78
WECC Data Preparation Manual for Steady-State and Dynamic Base Case Data In terconnection-wide Cases System Review Work Group Technical Studies Subcommittee October 7, 2014 W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual BCCS WECC TECH ... · Web viewTransformer data can be entered on either the transformer base (transformer winding MVA base and winding voltage base) or

  • Upload
    dinhdat

  • View
    220

  • Download
    1

Embed Size (px)

Citation preview

WECC Data Preparation Manualfor Steady-State and Dynamic Base Case

Data Interconnection-wide Cases

System Review Work GroupTechnical Studies Subcommittee

October 7, 2014

155 North 400 West, Suite 200

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

Document Title 2

Salt Lake City, Utah 84103-1114

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 3

Table of Contents

I. Introduction...............................................................................................................................1

II. NERC Reliability Standards.........................................................................................................1

III. Definitions..................................................................................................................................2

IV. General Data Requirements and Reporting Procedures..............................................................3

Data Requirements...........................................................................................................................3

Reporting Procedures.......................................................................................................................4

Steady-State Data.......................................................................................................................5

Dynamic Data..............................................................................................................................5

V. Steady-State Data Requirements................................................................................................6

AC and DC Buses (MOD-011, R1.1)...................................................................................................8

Generation (MOD-011, R1.2)..........................................................................................................10

AC Transmission Lines (MOD-011, R1.3, R1.6)................................................................................15

Transformers (MOD-011, R1.5)...................................................................................................... 17

Fixed Shunt Reactive Elements (MOD-011, R1.6)...........................................................................23

Controlled Shunt Reactive Devices (MOD-011, R1.6).....................................................................24

Loads (MOD-011, R1.1)...................................................................................................................26

DC Transmission Lines (MOD-011, R1.4).........................................................................................28

Area Interchange Schedules (MOD-011, R1.7)...............................................................................29

Master Tie-Line File........................................................................................................................ 29

VI. Dynamic Data Requirements....................................................................................................31

Generation Requirements.............................................................................................................. 32

Load Characteristics........................................................................................................................32

Underfrequency Load Shedding (UFLS)..........................................................................................33

Undervoltage Load Shedding (UVLS)..............................................................................................33

Back-to-Back DC Ties...................................................................................................................... 34

DC Lines, SVC, and D-VAR systems.................................................................................................34

VII. Short Circuit Data.....................................................................................................................34

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 4

VIII. Contingency and Remedial Action Scheme Data.......................................................................34

Appendix 1 – Late Data Procedure....................................................................................................36

Area Coordinator and Staff Responsibilities...................................................................................36

Actions to Take............................................................................................................................... 37

Backfitting of Late Data...................................................................................................................37

Appendix 2 – Area, Zone and Bus Number Assignments....................................................................39

Southwest Region...........................................................................................................................39

Southern California Region.............................................................................................................40

Northern California Region.............................................................................................................41

Northwest Region...........................................................................................................................42

Canadian Region.............................................................................................................................43

Central Region................................................................................................................................ 43

Eastern Region................................................................................................................................44

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 1

I. Introduction

The WECC Data Preparation Manual (DPM) is intended to provide data requirements and reporting procedures necessary to support creation of interconnection-wide cases. Interconnection-wide cases are used The North American Electric Reliability Corporation (NERC) is the federally designated Electric Reliability Organization (ERO) in North America and maintains comprehensive reliability standards that define requirements for planning and operating the collective Bulk Electric System. The collective Bulk Electric System must be designed and operated in a coordinated effort in accordance with the NERC Reliability Standards and the Western Electric Coordinating Council (WECC) Regional Reliability Standards and Criteria. To help meet these requirements, power system electrical characteristics are used in steady-state and dynamic stability studies for system evaluation and operations support by the various members of the WECC community. SWECC and its members use steady-state and dynamic data sets are utilized by WECC and its members for seasonal Operating Transfer Capability (OTC) studies, WECC’s annual study program, WECC path rating studies, and regional- and local-area studies.

Planning Coordinators are responsible for making available models for their planning area reflecting the data provided to them to WECC. Following the data requirement and reporting procedures, by Planning Coordinators, outlined in the DPM will ensure the creation of interconnection-wide cases to meet the needs as coordinated through SRWG. Planning CoordinatorsThis WECC Data Preparation Manual (DPM) is to be used by WECC members and any other entities owning/operating facilities in the Western Interconnection. It covers the submittal and use of both steady-state and dynamic data. The data requirements are stated in NERC Reliability Standards and WECC Regional Reliability Standards and Criteria.

The System Review Work Group (SRWG), which reports to the Technical Studies Subcommittee (TSS), is responsible for maintaining the DPM with oversight from the TSS and Planning Coordination Committee (PCC). Transmission Owners, Planning Coordinators, Transmission Planners, Generator Owners, and Resource Planners (i.e., applicable entities) are responsible for submitting steady-state and dynamic data as required by NERC Reliability Standards and WECC Regional Reliability Standards and Criteria and in accordance with WECC scheduling requirements and this DPM. Applicable entities may delegate their data submission activities to a Ddata rRepresentative; however, the Planning Coordinators applicable entities remain responsible for complying with any NERC standards. WECC staff is responsible for collecting, archiving, and making available solved interconnection-wide casessolved and solvable steady-state and dynamic datasets in the form of WECC base cases for use by WECC members and others.

Navigating the electronic version of the DPM:

Internal document hyperlinks: Throughout this DPM, there are many references to internal supporting documentsinformation. These internal hyperlinks are configured such that wherevewhenr you see a

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 2

reference that begins with “See” or “Refer to” followed by text enclosed by with double quotes, simply mouse over that text and you will be given the option of following the link to the supporting section of this document.

II. NERC Reliability Standards

The following NERC Reliability Standards pertain directly to the steady-state and dynamic data requirements and reporting procedures for use by WECC, Transmission Owners, Planning Coordinators, Transmission Planners, Generator Owners, and Resource Planners. It is required that these NERC Reliability Standards and WECC Steady-State and Dynamic Data Criterion be followed when submitting data for the purpose of compiling WECC base cases.

The DPM is intended to help in the implementation of and support for the following NERC Reliability Standards and WECC Steady-State Criterion:

MOD-032: Data for Power System Modeling and AnalysisMOD-010: Steady-State Data for Modeling and Simulation of the Interconnected Transmission System;

MOD-011: Steady-State Data Requirements and Reporting Procedures;

MOD-012: Dynamic Data for Modeling and Simulation of the Interconnected Transmission System;

MOD-013: Maintenance and Distribution of Dynamic Data Requirements and Reporting Procedures;

FAC-008-3: Establish and Communicate Facility Ratings; and

WECC Steady-State and Dynamic Data Criterion.

III. Definitions

Area: An Area is a subset of the Western Interconnection sSystem Mmodel composed of generators and connected contiguous elements to assist in the coordinated development of a WECC interconnection-wide caseBase Case. The data for the defined Areas with coordinated Area schedules is submitted to WECC by the Area Coordinators. The defined Areas are listed in “Appendix 2 – Area, Zone and Bus Number Assignments.”

Area Coordinator: The Area Coordinator is an entity to whom the aApplicable Eentities have delegated data collection and coordination activity for a defined Area.

Balancing Coordinator: Balancing Coordinator is an entity whom submits interchange schedules between Areas in coordination with adjacent Balancing Coordinators.

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 3

BCCS: Base Case Coordination System is a web-accessible, centralized database that automates base case building in PSLF and PSS®E formats. It also provides a central location for maintaining base case information. Refer to the BCCS Data Submitter's Guide for a detailed guide to using the BCCS.

Data Representative: An entity delegated by responsible functional entities to aid in the data submission activities of Planning Coordinators. An example of a data representative may be a sub-regional transmission planning entity comprising of multiple Planning Coordinators. This term is included for convenience in reference onlyAn entity delegated the data submission activities of Generator Owner(s), Transmission Owner(s), Transmission Planner(s) and/or Resource Planner(s) to submit steady-state and dynamic data according to the WECC DPM to Area Coordinators or Sub-Area Coordinators. An example of a Data Representative may be the Transmission Planning entity of the Transmission Planning Area in which a Generator Owner’s and/or Transmission Owner’s facilities are located. This term is included for convenience in reference only. An oOwner may submit data with or without a Data Representative.

Generation Netting: The representation of a generator(s) through the modeling a lLoad element with the real and reactive power requirements set to the net of generation and load. Alternatively, Generation Netting may be the representation of a generator(s) using a Lload element with a negative Real Power demand setting. Further, Generation Netting may be used only in Dynamic simulations by including the Generator element in the Netting section of the Positive Sequence Load Flow (PSLF) ‘dyd’ file for a given WECC Base Case.

Interconnection-wide Case(s): Models representing the entire Western Interconnection which may include WECC Base Cases or models in data formats specific to the need for which they are developed, i.e. short circuit analysis.

Master Dynamics File (MDF): File in PSLF ‘dyd’ format containing dDynamic data for use in the compilation of all WECC Base Cases.

Master Tie-Line File: File in PSLF ‘epc’ format containing Steady-State data used to model elements of the existing Western Interconnection which represent the tie lines between Areas and other modeling data which pertains to multiple Areas.

Planned Facilities: Planned facilities that have not yet met their in-service date at the time data is submitted for inclusion in a base case. See the “General Data Requirements and Reporting Procedures” section.

PSLF: GE’s Positive Sequence Load Flow software tool for electrical transmission analysis.

PSS®E: Siemens PTI’s Power System Simulator for Engineering software tool for electrical transmission analysis.

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 4

Sub-Area Coordinator: A Sub-Area Coordinator is an entity that represents a subset of the data collection and coordination activity within an Area. The sub area data is submitted to an Area Coordinator.

WECC Base Cases: A set of solved and solvable steady-state and dynamic data representing a specific operating scenario of the Western Interconnection compiled by WECC staff in cooperation with WECC members.

WECC staff: Employees of WECC who participate in the coordination of steady-state and dynamic data for use in creating WECC interconnection-wide casesBase Cases.

IV. General Data Requirements and Reporting Procedures

The data requirements and reporting procedures included in the Data Preparation manual are intended to provide an outline to Planning Coordinators to support their compliance with MOD-032-1, R1 and R4. The data requirements and reporting procedures jointly developed by each Planning Coordinator can address and incorporate desires, concerns, and issues of the entities within its Planning Coordinator Area and therefore are not included in the Data Preparation Manual. Data types requested in the Data Preparation Manual are not inclusive of all the data types required in MOD-032 R1.1.

Data Requirements

Data format and content requirements required to be provided by Planning Coordinators for the development of Interconnection-wide cases is broken into three data types: steady state, dynamics, and short circuit. Sections Error: Reference source not found, Error: Reference source not found, and Error: Reference source not found address each data type respectively. An additional data requirements section is provided to address the modeling of contingencies and remedial action schemes.

In consideration of including Power system modeling data requirements are stated generally in the NERC Reliability Standards and WECC Regional Reliability Standards and Criteria.

Accuracy of the data utilized in the steady-state and dynamic data sets is imperative as it must support informed decisions regarding power system expansion and operation. System response and parameters measured in simulating system operation must be comparable to measurements of the actual power system under the same conditions. Study results either overly optimistic or too pessimistic could lead to uninformed decisions regarding the design or operation of the power system and potentially adversely affect reliable operation.

Data representation should be in sufficient detail to adequately evaluate all system conditions of load, generation and interchange as well as steady-state and dynamic conditions of the power system. As a

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 5

guide, the level of detail should be at least that used by the member systems in conducting their own internal studies for the purpose of supporting their own system expansion and operating decisions.

Planned Facilities in submitted data, the following guidelines should be followedshall be included in submitted data if:

Tthe facilities are expected be in-service on the scheduled base case posting date;

t The facilities are expected to be in-service in the month and year represented in the case; or

t The facilities are required to support proposed generation facilities which that are modeled in-service in the case.

Data requirements not included in MOD-032-1, Attachment 1 are identified within the Data Preparation Manual by use of “#” prior to the requirements description.

All data must be the best available data. Dynamic data resulting from equipment testing should be provided if it is available. If test data is not available then design data should be provided. If design data is not available then generic Dynamic data should be provided. In-service equipment should be supported by test data while far-term planned equipment may only have generic Dynamic data available.

Reporting Procedures

The schedule and process for Planning Coordinators to submit data to WECC is outlined in the following documents:

Annual Study Program Scope of Work – describes schedule, intent, and process for creation of WECC base cases

Base Case Coordination System Data Submitter’s Guide – provides detailed instructions on the cre-ation and use of necessary files for submitting data to WECC

Planning Coordinators, through their jointly developed data requirements and reporting procedures, may determine whether the functional entities within their Planning Coordinator Area should utilize the Base Case Coordination System (BCCS) but is not required. The development of Interconnection-wide cases only requires Planning Coordinators to be included in the process. Including additional functional entities is determined by each Planning Coordinator.

The required data is requested to be supplied periodically throughout the calendar year on a schedule that supports all the various study activities: seasonal OTC studies, WECC's annual study program, path rating studies and regional and local area studies. Each Ffall, WECC issues a 10-Year Base Case Data Compilation Schedule (DCS) showing schedules for each case that are is to be submitted during the year. Separate data request letters are then issued throughout the year in a scheduled sequence that supports the DCS. The data request letters provide a detailed description of each case to be submitted.

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 6

All those who contribute to the data submittal effort (Area Coordinators, Transmission Owners, Transmission Planners, and Generator Owners and& Resource Planners) are required to submit the requested data in accordance with the stated schedule. A Late Data Procedure (see “Appendix 1 – Late Data Procedure”) is used when necessary to help preserve the original schedules stated in the DCS. It also allows tracking of late data and keeping TSS and PCC informed when the schedule is about to be compromised.

Data owners are responsible for validating and verifying the accuracy of their data maintained in the BCCS and contained in the Master Dynamics File (MDF) for any of their solely- or jointly-owned facilities prior to data submittal. With exemption to dynamics data, data Data owners and planners are responsible to for submitting the required data to WECC via the BCCS system. Area Coordinators who are then responsible to for reviewing the submittedinitial solved power flow base case along with any new/updated Dynamic data for errors. Email to WECC to request password access toin accordance with the BCCS and to send updates to dynamics data required schedule.

Data submittals Area Coordinators may select and specify formats for submittals to them, which may include accepted power flow formats, various spreadsheets, and other content.

Initial data submittals by Area Coordinators to WECC may only be done in BCCS projectPSS®E raw data format (raw) or in PSLF raw data file (prjepc) format or history file (sav) format in the version that is currently approved stated by WECC for production use. Submitted filesData submittals must be made via [email protected] also follow. WECC staff shall assure that the file structures defined inthree element ratings in PSS®E seasonal data are placed in proper fields of PSLF data, as directed by the BCCS Data Submitter's Guide. submitting entity. WECC shall assure that ratings in posted PSS®E cases are consistent with the specified season.

WECC will compile the data received into a solved and solvable case that initializes correctly with the latest Dynamic data updates included in the Master Dynamics File. (MDF). The base case along with the updated Dynamic data file and all associated materials (case details associated with each Area) are posted on the WECC wWeb site for review and comment. WECC will send aAn e-mail is sent out to WECC its members to announceing the posting and requesting a second review.

WECC will again incorporate the submitted changes from the second reviewCase comments back to WECC are preferred in either PSLF ‘epc’ or ‘epcl’ format, but will be accepted as a short list of changes in a text file format. WECC will incorporate the requested comments into the case and post the approved case along with the approved updated Dynamic data file and associated materials to the WECC wWeb site. AWECC will send an e-mail is sent out to WECC members to announcinge the posting of the approved case.

Flexibility in due dates can be granted by WECC staff due to BCCS technical difficulties. Contact WECC via the email prior to due dates if technical difficulties occur so alternate submittal methods can be arranged.

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 7

Steady-State Data

Power system electrical characteristics in the form of Steady-State positive-sequence data are required in accordance with NERC Standards MOD-010 and MOD-011 and are to be submitted in accordance with established requirements (see “”) herein and the WECC Steady-State and Dynamic Data Criterion.

Dynamic Data

Power system electrical characteristics in the form of Dynamic data are required in accordance with NERC Standards MOD-012 and MOD-013 and are to be submitted in accordance with established requirements (see “”) herein and the WECC Steady-State and Dynamic Data Criterion.

Dynamic data is submitted as soon as any new data becomes available. Dynamic data may become available outside the scheduled case building process as a result of individual entity equipment testing programs such as the generator testing program. Dynamic data for equipment such as generators, motors, frequency or voltage load shedding models, load representation models, etc., should be submitted to WECC as soon as the new data is available.

Dynamic data for the entire WECC iWestern Interconnection is kept in the MDF. It is critical that this file be maintained and updated as soon as new or updated Dynamic data is available. Every base-case-data request letter includes an additional request for updated Dynamic data. This includes Dynamic data for generators and associated power plant models, motors, uUnderfrequency lLoad sShedding (UFLS) and Uundervoltage lLoad sShedding (UVLS) models, load representation models, DC lines, Static Var Compensators (SVCs), and any other Dynamic equipment modeled in the WECC Base Case.

Facility owners are responsible to test and validate Dynamic data for any of their solely- or jointly-owned Dynamic equipment to be modeled in WECC cases. Facility owners shall provide test reports, validation reports, and Dynamic model data to their Transmission Planners. It is advisable for Facility Owners to request acknowledgement of receipt of the data for compliance documentation purposes.

Dynamic data for new generators and updates for existing generators are submitted via the WECC Generating Unit Model Validation Policy. The WECC Generating Unit Model Validation Policy includes the roles and responsibilities of the Generator Owner, the Transmission Planner, and WECC.

The most recent version of the MDF is available in the current year of the Base Case Files, in the PSLF library located here: Master Dynamics File.

Note: The MDF is in PSLF format. Dynamic data for PSS®E is created using conversion software developed by Siemens PTI.

[V.] Steady-State Data Requirements

To establish consistent system models to be used in the system analysis of the reliability of the interconnected transmission system,; Planning CoordinatorsTransmission Owners, Transmission

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 8

Planners, Generator Owners, and Resource Planners shall provide steady-state data to WECC according to the requirements listed herein. To provide consistency in data submittals and help avoid potential solution problems, the guidelines below shall be followed to the maximum extent possible. However, WECC recognizes deviations from the guidelines may occasionally be needed. For these situations, submitters are requested to provide the SRWG and MVWG with the rationale for exceptions. The Interconnection-wide requirements shall include the following steady-state data requirements:

With the exception of collector-based generation such as wind and solar all Bulk Electric System elements, as presently defined by NERC, within the Western Interconnection shall be represented in WECC Base Cases without equivalencing.

Non-Bulk Electric System elements may also be included in WECC Base Cases and must follow the same data submittal requirements as those for Bulk Electric System elements. Any equivalencing of non-Bulk Electric System elements shall be modeled to yield almost identical performance of a full representation in both static and dynamic analysis.

Non-Bulk Electric System elements shall be included if it has been determined that they have significant interaction with Bulk Electric System elements. Non-Bulk Electric System elements that may have a significant interaction with Bulk Electric System elements may exhibit one or more of the following characteristics:

o Facilities that are operated at or above 50 kV

o Facilities which that are operated in parallel with BES elements

o Facilities with connected individual generation resources >=10 MVA or aggregate generation resources >=20MVA

o Facilities with connected reactive resources >=10 MVAR

Non-Bulk Electric Local Networks and radial systems that feed only load or parallel/looped systems that are normally operated in a radial configuration would generally be excluded from modeling.

Steady-state power flow data submitted as described in the data request letter shall represent the existing Bulk Electric System elements plus planned transmission and generation facilities as deemed appropriate by the Planning Coordinatordata submitting entity.

Paths defined in the WECC Path Rating Catalog shall be modeled to include all elements consistent with the path definition.

All data submittals shall conform to and meet the data requirements of the latest WECC approved version of the BCCS.PSLF. Some data fields can be populated with data that is optional and not required by this DPM. The use of optional fields, if used, shall follow the field format documented in the PSLF manual. Optional fields are not listed in this DPM.

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 9

Data fields that are strings shall not contain commas, single quotes, or double quotes.

Key element identifiers (e.g., number, name, base voltage, ID) that identify indicate an element representing the same equipment shall be consistent between base cases.

o Devices with alpha characters shall consistently use either uppercase or lowercase IDs.

o Bus names with alpha characters shall consistently be either uppercase or lowercase.

Uniqueness shall not depend on names and ID’s being case sensitive.

The required data is listed below in the tables of data requirements. Data fields listed in this DPM are all required and any description for the field shall be followed.

Bus naming guideline: Although the criterion for bus names is that ‘Bus names shall be unique within the same Base Voltage class,’ it is intended that, ideally, bus names should be the same for all equipment located in the same vicinity. For example, two substations which that are in different areas could both be named “Midway.” Names could be set to “MIDWAY” at one location, and to “MDWAY” at the other. The SRWG stronglyIt is suggestsed that naming of new buses added to the model adhere to the ideal guideline if possible. It is also recommendsed, but it is not mandatory, to that spaces are eliminated spaces in bus names, and substitute underscore characters be substituted for spacesinstead. It is the responsibility of the party adding bus information to assure there is no name duplication.

AC and DC Buses (MOD-011, R1.1032, Attachment 1)

General Requirements:

1. Buses usually represent all of the equipment in a substation that is at the same voltage level and is connected together. If desired, multiple bus sections can be represented by separate buses connected by AC Transmission Line models that can be opened or closed as needed. Buses may also represent a node on a transmission line such as a tapping point or change in ownership.

2. Location of the bus will be identified by the combination of Area, Zone, and/or Owner fields. Optionally, the latitude and longitude fields can be submitted using decimal degrees with data entered not to exceed five decimal places.

Table 1: Data Requirements (Buses)

Field Description Requirements

#Number Bus number B1. Refer to “Appendix 2 – Area, Zone and Bus Number Assignments” for designated ranges of Bus numbers.

B2. WECC staff shall provide DC Bus numbers.

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

jramey, 01/22/15,
This sounds like it contradicts the two sub-bullet points on the previous bullet.

WECC Data Preparation Manual 10

Field Description Requirements

#Name Bus name Alphanumeric string

containing 1 to 12 characters

At least one non-numeric character

B3. Bus names shall be unique within the same Base Voltage class.

Base Voltage

Nominal voltage class of Bus (kV)

#Bus Type AC Bus type {0,1,2,-2} 0 = swing bus (voltage

magnitude and phase fixed) 1 = load bus (unconstrained

voltage angle and magnitude) 2 = generator bus (voltage

control [terminal or remote] within generator limits)

2 = generator bus with unlimited reactive power limits

Other bus types may be used to indicate OFF status.Bus type -4 and smaller is the accepted convention for deleted buses.

DC Bus type {1,2} 1 = for a rectifier 2 = for an inverter

DC System Number

DC system number (not required for AC Bus)

B4. WECC staff shall assign a DC system number for each DC system prior to model submission.

Scheduled Voltage

Scheduled voltage (pu) 5 decimals Default: 1.00000

B5. If the Bus is regulated by a generator or other device, the scheduled voltage shall be specified in per unit with respect to the Base Voltage of the Bus.

B6. If the Bus is not regulated, the scheduled voltage is optional and for information purposes only.

Area Bus Area in which Bus is located B7. Refer to “Appendix 2 – Area, Zone and Bus Number Assignments” for designated Area.

Zone Bus Zone in which Bus is located B8. Refer to “Appendix 2 – Area, Zone and Bus Number Assignments” for designated ranges of Zones used by Area.

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 11

Field Description Requirements

Owner Owner Number [B9.] Owner Nnumber shall be the Transmission Owner, Generator Owner, or reporting entity, by written agreement.

B9.[B10.] WECC staff shall assign Owner Number to required entities.

#Planning Coordinator

Planning Coordinator Area in which Bus is located

B10. Refer to “Appendix 2 – Area, Zone and Bus Number Assignments” for designated Planning Coordinator Areas.

Generation (MOD-032, Attachment 1011, R1.2)

General requirementsGeneral Requirements:

[1.] Modeling of generators in WECC Base Cases shall comply with WR9 of the WECC Steady-State and Dynamic Data Criterion.the following:

a. If the individual generator unit capacity is 10 MVA or larger, and is connected to the WECC transmission system at 60 kV or higher, then steady-state data and dynamics data shall be submitted for each generator.

b. If the aggregated generator unit capacity is 20 MVA or larger, and is connected to the WECC transmission system at 60 kV or higher, and is not a collector–based generation facility, then steady-state data and dynamics data shall be submitted for each generator. (Wind and solar farms are an example of a collector-based generation facility.)

c. If the aggregated generation capacity is 20 MVA or larger, and is connected to the WECC transmission system at 60 kV or higher, and is a collector–based generation facility, then steady-state data and dynamics data shall be submitted for the aggregated generation capacity as a single-unit generator model. (Wind and solar farms are an example of a collector-based generation facility.)

d. All other generating facilities shall either be netted with bus load and steady-state data shall be submitted accordingly.

2. [2.] Steady-state and dynamic generator data shall be consistent per WR10 of the WECC Steady-State

and Dynamic Data Criterion.

[3.] Synchronous motors 10 MVA and larger shall be modeled as individual machines, using a generator model with negative Rreal pPower output and constant Q.

[4.] The netting of small generating units whose with single capacity is greater than or equal to 10 MVA or aggregate capacity is greater than or equal to 20 MVA may not be modeled as a negative load. Generators modeled as negative load shall have an assigned load ID of ‘NT’ and have its their ‘non-conforming load FLAG’ set appropriately.

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

jramey, 01/22/15,
There are several different terms used with “Q.” Can you give a quick footnote as to what “Q” means?

WECC Data Preparation Manual 12

3.[5.] Induction motors shall be modeled as a load with the intent of using an induction motor model (MOTORW).

4.[6.] Synchronous condensers shall be modeled individually using a generator model.

[7.] Generator step-up transformers shall be modeled explicitly; therefore, they shall not be modeled using the internal generator step-up transformer feature of a generator model. All related parameters shall be set to the default values. See “Data Requirements (Transformers)Data Requirements (Transformers).”.

[8.] Station service loads (ID = ‘SS’) shall be represented explicitly as separate loads on the generator bus. See “Data Requirements (Loads)Data Requirements (Loads).”

5.[9.] Wind and photovoltaic projects shall be represented through an equivalent generator(s), equivalent low-voltage to intermediate-voltage transformer, equivalent collector system, and substation transformer between the collector system and the transmission bus. See the WECC Wind Power Plant Power Flow Modeling Guide and PV Plant Power Flow Modeling Guide.

[10.] Large industrial sites may include imbedded generation. Industrial generators 10 MVA and larger shall be represented in power flow instead of netting with the total load. If a generator is connected to the low side of the bulk- power- delivery transformer, then the transformer must be represented in the power flow, and the generator and load must be connected to the low-voltage side of the transformer.

[11.] Generator maximum Real Power Pmax in power flow must be consistent with the turbine capabilities defined in the Master Dynamics File.

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

jramey, 01/22/15,
These links go to different versions of the same document that was written in 2010. The first link appears to be misdirected and the second link goes to a document in serious need of updating.

WECC Data Preparation Manual 13

Table 2: Data Requirements (Generation)

Field Description Requirements Measure

#Bus Numbers

Number of the Bus to which the generator is attached.

See “Data Requirements (Buses)Data Requirements (Buses)”

#Unit ID Two -character Generator identifier

Status Generator status

1 = in-service

0 = out-of-service

G1. Out-of-service units shall have status set to zero.

G2. Retired units shall be deleted rather than having status set to zero.

Pgen Real Power output (gross MW) G3. Pgen shall be at or within the unit Pmax and Pmin parameters for units that are in-service.

If Status = 1: Pmin ≤ Pgen ≤ Pmax

Qgen Reactive power output (MVAr)

Pmax Maximum Real Power output (MW)

G4. Pmax shall reflect the maximum Real Power output of the unit, also known as ‘gross’ capability.

G5. Pmax shall not be greater than the maximum capability of the unit represented by the governor model.

Pmax ≤ Governor Max

Pmin Minimum Real Power output (MW)

G6. Pmin shall reflect the minimum Real Power output of the unit.

G7. Pmin shall be less than or equal to Pmax.

Pmin ≤ Pmax

Qmax Maximum reactive power output (MVAr)

G8. Qmax shall reflect the appropriate maximum reactive power output of the unit.

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 14

Field Description Requirements Measure

Qmin Minimum reactive power output (MVAr)

G9. Qmin shall reflect the appropriate minimum reactive power output of the unit.

G10. Qmin shall be less than or equal to Qmax.

Qmin ≤ Qmax

#Q Alloc Factor

Reactive power regulating assignment factor

0.0 – 1.0

> 0.0 for AVR control

0.0 for constant PF control or gen ST=0

#Q Table Flag

Reactive capability curve flag

0 = do not use capability curve

1 = use capability curve if it exists

G11. Q-Table data used for internal studies shall be included in WECC Base Case submittals.

#Base load Flag

Base load flag

0 = non-base load unit (responds to low frequency with additional mechanical power)

1 = base load unit (cannot respond to low frequency with additional mechanical power)

2 = base load unit (cannot respond to low and high frequency with mechanical power)

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 15

Field Description Requirements Measure

Turbine Type

0 = unknown 1 = non-reheat steam 2 = reheat steam 3 = steam cross-compound 4 = steam in combined cycle

(separate shaft) 5 = hydro 6 = diesel non turbo

charged 7 = diesel turbo charged 11 = industrial GT (single

shaft) 12 = aero derivative GT 13 = single shaft combined

cycle 14 = Synchronous

condenser (no turbine) 21 = type 1 wind turbine 22 = type 2 wind turbine 23 = type 3 wind turbine 24 = type 4 wind turbine 31 = photovoltaic 40 = DC tie (generators

representing DC ties)

Reg Bus Bus whose with voltage is controlled by this Generator

G12. Regulation of a remote Bus that does not represent actual system operation shall be avoided.

Vsched Generator scheduled voltage (pu)

#Area Generator Area in which generator is located

G13. Refer to “Appendix 2 – Area, Zone and Bus Number Assignments” for designated Area.

#Zone Generator Zone in which generator is located

G14. Refer to “Appendix 2 – Area, Zone and Bus Number Assignments” for designated ranges of Zones used by Area

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 16

Field Description Requirements Measure

Base MVA Generator base (MVA) G15. Unit Base MVA shall be equal to the MVA Base parameter of the unit’s Dynamic machine model.

Base MVA = Machine Base

#Owner Owner Number

Up to 8 owners allowed

G16. Owner Number shall be the Generator Owner.

G17. WECC staff shall assign Owner Number to required entities.

#Planning Coordinator

Planning Coordinator Area in which Generator is located

G18. Refer to “Appendix 2 – Area, Zone and Bus Number Assignments” for designated Planning Coordinator Areas.

G tap Tap ratio of generator step up transformer

G19.[G18.] G tap shall be set to 1. G tap = 1

R TR Resistance of generator step up transformer

G20.[G19.] R TR shall be set to 0. R TR = 0

XTR Reactance of generator step up transformer

G21.[G20.] X TR shall be set to 0. X TR = 0

R Sub- transient

Sub- transient resistance of generator

X Sub -transient

Sub- transient reactance of generator

[G21.] X Sub- transient shall be equal to the sub- transient reactance represented in the unit Dynamic machine model.

X Sub -transient = Xdpp (or Ldpp)

AC Transmission Lines (MOD-032, Attachment 1011, R1.3, R1.6)

General requirementsGeneral Requirements:

[1.] Series- connected reactive devices modeled in AC Transmission Lines shall be explicitly modeled.

[2.] AC Transmission Line models connecting two areas, as defined by WECC, shall be maintained in the “Master Tie-Line File.” (See “Appendix 2 – Area, Zone and Bus Number Assignments” for designated areas).

[3.] When bus ties are necessary, the impedance should be R = 0.0 pu and X = 0.00029 pu, or less. No value of charging (G or B) is allowed on lines having less than the jumper threshold impedance. Do

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 17

not make a closed loop (ring-bus representation) with ties that are less than the threshold impedance. In addition, do not use bus ties to connect different areas.

[4.] Normal and emergency thermal rating fields for summer, winter, spring, and fall shall be submitted and stored in the BCCS in rating profiles. Refer to the BCCS Data Submitter's Guide for formatting and structure requirements for these files. the seasonal scenario described in the base case data request letter shall be populated for all AC Transmission Line models.

[5.] Line connected transformers shall not be modeled using the internal line connected transformer feature of a transmission line model; all related parameters shall be set to the default values. See “Data Requirements (Transformers)Data Requirements (Transformers).”

1.[6.] Data for AC lines will consider the length of the line when calculating line parameters. For example, long lines will be modeled with impedances adjusted to account for the uniform distribution of the series impedance and shunt admittance along the length of the line.

[7.] PSS®E base case data includes three facility ratings for transmission lines. Ratings 1 and 2 are used for seasonal normal and emergency ratings in the season of the case. Rating 3 is used for various other purposes. If directed by an aArea cCoordinator, WECC staff will load move ratings 1 and 2 into the appropriate seasonal ratings into ratings 1 and 2 when creating PSS®E cases incolumns for the BCCSPSLF base case being developed.

Table 3: Data Requirements (AC Transmission)

Field Description Requirements Measure

#FROM Bus Number

Number of the bus to which the FROM end of the transmission line section is attached.

See “Data Requirements (Buses)Data Requirements (Buses)”

#TO Bus Number

Number of the bus to which the TO end of the transmission line section is attached.

See “Data Requirements (Buses)Data Requirements (Buses)”

#Circuit ID Circuit identifier

Two-character circuit identifier

X1. AC Transmission Line modeling equivalent circuits shall have Circuit ID set to ‘99’ or ‘EQ.’

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 18

Field Description Requirements Measure

#Section Number

Section number (1-9 in ascending order beginning at FROM end)

X2. AC Transmission Line with multiple sections shall number the sections consecutively starting with ‘1.’

Status Branch status

0 = out-of-service

1 = in-service

2 = bypass

X3. AC Transmission Line shall have the anticipated status of the line in the case.

R Branch section positive sequence resistance

[X4.] Resistance used for modeling an AC Transmission Line shall conform to the modeling practices as deemed appropriate by the tTransmission Oowner.

X Branch section positive sequence reactance

[X5.] Reactance used for modeling an AC Transmission Line shall conform to the modeling practices as deemed appropriate by the Ttransmission Oowner.

B Branch section positive sequence susceptance

[X6.] Susceptance used for modeling an AC Transmission Line shall conform to the modeling practices as deemed appropriate by the Ttransmission oOwner.

Rating MVA 1

Summer Normal Branch Rating (MVA)

X4.[X7.] Line rating required Rating MVA 1 > 0

Rating MVA 2

Summer Emergency Branch Rating (MVA)

X5.[X8.] Line rating required Rating MVA 2 > 0

Rating MVA 3

Winter Normal Branch Rating (MVA)

Rating MVA 4

Winter Emergency Branch Rating (MVA)

Rating MVA 5

Fall Normal Branch Rating (MVA)

Rating MVA 6

Fall Emergency Branch Rating (MVA)

Rating MVA 7

Spring Normal Branch Rating (MVA)

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 19

Field Description Requirements Measure

Rating MVA 8

Spring Emergency Branch Rating (MVA)

#From

Loss Assign.

Loss factor (0.0 - 1.0) used to assign losses

1.0 = 100% loss assigned to FROM end of AC Transmission Line

0.0 = 100% loss assigned to “TO” end of AC Transmission Line

#Area AC Transmission Line Aarea location X6.[X9.] Refer to “Appendix 2 – Area, Zone and Bus Number Assignments” for designated Area

#Zone Transmission Line Zzone location X7.[X10.] Refer to “Appendix 2 – Area, Zone and Bus Number Assignments” for designated ranges of Zones used by Area

#Ohms Ohmic data flag

0 = impedances in pu

1 = impedances in ohms

#Owner Owner Number (1 through 8) [X11.] Owner Nnumber shall be the Transmission Owner of transmission facility and Generator Owner of generation facility.

X8.[X12.] WECC staff shall assign Owner Number to required entities.

Transformers (MOD-032, Attachment 1011, R1.5)

General Requirements

1. Transformers with no Tap Changing Under Load (TCUL) or phase-shifting capability shall have the Tap Control Type field set to ‘1’ and shall not have TCUL or phase-shifting data included in the model. Conversion from the latest approved version of PSLF to other widely used programs may create model discrepancies with partial TCUL or phase-shifting data.

[2.] Transformer data may can be entered on either the transformer base (transformer winding MVA base and winding voltage base) or the system model base (100 MVA and system nominal voltage base). Impedance values and tap position values shall use a consistent unit base value for a given transformer.

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 20

[3.] Transformer models connecting two Areas, as defined by WECC, shall be represented in the “Master Tie-Line File” as well as in case data. (Ssee “Appendix 2 – Area, Zone and Bus Number Assignments” for designated Areas).

[4.] Normal and Emergency thermal rating fields for summer, winter, spring, and fall shall be submitted and stored in the BCCS in rating profiles the seasonal scenario described in the base case data request letter shall be populated for all Transformer models. See Appendix 3 for formatting and structure requirements for these files.

[5.] The Transformer Impedance Correction Table shall be maintained in the “Master Tie-Line File.”

[6.] PSS®E cases use ratings 1 and 2 for seasonal normal and emergency ratings in the season of the case. If directed by the Area Coordinator, WECC staff will load move ratings 1 and 2 into the appropriate seasonal ratings into ratings 1 and 2 when creating PSS®E cases in columns for the BCCSPSLF Base Case being developed.

Table 4: Data Requirements (Transformers)

Field Description Requirements Measure

#FROM Bus Number

Number of the bus to which the FROM end of the transformer is attached.

See “Data Requirements (Buses)Data Requirements (Buses)”

#TO Bus Number

Number of the bus to which the “TO” end of the transformer is attached.

See “Data Requirements (Buses)Data Requirements (Buses)”

#Circuit ID Circuit identifier

Two-character circuit identifier

T1. Transformer modeling equivalent circuits shall have Circuit ID set to ‘99’ or ‘EQ.’

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 21

Field Description Requirements Measure

Status Transformer Status

0 = out-of-service

1 = in-service

2 = secondary open

3 = tertiary open

4 = primary open

T2. Transformers shall have the anticipated status of the transformer in the case.

Tap Control Type

Transformer type code

1 or 11 = Fixed

2 or 12 = TCUL

4 or 14 = Phase-Shifting

Regulated Bus Number

Number of Bus whose with voltage is regulated or “TO” bus number for phase-regulated transformer

T3. Regulation of a remote bus that does not represent actual system operation shall be avoided.

#Impedance Table Number

Impedance correction table number

#Tert Bus Number

Tertiary winding Bus number

See “Data Requirements (Buses)Data Requirements (Buses)”

#3wpt Bus Number

Internal ‘3-winding point’ Bus number

See “Data Requirements (Buses)”

#Area Transformer Area in which Transformer is located

T4. Refer to “Appendix 2 – Area, Zone and Bus Number Assignments” for designated Area.

#Zone Transformer Zone in which Transformer is located

T5. Refer to “Appendix 2 – Area, Zone and Bus Number Assignments” for designated ranges of Zones used by Area.

#FROM-TO Base MVA

Transformer MVA base (prim. to sec. for 3-wndg)

#FROM-Tert Base MVA

MVA base - prim. to tertiary for 3-wndg

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

jramey, 01/22/15,
This should be “for a phase-regulated transformer” or “for phase-regulated transformers.”

WECC Data Preparation Manual 22

Field Description Requirements Measure

#TO-Tert Base MVA

MVA base - tertiary. to sec. for 3-wndg

R FROM-TO Resistance primary to secondary

X FROM-TO Reactance primary to secondary

R FROM-Tert Resistance primary to tertiary

X FROM-Tert Reactance primary to tertiary

R TO-Tert Resistance secondary to tertiary

X TO-Tert Reactance secondary to tertiary

FROM Winding Nom Volt

Primary winding nominal voltage (kV)

TO Winding Nom Volt

Secondary winding nominal voltage (kV)

Tert Winding Nom Volt

Tertiary winding nominal voltage (kV)

FROM Fixed Tap

Primary winding fixed tap position (pu)

TO Fixed Tap Secondary winding fixed tap position (pu)

Tert Fixed Tap

Tertiary winding fixed tap position (pu)

Variable V Tap or Variable Angle

TCUL tap position (primary winding) or phase angle position

T6. Variable V Tap or Variable Angle shall be at or within Max VAr Tap and Min VAr Tap for Transformers that are in-service.

Min VAr Tap ≤ V Tap ≤ Max VAr Tap

Step Size TCUL (pu) or phase-shift (angle in deg) step

T7. Step Size shall reflect the capability of the transformer.

FROM Angle Primary winding phase angle (deg)

TO Angle Secondary winding phase angle (deg)

Tertiary Angle

Tertiary winding phase angle (deg)

G-Core Loss Magnetizing conductance (pu)

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 23

Field Description Requirements Measure

B Magnetizing

Magnetizing susceptance (pu)

Rating 1 Summer Normal Branch Rating (MVA) (primary winding for

3-winding xfmr)

T8. Transformer rating required. Rating MVA 1 > 0

Rating 2 Summer Emergency Branch Rating (MVA) (primary winding for

3-winding xfmr)

T9. Transformer rating required. Rating MVA 2 > 0

Rating 3 Winter Normal Branch Rating (MVA) (primary winding for

3-winding xfmr)

Rating 4 Winter Emergency Branch Rating (MVA) (primary winding for

3-winding xfmr)

Rating 5 Fall Normal Branch Rating (MVA) (primary winding for 3-winding xfmr)

Rating 6 Fall Emergency Branch Rating (MVA) (primary winding for

3-winding xfmr)

Rating 7 Spring Normal Branch Rating (MVA) (primary winding for 3-winding xfmr)

Rating 8 Spring Emergency Branch Rating (MVA) (primary winding for

3-winding xfmr)

TO Winding Rating MVA 1

Ratings – secondary winding for

3-winding xfmr

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 24

Field Description Requirements Measure

TO Winding Rating MVA 2

Ratings – secondary winding for

3-winding xfmr

TO Winding Rating MVA 3

Ratings – secondary winding for

3-winding xfmr

Tert Wind. Rating MVA 1

Ratings – tertiary winding for

3-winding xfmr

Tert Wind. Rating MVA 2

Ratings – tertiary winding for

3-winding xfmr

Tert Wind. Rating MVA 3

Ratings – tertiary winding for

3-winding xfmr

#FROM Loss Assign

Loss assignment factor (primary winding for 3-winding xfmr) (pu)

#TO Loss Assign

Loss assignment factor - secondary winding for 3-winding xfmr (pu)

#Tert Loss Assign

Loss assignment factor – tertiary winding for 3-winding xfmr (pu)

Max Var. Tap Maximum TCUL ratio (pu or deg) T10. Max Var. Tap shall be greater than Min Var. Tap.

Min Var. Tap Minimum TCUL ratio (pu or deg)

Max Cont V or MW

Maximum voltage (power) at controlled bus (pu or MW)

T11. Max Cont V shall be greater than Min Cont V.

Min Cont V or MW

Minimum voltage (power) at controlled bus (pu or MW)

#Ohms Ohmic data flag

0 = impedances in pu

1 = impedances in ohms

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 25

Field Description Requirements Measure

#Owner Owner Number (1 through 8) [T12.] Owner Nnumber shall be the Transmission Owner for transmission facility and Generator Owner for generator facility.

T12.[T13.] WECC staff shall assign Owner Number to required entities.

Fixed Shunt Reactive Elements (MOD-011, R1.6032, Attachment 1)

General Requirements

1. Represent fixed shunt elements that are directly connected to a bus as bus shunts.

2. Represent fixed shunt elements that directly connect to and switch with a transmission line as line shunts.

[3.] Fixed Line Shunt models connected to an AC Transmission Line model connecting two Areas, as defined by WECC, shall be represented in the “Master Tie-Line File” as well as in case data.

[4.] Fixed shunt reactive devices inside wind and solar projects must be modeled explicitly in power flow.

Table 5: Data Requirements (Fixed Shunts)

Field Description Requirement

#FROM Bus Number

Number of the Bus to which the FROM end of the transmission line on which the shunt is connected for line shunts or number of the Bus at which shunt is connected for bus shunts.

See “Data Requirements (Buses)Data Requirements (Buses)”

#TO Bus Number Number of the Bus to which the TO end of the transmission line on which the shunt is connected for line shunts or 0 for bus shunts.

See “Data Requirements (Buses)Data Requirements (Buses)”

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 26

Field Description Requirement

#Shunt ID Shunt identifier

Two-character shunt identifier

F1. Line shunt connected to the FROM end of the transmission line shall have Shunt ID starting with ‘F.’

F2. Line shunt connected to the TO end of the transmission line shall have Shunt ID starting with ‘T.’

#Circuit ID AC Transmission Line circuit identifier for line shunts or blank for bus shunts

Two-character circuit identifier

#Section Number Number of AC Transmission Line section to which shunt is connected if line shunt or ‘0’ if bus shunt

Shunt Status Shunt status

0 = out-of-service

1 = in-service

F3. Fixed shunts shall have the anticipated status of the shunt in the case.

#Area Fixed Shunt Area in which fixed shunt is located F4. Refer to “Appendix 2 – Area, Zone and Bus Number Assignments” for designated Area.

#Zone Fixed Shunt Zone in which fixed shunt is located F5. Refer to “Appendix 2 – Area, Zone and Bus Number Assignments” for designated ranges of Zones used by Area.

G Actual shunt conductance (pu)

B Actual shunt susceptance (pu)

#Owner Owner Number (1 – 4) [F6.] Owner Nnumber shall be the Transmission Owner or Generator Owner.

F6.[F7.] WECC staff shall assign Owner Number to required entities.

Controlled Shunt Reactive Devices (MOD-032, Attachment 1011, R1.6)

General Requirements

1. Controlled shunt reactive device models should be used to represent the following devices explicitly in power flow:

Mechanically switched shunt capacitors and reactors;

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 27

Static VAR Compensators;

STATCOMs; and/or

Thyristor- switched shunt capacitors and reactors.

2. Controlled shunt reactive devices inside wind and solar projects must be modeled explicitly in power flow.

Table 6: Data Requirements (Controlled Shunts)

Field Description Requirement

#Bus Number Number of Bus at which device is connected See “Data Requirements (Buses)Data

Requirements (Buses)”

#SVD ID SVD identifier Two-character identifier

SVD Status SVD status 0 = out-of-service 1 = in-service

S1. Controlled shunts shall have the anticipated status of the shunt in the case.

SVD Control Type Device type 0 = Fixed 1 = Discrete 2 = Continuous 3 = All or Nothing 4 = Discrete control using Voltage Dead Band 5=WECC SVC 6=WECC STATCOM 7=WECC TSC/TSR

Regulated Bus Number of Bus regulated by this shunt See “Data Requirements (Buses)Data

Requirements (Buses)”

S2. Regulation of a remote Bus that does not represent actual system operation shall be avoided.

#Area Controlled Shunt Area in which Controlled Shunt is located

[S3.] Refer to “Appendix 2 – Area, Zone and Bus Number Assignments”Appendix 2 for designated Area.

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

jramey, 01/22/15,
Linked to the TSS home page instead of documents.

WECC Data Preparation Manual 28

Field Description Requirement

#Zone Controlled Shunt Zone in which Controlled Shunt is located

[S4.] Refer to “Appendix 2 – Area, Zone and Bus Number Assignments”Appendix 2 for designated ranges of Zones used by Area.

G Actual Actual shunt conductance (pu)

B Actual Actual shunt susceptance (pu)

B Min Minimum susceptance of continuous element (pu)

B Max Maximum susceptance of continuous element (pu)

Voltage Dead Band

Voltage control bandwidth divided by two (pu) (types 3 & and 4)

S3.[S5.] Voltage Dead Band shall prevent regulated voltage from exceeding the Voltage Dead Band with a single Controlled Shunt step.

S4.[S6.] The minimum dead band shall be 0.02.

B Step Susceptance of each switched element in nth stage (pu) (types 1-4, 7)

S5.[S7.] Step size shall reflect the capability of the controlled shunt.

No. of Steps Number of equal admittance steps in nth switched stage (types 1-4, 7)

S6.[S8.] Number of steps shall reflect the capability of the controlled shunt.

B Min Minimum total susceptance for device (pu)

B Max Maximum total susceptance for device (pu)Maximum current for type 6 (pu)

XC Compensating (slope) reactance (pu) (types 5, 6, 7)

B Min SH Minimum B for switching shunts (pu) (types 5, 6, 7)

B Max SH Maximum B for switching shunts (pu) (types 5, 6, 7)

STSB Slow reset control on/off status (pu) (types 5, 6, 7)

B Min SB Minimum B for slow reset (pu) (pu) (types 5, 7)

B Max SB Maximum B for slow reset (pu) (pu) (types 5, 7)

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 29

Field Description Requirement

VRFMIN Minimum Voltage reference for slow reset (pu) (types 5, 6, 7)Minimum Voltage reference for types 3 &and 4 if Voltage Dead Band <= 0

VRFMAX Maximum Voltage reference for slow reset (pu) (types 5, 6, 7)Maximum Voltage reference for types 3 and &4 if Voltage Dead Band <= 0

dVdB System dV/dB for slow reset (pu) (types 5, 6, and 7)

Ni Number of steps in shunt

#Owner Owner Number (1 through 4) [S9.] Owner Nnumber shall be the Transmission Owner or Generator Owner.

S7.[S10.] WECC staff shall assign Owner Number to required entities.

Loads (MOD-011, R1.1032, Attachment 1)

General Requirements

1. Real and reactive power for each load shall be provided.

[2.] Motors 10 MVA or larger shall be modeled as machines. (Ssee “General Requirements:).”

[3.] Station service at modeled generation facilities with station service load greater than or equal to 1 MW shall be modeled explicitly. As noted in the table below, load which modeling generator station service shall have Load ID set to ‘SS.’

2.[4.] A Long ID shall be provided for each load in accordance with the WECC MVWG Load Long ID Instructions (LID_Instructions), either within the case data provided, or in a separate spreadsheet file. See Dynamic section 6B Load Characteristics. There is a separate Long ID for Station Service or generator Auxiliary loads.

3.[5.] Industrial loads and embedded generation shall be modeled on the low side of the transformer, as shown in the figure below.

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

jramey, 01/22/15,
Not in this document. Need link.
jramey, 01/22/15,
Which one? There are 11 of these references.

WECC Data Preparation Manual 30

10 MW

115-kV

WRONG! Industrial load is netted with embedded generation

100 MW

115-kV

WRONG! Industrial load and embedded generation are connected to high voltage bus

G 90 MW

100 MW

115-kV

RIGHT! Industrial load and embedded generation are connected to low voltage bus

G 90 MW

13.8-kV

Table 7: Data Requirements (Loads)

Field Description Requirement

Bus

Number

Number of Bus at which load is connected

See “Data Requirements (Buses)Data Requirements (Buses)”

Load ID Two-character identifier L1. Load modeling generator station service shall have Load ID set to ‘SS.’

L2. Loads at the same Bus shall have unique Load ID.

Load Status 0 = load out-of-service

1 = load in-service

L3. Load shall have the anticipated status of the load in the case.

Non-Conforming Flag

0 = load will change with scaling

1 = load does not change with scaling

L4. Non-conforming Flag shall be set to ‘1’ for loads which should not be changed in load scaling operations of power flow software.

Area Load Area in which located L5. Refer to “Appendix 2 – Area, Zone and Bus Number Assignments” for designated Area.

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 31

Field Description Requirement

Zone Load Zone in which located L6. Refer to “Appendix 2 – Area, Zone and Bus Number Assignments” for designated ranges of Zones used by Area.

Planning Coordinator

Planning Coordinator Area in which Load is located

L7. Refer to “Appendix 2 – Area, Zone and Bus Number Assignments” for designated Planning Coordinator Areas.

Const MVA P Constant MVA Real Power load

Const MVA Q Constant MVA reactive power load

Const CUR P Constant current Real Power load L8.[L7.] Const CUR P shall not be used.

Const CUR Q Constant current reactive power load L9.[L8.] Const CUR Q shall not be used.

Const Y P Constant admittance Real Power load L10.[L9.] Const Y P shall not be used.

Const Y Q Constant admittance reactive power load L11.[L10.] Const Y Q shall not be used.

#Owner Owner Number [L11.] Owner Nnumber shall be the Transmission Owner, Generator Owner, or Distribution Service Provider.

L12. WECC staff shall assign Owner Number to required entities.

#Long ID Climate zone and substation type identification L13. Seven-character identifiers of the climate zone and load type – the first three characters represent the climate zone, underscore, and three characters representing the substation/feeder type. Details are included in the LID_Instructions and Composite Load Model Implementation documents.

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 32

DC Transmission Lines (MOD-011, R1.4032, Attachment 1)

General Requirements

1. Include (at a minimum) the following DC Transmission Line (overhead and underground) requirements: line parameters, Normal and Emergency Ratings, control parameters, rectifier data, and inverter data.

[2.] MW Megawatt set-point of converter data shall be equal to or less than the DC Transmission Line Rating.

Table 8: Data Requirements (DC Transmission)

Field Description Requirement Measure

ifrom DC ‘FROM’ bus number

ito DC ‘TO’ bus number

ck[2] DC line identifier

projid Project Identifier

st DC line status

dcsys DC system number

area Area number

zone Zone number

r DC line resistance ohms

l DC line inductance henries

c DC line capacitance microfarad

rate[8] DC current ratings amps

aloss DC line loss assignment factor per unit

nown[8] Owner Nnumber

Area Interchange Schedules (MOD-011, R1.7)

General Requirements

1. Area Interchange schedules shall be coordinated between Areas to meet the objectives of the data request letter.

2. The sum of net Area Interchange Schedules shall be equal to zero.

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 33

3. WECC staff shall set the Real Power Net Interchange Tolerance equal to 1.0 MW for each Area.

Master Tie-Line File

The Master Tie-Line File (MTLF) contains:

Master lists of Oowners and Zzones;

Path definitions and ratings for paths in the WECC Path Rating Catalog;

Lists of lines and transformers which that interconnect areas; and

A pPlaceholder for Aarea-to-aArea transactions for the existing system.

General Requirements

[1.] WECC staff shall maintain the MTLF.

[2.] WECC staff shall post the current MTLF in the present year’s base- case fFiles on the WECC wWeb site.

[3.] The MTLF is used in the compilation of all base cases to ensure consistency of steady-state data common to multiple Areas.

[4.] Updates to the MTLF shall be coordinated between Areas as necessary and submitted to WECC staff in an ‘epc’ file format.

[5.] The MTLF shall only be maintained and applied to all WECC operating base cases. The tie-line data pertaining to planning horizon cases will be handled on a case-by-case basis.

Data Requirements (Area Interchange)

[1.] Tie-Lines – Existing transmission lines (including line shunts) and transformers, as of the date of the data request letter, connecting two Areas shall have steady-state data submitted to WECC staff for inclusion in the MTLF according to(see Section 5.C – “AC Transmission Lines (MOD-032, Attachment1)”) and “Transformers (MOD-032, Attachment 1)” respectively.

[2.] Zones – Zone Names and Zone Numbers shall be maintained in the BCCS MTLF. Zone assignments to the applicable entitiesPlanning Coordinators can be found in(see “Appendix 2 – Area, Zone and Bus Number Assignments.”)

[3.] WECC staff shall identify paths (as listed in the WECC Path Rating Catalog) in the BCCS MTLF under the Interface Data section. The Interface Number shall match the WECC path number. Rating 1 shall be used for the Path Transfer Limit for prevailing flow direction and Rating 2 shall be used for the secondary flow direction Path Transfer Limit.

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 34

[4.] WECC path element information shall be maintained in the BCCSMTLF. Area Coordinators shall provide updates to WECC staff as changes are made or as facilities are placed in-service.

[5.] Facility owners of DC buses, lines, and converters that are part of any area tie line shall provide the steady-state data to be maintained in the BCCSMTLF.

[6.] Transformer Impedance Correction Table – Impedance correction parameters to be used for TCUL transformers and phase-shifting transformers shall be maintained in the BCCSMTLF.

[7.] Owner Data – A list of Oowner nNumbers, names, and four-character abbreviations shall be maintained in the BCCSMTLF.

[8.] Transaction Data – There must be a transaction for any connection between Aareas. Staff manages this data inportion of the BCCSMTLF file on a case-by-case basis.

V.[VI.] Dynamic Data Requirements

The WECC staff, in concert with the SRWG, MVWG, and other entities as appropriate, is responsible for managing the collection of the dynamic data required to comply with applicable NERC Standards and Measurements.

To provide consistency in data submittals and help avoid potential solution problems, the guidelines below shall be followed to the maximum extent possible. However, WECC recognizes deviations from the guidelines may occasionally be needed. For these situations, submitters are requested to provide the SRWG and MVWG with the rationale for exceptions. In all cases, dynamic data must be consistent with steady-state data provided for each WECC Base Case. The Planning Coordinators facility owners are responsible for providing data for their solely- or jointly-owned facilities in the format specified and for the accuracy of these data, either directly or through a Data Representative, at the option of the owner.

Dynamic data is submitted as soon as any new data becomes available. Dynamic data may become available outside the scheduled case building process as a result of individual entity equipment testing programs such as the generator testing program.

Dynamic data for new generators and updates for existing generators are submitted via the WECC Generating Unit Model Validation Policy. The WECC Generating Unit Model Validation Policy includes the roles and responsibilities of the Generator Owner, the Transmission Planner, and WECC.

Approved dynamic models conform to the WECC Dynamic Modeling Procedure. All dynamic models contained in the MDF shall be those approved by MVWG. If the model you want to use is not on the

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 35

approved list, you must go through MVWG and follow the WECC Dynamic Modeling ProcedureWECC Dynamic Modeling Procedure.

The following approach to dynamic data shall apply Interconnection-wide:

Generators and other dynamic devices shall be represented with approved dynamic data as recommended by the MVWG to represent the designated dynamic equipment modeled in WECC Base Cases. The approved models can be found within the Approved Dynamic Model Library.

o When new models have been added to or obsolete models have been removed from the Approved Dynamic Model Library, TSS and SRWG will determine an appropriate implementation schedule and scope for submitting the necessary data required by the newly approved models.

Estimated or typical manufacturer’s dynamic data based on facilities of similar design and characteristics may be used to represent planned generators and other dynamic devices if specific design data cannot be obtained. MVWG maintains the Typical Machine Data document. Specific dynamic design data shall be submitted according to the WECC Steady-State and Dynamic Data Criterion.

Where there is a difference between the requirements of this document and the WECC Generating Unit Model Validation Policy, the WECC Generating Unit Model Validation Policy shall preside.

Typical dynamics studies are up to 60 seconds from the initiating event. All models, on the Approved Dynamic Model Library list, that can respond within that time frame shall be submitted.

Generation Requirements

[1.] Design data for new or refurbished excitation systems (for synchronous generators and synchronous condensers) shall be provided at least three months prior to the in-service date. If design data is unavailable from the manufacturer, estimated or typical manufacturer’s data, based on excitation systems of similar design and characteristics, shall be provided three months prior to the in-service date.

[2.] Dynamic data for generators, synchronous condensers, excitation systems, voltage regulators, turbine governor systems, power system stabilizers, and other associated generation equipment shall be derived from test results obtained by adhering to the WECC Generating Unit Model Validation Policy for each unit represented in WECC Base Cases according to thresholds as specified in Section V. WECC Steady-State and Dynamic Data Criterion. This includes, as appropriate to the

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 36

model, items such as inertia constant, damping coefficient, saturation parameters, and direct and quadrature axis reactances and time constants.

[3.] Generator Oowners shall submit power plant data in accordance to the size thresholds as described in the WECC Steady-State and Dynamic Data CriterionSection V.WECC Steady-State and Dynamic Data Criterion.

[4.] Netting of planned generators represented in WECC Base Cases shall conform to the threshold requirements of the WECC Steady-State and Dynamic Data Criterion.Section VWECC Steady-State and Dynamic Data Criterion..

1. The MWCAP parameter in the dynamic turbine-governor model shall be greater than or equal to the Pmax parameter of the generator steady-state model to avoid governor initialization problems.

2.[5.] Power System Stabilizer (PSS) Dynamic data shall be submitted for all generators that have active PSS. See the WECC Policy Statement on Power System Stabilizers document.

3.[6.] Existing generators shall follow the WECC Generating Unit Model Validation Policy.

Load Characteristics

The goal of this section is to model effects of voltage and frequency on load as accurately as possible.

1. Keep dynamic load data consistent with reported steady-state data supplied.

2. Modeling voltage and frequency characteristics explicitly for each individual load, if possible. However, use default zone or area records for buses not explicitly defined.

[3.] For loads less than 5 MW, Area CoordinatorsPlanning Coordinators will work with WECC staff to establish a default load representation record for each area to represent loads not modeled with the CMPLDW model. This is to avoid the load representation defaulting to constant power (PSLF default). If actual dynamic load characteristics are not available, load should be modeled as constant current P, and constant impedance Q. Bus specific exceptions to the default load representation must be submitted to WECC staff for inclusion in the MDF.

Underfrequency Load Shedding (UFLS)

[1.] Include uUnderfrequency lLoad Sshedding records for all loads that have underfrequency relays on the interconnected system.

1.[2.] Ensure the pickup frequency of each stage is lower than that of the previous stage. UFLS must comply with WECC-coordinated off-nominal requirements as specified in the WECC Off-Nominal Frequency Load Shedding Plan document.

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

jramey, 01/22/15,
Not spelled out that I can find.

WECC Data Preparation Manual 37

[3.] Include pertinent load data in the MDF. All Uunder-frequency lLoad-sShedding data in the MDF must match bus, load, and/or branch identifiers in the operating cases. For this data category, the MDF data is not a master database because it does not apply to planning cases. If data is to be included in the planning cases, the data is to be submitted with the case development and identified as planning data.

[4.] UFLS models provided for each base case must correspond to UFLS information provided to WECC Underf-Frequency Load-Shedding Review Group in accordance with WECC Underf-Frequency Load Shedding Criterion.

Undervoltage Load Shedding (UVLS)

[1.] Include under-voltage load-shedding records for all loads that have undervoltage relays on the interconnected system.

1.[2.] Coordinate the pick-up and time-delay setting for each stage with the previous stage.

[3.] Include pertinent load data in the MDF. All under-voltage load-shedding data in the MDF must match bus, load, and/or branch identifiers in the operating cases. For this data category, the MDF data is not a master database because it does not apply to planning cases. If data is to be included in the planning cases, the data is to be submitted with the case development and identified as planning data.

#

Relays

Include relay models as approved for use by the SRWG per the time line and scope it establisheds by SRWG for pPrimary relays. Data submitters are also strongly encouraged to submit all relevant backup relay modeling data.

Back-to-Back DC Ties

Netting is allowed for back-to-back DC ties. Represent back-to-back DC ties as generation in the power flow, but netted in dynamic data. The record should include an ID designation of ‘DC’ on the generator record.

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

jramey, 01/21/15,
This is linked to the wrong criterion.

WECC Data Preparation Manual 38

DC Lines, SVC, and D-VAR systems

1. Device specific dynamic data for dynamic devices shall be modeled, including but not limited to static VAR compensators and controllers, high-voltage direct-current systems, flexible AC transmission systems, and automatically switched shunt and series capacitors or reactors.

2. Model, to the maximum extent possible, DC lines and SVC systems to accurately reflect actual system performance.

3. Coordinate DC bus numbering with WECC staff prior to model submission.

VI.[VII.] Short Circuit Data

MOD-032-1 requires that short circuit data should be shared openly between applicable NERC functional entities. This data should be provided upon request by applicable NERC functional entities in the data owners preferred software format. WECC does not currently create interconnection-wide cases for the use of short circuit analysis.

VII. # Contingency and Remedial Action Scheme Data

NERC and FERC are suggesting that contingency and Remedial Action Scheme (RAS) data should be shared openly between applicable NERC functional entities.

The following approach should be taken when providing contingency and RAS data:

All models should be provided upon request by applicable NERC functional entities in the providers preferred format until the WECC common format is available in the providers preferred software.

Provide all contingencies used for internal TPL studies.

RAS models should be provided if the affected elements are modeled in the case.

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

jramey, 01/22/15,
Links to TSS home page.

WECC Data Preparation Manual 39

Disclaimer

WECC receives data used in its analyses from a wide variety of sources. WECC strives to source its data from reliable entities and undertakes reasonable efforts to validate the accuracy of the data used. WECC believes the data contained herein and used in its analyses is accurate and reliable. However, WECC disclaims any and all representations, guarantees, warranties, and liability for the information contained herein and any use thereof. Persons who use and rely on the information contained herein do so at their own risk.

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 40

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual

Appendix 1 – Late Data Procedure

The objective of the Late Data Procedure is to preserve the original schedule for the development of base cases in accordance with each year's Data Bank Compilation Schedule, and the Case Description sheet in the data request letter for each case. The Late Data Procedure describes Planning Coordinator Area Coordinator and staff data submittal responsibilities as well as actions to be taken for actual delays or anticipated delays in the submittal of data or for the submittal of unusable data. This procedure does not take effect until one of the following occurs:

A data submittal date has been missed; or

There is sufficient reason to believe that a submittal date will be missed; or

It is determined that the submitted data is not usable.

Success of the case development program depends on timely and accurate data submittal, review, and support of the development of each base case. A Planning Coordinatorn Area Coordinator or Member System not meeting a scheduled response date listed in the Data Bank Compilation Schedule section of the PCC Handbook with a usable response could result in a delay in the case development schedule if left uncorrected.

Examples of unusable data:

Data from two neighboring Planning Coordinators Area Coordinators whose with inter-area schedules that do not match; and

Data with such significant problems that it cannot be used for the comment phase development process which;, therefore, delays the progress of the case development.

Any unusable data received by the Area Coordinator or WECC staff must be corrected by the Planning Coordinator responsible party so as to not further impair the schedule or it will be rectified in accordance with this Late Data Procedure, as will any late data or anticipated late data.

Planning Coordinator Area Coordinator and Staff Responsibilities

It is the responsibility of Planning Coordinators every “data owner” to submit timely and accurate data in accordance with the Data Bank Compilation Schedule and the Case Description sheet in the data request letter. If, hHowever, if in the judgment of the Area Coordinator, it appears that the original schedule will be impaired due to late data submittal or submittal of unusable data,1, it will be the 1 Unusable data is defined as: data that has been submitted for use in a power flow/dynamic study case that produces unreasonable

power flow/initialization results as may be determined by unreasonable solution results, significant run-time data errors being reported, or a diverging power flow solution and is; data that clearly does not meet the objectives of the case for which the datait is being submitted.

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 42

responsibility of the Area Coordinator to provide the data for the Member System regarding the case in question. A schedule can be impaired either by data being submitted after the scheduled due date or with by the submisstiontal of unusable data, even if it is submitted on time. In either instance, there is potential for schedule impairment.

If, in the judgment of WECC staff, it appears that the schedule will be impaired due to lack of usable data response by the Planning CoordinatorArea Coordinator, it will be the responsibility of WECC staff to provide the data for the case in question.

Actions to Take

There are two actions specified by this procedure in the event that the Area Coordinator or WECC staff has to exercise its late data responsibilities for a delinquent entity. The first is the action of assuming the responsibility for submitting the data and the second is the notification of such action. If the staff or the Area Coordinator takes over the responsibility for the submittal of data for the delinquent entity, the data to be submitted should always be the best data available in the judgment of the person submitting the data. The data should be submitted in such a way that the original schedule is maintained or not further impaired.

At the time the Area CoordinatorWECC Staff takes over data submittal responsibility for the Member Systema Planning Coordinator:

[1.] The Area Coordinator will immediately notify the staff.[2.] The WECC staff will then notify the Planning Coordinator WECC Member Representative of the

Member System and copy the notification of the action taken to:[a.] PCC and TSS representatives of the Planning CoordinatorMember System; and [b.] All Area Coordinators and Sub-Coordinators directly involvedSRWG.

3. When the case involved is an operating case for OTC studies, the staff will send a notification letter to:

[a.] The PCC, TSS and SRWG chairs; [b.] All of TSS and SRWG; and [c.] The Operating Committee (OC) and the Operating Transfer Capability Policy Group Study

Group (OTCPGSG).

The notification will consist of the nature and extent and reasons of the action taken. The staff will take the same notification action if they themselves also must exercise their late data responsibility in the interest of an Area Coordinator. Those who consistently abuse the base-case development process by submitting late or unusable data may be significantly compromising the reliability of the Western Interconnection transmission system, which may eventually becomeis a NERC compliance issue.

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 43

Backf Fitting of Late Data

The Late Data Procedure allows for an Area Coordinator or the WECC staff to take over data submittal responsibilities for a delinquent entityPlanning Coordinator in the event that entity is unable to submit usable data in accordance with the defined schedule. If the Planning Coordinator delinquent entity's data should subsequently become available, the data shall be submitted to the appropriate Area Coordinator or to theWECC staff to partially or fully replace that which was previously submitted. However, Tthe staff may, however, refuse to accept this back-fit data if, in their its judgment, the back-fit data is no better than the data already in the case or if there would be unacceptable impairment of the schedule by accepting the back-fit data.

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual

Appendix 2 – Area, Zone, and Bus Number Assignments

Southwest Region

Area Number Range 10 – 18 Zone Number Range 100 – 199, 10500 – -

19599 Bus Number Range 10,000 – 19,999

100,000 – 199,999 Member System Bus RangeArea No. Zone Range Area Name Member System

10 100-1091000 - 1099

New Mexico PNM 10,000 – 10,999100,000 – 109,999

120-1391200 - 1399

New Mexico TSGT 12,000 – 12,999120,000 – 129,999

LAC, NAPI, TNP 13,000 – 13,999130,000 – 139,999

11 110 – 1191100 - 1199

El Paso EPE 11,000 – 11,999110,000 – 119,999

14 140-1491400 - 1499

Arizona APS 14,000 – 14,99984,000 – 85,999140,000 – 149,999

150-1591500-1599 (Temporary)

SRP, APA 15,000 – 15,999150,000 – 159,999

160-169 1600 - 1699

TEP, UES 16,000 – 16,999160,000 – 169,999

170-1791700 - 1799

AEPC, Others 17,000 – 17,999170,000 – 179,999

190 – 1991900 - 1999

WALC 19,000 – 19,999190,000 – 199,999

18 180 – 1881800 - 1889

Nevada NEVP 18,000 – 18,899180,000 – 188,999

1891899

VEA 18,900 – - 18,999189,000 – - 189,999

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

Jonathan Young, 01/16/15,
NV Energy is requesting 100 extra zone numbers. No specific range was requested. Note PSLF is limited to the zone range of 1 – 4999.

WECC Data Preparation Manual 45

Southern California Region

Area Number Range 20 – 29Zone Number Range 200 – 299

2000 – 2999Bus Number Range 20,000 – 29,999

94,000 – 95,999200,000 – 299,999 Member System

Bus RangeArea No. Zone Range Area Name Member System20 200 – 209

2000 - 2099Mexico – CFE CFE 20,000 – 20,999

200,000 – 209,99921 210 – 219

2100 – 2199Imperial, CA IID 21,000 – 21,999

210,000 – 219,99922 220 – 239

2200 – 2399San Diego SDGE 22,000 – 22,999

220,000 – 229,999Others 23,000 – 23,999

230,000 – 239,99924 240 – 259

2400 – 2599So Calif SCE 24,000 – 24,999

240,000 – 249,999940 – 9599400 – 9599

94,000 – 95,99929,000 – 29,999290,000 – 299,999

CDWR, MWD, Others

25,000 – 25,999250,000 – 259,999

26 260 – 2992600 – 2999

LADWP LDWP 26,000 – 26,999260,000 – 269,999

BURB, GLEN 27,000 – 27,999270,000 – 279,999

Others 28,000 – 28,999280,000 – 289,999

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 46

Northern California Region

Area Number Range 30 – 39Zone Number Range 300 – 399

3000 – 3999Bus Number Range 30,000 – 39,999

300,000 – 399,999 Member System Bus RangeArea No. Zone Range Area Name Member System

30 300 – 3993000 – 3999

PG and E PG&E 30,000 – 36,999300,000 – 369,999

SMUD 37,000 – 37,499370,000 – 374,999

WAPA SNR 37,500 – 37,899375,000 – 378,999

REU 37,900 – 37,999379,000 – 379,999

NCPA 38,000 – 38,199380,000 – 381,999

MID 38,200 – 38,399382,000 – 383,999

TID 38,400 – 38,599384,000 – 385,999

CDWR 38,600 – 38,899386,000 – 388,999

Others 38,900 – 39,999389,000 – 399,999

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 47

Northwest Region

Area Number Range 40 – 49Zone Number Range 400 – 499

4000 – 4999Bus Number Range 40,000 – 49,999

90,000 – 90,999400,000 – 499,999 Member System

Bus RangeArea No. Zone Range Area Name Member System40 400 – 499

4000 – 4999Northwest BPA, other Federal,

WPPSS, Detailed Federal hydro

40,000 – 41,99944,000 – 44,499400,000 – 419,999440,000 – 444,999

PSE 42,000 – 42,999420,000 – 429,999

PGE 43,000 – 43,999430,000 – 439,999

Not used 44,000 – 44,499440,000 – 444,999

PACW 44,500 – 45,599445,000 – 455,999

SNPD 45,600 – 45,999456,000 – 459,999

GCPD 46,000 – 46,199460,000 – 461,999

EWEB 46,200 – 46,399462,000 – 463,999

SCL 46,400 – 46,599464,000 – 465,999

TPWR 46,600 – 46,79946,900 – 46,999466,000 – 467,999469,000 – 469,999

CHPD 46,800 – 46,899468,000 – 468,999

Others – Public 47,000 – 47,499470,000 – 474,999

Others – Private or IOU

47,500 – 47,999475,000 – 479,999

AVA 48,000 – 49,999480,000 – 499,999

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 48

Canadian Region

Area Number Range 50 – 59Zone Number Range 500 – 599

5000 – 5999Bus Number Range 50,000 – 59,999

80,000 – 81,999500,000 – 599,999 Member System

Bus RangeArea No. Zone Range Area Name Member System50 500 – 519

5000 – 5199BC Hydro BCHA 50,000 – 51,999

500,000 – 519,99980,000 – 81,999

52 520 – 539520 – 5399

Fortis BC FBC 52,000 – 53,999520,000 – 539,999

54 540 – 5995400 – 5999

Alberta AESO 54,000 – 59,999540,000 – 599,999

Central Region

Area Number Range 60 – 69Zone Number Range 600 – 699

6000 – 6999Bus Number Range 60,000 – 69,999

600,000 – 699,999 Member System Bus RangeArea No. Zone Range Area Name Member System

60 600 – 6196000 – 6199

Idaho IPC 60,000 – 60,999600,000 – 609,999

BPA, Others 61,000 – 61,999610,000 – 619,999

62 620 – 6296200 – 6299

Montana NWMT 62,000 – 62,999620,000 – 629,999

63 630 – 6396300 – 6399

WAPA UGP WAUW 63,000 – 63,999630,000 – 639,999

64 640 – 6496400 – 6499

Sierra SPP 64,000 – 64,999640,000 – 649,999

65 650 – 6996500 - 6999

Pace PACE-UT, WY, ID 65,000 – 69,999650,000 – 699,999

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

Jonathan Young, 01/16/15,
NV Energy is requesting 100 extra zone numbers. No specific range was requested. Note PSLF is limited to the zone range of 1 – 4999.

WECC Data Preparation Manual 49

Eastern Region

Area Number Range 70 – 79Zone Number Range 700 – 799Bus Number Range 70,000 – 79,999

700,000 – 799,999 Member System Bus RangeArea No. Zone Range Area Name Member System

70 700 – 7297000 – 7299

PSColorado PSC 70,000 – 70,999700,000 – 709,999

WPE 71,000 – 71,999710,000 – 719,999

TSGT 72,000 – 72,999720,000 – 729,999

73 730 – 7997300 – 7999

WAPA R.M. WALM 73,000 – 73,999730,000 – 739,999

BHPL 74,000 – 74,999740,000 – 749,999

PRPA 75,000 – 75,999750,000 – 759,999

BEPC 76,000 – 76,999760,000 – 769,999

WAUC 79,000 – 79,999790,000 – 799,999

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

WECC Data Preparation Manual 50

Area Number Range Not ApplicableZone Number Range Not ApplicableBus Number Range 97,000 – 99,999

897,000 – 899,999 997,000 – 999,999

Dummy Buses

Bus Number Range 1-9,99990,000 – 91,999 (Temporary)

Internal Use Buses

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L

jramey, 01/23/15,
No label on this table.

WECC Data Preparation Manual 51

Revision History

Version Date Editor(s) Revision Description

June 26, 2012Mark MallardGordon ComegysDoug Tucker

Added Turbine Type field for Generator’s Expanded bus number ranges for Areas Added dynamic data submittal requirement to include all

devices that could respond within 60 seconds if an approved model exists

October 12, 2012 Doug TuckerGordon ComegysDon Streebel

Added language for sub-100- kV elements Fixed minor changes in text

July 18, 2014 Jonathan Young

Doug Tucker

Accommodate BES Definition Reword UVLS sections Added Short Circuit Data info Added Contingency and Remedial Action Scheme Data Bus number ranges slightly changed Few member Acronyms changed Fixed minor changes in text

BCCS Version Jonathan Young Incorporated BCCS methodologies

December 12, 2014 (SRWG Approval)

Jonathan Young

J. Ramey

Added four digit zone number ranges WECC Technical Writer edits and formatting

January 21, 2015 Jonathan Young

John Gross

Incorporated MOD-032-1 implementation plan concepts

W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C O U N C I L