 days 1921 Installation of Suspended slab Rebars 2nd flr 4 days 2022 Installation of C-Joist 2nd flr 4 days 2123 Concrete Pouring for Slab Topping 2nd flr 1 day 22,27,2824 Installation of 2nd Flr Column Rebars 3 days 1825 Installaton of Column forms and Scaffolding 2 days 24,23,4626 Concrete Pouring 1 day 2527 installation of Electrical wires, PVC pipes,Switches & Accessories for 2nd Flr 4 days 2028 Installation of Electrical Roughing-ins for2 nd Flr 3 days 2029 Curing Time 7 days 2630 Installation of CHB Wall 2nd Flr 3 days 2331 Removal of formworks 1 day 2932 Installation of ceiling in ground flr 5 days 3133 Installation of trusses baseplate & anchor bolts 3 days 3234 Fabrication of Trusses 10 days 2035 installation of trusses 6 days 33,34,38,39,41,42,5436 Installation of Roofings gutter &facia board 7 roof drains 4 days 3537 punch listing & substantial turn-over 2 days 36,5338 Plastering of walls 5 days 3039 Installation of Septic tanks & Catch basin 7 days 3040 painting of all walls & installation of all balcony 8 days 3541 Installation of doors & windows 3 days 3042 installation of Tiles 5 days 3043 installation of stair rebars & formworks 2ndflr 2 days 20,5144 Pouring of Concrete Stair 2 2ndflr 2 days 4345 Curing time 7 days 4446 Removal of Stair Formworks 1 day 4547 Installation of stairrebar @ gr flr 4 days 1448 installation of formworks stair 3 days 4749 Conrete pouring stair gr 1 day 4850 curing time 7 days 4951 Removal of conrete stair formworks 1 day 5052 installation of railing and watr proofing 3 days 4053 testing & commission of plumbing & electrical works 6 days 5254 installation of ceilings @ gr,2nd flr 7 days 3255 Cleaning turn over& demob 7 days 37

S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F SWeek 1 Week 2 Week 3 Week 4 Week 5 Week 6

Task

Critical Task

Progress

Milestone

Summary

Rolled Up Task

Rolled Up Critical Task

Rolled Up Milestone

Rolled Up Progress

Split

External Tasks

Project Summary

Group By Summary

Deadline

Page 1

Project: EPQ 3 storey Bldg.Date: Tue 6/30/15

Page 61: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T WWeek 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17 Week 18 Week 19

Task

Critical Task

Progress

Milestone

Summary

Rolled Up Task

Rolled Up Critical Task

Rolled Up Milestone

Rolled Up Progress

Split

External Tasks

Project Summary

Group By Summary

Deadline

Page 2

Project: EPQ 3 storey Bldg.Date: Tue 6/30/15

Page 62: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

ID Task Name Duration Predecessors

1 Mobilization 3 days2 Construction of Tempacil & Utilities Facilities 7 days 13 Demolition of Existing Structure 3 days 24 Clearing & Grabbing 2 days 35 Layout / Survey 2 days 36 Structure Excavation 3 days 47 Soil Poisoning & Granel Bedding 3 days 6,58 Fabrication and Installation of Footing Rebars and Fedestal 2 days 79 Installation of Grade Beam Rebars 3 days 710 Installation of Electrical Roughing-Ins For Gr. Flr 3 days 711 Installation of the Soil Pipes & WaterLine and Drainage Pipes 3 days 712 Concrete Pouring for Foting & Grade Beams 2 days 8,913 Installationof Pedestal and Column Formworks 2 days 1214 Slab On fill Gravel Bedding 1 day 10,1115 Concrete Pouring of Slab on Fill 1 day 1416 Concrete Pouring of Pedestal & Column 1 day 1317 Concrete Curing Time 7 days 16,1518 Removal of Formworks column 0.57 days 1719 Installation of Gr. Flr. CHB Wall 3 days 1520 Installation of Suspended Beam Formworks & scaffolding for 2nd flr 3 days 1921 Installation of Suspended slab Rebars 2nd flr 4 days 2022 Installation of C-Joist 2nd flr 4 days 2123 Concrete Pouring for Slab Topping 2nd flr 1 day 22,27,2824 Installation of 2nd Flr Column Rebars 3 days 1825 Installaton of Column forms and Scaffolding 2 days 24,23,4626 Concrete Pouring 1 day 2527 installation of Electrical wires, PVC pipes,Switches & Accessories for 2nd Flr 4 days 2028 Installation of Electrical Roughing-ins for2 nd Flr 3 days 2029 Curing Time 7 days 2630 Installation of CHB Wall 2nd Flr 3 days 2331 Removal of formworks 1 day 2932 Installation of ceiling in ground flr 5 days 3133 Installation of trusses baseplate & anchor bolts 3 days 3234 Fabrication of Trusses 10 days 2035 installation of trusses 6 days 33,34,38,39,41,42,5436 Installation of Roofings gutter &facia board 7 roof drains 4 days 3537 punch listing & substantial turn-over 2 days 36,5338 Plastering of walls 5 days 3039 Installation of Septic tanks & Catch basin 7 days 3040 painting of all walls & installation of all balcony 8 days 3541 Installation of doors & windows 3 days 3042 installation of Tiles 5 days 3043 installation of stair rebars & formworks 2ndflr 2 days 20,5144 Pouring of Concrete Stair 2 2ndflr 2 days 4345 Curing time 7 days 4446 Removal of Stair Formworks 1 day 4547 Installation of stairrebar @ gr flr 4 days 1448 installation of formworks stair 3 days 4749 Conrete pouring stair gr 1 day 4850 curing time 7 days 4951 Removal of conrete stair formworks 1 day 5052 installation of railing and watr proofing 3 days 4053 testing & commission of plumbing & electrical works 6 days 5254 installation of ceilings @ gr,2nd flr 7 days 3255 Cleaning turn over& demob 7 days 37

S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S SWeek 1 Week 2 Week 3 Week 4 Week 5 Week 6 W

Task

Critical Task

Progress

Milestone

Summary

Rolled Up Task

Rolled Up Critical Task

Rolled Up Milestone

Rolled Up Progress

Split

External Tasks

Project Summary

Group By Summary

Deadline

Page 1

Project: EPQ 3 storey Bldg.Date: Tue 6/30/15

Page 63: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground

M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T Wek 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17 Week 18 Week 19

Task

Critical Task

Progress

Milestone

Summary

Rolled Up Task

Rolled Up Critical Task

Rolled Up Milestone

Rolled Up Progress

Split

External Tasks

Project Summary

Group By Summary

Deadline

Page 2

Project: EPQ 3 storey Bldg.Date: Tue 6/30/15

Page 64: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground
Page 65: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground
Page 66: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground
Page 67: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground
Page 68: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground
Page 69: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground
Page 70: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground
Page 71: Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 … · 151 Installation of CHB Wall 2nd Flr 5.25 days 152 Removal of formworks 1.75 days 153 Installation of ceiling in ground