Wastewater Treatment Plant (WWTP) Upgrade and Expansion Project Neighborhood Meeting August 21, 2018

Wastewater Treatment Plant (WWTP) Upgrade and Expansion

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Wastewater Treatment Plant (WWTP) Upgrade and Expansion

Wastewater Treatment Plant (WWTP)Upgrade and Expansion Project

Neighborhood MeetingAugust 21, 2018

Page 2: Wastewater Treatment Plant (WWTP) Upgrade and Expansion

AgendaOverview of Clean Water ProgramWWTP Upgrade and Expansion Project Update—Upcoming Construction• Construction Phase 1: Site Preparation

—Future Construction• Construction Phase 2: Build the Foundation• Construction Phase 3: Build the WWTP Facilities

Q&A Session

2

Page 3: Wastewater Treatment Plant (WWTP) Upgrade and Expansion

Outreach Activities

Nov JanMar ‐ May Jun Jul

2017 2018FebJun‐Jul Aug – Sep Aug

20162015Nov – Dec MayJan Jun

Page 4: Wastewater Treatment Plant (WWTP) Upgrade and Expansion

Community Outreach Channels ‐ Effectiveness Polling

Postcard MailingCity or Clean Water Program Website & Events CalendarPress Release & ArticlesSocial Media—Nextdoor, Facebook, TwitterEmail or E‐Newsletter

4

Page 5: Wastewater Treatment Plant (WWTP) Upgrade and Expansion

Overview of Clean Water Program

5

Page 6: Wastewater Treatment Plant (WWTP) Upgrade and Expansion

Aging Wastewater System Infrastructure

4

Page 7: Wastewater Treatment Plant (WWTP) Upgrade and Expansion

HEAVYRAINS

Peak Wet Weather Conditions & Insufficient Capacity

SEWER MAIN

MANHOLE

Sanitary Sewer Overflow (SSO)What Causes Sewer Overflows?Sewage, PLUS unintended 

Rain Water Entering the System

5

Page 8: Wastewater Treatment Plant (WWTP) Upgrade and Expansion

Sewer Overflow Impacts & Regulatory Violations

8

SF BAY

LAGOON

CREEKS

Page 9: Wastewater Treatment Plant (WWTP) Upgrade and Expansion

Clean Water Program Drivers and Goals

9

Align with City’s Sustainability Goals

Provide Higher Levels of Treatment & Capacity Assurance

Replace Aging Infrastructure

RWQCB Cease & Desist OrderNPDES Permit

Page 10: Wastewater Treatment Plant (WWTP) Upgrade and Expansion

Clean Water Program

Before & After Treatment

Reusable Clean Water

1. Collect 2. Treat 3. Discharge

New WWTP Treatment Approach to Prevent Sewer Overflows to SF Bay

Pipe, Pump Station, & In‐System Storage 

Upgrades to Prevent SSOs

WasteWater

Page 11: Wastewater Treatment Plant (WWTP) Upgrade and Expansion

WWTP Upgrade & Expansion ProjectUpdate

11

Page 12: Wastewater Treatment Plant (WWTP) Upgrade and Expansion

WWTP Site Location and 

Vicinity

12

San Francisco BaySeal Point Park

JoinVillePark

Leslie Creek

Leslie Creek

Kehoe Ave

Seal Slough

ExistingWWTP

Shoreview Ave

Detroit Dr.Site John Lee 

Dog Park

Page 13: Wastewater Treatment Plant (WWTP) Upgrade and Expansion

WWTP Site Location

13

Leslie Creek

Detroit DriveSite

Page 14: Wastewater Treatment Plant (WWTP) Upgrade and Expansion

WWTP Site Layout 

14

Aging Existing Facilities to be Replaced 

New Facilities

Existing Facilities to be Rehabilitated/ Repurposed

Page 15: Wastewater Treatment Plant (WWTP) Upgrade and Expansion

15

WWTP Conceptual Renderings

Page 16: Wastewater Treatment Plant (WWTP) Upgrade and Expansion

WWTP Conceptual Renderings

16

Page 17: Wastewater Treatment Plant (WWTP) Upgrade and Expansion

17

WWTP Conceptual Renderings

Page 18: Wastewater Treatment Plant (WWTP) Upgrade and Expansion

Construction – Phase 1

Site Preparation

18

Page 19: Wastewater Treatment Plant (WWTP) Upgrade and Expansion

Existing Site ‐ Wide Angle ViewPhoto taken August 2018

19

Detroit DriveSite

Page 20: Wastewater Treatment Plant (WWTP) Upgrade and Expansion

Existing Site – Aerial ViewGoogle Maps Satellite Capture

20

Page 21: Wastewater Treatment Plant (WWTP) Upgrade and Expansion

21

Phase 1 – Site PreparationWork includes:‒Demolish retired facilities‒Mass Excavation‒Dewatering System‒Construction Trailers Setup

Schedule:‒Approximately 10 months starting Spring 2019

Conceptual Rendering of Phase 1 Construction Work

Retired Filters

Retired Digesters

Construction Trailers

Dewatering System

Mass Excavation

Page 22: Wastewater Treatment Plant (WWTP) Upgrade and Expansion

Phase 1 – Construction Traffic MitigationPhase 1 – Construction Traffic Mitigation

22

WWTP Upgrade and Expansion SiteTraffic Management Plan 

City Approved Haul Routes

Page 23: Wastewater Treatment Plant (WWTP) Upgrade and Expansion

Phase 1 ‐ Dust MitigationPhase 1 ‐ Dust Mitigation

23

Wet Sweeping

Rumble Strips at Construction Site Exits

Cover Hauling Trucks

Page 24: Wastewater Treatment Plant (WWTP) Upgrade and Expansion

Phase 1 – Anticipated Noise & VibrationPhase 1 – Anticipated Noise & Vibration

24

Typical construction noise expectedVibration potentially during demolition activity

Page 25: Wastewater Treatment Plant (WWTP) Upgrade and Expansion

Existing Routes to be ClosedAlternate Routes

Portion of Detroit Dr. to be Permanently Closed

Phase 1 ‐ Ped/Bike Access Route AlternativesPhase 1 ‐ Ped/Bike Access Route Alternatives

Page 26: Wastewater Treatment Plant (WWTP) Upgrade and Expansion

Phase 1Parking Restrictions& Accommodations 

Phase 1Parking Restrictions& Accommodations 

26

No Public Parking during Construction

Alternative Parking & Facilities

Seal Point Park Parking & Dog Park

Portion of Anchor Rd Parking Lot

Anchor Rd Public On‐Road Parking

Joinville ParkParking Lot

Page 27: Wastewater Treatment Plant (WWTP) Upgrade and Expansion

Phase 1 ‐ Staging of Construction Trailers, Contractor Parking, and Equipment LaydownPhase 1 ‐ Staging of Construction Trailers, 

Contractor Parking, and Equipment Laydown

AREA 1Dale Ave Undeveloped Open SpaceConstruction Trailers & Parking

AREA 3Portion of Anchor Rd Parking Lot

Contractor Parking

AREA 2Anchor Rd Passive Open Space

Contractor Parking & Equipment Laydown

Page 28: Wastewater Treatment Plant (WWTP) Upgrade and Expansion

Phase 1 – Setup Staging Area 1Conceptual Rendering

Phase 1 – Setup Staging Area 1Conceptual Rendering

28

Contractor Parking

Screened Fence

Construction Trailers

Path Closed During Construction

Phase 1

Phase 2/3

Phase 3

Phase 3

Phase 3

Dale Ave

Page 29: Wastewater Treatment Plant (WWTP) Upgrade and Expansion

Future ConstructionPhases 2 & 3

29

Page 30: Wastewater Treatment Plant (WWTP) Upgrade and Expansion

30

Phase 2 – Build the FoundationConcept Rendering of Phase 2 Completed Work

Work includes:—Majority of Pile Driving 

—Underground Utilities and Pipes

Schedule: —Tentatively starting Fall 2019 and would last approx. 6‐8 months

—Work overlaps with the Phase 1

Majority of Pile Driving

Underground Utilities & Pipes

Page 31: Wastewater Treatment Plant (WWTP) Upgrade and Expansion

31

Phase 3 – Build the WWTP FacilitiesConcept Rendering of Completed Project

Work includes:—New Treatment Facilities—Administration Building —Additional Pile Driving—Street  and Landscape Improvements

—Demobilization

Schedule:—Tentatively planned to start Summer 2020

—Work overlaps with Phase 2

Construction duration for all three phases is approx. 5 years total

Page 32: Wastewater Treatment Plant (WWTP) Upgrade and Expansion

Sign Up for Email [email protected]

Register for Private Neighborhood Updateswww.NextDoor.com

Contact Us www.CleanWaterProgramSanMateo.org650‐727‐6870

32

How to Stay Informed and Provide Input

Page 33: Wastewater Treatment Plant (WWTP) Upgrade and Expansion

33

Q&A Session