McCauley, Pittsboro, and Columbia Street
Construction Process
Underground Electrical Duct BankUnderground Electrical Duct Bank
McCauley Street
Pittsboro Street
South Columbia Street
August 9, 2006August 9, 2006
Neighborhood MeetingNeighborhood Meeting
••PurposePurpose––Increase reliability and capacity of power to campus facilities Increase reliability and capacity of power to campus facilities and UNC and UNC HospitalsHospitals
––Provides a critical connection to the Manning SubstationProvides a critical connection to the Manning Substation
••ImplementationImplementation––Install underground duct bank in McCauley, Pittsboro, and South Install underground duct bank in McCauley, Pittsboro, and South Columbia StreetsColumbia Streets
––Four phases:Four phases:
••Phase 1 RansomPhase 1 Ransom--McCauley Intersection: Fall of 2006 with 1.5 month durationMcCauley Intersection: Fall of 2006 with 1.5 month duration
••Phase 2 McCauley Street: Winter of 2007 with 7 month durationPhase 2 McCauley Street: Winter of 2007 with 7 month duration
••Phase 3 Pittsboro: Fall of 2007 with 4 month durationPhase 3 Pittsboro: Fall of 2007 with 4 month duration
••Phase 4 S. Columbia: Fall of 2007 with 4 month durationPhase 4 S. Columbia: Fall of 2007 with 4 month duration
••Needs to be complete by Spring 2008Needs to be complete by Spring 2008
Underground Electrical Duct BankUnderground Electrical Duct Bank
McCauley, Pittsboro, and S. Columbia Street
Construction Process
Underground Electrical Duct BankUnderground Electrical Duct Bank
McCauley, Pittsboro, and S. Columbia Street
Construction Process
••Duct Bank ConstructionDuct Bank Construction––Six foot wide trench in street and eight Six foot wide trench in street and eight
feet deepfeet deep
––6 inch conduits encased in concrete 6 inch conduits encased in concrete
buried three feet below streetburied three feet below street
••High voltage transmission and High voltage transmission and
distribution circuitsdistribution circuits
••Telecommunications and control Telecommunications and control
circuitscircuits
McCauley Street
Construction Process
Underground Electrical Duct BankUnderground Electrical Duct Bank
Construction limited to Construction limited to
Right of WayRight of Way
Approximately 6 new Approximately 6 new
access vaultsaccess vaults
Phase 1 Construction:Phase 1 Construction:
Intersection of McCauley Intersection of McCauley
and Ransom Streetsand Ransom Streets
Fall 2006Fall 2006
1.5 month duration1.5 month duration
Phase 2 Construction: Phase 2 Construction:
McCauley StreetMcCauley Street
Winter 2007Winter 2007
7 month duration7 month duration
EXAMPLE CROSS-SECTION A
Underground Electrical Duct BankUnderground Electrical Duct Bank
McCauley Street
Construction Process
Access vault will Access vault will
span from span from
sidewalk to roadsidewalk to road
1616’’ x 8x 8’’
No plantings, or retaining No plantings, or retaining
walls will be removed.walls will be removed.
Install in west bound Install in west bound
lane (north side)lane (north side)
McCauley and Pittsboro Intersection
Road Closure with DETOUR
Underground Electrical Duct BankUnderground Electrical Duct Bank
McCauley Street
Construction Process
Road Closed to Thru Road Closed to Thru
TrafficTraffic Pedestrian Traffic on Pedestrian Traffic on
north side closed to north side closed to
pedestrianspedestrians
Underground Electrical Duct BankUnderground Electrical Duct Bank
McCauley Street
Construction Process
TYPICAL STREET CONSTRUCTION
Lane Closure with one way traffic
East bound lane open for East bound lane open for
neighbor trafficneighbor traffic
Driveway access in Driveway access in
eveningevening
Underground Electrical Duct BankUnderground Electrical Duct Bank
McCauley Street
Construction Process
TYPICAL STREET CONSTRUCTION
Lane Closure with one way traffic
Installed in sections to Installed in sections to
limit the number of limit the number of
driveways blockeddriveways blocked
to 1 to 3 driveways.to 1 to 3 driveways.
FlaggersFlaggers used to control used to control
one way accessone way access
Section opened in Section opened in
evening for two evening for two
way trafficway traffic
Underground Electrical Duct BankUnderground Electrical Duct Bank
Pittsboro Street
Construction Process
Phase 3 construction:Phase 3 construction:
Pittsboro StreetPittsboro Street
Fall 2007Fall 2007
4 month duration4 month duration
Left Lane (east side) Left Lane (east side)
closedclosed
Underground Electrical Duct BankUnderground Electrical Duct Bank
EXAMPLE CROSS-SECTION
Pittsboro Street
Construction Process
Right lane Right lane
open to open to
thru trafficthru trafficPedestrian traffic closed Pedestrian traffic closed
on east sideon east side
Underground Electrical Duct BankUnderground Electrical Duct Bank
Columbia Street
Construction Process
Duct bank installed Duct bank installed
off streetoff street
Lane Closure for Lane Closure for
crossing onlycrossing only
(One lane at a time)(One lane at a time)
Pedestrian traffic Pedestrian traffic
closed on east sideclosed on east side
Phase 4 Phase 4
construction:construction:
S. Columbia StreetS. Columbia Street
Fall 2007Fall 2007
4 month duration4 month duration
QuestionsQuestions
andand
CommentsComments
Underground Electrical Duct BankUnderground Electrical Duct Bank
McCauley, Pittsboro, and S. Columbia Street
Construction Process