Collingwood Wastewater Treatment Plant 2016 Annual Compliance Report

Collingwood Wastewater Treatment Plant · WWTP Expansion/Upgrade ... HP Horsepower Kg Kilograms kW Kilowatt mg/l Milligrams per litre Ml/d Mega litres per day m3/d Cubic metres per

Embed Size (px)

Citation preview

Page 1: Collingwood Wastewater Treatment Plant · WWTP Expansion/Upgrade ... HP Horsepower Kg Kilograms kW Kilowatt mg/l Milligrams per litre Ml/d Mega litres per day m3/d Cubic metres per

Collingwood Wastewater Treatment Plant2016 Annual Compliance Report

annenorris
Typewritten Text
Page 2: Collingwood Wastewater Treatment Plant · WWTP Expansion/Upgrade ... HP Horsepower Kg Kilograms kW Kilowatt mg/l Milligrams per litre Ml/d Mega litres per day m3/d Cubic metres per

Wastewater Treatment Annual Report 2016 1

Table of Contents Definitions ..................................................................................................................................................................2

Wastewater System General Information ..................................................................................................................3

Executive Summary ....................................................................................................................................................4

Section 1.0 The Facility .........................................................................................................................................5

Section 2.0 Annual Average Performance Evaluation ..........................................................................................6

2.1 Effluent Quality Assessment .......................................................................................................................6

2.2 Effluent Sampling Requirements Monitoring & Reporting .........................................................................7

2.3 Capacity Assessment ..................................................................................................................................9

Section 3.0 Biosolids Management ......................................................................................................................9

Section 4.0 Bypass Occurrences ........................................................................................................................ 10

Section 5.0 Maintenance ................................................................................................................................... 10

Section 6.0 Complaints ...................................................................................................................................... 10

Section 7.0 Other Projects ................................................................................................................................. 11

WWTP Expansion/Upgrade ................................................................................................................................. 11

Cogeneration/ Odour Control .............................................................................................................................. 11

EPS OXI-G Unit Installation .................................................................................................................................. 11

2017 Capital Improvement Projects .................................................................................................................... 11

Appendix A WWTP Sampling Program ............................................................................................................... 13

Appendix B Monthly Flow and Process Quality Data ......................................................................................... 14

2016 Monthly Final Effluent Flows ...................................................................................................................... 15

2016 Monthly Average Concentration Final Effluent CBOD5 ............................................................................... 16

2016 WWTP Final Effluent Total Phosphorous .................................................................................................... 17

2016 Monthly Average Concentration Final Effluent TSS .................................................................................... 18

Appendix C Sludge Management Overview ....................................................................................................... 19

Appendix D Bypass and Spills Report .................................................................................................................. 31

Page 3: Collingwood Wastewater Treatment Plant · WWTP Expansion/Upgrade ... HP Horsepower Kg Kilograms kW Kilowatt mg/l Milligrams per litre Ml/d Mega litres per day m3/d Cubic metres per

Wastewater Treatment Annual Report 2016 2

Definitions

BOD Biochemical Oxygen Demand

CBOD5 Carbonaceous Biochemical Oxygen Demand

Cfu Colony Forming Units

C of A Ministry of the Environment Certificate of Approval

COD Chemical Oxygen Demand

DO Dissolved Oxygen

ECA Environmental Compliance Approval

Hg Mercury

FP Filtered Phosphorous

HP Horsepower

Kg Kilograms

kW Kilowatt

mg/l Milligrams per litre

Ml/d Mega litres per day

m3/d Cubic metres per day

NH3 Ammonia

NO2 Nitrites

NO3 Nitrates

SPS Sewage Pump Station

STF Sewage Transfer Station

SVI Sludge Volume Index

TBOD Total Biochemical Oxygen Demand

TKN Total Kjeldahl Nitrogen

TP Total Phosphorous

TS Total Solids

TSS Total Suspended Solids

UV Ultraviolet

VFA Volatile Fatty Acids

VS Volatile Solids

WWTP Wastewater Treatment Plant

Page 4: Collingwood Wastewater Treatment Plant · WWTP Expansion/Upgrade ... HP Horsepower Kg Kilograms kW Kilowatt mg/l Milligrams per litre Ml/d Mega litres per day m3/d Cubic metres per

Wastewater Treatment Annual Report 2016 3

Wastewater System General Information This annual report has been presented and approved by the Town of Collingwood Council. A notice has been placed in local newspapers notifying the public and any interested authority that the Collingwood Wastewater System’s 2016 Annual Compliance Report can be viewed on the website shown below or upon request, a copy will be made available free of charge. The Wastewater System 2016 Annual Report can be viewed and downloaded in PDF format from the following website: http://www.collingwood.ca/water/docs

Wastewater System Name Collingwood Wastewater Treatment Plant

Wastewater Works Number 120000550

Wastewater System Owner Town of Collingwood

Wastewater System Category

Class III Certification

Period being Reported

January 1, 2016 to December 31, 2016

Plant Certificate of Approval & Amendments: The Plant operates under the Certificate of Approval Number 2639-5TLQB2 dated the 17th day of December 2003.

Page 5: Collingwood Wastewater Treatment Plant · WWTP Expansion/Upgrade ... HP Horsepower Kg Kilograms kW Kilowatt mg/l Milligrams per litre Ml/d Mega litres per day m3/d Cubic metres per

Wastewater Treatment Annual Report 2016 4

Executive Summary This report has been compiled in accordance with the reporting requirements of the Certificate of Approval (C of A) 2639-5TLQB2, Condition 10 (6). The report is broken down into sections for simplicity. Additional information may be contained in each section over and above that which is required to support and substantiate the required content. If further clarification is required please contact: Mr. Glenn Price, Manager of Wastewater Treatment 705-445-1581 Ext. 3315 [email protected]

Page 6: Collingwood Wastewater Treatment Plant · WWTP Expansion/Upgrade ... HP Horsepower Kg Kilograms kW Kilowatt mg/l Milligrams per litre Ml/d Mega litres per day m3/d Cubic metres per

Wastewater Treatment Annual Report 2016 5

Section 1.0 The Facility The Collingwood WWTP, owned and operated by the Town of Collingwood, is a conventional activated sludge plant with alum addition for phosphorus removal. Treated effluent from the plant is discharged to Collingwood Harbour, which is situated in Georgian Bay on the south shore of Nottawasaga Bay. The plant is located at the northern limit of Birch Street in Collingwood. The plant was first constructed in 1958 to provide primary treatment of the Town's domestic and industrial wastewater. The primary plant was expanded in 1968. Secondary treatment was added in 1981. The rated flow capacity is 24,548 m3 /day with a peak flow rate of 60,900 m3/day. Wastewater from the serviced area flows to the plant by gravity, although seven (7) pumping stations at Minnesota Street, St. Clair Street, Paterson Street, Cranberry Trail, Black Ash Creek, Pretty River Estates and Silver Glen boost the flow throughout the area. Major unit operations at the Collingwood WWTP include the following:

Headworks - provides the following preliminary process treatments: o Emergency plant bypass o Automated mechanical raked raw sewage screen o Manual raked bypass raw sewage screen o Raw sewage pumping station o Grit removal o Bio scrubber for headwork’s odour control o Septic/leachate handling

Primary Sedimentation

Activated Sludge with Alum addition for Phosphorus Removal

Secondary Clarification

Disinfection with UV

Effluent discharge to Collingwood Harbour

Thickening of waste activated sludge by Dissolved Air Flotation

Anaerobic Sludge Digestion

Liquid Digested Sludge Land Utilization Disposal

Sludge Storage Lagoon (off site)

Standby power source (diesel driven generator)

Page 7: Collingwood Wastewater Treatment Plant · WWTP Expansion/Upgrade ... HP Horsepower Kg Kilograms kW Kilowatt mg/l Milligrams per litre Ml/d Mega litres per day m3/d Cubic metres per

Wastewater Treatment Annual Report 2016 6

Section 2.0 Annual Average Performance Evaluation

2.1 Effluent Quality Assessment

1. Effluent Objectives - Condition 6 (1) of the C of A states the requirements for effluent objective quality. The Owner shall use best efforts to operate the treatment system within these effluent limits.

The effluent objective concentrations are summarized below in Table 1.

Table 1-Effluent Objectives Effluent Parameter Concentration Objectives

(milligrams per litre unless otherwise indicated)

CBOD5 15.0

Total Suspended Solids 15.0

Total Phosphorus 0.8

E.Coli

Monthly Geometric Mean Density 100 organisms per 100ml

pH of the effluent maintained between 6.5 to 9.5, inclusive, at all times

2. Effluent Limits - For the purposes of determining compliance with and enforcing concentrations and readings in Table 2, see Condition 7(2) of C of A. Effluent Compliance limits are what the system must achieve.

Table 2-Effluent Limits Effluent Parameter Average Concentration

(milligrams per litre unless otherwise indicated)

Average Waste Loading (kilograms per day unless otherwise

indicated)

CBOD5 25.0 613.7

Total Suspended Solids 25.0 613.7

Total Phosphorus 1.0 24.5

pH of the effluent maintained between 6.0 to 9.5, inclusive, at all times

a. The Annual Average Concentration of Carbonaceous Biochemical Oxygen Demand (CBOD5)

and Total Suspended Solids named in Column 1 of Table 2 shall not exceed the corresponding maximum concentration set out in Column 2 of Table 2.

b. The Monthly Average Concentration of Total Phosphorus named in Column 1 of Table 2 shall not exceed the corresponding maximum concentration set out in Column 2 of Table 2.

c. The Annual Average Loading of a parameter named in Column 1 of Table 2 shall not exceed the corresponding maximum waste loading set out in Column 3 of Table 2.

d. The pH of the effluent shall be maintained within the limits outlined in Table 2 at all times.

Page 8: Collingwood Wastewater Treatment Plant · WWTP Expansion/Upgrade ... HP Horsepower Kg Kilograms kW Kilowatt mg/l Milligrams per litre Ml/d Mega litres per day m3/d Cubic metres per

Wastewater Treatment Annual Report 2016 7

e. Notwithstanding Condition 7(1), the Owner shall operate and maintain the works such that the effluent is continuously disinfected so that the monthly Geometric Mean Density of E.coli does not exceed 200 organisms per 100 millilitres of effluent discharged from the works.

f. Only those monitoring results collected during the corresponding time period shall be used in calculating the Annual Average Concentration/Monthly Average Concentration/Annual Average Loading for this Certificate.

Monitoring results for 2016 are summarized in Appendix B.

A summary of compliance is listed below:

The annual average effluent concentrations for CBOD5, and TP fell within the applicable objectives.

The monthly average effluent concentrations for TP fell within the applicable objective.

The annual average effluent concentrations for CBOD5, and TSS fell within the applicable compliance limit.

The monthly average effluent concentration for TP fell within the applicable compliance limit.

The annual average effluent loadings for CBOD5, TSS, and TP, all fell within the applicable compliance limits.

The pH values have fallen within the 6.0 to 9.5 range permitted under the certificate.

The monthly geometric mean densities of E-Coli bacteria in the final effluent met the compliance criteria for all months.

The monthly geometric mean densities of E-Coli bacteria in the final effluent met the objective criteria for all months except January.

2.2 Effluent Sampling Requirements Monitoring & Reporting 1.0 Compliance Testing and Analysis Monitoring requirements are specified under Condition 9 (3) of the C of A. Twenty-four (24) hour composite samples of raw sewage are required to be collected quarterly and analyzed for CBOD5, TSS, TP and TKN. Twenty–four (24) hour composite samples of final effluent are required to be collected monthly and analyzed for CBOD5, TSS. Twenty–four (24) hour composite samples of final effluent are required to be collected weekly and analyzed for TP and total ammonia nitrogen. Grab samples of final effluent are required to be collected weekly for analysis for E-Coli bacteria. Lastly, the temperature and pH of the final effluent is required to be tested three times each week. The plant’s current regular monitoring program exceeds these minimum requirements. Compliance sampling and analysis of raw sewage is carried out quarterly. Twenty–four (24) hour composite samples are collected using an automatic sampler for analysis of CBOD5, TSS, TP and TKN. Compliance sampling and analysis of final effluent is carried out weekly. Twenty–four (24) hour composite samples are collected using a refrigerated automatic sampler for analysis of CBOD5, TSS, TP, and TKN, total ammonia nitrogen, nitrite and nitrate. Grab samples of final effluent are also collected weekly for analysis of E.Coli bacteria. Lastly, grab samples are collected daily (Monday to Friday) and tested for pH and temperature. With the exception of the samples collected for pH and temperature testing, analysis for all compliance samples is carried out by our external contract laboratory, ALS Environmental Laboratory, in Waterloo, Ontario.

Page 9: Collingwood Wastewater Treatment Plant · WWTP Expansion/Upgrade ... HP Horsepower Kg Kilograms kW Kilowatt mg/l Milligrams per litre Ml/d Mega litres per day m3/d Cubic metres per

Wastewater Treatment Annual Report 2016 8

The plant also complies with Guideline F-10-1 concerning sampling and analysis requirements which satisfies Condition 9 (4) (a). The temperature and pH of the final effluent is taken in the field at the time of sampling for Total Ammonia Nitrogen so as we can calculate the concentration of un-ionized ammonia as set out in Condition 9 (5). The Collingwood WWTP external sampling program is attached as Appendix A – WWTP Sampling Program. All external laboratory analysis results are reported in the R1 and R2 Municipal Utility Monitoring forms which are submitted electronically to the Barrie District Office and are used in generating the annual plant performance report. 2.0 In-House Testing and Analysis for Process Control Twenty–four (24) hour composite samples are collected Monday through Friday on influent, primary effluent and final effluent. Grab samples are also obtained for other process streams as required for process control purposes. All samples are analyzed on-site using standard method techniques or using approved methods for HACH DR/2010 Spectrophotometer. The Collingwood WWTP internal sampling program is attached as Appendix A – WWTP Sampling Program. Samples are analyzed using procedures from the most current edition of Standard Methods or HACH DR/2010 spectrophotometer methods. The time and day of the samples is determined by the Laboratory Technician so as to equalize the workload while maintaining representative operations data. The Technician is responsible for obtaining proper and sufficient samples through co-ordination with the process operators. 3.0 Flow Measurement Flows at the Collingwood WWTP are continuously measured at the raw sewage pumps and at the final effluent weir.

Raw sewage flows are monitored by ultrasonic flow measuring devices on pumps 1 and 3 and an electromagnetic device (magmeter) on pump 2. All devices are installed on the discharge side of the pumps.

Final effluent flows are continuously monitored by means of rectangular weir with an ultrasonic flow monitor.

A 24-hour chart recorder records the final effluent flow.

Both the influent and final effluent flows are trended through the SCADA system.

The meters are calibrated annually for accuracy (must be +/- 15%of flow rate) to satisfy Condition 9 (7) of the C of A.

Date Equipment Calibrated/Maintenance

Company Performing Calibration/ Maintenance

June 1, 2016 Influent X 3, Raw Sludge Flow, Sludge Loading, TWAS and Final Effluent

V. Nowik Instrumentation and Controls

Page 10: Collingwood Wastewater Treatment Plant · WWTP Expansion/Upgrade ... HP Horsepower Kg Kilograms kW Kilowatt mg/l Milligrams per litre Ml/d Mega litres per day m3/d Cubic metres per

Wastewater Treatment Annual Report 2016 9

2.3 Capacity Assessment The Certificate of Approval specifies that the plant is rated to treat an average daily flow of 24,548 m3/d and a peak flow of 60,900 m3/d.

Design Current Year

ADF in m3/d 24,548 16,879

Maximum daily flow in m3/d 60,900 60,310*

The annual average daily flow has fallen within these limits for this reporting period. *The peak single day max daily design flow was exceeded; approximately 50,000m3 was bypassed during an extreme weather event in addition to the max daily design flow that went through the plant. The annual average performance data is summarized in Appendix B.

Section 3.0 Biosolids Management The WWTP currently stabilizes its biosolids (sludge) through anaerobic digestion comprised of two (2) primary digesters, each with a capacity of 1,223m3, one (1) secondary digester for separation of digested sludge and collection and storage of gas, with a capacity of 1,223m3 and one (1) sludge holding tank with continuous air supply and a capacity of 990m3. A waste gas burner with a rated capacity of 560m3/hr is connected to the system. Stabilized biosolids are spread on licensed agricultural land as a nutrient and soil conditioner. Sludge produced at the Collingwood WWTP meets the quality criteria specified in the Ontario Guidelines for Sewage Sludge Utilization on Agricultural Lands. Sludge is applied in accordance with these guidelines and the conditions set out in the site Certificate of Approvals. Sludge disposal through direct utilization on land is not practical during winter months, during periods of inclement weather and when agricultural fields are inaccessible. The provincial guidelines for biosolids utilization on land recommends municipalities provide 6 months sludge storage facilities. The Town of Collingwood currently owns & operates a 5,000 m3 STF located on Part Lot 48, Concession 12 in the Town of Collingwood and contracts two 6,800 m3 STF from Region of Huronia Environmental Services Ltd. to achieve this guideline. Sludge disposal operations are currently contracted to a private hauler, Region of Huronia Environmental Services Limited, R. R. #1, New Lowell, Ontario, L0M 1N0 A total volume of 26,303.4m3 of biosolids was disposed of from the Collingwood facility in 2016. Samples of anaerobic sludge are collected twice monthly and sent for metals, E.coli, and nutrient analysis to ALS Environmental, Waterloo, Ontario, N2V 2C5. Appendix C provides a detailed summary report of sites utilized for sludge disposal in 2016. Original reporting analysis is available at the plant for viewing.

Page 11: Collingwood Wastewater Treatment Plant · WWTP Expansion/Upgrade ... HP Horsepower Kg Kilograms kW Kilowatt mg/l Milligrams per litre Ml/d Mega litres per day m3/d Cubic metres per

Wastewater Treatment Annual Report 2016 10

Section 4.0 Bypass Occurrences

There was one bypass occurrence during this reporting period on March 28, 2016 due to an extreme weather event. Flow to the plant went beyond the peak capacity of 60,900 m3/d. This was due to extreme weather condition which saw a high amount of snow melt and rain water reach the WWTP. Approximately 50,000 m3 was bypassed directly to Georgian Bay. The WWTP ORO contacted the Ministry of Environment and Climate Change, Spills Action and the Ministry of Health as required and provided a detailed summary of the event. A summary of the event is attached as Appendix D.

Section 5.0 Maintenance A record log is kept for each piece of equipment at the Collingwood WWTP. These logs are available for inspection at the plant. In 2016, we continued with the Continuous Service Program performed by Ainsworth Electric Co. Limited. This program utilizes such tools as thermography, voltage, load and harmonic checks, vibrations analysis etc. and has been designed using predictive and preventative maintenance to increase safety, reduce down time, reduce maintenance costs, protect asset value and extend equipment life. Regarding electrical inspections, the WWTP and seven pumping stations are being reviewed under the Electrical Safety Authority. The associated logbook at the site is available for review. All boiler and pressure vessels were inspected by personnel from the Boiler Inspection and Insurance Company of Canada. Signs of small leakage in the heat exchanger were noted and a full boiler re-tube was performed. The boiler was placed back into service with minimal downtime with no effect on plant performance. All primary and secondary clarifiers were taken out of service for inspection and repairs implemented as required (e.g. damaged flights replaced, drive chains changed, etc.). UV lamps on the disinfection system were changed out before the 5000 hour limit. Yearly inspection/maintenance was performed by Toromont CAT on standby power equipment at the main plant and all pumping stations. Gas monitoring equipment was calibrated and serviced as original equipment manufacturer’s recommendation.

Section 6.0 Complaints

The report below outlines each complaint received in 2016. The documented versions of these complaints are held at the Collingwood WWTP and are available for review on request.

Page 12: Collingwood Wastewater Treatment Plant · WWTP Expansion/Upgrade ... HP Horsepower Kg Kilograms kW Kilowatt mg/l Milligrams per litre Ml/d Mega litres per day m3/d Cubic metres per

Wastewater Treatment Annual Report 2016 11

Date Complaint Action/Observations

November 14, 2016 Complainant said waste gas burner was out. Upon arriving at plant, burner was going.

Called complainant and advised that equipment was running.

Section 7.0 Other Projects

WWTP Expansion/Upgrade

Conestoga Rovers and Associates (CRA) (now operating as GHD Canada) completed a Class Environmental Assessment (Class EA) related to the next expansion phase for the Collingwood Wastewater Treatment Plant in May 2011. The Class EA was initiated at a time when treatment flows were close to 80% of the WWTP average day capacity. The Class EA selected a preferred expansion concept that included maintaining the current conventional activated sludge treatment process, and an expansion utilizing compact secondary and tertiary technology with the ability for phased implementation. With the completion of infiltration/inflow improvements in the collection system and the loss of industry demands in the Town, current flows indicate an expansion is not required in the near future. In 2016, the WWTP ADF was operating at 69% of design ADF.

Cogeneration/ Odour Control Following the completion of a feasibility study on economic and technical options for using the digester gas, the Town decided to move forward with the installation of a co-generation plant. A micro turbine will use digester gas to create electricity which will be fed back into the plant behind the hydro meter, reducing the amount of electricity needed at the WWTP. This project will reduce the carbon footprint of the WWTP and is a beneficial way to utilize digester gas that is produced from the treatment process. Included in the project is the installation of a cover over the primary clarifiers and the installation of a gas conditioning skid to treat gas released during the transfer of digested sludge. This combined project received approval in 2016 for Small Communities Funding, a funding partnership between the Government of Canada, the Province of Ontario and the Town of Collingwood. Construction of the co-generation and odour control systems commenced in July 2016. The project is expected to be commissioned by August 2017.

EPS OXI-G Unit Installation The WWTP received a minimal amount of odour complaints in 2016. Odour control at the WWTP will be further improved in 2017 following the installation of an OXI-G unit in the headworks building. This revolutionary and proprietary unit will be installed in the headworks building and will operate in conjunction with the existing bioscrubber. This unit oxidizes chemicals in the gas stream, converting ambient air into pure ozone and hydroxide radicals. The unit will remove odours with a predicted 99% efficiency. The installation of this Canadian design in Collingwood will be the first full scale application of this product.

2017 Capital Improvement Projects

A number of improvement projects will be advanced in 2017. The following projects have been included in the 2017 budget:

Feasibility study on the options for UV unit replacement.

Page 13: Collingwood Wastewater Treatment Plant · WWTP Expansion/Upgrade ... HP Horsepower Kg Kilograms kW Kilowatt mg/l Milligrams per litre Ml/d Mega litres per day m3/d Cubic metres per

Wastewater Treatment Annual Report 2016 12

Engineering design and commence construction of upgrades at the Black Ash Creek & Minnesota Sewage Pump Stations, as identified through the asset management plan.

Purchase and installation of variable frequency drives on pump motors for increased efficiency.

Completion of design specifications for the replacement of existing brick facades.

Page 14: Collingwood Wastewater Treatment Plant · WWTP Expansion/Upgrade ... HP Horsepower Kg Kilograms kW Kilowatt mg/l Milligrams per litre Ml/d Mega litres per day m3/d Cubic metres per

Wastewater Treatment Annual Report 2016 13

Appendix A WWTP Sampling Program

Samples are analyzed using procedures from the most current edition of Standard Methods or HACH

DR/2010 spectrophotometer methods. The time and day of the samples is determined by the

Laboratory Technician so as to equalize the workload while maintaining representative operations data.

The Technician is responsible for obtaining proper and sufficient samples through co-ordination with the

process operators.

COLLINGWOOD EXTERNAL SAMPLING PROGRAM

Unit Process Type Sample Parameters Tested Frequency

Raw Sewage Composite CBOD5, TSS, TP, TKN Quarterly

Primary Effluent Composite NH3,TKN, VFA, NO3, CBOD5, NO2,

Biweekly

Final Effluent Composite Grab

NH3, TKN, TP, NO3, CBOD5, SS, TBOD5, NO2, Bacti (E-coli)

Weekly Weekly

Biosolids (Anaerobic sludge)

Grab when truck loaded

TS, anions, ICP, Hg, TKN, TP, VS & E-coli

2x/month

Influent 24 hr. composite pH, SS, TP, FP, Temperature, COD, BOD5,

Daily M-F WTF

Primary Effluent 24 hr. composite SS, TP, FP, COD, BOD5 Daily M-F W,Th,F

Final Effluent 24 hr. composite

pH, SS, TP, FP, Temperature. COD, NH3, BOD5,

Daily M-F W,Th,F

Aeration mixed liquor return sludge (iii) waste activated sludge

Grab Grab Grab

- half hour settling - SS - Calculate SVI - DO (as required to check against on-line readings) SS SS

Daily M-F Daily M-F Daily M-F

Thickening Grab TS, VS in thickened sludge 4 X/week

Raw Sludge Grab TS, VS 4 X/week

Digested Sludge Grab TS, VS Weekly

Digester Supernatant

Grab TS, VS, BOD5, TP, alkalinity Volatile acids, pH

As process requires

Page 15: Collingwood Wastewater Treatment Plant · WWTP Expansion/Upgrade ... HP Horsepower Kg Kilograms kW Kilowatt mg/l Milligrams per litre Ml/d Mega litres per day m3/d Cubic metres per

Wastewater Treatment Annual Report 2016 14

Appendix B Monthly Flow and Process Quality Data Plant Collingwood WWTP Region Central

Municipality Town of Collingwood District Simcoe CBOD5 15mg/L

Works Number Operating AuthorityMunicipal TSS 15mg/L

Treatment Conventional Activated Sludge Watercourse Collingwood Harbour TP 0.8 mg/L

Phosphorus Removal Minor Basin Huron E-Coli 100 organisms/ 100mL

Design Capacity 24.548 (1000 m3/d) Major Basin Great Lakes pH 6.5 to 9.0

Population Served 19951

Annual average Annual average Average

2016 Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec concentration Loading daily flow

FLOWS (m3/d) 16879

Monthly ADF 16389 22954 28627 25164 15907 12783 12079 12742 14370 13306 11821 16691

Month Total 508049 665680 887430 754920 493119 383480 374460 395010 431090 412480 354620 517410

Max day 24070 36810 60310 46850 24360 15980 14110 24670 30870 17380 14200 30620

Min day 12560 15200 16470 16640 10430 10770 10300 10270 9550 10910 9480 12590

CBOD5 (mg/L) Compliance is Compliance is

Influent 79.9 141 355 166 25 mg/L 613.7 kg/d

Effluent 2.00 2.23 2.62 2.4 2.2 5.1 2.1 3.1 2.4 2.3 2.0 2.4 2.6 43.37

Final Effluent Objective concentration is 15 mg/L

SS(mg/L) Compliance is Compliance is

Influent 85 137 536 130 25 mg/L 613.7 kg/d

Effluent 4.1 3.8 4.6 4.1 4.1 10.9 2.6 3.6 3.7 4.0 1.9 3.7 4.3 71.95

Final Effluent Objective concentration is 15 mg/L

TP (mg/L) Compliance is

Influent 1.69 3.09 8.79 5.61 24.5 kg/d

Effluent 0.15 0.15 0.12 0.15 0.17 0.31 0.11 0.45 0.28 0.15 0.21 0.11 0.20 3.33

Monthly average concentration:objective is 0.8mg/L, compliance limit is1.0mg/L and an annual average loading of 24.5 kg/d

TKN (mg/L)

Influent 13.1 35.1 55 38.3

Effluent 2.4 3.8 4.2 7.5 2.7 3.9 1.7 4.1 2.2 0.4 0.4 2.2

TAN (mg/L)

Influent

Effluent 1.78 3.16 3.03 6.21 1.12 1.76 0.14 2.35 0.84 0.42 0.11 0.69

pH of Final Effluent

Min (6.0) 6.8 6.9 7 7 7.1 7.1 7.1 7 7 6.9 7 7.1

Max (9.5) 7.6 7 7.3 7.57 7.3 7.4 7.5 7.2 7.2 7.9 7.2 7.3

Compliance means maintaining the the pH of the final effluent within the limits 6.0 to 9.5(objective is 6.5 to 9.0)

E-Coli

Final effluent 128 72 58 21 3 13 2 6 63 2 0 2

Monthly geometric mean density of E-Coli: objective is100organisms/100mL,compliance is 200 organisms /100mL

120000550

Effluent Objectives

Page 16: Collingwood Wastewater Treatment Plant · WWTP Expansion/Upgrade ... HP Horsepower Kg Kilograms kW Kilowatt mg/l Milligrams per litre Ml/d Mega litres per day m3/d Cubic metres per

Wastewater Treatment Annual Report 2016 15

2016 Monthly Final Effluent Flows

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Design Daily 25000 m3/day 25000 25000 25000 25000 25000 25000 25000 25000 25000 25000 25000 25000

Average Daily 16389 22954 28627 25164 15907 12783 12079 12742 14370 13306 11821 16691

0

5000

10000

15000

20000

25000

30000

m3/day

Town of Collingwood WWTP Monthly Average Final Effluent Flows

Page 17: Collingwood Wastewater Treatment Plant · WWTP Expansion/Upgrade ... HP Horsepower Kg Kilograms kW Kilowatt mg/l Milligrams per litre Ml/d Mega litres per day m3/d Cubic metres per

Wastewater Treatment Annual Report 2016 16

2016 Monthly Average Concentration Final Effluent CBOD5

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Compliance Annual Average 25mg/l

25 25 25 25 25 25 25 25 25 25 25 25

Operating Objective 15mg/l 15 15 15 15 15 15 15 15 15 15 15 15

CBOD5 mg/l 2.00 2.23 2.62 2.4 2.2 5.1 2.1 3.1 2.4 2.3 2.0 2.4

0

5

10

15

20

25

30

mg/l

Town of Collingwood WWTP 2016 Monthly Average Concentration Final Effluent CBOD5

Page 18: Collingwood Wastewater Treatment Plant · WWTP Expansion/Upgrade ... HP Horsepower Kg Kilograms kW Kilowatt mg/l Milligrams per litre Ml/d Mega litres per day m3/d Cubic metres per

Wastewater Treatment Annual Report 2016 17

2016 WWTP Final Effluent Total Phosphorous

Jan Feb Mar AprMay

Jun Jul Aug Sep Oct Nov Dec

Compliance Annual Average 1.0mg/l

1 1 1 1 1 1 1 1 1 1 1 1

Operating Objective 0.8mg/l

0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8

Total Phosphorous mg/l 0.15 0.15 0.12 0.15 0.17 0.31 0.11 0.45 0.28 0.15 0.21 0.11

0.0

0.2

0.4

0.6

0.8

1.0

1.2

mg/l

Town of Collingwood WWTP Final Effluent Total Phosphorous

Page 19: Collingwood Wastewater Treatment Plant · WWTP Expansion/Upgrade ... HP Horsepower Kg Kilograms kW Kilowatt mg/l Milligrams per litre Ml/d Mega litres per day m3/d Cubic metres per

Wastewater Treatment Annual Report 2016 18

2016 Monthly Average Concentration Final Effluent TSS

Page 20: Collingwood Wastewater Treatment Plant · WWTP Expansion/Upgrade ... HP Horsepower Kg Kilograms kW Kilowatt mg/l Milligrams per litre Ml/d Mega litres per day m3/d Cubic metres per

Wastewater Treatment Annual Report 2016 19

Appendix C Sludge Management Overview

ContaminantArsenic Cadmium Cobalt Chromium Copper Mercury Molybdenum Nickel Lead Selenium Zinc Ammonia Nitrate Nitrite Kjeldahl-N Phosphorus Potassium Total Solids E-Coli Volatile Solids

Sampling As Cd Co Cr Cu Hg Mo Ni Pb Se Zn NH3 NO3 NO2 TKN TP K TS VS

Date mg / L mg / L mg / L mg / L mg / L mg / L mg / L mg / L mg / L mg / L mg / L mg / L mg / L mg / L mg / L mg / L mg / L % cfu/g %

6-Jan-16 0.12 0.0404 0.132 0.7 29.5 0.0248 0.324 0.52 3.33 0.112 31.5 1280 0.4 0.2 2500 764 155 2.58 14100 65.0

20-Jan-16 0.113 0.0324 0.106 0.8 26.9 0.016 0.283 0.4 2.34 0.0958 26.4 1210 0.4 0.2 2890 700 168 2.41 11900 64.0

3-Feb-16 0.083 0.0185 0.061 0.6 31 0.0109 0.156 0.32 1.42 0.0591 14.6 919 0.4 0.2 1670 492 140 1.72 160000 62.9

17-Feb-16 0.113 0.0274 0.061 0.9 22.2 0.0014 0.234 0.387 2.11 0.0853 21.1 3760 0.4 0.2 3160 860 166 2.23 20100 61.8

3-Mar-16 0.131 0.0317 0.09 1.0 27.7 0.0025 0.241 0.474 3.14 0.0978 20.4 1210 0.4 0.2 2530 7870 144 2.76 9550 64.1

16-Mar-16 0.098 0.0193 0.061 0.7 18.3 0.0066 0.145 0.284 2.03 0.0631 11.5 1120 0.4 0.2 2040 795 146 1.84 16300 63.7

30-Mar-16 0.134 0.0224 0.079 0.9 23.5 0.0078 0.185 0.392 2.52 0.081 15.3 1160 0.4 0.2 1860 1020 173 2.05 6600 62.3

13-Apr-16 0.12 0.0168 0.061 0.7 17.9 0.0109 0.138 0.294 1.74 0.064 12.3 987 0.4 0.2 3390 1050 167 1.75 167000 62.4

27-Apr-16 0.014 0.0019 0.01 0.1 1.83 0.0102 0.0144 0.05 0.239 0.0064 1.25 1080 0.4 0.2 3040 997 18.7 2.06 6440 61.6

11-May-16 0.123 0.0157 0.06 0.6 17.9 0.0111 0.12 0.331 1.85 0.0671 11.4 1340 0.4 0.2 3170 691 160 2.01 112000 63.7

26-May-16 0.11 0.0197 0.057 0.5 14.4 0.0097 0.121 0.274 1.51 0.0606 10.1 1290 0.4 0.2 3040 1060 150 2.4 9110 63.3

8-Jun-16 0.095 0.019 0.057 0.5 15 0.0248 0.13 0.25 1.16 0.0578 10.7 1310 0.4 0.2 2450 500 131 2.13 12700 64.6

22-Jun-16 0.066 0.0126 0.041 0.4 10.3 0.0111 0.0949 0.227 0.715 0.0454 8.78 1340 0.4 0.2 2400 513 125 1.85 27200 66.5

6-Jul-16 0.05 0.0089 0.029 0.2 7.37 0.0041 0.0645 0.137 0.489 0.0303 6.12 1040 0.4 0.2 2130 542 116 1.73 13100 66.7

21-Jul-16 0.064 0.0234 0.046 0.3 12.8 0.0094 0.107 0.206 0.706 0.045 9.15 1030 0.4 0.2 1900 419 104 1.88 111000 67.2

3-Aug-16 0.024 0.0037 0.022 0.1 3.67 0.0089 0.0312 0.094 0.166 0.0173 3.02 983 0.4 0.2 1940 462 99.4 1.86 35400 65.2

17-Aug-16 0.066 0.0151 0.748 0.4 15.2 0.053 0.893 1.64 0.716 0.147 14.1 1150 0.4 0.2 1970 685 133 2.02 41200 65.2

31-Aug-16 0.078 0.0196 0.067 0.4 16.2 0.0669 0.135 0.286 0.79 0.0536 13.2 1130 0.4 0.2 1280 626 123 1.94 10400 64.4

14-Sep-16 0.096 0.0216 0.078 0.6 19 0.0165 0.159 0.42 0.929 0.0652 15.5 835 0.4 0.2 2780 737 144 1.87 27000 64.3

28-Sep-16 0.06 0.0135 0.053 0.4 9.74 0.0283 0.0787 0.305 0.447 0.0417 9.44 785 0.4 0.2 1880 568 124 2.19 84700 62.9

12-Oct-16 0.111 0.0321 0.091 0.8 14.8 0.032 0.124 0.701 0.777 0.0545 17.7 717 0.4 0.2 2120 624 99.5 2.03 57400 61.4

26-Oct-16 0.149 0.0421 0.13 1.2 20.9 0.0377 0.178 0.72 1.02 0.081 22.5 1060 0.4 0.2 2090 835 130 2.19 16400 62

9-Nov-16 0.108 0.0277 0.1 0.7 16.6 0.0281 0.142 0.45 0.822 0.065 16.9 977 0.4 0.2 2690 718 122 1.92 165000 64.9

23-Nov-16 0.106 0.028 0.1 0.7 17.7 0.02 0.145 0.47 0.937 0.068 17.1 1090 0.4 0.2 2920 824 145 2.01 22500 64.7

7-Dec-16 0.075 0.0173 0.1 0.5 12 0.0116 0.11 0.3 0.531 0.043 11.3 1170 0.4 0.2 2340 841 120 1.9 63500 63.6

21-Dec-16 0.103 0.0261 0.1 0.6 18 0.0167 0.143 0.4 0.694 0.066 15.2 1230 0.04 0.2 2900 1310 136 2.08 73500 64.1

Page 21: Collingwood Wastewater Treatment Plant · WWTP Expansion/Upgrade ... HP Horsepower Kg Kilograms kW Kilowatt mg/l Milligrams per litre Ml/d Mega litres per day m3/d Cubic metres per

Wastewater Treatment Annual Report 2016 20

Page 22: Collingwood Wastewater Treatment Plant · WWTP Expansion/Upgrade ... HP Horsepower Kg Kilograms kW Kilowatt mg/l Milligrams per litre Ml/d Mega litres per day m3/d Cubic metres per

Wastewater Treatment Annual Report 2016 21

Page 23: Collingwood Wastewater Treatment Plant · WWTP Expansion/Upgrade ... HP Horsepower Kg Kilograms kW Kilowatt mg/l Milligrams per litre Ml/d Mega litres per day m3/d Cubic metres per

Wastewater Treatment Annual Report 2016 22

Page 24: Collingwood Wastewater Treatment Plant · WWTP Expansion/Upgrade ... HP Horsepower Kg Kilograms kW Kilowatt mg/l Milligrams per litre Ml/d Mega litres per day m3/d Cubic metres per

Wastewater Treatment Annual Report 2016 23

Page 25: Collingwood Wastewater Treatment Plant · WWTP Expansion/Upgrade ... HP Horsepower Kg Kilograms kW Kilowatt mg/l Milligrams per litre Ml/d Mega litres per day m3/d Cubic metres per

Wastewater Treatment Annual Report 2016 24

Page 26: Collingwood Wastewater Treatment Plant · WWTP Expansion/Upgrade ... HP Horsepower Kg Kilograms kW Kilowatt mg/l Milligrams per litre Ml/d Mega litres per day m3/d Cubic metres per

Wastewater Treatment Annual Report 2016 25

Page 27: Collingwood Wastewater Treatment Plant · WWTP Expansion/Upgrade ... HP Horsepower Kg Kilograms kW Kilowatt mg/l Milligrams per litre Ml/d Mega litres per day m3/d Cubic metres per

Wastewater Treatment Annual Report 2016 26

Page 28: Collingwood Wastewater Treatment Plant · WWTP Expansion/Upgrade ... HP Horsepower Kg Kilograms kW Kilowatt mg/l Milligrams per litre Ml/d Mega litres per day m3/d Cubic metres per

Wastewater Treatment Annual Report 2016 27

Page 29: Collingwood Wastewater Treatment Plant · WWTP Expansion/Upgrade ... HP Horsepower Kg Kilograms kW Kilowatt mg/l Milligrams per litre Ml/d Mega litres per day m3/d Cubic metres per

Wastewater Treatment Annual Report 2016 28

Page 30: Collingwood Wastewater Treatment Plant · WWTP Expansion/Upgrade ... HP Horsepower Kg Kilograms kW Kilowatt mg/l Milligrams per litre Ml/d Mega litres per day m3/d Cubic metres per

Wastewater Treatment Annual Report 2016 29

Page 31: Collingwood Wastewater Treatment Plant · WWTP Expansion/Upgrade ... HP Horsepower Kg Kilograms kW Kilowatt mg/l Milligrams per litre Ml/d Mega litres per day m3/d Cubic metres per

Wastewater Treatment Annual Report 2016 30

Page 32: Collingwood Wastewater Treatment Plant · WWTP Expansion/Upgrade ... HP Horsepower Kg Kilograms kW Kilowatt mg/l Milligrams per litre Ml/d Mega litres per day m3/d Cubic metres per

Wastewater Treatment Annual Report 2016 31

Appendix D Bypass and Spills Report The report below outlines any bypasses in 2016. The original document is held at the Collingwood WWTP and is available for review upon request.

Pumping Station And Plant Bypass Monthly Summary

Month

Primary Bypass Secondary Bypass

No. of days Duration

(hrs) Volume

(1,000 m3) No. of days

Duration (hrs)

Volume (1,000 m3)

Jan 0 0

Feb 0 0

Mar 1 11 50,000m3 0

Apr 0 0

May 0 0

Jun 0 0

Jul 0 0

Aug 0 0

Sep 0 0

Oct 0 0

Nov 0 0

Dec 0 0

Total 1 11 50,000m3 0

All the information supplied within this document is correct and complete to the best of the authors’ knowledge. If further information is required please do not hesitate to contact the author: Mr. Glenn Price, Manager of Wastewater Treatment 705-445-1581 Ext. 3315 [email protected]