Technical Report Documentation Page 1. Report No. FHWA/TX-05/5-2110-03-1 2. Government Accession No. 3. Recipient's Catalog No. 5. Report Date October 2004 4. Title and Subtitle UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS EPORT R 6. Performing Organization Code 7. Author(s) Cesar Quiroga, Robert Pina, Doyle Dennis, and Sangita Sunkari 8. Performing Organization Report No. Report 5-2110-03-1 10. Work Unit No. (TRAIS) 9. Performing Organization Name and Address Texas Transportation Institute The Texas A&M University System College Station, Texas 77843-3135 11. Contract or Grant No. Project 5-2110-03 13. Type of Report and Period Covered Implementation Report: September 2003 – August 2004 12. Sponsoring Agency Name and Address Texas Department of Transportation Research and Technology Implementation Office P. O. Box 5080 Austin, Texas 78763-5080 14. Sponsoring Agency Code 15. Supplementary Notes Project performed in cooperation with the Texas Department of Transportation and the Federal Highway Administration. Project Title: Internet Based Utility Data Submissions and a GIS Inventory of Utilities 16. Abstract Each year, thousands of utilities are installed within the Texas Department of Transportation (TxDOT) right- of-way (ROW). This proliferation of utilities makes it increasingly difficult for TxDOT to manage its own transportation system effectively and allow for more utilities. Research Project 0-2110 developed a prototype geographic information system (GIS)-based platform for the inventory of utilities located within the TxDOT ROW. As part of the project, the researchers compiled and reviewed existing sources of utility data at TxDOT, developed a prototype GIS-based utility inventory model, developed a prototype Internet- based data entry procedure to capture notice of proposed installation (NOPI) data, and provided recommendations for implementing and expanding the prototypes. Implementation Projects 5-2110-01 and 5-2210-03 are the result of TxDOT’s decision to implement the findings of research Project 0-2110. Project 5-2110-01 focuses on the implementation of the GIS-based utility inventory model, whereas Project 5-2110-03 focuses on the implementation of the Internet-based utility installation notice review process (also known as utility permitting process). This report is the first- year report for Project 5-2110-03. It summarizes the system analysis, design, and development phases and outlines the activities to be conducted during the second year. 17. Key Words Utilities, Right-of-Way, ROW, Notice of Proposed Installation, Utility Permits, Geographic Information Systems, GIS, Internet 18. Distribution Statement No restrictions. This document is available to the public through NTIS: National Technical Information Service Springfield, Virginia 22161 http://www.ntis.gov 19. Security Classif.(of this report) Unclassified 20. Security Classif.(of this page) Unclassified 21. No. of Pages 36 22. Price Form DOT F 1700.7 (8-72) Reproduction of completed page authorized

UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS REPORTInternet Intranet Figure 1. Prototype Data Flow for Conducting Online Installation Notice Reviews. The following sections describe

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS REPORTInternet Intranet Figure 1. Prototype Data Flow for Conducting Online Installation Notice Reviews. The following sections describe

Technical Report Documentation Page 1. Report No. FHWA/TX-05/5-2110-03-1

2. Government Accession No.

3. Recipient's Catalog No. 5. Report Date October 2004

4. Title and Subtitle UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS

EPORT R 6. Performing Organization Code

7. Author(s) Cesar Quiroga, Robert Pina, Doyle Dennis, and Sangita Sunkari

8. Performing Organization Report No. Report 5-2110-03-1 10. Work Unit No. (TRAIS)

9. Performing Organization Name and Address Texas Transportation Institute The Texas A&M University System College Station, Texas 77843-3135

11. Contract or Grant No. Project 5-2110-03 13. Type of Report and Period Covered Implementation Report: September 2003 – August 2004

12. Sponsoring Agency Name and Address Texas Department of Transportation Research and Technology Implementation Office P. O. Box 5080 Austin, Texas 78763-5080

14. Sponsoring Agency Code

15. Supplementary Notes Project performed in cooperation with the Texas Department of Transportation and the Federal Highway Administration. Project Title: Internet Based Utility Data Submissions and a GIS Inventory of Utilities 16. Abstract Each year, thousands of utilities are installed within the Texas Department of Transportation (TxDOT) right-of-way (ROW). This proliferation of utilities makes it increasingly difficult for TxDOT to manage its own transportation system effectively and allow for more utilities. Research Project 0-2110 developed a prototype geographic information system (GIS)-based platform for the inventory of utilities located within the TxDOT ROW. As part of the project, the researchers compiled and reviewed existing sources of utility data at TxDOT, developed a prototype GIS-based utility inventory model, developed a prototype Internet-based data entry procedure to capture notice of proposed installation (NOPI) data, and provided recommendations for implementing and expanding the prototypes. Implementation Projects 5-2110-01 and 5-2210-03 are the result of TxDOT’s decision to implement the findings of research Project 0-2110. Project 5-2110-01 focuses on the implementation of the GIS-based utility inventory model, whereas Project 5-2110-03 focuses on the implementation of the Internet-based utility installation notice review process (also known as utility permitting process). This report is the first-year report for Project 5-2110-03. It summarizes the system analysis, design, and development phases and outlines the activities to be conducted during the second year. 17. Key Words Utilities, Right-of-Way, ROW, Notice of Proposed Installation, Utility Permits, Geographic Information Systems, GIS, Internet

18. Distribution Statement No restrictions. This document is available to the public through NTIS: National Technical Information Service Springfield, Virginia 22161 http://www.ntis.gov

19. Security Classif.(of this report) Unclassified

20. Security Classif.(of this page) Unclassified

21. No. of Pages

36

22. Price

Form DOT F 1700.7 (8-72) Reproduction of completed page authorized

Page 2: UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS REPORTInternet Intranet Figure 1. Prototype Data Flow for Conducting Online Installation Notice Reviews. The following sections describe
Page 3: UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS REPORTInternet Intranet Figure 1. Prototype Data Flow for Conducting Online Installation Notice Reviews. The following sections describe

UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS REPORT

by

Cesar Quiroga, P.E. Associate Research Engineer Texas Transportation Institute

Robert Pina

Programmer/Analyst I Texas Transportation Institute

Doyle Dennis

Student Worker Texas Transportation Institute

and

Sangita Sunkari

Programmer/Analyst II Texas Transportation Institute

Report 5-2110-03-1 Project Number 5-2110-03

Project Title: Internet Based Utility Data Submissions and a GIS Inventory of Inventory of Utilities

Performed in cooperation with the Texas Department of Transportation

and the Federal Highway Administration

October 2004

TEXAS TRANSPORTATION INSTITUTE The Texas A&M University System College Station, Texas 77843-3135

Page 4: UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS REPORTInternet Intranet Figure 1. Prototype Data Flow for Conducting Online Installation Notice Reviews. The following sections describe
Page 5: UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS REPORTInternet Intranet Figure 1. Prototype Data Flow for Conducting Online Installation Notice Reviews. The following sections describe

DISCLAIMER

The contents of this document reflect the views of the authors, who are responsible for the facts and the accuracy of the data presented herein. The contents do not necessarily reflect the official view or policies of the Federal Highway Administration (FHWA) or the Texas Department of Transportation (TxDOT). This document does not constitute a standard, specification, or regulation, nor is it intended for construction, bidding, or permit purposes. The engineer in charge of the project was Cesar Quiroga, P.E. (Texas Registration #84274).

NOTICE The United States Government and the State of Texas do not endorse products or manufacturers. Trade or manufacturers’ names appear herein solely because they are considered essential to the object of this report.

v

Page 6: UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS REPORTInternet Intranet Figure 1. Prototype Data Flow for Conducting Online Installation Notice Reviews. The following sections describe

ACKNOWLEDGMENTS

This project was conducted in cooperation with TxDOT and FHWA. The researchers would like to gratefully acknowledge the assistance provided by TxDOT officials, in particular the following: Richard Kirby – Maintenance Division (Implementation Director) Jesse Cooper – Right-of-Way (ROW) Division John Campbell – ROW Division (Program Coordinator) Phil Hancock – Information Services Division Jim Paterson – Information Services Division Byron Miller – Information Services Division Bill Gee – Information Services Division James Pennington – Information Services Division Gary Adair – Information Services Division Gladys Harper – Information Services Division Janet Hyndman – Information Services Division Kevin Wagner – Information Services Division Chris Pratt – Information Services Division John Bohuslav – San Antonio District William Howard – San Antonio District Dan Stacks – San Antonio District Irene Ugarte – San Antonio District Mike Williams – San Antonio District Darcie Schipull – Austin District The researchers would also like to acknowledge the feedback provided by San Antonio Water System (SAWS) and City Public Service (CPS) officials.

vi

Page 7: UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS REPORTInternet Intranet Figure 1. Prototype Data Flow for Conducting Online Installation Notice Reviews. The following sections describe

TABLE OF CONTENTS

Page

LIST OF FIGURES ..................................................................................................................... viii

LIST OF TABLES......................................................................................................................... ix

LIST OF ACRONYMS, ABBREVIATIONS, AND TERMS ....................................................... x

INTRODUCTION .......................................................................................................................... 1

UTILITY INSTALLATION REVIEW (UIR) SYSTEM DEVELOPMENT ................................ 3 PROTOTYPE WORKFLOW................................................................................................... 3 SYSTEM ANALYSIS.............................................................................................................. 3

Architecture Requirements ................................................................................................. 4 Application Requirements .................................................................................................. 5

SYSTEM DESIGN ................................................................................................................... 5 System Architecture............................................................................................................ 5 Workflow Diagram ............................................................................................................. 7 Database Model .................................................................................................................. 8

SYSTEM DEVELOPMENT .................................................................................................. 17 System Architecture.......................................................................................................... 17 Database............................................................................................................................ 17 Code .................................................................................................................................. 17 Utility Company User Interface........................................................................................ 19 Administrative Interface ................................................................................................... 19

SYSTEM TESTING AND DELIVERY ................................................................................ 22

REFERENCES ............................................................................................................................. 23

vii

Page 8: UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS REPORTInternet Intranet Figure 1. Prototype Data Flow for Conducting Online Installation Notice Reviews. The following sections describe

LIST OF FIGURES

Page Figure 1. Prototype Data Flow for Conducting Online Installation Notice Reviews. ................... 3 Figure 2. System Architecture. ...................................................................................................... 6 Figure 3. Workflow Diagram......................................................................................................... 9 Figure 4. Logical Model. ............................................................................................................. 15 Figure 5. Physical Model. ............................................................................................................ 16 Figure 6. Sample Utility Company User Interface Web Pages. .................................................. 20 Figure 7. Sample Administrative Interface Web Pages. .............................................................. 21

viii

Page 9: UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS REPORTInternet Intranet Figure 1. Prototype Data Flow for Conducting Online Installation Notice Reviews. The following sections describe

LIST OF TABLES

Page

Table 1. Tabular Representation of the Workflow Diagram. ...................................................... 11

ix

Page 10: UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS REPORTInternet Intranet Figure 1. Prototype Data Flow for Conducting Online Installation Notice Reviews. The following sections describe

LIST OF ACRONYMS, ABBREVIATIONS, AND TERMS

ArcIMS Arc Internet Map Server ArcSDE Arc Spatial Data Engine ASP Active server page CAD Computer-aided design CD Compact disk CDO Collaboration data object CPS City Public Service DBMS Database management system DVD Digital video disk ESRI Environmental Systems Research Institute FSO File system object FHWA Federal Highway Administration GIS Geographic information system HTML Hypertext mark-up language IIS Internet Information Server ISD (TxDOT’s) Information Systems Division IT Information technology NOPI Notice of proposed installation ODBC Open database connection PDF Portable document format ROW Right-of-way SAWS San Antonio Water System

x

Page 11: UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS REPORTInternet Intranet Figure 1. Prototype Data Flow for Conducting Online Installation Notice Reviews. The following sections describe

SMTP Simple mail transfer protocol SQL Structured query language SSL Secure Socket Layer TLMS Texas Linear Measurement System TNRIS Texas Natural Resources Information System TxDOT Texas Department of Transportation UIR Utility installation review XML Extensible mark-up language

xi

Page 12: UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS REPORTInternet Intranet Figure 1. Prototype Data Flow for Conducting Online Installation Notice Reviews. The following sections describe
Page 13: UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS REPORTInternet Intranet Figure 1. Prototype Data Flow for Conducting Online Installation Notice Reviews. The following sections describe

INTRODUCTION

Each year, there are thousands of new utility installations within the Texas Department of Transportation (TxDOT) right-of-way (ROW). This proliferation of utilities makes it increasingly difficult for TxDOT to manage its own transportation system effectively and allow for more utilities. Research Project 0-2110 developed a prototype geographic information system (GIS)-based platform for the inventory of utilities located within the TxDOT ROW (1). As part of the project, the researchers

• compiled and reviewed existing sources of utility data at TxDOT; • developed a prototype GIS-based utility inventory model; • developed a prototype Internet-based data entry procedure to capture notice of proposed

installation (NOPI) data; and • provided recommendations for implementing and expanding the prototypes.

Implementation Projects 5-2110-01 and 5-2210-03 are the result of TxDOT’s decision to implement the findings of research Project 0-2110. Project 5-2110-01 focuses on the implementation of the GIS-based utility inventory model, whereas Project 5-2110-03 focuses on the implementation of the Internet-based utility installation notice review process (also known as utility permitting process). This report is the first-year report for Project 5-2110-03. A separate report is the first-year report for Project 5-2110-01 (2).

1

Page 14: UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS REPORTInternet Intranet Figure 1. Prototype Data Flow for Conducting Online Installation Notice Reviews. The following sections describe
Page 15: UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS REPORTInternet Intranet Figure 1. Prototype Data Flow for Conducting Online Installation Notice Reviews. The following sections describe

UTILITY INSTALLATION REVIEW (UIR) SYSTEM DEVELOPMENT

PROTOTYPE WORKFLOW

As part of research Project 0-2110, the researchers conducted a statewide survey as well as follow-up personal interviews with a reduced sample of districts to develop an understanding of the utility installation notice review process at TxDOT. Based on the responses provided, the researchers developed a conceptual model to represent the typical workflow associated with the submission, review, and approval of utility installation notices at TxDOT. The researchers also developed a prototype Internet-based installation notice review system (Figure 1) that took into consideration that workflow, while, at the same time, addressing two main limitations of the traditional, paper-based process:

• variability in procedures, data formats, documentation requirements, and quality of the spatial information provided by utility companies; and

• repetitive, labor intensive nature of the installation notice review process.

Application

Utilitycompany

Districtoffice

Maintenanceoffice

Confirmation

Approval

Utilityfield work

Final data

Representative

Client Server Client

Data

MapsClient

Intra

net

GPSreceiver

Verification

Feedback

IntranetInternet

Figure 1. Prototype Data Flow for Conducting Online Installation Notice Reviews.

The following sections describe the work conducted during the first year of the implementation phase of the online utility installation review (UIR) system.

SYSTEM ANALYSIS

The researchers conducted a series of detailed interview sessions with TxDOT officials to determine system architecture (hardware, software, and system compatibility) requirements and system application (user) requirements.

3

Page 16: UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS REPORTInternet Intranet Figure 1. Prototype Data Flow for Conducting Online Installation Notice Reviews. The following sections describe

Architecture Requirements

The researchers consulted with TxDOT Information Systems Division (ISD) officials to develop a set of system architecture requirements and specifications to ensure portability to the TxDOT architecture. A summary of architecture requirements follows.

Hardware Specifications (TxDOT Server)

A typical TxDOT web server that will host the UIR system will likely have the following characteristics:

• processor: quad gigahertz processors; • memory: several gigabytes of memory; • secondary storage: 20–25 gigabytes of hard drive space to be allocated to the UIR

system; and • tertiary storage: tape drive.

Software Requirements

The UIR system requires a number of software components that are part of TxDOT’s information technology (IT) architecture. A summary of required software components follows:

• server operating system: Microsoft Server 2000; • Internet server: Microsoft Internet Information Server (IIS) 5; • database management system (DBMS): Oracle 9i; • spatial data component: Environmental Systems Research Institute (ESRI) Arc Spatial

Data Engine (ArcSDE) 8.3; • map server: ESRI Arc Internet Map Server (ArcIMS); • upload file component: SoftArtisans SAFileUp; • e-mail component: simple mail transfer protocol (SMTP); and • security component: Baltimore Secure Socket Layer (SSL) Certificate.

TxDOT ISD servers currently use 64-bit encryption with “on the fly” upgradeable 128-bit encryption for browsers that support 128-bit encryption.

Database Modeling Requirements

The UIR system must comply with TxDOT’s data architecture requirements (3). The data modeling requirements include normalization of naming conventions and the development of the following models in Computer Associates’ ERwin 4.1.4 format:

• Logical Model: This model identifies all the data entities and their relationships. • Physical Model: This model represents the implementation of the logical model in a

specific relational DBMS. • Data Dictionary: This dictionary lists all data class words in a tabular format including

their abbreviation, definition, an example, and format.

4

Page 17: UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS REPORTInternet Intranet Figure 1. Prototype Data Flow for Conducting Online Installation Notice Reviews. The following sections describe

Application Installation and Updates

UIR system submittal to ISD (initial installation and subsequent updates) must be on a physical electronic medium such as compact disk (CD) or digital video disk (DVD). Delivery will also include an installation and update manual.

Application Requirements

The researchers conducted a series of meetings with the project panel and San Antonio District officials to develop an understanding of their vision and expectations concerning the implementation of the UIR system. This exercise resulted in the definition of a series of user requirements that helped drive the system design:

• Support dynamic permit processes: UIR should support a district-independent dynamic permit process to accommodate differences among districts without requiring major system modifications.

• Accommodate large and small utility companies: UIR must be flexible enough to support a wide range of utility company data submittal capabilities. The required data and submittal process must be flexible enough that small utility companies are able to submit notices while not restricting the performance and resources typically associated with larger utility companies.

• Cross-platform file support: UIR should enable users to upload and view files in a variety of file formats.

• Application output: UIR should produce at a minimum the following types of outputs: o online map displaying the location of existing and proposed utility installations, o printer-friendly version of the NOPI form, and o printer-friendly version of the approval form.

• User help: UIR should provide user help integrated into the system.

SYSTEM DESIGN

Following the identification of the architecture and application requirements, the researchers completed a formal system design phase that included developing three main components: system architecture, data workflow diagram, and database models.

System Architecture

As Figure 2 shows, UIR has two groups of components: client-side components and server-side components. On the client side, a hypertext mark-up language (HTML) viewer serves as a front-end interface that allows users on client computers to submit installation notice applications, select and view installation notice application data, review pending applications, and view and query utility maps. The client side also includes an e-mail client application to notify utility company users and/or TxDOT officials about the progress of the review process. Minimum client requirements include either a Mosaic-based browser (e.g., Internet Explorer) or a Mozilla-based browser (e.g., Netscape Navigator) and Adobe Acrobat Reader. Both utility company users and TxDOT users can act as clients, but their interfaces are different and require different

5

Page 18: UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS REPORTInternet Intranet Figure 1. Prototype Data Flow for Conducting Online Installation Notice Reviews. The following sections describe

access levels—for security, ISD will include the TxDOT user interface within the TxDOT Intranet where it cannot be accessed by utility company users. On the server side, UIR includes a number of components, including the following:

• servers: web server (IIS), e-mail server, database server (Oracle), map server (ArcIMS), portable document format (PDF) server (AdLib eXpress Server);

• database: Oracle 9i; • objects and components: file system object (FSO), file upload (SAFileUp); and • connectors: open database connection (ODBC), spatial data engine (ArcSDE).

Virtual Folders

File System Object(FSO)

File Upload Component

Database Connector

(ODBC)

Oracle 9i

E-Mail Server

Database Server(Oracle)

Map Server(ArcIMS)

Secondary Storage

Web Server(Internet Information Server – IIS 5.0)

Spatial Data Engine

(ArcSDE)

E-Mail ClientWeb Browser(Mozilla, Mosaic)

Server Side

Client Side

AdLib eXpress Server

(pdf)

Figure 2. System Architecture.

6

Page 19: UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS REPORTInternet Intranet Figure 1. Prototype Data Flow for Conducting Online Installation Notice Reviews. The following sections describe

Workflow Diagram

The workflow diagram outlines the steps that different offices go through during the utility installation data and review process, as well as the subsequent follow up during and after construction. The researchers gathered workflow data through a series of meetings with San Antonio District officials (district office, area office, and maintenance office levels) and representatives from three utility companies the district invited to participate: San Antonio Water System (SAWS), City Public Service (CPS), and SBC Communications. At the meetings with San Antonio District officials, it became clear the utility installation review process was much more complex than the workflow originally established during the research phase. Rather than the straightforward linear workflow outlined in Figure 1, the actual workflow included many possible paths involving a rather large number of offices and individuals. It also became clear that different districts could be handling the review process in many different ways. For this reason, and considering the application requirement that the system should support differences in review practices throughout the state, the researchers developed a workflow diagram configuration—and subsequent database implementation—that relied on a dynamic relationship between office type responsibilities, events needed, events completed, and application status levels. This configuration enables individual districts to generate and manage their own workflow diagrams and corresponding tabular versions without having to make changes to the code. Figure 3 shows the current version of the workflow diagram for the San Antonio District. Table 1 shows the corresponding tabular representation of the diagram. Notice in Figure 3 the workflow diagram involves five phases as follows:

• Review. This is the phase where district officials review the feasibility of allowing a new utility installation within the ROW. Depending on the specific path, the review could involve one or more area offices and maintenance offices, as well as interaction with utility companies to provide clarification or additional documentation. The outcome of this phase is either application approval or application rejection.

• Pre-construction. This is the phase where utility companies notify TxDOT at least 48 hours prior to construction or, if necessary, request an extension to start construction at a later date. The outcome of this phase is the notification.

• Construction. This is the phase where utility companies proceed with the installation in the field and TxDOT officials are conducting field inspections. This is also the phase where TxDOT field inspectors can stop construction and require utility companies to submit revised plans to address unexpected situations encountered during construction.

• Post-construction. This is the phase where TxDOT field inspectors notify the district utility permit office that construction has ended and utility companies submit as-built drawings to TxDOT. In this phase, district personnel can interact with utility companies as needed until the submission of as-builts reaches a satisfactory status.

• Utility inventory update. This is the phase where district personnel update the utility inventory based on as-built documentation provided by the utility companies.

7

Page 20: UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS REPORTInternet Intranet Figure 1. Prototype Data Flow for Conducting Online Installation Notice Reviews. The following sections describe

8

Database Model

As mentioned previously, the data modeling requirements included normalization of naming conventions and the development of the following models:

• Logical Model: This model identifies all the data entities and their relationships. • Physical Model: This model represents the implementation of the logical model in a

specific relational DBMS (Oracle 9i). • Data Dictionary: This dictionary lists all data class words in a tabular format including

their abbreviation, definition, an example, and format. Figure 4 shows the logical model and Figure 5 shows the physical model for Oracle.

Page 21: UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS REPORTInternet Intranet Figure 1. Prototype Data Flow for Conducting Online Installation Notice Reviews. The following sections describe

Application submitted. Conduct initial review

(1)Utility

Company

(2)Utility Permit

Office

(5)Area Office

(21)Utility Permit

Office

Review completed. Conduct review

Review completed and application rejected. Nothing. Application

rejected

New/revised documentation submitted. Conduct review.New/revised documentation

submitted

(3)Utility

Company

2

(22)Area Office

(27)Utility Permit

Office

(12)Maintenance

Office

Review partially completed. Submit new/revised documentation

Review completed. Conduct review

(30)District

Maintenance Office

Review completed. Approve/reject

application

Review completed. Conduct review

New/revised documentation submitted. Conduct review.New/revised documentation

submitted

(9)Utility

Company

2

Review partially completed. Submit new/revised documentation

12

Review completed. Conduct review

Review completed. Conduct review

Review completed. Conduct review

New/revised documentation submitted. Conduct review.New/revised documentation

submitted

(19)Utility

Company

2

Review partially completed. Submit new/revised documentation

New/revised documentation submitted. Conduct review.New/revised documentation

submitted

(26)Utility

Company

2

Review partially completed. Submit new/revised documentation

New/revised documentation submitted. Conduct review.New/revised documentation

submitted

(28)Utility

Company

27

Review partially completed. Submit new/revised documentation

125

Review completed. Conduct review

Review completed. Conduct review

(25)District

Maintenance Office

Review completed. Approve/reject

application

New/revised documentation submitted. Conduct review.New/revised documentation

submitted

(23)Utility

Company

21

Review partially completed. Submit new/revised documentation

125

Review completed. Conduct review

Review completed. Conduct review

(11)Utility Permit

Office

(18)District

Maintenance Office

Review completed. Approve/reject

application

New/revised documentation submitted. Conduct review.New/revised documentation

submitted

(16)Utility

Company

2

Review partially completed. Submit new/revised documentation

5

Review completed. Conduct review

Review completed. Utility must forward to Bridge Section. Bridge attachment.

Contact Bridge Section

(10)Utility

Company

Clarification submitted. Conduct review

5

Review partially completed. Submit

clarification

(4)Utility

Company

Clarification submitted. Conduct review

2

(34)Utility Permit

Office

(40)District

Maintenance Office

Review completed. Approve/reject

application

Review completed and application rejected. Nothing. Application

rejected

New/revised documentation submitted. Conduct review.New/revised documentation

submitted

(37)Utility

Company13

Review completed. Conduct review

Clarification submitted. Conduct review

(20)Utility

Company

12

Review partially completed. Submit

clarification

Review partially completed. Submit

clarification

Review completed. Approve/reject

application

Review completed. Conduct review

5

Review completed. Conduct review

(14)CCMO

Clarification submitted. Conduct review

5

Review partially completed. Submit

clarification

(15)Construction

Office

Review completed. Conduct review

New/revised documentation submitted. Conduct review.New/revised documentation

submitted

(32)Utility

Company

2

(33)Utility

Company

Clarification submitted. Conduct review

13

Review completed. Conduct review

13

Review completed. Conduct review

(35)CCMO

Clarification submitted. Conduct review

13

Review partially completed. Submit

clarification

(36)Construction

Office5

(41)Utility Permit

Office

Review completed. Conduct review

13

Review completed. Conduct review

Review completed. Conduct review

(38)Utility

Company

Clarification submitted. Conduct review

13

2155

11552755

3455

(8)District

Maintenance Office

255

Review completed. Conduct review

Review partially completed. Submit new/revised documentation

Review partially completed. Submit

clarification

Review partially completed. Submit new/revised documentation

Review partially completed. Submit

clarification

Review completed and application approved. Application approved.

Notify TxDOT 48 hours prior to construction

Review completed. Conduct review

Review completed and application rejected. Nothing. Application

rejected

Review completed and application rejected. Nothing. Application

rejected

Review completed and application rejected. Nothing. Application

rejected

Review completed and application rejected. Nothing. Application

rejected

Review completed and application approved. Application approved.

Notify TxDOT 48 hours prior to construction

Review completed. Conduct review

Review completed and application rejected. Nothing. Application

rejected

Review completed and application approved. Application approved.

Notify TxDOT 48 hours prior to construction

Review completed. Conduct review

Review completed and application rejected. Nothing. Application

rejected

Review completed and application approved. Application approved.

Notify TxDOT 48 hours prior to construction

Review completed. Conduct review

Review completed and application rejected. Nothing. Application

rejectedReview completed and application approved.

Notify TxDOT 48 hours prior to construction

Review completed. Conduct review

Review completed and application rejected. Nothing. Application

rejected

(forwards if active construction project is suspected)

(13)Construction Area Office

Figure 3. Workflow Diagram.

9

Page 22: UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS REPORTInternet Intranet Figure 1. Prototype Data Flow for Conducting Online Installation Notice Reviews. The following sections describe

(56) Utility Permit

Office

55

Extension request rejected. Nothing. Extension request

rejected

Request approved. Notify TxDOT 48 hours prior to

construction

(55)Utility

Company

(90) CAO's

Maintenance Office

(70) Construction

Office

(58) Construction Area Office

(59)Area Office

58

(122) Utility Permit

Office

Requested utility inventory update.

Update utility inventory

(123) Survey Section

Utility inventory updated

(124) Survey Section

Utility inventory updated

(120) Utility Permit

Office

(121)Utility

Company

As-built documentation submitted. Conduct review.

As-built documentation submitted

(71)Utility

Company

(72) Utility Permit

Office

Review completed. Conduct review

Review completed. Conduct review

Revised drawings submitted. Conduct review. Revised drawings submitted

(75) Utility Permit

Office

70

Review partially completed. Submit additional revisions

Revisions approved. Continue inspections. Revisions approved

71

(74) Construction

Office

Review completed. Conduct review

(73) Construction Area Office

(111)Utility

Company

(112) Utility Permit

Office

(113)Area Office

Review completed. Conduct review

Review completed. Conduct review

Revised drawings submitted. Conduct review. Revised drawings submitted

(115) Utility Permit

Office

110

Review partially completed. Submit additional revisions

Revisions approved. Continue inspections.

111

(114) Maintenance

Office

Review completed. Conduct review

(82) Utility Permit

Office

Requested utility inventory update.

Update utility inventory

(83) Survey Section

Utility inventory updated

(84)Survey Section

Utility inventory updated

(80) Utility Permit

Office

Requested utility inventory update.

Update utility inventory

(81)Utility

Company

Requested as-built documentation. Submit as-built documentation

As-built documentation submitted. Conduct review.

As-built documentation submitted

110(91)

Utility Company

(92)Utility Permit

Office

Review completed. Conduct review

Review completed. Conduct review

Revised drawings submitted. Conduct review. Revised drawings submitted

(95)Utility Permit

Office

90

Review partially completed. Submit additional revisions

Revisions approved. Continue inspections. Revisions approved

91

(94)CAO's

Maintenance Office

Review completed. Conduct review

(93) Construction Area Office

(102) Utility Permit

Office

Requested utility inventory update.

Update utility inventory

(103) Survey Section

Utility inventory updated

(104) Survey Section

Utility inventory updated

(100) Utility Permit

Office

Requested utility inventory update.

Update utility inventory

(101)Utility

Company

As-built documentation submitted. Conduct review.

As-built documentation submitted

(110) Maintenance

Office

Construction stopped. Requested revised drawings.

Stop construction. Submit revised drawings

Notification of completion submitted. Conduct review.

Construction completed

Notification of completion submitted. Conduct review.

Construction completed

Notification of completion submitted. Conduct review.

Construction completed

Extension requested. Grant

extension

Notified TxDOT 48 hours prior to construction. Begin

inspection. Construction will start in at least 48 hours

Notified TxDOT 48 hours prior to construction. Begin

inspection. Construction will start in at least 48 hours

55

Forwarded. Begin inspection. Construction

will start in at least 48 hours

Forwarded. Begin inspection. Construction

will start in at least 48 hours

Forwarded. Begin inspection. Construction

will start in at least 48 hours

Construction stopped. Requested revised drawings.

Stop construction. Submit revised drawings

Construction stopped. Requested revised drawings.

Stop construction. Submit revised drawings

Requested as-built documentation. Submit as-built documentation

Forwarded. Begin inspection.

Construction will start in at least 48

hours

Forwarded. Begin inspection.

Construction will start in at least 48

hours

Requested as-built documentation. Submit as-built documentation

Requested utility inventory update.

Update utility inventory

Figure 3. Workflow Diagram (Continued).

10

Page 23: UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS REPORTInternet Intranet Figure 1. Prototype Data Flow for Conducting Online Installation Notice Reviews. The following sections describe

Table 1. Tabular Representation of the Workflow Diagram. Loc Next

Loc Office Status Event Completed Event Needed

-99 -99 Utility Company Rejected Review completed and application rejected

Nothing. Application rejected

1 2 Utility Company Submitted Application submitted Conduct initial review 2 -99 Utility Permit Office Rejected Review completed and application

rejected Nothing. Application rejected

2 -99 Utility Permit Office Rejected Review completed. Utility must forward to Bridge Section

Bridge attachment. Contact Bridge Section

2 3 Utility Permit Office Under Review Review partially completed Submit new/revised documentation 2 4 Utility Permit Office Under Review Review partially completed Submit clarification 2 5 Utility Permit Office Under Review Review completed Conduct review 2 8 Utility Permit Office Under Review Review completed Approve/reject application 3 2 Utility Company Under Review New/revised documentation submitted Conduct review. New/revised

documentation submitted 4 2 Utility Company Under Review Clarification submitted Conduct review 5 9 Area Office Under Review Review partially completed Submit new/revised documentation 5 10 Area Office Under Review Review partially completed Submit clarification 5 11 Area Office Under Review Review completed Conduct review 5 12 Area Office Under Review Review completed Conduct review 5 13 Area Office Under Review Review completed Conduct review 5 14 Area Office Under Review Review partially completed Submit clarification 5 15 Area Office Under Review Review completed Conduct review 8 -99 District Maintenance Office Rejected Review completed and application

rejected Nothing. Application rejected

8 2 District Maintenance Office Under Review Review completed Conduct review 8 55 District Maintenance Office Approved Review completed and application

approved Application approved. Notify TxDOT 48 hours prior to construction

9 2 Utility Company Under Review New/revised documentation submitted Conduct review. New/revised documentation submitted

10 5 Utility Company Under Review Clarification submitted Conduct review 11 5 Utility Permit Office Under Review Review completed Conduct review 11 16 Utility Permit Office Under Review Review partially completed Submit new/revised documentation 11 -99 Utility Permit Office Rejected Review completed and application

rejected Nothing. Application rejected

11 18 Utility Permit Office Under Review Review completed Approve/reject application 12 19 Maintenance Office Under Review Review partially completed Submit new/revised documentation 12 20 Maintenance Office Under Review Review partially completed Submit clarification 12 21 Maintenance Office Under Review Review completed Conduct review 12 22 Maintenance Office Under Review Review completed Conduct review 13 5 Area Office Under Review Review completed Conduct review 13 32 Area Office Under Review Review partially completed Submit new/revised documentation 13 33 Area Office Under Review Review partially completed Submit clarification 13 34 Area Office Under Review Review completed Conduct review 13 35 Area Office Under Review Review partially completed Submit clarification 13 36 Area Office Under Review Review completed Conduct review 14 5 CCMO Under Review Clarification submitted Conduct review 15 5 Construction Office Under Review Review completed Conduct review 16 2 Utility Company Under Review New/revised documentation submitted Conduct review. New/revised

documentation submitted 18 -99 District Maintenance Office Rejected Review completed and application

rejected Nothing. Application rejected

18 11 District Maintenance Office Under Review Review completed Conduct review 18 55 District Maintenance Office Approved Review completed and application

approved Application approved. Notify TxDOT 48 hours prior to construction

19 2 Utility Company Under Review New/revised documentation submitted Conduct review. New/revised documentation submitted

20 12 Utility Company Under Review Clarification submitted Conduct review 21 5 Utility Permit Office Under Review Review completed Conduct review 21 12 Utility Permit Office Under Review Review completed Conduct review 21 23 Utility Permit Office Under Review Review partially completed Submit new/revised documentation 21 -99 Utility Permit Office Rejected Review completed and application

rejected Nothing. Application rejected

11

Page 24: UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS REPORTInternet Intranet Figure 1. Prototype Data Flow for Conducting Online Installation Notice Reviews. The following sections describe

Table 1. Tabular Representation of the Workflow Diagram (Continued). Loc Next

Loc Office Status Event Completed Event Needed

21 25 Utility Permit Office Under Review Review completed Approve/reject application 22 12 Area Office Under Review Review completed Conduct review 22 26 Area Office Under Review Review partially completed Submit new/revised documentation 22 27 Area Office Under Review Review completed Conduct review 23 21 Utility Company Under Review New/revised documentation submitted Conduct review. New/revised

documentation submitted 25 -99 District Maintenance Office Rejected Review completed and application

rejected Nothing. Application rejected

25 21 District Maintenance Office Under Review Clarification submitted Conduct review 25 55 District Maintenance Office Under Review Review completed and application

approved Application approved. Notify TxDOT 48 hours prior to construction

26 2 Utility Company Under Review New/revised documentation submitted Conduct review. New/revised documentation submitted

27 5 Utility Permit Office Under Review Review completed Conduct review 27 12 Utility Permit Office Under Review Review completed Conduct review 27 28 Utility Permit Office Under Review Review partially completed Submit new/revised documentation 27 -99 Utility Permit Office Rejected Review completed and application

rejected Nothing. Application rejected

27 30 Utility Permit Office Under Review Review completed Approve/reject application 28 27 Utility Company Under Review New/revised documentation submitted Conduct review. New/revised

documentation submitted 30 -99 District Maintenance Office Rejected Review completed and application

rejected Nothing. Application rejected

30 27 District Maintenance Office Under Review Review completed Conduct review 30 55 District Maintenance Office Approved Review completed and application

approved Application approved. Notify TxDOT 48 hours prior to construction

32 2 Utility Company Under Review New/revised documentation submitted Conduct review. New/revised documentation submitted

33 13 Utility Company Under Review Clarification submitted Conduct review 34 -99 Utility Permit Office Rejected Review completed and application

rejected Nothing. Application rejected

34 13 Utility Permit Office Under Review Review completed Conduct review 34 37 Utility Permit Office Under Review Review partially completed Submit new/revised documentation 34 38 Utility Permit Office Under Review Review partially completed Submit clarification 34 40 Utility Permit Office Under Review Review completed Approve/reject application 35 13 CCMO Under Review Clarification submitted Conduct review 36 13 Construction Office Under Review Review completed Conduct review 37 41 Utility Company Under Review New/revised documentation submitted Conduct review. New/revised

documentation submitted 38 13 Utility Company Under Review Clarification submitted Conduct review 40 -99 District Maintenance Office Rejected Review completed and application

rejected Nothing. Application rejected

40 34 District Maintenance Office Under Review Review completed Conduct review 40 55 District Maintenance Office Approved Review completed and application

approved Application approved. Notify TxDOT 48 hours prior to construction

41 13 Utility Permit Office Under Review Review completed Conduct review 55 56 Utility Company Approved Extension requested Grant extension 55 58 Utility Company Construction Notified TxDOT 48 hours prior to

construction Begin inspection. Construction will start in at least 48 hours

55 110 Utility Company Construction Notified TxDOT 48 hours prior to construction

Begin inspection. Construction will start in at least 48 hours

56 55 Utility Permit Office Approved Extension request rejected Nothing. Extension request rejected 56 55 Utility Permit Office Approved Request approved Request approved. Notify TxDOT 48

hours prior to construction 58 59 Area Office Construction Forwarded Begin inspection. Construction will

start in at least 48 hours 58 70 Area Office Construction Forwarded Begin inspection. Construction will

start in at least 48 hours 58 90 Maintenance Office Construction Forwarded Begin inspection. Construction will

start in at least 48 hours 59 58 Area Office Construction Forwarded Begin inspection. Construction will

start in at least 48 hours

12

Page 25: UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS REPORTInternet Intranet Figure 1. Prototype Data Flow for Conducting Online Installation Notice Reviews. The following sections describe

Table 1. Tabular Representation of the Workflow Diagram (Continued). Loc Next

Loc Office Status Event Completed Event Needed

59 110 Area Office Construction Forwarded Begin inspection. Construction will start in at least 48 hours

70 71 Construction Office Construction stopped. Under review

Construction stopped. Requested revised drawings

Stop construction. Submit revised drawings

70 80 Construction Office Construction Notification of completion submitted Conduct review. Construction completed

71 72 Utility Company Construction stopped. Under review

Revised drawings submitted Conduct review. Revised drawings submitted

72 73 Utility Permit Office Construction stopped. Under review

Review completed Conduct review

73 74 Area Office Construction stopped. Under review

Review completed Conduct review

74 75 Construction Office Construction stopped. Under review

Review completed Conduct review

75 70 Utility Permit Office Construction Revisions approved Continue inspections. Revisions approved

75 71 Utility Permit Office Construction stopped. Under review

Review partially completed Submit additional revisions

80 81 Utility Permit Office Post Construction Requested as-built documentation Submit as-built documentation 80 84 Utility Permit Office Post Construction Requested utility inventory update Update utility inventory 81 82 Utility Company Post Construction As-built documentation submitted Conduct review. As-built

documentation submitted 82 83 Utility Permit Office Post Construction Requested utility inventory update Update utility inventory 83 -99 Survey Section Completed Utility inventory updated Exit system 84 -99 Survey Section Completed Utility inventory updated Exit system 90 91 Maintenance Office Construction

stopped. Under review

Construction stopped. Requested revised drawings

Stop construction. Submit revised drawings

90 100 Maintenance Office Construction Notification of completion submitted Conduct review. Construction completed

91 92 Utility Company Construction stopped. Under review

Revised drawings submitted Conduct review. Revised drawings submitted

92 93 Utility Permit Office Construction stopped. Under review

Review completed Conduct review

93 94 Area Office Construction stopped. Under review

Review completed Conduct review

94 95 Maintenance Office Construction stopped. Under review

Review completed Conduct review

95 90 Utility Permit Office Construction Revisions approved Continue inspections. Revisions approved

95 91 Utility Permit Office Construction stopped. Under review

Review partially completed Submit additional revisions

100 101 Utility Permit Office Post Construction Requested as-built documentation Submit as-built documentation 100 104 Utility Permit Office Post Construction Requested utility inventory update Update utility inventory 101 102 Utility Company Post Construction As-built documentation submitted Conduct review. As-built

documentation submitted 102 103 Utility Permit Office Post Construction Requested utility inventory update Update utility inventory 103 -99 Survey Section Completed Utility inventory updated Exit system 104 -99 Survey Section Completed Utility inventory updated Exit system

13

Page 26: UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS REPORTInternet Intranet Figure 1. Prototype Data Flow for Conducting Online Installation Notice Reviews. The following sections describe

Table 1. Tabular Representation of the Workflow Diagram (Continued). Loc Next

Loc Office Status Event Completed Event Needed

110 111 Maintenance Office Construction stopped. Under review

Construction stopped. Requested revised drawings

Stop construction. Submit revised drawings

110 120 Maintenance Office Construction Notification of completion submitted Conduct review. Construction completed

111 112 Utility Company Construction stopped. Under review

Revised drawings submitted Conduct review. Revised drawings submitted

112 113 Utility Permit Office Construction stopped. Under review

Review completed Conduct review

113 114 Area Office Construction stopped. Under review

Review completed Conduct review

114 115 Maintenance Office Construction stopped. Under review

Review completed Conduct review

115 110 Utility Permit Office Construction Revisions approved Continue inspections. Revisions approved

115 111 Utility Permit Office Construction stopped. Under review

Review partially completed Submit additional revisions

120 121 Utility Permit Office Post Construction Requested as-built documentation Submit as-built documentation 120 124 Utility Permit Office Post Construction Requested utility inventory update Update utility inventory 121 122 Utility Company Post Construction As-built documentation submitted Conduct review. As-built

documentation submitted 122 123 Utility Permit Office Post Construction Requested utility inventory update Update utility inventory 123 -99 Survey Section Completed Utility inventory updated Exit system 124 -99 Survey Section Completed Utility inventory updated Exit system

14

Page 27: UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS REPORTInternet Intranet Figure 1. Prototype Data Flow for Conducting Online Installation Notice Reviews. The following sections describe

ACTION TYPESACTION TYPE IDACTION

<pi> NVA50

<M>

PK_ACTION_TYPES <pi>

APWA COLORAPWA COLOR IDAPWA COLOR

<pi> NVA50

<M>

PK_APWA_COLOR <pi>

ATTACHMENT TYPESATTACHMENT TYPE IDATTACHMENT TYPE

<pi> NVA50

<M>

PK_ATTCHMNTS_TYPES <pi>

CASINGSCASING IDCASING

<pi> NVA50

<M>

PK_CASINGS <pi>

COUNTIESCOUNTY IDCOUNTY NAMEDISTRICT NUMBER

<pi> NVA100N

<M>

PK_COUNTIES <pi>

DISTRICTSDISTRICT IDDISTRICT NAMEDISTRICT NUMBERENGINEERPHYSICAL STREET ADDRESSPHYSICAL CITYPHYSICAL STATEPHYSICAL ZIPCODEMAIL STREET ADDRESSMAIL CITYMAIL STATEMAIL ZIPCODEPHONE NUMBERFAX NUMBER

<pi> VA3VA50NVA100VA255VA75VA75VA20VA255VA75VA75VA20VA25VA25

<M>

PK_DISTRICTS <pi>

FEATURE CLASSESFEATURE CLASSES IDFEATURE CLASSESFEATURE TYPE

<pi> NVA50VA50

<M>

PK_FEATURE_CLASSES <pi>

FEATURE LEVELSFEATURE LEVEL IDFEATURE LEVEL

<pi> NVA50

<M>

PK_FEATURE_LEVELS <pi>

FEATURE MATERIALSMATERIAL IDMATERIAL

<pi> NVA50

<M>

PK_FEATURE_MATERIALS <pi>

FOUNDATIONSFOUNDATION IDFOUNDATION

<pi> NVA50

<M>

PK_FOUNDATIONS <pi>

HIGHWAY SYSTEMSPREFIXHIGHWAY SYSTEMCOMMENT

<pi> VA2VA50VA200

<M>

PK_HIGHWAY_SYSTEMS <pi>

METHODMETHOD IDMETHODMETHOD DESCRIPTION

<pi> NVA50VA200

<M>

PK_METHOD <pi>

OFFICES

OFFICE ID <pi> N <M>PK_OFFICES <pi>

PERMITS

PERMIT APPLICATION NUMBERUSER PROFILE IDTXDOT PERMIT IDUTILITY CLASS IDUTILITY COMPANY PERMIT IDINSPECTION OFFICE ID

<pi> VA20NVA20NVA20N

<M>

PK_PERMITS <pi>

PERMIT APPLICATION ACTIONSACTION IDCAPACITYCASING SIZEMINIMUM DEPTH HEIGHTMAXIMUM DEPTH HEIGHTUTILITY FACILITY ACTION CONFIGURATIONSHARED UTILITY CAPACITY

<pi> NNNNNNN

<M>

PK_PERMIT_APPLN_ACTIONS <pi>

PERMIT APPLICATION DETAILS

DESCRIPTIONUTILITY PROPOSES BEGIN WORKUTILITY PROPOSES FINISH WORK

VA1000VA10VA10

PERMIT CHECKLISTDISTRICT IDQUESTION IDQUESTIONUSER PROFILE IDSTART DATESTART TIMEEND DATEEND TIMEQUESTION ORDER ID

<pi><pi>

VA3NVA400NVA10VA8VA10VA8N

<M><M>

PK_PERMIT_CHECKLIST <pi>

PERMIT_CHECKLIST_ANSWERS

ANSWERREASON

NVA200

PERMIT DATA PATHSPERMIT DATA PATHDESCRIPTION

<pi> NVA100

<M>

PK_PERMIT_DATA_PATHS <pi>

PERMIT EVENTSPERMIT EVENT NUMBERPERMIT EVENT DATEPERMIT EVENT TIMEPERMIT LOCATION IDNEXT PERMIT LOCATION IDNEXT PRIMARY USER PROFILE IDNEXT SECONDARY USER PROFILE IDDESCRIPTION

<pi> NVA10VA8VA50VA50NNVA1000

<M>

PK_PERMIT_EVENTS <pi>

PERMIT EVENT ATTACHMENTSATTACHMENT IDACTION IDATTACHMENT NAMEATTACHMENT SIZEATTACHMENT USER NMGEOREFERENCED

<pi> NNVA100NVA100N

<M>

PK_PERMIT_EVENT_ATTCHMNTS <pi>

PERMIT EVENT LOCATIONSROUTE NAMECTRL SECTIONLATITUDELONGITUDEMAINTENANCE NUMBERTLMS NUMBERBEGIN TLMS DISTANCEEND TLMS DISTANCECOUNTY ID

VA10VA50NNA10NNNN

PERMIT EVENT TYPESPERMIT EVENT TYPE IDPERMIT EVENT NEEDEDPERMIT EVENT COMPLETED

<pi> NVA100VA100

<M>

PK_PERMIT_EVENT_TYPES <pi>

PERMIT MESSAGE LOGLOG IDLOG DATEMESSAGE FROMMESSAGE TOMESSAGE CCTITLEDESCRIPTION

<pi> NVA50VA50VA50VA50VA70VA1

<M>

PK_PERMIT_MESSAGE_LOG <pi>

PROVISIONS

PROVISION_IDFORM IDREVISION DATEPROVISION TITLEDISTRICT IDSTATUSFILE NAMEUSER ID

<pi> NVA20VA10VA100VA3VA20VA100VA20

<M>

PK_PROVISIONS <pi>

PERMIT STATUSSTATUS IDSTATUSSTATUS DESCRIPTION

<pi> NVA50VA200

<M>

PK_PERMIT_STATUS <pi>

PERMIT WORKFLOW : 1

PERMIT LOCATION IDNEXT PERMIT LOCATION IDOFFICE TYPE ID

<pi><pi>

NNN

<M><M>

PK_PERMIT_WORKFLOW <pi>

POSTAL ABBREVIATIONSABBREVIATION IDPOSTAL NAMEAACR_ABBREVIATION

<pi> VA50VA50VA50

<M>

PK_POSTAL_ABBREVIATIONS <pi>

PROVISION TYPESPROVISION TYPE IDPROVISIONTYPE

<pi> NVA50

<M>

PK_PROVISION_TYPES <pi>

RELATIONAL HORIZONTAL LOCATIONS

RELATIONAL HORIZONTAL LOCATION IDRELATIONAL HORIZONTAL LOCATION

<pi> NVA50

<M>

PK_RLTNL_HRZNTL_LOCATIONS <pi>

RELATIONAL VERTICAL LOCATIONS

RELATIONAL VERTICAL LOCATION IDRELATIONAL VERTICAL LOCATION

<pi> NVA50

<M>

PK_RLTNL_VERT_LOCATIONS <pi>

SHAPESSHAPE IDSHAPE

<pi> NVA50

<M>

PK_SHAPES <pi>

TXDOT OFFICESTXDOT OFFICE IDOFFICE IDOFFICE NAMEPARENT TXDOT OFFICE IDSUPERVISOR USER PROFILE IDPHYSICAL STREET ADDRESSPHYSICAL CITYPHYSICAL STATEPHYSICAL ZIPCODEMAIL STREET ADDRESSMAIL CITYMAIL STATEMAIL ZIPCODEPHONE NUMBERFAX NUMBER

<pi> NNVA75NVA50VA255VA75VA75VA20VA255VA75VA75VA20VA25VA25

<M>

PK_TXDOT_OFFICES <pi>

TXDOT OFFICE TYPESTXDOT OFFICE TYPE IDTXDOT OFFICE TYPE DESCRIPTION

<pi> NVA75

<M>

PK_TXDOT_OFFICE_TYPES <pi>

TXDOT USERS : 1

EVENT DATEFIRST NAMELAST NAMETITLEPHONE NUMBERFAX NUMBEREMAIL ADDRESS

VA10VA30VA30VA50VA25VA25VA50

TXDOT USER ACCOUNTS

USER PROFILE IDUSER NAMEPASSWORDCONFIRM PASSWORD

<pi> NVA20VA20VA20

<M>

PK_TXDOT_USER_ACCOUNTS <pi>

TXDOT USER PRIVILILEGES

ACCOUNT PRIVILEGE IDACCOUNT PRIVILEGE

<pi> NVA50

<M>

PK_TXDOT_USER_PRIV <pi>

UNITSUNIT IDUNITSYMBOL

<pi> NVA50VA50

<M>

PK_UNITS <pi>

USERS

USER PROFILE ID <pi> N <M>PK_USERS <pi>

USER ACCOUNT STATUS

ACCOUNT STATUS IDACCOUNT STATUS

<pi> NVA50

<M>

PK_USER_ACCOUNT_STATUS <pi>

UTILITY CLASSESUTILITY CLASS IDUTILITY CLASS

<pi> NVA50

<M><M>

PK_UTIL_CLASSES <pi>

UTILITY COMPANY OFFICES

UTILITY COMPANY OFFICE IDPARENT UTIL COMPANY OFFICEOFFICE NAMEACRONYMDISTRICT IDACCOUNT STATUS ID

<pi> NNVA75VA50VA3N

<M>

PK_UTIL_COMPANY_OFFICES <pi>

UTILITY COMPANY USERS

EVENT DATEFIRST NAMELAST NAMETITLEPHYSICAL STREET ADDRESSPHYSICAL CITYPHYSICAL STATEPHYSICAL ZIPCODEPHONE NUMBERFAX NUMBEREMAIL ADDRESSCOUNTY IDDISTRICT ID

VA10VA30VA30VA50VA255VA75VA75VA20VA25VA25VA50NVA3

UTILITY COMPANY USER ACCOUNTS

USER PROFILE IDUSER NAMEPASSWORDCONFIRM PASSWORD

<pi> NVA20VA20VA20

<M>

PK_UTIL_COMPANY_USER_ACCOUNTS <pi>

UTILITY COMPANY USER PRIVILEGES

ACCOUNT PRIVILEGE IDACCOUNT PRIVILEGE

<pi> NVA50

<M>

PK_UTIL_COMPANY_USER_PRIV <pi>

ACCESS TYPES

ACCESS TYPE IDACCESS TYPE

<pi> NVA50

<M>

PK_ACCESS_TYPES <pi>

PERMIT WORKFLOW : 2

PERMIT LOCATION IDNEXT PERMIT LOCATION IDOFFICE TYPE ID

<pi><pi>

NNN

<M><M>

PK_PERMIT_WORKFLOW <pi>

TXDOT USERS : 2

EVENT DATEFIRST NAMELAST NAMETITLEPHONE NUMBERFAX NUMBEREMAIL ADDRESS

VA10VA30VA30VA50VA25VA25VA50

Figure 4. Logical Model.

15

Page 28: UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS REPORTInternet Intranet Figure 1. Prototype Data Flow for Conducting Online Installation Notice Reviews. The following sections describe

ACTION_TYPESACTION_TYPE_IDACTION

NUMBERVARCHAR2(50)

<pk>APWA_COLOR

APWA_COLOR_IDAPWA_COLOR

NUMBERVARCHAR2(50)

<pk>

ATTCHMNTS_TYPESATTCHMNT_TYPE_IDATTCHMNT_TYPE

NUMBERVARCHAR2(50)

<pk>

CASINGSCASING_IDCASING

NUMBERVARCHAR2(50)

<pk>

COUNTIES

COUNTY_IDCOUNTY_NMDISTRICT_IDDISTRICT_NBR

NUMBERVARCHAR2(100)VARCHAR2(3)NUMBER

<pk>

<fk>

DISTRICTSDISTRICT_IDDISTRICT_NMDISTRICT_NBRENGINEERPHYS_STREET_ADDRPHYS_CITYPHYS_STATEPHYS_ZIPCODEML_STREET_ADDRML_CITYML_STATEML_ZIPCODEPHONE_NBRFAX_NBR

VARCHAR2(3)VARCHAR2(50)NUMBERVARCHAR2(100)VARCHAR2(255)VARCHAR2(75)VARCHAR2(75)VARCHAR2(20)VARCHAR2(255)VARCHAR2(75)VARCHAR2(75)VARCHAR2(20)VARCHAR2(25)VARCHAR2(25)

<pk>

FEATURE_CLASSES

FEATURE_CLASSES_IDFEATURE_CLASSESFEATURE_TYPE

NUMBERVARCHAR2(50)VARCHAR2(50)

<pk>FEATURE_LEVELS

FEATURE_LEVEL_IDFEATURE_LEVEL

NUMBERVARCHAR2(50)

<pk>FEATURE_MATERIALS

MATERIAL_IDMATERIAL

NUMBERVARCHAR2(50)

<pk>FOUNDATIONS

FOUNDATION_IDFOUNDATION

NUMBERVARCHAR2(50)

<pk>

HIGHWAY_SYSTEMSPREFIXHIGHWAY_SYSTEMCMNT

VARCHAR2(2)VARCHAR2(50)VARCHAR2(200)

<pk>METHOD

METHOD_IDMETHODMETHOD_DSCR

NUMBERVARCHAR2(50)VARCHAR2(200)

<pk>

OFFICESOFFICE_IDTXDOT_OFFICE_IDUTIL_COMPANY_OFFICE_ID

NUMBERNUMBERNUMBER

<pk><fk1><fk2>

PERMITS

PERMIT_APPLN_NBRUSER_PROFL_IDDISTRICT_IDPERMIT_DATA_PATHTXDOT_PERMIT_IDUTIL_CLASS_IDUTIL_COMPANY_PERMIT_IDINSPECTION_OFFICE_ID

VARCHAR2(20)NUMBERVARCHAR2(3)NUMBERVARCHAR2(20)NUMBERVARCHAR2(20)NUMBER

<pk>

<fk1><fk2>

PERMIT_APPLN_ACTIONSPERMIT_APPLN_NBRPERMIT_EVENT_NBRACTION_IDACTION_TYPE_IDUTIL_CLASS_IDFEATURE_CLASS_IDFEATURE_IDMATERIAL_IDCAPACITYCAPACITY_UNIT_IDCASING_IDFOUNDATION_IDSHAPE_IDCASING_SIZEMINIMUM_DEPTH_HEIGHTMAXIMUM_DEPTH_HEIGHTUTIL_FACILITY_ACTION_CONFIGSHARED_UTIL_CAPACITY

VARCHAR2(20)NUMBERNUMBERNUMBERNUMBERNUMBERNUMBERNUMBERNUMBERNUMBERNUMBERNUMBERNUMBERNUMBERNUMBERNUMBERNUMBERNUMBER

<pk,fk10><pk,fk10><pk><fk1><fk7><fk8><fk3><fk9>

<fk6><fk2><fk4><fk5>

PERMIT_APPLN_DETAILS

PERMIT_APPLN_NBRPERMIT_EVENT_NBRDSCRUTIL_PROPOSES_BEGIN_WORKUTIL_PROPOSES_FINISH_WORK

VARCHAR2(20)NUMBERVARCHAR2(1000)VARCHAR2(10)VARCHAR2(10)

<pk,fk><pk,fk>

PERMIT_CHECKLIST

DISTRICT_IDQUESTION_IDQUESTIONUSER_PROFL_IDSTART_DTSTART_TMEND_DTEND_TMQUESTION_ORDER_ID

VARCHAR2(3)NUMBERVARCHAR2(400)NUMBERVARCHAR2(10)VARCHAR2(8)VARCHAR2(10)VARCHAR2(8)NUMBER

<pk><pk>

PERMIT_CHECKLIST_ANSWERS

PERMIT_APPLN_NBRDISTRICT_IDQUESTION_IDANSWERREASON

VARCHAR2(20)VARCHAR2(3)NUMBERNUMBERVARCHAR2(200)

<pk,fk1><pk,fk2><pk,fk2>

PERMIT_DATA_PATHSPERMIT_DATA_PATHDSCR

NUMBERVARCHAR2(100)

<pk>

PERMIT_EVENTSPERMIT_APPLN_NBRPERMIT_EVENT_NBRPERMIT_EVENT_TYPE_IDPERMIT_EVENT_DTPERMIT_EVENT_TMPERMIT_LOCATION_IDUSER_PROFL_IDNEXT_PERMIT_LOCATION_IDNEXT_PRIMARY_USER_PROFL_IDNEXT_SECONDARY_USER_PROFL_IDDSCR

VARCHAR2(20)NUMBERNUMBERVARCHAR2(10)VARCHAR2(8)VARCHAR2(50)NUMBERVARCHAR2(50)NUMBERNUMBERVARCHAR2(1000)

<pk,fk1><pk><fk2>

<fk3>

PERMIT_EVENT_ATTCHMNTSPERMIT_APPLN_NBRPERMIT_EVENT_NBRATTCHMNT_IDATTCHMNT_TYPE_IDACTION_IDATTCHMNT_NMATTCHMNT_SIZEATTCHMNT_USER_NMGEOREFERENCED

VARCHAR2(20)NUMBERNUMBERNUMBERNUMBERVARCHAR2(100)NUMBERVARCHAR2(100)NUMBER

<pk,fk2><pk,fk2><pk><fk1>

PERMIT_EVENT_LOCATIONSPERMIT_APPLN_NBRPERMIT_EVENT_NBRRTE_NMCTRL_SECT_LATLONMAINT_NBRTLMS_NBRBEGIN_TLMS_DISTANCEEND_TLMS_DISTANCEACCESS_TYPE_IDVERTICAL_LOCATION_IDHORIZONTAL_LOCATION_IDCOUNTY_ID

VARCHAR2(20)NUMBERVARCHAR2(10)VARCHAR2(50)NUMBERNUMBERCHAR(10)NUMBERNUMBERNUMBERNUMBERNUMBERNUMBERNUMBER

<pk,fk1><pk,fk1>

<fk2><fk4><fk3>

PERMIT_EVENT_TYPESPERMIT_EVENT_TYPE_IDPERMIT_EVENT_NEEDEDPERMIT_EVENT_COMPLETED

NUMBERVARCHAR2(100)VARCHAR2(100)

<pk>

PERMIT_MESSAGE_LOGPERMIT_APPLN_NBRLOG_IDLOG_DTMESSAGE_FROMMESSAGE_TOMESSAGE_CCTITLEDSCR

VARCHAR2(20)NUMBERVARCHAR2(50)VARCHAR2(50)VARCHAR2(50)VARCHAR2(50)VARCHAR2(70)VARCHAR2(1)

<pk,fk><pk>

PERMIT_PROVISIONS

PERMIT_APPLN_NBRPROVISION_ID

VARCHAR2(20)NUMBER

<pk,fk1><pk,fk2>

PERMIT_STATUS

STATUS_IDSTATUSSTATUS_DSCR

NUMBERVARCHAR2(50)VARCHAR2(200)

<pk>

PERMIT_WORKFLOW : 1PERMIT_LOCATION_IDNEXT_PERMIT_LOCATION_IDDISTRICT_IDPERMIT_EVENT_TYPE_IDSTATUS_IDOFFICE_TYPE_ID

NUMBERNUMBERVARCHAR2(3)NUMBERNUMBERNUMBER

<pk><pk><pk,fk1><pk,fk2><fk3>

POSTAL_ABBREVIATIONSABBREVIATION_IDPOSTAL_NMAACR_ABBREVIATION

VARCHAR2(50)VARCHAR2(50)VARCHAR2(50)

<pk>

PROVISIONS

PROVISION_IDPROVISION_TYPE_IDFORM_IDREVISION_DTPROVISION_TITLEDISTRICT_IDSTATUSFILENAMEUSER_ID

NUMBERNUMBERVARCHAR2(20)VARCHAR2(10)VARCHAR2(100)VARCHAR2(3)VARCHAR2(20)VARCHAR2(100)VARCHAR2(20)

<pk><fk>

PROVISION_TYPESPROVISION_TYPE_IDPROVISION_TYPE

NUMBERVARCHAR2(50)

<pk>

RLTNL_HRZNTL_LOCATIONSRLTNL_HRZNTL_LOCATION_IDRLTNL_HRZNTL_LOCATION

NUMBERVARCHAR2(50)

<pk>RLTNL_VERT_LOCATIONS

RLTNL_VERT_LOCATION_IDRLTNL_VERT_LOCATION

NUMBERVARCHAR2(50)

<pk>

SHAPESSHAPE_IDSHAPE

NUMBERVARCHAR2(50)

<pk>

TXDOT_OFFICESTXDOT_OFFICE_IDDISTRICT_IDTXDOT_OFFICE_TYPE_IDOFFICE_IDOFFICE_NMPARENT_TXDOT_OFFICE_IDSUPERVISOR_USER_PROFILE_IDPHYS_STREET_ADDRPHYS_CITYPHYS_STATEPHYS_ZIPCODEML_STREET_ADDRML_CITYML_STATEML_ZIPCODEPHONE_NBRFAX_NBR

NUMBERVARCHAR2(3)NUMBERNUMBERVARCHAR2(75)NUMBERVARCHAR2(50)VARCHAR2(255)VARCHAR2(75)VARCHAR2(75)VARCHAR2(20)VARCHAR2(255)VARCHAR2(75)VARCHAR2(75)VARCHAR2(20)VARCHAR2(25)VARCHAR2(25)

<pk><fk1><fk2>

TXDOT_OFFICE_TYPESTXDOT_OFFICE_TYPE_IDTXDOT_OFFICE_TYPE_DSCR

NUMBERVARCHAR2(75)

<pk>

TXDOT_USERS : 1USER_PROFL_IDTXDOT_OFFICE_IDEVENT_DTFIRST_NMLAST_NMTITLEPHONE_NBRFAX_NBREMAIL_ADDR

NUMBERNUMBERVARCHAR2(10)VARCHAR2(30)VARCHAR2(30)VARCHAR2(50)VARCHAR2(25)VARCHAR2(25)VARCHAR2(50)

<pk,fk2><fk1>

TXDOT_USER_ACCOUNTSUSER_PROFL_IDACCOUNT_PRIV_IDACCOUNT_STATUS_IDUSER_NMPASSWORDCONFIRM_PASSWORD

NUMBERNUMBERNUMBERVARCHAR2(20)VARCHAR2(20)VARCHAR2(20)

<pk><fk1><fk2>

TXDOT_USER_PRIVACCOUNT_PRIV_IDACCOUNT_PRIV

NUMBERVARCHAR2(50)

<pk>

UNITS

UNIT_IDUNITSYMBOL

NUMBERVARCHAR2(50)VARCHAR2(50)

<pk>

USERSUSER_PROFL_IDTXDOT_USER_IDUTIL_COMPANY_USER_ID

NUMBERNUMBERNUMBER

<pk><fk1><fk2>

USER_ACCOUNT_STATUS

ACCOUNT_STATUS_IDACCOUNT_STATUS

NUMBERVARCHAR2(50)

<pk>

UTIL_CLASSES

UTIL_CLASS_IDUTIL_CLASSAPWA_COLOR_ID

NUMBERVARCHAR2(50)NUMBER

<pk>

<fk>

UTIL_COMPANY_OFFICES

UTIL_COMPANY_OFFICE_IDPARENT_UTIL_COMPANY_OFFICEOFFICE_NMACRONYMDISTRICT_IDACCOUNT_STATUS_ID

NUMBERNUMBERVARCHAR2(75)VARCHAR2(50)VARCHAR2(3)NUMBER

<pk>

UTIL_COMPANY_USERS

USER_PROFL_IDUTIL_COMPANY_OFFICE_IDEVENT_DTFIRST_NMLAST_NMTITLEPHYS_STREET_ADDRPHYS_CITYPHYS_STATEPHYS_ZIPCODEPHONE_NBRFAX_NBREMAIL_ADDRCOUNTY_IDDISTRICT_ID

NUMBERNUMBERVARCHAR2(10)VARCHAR2(30)VARCHAR2(30)VARCHAR2(50)VARCHAR2(255)VARCHAR2(75)VARCHAR2(75)VARCHAR2(20)VARCHAR2(25)VARCHAR2(25)VARCHAR2(50)NUMBERVARCHAR2(3)

<pk,fk1><fk2>

UTIL_COMPANY_USER_ACCOUNTS

USER_PROFL_IDACCOUNT_STATUS_IDACCOUNT_PRIV_IDUSER_NMPASSWORDCONFIRM_PASSWORD

NUMBERNUMBERNUMBERVARCHAR2(20)VARCHAR2(20)VARCHAR2(20)

<pk><fk2><fk1>

UTIL_COMPANY_USER_PRIVACCOUNT_PRIV_IDACCOUNT_PRIV

NUMBERVARCHAR2(50)

<pk>

ACCESS_TYPESACCESS_TYPE_IDACCESS_TYPE

NUMBERVARCHAR2(50)

<pk>

PERMIT_WORKFLOW : 2

PERMIT_LOCATION_IDNEXT_PERMIT_LOCATION_IDDISTRICT_IDPERMIT_EVENT_TYPE_IDSTATUS_IDOFFICE_TYPE_ID

NUMBERNUMBERVARCHAR2(3)NUMBERNUMBERNUMBER

<pk><pk><pk,fk1><pk,fk2><fk3>

TXDOT_USERS : 2USER_PROFL_IDTXDOT_OFFICE_IDEVENT_DTFIRST_NMLAST_NMTITLEPHONE_NBRFAX_NBREMAIL_ADDR

NUMBERNUMBERVARCHAR2(10)VARCHAR2(30)VARCHAR2(30)VARCHAR2(50)VARCHAR2(25)VARCHAR2(25)VARCHAR2(50)

<pk,fk2><fk1>

Figure 5. Physical Model.

16

Page 29: UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS REPORTInternet Intranet Figure 1. Prototype Data Flow for Conducting Online Installation Notice Reviews. The following sections describe

SYSTEM DEVELOPMENT

System Architecture

Implementation of the system design involved developing interactions among several computers: one or more client computers, a web server, an Oracle server, and an e-mail server. The interaction begins with a client computer, which, as mentioned previously, has minimal technical requirements, mainly in the form of an Internet browser and e-mail software that supports the SMTP protocol (e.g., Microsoft Outlook, Novell GroupWise). This client computer interacts with a web server that serves the online application to the client computer over the Internet using IIS. The web server also stores all files uploaded by the client user in a designated folder that AdLib eXpress uses to generate PDF versions of those files. When the system generates a database request, the system sends the request to the Oracle server, which, in turn, completes the request and returns with a response. The Oracle server also houses ArcSDE, which handles spatial data requests. The final computer involved is the e-mail server, which sends application-driven e-mails to client users in response to requests made by the system through the web server.

Database

The researchers exported the ERwin database design in script format and then ran the script in Oracle to generate the database. After generating the database, the researchers populated the database with a “seed” data set that included records in tables PERMIT_WORKFLOW, PERMIT_EVENT_TYPES, and PERMIT_STATUS. These tables directly reflect the workflow gathered in the system design phase and control the flow of the online application. As mentioned previously, the design is dynamic so that if the online application flow needs changes, only the database entries will require modifications.

Code

The system is actually the integration of two subsystems: a data management subsystem and a web mapping subsystem. This modular architecture facilitated the development process.

Data Management Subsystem

The data management subsystem includes web pages and procedures that enable users on client computers to log into the system, enter data, upload files, review pending applications, and print forms. The subsystem generates web pages dynamically using active server pages (ASP) and then serves those pages to client computers. In addition, server-side scripts perform a variety of tasks such as connecting to the database, transforming and parsing data, and uploading files. ASP files also contain client-side scripts that make calls to client components, e.g., to check the client browser configuration. The Oracle database stores all data entered by users, except files such as computer-aided design (CAD) drawings and other attachments, which are stored on the web server’s hard drive. To interact with the Oracle database, the application uses structured query language (SQL) queries through an ODBC object. To upload files from client computers, the application uses SAFileUp, which is a server-side component that enables file uploading through client browser interfaces.

17

Page 30: UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS REPORTInternet Intranet Figure 1. Prototype Data Flow for Conducting Online Installation Notice Reviews. The following sections describe

After uploading files to the server, the system makes those files available to view and download. At the same time, AdLib eXpress generates a PDF version of the uploaded files, which the system also makes available to view and download. As individual applications undergo processing, the data management subsystem automatically sends e-mails to designated officials or back to utility company users. ASP uses objects in the collaboration data object (CDO) library to pass SMTP requests to the e-mail server.

Web Mapping Subsystem

The web mapping subsystem includes web pages and procedures that enable users on client computers to view maps, query features, and select and view installation notice application locations. As Figure 2 shows, the system handles map requests through an ArcIMS map server, which includes an application server, a spatial server, and a map service. Every time the client sends a request, e.g., to zoom in, zoom out, or pan, the map service produces and delivers a snapshot of the map in image format back to the client through the spatial server. The application server directs incoming spatial requests to the appropriate spatial server. To ensure integration with the data management subsystem, the researchers developed new ASP and ArcXML (ESRI’s version of extensible mark-up language [XML]) code, JavaScript functions, and HTML pages, and customized native ArcIMS JavaScript functions and HTML pages to accommodate those new pages:

• ASP and ArcXML code. Using an ODBC link, ASP code queries data from the database and packages the data for transfer to the JavaScript functions. ArcXML code passes requests to the spatial server, which, after processing by the map service, returns with responses packaged as ArcXML messages back to the client. For example, ArcXML generates requests to load “acetate” layers to display points along routes where utility company users click to define proposed utility installation locations. In this case, the spatial server response is a map image of installation notice locations on the requested “acetate” layer. In general, to support map viewing and relational database querying capabilities, it was necessary to modify some default ArcIMS files.

• JavaScript functions. JavaScript functions create, manage, and delete the “acetate” layers used to dynamically display utility installation locations selected by the user. JavaScript functions generate ArcXML tags for the spatial server request based on the data retrieved by the ASP pages. JavaScript functions perform calculations such as conversion of screen coordinates to world coordinates. They also manage HTML page event handlers such as those used for clicking on the map, and generate and alter HTML pages viewed by clients.

• HTML code. HTML code provides interaction with client computers through a series of frames, each of which has a specific function. HTML pages are the front end of the application and the only means of interaction between users and the JavaScript functions. The HTML component is the final product of the other two pieces of code, combining the map images created by the ArcXML and ASP code with the background and interactive work of the JavaScript functions.

To facilitate the utility installation application and review process, the researchers configured the web mapping subsystem to support the display and query of the following map layers:

18

Page 31: UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS REPORTInternet Intranet Figure 1. Prototype Data Flow for Conducting Online Installation Notice Reviews. The following sections describe

• Routes: This layer is part of TxDOT’s roadway inventory. It contains routes for the

entire state. The UIR system queries the layer to determine the route number associated with the location of proposed utility installations.

• Control sections: This layer is part of TxDOT’s roadway inventory. It contains control sections for the entire state. The UIR system queries the layer to determine the control section associated with the location of proposed utility installations.

• Streets: This layer is part of TxDOT’s roadway inventory. It contains roadway centerlines TxDOT used to develop its Texas Linear Measurement System (TLMS).

• Counties: The researchers generated this layer using several online data sources, including data layers available through the Texas Natural Resources Information System (TNRIS) (4) and the Texas General Land Office (5).

• Maintenance office map: The researchers generated this layer using hard copy printouts provided by San Antonio District officials. The UIR system queries the layer to determine the maintenance office that, by jurisdiction, would be responsible for conducting the field inspection for new utility installations.

• Area office map: The researchers generated this layer using the maintenance office layer and hard copy printouts provided by San Antonio District officials.

• Districts: The researchers generated this layer based on the county layer and information available at the TxDOT web site.

• Utility inventory: This layer shows utility locations collected during the research phase. It may be worth noting the map server can support the display and query of many other layers of information. Currently, the researchers are evaluating the feasibility of including ½-ft year 2003 aerial photography to support the identification of ROW and edge of pavement locations in Bexar County. Based on a preliminary analysis, the researchers believe using recent, geo-referenced fine-resolution aerial photography can support the online utility installation review process more effectively than the scanned ROW maps currently available through the TxDOT web site (6).

Utility Company User Interface

The utility company user interface supports the needs and responsibilities of utility companies during the installation notice review process. They include submitting new applications, viewing pending applications, viewing TxDOT special provisions, and managing user profile data. Figure 6 shows a collage of sample web pages included in the interface.

Administrative Interface

The administrative interface supports the needs and responsibilities of TxDOT officials during the review process. The system facilitates this process through automated e-mails that alert specified officials when an application has reached a status for which those officials are responsible. The specified official then logs into the system (a link is provided within the e-mail for convenience), clicks on the appropriate processing link in the navigation bar, and processes the application. Figure 7 shows a collage of sample web pages included in the interface.

19

Page 32: UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS REPORTInternet Intranet Figure 1. Prototype Data Flow for Conducting Online Installation Notice Reviews. The following sections describe

Figure 6. Sample Utility Company User Interface Web Pages.

20

Page 33: UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS REPORTInternet Intranet Figure 1. Prototype Data Flow for Conducting Online Installation Notice Reviews. The following sections describe

Figure 7. Sample Administrative Interface Web Pages.

21

Page 34: UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS REPORTInternet Intranet Figure 1. Prototype Data Flow for Conducting Online Installation Notice Reviews. The following sections describe

SYSTEM TESTING AND DELIVERY

At the conclusion of fiscal year 2004, the development of the UIR system has achieved a beta level. As such, the system is functional from beginning to end, but it is not yet a finished product. In fiscal year 2005, the researchers will undertake a series of activities to test UIR, fine tune it, and deliver the system to TxDOT. Some of the activities will include the following:

• add capability to display fine-resolution aerial photography; • test the system in conjunction with volunteer utility companies (as of this writing, SAWS

and CPS have agreed to participate, with SBC declining the invitation to do so); • provide training and technical assistance to both TxDOT and utility company users; • fine tune the system to address feedback provided by TxDOT and utility company users; • prepare documentation; and • submit deliverables to TxDOT.

22

Page 35: UTILITY INSTALLATION REVIEW SYSTEM—PROGRESS REPORTInternet Intranet Figure 1. Prototype Data Flow for Conducting Online Installation Notice Reviews. The following sections describe

REFERENCES

1. Quiroga, C., Ellis, C., Shin, S., and Pina, R. A Data Platform for Managing Utilities along Highway Corridors. Report FHWA/TX-02/2110-1, Texas Department of Transportation, Austin, TX, 2002, 88 p.

2. Quiroga, C., Pina, R., Amoako-Atta, S., Kraus, E., and Hardy, A. Inventory of Utilities—Progress Report. Draft. Report FHWA/TX-04/2110-01-1, Texas Department of Transportation, Austin, TX, 2004, 46 p.

3. Data Architecture. Texas Department of Transportation, version 1.0, July 2002, 94 p. 4. StratMap. Texas Natural Resources Information System (TNRIS),

http://www.tnris.state.tx.us/stratmap/index.htm, 2004. Accessed August 27, 2004. 5. Geographic Information Systems Data. Texas General Land Office,

http://www.glo.state.tx.us/gisdata/gisdata.html, 2004. Accessed August 27, 2004. 6. San Antonio Right of Way Application. Texas Department of Transportation,

http://www.dot.state.tx.us/sat/rowmap/sarow.htm, 2004. Accessed August 27, 2004.