Waterview Connection Project (CA3466):
Auckland Council Monthly Environmental Report Report 18 – Period August 2013
Document 025-RPT-02723
30 September 2013
August 2013 Environmental Report
AC Monthly Report August 2013 final.docx Page 1 30 September 2013
Contents
1. Introduction .................................................................................................................................... 2
2. Resource Consents .......................................................................................................................... 2
3. Construction Works ........................................................................................................................ 2
4. Site Meetings and Inspections ........................................................................................................ 4
5. Environmental Monitoring .............................................................................................................. 4
5.1 Tree Management....................................................................................................................... 4
5.2 Noise and Vibration .................................................................................................................... 5
5.3 Air Quality ................................................................................................................................... 6
5.4 Ground Water ............................................................................................................................. 7
5.5 Oakley Creek Flow ..................................................................................................................... 10
5.6 Settlement ................................................................................................................................ 10
5.7 Ecological, Water Quality and Sediment Quality ...................................................................... 11
5.8 Contaminated Soil ..................................................................................................................... 14
5.9 Erosion and Sediment Control .................................................................................................. 17
5.10 Archaeological ........................................................................................................................... 17
6. Stakeholder ................................................................................................................................... 17
6.1 Local Liaison Activity ................................................................................................................ 17
6.2 Queries, Concerns and Complaints .......................................................................................... 19
6.3 Education Liaison Group .......................................................................................................... 19
Appendicies
A Consents Triggered by Works To Date .......................................................................................... 20
August 2013 Environmental Report
AC Monthly Report August 2013 final.docx Page 2 30 September 2013
1. Introduction
To meet reporting requirements for the Waterview Connection, a monthly report will be prepared and
sent to AC in the 2nd week of the following month.
This report sets out the reporting requirements for the Waterview Connection for the period August
2013.
2. Resource Consents
Appendix A provides a table of all the consents triggered by works to date.
3. Construction Works - August until November
The table below outlines the construction works carried out in August and an indicative programme which
shows the anticipated works in the coming 3 months until 30th November 2013.
South Work Package Aug Sep Oct Nov
Dominion Road to Maioro St
Install Traffic Management
Install erosion and sediment controls and site establishment
Bulk earthworks
Drainage installation, service relocations and ground improvements
Subgrade preparation Maioro St to Richardson Road
Construct cycleway (including earthworks)
Construct CTKS Noise wall
Richardson Rd bridge services and finishing works
Construct soil nail walls at 903 retaining wall
Construct Retaining Wall 901
Richardson Rd to Oakley Creek
Construct Oakley Creek bridge & aqueduct (SW Culvert)
Construct tunnel spoil building incl sheet piling, bored piling & conc works
Construct TP10 pond at rear of Richardson Rd tavern
Construct Oakley Creek pedestrian bridge No.3
Construct soil nail walls at 903 retaining wall
Drainage Installation
Oakley Creek Bridge to cut in Southern Approach Trench (SAT)
Construct haul roads from Oakley Creek to SAT
Hendon Footbridge Approach Ramp
Stream Works between realignment A to B
Valonia Wetland excavation
August 2013 Environmental Report
AC Monthly Report August 2013 final.docx Page 3 30 September 2013
SAT cut to CY9
Bulk excavation of East Coast Bays material from SAT
Construct SAT Sump
Subgrade preparation and pavements in SAT
Construct CY9 & 10 laydown, crane platform, pond & buildings
Hendon Swale (East of the SAT)
Construct Haul Roads outside the SAT
Construct segment yard platform in SAT
TBM assembly and commissioning
Constuct spoil conveyor system
TBM Tunnelling
Stream works between Stream Realignment B to C
North Work Package Aug Sep Oct Nov
Northern Approach Trench (NAT) & surrounds to cut
NAT excavation Stage 1
Construct props, whalers at Stage 1 excavation level
Construct ground anchors
NAT excavation
Northern Fill Embankment, North Oakley Creek inlet (the Bog) & Ramp 2
Lay structural fill for northern fill embankment
Construct permanent piles at Ramps 1, 3 and 4
Construct columns and cross heads at Ramps 1, 3 and 4
Construct staging and access platforms at Ramp 2
Construct permanent piles at Ramp 2
Construct columns in CMA at Ramp 2
Great North Road Interchange
Construct permanent piles in the Tear Drop
Construct columns and cross heads in Tear Drop
Construct traffic diversion at Great North Road off ramp (Big Flint)
Construct permanent piles in Spear head
Construct abutment, columns and cross heads in Spear head
Drill permanent piles in Splinter east
Site establishment in the Little Flint
Drill permanent pile, construct column in the Little Flint
Site establishment, haul Rd, envl controls & services in Machete
Carrington Rd Interchange
Construct Retaining Wall 502 Stage 1 (Eastern Splinter)
Site establishment and Tree Clearance at Retaining Wall 603
Construct Retaining Wall 501 Stage 1 (in the Machete)
Construct Retaining Wall 601
Construct Retaining Wall 603
August 2013 Environmental Report
AC Monthly Report August 2013 final.docx Page 4 30 September 2013
4. Site Meetings and Inspections
Auckland Council’s Erosion and Sediment Control officer visited the Southern and Northern Area works
on the 1st, 9th, 15th, 22nd and 29th of August.
5. Environmental Monitoring
5.1. Tree Management
Grant Sirl, Arborist – Arbor Advice Ltd (the Project Arborist) has provided the following report for the
amenity trees affected by the works;
Amenity Tree
Species Location Health Fencing Observations/recommended actions
South
522 Zelkova Within compound area adjacent north side Richardson Rd
Good Good Protective fencing – steel pipe/ mesh free standing panels in good condition. No materials within exclusion zone around the tree.
698 Group various native species
Alan Wood Reserve, access via Methuen Rd
Good/ fair Sound barrier wall appropriate protection
Remaining trees of group 698 appear in reasonable health/ condition. Numerous native tree seedlings establishing. Weeds species also establishing, e.g. Chinese privet & Woolly Nightshade. Maintenance of area required.
Grove various species
Small Kowhai, Karamu etc
Located southwest side of Alan Wood Reserve.
Good Good No actions required.
512, 513 to
516 and 519
groups
Titoki, Prunus, Totara, Tarata, Karaka & Cabbage
Near western end of Alan Wood Reserve adjacent basketball court. (outside designation).
Good/Fair Sth Totara
in good condition. Rootplate mulched. Northern
tree in fair condition.
Good - southern side of work site alignment. Good – Northern Side of work site alignment, with the exception of section of fencing around northern side Totara tree.
Southern side protective fencing erected/sturdy and in good condition. Fencing seperates site area from vegetation. Northern Totara tree – Need to remove pipes away from tree and erect steel pipe/netting fence around tree. Tree vulnerable to damage. Secure site fence excludes remaining trees/vegetation in Park area from construction.
North
N/A Pohutukawa Waterview Primary School, outside designation.
Good Sound barrier wall erected eastern side of tree.
Epicormic growth establishing upon reduced stems following tree cutting regime. No actions required at this stage.
811 Titoki Herdman Street – Street trees
Good/Fair Tree in designation to be preserved if possible. Noise wall protects tree.
No actions required. Tree located outside construction zone.
August 2013 Environmental Report
AC Monthly Report August 2013 final.docx Page 5 30 September 2013
#247 Pohutukawa Waterview Reserve
Fair Tree relocated to within Reserve
Tree status appears reasonably good following tree relocation procedure. No actions required.
272, 276, 300, 315, 330, 729, 730, 732
Totara Robinia x6 Robinia Robinia x4 Robinia x3 Robinia x3 Karaka Karaka
Located within Star Mill archaeological area
Good/Fair Trees in archaeological area have been fenced off from construction zone.
Regular maintenance required.
Minor damage evident to side crown strucuture of Totara tree (#272), torn branches presumably caused by a digger. Minor remedial work required.
#’s 804, 805, 806, 807,
808 & 809
Kowhai, Silver Birch, Kawaka, Kahikatea, Bottlebrush, Lancewood & Cabbage tree
23/25 Waterbank Crescent
Majority Good
Trees retained around remaining dwellings & excluded from work area with steel mesh security fencing
Weed infestation occurring where previous under-storey vegetation has been cleared.
5.2. Noise and Vibration Monitoring
Noise monitoring has been undertaken for new plant and activities since commencement of construction in
January 2012 to assess levels against noise predictions (as per the Construction Noise and Vibration
Management Plan) and confirm compliance with the project noise criteria, specifically as relates to Consent
conditions CNV.2 for noise, CNV.3 for noise from air blast and CNV.4 and CNV.5 for vibration.
No blasting was carried out during August. The focus for noise and vibration during August has been
assessment of extended works required outside normal working hours (07.30 – 18.00hrs Monday to
Saturdays) and submission of Site Specific Noise management Plans (SSNMPs) to Council.This was
particularly in relation to service works at Great North Road Interchange (GNRI) and day-time sheet piling
works for the tunnel spoil handling building. Noise monitoring was undertaken for the sheet piling works
which informed SSNMP#37. The table below shows the maximum measured noise levels, which confirmed
the need for a SSNMP in relation to sheet piling works. Sheet piling was stopped 27/08/13 following nosie
monitoring and trials undertaken to assess the most appropriate mitigation measures and a SSNMP
submitted to Council for approval.
Date/time Measurement location Activity Noise level LAeq (15) (dB)
Noise level LAMax (dB)
27/08/13 1pm
At receiver façade Richardson Tavern, Richardson Road
Vibrohammer sheet piling works for tunnel spoil handling building (now under SSNMP# 37).
82.0 91.6
29/08/13 11.30am
Near receiver Richardson Tavern, Richardson Road (Works 60m from measurement position, 70m from receiver)
73.2 93
Project noise criteria Southern area (07.30-18.00) (Apply at residential property) 70 85
Table showing Measured Noise Levels
August 2013 Environmental Report
AC Monthly Report August 2013 final.docx Page 6 30 September 2013
The SSNMP submitted and approved in August 2013 under consent condition CNV13 are listed below.
SSNMP Ref Date of Works
Night Works or
Day Works
Location of Works
Description of Works
Works start time
Works end time
Date SSNMP
Submitted to Council
Date SSNMP Approved by
Council
Works now
complete
SSNMP#35 Rev2
21/07-08/08/13
Night Great North Road
Interchange
Gas relocation 9pm 4am 24/07/2013 6/08/2013 Yes
SSNMP#35 Rev3
14/08 - 21/08/13
Night Great North Road
Interchange
Gas relocation 9pm 4am 8/08/2013 9/08/2013 Yes
SSNMP#36
4/08/2013 Night Great North Road
Interchange
Paving works GNR
westbound offramp
8.30 pm
5am 24/07/2013 6/08/2013 Yes
SSNMP#37
30/08/13 - 21/09/13
Day Richardson Road
Sheet piling for spoil building
8am 5.30 pm
29/09/2013 30/09/2013 No
5.3. Air Quality Monitoring
Two Total Suspended Particulate (TSP) analysers and one met mast are required in the Southern Area
(Sector 9) and one TSP analyser with met mast is required in the Northern Portal Area (sector 7) under
consent conditions AQ16 and AQ17.
Two E-BAM TSP monitors (E-BAM1 & EBAM2) are located in the Southern Area. Up until 29th August
EBAM1 & EBAM2 were co-located on site adjacent 123 Hendon Avenue. EBAM2 was relocated near to
the Southern Approach Trench on the 29th August, on site at the rear of 91 Hendon Avenue. The Northern
Portal area E-BAM is located outside the Waterview School grounds.
E-BAM results for August show levels below the project consent limit for TSP with the exception of the
following episodes.
Southern Area (EBAMs 1 &2):
Exceedences of the hourly trigger level of 200 µg/m3 occurred at EBAM1 (22/08/13 07:00am-
08:00am 561 µg/m3; 24/08/13 09:00pm-10:00pm 443 µg/m3). These exceedances can be
attributed to high humidity events caused by rainfall. Data at the co-located EBAM2 showed
concentrations well below the trigger level (22/08/13 07:00am-08:00am 16 µg/m3; 24/08/13
09:00pm-10:00pm 19 µg/m3). It should also be noted that the exceedances also occur outside of
construction hours.
No exceedences were recorded of the daily average consent limit of 80 µg/m3 for EBAM1 &
EBAM2.
No exceedences were recorded of the hourly trigger level of 200 µg/m3 for EBAM2.
Northern Area (EBAM 3):
No exceedences were recorded of the hourly trigger level of 200 µg/m3
No exceedences were recorded of the daily average consent limit of 80 µg/m3.
August 2013 Environmental Report
AC Monthly Report August 2013 final.docx Page 7 30 September 2013
Monitoring Period
Description EBAM % Data capture
TSP Concentration
in µg/m3
TSP Project criteria in
µg/m3
01/08/13-31/08/13
Maximum Hourly Average TSP 1-
southern area
99.5
561 200
Maximum Rolling 24-Hour Average TSP 43 80
Maximum Daily Average TSP(Consent condition AQ.20 Trigger for investigation)
38 80
Maximum Hourly Average TSP 2-
southern area
99.9
141 200
Maximum Rolling 24-Hour Average TSP 35 80
Maximum Daily Average TSP(Consent condition AQ.20 Trigger for investigation)
30 80
Maximum Hourly Average TSP 3-
northern area
99.5
91 200
Maximum Rolling 24-Hour Average TSP 26 80
Maximum Daily Average TSP(Consent condition AQ.20 Trigger for investigation)
22 80
Table showing TSP Monitoring Results
5.4. Ground Water Monitoring
Monthly monitoring for piezometers identified in Appendix A of the Groundwater Management Plan
(GWMP) is ongoing; with the exception of around 3 piezometers around the tunnel which are still to be
installed (these piezometers are located in the Unitec grounds and will be installed, where landowner
approvals allow 12 months ahead of active tunnelling as per the rev 4 GWMP).
Piezometers located within 150 m of the Southern Approach trench have been monitored weekly since
June 2012 in advance of excavation that commenced in July 2012. Dewatering activities commenced in
September 2012 when groundwater was encountered in the excavation at a depth of approximately 9 m
below ground level.
The southern approach trench extends from approximate CH10530 (to the south) to the southern portal
head wall at CH11080. Over this length the excavation has reached full depth and the base slab has been
poured. Dewatering via sump pumps in the excavation and below the base slab is occurring between
chainages 10600 and 11080. Accordingly groundwater levels in piezometers within 150 m of the Southern
Approach Trench are monitored twice-weekly in accordance with condition G.6.
CH11000 to CH11080
Piezometers in very close proximity to the trench (i.e. less than 50 m distance, and inside the construction
zone) have recorded a drop in groundwater level of up to 18.5 m in the East Coast Bays Formation (ECBF),
6.8 m in the Tauranga Group alluvium and up to 5 m in the basalt (Figure 1). Drawdown in the basalt and
alluvium reached near steady state conditions in March / April 2013, and in most piezometers the
groundwater level rose in mid-April and remained steady as a result of normal to above normal rainfall
through to the end of June. A slight drop was observed in July (generally of less than 0.5 m) as a result of
low rainfall (33% of normal, Figure 2) however water levels have tended to recover slightly through
August as a result of rainfall recharge.
Drawdown in the ECBF appears to have reached a pseudo-steady state (excluding seasonal fluctuations)
now that excavation has reached maximum depth. As the base slab is drained we do not expect to see
August 2013 Environmental Report
AC Monthly Report August 2013 final.docx Page 8 30 September 2013
any recovery of these water levels; however as maximum depth has been reached we do not expect that
there will be any further significant drawdown.
Beyond the construction zone (> 50 m distance) piezometers in this areas have recorded a drop in
groundwater level of up to 4 m in the basalt and alluvium, and up to 6 m in the ECBF. Nine (9)
piezometers have recorded a groundwater level below alert trigger level. Several of the affected
piezometers (BH519, BH1106, BH1108 and SPZ005) are located along the axis (and deepest part) of the
basalt lobe that is intersected by the Southern Approach Trench excavation. The zone of greater
drawdown along this axis likely reflects a fracture, of low storativity, that runs through the middle of the
basalt lobe. As outlined in previous reports there is 8 m to 20 m of incompressible basalt in this area so
the potential for damaging consolidation settlement is considered to be very low. An alarm trigger level
for bores in this area was recommended (December 2012) to be 8 m (i.e. allowing sufficient time to warn
against drawdown approaching that which might result in settlement exceeding the consented levels);
groundwater levels at the end of July remain well above this level. As with those piezometers in close to
the excavation, we are not anticipating any further drawdown in the groundwater level at these
locations.
Figure 1: Drawdown vs. Distance Graph for SAT (to August 2013)
The other affected piezometers (BH503, BH525, DH825, DH826 and DH829) are clustered around the
Southern portal head wall. Within these piezometers only the groundwater level within the ECBF is
below an alert level. Groundwater levels in the basalt and alluvium remain above trigger levels and have
been steady or rising since April 2013; hence the potential for damaging consolidation settlement is
considered to be very low.
In light of the alert level exceedances we have increased the number and extent of wells being monitored
twice-weekly (the majority of which are continuously logged) and groundwater level data will continue to
be reviewed every other day until the pressure has fully stabilised. In addition we are currently reviewing
the groundwater level and settlement predictions for this area to confirm that there is no increase in the
potential for effects resulting from this drawdown.
0.00
5.00
10.00
15.00
20.00
25.00
1 10 100 1000
Max
imu
m C
han
ge in
Le
vel (
m)
Distance from SAT (m)
V
A
ER
EW
EU
BH1106
BH519
DH829 BH1103
BH1108
Shallow bores alert levelDeep bores alert levelBasalt bores alert level
August 2013 Environmental Report
AC Monthly Report August 2013 final.docx Page 9 30 September 2013
Markers within 100 m of the area (generally located on control sections K, L and M) have been specifically
reviewed, with movement being within the trigger levels for these areas.
CH10500 to CH11000
Within this zone excavation has reached maximum depth and groundwater levels in all piezometers have
been steady or rising since the end of March 2013. Groundwater levels in this area are all above trigger
levels.
Seasonal Trends
Monitoring confirms that recorded drawdowns continue to be exacerbated by the exceptionally low
rainfall that fell in Auckland in January, February, March, and again in July. Total rainfall for the Jan to
March period was less than 30 % of normal rainfall, and during the month of January less than 10 % of
normal rainfall was recorded. This followed a dry period between September 2012 and December 2012;
during this time although total rainfall was 50 % to 80% of normal, most of the rain fell in discrete storm
events therefore it can be expected that a significant proportion of the rain would have discharged to
stormwater without recharging the aquifers.
Rainfall in April, May and June 2013 has been above normal (around 600 mm over these months
compared to an expected norm of around 350 mm). More than 60 % of piezometers around the SAT have
recorded a trend in rising groundwater levels since April 16th when the first significant rainfall of the year
fell (see example of BH1106, Figure 2 below). This trend is also seen in monitoring of piezometers in the
wider Project area. The rise is generally of the order of 0.5 m to 2.0 m (since mid-April) however in some
areas the groundwater level has risen by more than 3.0 m.
Figure 2: Groundwater Levels in BH1106 compared to daily rainfall
Rainfall in July was 33 % of normal resulting in a drop in water level of typically between 0.1 m and 0.5 m
in all piezometers in the Southern Area (see example in Figure 2). Following above average rainfall in
August there has been a rise in groundwater levels.
0
10
20
30
40
50
60
70
80
90
100
29
30
31
32
33
34
35
36
37
38
39
1/11/2012 29/11/2012 27/12/2012 24/01/2013 21/02/2013 21/03/2013 18/04/2013 16/05/2013 13/06/2013 11/07/2013 8/08/2013 5/09/2013
Dai
ly R
ain
fall
(mm
)
Gro
un
dw
ate
r Le
vel (
RL
m)
Axis Title
BH1106
Mt Albert Grammar Whau Mt Roskill Avondale Racecourse BH1106_13m_V Vb alert trigger level
BH1106_15m_A A alert trigger level BH1106_20.2m EU EU alert triggerl level
August 2013 Environmental Report
AC Monthly Report August 2013 final.docx Page 10 30 September 2013
5.5. Oakley Creek Flow Monitoring
Six (6) continuous flow monitoring stations have been established by NIWA in Oakley Creek. The data
from these are updated and reviewed on a monthly basis to investigate whether the construction works
have had any effect on base flows in Oakley Creek. Five gauges were installed in late 2010, with the sixth
(Cradock Street footbridge) installed in September 2009.
Comparison of records for April to August 2013 show recorded flows generally increasing at gauges the
further downstream, from the sewer bridge to Waterview Downs. This is consistent with increasing
contribution from the aquifer and increasing catchment moving downstream.
The next full review of creek flows will in reported in the September 2013 report.
5.6. Settlement Monitoring
Monthly monitoring of framework ground settlement markers identified in the Settlement Effects
Management Plan (SEMP rev3), and additional markers installed since that time continues.
Framework markers within 150 m of the Southern Approach Trench have been being monitored
weekly since June 2012 (Figure 5). Surveyed ground levels have generally shown a broad upward trend
(around 3 mm to 5 mm) since the end of March in response to rainfall and seasonal swelling.
The majority of markers continue to show movement within +/- 3 mm of their adopted pre-construction
minimum (i.e. within the accuracy of the survey). Six markers (M9, X12, X17, X23a, Z154 and Z155)
continue to show movement in the range of 4 mm to 10 mm however this level of movement is still
within adopted trigger levels. There is no clear spatial distribution (there are markers between these six
localities and the alignment which have shown negligible movement) and with exception of X17 all
markers have shown an upward trend since June, suggesting that the movement is likely to be as a result
of seasonal settlement and rebound.
Figure 3: Ground movement for markers within 150 m of the Southern Approach Trench (to July 2013)
August 2013 Environmental Report
AC Monthly Report August 2013 final.docx Page 11 30 September 2013
For two marks (Z154 and Z155) downward movements of up to 10 mm were recorded in June and early
July approaching the alert trigger level of 10 mm at this location. These markers have shown recovery of 3
mm to 5 mm since that time, consistent with markers in the wider area. These markers form a differential
pair (in accordance with condition S.17); differential settlement between the two markers is calculated to
be flatter than 1/6,000 therefore the potential for any adverse effects is considered to be negligible and
all other markers in this area have indicated movement of less than 3 mm to 5 mm (well within trigger
levels). Regardless we will continue to monitor these markers.
Differential movement between markers is flatter than 1 in 7000 in all other areas and remains well
below trigger levels, as are assessed building damage categories in the area. Markers will continue to be
monitored and reviewed weekly.
The Alliance has recently installed 7 No. fixed deep survey benchmarks to supplement the 2nd order LINZ
benchmarks to which this survey data has historically been tied. The LINZ benchmarks are shallow and
likely to have been moving seasonally and therefore the seasonal range may have been underestimated.
Once the benchmarks have been fully established and incorporated into the survey loops, the Alliance will
be reviewing the seasonal range of movement around the Northern Area and tunnels. This will be
presented in the updated SEMP.
5.7. Ecological, Water Quality Monitoring & Sediment Quality Monitoring: Oakley Creek
Construction phase water quality monitoring has been carried out monthly, as required by consent
conditions, with the most recent routine monitoring carried out on 16 August 2013. Pre-construction and
construction phase monitoring results are shown in Figures 4 to 9 below. Full laboratory transcripts are
available on request.
0
5
10
15
20
25
30
35
Turb
idity
(NTU
)
WR1
WR2
WR3
WR4
WR5
Construction
Figure 4: Turbidity data from sites WR1-WR5
August 2013 Environmental Report
AC Monthly Report August 2013 final.docx Page 12 30 September 2013
0
10
20
30
40
50
60
70
Tota
l Sus
pend
ed S
olid
s (g
/m3 )
WR1
WR2
WR3
WR4
WR5
Pre-construction Construction
Figure 5: TSS data from sites WR1-WR5
0
2
4
6
8
10
12
pH u
nits WR1
WR2
WR3
WR4
WR5
Pre-construction Construction
Figure 6: pH data from sites WR1-WR5
0
0.002
0.004
0.006
0.008
0.01
0.012
0.014
0.016
0.018
Tota
l Cop
per (
g/m
3 )
WR1
WR2
WR3
WR4
WR5
Pre-construction Construction
Figure 7: Total copper data from sites WR1-WR5
August 2013 Environmental Report
AC Monthly Report August 2013 final.docx Page 13 30 September 2013
0
0.001
0.002
0.003
0.004
0.005
0.006
Tota
l Lea
d (g
/m3 )
WR1
WR2
WR3
WR4
WR5
Pre-construction Construction
Figure 8: Total lead data from sites WR1-WR5
0
0.01
0.02
0.03
0.04
0.05
0.06
0.07
0.08
0.09
0.1
Tota
l Zin
c (g
/m3 )
WR1
WR2
WR3
WR4
WR5
Pre-construction Construction
Figure 9: Total zinc data from sites WR1-WR5
The August routine monitoring data are summarised as follows:
Turbidity and suspended solids results were comparable to July results and to baseline data
collected prior to the commencement of construction.
pH was near-neutral at all sites and well within the accepted range that is representative of good
water quality (pH 6-9).
There were no significant differences in metals concentrations upstream and downstream of the
construction site, and measured metal levels downstream of the site were within the ‘baselind’
range recorded before the commencement of construction.
An incident involving the accidental discharge of water from the stormwater pond near CY11 occurred on
the night of 17/18 July. The results of initial follow-up water quality and ecological monitoring were
reported to Council in early August, and further follow up monitoring has recently been completed and
reported to Council.
August 2013 Environmental Report
AC Monthly Report August 2013 final.docx Page 14 30 September 2013
Six-monthly aquatic ecology and stream channel monitoring will take place in September, ahead of the
commencement of the 2013-2014 earthworks season.
Fortnightly monitoring of significant vegetation, including geraniums, continues to be carried out. All
translocation of geranium plants from areas that will be affected by the works has been completed. This
has included successful transplanting into the Diversion C area. The annual lizard and geranium
relocation report will be issued to Counil before the end of September.
A New Zealand dotterel in breeding plumage has been observed at the Great North Road interchange
(‘teardrop’ area). Measures had previously been taken to discourage dotterels from nesting in this area
(e.g. letting grass grow rank), and it does not appear that this dotterel has attempted to build a nest here.
The area is being monitored every few days, ascertain if the situation changes.
5.8. Contaminated Soil Monitoring
5.8.1. Site monitoring
No unexpected contamination was reported during the month of August 2013.
5.8.2. Soil disposal
Tables 5.1 and 5.2 below provide a summary of the soil volumes removed from the project area in August.
A total of approximately 36,350 tonnes of soil and rock were removed from the project that month. All
rock was excavated from the southern area of the project and was removed to Wiri Cleanfill for processing.
Soil was removed to Onehunga Foreshore, Ridge Road Landfill and Wire Cleanfill during the month of
August. The soil removed to Onehunga Foreshore and Wiri Cleanfill comprised East Coast Bays Formation
soils from both the northern and southern portal trench excavations. Soil removed to Ridge Road Landfill
comprised excavations related to the near surface soils from establishment works in the north and south of
the project and piling works from the GNRI works.
Earthworks that will require contaminated soil monitoring and off-site disposal in September are
summarised below.
• Between Maioro Interchange and Richardson Road for motorway alignment and retaining wall
construction to Wiri cleanfill/Onehunga Foreshore Project (up to September 2013).
• CY9, CY10 and CY11 (spoil building) formation works for disposal to both Wiri cleanfill, Three Kings
Managed Fill and/or Ridge Road Landfill (up to September 2013).
Works within Southern Approach Trench for disposal to Wiri cleanfill/Onehunga Foreshore Project (up
to September 2013).
Northern portal trench excavation for disposal to Wiri Cleanfill (up to 2014).
Establishment works, utility diversion and and piling works for the GNRI works for disposal to either
Wiri cleanfill, Three Kings Managed Fill, Ridge Road, Greenmount Landfill and/or Redvale Landfill (up
to 2014).
August 2013 Environmental Report
AC Monthly Report August 2013 final.docx Page 15 30 September 2013
Table 5.1: Disposal location and approximate quantity of soil disposed off site from the south in August 2013
Notes:
* Estimated volume based on a soil density of 1.7 tonnes/m3 ^ Estimated volume based on 19 tonnes for a articulated truck
Volume Volume Volume Volume Volume Volume Volume Volume
Tonnes tonnes m3 * Tonnes tonnes m3 * Tonnes tonnes m3 * Tonnes tonnes m3 * Tonnes tonnes m3 * Tonnes tonnes m3 * Tonnes ^ tonnes m3 * Tonnes ^ tonnes m3 *
1/08/2013 0 167212.93 98361 0.00 73921.71 43483 0.00 12051.2 7089 0.00 272773.31 160455 1096.82 257757.472 151622 0.00 8534.18 5020 0.00 16,616 9,774 1288.00 4,290 2,524
2/08/2013 0 167212.93 98361 0.00 73921.71 43483 0.00 12051.2 7089 190.72 272964.03 160567 0.00 257757.472 151622 0.00 8534.18 5020 532.00 17,148 10,087 1008.00 5,298 3,116
5/08/2013 0 167212.93 98361 0.00 73921.71 43483 0.00 12051.2 7089 456.50 273420.53 160836 295.80 258053.272 151796 0.00 8534.18 5020 448.00 17,596 10,351 0.00 5,298 3,116
6/08/2013 0 167212.93 98361 0.00 73921.71 43483 0.00 12051.2 7089 673.80 274094.33 161232 777.30 258830.572 152253 0.00 8534.18 5020 196.00 17,792 10,466 0.00 5,298 3,116
7/08/2013 0 167212.93 98361 0.00 73921.71 43483 0.00 12051.2 7089 983.58 275077.91 161811 0.00 258830.572 152253 0.00 8534.18 5020 0.00 17,792 10,466 0.00 5,298 3,116
8/08/2013 0 167212.93 98361 0.00 73921.71 43483 0.00 12051.2 7089 587.28 275665.19 162156 323.86 259154.432 152444 0.00 8534.18 5020 112.00 17,904 10,532 0.00 5,298 3,116
9/08/2013 0 167212.93 98361 0.00 73921.71 43483 0.00 12051.2 7089 641.09 276306.28 162533 313.26 259467.692 152628 0.00 8534.18 5020 0.00 17,904 10,532 0.00 5,298 3,116
12/08/2013 0 167212.93 98361 0.00 73921.71 43483 0.00 12051.2 7089 0.00 276306.28 162533 417.00 259884.692 152873 0.00 8534.18 5020 0.00 17,904 10,532 0.00 5,298 3,116
13/08/2013 0 167212.93 98361 0.00 73921.71 43483 0.00 12051.2 7089 274.58 276580.86 162695 0.00 259884.692 152873 0.00 8534.18 5020 0.00 17,904 10,532 0.00 5,298 3,116
14/08/2013 0 167212.93 98361 0.00 73921.71 43483 0.00 12051.2 7089 89.28 276670.14 162747 1068.66 260953.352 153502 0.00 8534.18 5020 0.00 17,904 10,532 0.00 5,298 3,116
15/08/2013 0 167212.93 98361 0.00 73921.71 43483 0.00 12051.2 7089 416.98 277087.12 162992 806.20 261759.552 153976 0.00 8534.18 5020 0.00 17,904 10,532 0.00 5,298 3,116
16/08/2013 0 167212.93 98361 0.00 73921.71 43483 0.00 12051.2 7089 330.88 277418 163187 997.96 262757.512 154563 0.00 8534.18 5020 0.00 17,904 10,532 0.00 5,298 3,116
19/08/2013 0 167212.93 98361 0.00 73921.71 43483 0.00 12051.2 7089 587.40 278005.4 163533 1217.36 263974.872 155279 0.00 8534.18 5020 0.00 17,904 10,532 0.00 5,298 3,116
20/08/2013 0 167212.93 98361 0.00 73921.71 43483 0.00 12051.2 7089 641.14 278646.54 163910 1205.46 265180.332 155988 0.00 8534.18 5020 0.00 17,904 10,532 0.00 5,298 3,116
21/08/2013 0 167212.93 98361 0.00 73921.71 43483 0.00 12051.2 7089 589.57 279236.11 164257 339.50 265519.832 156188 0.00 8534.18 5020 1092.00 18,996 11,174 0.00 5,298 3,116
22/08/2013 0 167212.93 98361 0.00 73921.71 43483 0.00 12051.2 7089 363.52 279599.63 164470 1179.22 266699.052 156882 0.00 8534.18 5020 0.00 18,996 11,174 0.00 5,298 3,116
23/08/2013 0 167212.93 98361 0.00 73921.71 43483 0.00 12051.2 7089 0.00 279599.63 164470 660.84 267359.892 157271 0.00 8534.18 5020 0.00 18,996 11,174 0.00 5,298 3,116
26/08/2013 0 167212.93 98361 0.00 73921.71 43483 0.00 12051.2 7089 0.00 279599.63 164470 764.08 268123.972 157720 0.00 8534.18 5020 0.00 18,996 11,174 0.00 5,298 3,116
28/08/2013 0 167212.93 98361 0.00 73921.71 43483 0.00 12051.2 7089 216.14 279815.77 164598 0.00 268123.972 157720 0.00 8534.18 5020 0.00 18,996 11,174 0.00 5,298 3,116
30/08/2013 0 167212.93 98361 0.00 73921.71 43483 0.00 12051.2 7089 0.00 279815.77 164598 1015.36 269139.332 158317 0.00 8534.18 5020 0.00 18,996 11,174 0.00 5,298 3,116
Month of August 0 0 0 7042.46 12478.68 0 2380 2296
Onehunga Foreshore
Cummulative total
Ridge Road Disposal Site
Cummulative total
Redvale Disposal Site
Cummulative total
Wiri Disposal Site (Cleanfill)
Cummulative total
Date
Cummulative total
Puketutu Managed Fill Site
Cummulative total
Wiri Disposal Site (Rock)Three Kings Managed Fill Site
Cummulative total
Greenmount Managed Fill Site
Cummulative total
August 2013 Environmental Report
AC Monthly Report August 2013 final.docx Page 16 30 September 2013
Table 5.2: Disposal location and approximate quantity of soil disposed off site from the north in August 2013
Notes:
* Estimated volume based on a soil density of 1.7 tonnes/m3 ^ Estimated volume based on 19 tonnes for a articulated truck
Volume Volume Volume Volume Volume Volume
Tonnes tonnes m3 * Tonnes tonnes m3 * Tonnes tonnes m3 * Tonnes tonnes m3 * Tonnes ^ tonnes m3 * Tonnes ^ tonnes m3 *
1/08/2013 0.00 14,456.68 8504 0.00 0 0 768.68 97861.77 57566 0.00 941.38 554 0.00 38 22 0.00 0 0
2/08/2013 0.00 14,456.68 8504 0.00 0.00 0 860.42 98722.19 58072 0.00 941.38 554 168.00 206.00 121 0.00 0 0
5/08/2013 0.00 14,456.68 8504 0.00 0.00 0 939.56 99661.75 58625 0.00 941.38 554 0.00 206.00 121 0.00 0 0
6/08/2013 0.00 14,456.68 8504 0.00 0.00 0 1006.06 100667.81 59216 0.00 941.38 554 0.00 206.00 121 0.00 0 0
7/08/2013 0.00 14,456.68 8504 0.00 0.00 0 512.14 101179.95 59518 0.00 941.38 554 0.00 206.00 121 980.00 980 576
8/08/2013 0.00 14,456.68 8504 0.00 0.00 0 89.36 101269.31 59570 0.00 941.38 554 0.00 206.00 121 28.00 28 16
9/08/2013 0.00 14,456.68 8504 0.00 0.00 0 88.16 101357.47 59622 0.00 941.38 554 0.00 206.00 121 0.00 0 0
12/08/2013 0.00 14,456.68 8504 0.00 0.00 0 27.58 101385.05 59638 0.00 941.38 554 56.00 262.00 154 0.00 980 576
13/08/2013 0.00 14,456.68 8504 0.00 0.00 0 85.48 101470.53 59689 0.00 941.38 554 224.00 486.00 286 0.00 28 16
14/08/2013 0.00 14,456.68 8504 0.00 0.00 0 629.96 102100.49 60059 0.00 941.38 554 0.00 486.00 286 0.00 0 0
15/08/2013 0.00 14,456.68 8504 0.00 0.00 0 679.24 102779.73 60459 0.00 941.38 554 0.00 486.00 286 0.00 980 576
16/08/2013 0.00 14,456.68 8504 0.00 0.00 0 592.48 103372.21 60807 0.00 941.38 554 280.00 766.00 451 0.00 28 16
17/08/2013 0.00 14,456.68 8504 0.00 0.00 0 838.28 104210.49 61300 0.00 941.38 554 308.00 1074.00 632 0.00 0 0
19/08/2013 0.00 14,456.68 8504 0.00 0.00 0 487.08 104697.57 61587 0.00 941.38 554 168.00 1242.00 731 0.00 980 576
20/08/2013 0.00 14,456.68 8504 0.00 0.00 0 428.76 105126.33 61839 0.00 941.38 554 112.00 1354.00 796 0.00 28 16
21/08/2013 0.00 14,456.68 8504 0.00 0.00 0 378.40 105504.73 62062 0.00 941.38 554 28.00 1382.00 813 0.00 0 0
22/08/2013 0.00 14,456.68 8504 0.00 0.00 0 327.24 105831.97 62254 0.00 941.38 554 0.00 1382.00 813 0.00 980 576
23/08/2013 0.00 14,456.68 8504 0.00 0.00 0 445.94 106277.91 62516 0.00 941.38 554 0.00 1382.00 813 0.00 28 16
26/08/2013 0.00 14,456.68 8504 0.00 0.00 0 221.10 106499.01 62646 0.00 941.38 554 0.00 1382.00 813 0.00 0 0
30/08/2013 0.00 14,456.68 8504 0.00 0.00 0 393.84 106892.85 62878 0.00 941.38 554 0.00 1382.00 813 0.00 980 576
Month of August 0.00 0.00 9799.76 0.00 1344.00 1008.00
Wiri Disposal Site (Cleanfill)
Cummulative total
Onehunga ForeshoreRidge Road Disposal Site
Cummulative total
Date
Three Kings Managed Fill Site Greenmount Managed Fill Site Redvale Disposal Site
Cummulative total Cummulative total Cummulative total Cummulative total
August 2013 Environmental Report
AC Monthly Report August 2013 final.docx Page 17 30 September 2013
5.9. Erosion and Sediment Control Monitoring
CESCP No. 32, Hendon Footbridge was approved by Auckland Council during the month of August.
Regular daily visits to areas of the site have been made during August by a member of the Erosion and
Sediment Control Team.
Pumping monitoring records based on the site wide pumping and dewatering plan are recorded and
maintained onsite, and are being submitted to Council for file records.
5.10. Archaeological monitoring
General archaeological monitoring of the works has been undertaken by the Project Archaeologists from
Clough and Associates in accordance with consent conditions and the following New Zealand Historic Place
Trust (NZHPT) Authorities:
2013/174 - General Authority for earthworks in association with Stage 3 Northern Portal Works.
2013/518 - General Authority for earthworks in association with Stage 4 Great North Road
Interchange Works.
6. Stakeholder Management
6.1. Stakeholders – local liaison activity
Southern Works area (Owairaka / New Windsor)
• Ongoing discussions with local residents in and around Hendon Avenue and site staff in relation to
the TBM assembly, crane movements and night works.
• Providing notification to Richardson Road residents in relation to sheet piling work for spoil handling
building.
Ongoing discussions with Wesley Primary to discuss assistance with road works project.
Providing updates in relation to Richardson Tavern to sheet piling work and project works in general.
• Ongoing discussions with Mt Roskill Business Association, advising of project work and providing
update.
• Meeting with Neighbourhood Support to provide an update on the project and discussions to
become a committee member.
• Meeting with The Police to provide a general update/ confirm key local contacts
• Fortnightly distribution of Construction Updates to local residents / businesses / cafes / libraries /
community centres / banks.
Northern sector community liaison
Meetings with residents in Pt Chevalier around the upcoming works and post construction urban
deisgn
August 2013 Environmental Report
AC Monthly Report August 2013 final.docx Page 18 30 September 2013
Letterbox drop/meeting/ongoing liaison with Montrose Street residents to discuss night works, for
service relocation on Great North Road, which required relocation of residenst from six properties
into a hotel over a period of two weeks.
Door knocking/letterdrop with Great North Road residents to discuss settlement monitoing around
their property and get approval to do so
Meeting with principal of St Francis Catholic School, Pt Chevalier to discuss service relocation works
near the school and to discuss what presentation WCA can do with the school pupils over the coming
months.
Advertised weekly timeslots at the Waterview Coffee Project
Ongoing facilitation of school noise wall mural design with Waterview School kids
Presetation to two Year 12 Geography classes at Rutherford High School, Te Atatu on the ‘How the
opinion of the Waterview community has changed since the project started’.
Presenations on the Tunnel Boring Machine to Gladstone Primary School
Participation in Waterview Neighbourhood Safety Panel group
Fortnightly distribution of Construction Updates to local residents / businesses / cafes / libraries /
community centres.
General Communications Activity: Overview
Following the excitement and activity around the TBM arrival in July, August has been a month of consolidation, future planning and social media interaction.
We have been refining the communications strategy for tunnelling – in particular how we engage residents above or directly adjacent to the tunnel alignment. Residents will be initially engaged ahead of the TBM launch to allay any concerns they may have, and then kept up to date with progress at a level they’re comfortable with through direct access to the community liaison team. General tunnelling progress will be shown online through a progress graphic.
We’ve also been working closely with the NZTA’s acoustic and environmental teams to clarify the short- and long-term consent conditions pertaining to construction and operational noise. This has in turn enabled us to ensure residents better understand the full picture of what lies ahead. Other NZTA engagement has been through a Western Ring Route coordination group to look at creating a more streamlined customer experience for SH16 users through construction.
This month we have adopted the cancer society as a nominated charity to support. We will be using our existing communications channels to help spread awareness of treatment and support in the communities in which we work, and have also commissioned the painting yellow of the launching gantry to be used for the Great North Road Interchange to assist the overall promotion.
The majority of our communictaions activity through August has been in the social media space. We now have over 900 ‘likes’ of our facebook page, and note that posts generally reach an audience of 2000+. Time-lapse and progress videos on YouTube are being well received, with social media activity well supported by traditional media interaction.
Summary of external communications activity:
Media release on main drive lowering
Time-lapse progress video released
Social media updates through facebook, Twitter and YouTube
The next major communictaions milestone will be the public open day on October 13.
August 2013 Environmental Report
AC Monthly Report August 2013 final.docx Page 19 30 September 2013
6.2. Queries, Concerns and Complaints
In summary, 14 complaints were received;
12 Noise complaints - A combination of complaints from both northern and southern areas where
residents were disturbed at night from noisy works.
2 Traffic complaints - Regarding road closures on GNR WB off ramp and GNR Pt Chev regarding an
unsigned detour for closure from GNR WB off ramp.
6.3. Education Liaison Group
In lieu of formal education sector meetings, which were poorly attended, the project team is engaging
directly with surrounding educational facilities and encouraging attendance at the quarterly Community
Liaison Group meetings
Team took six ESOL classes over two days at Wesley Primary School with a focus on personal
protection equipment (PPE). Children dressed up in PPE and were photographed playing a game
centred around Stop/Go signs.
Contruction updates / info sent out – All construction updates have been sent to local schools and
community organisations on a weekly basis. Construction Updates are also sent to NZTA for
uploading onto WCA website on a weekly basis.
We’ve had initial discussions about working with LEARNZ to opejn up the project to a nationwide
school audience through their ‘virtual field trip’ initiative.
We continue to work very closely with Waterview School, and have organised mural paintings with
Waterview Dchool pupils and also now Owairaka school.
Waterview Connection Council Monthly Compliance Reports have been uploaded to NZTA website.
August 2013 Environmental Report
AC Monthly Report August 2013 final.docx Page 20 30 September 2013
Appendix A
Consents Triggered by Works to Date
A
p
August 2013 Environmental Report
AC Monthly Report August 2013 final.docx Page 21 30 September 2013
Consent Description Trigger
Great North Road Interchange Works
EPA 10/2.005 For a new designation, SH16, SH20 and Great North underpass – NOR4. A new surface designation for construction, operation and maintenance of new interchange and structures associated with tunnel operation, including ventilation building and stack, mitigation and local road access, taking in new pieces of land, and allowing for construction and operation of ramps, stormwater, wetland ponds, ancillary safety and operational services and maintenance, temporary works, vegetation removal and restoration, relocation of services, works on north-western cycleway, landscaping and planting, open space restoration and restoration of the Oakley Inlet heritage area.
Works within the designation.
EPA 10/2.010 (ARC: 38313)
Land Disturbance (Sectors 1 – 9). Earthworks and roading / tracking/ trenching during construction - within and outside the Sediment Control Protection Area (includes the associated discharge of sediment laden water as a discharge consent)
Earthworks and roading /tracking/trenching during construction. Land disturbance activities.
EPA 10/2.025 (ARC 38329)
Discharge to air – Roadworks Discharge to air associated with roadworks (including dust emission)
General activities associated with road construction (Construction).
EPA 10/2.035 (ARC: 38340)
Erection of Temporary Structures in the CMA (Sector 5) This consent relates to the erection of temporary (construction) structures within the CMA including piers for ramps, conveyor structures, temporary staging platforms, stormwater discharge devices and other consequential activities such as disturbance and/or vegetation removal. In CPA 1 – Oakley Creek Inlet.
Erecting temporary structures within the Oakley Creek Inlet for the construction of the Great North Interchange Ramps (Construction)
EPA 10/2.041 (ARC: 38345)
Disturbance of Foreshore and Seabed (Sectors 4 and 5) Disturbance of the foreshore and seabed during construction including vegetation removal and mangrove removal, use of motor vehicles, disturbance of sediment, temporary structures and erosion and sediment control measures including, in CPA1, to access existing lawful structures, but excluding the disturbance consequential to activities under which other consents are sought. This includes disturbance for activities such as machinery access to temporary construction areas in the CMA (e.g. the estuary, Causeway Bridges, pedestrian/cycle way facility, coastal protection works, rock revetment / batters, and temporary staging platforms within Oakley Inlet etc).
Disturbance of the foreshore and seabed to access existing lawful structures during construction of the Great North Road Interchange which is not covered by other consents
EPA 10/2.042 (ARC: 38346)
Disturbance of Foreshore and Seabed (Sectors 4 and 5) The use of motor vehicles in any CPA.
Using motor vehicles in the CPA during construction of the Great North Road Interchange ramps
EPA 10/2.046 (ARC: 38350)
Discharge of Contaminants (Sectors 1 through 5) This consent relates to the discharge of contaminants during construction into the CMA and discharge of contaminants in stormwater flows during construction along Sectors 1 – 5, including point source and sheet flow discharges.
Discharge of contaminants during construction of the Great North Road Interchange Ramps and from stormwater associated with impermeable surfaces (Ramps) during construction
EPA 10/2.047 (ARC: 38351)
Discharge of Contaminants (Sectors 1 through to 5) This consent relates to the discharge of contaminants during construction into the CMA and discharge of stormwater during construction along Sectors 1 – 5, including point source and sheet flow discharges
Discharge of contaminants during construction and stormwater from impermeable surfaces (Ramps) during construction
August 2013 Environmental Report
AC Monthly Report August 2013 final.docx Page 22 30 September 2013
EPA 10/2.056 (ARC: 38361)
Occupation of CMA (Sectors 4 and 5) Occupation of the CMA for construction works in, on and over the seabed and foreshore for Project works including stormwater outfall and ancillary works in General Management Area.
Temporary occupation of the CMA during construction of the Great North Road Interchange Ramps and associated works
EPA 10/2.021 (ARC: 36474)
Discharge of contaminants to land or water from contaminated land (that is undergoing disturbance or remediation) (Sectors 1, 3, 5, 6, 7, 8 and 9) It cannot be determined at this time whether compliance with Rule 5.5.44 can be met and so, in an abundance of caution consent is being sought under Rule 5.5.44A.
Disturbance or remediation of contaminated land during construction
Northern Portal Works
EPA 10/2.005 For a new designation, SH16, SH20 and Great North underpass – NOR4. A new surface designation for construction, operation and maintenance of new interchange and structures associated with tunnel operation, including ventilation building and stack, mitigation and local road access, taking in new pieces of land, and allowing for construction and operation of ramps, stormwater, wetland ponds, ancillary safety and operational services and maintenance, temporary works, vegetation removal and restoration, relocation of services, works on north-western cycleway, landscaping and planting, open space restoration and restoration of the Oakley Inlet heritage area.
Works within the designation.
EPA 10/2.010 (ARC: 38313)
Land Disturbance (Sectors 1 – 9). Earthworks and roading / tracking/ trenching during construction - within and outside the Sediment Control Protection Area (includes the associated discharge of sediment laden water as a discharge consent)
Earthworks and roading /tracking/trenching during construction. Land disturbance activities.
EPA 10/2.017 (ARC: 38322)
Discharge to the Water Table of a Road (Sectors 1 – 9). Diversion and discharge of stormwater from impermeable areas into the water table of a road.
Discharges from the sealed carriageway.
EPA10/2.018 (ARC: 38323)
Discharge of Water from Roads (Sectors 1– 9). Diversion and discharge of stormwater into any watercourse for the purpose of draining roads.
Discharges from the sealed carriageway.
EPA 10/2.019 (ARC 38324)
Stormwater Discharge - Network Operator Activities within Urban Areas (Sectors 5, 7, 9). Stormwater discharge onto land and water. This includes discharges into Oakley Creek, Meola Stream & Pixie Stream.
Discharges to the permanent stormwater system.
EPA 10/2.025 (ARC 38329)
Discharge to Air – Roadworks. Taking precautionary approach consent is sought for discharges to air associated with roadworks (including dust emissions).
General activities associated with the road construction.
Southern Area Enabling Works
EPA 10/2.008 (ACC: Plan Modification 202)
For new designation, SH20, southern tunnel portal to Maioro Street Interchange – NOR7.
Works within the designation.
EPA 10/2.010 (ARC: 38313)
Land use consents – Land disturbance (Sectors 1-9 inclusive). Earthworks and roading/tracking/trenching during construction. Land disturbance activities.
EPA 10/2.021 (ARC 36474)
Discharge of contaminants to land or water from contaminated land (that is undergoing disturbance or remediation) (Sectors 1, 3, 5, 6, 7, 8 and 9).
Land disturbance activities within areas potentially containing contaminated material.
EPA 10/2.025 (ARC: 38329)
Discharge to air – Roadworks. Discharge to air associated with roadworks (including dust emission).
General activities associated with the road construction.
August 2013 Environmental Report
AC Monthly Report August 2013 final.docx Page 23 30 September 2013
Additional consents obtained:
Consent Description Trigger
R/LUC/2011/4677 35 Valonia Street, New Windsor
Land use consent for temporary carpark and accessway, associated earthworks and tree removal, and works within the dripline of protected trees.
Construction of temporary and permanent playing field outside designation requiring resource consents in accordance with Auckland City District Plan.
ARC: 39983 35 Valonia Street, New Windsor
Landuse consent for earthworks. Earthworks for carpark and playing field outside the designation requiring resource consents in accordance with Auckland City District Plan.
R/LUC/2012/991 Alan Wood Reserve
Removal and works within the dripline of protected trees associated with the relocation of a wastewater pipe (the Hendon Sewer) within Alan Wood Reserve.
Works for the Watercare sewer relocation located outside the designation requiring resource consents in accordance with Auckland City District Plan.
R/LUC/2012/1879 6 Barrymore Road, Owairaka
Land use consent for removal of eight protected trees associated with the creation of pedestrian and vehicular accesses within Barrymore Road Reserve.
Access to CY11 from Barrymore Road involving removal of trees outside the designation requiring resource consents in accordance with Auckland City District Plan.
Southern Area Main Works
EPA 10/2.008 (ACC: Plan Modification 202)
For new designation, SH20, southern tunnel portal to Maioro Street Interchange – NOR7.
Works within the designation.
EPA 10/2.010 (ARC: 38313)
Land use consents – Land disturbance (Sectors 1-9 inclusive) Earthworks and roading/tracking/trenching during construction.
Land disturbance activities.
EPA 10/2.001 (ARC: 38316)
Use, Erection or Placement of New Structures (Sector 9). For a stormwater pipe underneath Oakley Creek as a permanent stream.
Construction of the Hendon Park Culvert.
EPA 10/2.012 (ARC: 38317)
Use, Erection or Placement of New Structures (Sector 9). For bridges constructed over Oakley Creek – includes Hendon Park Bridge and cycleway bridges.
Construction of Oakley Creek Bridge, Hendon Pedestrian Bridge and cycle and pedestrian bridges.
EPA 10/2.014 (ARC: 38319)
Use, Erection or Placement of New Structures (Sector 9). Stormwater outfall structures for Oakley Creek.
Diversion and relocation of existing stormwater outfalls.
EPA 10/2.016 (ARC:38321)
Disturbance of bed of lakes and rivers (Sector 9). Excavation, drilling or tunnelling or other disturbance for the purpose of diverting a permanent river or stream to a new course.
Diversion of three sections of the Oakley Creek.
EPA 10/2.017 (ARC: 38322)
Discharge to the water table of a road (Sectors 1-9). Diversion and discharge of stormwater from impermeable areas into the water table of a road.
Discharges from the sealed carriageway.
EPA10/2.018 (ARC: 38323)
Discharge to the water table of a road (Sectors 1-9). Diversion and discharge of stormwater into any watercourse for the purpose of draining roads.
EPA 10/2.019 (ARC 38324)
Stormwater discharge – Network Operator activities within urban areas (Sectors 1, 3, 5, 6, 7, 9). Stormwater discharge onto land or water.
Discharges to the permanent stormwater system.
EPA 10/2.025 (ARC 38329)
Discharge to air – Roadworks Discharge to air associated with roadworks (including dust emission)
General activities associated with the road construction.
EPA 10/2.027 (ARC: 38330)
Diversion of water other than open coastal water (Sector 9). Structures for diversion of water flows of a floodplain and associated diversion and deposition of material in Sector 9.
EPA 10/2.021 (ARC:36474)
Discharge of contaminants to land or water from contaminated land (that is undergoing. disturbance or remediation) (Sectors 1, 3, 5, 6, 7, 8 and 9).
Land disturbance activities within areas potentially containing contaminated material.
August 2013 Environmental Report
AC Monthly Report August 2013 final.docx Page 24 30 September 2013
Consent Description Trigger
ARC: 40097 and 40166 53 Ormiston Road, East Tamaki
Land use consents for land modification and land disturbance for construction of a Pre-Cast Facility.
Earthworks for East Tamaki Pre-Cast Yard requiring resource consents in accordance with Manukau City District Plan.
R/LUC/2012/2168 142-160A Stoddard Rd, Mount Roskill
Land use consent for the construction and use of a new Project Site Office at Stoddard Rd, including associated earthworks and parking.
Construction of project office requiring resource consents in accordance with Auckland City District Plan.
ARC: 40316 - Stormwater ARC: 40318 - Industrial & Trade; ARC: 40319 - Air Discharge; and ARC:40627 – Landuse 53 Ormiston Road, East Tamaki
Integrated Land use consents (District & Regional) for the diversion and discharge of stormwater, the discharge of contaminants from an industrial or trade activity, the discharge of contaminants to air and parking and vehicular access infringements associated with the construction and operation of a Pre-Cast concrete facility at 53 Ormiston Road, East Tamaki.
Construction and operation of the East Tamaki Pre-Cast Yard requiring resource consents in accordance with Manukau City District Plan and Auckland Regional Plan: Air, Land and Water.
R/LUC/2012/2568 Installation of above ground duct containing power, water and telecommunication services
Installation of an above ground duct containing power, water and telecommunication services to provide services to Construction Yard 11
Works for the required above ground cable to provide services to CY11 located outside the designation requiring resource consents in accordance with Auckland City District Plan.
R/LUC/2012/4601 Valonia Sportsfield Lights 35 Valonia Street, New Windsor
To construct a sportsfield lighting column, with 2000 watt medium beam lights mounted on a 16.5 metre high pole, at Valonia Sports Field (Field No.2).
Construction of a sportsfield lighting column at
Valonia sportsfield, located outside the Project
designation, requires discretionary activity
resource consent in accordance with the
Auckland City Isthmus District Plan. R/TRC/2013/709 Richardson Rd Tree Removal
The removal of a generally protected tree located within the road reserve of Richardson Road associated with the shared pedestrian and cycleway.
The removal of a generally protected tree
located within the road reserve of Richardson
Road and outside the Project designation,
requires Restricted Discretionary Consent in
accordance with the Auckland City Isthmus
District Plan.
R/LUC/2013/646 CY11 Carpark & Storage
CY11 Carpark Extension and Storage, including associated earthworks
Located outside the Project designation the
proposal required Restricted controlled consent
for earthworks;Discretionary and Restrricted
discretionary consent for car parking; and
Discretionary consent for the placement of
containers under the Auckland City Isthmus
District Plan.
ARC: 41436 Stormwater CY11 Carpark & Storage
CY11 Carpark Extension – associated stormwater diversion
Located outside the Project designation the
proposal required Controlled activity consent
for the diversion and discharge of stormwater
(Rule 5.5.2) under the Auckland Regional Plan:
Air, Land and Water.
ARC: 41437 Earthworks CY11 Carpark & Storage
CY11 Carpark Extension – associated earthworks
Located outside the Project designation the
proposal required Restricted discretionary
consent for earthworks under the Auckland
Regional Plan: Air, Land and Water.
August 2013 Environmental Report
AC Monthly Report August 2013 final.docx Page 25 30 September 2013
Consent Description Trigger
NZHPT Authority Southern Area Enabling Works
General NZHPT Authority for Earthworks in association with Southern Area Enabling Works
Archaeological Authority required in accordance with Section 12 of the Historic Places Act.
NZHPT Authority Southern Area Main Works
General NZHPT Authority for Earthworks in association with Southern Area Main Works
Archaeological Authority required in accordance with Section 12 of the Historic Places Act.
NZHPT Authority Northern Portal Works
General HPT Authority for Earthworks in association with Northern Portal Works
Archaeological Authority required in accordance with Section 12 of the Historic Places Act.
NZHPT Authority Great North Interchange Works
General HPT Authority for Earthworks in association with Great North Interchange Works
Archaeological Authority required in accordance with Section 14 of the Historic Places Act.