Upload
dodiep
View
212
Download
0
Embed Size (px)
Citation preview
STATE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)Volume 2 (Divisions 8–14)
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION
20172018–2027 AUGUST 2017
2018-2027 State Transportation Improvement Program
Table of Contents
Note: STIP Reading Guide and Funding Source Key for Highway and Non Highway Programs are shown at the beginning of each Program for every Division and Statewide Program
Volume 1 Transportation Program What is a State Transportation Improvement Program (STIP) .......................... T-1 How is the STIP organized / Strategic Prioritization .......................................... T-2 Public Involvement – Draft STIP / Transportation Conformity ............................ T-4 Public Transportation Project Funding ............................................................... T-5 Project Descriptions ........................................................................................... T-6 Transportation Revenue / State Budget / Federal Budget .................................. T-7 Federal Aid Program ........................................................................................... T-8 Garvee Bonds .................................................................................................... T-9 State Highway Trust Fund ................................................................................ T-11 Anticipated Inflation Impact ............................................................................... T-11 Cash Model ....................................................................................................... T-12 The North Carolina Turnpike Authority (NCTA) ................................................ T-13 Alphabetical Listing of Counties / Listing of Counties by NCDOT Divisions.... T-14 Listing of Metropolitan Planning Organizations (MPO) .................................... T-15 Listing of Rural Planning Organizations (RPO) ................................................ T-16 North Carolina Board of Transportation and Division and District Offices Map T-17 Highway Program Legend ................................................................................ T-18 Non Highway Program Legend ......................................................................... T-19 Division Program Division Maps / Highway / Non Highway Sections Division 1 ........................................................................................................... 1-3 Division 2 ........................................................................................................... 2-3 Division 3 ........................................................................................................... 3-3 Division 4 ........................................................................................................... 4-3 Division 5 ........................................................................................................... 5-3 Division 6 ........................................................................................................... 6-3 Division 7 ........................................................................................................... 7-3
Volume 2 Division Program (continued) Division Maps / Highway / Non Highway Sections Division 8 ........................................................................................................... 8-3 Division 9 ........................................................................................................... 9-3 Division 10 ....................................................................................................... 10-3 Division 11 ....................................................................................................... 11-3 Division 12 ....................................................................................................... 12-3 Division 13 ....................................................................................................... 13-3 Division 14 ....................................................................................................... 14-3 Statewide .......................................................................................................... S-3 Highway / Non Highway Division and Statewide Sections include: (A, AV,B, BD, BK, BP, C, E, EB, EE,EL, ER, F, FS, I, K, M, P, R,S, SF, SR, TA, TC, TD, TE, TG, TI, TK, TM, TN, TO, TP, TQ, TS, TT, TV, TW, U, W, X, Y and Z Projects) Governor's Highway Safety Program ...................................................................................... G-3 Planning & Administration .............................................................................................. G-4 Alcohol Involvement ...................................................................................................... G-4 Occupant Protection ...................................................................................................... G-6 Motorcycle Safety........................................................................................................... G-6 Pedestrian & Bicycle Safety ........................................................................................... G-6 Police Traffic Services ................................................................................................... G-7 Traffic Records ............................................................................................................... G-8 Driver Education ............................................................................................................ G-8 Safe Communities .......................................................................................................... G-8 School Bus ..................................................................................................................... G-8 Completed / Deleted Projects Fiscal Year 2015 - 2017 ............................................................................................... C/D-3
STATE TRANSPORTATION IMPROVEMENT PROGRAM
8
Division 8ChathamHokeLeeMontgomeryMooreRandolphRichmondScotland
HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
PLANNING / DESIGN IN PROGRESS
R-5724 7069 650LAUNIS STREET TO POWELL PLACE LANE IN PITTSBORO. WIDEN TO MULTILANES.
1.4
DIV
T R 235 T U 28 T C 6156
CHATHAM
US 15 / US 501
PLANNING / DESIGN IN PROGRESS
R-5825 649 59SR 1731 (O'KELLY CHAPEL ROAD). UPGRADE AND REALIGN INTERSECTION.
DIV
T R 100 T U 100 T C 390
CHATHAM
NC 751
UNDER CONSTRUCTION
R-5788 565 565DIVISION 8 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVCHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
URBAN PROJECTS
PLANNING / DESIGN IN PROGRESS
U-5737 11053 1000NORTH GLENN AVENUE TO EAST OF US 421 IN SILER CITY. UPGRADE ROADWAY TO INCLUDE MEDIAN FOR ACCESS CONTROL, SIDEWALKS, CROSSWALKS, BICYCLE LANES AND / OR MULTIUSE SIDEPATH.
3
REG
T R 244 T U 29 T C 9780
CHATHAM
US 64(EAST 11TH STREET)
IN PROGRESS - PRIOR YEAR AMOUNT INCLUDES $223K FEDERAL TIGER GRANT
U-4727 13856 13856DURHAM-CHAPEL HILL-CARRBORO METROPOLITAN PLANNING ORGANIZATION (DCHCMPO) PLANNING ALLOCATION AND UNIFIED WORK PROGRAM.
DIVCHATHAMDURHAMORANGE
VARIOUS
8-3 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
INCLUDES $137K TO BE ALLOCATED TO TG-5235
U-5023 33959DURHAM-CHAPEL HILL-CARRBORO METROPOLITAN PLANNING ORGANIZATION (DCHCMPO) STPDA FUNDS - RESERVED FOR FUTURE PROGRAMMING.
DIV
STBGDA C 954 4715C4715C4715C C 4715 C 4715 C 4715 C 4715
CHATHAMDURHAMORANGE
VARIOUS
BRIDGE PROJECTS
UNDER CONSTRUCTION
B-4461 2365 2365REPLACE BRIDGE 180010 OVER SHADDOX CREEK.
HFCHATHAM
SR 1916(CORINTH ROAD)
PLANNING / DESIGN IN PROGRESS
B-5738 2234 100REPLACE BRIDGE 180147 OVER ROCKY RIVER.
DIV
STPOFF R 102 STPOFF 2032C
CHATHAM
SR 1953 (CHATHAMCHURCH ROAD)
IN PROGRESS - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5108 21538 21538DIVISION 8 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVCHATHAM
HOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4908 29709 29709ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 8 PROJECT MITIGATION.CHATHAM
HOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
8-4 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5208 4960 4960DIVISION 8 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS. MA NC 144 INTERSECTION. CONSTRUCT ROUNDABOUT - IN PROGRESSREGCHATHAM
HOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
IN PROGRESS
W-5708 1045 345SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 8.
HSIP R 30 DIV HSIP C 180 DIV HSIP R 30 RE HSIP C 180 RE HSIP R 40 SW HSIP C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
CHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
CONGESTION MITIGATION PROJECTS
UNDER CONSTRUCTION BY TOWN OF PITTSBORO
C-5551 133 133CHATHAM BUSINESS PARK DRIVE TO WHITE'S MOBILE HOME PARK DRIVE IN PITTSBORO. CONSTRUCT SIDEWALK ON SOUTH SIDE.EXCHATHAM
US 64 BUSINESS(EAST STREET)
8-5 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)CONGESTION MITIGATION PROJECTS
C-5618 575PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE TRIANGLE AREA RPO.
EX
CMAQ PE 23 PE 23 L PE 6 PE 6 CMAQ R 23 R 23 L R 6 R 6 CMAQ C 136 C 138 L C 34 C 35 CMAQ O 23 O 23 L O 6 O 6 CMAQ I 23 I 23 L I 6 I 6
CHATHAMORANGE
VARIOUS
C-5605 6000PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE DURHAM / CHAPEL HILL / CARRBORO MPO.
EX
CMAQ PE 238 PE 242 L PE 59 PE 61 CMAQ R 238 R 242 L R 59 R 61 CMAQ C 1427 C 1453 L C 357 C 363 CMAQ O 238 O 242 L O 59 O 61 CMAQ I 238 I 242 L I 59 I 61
CHATHAMDURHAMORANGE
VARIOUS
RURAL PROJECTSR-5827 210200US 401 IN LAURINBURG TO US 1 IN
ABERDEEN. WIDEN TO MULTILANES.23.2
DIV
T R 16600 R 16600 T U 2000 U 2000 T 129750C C 43250
HOKEMOORESCOTLAND
US 15 / US 501
PLANNING / DESIGN IN PROGRESS
R-5709 151719 10000US 15 / US 501 IN ABERDEEN TO SR 1244 (WEST PALMER STREET) / SR 1311 (MOCKINGBIRD HILL ROAD) IN RAEFORD. WIDEN TO MULTILANES.
15.4
REG
T R 21178 21178R T U 2542 2541U T 23570C23570C C 23570 C 23570
HOKEMOORE
NC 211
8-6 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
UNDER CONSTRUCTION
R-5788 565 565DIVISION 8 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVCHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
URBAN PROJECTS
PLANNING / DESIGN IN PROGRESS
U-6051 27266 1199SR 1406 (ROCKFISH ROAD) IN HOKE COUNTY TO FAYETTEVILLE LOOP (PROPOSED I-295) IN CUMBERLAND COUNTY. WIDEN TO 4-LANE DIVIDED FACILITY WITH SIDEWALKS.
2.1 T R 3319 A T U 398 A T C 8274 AT 3896R B T 468U B T 9712C B
A SR 1406 (ROCKFISH ROAD) TO CUMBERLAND COUNTY LINE.DIVB HOKE COUNTY LINE TO FAYETTEVILLE LOOP (PROPOSED I-295).
CUMBERLANDHOKE
SR 1003(CAMDEN ROAD)
COORDINATE WITH U-5707, U-5753, U-5857, AND U-5858 - PLANNING/DESIGN IN PROGRESS
U-5798 21486 1000US 401 (RAEFORD ROAD) TO SR 1418 (LINDSAY ROAD). WIDEN TO MULTI-LANES.
2.4
DIV
T 1598R T 192U T 6232C C 6232 C 6232
CUMBERLANDHOKE
SR 1102(GILLIS HILLROAD)
COORDINATE WITH U-5707, U-5798, U-5857, AND U-5858
U-5753 14637PLANK ROAD TO US 401. WIDEN TO MULTILANES.
1.6
DIV
T R 2178 T U 261 T 4066C4066C C 4066
HOKE
SR 1305(WAYSIDE ROAD)
COORDINATE WITH U-5707, U-5753, U-5798 AND U-5858
U-5857 29832SR 1418 (LINDSAY ROAD) TO SR 1003 (CAMDEN ROAD) NEAR FAYETTEVILLE. WIDEN TO MULTILANES.
3.2
DIV
T R 5159 T U 619 T 8018C8018C C 8018
HOKE
SR 1406(ROCKFISH ROAD)
8-7 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
COORDINATE WITH U-5707, U-5753, U-5798 AND U-5857
U-5858 23846SR 1406 (ROCKFISH ROAD) TO US 401 NEAR FAYETTEVILLE. WIDEN TO MULTILANES.
2.9
DIV
T R 1850 T U 222 T 7258C7258C C 7258
HOKE
SR 1418(LINDSAY ROAD)
PLANNING / DESIGN IN PROGRESS - COORDINATE WITH U-5753, U-5798, U-5857, AND U-5858
U-5707 6544 700GILLIS HILL ROAD EXTENSION, SR 1406 (ROCKFISH ROAD) TO SR 1418 (LINDSAY ROAD) NEAR FAYETTEVILLE. CONSTRUCT MULTILANE FACILITY ON NEW LOCATION TO TIE IN AT THE INTERSECTION OF SR 1406 ROCKFISH ROAD AND SR 1421 SCHOOL DRIVE.
0.4
DIV
T R 867 T 4977C
HOKE
SR 1420(GILLIS HILL ROAD)
IN PROGRESS
U-5207 5000 2500FAYETTEVILLE URBAN AREA PLANNING ALLOCATION AND UNIFIED WORK PROGRAM.
DIV
STBGDA PE 200 PE 200 PE 200 200PE200PE200PE PE 200 PE 200 PE 200 PE 200L PE 50 PE 50 PE 50 50PE50PE50PE PE 50 PE 50 PE 50 PE 50
CUMBERLANDHARNETTHOKE
VARIOUS
FEASIBILITY STUDIES
SCHEDULED FOR FEASIBILITY STUDY
FS-1508B SOUTH CAROLINA STATE LINE TO US 401 BUSINESS NORTHEAST OF RAEFORD. WIDEN TO MULTILANES.HOKE
SCOTLAND
US 401
BRIDGE PROJECTS
UNDER CONSTRUCTION
B-4967 2303 2303REPLACE BRIDGE 460008 OVER LUMBER RIVER.
DIVHOKE
SR 1203(TURNPIKE ROAD)
UNDER CONSTRUCTION
B-5755 1056 1056REPLACE BRIDGE 460057 OVER PUPPY CREEK.
DIVHOKE
SR 1406(ROCKFISH ROAD)
8-8 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BRIDGE PROJECTS
IN PROGRESS - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5108 21538 21538DIVISION 8 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVCHATHAM
HOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4908 29709 29709ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 8 PROJECT MITIGATION.CHATHAM
HOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5208 4960 4960DIVISION 8 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS. MA NC 144 INTERSECTION. CONSTRUCT ROUNDABOUT - IN PROGRESSREGCHATHAM
HOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
8-9 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5708 1045 345SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 8.
HSIP R 30 DIV HSIP C 180 DIV HSIP R 30 RE HSIP C 180 RE HSIP R 40 SW HSIP C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
CHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
RURAL PROJECTS
PLANNING / DESIGN IN PROGRESS
R-3830 35718 1220NC 42, US 421 (HORNER BOULEVARD) IN SANFORD TO SR 1579 (BROADWAY ROAD) AND SR 1579 (BROADWAY ROAD / NORTH MAIN STREET), NC 42 (AVENTS FERRY ROAD) TO SR 1538 (EAST HARRINGTON AVENUE) IN BROADWAY. WIDEN TO MULTILANES.
5.4
DIV
T R 6320 T U 5878 T C 7433 7433C7434C
LEE
NC 42;SR 1579(BROADWAY ROAD / NORTH MAIN STREET
UNDER CONSTRUCTION
R-5788 565 565DIVISION 8 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVCHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
8-10 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
PLANNING / DESIGN IN PROGRESS; COORDINATE WITH U-5975
U-5727 33048 3000SOUTH OF NC 78 (TRAMWAY ROAD) / SR 1303 (CENTER CHURCH ROAD) TO PENDERGRASS ROAD IN SANFORD. CONVERT AT-GRADE INTERSECTION TO GRADE SEPARATION AND RELOCATE NC 78 TO TIE INTO INTERCHANGE.
2
REG
NHP R 3600 NHP C 8816 8816C8816C
LEE
US 1 / US 15 / US 501
PLANNING / DESIGN IN PROGRESS - COORDINATE WITH U-5727
U-5975 42304 3846US 15 / US 501 (WHITE HILL ROAD) TO SR 1334 (PENDERGRASS ROAD) IN SANFORD. UPGRADE TO SUPERSTREET.
REG
T R 11479 R 11478 T U 1378 U 1377 T C 6373 6373C
LEE
US 1 / US 15 / US 501
PLANNING / DESIGN IN PROGRESS
U-5722 32331 3500US 1 / US 15 / US 501 TO NORTH OF SR 1514 (BRAGG STREET) IN SANFORD. RECONSTRUCT AS A "COMPLETE STREET" WITH IMPROVEMENTS SUCH AS MEDIANS, SIDEWALKS, BICYCLE FACILITIES, AND STREETSCAPING.
3.2
REG
T 8956R T 1075U T 6267C C 6267 C 6266
LEE
US 421 BUSINESS /NC 87
U-6070 61600US 1 TO SR 1001 (LEMON SPRINGS ROAD) IN SANFORD. WIDEN TO MULTILANES.
3.7
REG
T R 13500 R 13500 T U 1625 U 1625 T 20900C C 10450
LEE
NC 78
PLANNING / DESIGN IN PROGRESS
U-5709 13313 1200SR 1152 (FIRE TOWER ROAD) TO NC 42 (WICKER STREET) IN SANFORD. WIDEN ROADWAY.
0.8
DIV
T R 2674 T U 321 T 9118C
LEE
SR 1237(CARTHAGE STREET)
BRIDGE PROJECTSB-5976 4130REPLACE BRIDGE 520069 AND BRIDGE
520070 OVER NORFOLK SOUTHERN RAILROAD.DIV
STPOFF R 196 STPOFF C 3934
LEE
SR 1400(CUMNOCK ROAD)
8-11 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BRIDGE PROJECTS
IN PROGRESS - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5108 21538 21538DIVISION 8 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVCHATHAM
HOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4908 29709 29709ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 8 PROJECT MITIGATION.CHATHAM
HOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
HIGHWAY SAFETY PROJECTS
UNDER CONSTRUCTION
W-5513 2225 2225US 1 INTERCHANGE WITH US 15 / US 501 / NC 87. CONSTRUCT ROUNDABOUTS AT RAMP TERMINALS. US 1 BUSINESS / SR 1420 (AMOS BRIDGES ROAD) INTERSECTION. CONSTRUCT LEFTOVER. US 15 / US 501 INTERSECTION WITH SR 1444 (BEECHTREE ROAD) . CONSTRUCT LEFT TURN LANE.
0.4
TRNLEE
US 1;US 1 BUSINESS;US 15 / US 501 /NC 87
8-12 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5708 1045 345SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 8.
HSIP R 30 DIV HSIP C 180 DIV HSIP R 30 RE HSIP C 180 RE HSIP R 40 SW HSIP C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
CHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
IN PROGRESS
W-5208 4960 4960DIVISION 8 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS. MA NC 144 INTERSECTION. CONSTRUCT ROUNDABOUT - IN PROGRESSREGCHATHAM
HOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
INTERSTATE PROJECTSI-5947 13354RICHMOND COUNTY LINE TO RANDOLPH
COUNTY LINE. PAVEMENT REHABILITATION.24.5
SW
NHPIM 4451C4452C C 4451
MONTGOMERYI-73 / I-74 / US 220
RURAL PROJECTS
UNDER CONSTRUCTION
R-0623 62272 62272TROY BYPASS, WEST OF SR 1138 (DAIRY ROAD) TO EAST OF LITTLE RIVER. FOUR LANES, PART ON NEW LOCATION.
5
TRNMONTGOMERY
NC 24 /NC 27
8-13 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
PLANNING / DESIGN IN PROGRESS
R-2527 58616 2979NC 73 TO TROY BYPASS. WIDEN TO MULTILANES.
9.1
REG
T R 8426 T U 1011 T 11550C11550C11550C C 11550
MONTGOMERY
NC 24 / NC 27
PLANNING / DESIGN IN PROGRESS PLANNING / DESIGN IN PROGRESS
R-5826 51410 1510NC 73 (NORTH MAIN STREET) IN MT. GILEAD TO NC 24 / NC 27. UPGRADE ROADWAY, INCLUDING PAVED SHOULDERS, TURN LANES AND SIGNALS.
8 T R 3700 A T U 500 A T C 9200 A T R 2000 B T U 300 B T C 12800 B T 3000R C T 400U C T 18000C C
A NC 73 (NORTH MAIN STREET) IN MT. GILEAD TO SR 1127 (HEARNE FARM ROAD).DIVB SR 1127 (HEARNE FARM ROAD) TO SR 1174 (PEE DEE ROAD).DIVC SR 1174 (PEE DEE ROAD) TO NC 24 / NC 27.
MONTGOMERY
NC 109
PLANNING / DESIGN IN PROGRESS
R-5844 24218 1445NC 24 / NC 27 IN TROY TO NC 47 IN DENTON. INCREASE LANE WIDTH, IMPROVE SHOULDERS AND SIGNALIZATION, CONSTRUCT TURN LANES AND PROVIDE BICYCLE ACCOMMODATIONS.
24.5 T R 64 A T U 64 A T C 14447 AT 36R B T 36U B T 8126C B
A NC 24 / NC 27 TO DAVIDSON COUNTY LINEDIVB RANDOLPH COUNTY LINE TO NC 47 IN DENTON
DAVIDSONMONTGOMERYRANDOLPH
NC 109
UNDER CONSTRUCTION
R-5788 565 565DIVISION 8 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVCHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
8-14 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BRIDGE PROJECTS
IN PROGRESS - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5108 21538 21538DIVISION 8 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVCHATHAM
HOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4908 29709 29709ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 8 PROJECT MITIGATION.CHATHAM
HOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5708 1045 345SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 8.
HSIP R 30 DIV HSIP C 180 DIV HSIP R 30 RE HSIP C 180 RE HSIP R 40 SW HSIP C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
CHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
8-15 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5208 4960 4960DIVISION 8 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS. MA NC 144 INTERSECTION. CONSTRUCT ROUNDABOUT - IN PROGRESSREGCHATHAM
HOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
CONGESTION MITIGATION PROJECTS
IN PROGRESS BY PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION
C-4936 714 714PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM.
EXCASWELLDAVIDSONFORSYTHGUILFORDMONTGOMERYRANDOLPHROCKINGHAM
VARIOUS
RURAL PROJECTSR-5827 210200US 401 IN LAURINBURG TO US 1 IN
ABERDEEN. WIDEN TO MULTILANES.23.2
DIV
T R 16600 R 16600 T U 2000 U 2000 T 129750C C 43250
HOKEMOORESCOTLAND
US 15 / US 501
PLANNING / DESIGN IN PROGRESS - COORDINATE WITH R-5726
R-2807 3400 300NC 211 TO PROPOSED NC 211 BYPASS OF WEST END. RELOCATE PORTION OF NC 73 TO ELIMINATE OFFSET INTERSECTIONS IN WEST END.
0.5
DIV
T R 800 T U 100 T 2200C
MOORE
NC 73
8-16 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
PLANNING / DESIGN IN PROGRESS
R-5709 151719 10000US 15 / US 501 IN ABERDEEN TO SR 1244 (WEST PALMER STREET) / SR 1311 (MOCKINGBIRD HILL ROAD) IN RAEFORD. WIDEN TO MULTILANES.
15.4
REG
T R 21178 21178R T U 2542 2541U T 23570C23570C C 23570 C 23570
HOKEMOORE
NC 211
PLANNING / DESIGN IN PROGRESS - COORDINATE WITH R-2807
R-5726 44233 4000SR 1241 (HOLLY GROVE SCHOOL ROAD) TO NC 73 IN WEST END. WIDEN TO MULTILANES.
7.1
REG
T R 12708 T U 1525 T C 6500 6500C6500C6500C
MOORE
NC 211
PLANNING / DESIGN IN PROGRESS
R-5824 4016 365US 1 IN VASS TO CUMBERLAND COUNTY LINE. UPGRADE ROADWAY, TO INCLUDE TURN LANES AT VARIOUS LOCATIONS AND SOME REALIGNMENT.
11.7
REG
T R 585 T U 100 T C 2966
MOORE
NC 690(LOBELIA ROAD)
UNDER CONSTRUCTION
R-5788 565 565DIVISION 8 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVCHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
URBAN PROJECTS
PLANNING / DESIGN IN PROGRESS - COORDINATE WITH U-5814
U-5815 21033 1900OLD US 1 TO SR 1112 (ROSELAND ROAD) IN ABERDEEN. ACCESS MANAGEMENT IMPROVEMENTS.
2.8
REG
T R 902 T U 7515 T C 10716
MOORE
US 1(SANDHILLS BOULEVARD)
8-17 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
PLANNING / DESIGN IN PROGRESS
U-5976 6600 600SR 1905 (VOIT GILMORE LANE) IN SOUTHERN PINES TO SR 1208 PAGE ROAD IN PINEHURST. UPGRADE SR 1208 INTERSECTION AND CONSTRUCT IMPROVEMENTS TO PINEHURST TRAFFIC CIRCLE AND APPROACHES.
2.3
REG
T R 1800 T U 600 T C 3600
MOORE
US 15 / US 501
PLANNING / DESIGN IN PROGRESS - COORDINATE WITH U-5815
U-5814 6854 600US 1 (SANDHILLS BOULEVARD) TO BRUCEWOOD ROAD IN ABERDEEN AND SOUTHERN PINES. ACCESS MANAGEMENT IMPROVEMENTS.
1.3
REG
T R 195 T U 23 T C 6036
MOORE
US 15 / US 501 / NC 211
PLANNING / DESIGN IN PROGRESS
U-5756 9798 2800US 1 IN ABERDEEN TO SOUTH CITY LIMITS OF PINEHURST. CONSTRUCT TURN LANES AND ADD PAVED SHOULDERS.
3.9
REG
T R 360 T U 100 T 3269C3269C
MOORE
NC 5
PLANNING / DESIGN IN PROGRESS
U-3628 5964 289COURTHOUSE WEST OF NC 22 (MCNEILL STREET) TO US 15 / US 501 IN CARTHAGE. WIDEN TO THREE LANES WITH CURB AND GUTTER AND BICYCLE / PEDESTRIAN ACCOMMODATIONS.
REG
T R 2031 T U 244 T C 3400
MOORE
NC 24 / NC 27
BRIDGE PROJECTS
IN PROGRESS - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5108 21538 21538DIVISION 8 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVCHATHAM
HOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
8-18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BRIDGE PROJECTS
UNDER CONSTRUCTION BY VILLAGE OF WHISPERING PINES - MUNICIPAL BRIDGE
B-5543 970 970REPLACE BRIDGE 620087 OVER THAGGARDS LAKE IN WHISPERING PINES.
DIVMOORE
SOUTH LAKESHOREDRIVE
MITIGATION PROJECTS
IN PROGRESS
EE-4908 29709 29709ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 8 PROJECT MITIGATION.CHATHAM
HOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5708 1045 345SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 8.
HSIP R 30 DIV HSIP C 180 DIV HSIP R 30 RE HSIP C 180 RE HSIP R 40 SW HSIP C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
CHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
8-19 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5208 4960 4960DIVISION 8 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS. MA NC 144 INTERSECTION. CONSTRUCT ROUNDABOUT - IN PROGRESSREGCHATHAM
HOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
INTERSTATE PROJECTS
UNDER CONSTRUCTION
I-5737 100 100SOUTH OF SR 2269 (VISION DRIVE) TO NORTH OF SR 1712 (PINEVIEW STREET). PAVEMENT REHABILITATION.
2.2SWRANDOLPH
I-73
UNDER CONSTRUCTION
I-5763 9050 9050US 311 TO 0.6 MILE NORTH OF SR 1938 (HOCKETT DAIRY ROAD). PAVEMENT REHABILITATION.
7.7SWRANDOLPH
I-73
I-5948 8327MONTGOMERY COUNTY LINE TO NORTH OF SR 1462 (PARK DRIVE) IN ASHEBORO. PAVEMENT REHABILITATION.
15.4SW
NHPIM C 8327
RANDOLPHI-73 / I-74 / US 220
I-5949 3973US 29 / US 70 / BUSINESS 85 IN GUILFORD COUNTY TO SR 1928 (CEDAR SQUARE ROAD) IN RANDOLPH COUNTY. PAVEMENT REHABILITATION.
7.1SW
NHPIM C 3973
GUILFORDRANDOLPH
I-74 / US 311
UNDER CONSTRUCTION - CONSTRUCTION COST INCLUDED UNDER I-5789
I-5738 150 150SOUTH OF SR 1009 (MAIN STREET) TO NORTH OF SR 1912 (LUNAR DRIVE) IN ARCHDALE. PAVEMENT REHABILITATION.
1SWRANDOLPH
I-85
RURAL PROJECTS
UNDER CONSTRUCTION - DESIGN-BUILD PROJECT
R-2536 353674 284174ASHEBORO SOUTHERN BYPASS, US 64 WEST TO US 64 EAST. FOUR-LANE FREEWAY ON NEW LOCATION WITH INTERCHANGES AT US 220, NC 49 AND ZOO ACCESS AT NC 159.
14TRN
T C 69500
RANDOLPHUS 64
8-20 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
R-2220 211080 17602US 64, EAST OF I-85 BUSINESS IN LEXINGTON TO ASHEBORO BYPASS. WIDEN TO MULTILANES.
T R 12716 B T U 1526 B T 24833C B C 12417 BT R 9880 CA T U 1186 CA T 12913C CA C 6457 CAT 10200R CB T 1400U CB T 34900C CB T 5225R DA5225R DA T 1300U DA T 13325C DA C 13325 DA C 13325 DA C 13325 DA
A US 64, I-85 BUSINESS IN LEXINGTON TO EAST OF I-85. - COMPLETEB I-85 EAST OF LEXINGTON TO NC 109 - PLANNING / DESIGN IN PROGRESSREGCA NC 109 TO RANDOLPH COUNTY LINE - PLANNING / DESIGN IN PROGRESSREGCB DAVIDSON COUNTY LINE TO SR 1409 (LAKE PARK ROAD) - PLANNING / DESIGN IN PROGRESSDA SR 1409 (LAKE PARK ROAD) TO ASHEBORO BYPASS - PLANNING / DESIGN IN PROGRESSREG
DAVIDSONRANDOLPH
US 64
PART B - GARVEE BOND FUNDING $9.4 MILLION FOR RIGHT OF WAY; PAYBACK FY 2008 - FY 2019 AND GARVEE BOND FUNDING $80.0 MILLION FOR CONSTRUCTION; PAYBACK FY 2008 - FY 2019
R-2606 207268 187668SOUTH OF SR 1920 (TUTTLE ROAD) TO US 220 NORTH OF ASHEBORO. FREEWAY ON NEW LOCATION.
11.5
TRN
NHP RG 1031 B RG 1031 B NHP CG 8769 B CG 8769 B
A SOUTH OF SR 1920 (TUTTLE ROAD) TO NORTH OF SR 1929 (SPENCER ROAD) - COMPLETEB NORTH OF SR 1929 (SPENCER ROAD) TO US 220 / FUTURE I-73 - DESIGN-BUILD PROJECT - COMPLETETRN
RANDOLPH
US 311 /FUTURE I-74
PLANNING / DESIGN IN PROGRESS
R-5844 24218 1445NC 24 / NC 27 IN TROY TO NC 47 IN DENTON. INCREASE LANE WIDTH, IMPROVE SHOULDERS AND SIGNALIZATION, CONSTRUCT TURN LANES AND PROVIDE BICYCLE ACCOMMODATIONS.
24.5 T R 64 A T U 64 A T C 14447 AT 36R B T 36U B T 8126C B
A NC 24 / NC 27 TO DAVIDSON COUNTY LINEDIVB RANDOLPH COUNTY LINE TO NC 47 IN DENTON
DAVIDSONMONTGOMERYRANDOLPH
NC 109
8-21 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
UNDER CONSTRUCTION
R-5788 565 565DIVISION 8 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVCHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
URBAN PROJECTS
FEASIBILITY STUDY (FS-1008A) IN PROGRESS
U-5770 29550 225SR 1009 (SOUTH MAIN STREET) IN ARCHDALE. INTERCHANGE IMPROVEMENTS.
REG
T R 16950 T U 575 T 3933C3933C3934C
RANDOLPH
I-85
PLANNING / DESIGN IN PROGRESS
U-5813 33375 500ASHEBORO BYPASS TO EAST OF I-73 / I-74 / US 220 IN ASHEBORO. WIDEN TO MULTILANES, RECONSTRUCT INTERCHANGE AT NC 49, MODIFY INTERCHANGE AT I-73 / I-74 / US 220 AND REPLACE BRIDGE 750171 OVER US 64 AND NC 49.
2.2
REG
NHP R 6625 NHP U 1100 NHP C 6288 6287C6288C6287C
RANDOLPH
US 64
UNDER CONSTRUCTION
U-5758 1214 1214INTERSECTION OF US 220 BUSINESS (FAYETTEVILLE STREET) AND PRESNELL STREET IN ASHEBORO. INTERSECTION IMPROVEMENTS.REGRANDOLPH
US 220 BUSINESS(FAYETTEVILLE STREET)
PLANNING / DESIGN IN PROGRESS
U-6006 10380 944SR 2123 (CAUDLE ROAD) TO SR 2270 (US 311 EXTENSION) IN RANDLEMAN. WIDEN TO 4-LANE DIVIDED FACILITY.
0.7
DIV
T R 2139 T U 500 T 3398C3399C
RANDOLPH
US 220 BUSINESS
8-22 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
PLANNING / DESIGN IN PROGRESS
U-6007 3667 333RIDGE STREET TO ATLANTIC AVENUE IN ASHEBORO. REALIGN ATLANTIC AVENUE INTERSECTION AND IMPLEMENT ACCESS MANAGEMENT.
0.3
DIV
T R 682 T U 500 T C 2152
RANDOLPH
US 220 BUSINESS(SOUTHFAYETTEVILLESTREET)
PLANNING / DESIGN IN PROGRESS
U-5743 8157 700NORTH OF US 64 / NC 49 (DIXIE DRIVE) TO SR 2237 (EAST SALISBURY STREET) IN ASHEBORO. WIDEN TO THREE LANES AND REALIGN NC 42 ALONG DUBLIN SQUARE ROAD.
0.5
REG
T R 1251 T U 150 T C 6056
RANDOLPH
NC 42;SR 2194(DUBLIN SQUARE ROAD)
UNDER CONSTRUCTION
U-5305 5249 5249SR 1144 (MACK ROAD) INTERSECTION AND APPROACHES IN ASHEBORO. OPERATIONAL / GEOMETRIC IMPROVEMENTS AND ROADWAY RELOCATION / REALIGNMENT.
TRNRANDOLPH
NC 49SR 1144 (MACK ROAD)
PLANNING / DESIGN IN PROGRESS
U-5308 20370 1800SR 3106 (KENNEDY ROAD) TO I-85 IN TRINITY. WIDEN TO MULTILANES.
2.3
DIV
T R 2839 T U 341 T C 7695 7695C
RANDOLPH
SR 1547(FINCH FARM ROAD)
PLANNING / DESIGN IN PROGRESS
U-3400 33050 750SR 1567 (ROBBINS COUNTRY ROAD) TO US 311 (MAIN STREET) IN ARCHDALE. WIDEN TO MULTILANES.
3.1
DIV
T R 5050 R 5050 T U 950 U 950 T 10150C10150C
GUILFORDRANDOLPH
SR 1577 / SR 1004(ARCHDALE ROAD)
8-23 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
PLANNING / DESIGN IN PROGRESS
U-5864 54551 3000I-85 IN TRINITY TO TO SR 1961 (WEST MARKET CENTER DRIVE) IN HIGH POINT. WIDEN TO MULTILANES.
2.9 T R 2517 A T U 302 A T 7980C A7980C A7980C A C 7980 A T 1066R B T 128U B T 15618C B
A I-85 IN TRINITY TO SR 1300 (WEST FAIRFIELD ROAD) IN HIGH POINT.DIVB SR 1300 (WEST FAIRFIELD ROAD) TO SR 1961 (WEST MARKET CENTER DRIVE) IN HIGH POINT.
GUILFORDRANDOLPH
SR 1595 / SR 4053(SURRETT DRIVE)
U-5711 3112WEST OF SYLVAN STREET TO US 220 BUSINESS IN ASHEBORO. WIDEN TO MULTILANES.
0.6
DIV
T R 1101 T U 132 T C 1879
RANDOLPH
SR 1712(PINEVIEW STREET)
BRIDGE PROJECTS
UNDER CONSTRUCTION
B-5128 793 793REPLACE BRIDGE 750058 OVER AN UNNAMED TRIBUTARY OF THE LITTLE UWHARRIE RIVER.DIVRANDOLPH
SR 1404(FULLER MILL ROAD)
UNDER CONSTRUCTION
B-5114 6567 6567REPLACE BRIDGE 750136 OVER US 29 / US 70 / BUSINESS 85.
REGRANDOLPH
SR 1619(PROSPECT STREET)
UNDER CONSTRUCTION
B-5763 625 625REPLACE BRIDGE 750129 OVER BRANCH OF SANDY CREEK.
DIVRANDOLPH
SR 2407 (STARMOUNTROAD)
UNDER CONSTRUCTION - LET WITH B-5360; CONSTRUCTION COST IS INCLUDED IN THAT PROJECT
B-5546 123 123REPLACE BRIDGE 750307 OVER MOUNT PLEASANT CREEK.
HFRANDOLPH
SR 2481(LOW BRIDGE ROAD)
UNDER CONSTRUCTION - LET WITH B-5546; PRIOR YEARS COST INCLUDES B-5546 CONSTRUCTION
B-5360 2568 2568REPLACE BRIDGE 750374 OVER SANDY CREEK.
HFRANDOLPH
SR 2481(LOW BRIDGE ROAD)
8-24 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BRIDGE PROJECTS
UNDER CONSTRUCTION
B-5739 1127 1127REPLACE BRIDGE 750170 OVER REED CREEK.
DIVRANDOLPH
SR 2621 (FOUSHEEROAD)
IN PROGRESS - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5108 21538 21538DIVISION 8 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVCHATHAM
HOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4908 29709 29709ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 8 PROJECT MITIGATION.CHATHAM
HOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5208 4960 4960DIVISION 8 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS. MA NC 144 INTERSECTION. CONSTRUCT ROUNDABOUT - IN PROGRESSREGCHATHAM
HOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
8-25 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5708 1045 345SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 8.
HSIP R 30 DIV HSIP C 180 DIV HSIP R 30 RE HSIP C 180 RE HSIP R 40 SW HSIP C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
CHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
CONGESTION MITIGATION PROJECTS
IN PROGRESS BY PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION
C-4936 714 714PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM.
EXCASWELLDAVIDSONFORSYTHGUILFORDMONTGOMERYRANDOLPHROCKINGHAM
VARIOUS
INTERSTATE PROJECTSI-5946 5180US 220 SOUTH OF ELLERBE TO
MONTGOMERY COUNTY LINE. PAVEMENT REHABILITATION.
10.1SW
NHPIM 5180C
RICHMONDI-73 / I-74
PLANNING / DESIGN IN PROGRESS
I-5979 15312 1092US 1 (EXIT 311). INTERCHANGE IMPROVEMENTS.
DIV
NHP R 2800 NHP U 500 NHP 5460C5460C
RICHMOND
US 74 / FUTURE I-74
8-26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
R-2501 298138 17277SOUTH CAROLINA STATE LINE TO SR 1001 (MARSTON ROAD). WIDEN TO FOUR LANES WITH VARIABLE WIDTH MEDIAN WITH BYPASS OF ROCKINGHAM ON NEW LOCATION.
24.1 T 4500R A T 25700C A T 5519R BA T 908U BA T 40500C BA T 67700C BB T 13300R BB T 2523U BB T 14280R BC T 3731U BC T 83600C BC T C 18600 C
A SOUTH CAROLINA STATE LINE TO SR 1104 (OSBORNE ROAD) - SCHEDULED FOR REPRIORITIZATIONBA SR 1104 (OSBORNE ROAD) TO US 74 BYPASS - SCHEDULED FOR REPRIORITIZATIONBB US 74 BYPASS TO US 74 BUSINESS - SCHEDULED FOR REPRIORITIZATIONBC US 74 BUSINESS TO NORTH OF SR 1606 (FOX ROAD) - SCHEDULED FOR REPRIORITIZATIONC NORTH OF SR 1606 (FOX ROAD) TO SOUTH OF SR 1001 (MARSTON ROAD) - RIGHT OF WAY IN PROGRESSDIV
RICHMOND
US 1
R-3421 247308 102608ROCKINGHAM BYPASS. FOUR LANES DIVIDED ON NEW LOCATION.
10.5 NHP 35100C A C 17550 A C 17550 ANHP 37250C B C 18625 B C 18625 B
A ROCKINGHAM BYPASS, US 74 BYPASS WEST OF ROCKINGHAM AT SR 1109 (ZION CHURCH ROAD) INTERCHANGE TO SOUTH OF SR 1140 (OLD CHARLOTTE HIGHWAY) - RIGHT OF WAY IN PROGRESS
DIV
B ROCKINGHAM BYPASS, SOUTH OF SR 1140 (OLD CHARLOTTE HIGHWAY) TO SOUTHWEST OF SR 1304 (HARRINGTON ROAD) - RIGHT OF WAY IN PROGRESSDIVC ROCKINGHAM BYPASS, 0.2 MILES SOUTHWEST OF SR 1304 (HARRINGTON ROAD) TO I-73 / I-74 INTERCHANGE SOUTH OF ELLERBE - UNDER CONSTRUCTIONTRN
RICHMOND
US 220 /FUTURE I-73 /FUTURE I-74
UNDER CONSTRUCTION
R-5788 565 565DIVISION 8 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVCHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
8-27 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
PLANNING / DESIGN IN PROGRESS
U-6027 7150 650US 220 TO US 1 IN ROCKINGHAM. WIDEN TO 3-LANE FACILITY AND RE-ROUTE US 1 ALONG PROJECT.
0.5
DIV
T R 1900 T U 500 T 4100C
RICHMOND
US 1 (PROPOSED) /SR 1516(GREENE STREET)
PLANNING / DESIGN IN PROGRESS
U-5706 6609 600US 74 BUSINESS TO SR 1426 (ABERDEEN ROAD). CONSTRUCT TWO LANE FACILITY UTILIZING SECTIONS OF SR 1641 (CLEMMER ROAD) AND SR 1645 (MT. OLIVE CHURCH ROAD), REMAINDER ON NEW LOCATION.
2.6
DIV
T R 1294 T U 155 T 4560C
RICHMOND
VARIOUS
FEASIBILITY STUDIES
FEASIBILITY STUDY IN PROGRESS
FS-1508A US 74 ROCKINGHAM-HAMLET BYPASS IN RICHMOND COUNTY TO EXISTING I-74 IN ROBESON COUNTY. UPGRADE CORRIDOR TO INTERSTATE STANDARDS.
23.4RICHMONDROBESONSCOTLAND
US 74 / FUTURE I-74
BRIDGE PROJECTS
IN PROGRESS - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5108 21538 21538DIVISION 8 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVCHATHAM
HOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
8-28 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)MITIGATION PROJECTS
IN PROGRESS
EE-4908 29709 29709ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 8 PROJECT MITIGATION.CHATHAM
HOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5708 1045 345SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 8.
HSIP R 30 DIV HSIP C 180 DIV HSIP R 30 RE HSIP C 180 RE HSIP R 40 SW HSIP C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
CHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
IN PROGRESS
W-5208 4960 4960DIVISION 8 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS. MA NC 144 INTERSECTION. CONSTRUCT ROUNDABOUT - IN PROGRESSREGCHATHAM
HOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
8-29 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
R-5827 210200US 401 IN LAURINBURG TO US 1 IN ABERDEEN. WIDEN TO MULTILANES.
23.2
DIV
T R 16600 R 16600 T U 2000 U 2000 T 129750C C 43250
HOKEMOORESCOTLAND
US 15 / US 501
R-5801 3380NC 144 INTERSECTION. UPGRADE INTERSECTION AND CONSTRUCT GRADE SEPARATION.
REG
T R 540 T U 500 T C 2340
SCOTLAND
US 15 / US 501
UNDER CONSTRUCTION
R-5788 565 565DIVISION 8 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVCHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
URBAN PROJECTS
PLANNING / DESIGN IN PROGRESS
U-5977 42767 3888SOUTH CAROLINA STATE LINE TO SOUTH OF SR 1105 (TURNPIKE ROAD) IN LAURINBURG. WIDEN TO MULTILANES.
3.4
REG
T R 5299 R 5299 T U 636 U 636 T C 13505 C 13504
SCOTLAND
US 15 / US 401
FEASIBILITY STUDIES
FEASIBILITY STUDY IN PROGRESS
FS-1508A US 74 ROCKINGHAM-HAMLET BYPASS IN RICHMOND COUNTY TO EXISTING I-74 IN ROBESON COUNTY. UPGRADE CORRIDOR TO INTERSTATE STANDARDS.
23.4RICHMONDROBESONSCOTLAND
US 74 / FUTURE I-74
8-30 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)FEASIBILITY STUDIES
SCHEDULED FOR FEASIBILITY STUDY
FS-1508B SOUTH CAROLINA STATE LINE TO US 401 BUSINESS NORTHEAST OF RAEFORD. WIDEN TO MULTILANES.HOKE
SCOTLAND
US 401
BRIDGE PROJECTS
IN PROGRESS - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5108 21538 21538DIVISION 8 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVCHATHAM
HOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
UNDER CONSTRUCTION BY CITY OF LAURINBURG - MUNICIPAL BRIDGE
B-5003 653 653REPLACE BRIDGE 820081 OVER LEITH CREEK WITH CULVERT IN LAURINBURG.
TRNSCOTLAND
COMMONWEALTHAVENUE
MITIGATION PROJECTS
IN PROGRESS
EE-4908 29709 29709ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 8 PROJECT MITIGATION.CHATHAM
HOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
HIGHWAY SAFETY PROJECTS
UNDER CONSTRUCTION
W-5145 435 435SR 1614 (BARNES BRIDGE ROAD) INTERSECTION. CONSTRUCT TURN LANES ON US 501.TRNSCOTLAND
US 501
8-31 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5208 4960 4960DIVISION 8 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS. MA NC 144 INTERSECTION. CONSTRUCT ROUNDABOUT - IN PROGRESSREGCHATHAM
HOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
IN PROGRESS
W-5708 1045 345SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 8.
HSIP R 30 DIV HSIP C 180 DIV HSIP R 30 RE HSIP C 180 RE HSIP R 40 SW HSIP C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
CHATHAMHOKELEEMONTGOMERYMOORERANDOLPHRICHMONDSCOTLAND
VARIOUS
8-32 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)AVIATION PROJECTS
AV-5736 365ACQUIRE NAVIGATION EASEMENTS IN RUNWAY 4 AND RUNWAY 22 APPROACHES, AND REMOVE OBSTRUCTIONS IN EASEMENTS.
DIV
T R 328 L R 37
CHATHAM
SILER CITY MUNICIPAL AIRPORT(SCR)
AV-5816 5660EXTEND RUNWAY 22 AND PARALLEL TAXIWAY BY 500 FT, INCLUDING RELOCATION OF AIRPORT ROADDIV
T C 5094 L C 566
CHATHAM
SILER CITY MUNICIPAAIRPORT (5W8)
BICYCLE AND PEDESTRIAN PROJECTS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY TOWN OF SILER CITY
EB-5871 275NORTH 5TH AVENUE TO US 64 (EAST 11TH STREET) IN SILER CITY. CONSTRUCT SIDEWALK ON SOUTH SIDE.
0.8
DIV
TAP PE 37 L PE 9 TAP C 183 L C 46
CHATHAM
SR 1107(EAST THIRD STREET)
EB-5734 870SOUTH 7TH AVENUE TO US 64 (EAST 11TH STREET) IN SILER CITY. CONSTRUCT SIDEWALK ON SOUTH SIDE FROM SOUTH 6TH AVENUE TO SOUTH 10TH AVENUE, AND CONSTRUCT MULTIUSE PATH ON SOUTH SIDE FROM SOUTH 10TH AVENUE TO US 64 (EAST 11TH STREET).
1.1
DIV
TAP PE 101 L PE 25 TAP C 595 L C 149
CHATHAM
SR 2103(EAST RALEIGHSTREET)
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY OTHERS - IN PROGRESS; TAPDA FUNDING REFLECTS UNPROGRAMMED BALANCE - PROGRAMMING SUBJECT TO MPO APPROVAL
U-4726 20303 10640DURHAM-CHAPEL HILL-CARRBORO (DCHC) MPO. BICYCLE, PEDESTRIAN, AND TRANSPORTATION ALTERNATIVES PROGRAM (TAP)–ELIGIBLE PROJECTS.DIV
STBGDA C 5272 L C 1838 TAPDA C 350 C 350 C 350 350C350C350C C 350 C 103
CHATHAMDURHAMORANGE
VARIOUS
UNDER CONSTRUCTION BY TOWN OF SILER CITY
EB-5004 1010 1010SR 2208 (SOUTH 2ND AVENUE) TO PONY FARM ROAD IN SILER CITY. CONSTRUCT MULTIUSE PATH.
1.5
TRNCHATHAM
LOVE'S CREEKGREENWAY
8-33 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
TM-6131 300 300OPERATING ASSISTANCE
HF
JARC L
CHATHAMLEE
CENTRAL CAROLINA COMMUNITY COLLEGEFOUNDATION
FUNDS AUTHORIZED IN PROGRESS
TQ-9020 60 60CAPITAL - PURCHASE OF SERVICE
HF
FEPD L S
CHATHAMLEE
CENTRAL CAROLINA COMMUNITY COLLEGEFOUNDATION
TQ-9007 312 312CAPITAL - PURCHASE OF SERVICE
HF
FEPD L S
CHATHAM
CHATHAM COUNTY COUNCIL ON AGING
FUNDS AUTHORIZED IN PROGRESS
TQ-9021 310 310CAPITAL - PURCHASE OF SERVICE
HF
FEPD L S
CHATHAM
CHATHAM COUNTY COUNCIL ON AGING
FUNDS AUTHORIZED IN PROGRESS
TA-6177 767 767CAPITAL
HF
FNU L S
CHATHAM
CHATHAM TRANSIT NETWORK
TA-5131 225PURCHASE OF THREE EXPANSION VEHICLES FOR CMAQ PROJECT
HF
FNU CP 180 L CP 45
CHATHAM
CHATHAM TRANSIT NETWORK
FUNDS AUTHORIZED IN PROGRESS
TA-6542 714 714CAPITAL
HF
FNU L S
CHATHAM
CHATHAM TRANSIT NETWORK
8-34 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
TG-6109A 150 150ROUTINE CAPITAL - SPARE ENGINES
HF
CMAQ
CHATHAM
CHATHAM TRANSIT NETWORK
FUNDS AUTHORIZED IN PROGRESS
TK-6117 3298 1882ADMINISTRATION
HF
FNU AD 188 AD 188 AD 188 188AD188AD188AD L AD 36 AD 36 AD 36 36AD36AD36AD S AD 12 AD 12 AD 12 12AD12AD12AD
CHATHAM
CHATHAM TRANSIT NETWORK
TO-5213 313OPERATING ASSISTANCE FOR CMAQ PROJECT
HF
FNU O 250 L O 63
CHATHAM
CHATHAM TRANSIT NETWORK
FUNDS AUTHORIZED IN PROGRESS
TQ-8011 57 57CAPITAL - MOBILITY MANAGEMENT
HF
FEPD L S
CHATHAM
CHATHAM TRANSIT NETWORK
FUNDS AUTHORIZED IN PROGRESS
TQ-6921 120 120OPERATING
HF
FEPD L
CHATHAM
CHATHAM TRANSIT NETWORK
TQ-6167 212 212MOBILITY MANAGEMENT
HF
FEPD L S
CHATHAM
CHATHAM TRANSIT NETWORK
TQ-6166 200 200OPERATING ASSISTANCE
HF
FEPD L
CHATHAM
CHATHAM TRANSIT NETWORK
8-35 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BICYCLE AND PEDESTRIAN PROJECTS
IN PROGRESS
U-5528 3194 42FAYETTEVILLE URBAN AREA MPO TRANSPORTATION ALTERNATIVES PROGRAM.
DIV
TAPDA R 25 R 25 R 25 25R25R25R R 25 R 25 L R 6 R 6 R 6 6R6R6R R 6 R 6 TAPDA C 290 C 290 C 290 290C290C290C C 290 C 290 L C 73 C 73 C 73 73C73C73C C 73 C 73
CUMBERLANDHARNETTHOKEROBESON
VARIOUS
PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TI-6102 10518 6642INTERCITY BUS - CHARLOTTE TO WILMINGTON
HF
FNU O 265 O 265 O 265 265O265O265O L O 116 O 116 O 116 116O116O116O S O 265 O 265 O 265 265O265O265O
ANSONCUMBERLANDHOKEMOORERICHMONDUNION
COACH AMERICA
TA-6106 691 683CAPITAL
HF
FNU CP 6 L CP 1 S CP 1
HOKE
HOKE COUNTY
FUNDS AUTHORIZED IN PROGRESS
TK-6134 1669 1669ADMINISTRATION
HF
FNU L S
HOKE
HOKE COUNTY
8-36 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
TG-6187 3751URBANIZED FORMULA PROGRAMFUNDS MANAGED BY NCDOT FORORANGE, ALAMANCE, DAVIDSON, GUILFORD, CABARRUS, IREDELL, HOKE, CUMBERLAND, HARNETT, UNION, MECKLENBURG TRANSPORTATION SYSTEMS – CAPITAL PROGRAM
HF
FUZ CP 500 CP 550 CP 600 700CP650CP L CP 125 CP 138 CP 150 175CP163CP
ALAMANCECABARRUSCUMBERLANDDAVIDSONGUILFORDHARNETTHOKEIREDELLMECKLENBURGORANGEUNION
STATEWIDE
AVIATION PROJECTS
UNDER CONSTRUCTION; INCLUDES $1.5 M IN ECONOMIC DEVELOPMENT FUNDING
AV-5762 3851 3851CONSTRUCT CORPORATE AREA APRON PHASE I.
DIVLEE
RALEIGH EXECUTIVESANFORD - LEE COUNTYAIRPORT (TTA)
AV-5856 3500CORPORATE HANGAR APRON EXPANSION - PHASE II
DIV
T 3150C L 350C
LEE
SANFORD - LEECOUNTY REGIONALAIRPORT (TTA)
BICYCLE AND PEDESTRIAN PROJECTS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF SANFORD
EB-5863 1913NC 42 (WICKER STREET) TO CHATHAM STREET IN SANFORD. REDUCE NUMBER OF LANES AND CONSTRUCT BICYCLE / PEDESTRIAN ACCOMMODATIONS.
0.9
DIV
TAP PE 235 L PE 59 TAP R 120 L R 30 TAP 1175C L 294C
LEE
US 1 BUSINESS(CARTHAGE STREET)
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF SANFORD
EB-5742 387WEST LEE MIDDLE SCHOOL ENTRANCE TO KIWANIS FAMILY PARK GREENWAY IN SANFORD. CONSTRUCT MULTIUSE PATH.
1.3
DIV
TAP C 310 L C 77
LEE
NC 42(WICKER STREET)
8-37 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BICYCLE AND PEDESTRIAN PROJECTS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF SANFORD
EB-5867 914SR 1237 (CARTHAGE STREET) TO US 421 BUSINESS (HORNER BOULEVARD) IN SANFORD.
1
DIV
TAP PE 119 L PE 30 TAP 17R L 4R TAP 595C L 149C
LEE
SR 1107(FIELDS DRIVE)
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY TOWN OF BROADWAY
EB-5870 103SR 1531 (MANSFIELD DRIVE) TO END OF EXISTING SIDEWALK IN BROADWAY. CONSTRUCT SIDEWALK.
0.3
DIV
TAP PE 14 L PE 3 TAP C 69 L C 17
LEE
SR 1579(SOUTH MAIN STREET
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF SANFORD
EB-5868 722EVERGREEN LANE TO GLOBE STREET IN SANFORD. CONSTRUCT SIDEWALK.
1.2
DIV
TAP PE 93 L PE 23 TAP 21R L 5R TAP 464C L 116C
LEE
WOODLAND STREET
PUBLIC TRANSPORTATION PROJECTSTM-6131 300 300OPERATING ASSISTANCE
HF
JARC L
CHATHAMLEE
CENTRAL CAROLINA COMMUNITY COLLEGEFOUNDATION
FUNDS AUTHORIZED IN PROGRESS
TQ-9020 60 60CAPITAL - PURCHASE OF SERVICE
HF
FEPD L S
CHATHAMLEE
CENTRAL CAROLINA COMMUNITY COLLEGEFOUNDATION
8-38 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TA-6234 491 491CAPITAL
HF
FNU L S
LEE
LEE COUNTY
FUNDS AUTHORIZED IN PROGRESS
TK-6140 2214 1266ADMINISTRATION
HF
FNU AD 126 AD 126 AD 126 126AD126AD126AD L AD 24 AD 24 AD 24 24AD24AD24AD S AD 8 AD 8 AD 8 8AD8AD8AD
LEE
LEE COUNTY
TQ-6786 72 72OPERATING
HF
FEPD L
LEE
LEE COUNTY
FUNDS AUTHORIZED IN PROGRESS
TQ-6922 44 44OPERATING
HF
FEPD L
LEE
LEE COUNTY
TN-6120 28 28OPERATING
HF
FNF L
LEE
STEVENS CENTER
FUNDS AUTHORIZED IN PROGRESS
TQ-6923 26 26OPERATING
HF
FEPD L
LEE
STEVENS CENTER
FUNDS AUTHORIZED IN PROGRESS
TQ-9023 62 62CAPITAL - PURCHASE OF SERVICE
HF
FEPD L S
LEE
STEVENS CENTER
8-39 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BICYCLE AND PEDESTRIAN PROJECTS
UNDER CONSTRUCTION BY TOWN OF TROY
EB-5521 715 715SR 1323 (OKEEWEMEE ROAD) TO BARNHILL STREET IN TROY. CONSTRUCT SIDEWALKS.
2.5
TRNMONTGOMERY
NC 134(NORTH MAINSTREET);SR 1005(SOUTH MAINSTREET)
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY TOWN OF MT. GILEAD
EB-5899 135EXISTING SIDEWALK ON NC 731 TO STANBECK PARK IN MT. GILEAD. CONSTRUCT SIDEWALK.
DIV
TAP PE 12 L PE 3 TAP 96C L 24C
MONTGOMERY
NC 731(EAST ALLENTONSTREET)
EB-5760 947MONTGOMERY MIDDLE AND HIGH SCHOOLS TO ARTHUR DRIVE IN BISCOE. CONSTRUCT SIDEPATH ALONG US 220 BUSINESS.
0.8
DIV
TAP PE 48 L PE 12 TAP C 710 L C 177
MONTGOMERY
EASTERN MONTGOMERYMIDDLE SCHOOLGREENWAY
PUBLIC TRANSPORTATION PROJECTSTA-6671 70PURCHASE 20-FT LIGHT TRANSIT VEHICLES
FOR SERVICE EXPANSION.
REG
FEDT A 56 T A 7 L A 7
MONTGOMERY
RANDOLPH-MONTGOMERY RESTORE
FUNDS AUTHORIZED IN PROGRESS
TK-6156 4826 2738ADMINISTRATION
HF
FNU O 279 O 279 O 279 279O279O279O FNU L O 52 O 52 O 52 52O52O52O S O 17 O 17 O 17 17O17O17O
MONTGOMERYRANDOLPH
REGIONAL COORDINATED AREA TRANSPORTION
AVIATION PROJECTSAV-5855 2720CONSTRUCT HANGAR TAXIWAYS AND
INTERNAL AIRFIELD SERVICE ROAD.DIV
T 2448C L 272C
MOORE
MOORE COUNTYAIRPORT (SOP)
8-40 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BICYCLE AND PEDESTRIAN PROJECTS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF ABERDEEN
EB-5741 100MAPLE AVENUE IN ABERDEEN. CONSTRUCT MID-BLOCK CROSSWALK, MEDIAN REFUGE ISLAND, AND INSTALL PEDESTRIAN SIGNAL.
0.3
DIV
TAP C 80 L C 20
MOORE
US 1 / US 15 / US 501(SANDHILLS BOULEVARD)
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY TOWN OF ABERDEEN
EB-5869 228US 15 / US 501 TO MIKE PLACE IN ABERDEEN. CONSTRUCT SIDEWALKS.
0.4
DIV
TAP PE 30 L PE 8 TAP C 152 L C 38
MOORE
SR 1203(JOHNSON STREET)
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY TOWN OF SOUTHERN PINES
EB-5864 564ARBORETUM DRIVE TO NORTH OF PADDOCK LANE IN SOUTHERN PINES. CONSTRUCT SIDEWALK.
1.4
DIV
TAP C 451 L C 113
MOORE
KNOLL ROAD
PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TI-6102 10518 6642INTERCITY BUS - CHARLOTTE TO WILMINGTON
HF
FNU O 265 O 265 O 265 265O265O265O L O 116 O 116 O 116 116O116O116O S O 265 O 265 O 265 265O265O265O
ANSONCUMBERLANDHOKEMOORERICHMONDUNION
COACH AMERICA
FUNDS AUTHORIZED IN PROGRESS
TQ-9028 486 486CAPIATAL - PURCHASE OF SERVICE
HF
FEPD L S
COLUMBUSDAVIEMOOREROBESONSTANLY
MONARCH
8-41 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TA-6131 233 233CAPITAL
HF
FNU L S
MOORE
MOORE COUNTY
FUNDS AUTHORIZED IN PROGRESS
TK-6147 3371 1925ADMINISTRATION
HF
FNU O 193 O 193 O 193 193O193O193O FNU L O 36 O 36 O 36 36O36O36O S O 12 O 12 O 12 12O12O12O
MOORE
MOORE COUNTY
AVIATION PROJECTSAV-5858 3456CONSTRUCT TAXILANE EXTENSION, EXTEND
ACCESS ROAD, AND CONSTRUCT NEW ACCESS ROAD.
DIV
T C 3110 L C 346
RANDOLPH
ASHEBOROREGIONAL AIRPORT(HBI)
BICYCLE AND PEDESTRIAN PROJECTSEB-5740 950NORTH ELM STREET TO DUBLIN ROAD IN
ASHEBORO. CONSTRUCT SIDEWALK ON BOTH SIDES.
0.8
DIV
TAP C 760 L C 190
RANDOLPH
NC 42(SALISBURY STREET)
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY TOWN OF RANDLEMAN
EB-5898 333WEST ACADEMY STREET TO US 220 BUSINESS (SOUTH MAIN STREET) IN RANDLEMAN. CONSTRUCT SIDEWALK, IMPLEMENT ROAD DIET, AND INSTALL RAISED CROSSWALK AND MEDIAN.
DIV
TAP PE 40 L PE 10 TAP 20R L 5R TAP 206C L 52C
RANDOLPH
SR 1950(WEST NAOMI STREET
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY THE TOWN OF RANDLEMAN
EB-5744 411SR 1952 (HIGH POINT STREET) TO HILLARY STREET IN RANDLEMAN. CONSTRUCT SIDEWALK ON NORTH SIDE.
1
DIV
TAP C 329 L C 82
RANDOLPH
SR 1950(WEST ACADEMY STREET)
8-42 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BICYCLE AND PEDESTRIAN PROJECTS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF ASHEBORO
EB-5862 217RANDOLPH COMMUNITY COLLEGE ENTRANCE TO CONTINUING EDUCATION AND INDUSTRIAL CENTER IN ASHEBORO. CONSTRUCT SIDEWALK ON SOUTH SIDE.
0.2
DIV
TAP PE 20 L PE 5 TAP C 154 L C 38
RANDOLPH
INDUSTRIAL PARKAVENUE
PUBLIC TRANSPORTATION PROJECTSTA-5129 175 175REPLACEMENT PARATRANSIT VEHICLES
HF
FUZ L
DAVIDSONGUILFORDRANDOLPH
HIGH POINT TRANSIT SYSTEM / HI-TRAN
FUNDS AUTHORIZED IN PROGRESS
TG-4814 3006 1632ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETC ($40K CAPITAL COST OF CONTRACTING)
HF
FUZ CP 181 CP 181 CP 181 181CP181CP181CP L CP 48 CP 48 CP 48 48CP48CP48CP
DAVIDSONGUILFORDRANDOLPH
HIGH POINT TRANSIT SYSTEM / HI-TRAN
FUNDS AUTHORIZED IN PROGRESS
TO-4790 42594 24104OPERATING ASSISTANCE
HF
FUZ O 1830 O 1202 O 1202 1202O1202O1202O L O 1830 O 1202 O 1202 1202O1202O1202O SMAP O 435 O 475 O 475 475O475O475O
DAVIDSONGUILFORDRANDOLPH
HIGH POINT TRANSIT SYSTEM / HI-TRAN
FUNDS AUTHORIZED IN PROGRESS
TS-5113 220 124SAFETY & SECURITY - MIN. 1% SET ASIDE
HF
FUZ CP 14 CP 14 CP 14 14CP14CP14CP L CP 2 CP 2 CP 2 2CP2CP2CP
DAVIDSONGUILFORDRANDOLPH
HIGH POINT TRANSIT SYSTEM / HI-TRAN
8-43 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
TA-5197A 475BUS REPLACEMENT
HF
CMAQ CP 380 L CP 95
DAVIDSONFORSYTHGUILFORDRANDOLPH
PIEDMONT AUTHORITY FOR REGIONAL TRANS.
TD-4920D 1551 1551VAN POOL REPLACEMENT TO SUPPORT NEW ROUTES
HF
CMAQ
DAVIERANDOLPH
PIEDMONT AUTHORITY FOR REGIONAL TRANS.
FUNDS AUTHORIZED IN PROGRESS
TO-5212 574 574OPERATING FUNDING
HF
CMAQ L
DAVIDSONFORSYTHGUILFORDRANDOLPH
PIEDMONT AUTHORITY FOR REGIONAL TRANS.
TA-6670 70PURCHASE ADDITIONAL 20-FOOT LIGHT TRANSIT VEHICLES.
REG
FEDT A 56 T A 7 L A 7
RANDOLPH
RANDOLPH-MONTGOMERY RESTORE
FUNDS AUTHORIZED IN PROGRESS
TA-6110 524 524CAPITAL
HF
FNU L S
RANDOLPH
RANDOLPH COUNTY SENIOR ADULTS ASSOCIATION, INC.
FUNDS AUTHORIZED IN PROGRESS
TQ-6665 164 164CAPITAL
HF
FEPD L S
RANDOLPH
RANDOLPH COUNTY SENIOR ADULTS ASSOCIATION, INC.
8-44 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TK-6156 4826 2738ADMINISTRATION
HF
FNU O 279 O 279 O 279 279O279O279O FNU L O 52 O 52 O 52 52O52O52O S O 17 O 17 O 17 17O17O17O
MONTGOMERYRANDOLPH
REGIONAL COORDINATED AREA TRANSPORTION
TQ-6168 124 124OPERATING ASSISTANCE
HF
FEPD L
RANDOLPH
REGIONAL COORDINATED AREA TRANSPORTION
PASSENGER RAIL PROJECTSP-5719 18000PIEDMONT SERVICE EXPANSION.
PURCHASE 5 BI-LEVEL PASSENGER CARS.REG
T A 18000
ALAMANCECABARRUSDAVIDSONDURHAMGUILFORDMECKLENBURGORANGERANDOLPHROWANWAKE
NCRR
P-2918 158562 158562TRAIN 74 / 75 OPERATIONS BETWEEN CHARLOTTE AND RALEIGH, EQUIPMENT AND CAPITAL YARD MAINTENANCE FACILITY.
EX A EQUIPMENT REBUILD - 2 F59PHI LOCOMOTIVES - IN PROGRESSB PURCHASE 2 USED LOCOMOTIVES - COMPLETEC EQUIPMENT REHABILITATION - 3 LOCOMOTIVES - IN PROGRESSD EQUIPMENT REHABILITATION - 3 PASSENGER CARS - COMPLETEE PASSENGER TRAIN SECURITY SYSTEM, CCTV DATA NETWORK AND GENERATORS - IN PROGRESSF CRISP CHARLOTTE MAINTENANCE FACILITY - TRACK EXTENSION AND SHOP BUILDING - IN PROGRESSG PURCHASE 4 USED PASSENGER CARS AND REHABILITATE 7 PASSENGER CARS - IN PROGRESSH CAPITAL YARD PHASE 1 IMPROVEMENTS - EXTEND TRACKS 1 AND 2, MAJOR WORK TRACK 3 - IN PROGRESSI EQUIP 9 STATIONS AND PLATFORMS WITH ADA/FRA PIDS - IN PROGRESS
ALAMANCECABARRUSDAVIDSONDURHAMGUILFORDMECKLENBURGORANGERANDOLPHROWANWAKE
PIEDMONT CORRIDOR
8-45 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)AVIATION PROJECTS
AV-5761 550CLEAR OBSTRUCTIONS IN RUNWAY 14 APPROACH.
DIV
T C 495 L C 55
RICHMOND
RICHMOND COUNTYAIRPORT (RCZ)
AV-5763 5627EXTEND RUNWAY 14-32 TO 5500 FEET.
DIV
T C 5065 L C 562
RICHMOND
RICHMOND COUNTYAIRPORT (RCZ)
AV-5853 3658CONSTRUCT EAST RAMP EXPANSION.
DIV
T C 3292 L C 366
RICHMOND
RICHMOND COUNTYAIRPORT (RCZ)
PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TI-6102 10518 6642INTERCITY BUS - CHARLOTTE TO WILMINGTON
HF
FNU O 265 O 265 O 265 265O265O265O L O 116 O 116 O 116 116O116O116O S O 265 O 265 O 265 265O265O265O
ANSONCUMBERLANDHOKEMOORERICHMONDUNION
COACH AMERICA
TA-6211 229 229CAPITAL
HF
FNU
RICHMOND
RICHMOND INTERAGENCY TRANSPORTATION, INC.
FUNDS AUTHORIZED IN PROGRESS
TK-6157 1114 1114ADMINISTRATION
HF
FNU L S
RICHMOND
RICHMOND INTERAGENCY TRANSPORTATION, INC.
8-46 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)AVIATION PROJECTS
AV-5854 6390CONSTRUCT 1500 FT RUNWAY EXTENSION.
DIV
T 5751C L 639C
SCOTLAND
LAURINBURG-MAXTON AIRPORT(MEB)
BICYCLE AND PEDESTRIAN PROJECTS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF LAURINBURG
EB-5866 131SR 1674 (LAUCHWOOD DRIVE) TO PLAZA ROAD IN LAURINBURG. CONSTRUCT SIDEWALK.
0.5
DIV
TAP PE 17 L PE 5 TAP 87C L 22C
SCOTLAND
US 401 BUSINESS(SOUTH MAIN STREET
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF LAURINBURG
EB-5865 455US 401 BUSINESS (SOUTH MAIN STREET) TO WEST VANCE STREET IN LAURINBURG. CONSTRUCT SIDEWALKS.
1
DIV
TAP PE 61 L PE 15 TAP 303C L 76C
SCOTLAND
SR 1107(ATKINSON STREET)
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF LAURINBURG; PROJECT LENGTH REFLECTS PARTS A AND C - PART B IS NON-STI PROJECT
EB-5872 703SR 1105 (TURNPIKE ROAD) TO SUNSET DRIVE IN LAURINBURG. CONSTRUCT SIDEWALK ON WEST SIDE, PROVIDE PEDESTRIAN ACCOMMODATIONS AT US 15 / US 401 INTERSECTION AND ACROSS US 74.
1.2
DIV
TAP PE 70 L PE 17 TAP C 174 A L C 44 A S C 180 B TAP C 174 C L C 44 C
A SR 1105 (TURNPIKE ROAD) TO GLASGOW DRIVE IN LAURINBURG.DIVB GLASGOW DRIVE TO EAST OF US 15 / US 401 / US 501 (MCCOLL ROAD) IN LAURINBURG.EXC EAST OF US 15 / US 401 / US 501 (MCCOLL ROAD) TO SUNSET DRIVE IN LAURINBURG.DIV
SCOTLAND
SR 1108(WEST BOULEVARD)
PUBLIC TRANSPORTATION PROJECTSTA-6156 433 433CAPITALHF
FNU
SCOTLANDSCOTLAND COUNTY
8-47 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 8
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TK-6163 1608 918ADMINISTRATION
HF
FNU O 92 O 92 O 92 92O92O92O FNU L O 17 O 17 O 17 17O17O17O S O 6 O 6 O 6 6O6O6O
SCOTLAND
SCOTLAND COUNTY
FREIGHT RAIL PROJECTS
IN PROGRESS; ECONOMIC DEVELOPMENT PROJECT; "O" FUNDING INCLUDES PARTICIPATION BY NORTH CAROLINA RAILROAD, LAURINBURG-MAXTON AIRPORT, RAIL INDUSTRIIAL ACCESS PROGRAM, AND COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM
P-5724 RAIL SPUR FOR INDUSTRIAL ACCESS. CONSTRUCT SPINE TRACK AND TURNOUTS, AND REHABILITATE EXISTING TRACK SECTIONS.
DIVSCOTLANDCSX
8-48 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)INTERSTATE PROJECTS
UNDER CONSTRUCTION
I-5740 3198 3198SR 2205 (OLD US 64) TO 0.4 MILES NORTH OF US 64. PAVEMENT REHABILITATION.
2.6SW A REHABILITATE BRIDGE 280181 AND BRIDGE 280182. - UNDER CONSTRUCTIONSWDAVIDSON
I-85
I-5951 974NC 109 IN THOMASVILLE TO RANDOLPH COUNTY LINE. PAVEMENT REHABILITATION.
1.3SW
NHPIM 974C
DAVIDSONI-85
PLANNING / DESIGN IN PROGRESS
I-5793 15075 75NORTH OF US 64 TO NC 109 IN THOMASVILLE. PAVEMENT REHABILITATION.
7SW
NHPIM C 15000
DAVIDSONI-85
INCLUDES B-3833; GARVEE BOND FUNDING: $14.3 MILLION FOR RIGHT OF WAY, SECTIONS AC & AD, PAYBACK FY 2009-2021; $111.7 MILLION FOR CONSTRUCTION, SECTIONS AC, PAYBACK FY 2010-2021; TIGER AWARD / INTERSTATE MAINTENANCE DISCRETIONARY FUNDING $11.7 MILLION
I-2304 302258 259195NORTH OF SR 2120 (LONG FERRY ROAD) IN ROWAN COUNTY TO US 29 / US 52 / US 70 / BUSINESS 85 IN DAVIDSON COUNTY. ADDITIONAL LANES AND YADKIN RIVER BRIDGE RECONSTRUCTION. (PROJECT INCLUDES B-3833).
6.8
TRN
NHP RG 505 AC RG 495 AC RG 533 AC 533RG AC NHP CG 16198 AC CG 14672 AC CG 4110 AC 4110CG AC NHP RG 466 AD RG 457 AD RG 492 AD 492RG AD
AC NORTH OF SR 2120 (LONG FERRY ROAD) IN ROWAN COUNTY TO NORTH OF NC 150 IN DAVIDSON COUNTY, INCLUDING YADKIN RIVER BRIDGE - COMPLETEEXAD NORTH OF NC 150 TO US 29-70-52/BUSINESS 85 IN DAVIDSON COUNTY - COMPLETETRNAE NORTH CAROLINA RAILROAD MP 327.4 - CURVE REALIGNMENT - COMPLETEAF IMPLEMENTATION OF INTELLIGENT TRANSPORTATION SYSTEM (ITS) - COMPLETETRN
DAVIDSONROWAN
I-85
I-5950 7332US 29 / US 52 / US 70 / BUSINESS 85 TO NORTH OF SR 2205 (OLD US 64). PAVEMENT REHABILITATION.
6.6SW
NHPIM 3666C3666C
DAVIDSONI-85
RURAL PROJECTS
PLANNING / DESIGN IN PROGRESS - "OTHER" FUNDS REFLECT PARTICIPATION BY DAVIDSON COUNTY COMMUNITY COLLEGE
R-5737 20400 1800SR 1798 (OLD GREENSBORO ROAD). CONVERT AT-GRADE INTERSECTION TO INTERCHANGE.
2
DIV
T R 700 O R 2900 T C 7500 7500C
DAVIDSON
US 29 / US 70 /BUSINESS 85
R-5862 183399US 601 SOUTH OF MOCKSVILLE TO US 29 / US 52 / US 70 / BUSINESS 85 IN LEXINGTON. WIDEN TO MULTILANES AND UPGRADE US 29 / US 52 / US 70 / BUSINESS 85 INTERCHANGE.
16.9 T 43236R A T 5188U A T 76000C A T R 13189 B T U 1583 B T 22102C B C 11051 B C 11050 B
A US 601 SOUTH OF MOCKSVILLE TO DAVIDSON COUNTY LINE.B DAVIE COUNTY LINE TO US 29 / US 52 / US 70 / BUSINESS 85 IN LEXINGTONREG
DAVIDSONDAVIE
US 64
9-3 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
R-2220 211080 17602US 64, EAST OF I-85 BUSINESS IN LEXINGTON TO ASHEBORO BYPASS. WIDEN TO MULTILANES.
T R 12716 B T U 1526 B T 24833C B C 12417 BT R 9880 CA T U 1186 CA T 12913C CA C 6457 CAT 10200R CB T 1400U CB T 34900C CB T 5225R DA5225R DA T 1300U DA T 13325C DA C 13325 DA C 13325 DA C 13325 DA
A US 64, I-85 BUSINESS IN LEXINGTON TO EAST OF I-85. - COMPLETEB I-85 EAST OF LEXINGTON TO NC 109 - PLANNING / DESIGN IN PROGRESSREGCA NC 109 TO RANDOLPH COUNTY LINE - PLANNING / DESIGN IN PROGRESSREGCB DAVIDSON COUNTY LINE TO SR 1409 (LAKE PARK ROAD) - PLANNING / DESIGN IN PROGRESSDA SR 1409 (LAKE PARK ROAD) TO ASHEBORO BYPASS - PLANNING / DESIGN IN PROGRESSREG
DAVIDSONRANDOLPH
US 64
R-4734 133790NC 109 IN DENTON TO I-85 IN THOMASVILLE. WIDEN TO MULTILANES.
16.2
REG
T R 1208 T U 500 T 99061C C 33021
DAVIDSON
NC 109
PLANNING / DESIGN IN PROGRESS
R-5844 24218 1445NC 24 / NC 27 IN TROY TO NC 47 IN DENTON. INCREASE LANE WIDTH, IMPROVE SHOULDERS AND SIGNALIZATION, CONSTRUCT TURN LANES AND PROVIDE BICYCLE ACCOMMODATIONS.
24.5 T R 64 A T U 64 A T C 14447 AT 36R B T 36U B T 8126C B
A NC 24 / NC 27 TO DAVIDSON COUNTY LINEDIVB RANDOLPH COUNTY LINE TO NC 47 IN DENTON
DAVIDSONMONTGOMERYRANDOLPH
NC 109
UNDER CONSTRUCTION
R-5789 350 350DIVISION 9 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVDAVIDSONDAVIEFORSYTHROWANSTOKES
VARIOUS
9-4 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
PLANNING / DESIGN IN PROGRESS
U-5757 1379 1259TH STREET TO SR 1408 (BIESECKER ROAD) IN LEXINGTON. WIDEN TO MULTILANES.
0.5
REG
T C 1254
DAVIDSON
NC 8(WINSTON ROAD)
U-5902 126251US 64 TO FORSYTH COUNTY LINE. WIDEN TO MULTILANES.
12.3 T 4343R A R 4343 AT 2858U A U 2858 AT 55485C A T 10738R B T 1289U B T 44337C B
A US 64 TO SR 1493 (FRYE BRIDGE ROAD).DIVB SR 1493 (FRYE BRIDGE ROAD) TO FORSYTH COUNTY LINE
DAVIDSON
NC 150
PLANNING / DESIGN IN PROGRESS
U-5786 27872 750US 52 / NC 8 / FUTURE I-285 TO NC 150. WIDEN TO MULTILANES.
2.9
DIV
T 4672R T 561U T 7297C C 7296 C 7296
DAVIDSON
SR 1508(HICKORY TREEROAD)
U-5022 39612WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION (WSUAMPO) STPDA FUNDS - RESERVED FOR FUTURE PROGRAMMING.
DIV
STBGDA C 2504 C 192 5304C5304C5092C C 5304 C 5304 C 5304 C 5304
DAVIDSONDAVIEFORSYTHSTOKES
VARIOUS
FORMERLY U-9999D - IN PROGRESS
U-4951 8250 5250WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION PLANNING (PL) SUPPLEMENT.DIV
STBGDA PL 600 PL 600 PL 600 600PL L PL 150 PL 150 PL 150 150PL
DAVIDSONDAVIEFORSYTHSTOKES
VARIOUS
9-5 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY OTHERS - IN PROGRESS
U-4742 10956 5956INTERSECTION IMPROVEMENT PROJECTS IN THE WINSTON-SALEM URBAN AREAMETROPOLITAN PLANNING ORGANIZATION (WSUAMPO) AREA.
DIV
STBGDA PE 100 PE 100 PE 100 100PE L PE 25 PE 25 PE 25 25PE STBGDA R 200 R 200 R 200 200R L R 50 R 50 R 50 50R STBGDA C 700 C 700 C 700 700C L C 175 C 175 C 175 175C
DAVIDSONDAVIEFORSYTHSTOKES
VARIOUS
BRIDGE PROJECTS
PLANNING / DESIGN IN PROGRESS - COORDINATE WITH B-5785
B-5779 4364 100REPLACE BRIDGE 280118 OVER SR 3346 (NORTH MAIN STREET) IN LEXINGTON.
REG
NHPB R 203 NHPB C 2031 C 2030
DAVIDSON
US 29 NB / US 64 EB /US 70 EB / BUSINESS85 NB
PLANNING / DESIGN IN PROGRESS
B-5783 6166 100REPLACE BRIDGE 280164 AND BRIDGE 280168 OVER NORFOLK SOUTHERN RAILROAD.REG
NHPB R 288 NHPB C 2889 C 2889
DAVIDSON
US 29 / US 70 /BUSINESS 85
UNDER CONSTRUCTION
B-3159 21367 21367REPLACE BRIDGE 280027 OVER US 29 / US 64 / US 70 / I-85 BUSINESS IN LEXINGTON.REGDAVIDSON
NC 8
UNDER CONSTRUCTION
B-5780 2025 2025REPLACE BRIDGE 280017 OVER SWEARING CREEK.HFDAVIDSON
NC 47
IN PROGRESS - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5109 20925 20925DIVISION 9 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVDAVIDSON
DAVIEFORSYTHROWANSTOKES
VARIOUS
9-6 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)MITIGATION PROJECTS
IN PROGRESS
EE-4909 17551 17551ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 9 PROJECT MITIGATION.DAVIDSON
DAVIEFORSYTHROWANSTOKES
VARIOUS
HIGHWAY SAFETY PROJECTSW-5709 895 195SAFETY IMPROVEMENTS AT VARIOUS
LOCATIONS IN DIVISION 9.HSIP R 30 DIV HSIP C 180 DIV HSIP R 30 RE HSIP C 180 RE HSIP R 40 SW HSIP C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
DAVIDSONDAVIEFORSYTHROWANSTOKES
VARIOUS
IN PROGRESS
W-5209 5068 5068DIVISION 9 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.DAVIDSON
DAVIEFORSYTHROWANSTOKES
VARIOUS
CONGESTION MITIGATION PROJECTS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF LEXINGTON - IN PROGRESS
C-5216 EXTEND SIDEWALKS ON SOUTH MAIN STREET AND PROVIDE WIDE PAVED SHOULDERS ON ANNA LEWIS DRIVE AND EMERGENCY DRIVE TO PROVIDE BICYCLE ACCESS TO LEXINGTON MEMORIAL HOSPITAL IN LEXINGTON.
EXDAVIDSON
SR 3346(SOUTH MAINSTREET)
9-7 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)CONGESTION MITIGATION PROJECTS
C-5620 4908PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE WINSTON-SALEM URBAN AREA MPO.
EX
CMAQ PE 194 PE 198 L PE 49 PE 50 CMAQ R 194 R 198 L R 49 R 50 CMAQ C 1167 C 1188 L C 292 C 297 CMAQ O 194 O 198 L O 49 O 50 CMAQ I 194 I 198 L I 49 I 50
DAVIDSONDAVIEFORSYTH
VARIOUS
C-5609 3255PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE HIGH POINT MPO.
EX
CMAQ PE 129 PE 131 L PE 32 PE 33 CMAQ R 129 R 131 L R 32 R 33 CMAQ C 775 C 789 L C 194 C 197 CMAQ O 129 O 131 L O 32 O 33 CMAQ I 129 I 131 L I 32 I 33
DAVIDSONFORSYTHGUILFORD
VARIOUS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF LEXINGTON - IN PROGRESS
C-5217 BIKE AND PEDESTRIAN IMPROVEMENTS IN VICINITY OF SCHOOL. BISECKER AND MIZE ROADS, PROVIDE WIDE PAVED SHOULDERS AND CONSTRUCT SIDE-WALKS ON CORNELIA STREET AND HILLSIDE DRIVE IN LEXINGTON.
EXDAVIDSONVARIOUS
IMPLEMENTATION BY DAVIDSON COUNTY - IN PROGRESS
C-5559 180 180TRANSIT OPERATIONS SUPPORT FOR CITY OF LEXINGTON CIRCULATOR ROUTE AND THOMASVILLE / LEXINGTON CONNECTOR ROUTE.
EXDAVIDSONVARIOUS
9-8 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)CONGESTION MITIGATION PROJECTS
IN PROGRESS BY PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION
C-4936 714 714PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM.
EXCASWELLDAVIDSONFORSYTHGUILFORDMONTGOMERYRANDOLPHROCKINGHAM
VARIOUS
IN PROGRESS BY TOWN OF DENTON
C-5560 38 38TOWN OF DENTON. PURCHASE ELECTRIC VEHICLE AND CHARGING STATION.EXDAVIDSON
TOWNWIDE
INTERSTATE PROJECTS
UNDER CONSTRUCTION
I-5794 1825 18250.3 MILE WEST OF NC 801 IN DAVIE COUNTY TO SR 1101 (HARPER ROAD) IN FORSYTH COUNTY. PAVEMENT REHABILITATION.
2.6SWDAVIE
FORSYTH
I-40
PARTS B AND C COMPLETE
I-0911 106773 28303WEST OF NC 801 IN BERMUDA RUN TO WEST OF SR 1122 (JONESTOWN ROAD) IN WINSTON-SALEM. ADD LANES.
7 NHP C 26157 A C 26157 A C 26156 A
A WEST OF NC 801 IN DAVIE COUNTY TO SR 1101 (HARPER ROAD) IN FORSYTH COUNTY. - UNDER CONSTRUCTION; DESIGN-BUILD PROJECTREGDAVIEFORSYTH
I-40
UNDER CONSTRUCTION
I-5765 11975 119750.5 MILES WEST OF US 601 TO 1.2 MILES EAST OF SR 1410 (FARMINGTON ROAD). PAVEMENT REHABILITATION.
5.8SWDAVIE
I-40
PLANNING / DESIGN IN PROGRESS
I-5823 30075 75IREDELL COUNTY LINE TO 0.5 MILE WEST OF US 601. PAVEMENT REHABILITATION.
7.2SW
NHPIM C 30000
DAVIEI-40
PROJECT COMPLETE - GARVEE BOND FUNDING $13.8 MILLION; PAYBACK FY 2007 - FY 2018
I-3600 26864 25298SR 1436 (PINEBROOK DRIVE) TO WEST OF NC 801. PAVEMENT REHABILITATION.
5TRN
NHP CG 1566
DAVIEI-40
9-9 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
R-5862 183399US 601 SOUTH OF MOCKSVILLE TO US 29 / US 52 / US 70 / BUSINESS 85 IN LEXINGTON. WIDEN TO MULTILANES AND UPGRADE US 29 / US 52 / US 70 / BUSINESS 85 INTERCHANGE.
16.9 T 43236R A T 5188U A T 76000C A T R 13189 B T U 1583 B T 22102C B C 11051 B C 11050 B
A US 601 SOUTH OF MOCKSVILLE TO DAVIDSON COUNTY LINE.B DAVIE COUNTY LINE TO US 29 / US 52 / US 70 / BUSINESS 85 IN LEXINGTONREG
DAVIDSONDAVIE
US 64
RIGHT OF WAY IN PROGRESS
R-5728 2425 1600SOUTH SALISBURY STREET IN MOCKSVILLE. INTERSECTION IMPROVEMENTS.REG
T C 825
DAVIEUS 601
PLANNING / DESIGN IN PROGRESS
R-5736 17630 700SR 1345 (BLAISE CHURCH ROAD) TO SR 1408 (CANA ROAD). WIDEN TO MULTILANES.
1.5
DIV
T R 4110 T U 500 T 6160C6160C
DAVIE
US 601
R-5854 2188I-40 EASTBOUND RAMP AND US 158 INTERSECTION. CONSTRUCT ROUNDABOUTS.
1
DIV
T 300R T 100U T C 1788
DAVIE
SR 1410(FARMINGTON ROAD)
UNDER CONSTRUCTION
R-5789 350 350DIVISION 9 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVDAVIDSONDAVIEFORSYTHROWANSTOKES
VARIOUS
URBAN PROJECTSU-6076 31961SR 1630 (BALTIMORE ROAD) IN DAVIE
COUNTY TO SR 1103 (LEWISVILLE-CLEMMONS ROAD) IN CLEMMONS. WIDEN TO 3-LANE SECTION.
5.1
REG
T U 500 T R 1359 T 30102C
DAVIEFORSYTH
US 158
9-10 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
FORMERLY U-9999D - IN PROGRESS
U-4951 8250 5250WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION PLANNING (PL) SUPPLEMENT.DIV
STBGDA PL 600 PL 600 PL 600 600PL L PL 150 PL 150 PL 150 150PL
DAVIDSONDAVIEFORSYTHSTOKES
VARIOUS
U-5022 39612WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION (WSUAMPO) STPDA FUNDS - RESERVED FOR FUTURE PROGRAMMING.
DIV
STBGDA C 2504 C 192 5304C5304C5092C C 5304 C 5304 C 5304 C 5304
DAVIDSONDAVIEFORSYTHSTOKES
VARIOUS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY OTHERS - IN PROGRESS
U-4742 10956 5956INTERSECTION IMPROVEMENT PROJECTS IN THE WINSTON-SALEM URBAN AREAMETROPOLITAN PLANNING ORGANIZATION (WSUAMPO) AREA.
DIV
STBGDA PE 100 PE 100 PE 100 100PE L PE 25 PE 25 PE 25 25PE STBGDA R 200 R 200 R 200 200R L R 50 R 50 R 50 50R STBGDA C 700 C 700 C 700 700C L C 175 C 175 C 175 175C
DAVIDSONDAVIEFORSYTHSTOKES
VARIOUS
PLANNING / DESIGN IN PROGRESS
U-6002 1200 300YADKINVILLE ROAD IN MOCKSVILLE. CONSTRUCT ROUNDABOUT.
DIV
T R 150 T U 100 T C 650
DAVIE
WILKESBORO STREET
BRIDGE PROJECTS
PROJECT COMPLETE - GARVEE BOND FUNDING $11.5 MILLION; PAYBACK FY 2007 - FY 2018
B-3637 32794 31644REPLACE BRIDGE 290037 AND REVISE INTERCHANGE AT I-40.TRN
NHPB CG 1150
DAVIENC 801
9-11 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BRIDGE PROJECTS
IN PROGRESS - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5109 20925 20925DIVISION 9 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVDAVIDSON
DAVIEFORSYTHROWANSTOKES
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4909 17551 17551ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 9 PROJECT MITIGATION.DAVIDSON
DAVIEFORSYTHROWANSTOKES
VARIOUS
HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5209 5068 5068DIVISION 9 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.DAVIDSON
DAVIEFORSYTHROWANSTOKES
VARIOUS
W-5709 895 195SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 9.
HSIP R 30 DIV HSIP C 180 DIV HSIP R 30 RE HSIP C 180 RE HSIP R 40 SW HSIP C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
DAVIDSONDAVIEFORSYTHROWANSTOKES
VARIOUS
9-12 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)CONGESTION MITIGATION PROJECTS
C-5620 4908PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE WINSTON-SALEM URBAN AREA MPO.
EX
CMAQ PE 194 PE 198 L PE 49 PE 50 CMAQ R 194 R 198 L R 49 R 50 CMAQ C 1167 C 1188 L C 292 C 297 CMAQ O 194 O 198 L O 49 O 50 CMAQ I 194 I 198 L I 49 I 50
DAVIDSONDAVIEFORSYTH
VARIOUS
C-5614 124PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE NORTHWEST PIEDMONT RPO.
EX
CMAQ PE 5 PE 5 L PE 1 PE 1 CMAQ R 5 R 5 L R 1 R 1 CMAQ C 30 C 30 L C 8 C 8 CMAQ O 5 O 5 L O 1 O 1 CMAQ I 5 I 5 L I 1 I 1
DAVIE
VARIOUS
INTERSTATE PROJECTSI-5952 6087SR 1101 (HARPER ROAD) IN CLEMMONS TO
EAST OF US 421 / BUSINESS 40 IN WINSTON-SALEM. PAVEMENT REHABILITATION.
7.4SW
NHPIM C 6087
FORSYTHI-40
PARTS B AND C COMPLETE
I-0911 106773 28303WEST OF NC 801 IN BERMUDA RUN TO WEST OF SR 1122 (JONESTOWN ROAD) IN WINSTON-SALEM. ADD LANES.
7 NHP C 26157 A C 26157 A C 26156 A
A WEST OF NC 801 IN DAVIE COUNTY TO SR 1101 (HARPER ROAD) IN FORSYTH COUNTY. - UNDER CONSTRUCTION; DESIGN-BUILD PROJECTREGDAVIEFORSYTH
I-40
UNDER CONSTRUCTION - COORDINATE WITH I-5857
I-5766 15135 151351.3 MILES EAST OF NC 150 (PETERS CREEK PARKWAY) TO NC 109 (THOMASVILLE ROAD) IN WINSTON-SALEM. PAVEMENT REHABILITATION.
1.4SWFORSYTH
I-40
9-13 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)INTERSTATE PROJECTS
UNDER CONSTRUCTION
I-5794 1825 18250.3 MILE WEST OF NC 801 IN DAVIE COUNTY TO SR 1101 (HARPER ROAD) IN FORSYTH COUNTY. PAVEMENT REHABILITATION.
2.6SWDAVIE
FORSYTH
I-40
PLANNING / DESIGN IN PROGRESS
I-5880 14335 335NC 109 (THOMASVILLE ROAD) / CLEMMONSVILLE ROAD SPLIT-DIAMOND INTERCHANGE IN WINSTON-SALEM. CONVERT HALF DIAMOND INTERCHANGE AT NC 109 TO FULL DIAMOND, AND REMOVE CONNECTOR ROADS AND HALF DIAMOND INTERCHANGE AT CLEMMONSVILLE ROAD
0.8
REG
T R 1500 T U 200 T 6150C6150C
FORSYTH
I-40 / US 311
I-5981 142742I-74 US 311 IN WINSTON-SALEM TO US 421 / BUSINESS 40 IN GUILFORD COUNTY. WIDEN TO 6 LANES.
10.1 NHP R 711 A NHP U 127 A NHP 17662C A C 8831 A C 8831 ANHP R 1047 B NHP U 187 B NHP 26028C B C 13014 B C 13014 BNHP 1047R C NHP 187U C NHP 52056C C
A I-74 / US 311 TO SR 2643 (UNION CROSS ROAD).SWB SR 2643 (UNION CROSS ROAD) TO NC 66.SWC NC 66 TO US 421 / BUSINESS 40.
FORSYTHGUILFORD
I-40
COORDINATE WITH U-2826
I-5988 103070US 52 / US 311 / NC 8 IN WINSTON-SALEM. UPGRADE INTERCHANGE.
REG
NHP R 10260 R 10260 NHP U 1231 U 1231 NHP 40054C C 20007 C 20027
FORSYTH
I-40
PLANNING / DESIGN IN PROGRESS
I-5795 22575 750.3 MILE EAST OF SR 3153 (HANES MALL BOULEVARD) TO 0.9 MILE EAST OF NC 150 (PETERS CREEK PARKWAY) IN WINSTON-SALEM AND SR 2747 (CLEMMONSVILLE ROAD) IN WINSTON-SALEM TO GUILFORD COUNTY LINE. PAVEMENT REHABILITATION.
15.3SW
NHPIM C 22500
FORSYTHI-40
UNDER CONSTRUCTION - CONSTRUCTION COST INCLUDED IN I-5736
I-5767 100 100I-40 TO GUILFORD COUNTY LINE. PAVEMENT REHABILITATION.
8.9SWFORSYTH
I-74 / US 311
9-14 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
PLANNING / DESIGN IN PROGRESS
R-2577 136821 3313MULTLANES NORTH OF US 421 / I-40 BUSINESS IN WINSTON-SALEM TO US 220 IN STOKESDALE. WIDEN TO MULTILANES.
18.8 T R 3900 A 3900R A T U 1654 A 1654U A T 8875C A8875C A C 8875 A C 8875 A T R 6800 B T U 500 B T 24700C B C 12350 B C 12350 BT 4800R C T 25400C C
A MULTI-LANES NORTH OF US 421 / I-40 BUSINESS TO SR 1965 (BELEWS CREEK ROAD)REGB SR 1965 (BELEWS CREEK ROAD) IN FORSYTH COUNTY TO SR 2034 (ANTHONY ROAD) IN GUILFORD COUNTYREGC NORTH OF SR 2034 (ANTHONY ROAD) TO US 220
FORSYTHGUILFORD
US 158
9-15 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
GARVEE BONDS: PART EB - $75M FOR CONSTRUCTION, PAYBACK IN FY 18 THROUGH FY 32
R-2247 672838 113628WINSTON-SALEM NORTHERN BELTWAY, WESTERN SECTION, I-40 TO US 52. FOUR LANE EXPRESSWAY ON NEW LOCATION.
14.8 T 2698R A T 2372U A T 58123C A T R 8741 BT U 1654 BT 49027C B C 2580 BT R 77 CAT U 510 CAT 24187C CA C 1273 CAT R 7001 CB T U 1936 CB T 24708C CB C 3901 CB C 24708 CB C 24708 CBT 11809R D T 5178U D T 4636C D C 29359 D C 29360 D C 29360 D T 3534R EA T 5685U EA T 8289C EA8289C EA1745C EA C 8289 EA C 8288 EA T R 24090 EB NHP 32175CG EBCG 6435 EB CG 6435 EB CG 6435 EB 6435CG EB6435CG EB6435CG EB CG 6435 EB CG 6435 EB CG 6435 EB CG 6435 EBS(M) C 1250 EB C 7917 EB C 7917 EB 7916C EB NHP C 650 EB C 4117 EB C 4117 EB 4116C EB T 8570C F
A WINSTON-SALEM NORTHERN BELTWAY, WESTERN SECTION, US 158 TO SOUTH OF I-40B WINSTON-SALEM NORTHERN BELTWAY, WESTERN SECTION, SOUTH OF I-40 TO SOUTH OF US 421 INTERCHANGE - DESIGN-BUILD PROJECTSWCA WINSTON-SALEM NORTHERN BELTWAY, WESTERN SECTION, INTERCHANGE WITH US 421 AND INTERCHANGE WITH SR 1140 (PEACE HAVEN ROAD) - DESIGN-BUILD PROJECTSWCB WINSTON-SALEM NORTHERN BELTWAY, WESTERN SECTION, NORTH OF US 421 INTERCHANGE TO SR 1348 (ROBINHOOD ROAD) - DESIGN-BUILD PROJECTSWCC WINSTON-SALEM NORTHERN BELTWAY, WESTERN SECTION, MUDDY CREEK. REPLACE BRIDGE NO. 221 AND BRIDGE NO. 222 - COMPLETE - WORK ACCOMPLISHED UNDER B-4507CD SR 1891 / NON-SYSTEM (PEACE HAVEN ROAD) - US 421 INTERCHANGE AND APPROACHES - DESIGN-BUILD PROJECT; IN PROGRESS - LET WITH R-2247ECSWD WINSTON-SALEM NORTHERN BELTWAY, WESTERN SECTION, NORTH OF SR 1348 (MEADOWLARK DRIVE-ROBINHOOD ROAD) TO NC 67 - DESIGN-BUILD PROJECTSWEA WINSTON-SALEM NORTHERN BELTWAY, WESTERN SECTION, NC 67 TO SOUTH OF US 52 - DESIGN-BUILD PROJECTREGEB WINSTON-SALEM NORTHERN BELTWAY, WESTERN SECTION, INTERCHANGE AT US 52 - PLANNING / DESIGN IN PROGRESSSWEC NC 65 INTERCHANGE. RECONSTRUCT INTERCHANGE. - DESIGN-BUILD PROJECT; IN PROGRESS - LET WITH R-2247CDSWF WINSTON-SALEM NORTHERN BELTWAY, WESTERN SECTION, INTELLIGENT TRANSPORTATION SYSTEMS DEPLOYMENT FOR SEGMENTS BA, BB, CA, CB, D, EA AND EB
FORSYTH
NEW ROUTE(FUTURE NC 452)
UNDER CONSTRUCTION
R-5789 350 350DIVISION 9 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVDAVIDSONDAVIEFORSYTHROWANSTOKES
VARIOUS
9-16 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
COORDINATE WITH I-5988
U-2826 513307SOUTH OF SR 2747 (CLEMMONSVILLE ROAD) TO FUTURE I-74 (WINSTON-SALEM NORTHERN BELTWAY). ADD LANES.
13
SW
NHP R 29248 R 29248 R 29248NHP U 3510 U 3510 U 3509NHP 415034C
FORSYTH
US 52
U-6076 31961SR 1630 (BALTIMORE ROAD) IN DAVIE COUNTY TO SR 1103 (LEWISVILLE-CLEMMONS ROAD) IN CLEMMONS. WIDEN TO 3-LANE SECTION.
5.1
REG
T U 500 T R 1359 T 30102C
DAVIEFORSYTH
US 158
U-2827 160587 126354I-40 TO WEST OF US 158 IN WINSTON-SALEM. PAVEMENT REHABILITATION, REPLACE BRIDGES 330178, 330269, 330278, 330286, 330288 330291, 330293, 330305, 330312 330313, 330336 AND VARIOUS SAFETY IMPROVEMENTS.
8 NHP C 34233 B
A WEST OF OLD VINEYARD ROAD TO EAST OF US 158 (STRATFORD ROAD) - COMPLETEB WEST OF FOURTH STREET TO EAST OF CHURCH STREET - RIGHT OF WAY AND CONSTRUCTION IN PROGRESS - DESIGN-BUILD PROJECTREGC WEST OF US 311 (MARTIN LUTHER KING, JR. DRIVE) TO WEST OF US 158 - COMPLETE
FORSYTH
US 158 / US 421 /NC 150 /BUSINESS 40
PLANNING / DESIGN IN PROGRESS BY CITY OF WINSTON-SALEM
U-5539A 3010 120US 158 / US 421 / NC 150 / BUSINESS 40 TO US 52 / NC 8 IN WINSTON-SALEM. STREETSCAPE IMPROVEMENTS.
1
DIV
STBGDA R 120 L R 30 STBGDA C 2192 L C 548
FORSYTH
US 311; SR 4394(MARTIN LUTHERKING, JR.BOULEVARD)
U-6074 106020SR 1122 (JONESTOWN ROAD) IN WINSTON-SALEM. UPGRADE INTERCHANGE.
REG
T R 14250 R 14250 T U 1710 U 1710 T 37050C C 18525 C 18525
FORSYTH
US 421
COORDINATE WITH U-6059
U-6068 110927FUTURE I-74 IN KERNERSVILLE TO I-40 IN GUILFORD COUNTY. WIDEN TO 6 LANES.
6.7
SW
T R 14246 T U 1710 T 71228C C 23743
FORSYTHGUILFORD
US 421(SALEM PARKWAY)
9-17 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
COORDINATE WITH U-6068
U-6059 41292SR 2662 (LINVILLE ROAD) IN WINSTON-SALEM. UPGRADE INTERCHANGE.
SW
T 5550R R 5550 T 666U U 666 T C 14430 C 14430
FORSYTH
US 421 / NC 150(SALEM PARKWAY)
PLANNING / DESIGN IN PROGRESS
U-6005 20778 500US 52 TO SR 3983 (NORTHRIDGE DRIVE) IN RURAL HALL. WIDEN TO MULTILANES.
1.2
DIV
T 3650R T 500U T 8064C C 8064
FORSYTH
NC 65(BETHANIA-RURALHALL ROAD)
PLANNING / DESIGN IN PROGRESS
U-5824 17598 1600HARLEY DRIVE TO US 158 IN WALKERTOWN. WIDEN TO MULTILANES.
1.6
DIV
T R 6955 T U 835 T 8208C
FORSYTH
NC 66(OLD HOLLOW ROAD)
PLANNING / DESIGN IN PROGRESS
U-6004 21982 750I-40 TO US 158 IN CLEMMONS. CONVERT ROADWAY TO 4-LANE MEDIAN DIVIDED FACILITY.
1.4
DIV
T 15127R T 1815U T C 4290
FORSYTH
SR 1103(LEWISVILLE-CLEMMONS ROAD)
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY TOWN OF LEWISVILLE
U-5617 1495IMPROVE ROUNDABOUTS WEST & EAST OF BRIDGE OVER US 421. WIDEN TO MULTI-LANES FROM ROUNDABOUT EAST OF BRIDGE TO WEST OF ROUNDABOUT AT SR 1001 (SHALLOWFORD ROAD) WITH SIDEWALKS ON BOTH SIDES. TOWN OF LEWISVILLE.
0.38
DIV
STBGDA PE 136 L PE 34 STBGDA R 132 L R 33 STBGDA C 928 L C 232
FORSYTH
SR 1173 (WILLIAMS ROAD)
PLANNING / DESIGN IN PROGRESS
U-2729 12526 1000MUSEUM DRIVE TO SR 4000 (UNIVERSITY PARKWAY) IN WINSTON-SALEM. WIDEN TO MULTILANES.
0.5
DIV
T R 2076 T U 500 T 8950C
FORSYTH
SR 1672(HANES MILL ROAD)
9-18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
U-6079 10408EXTENSION OF MARTIN LUTHER KING, JR. BOULEVARD, NORTHWEST BOULEVARD TO SR 1770 (NORTH MARSHALL STREET) IN WINSTON-SALEM. CONSTRUCT 2-LANE MEDIAN DIVIDED FACILITY ON NEW LOCATION.
0.6
DIV
T R 3739 T U 500 T C 6169
FORSYTH
SR 2578(MARTIN LUTHERKING, JR.BOULEVARD)
UNDER CONSTRUCTION
U-4909 95505 95505SR 2691 (WALLBURG ROAD) TO SR 2632 (SEDGE GARDEN ROAD) IN WINSTON-SALEM AND KERNERSVILLE. WIDEN TO MULTILANES.
3.6
TRN A INSTALLATION OF ITS COMPONENTS - UNDER CONSTRUCTIONTRNFORSYTH
SR 2643(UNION CROSS ROAD)
UNDER CONSTRUCTION
U-2707 17678 17678SR 2999 (HAMPTON ROAD) TO US 158 IN CLEMMONS. CONSTRUCT TWO-LANE SHOULDER SECTION ON NEW LOCATION AND REPLACE BRIDGE 330109 OVER NORFOLK SOUTHERN RAILROAD.
2.3DIVFORSYTH
SR 3000 (IDOLS ROAD
U-6077 24910SR 2632 (SEDGE GARDEN ROAD) IN WINSTON-SALEM TO HARMON CREEK ROAD IN KERNERSVILLE. WIDEN TO MULTILANES.
1.9
DIV
T R 5830 T U 700 T C 9190 C 9190
FORSYTH
SR 4315(KERNERSVILLEROAD)
U-6063 19463PETERS CREEK PARKWAY TO 4TH STREET IN WINSTON-SALEM. CONSTRUCT ROADWAY ON NEW LOCATION.
0.3
DIV
T R 7740 R 7740 T U 929 U 929 T C 2125
FORSYTH
NEW ROUTE
DESIGN-BUILD PROJECT - UNDER CONSTRUCTION
U-2925 93832 93832SALEM CREEK CONNECTOR, SR 4326 (RAMS DRIVE) TO SR 4325 (MARTIN LUTHER KING, JR. DRIVE) IN WINSTON-SALEM. MULTILANE FACILITY ON NEW LOCATION.
1TRNFORSYTH
NEW ROUTE
PLANNING / DESIGN IN PROGRESS
U-5899 5055 750FORUM PARKWAY CONNECTOR, SR 3955 (FORUM PARKWAY) TO NC 66 (UNIVERSITY PARKWAY) IN RURAL HALL. CONSTRUCT 2-LANE ROADWAY ON NEW LOCATION.DIV
T R 994 T U 119 T 3192C
FORSYTH
NEW ROUTE
9-19 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
ECONOMIC DEVELOPMENT PROJECT - UNDER CONSTRUCTION - INCLUDES $1 MILLION IN LOCAL PARTICIPATION
U-5551 3900 3900EAST OF SR 1101 (HARPER ROAD) TO SR 1103 (LEWISVILLE-CLEMMONS ROAD) IN CLEMMONS. CONSTRUCT 3-LANE FACILITY ON NEW LOCATION.
0.6DIVFORSYTH
NEW ROUTE
PLANNING / DESIGN BY TOWN OF LEWISVILLE - IN PROGRESS
U-5536 14797 596PROPOSED GREAT WAGON ROAD FROM SHALLOWFORD ROAD (SR 1001) TO LEWISVILLE-VIENNA ROAD (SR 1308) IN LEWISVILLE. MULTILANE FACILITY ON NEW LOCATION WITH BICYCLE AND PEDESTRIAN ACCOMMODATIONS.
1.1
DIV
STBG R 4372 L R 1093 STBG U 524 L U 132 STBG 6464C L 1616C
FORSYTH
NEW ROUTE
RIGHT OF WAY IN PROGRESS
U-4734 20186 6686MACY GROVE ROAD EXTENSION, SR 1005 (EAST MOUNTAIN STREET) TO NC 150 (NORTH MAIN STREET) IN KERNERSVILLE. FOUR-LANE DIVIDED FACILITY ON NEW LOCATION.
1.5DIV
T C 6750 C 6750
FORSYTHNEW ROUTE
PLANNING / DESIGN IN PROGRESS
U-6003 14496 500SR 1969 (PINEY GROVE ROAD) TO NC 150 (NORTH MAIN STREET) IN KERNERSVILLE. CONSTRUCT TWO-LANE DIVIDED FACILITY WITH BICYCLE / PEDESTRIAN ACCOMMODATIONS.
1
DIV
T 972R T 500U T 12524C
FORSYTH
NEW ROUTE
FORMERLY U-9999D - IN PROGRESS
U-4951 8250 5250WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION PLANNING (PL) SUPPLEMENT.DIV
STBGDA PL 600 PL 600 PL 600 600PL L PL 150 PL 150 PL 150 150PL
DAVIDSONDAVIEFORSYTHSTOKES
VARIOUS
U-5022 39612WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION (WSUAMPO) STPDA FUNDS - RESERVED FOR FUTURE PROGRAMMING.
DIV
STBGDA C 2504 C 192 5304C5304C5092C C 5304 C 5304 C 5304 C 5304
DAVIDSONDAVIEFORSYTHSTOKES
VARIOUS
9-20 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY OTHERS - IN PROGRESS
U-4742 10956 5956INTERSECTION IMPROVEMENT PROJECTS IN THE WINSTON-SALEM URBAN AREAMETROPOLITAN PLANNING ORGANIZATION (WSUAMPO) AREA.
DIV
STBGDA PE 100 PE 100 PE 100 100PE L PE 25 PE 25 PE 25 25PE STBGDA R 200 R 200 R 200 200R L R 50 R 50 R 50 50R STBGDA C 700 C 700 C 700 700C L C 175 C 175 C 175 175C
DAVIDSONDAVIEFORSYTHSTOKES
VARIOUS
U-4918 16239 16239US 52 / US 421 / I-40 BUSINESS VICINITY AT WAKE FOREST INNOVATION QUARTER (FORMERLY PIEDMONT TRIAD RESEARCH PARK) IN WINSTON-SALEM. TRANSPORTATION IMPROVEMENTS.
TRN A STADIUM DRIVE TO THIRD STREET - UNDER CONSTRUCTION BY OTHERS - ECONOMIC DEVELOPMENT PROGRAM PROJECTB CONSTRUCT MULTIUSE TRAIL FROM THIRD STREET TO RAMS DRIVE; CONSTRUCT PEDESTRIAN AMENITIES AND PROVIDE LANDSCAPING ON FOGLE STREET AND EXTEND ROAWAY FROM
EXISTING TERMINUS TO RESEARCH PARKWAY; CONSTRUCT CENTRAL POND GREENWAY; CONSTRUCT PATTERSON ALLEY SIDEWALK. - UNDER CONSTRUCTIONTRN
FORSYTHVARIOUS
9-21 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
GARVEE BONDS: PART AA, $30 M FOR CONST, PART AB $90 M FOR CONST, PART C $6.5 M FOR ROW, PART D $48 M FOR CONST, PART E $30 M FOR CONST, PART F $24 M FOR CONST; PAYBACK = 15 YEARS / PART B $96 M FOR CONST; PAYBACK = 12 YEARS
U-2579 1067024 263826WINSTON-SALEM NORTHERN BELTWAY, EASTERN SECTION, I-74 / US 311 TO US 52. MULTILANE FREEWAY ON NEW LOCATION.
17.1 T R 4885 AA T U 700 AA NHP 34320CG AA CG 3432 AA 3432CG AA3432CG AA3432CG AA CG 3432 AA CG 3432 AA CG 3432 AA CG 3432 AAS(M) C 2500 AA 2500C AA2500C AA2500C AA NHP C 5925 AA 5925C AA5925C AA5925C AA T R 27900 AB R 27900 AB T U 1400 AB U 1400 AB NHP 54054CG AB CG 7722 AB 7722CG AB7722CG AB7722CG AB CG 7722 AB CG 7722 AB CG 7722 AB CG 7722 ABS(M) C 7500 AB 7500C AB7500C AB7500C AB NHP C 7250 AB 7250C AB7250C AB7250C AB NHP CG 9853 B CG 9853 B CG 9853 B 9853CG B9853CG B9853CG B CG 9853 B CG 9853 B CG 9853 B S(M) C 8011 B NHP 1674RG CRG 558 C RG 558 C RG 558 C 558RG C558RG C558RG C RG 558 C RG 558 C RG 558 C RG 558 CNHP C 15375 C C 15375 C C 15375 C 15375C C T R 8834 D R 8833 D R 8833 D T U 400 D NHP 20590CG DCG 4118 D CG 4118 D CG 4118 D 4118CG D4118CG D4118CG D CG 4118 D CG 4118 D CG 4118 D CG 4118 DS(M) C 4000 D C 4000 D C 4000 D 4000C D NHP C 3600 D C 3600 D C 3600 D 3600C D T R 11184 E R 11183 E R 11183 E T U 360 E NHP 12870CG ECG 2574 E CG 2574 E CG 2574 E 2574CG E2574CG E2574CG E CG 2574 E CG 2574 E CG 2574 E CG 2574 ES(M) C 2500 E C 2500 E C 2500 E 2500C E NHP C 2475 E C 2475 E C 2475 E 2475C E T R 15084 F R 15083 F R 15083 F T U 440 F NHP 10295CG FCG 2059 F CG 2059 F CG 2059 F 2059CG F2059CG F2059CG F CG 2059 F CG 2059 F CG 2059 F CG 2059 FS(M) C 2000 F C 2000 F C 2000 F 2000C F NHP C 1800 F C 1800 F C 1800 F 1800C F
AA WINSTON-SALEM NORTHERN BELTWAY, EASTERN SECTION, I-74 / US 311 TO I-40 - PLANNING / DESIGN IN PROGRESSREGAB WINSTON-SALEM NORTHERN BELTWAY, EASTERN SECTION, I-40 TO US 421 / NC 150 / BUSINESS 40 - PLANNING / DESIGN IN PROGRESSREGB WINSTON-SALEM NORTHERN BELTWAY, EASTERN SECTION, US 421 / NC 150 / BUSINESS 40 TO US 158 - UNDER CONSTRUCTIONTRNC WINSTON-SALEM NORTHERN BELTWAY, EASTERN SECTION, US 158 TO US 311 - RIGHT OF WAY IN PROGRESSREGD WINSTON-SALEM NORTHERN BELTWAY, EASTERN SECTION, US 311 TO SR 2211 (BAUX MOUNTAIN ROAD) - PLANNING / DESIGN IN PROGRESS - DESIGN-BUILD PROJECTSWE WINSTON-SALEM NORTHERN BELTWAY, EASTERN SECTION, SR 2211 (BAUX MOUNTAIN ROAD) TO NC 8 - PLANNING / DESIGN IN PROGRESS - DESIGN-BUILD PROJECTSWF WINSTON-SALEM NORTHERN BELTWAY, EASTERN SECTION, NC 8 TO EAST OF US 52 - PLANNING / DESIGN IN PROGRESS - DESIGN-BUILD PROJECTSWG WINSTON-SALEM NORTHERN BELTWAY, EASTERN SECTION, BRIDGE NO. 366 OVER US 421 / NC 150 / BUSINESS 40 - PROJECT COMPLETE
FORSYTH
FUTURE I-74
9-22 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
PLANNING / DESIGN IN PROGRESS
U-5760 27344 2700US 421 / BUSINESS 40 TO NC 66 (WEST MOUNTAIN STREET) IN KERNERSVILLE. WIDEN BIG MILL FARM ROAD AND SR 2649 (HOPKINS ROAD) AND CONSTRUCT INTERCHANGE AT US 421 / NC 150 / BUSINESS 40.
1.8
DIV
T R 4316 T U 518 T 19810C
FORSYTH
KERNERSVILLESOUTHERN LOOP(PHASE I)
BRIDGE PROJECTSB-5950 4539REPLACE BRIDGE 330007 OVER SALEM
CREEK IN WINSTON-SALEM.
REG
T R 216 T 2161C C 2162
FORSYTH
NC 67 (WESTBOUND)(SILAS CREEKPARKWAY)
B-5948 2859REPLACE BRIDGE 330211 OVER NORFOLK SOUTHERN RAILROAD IN WINSTON-SALEM.
DIV
STPOFF R 136 STPOFF C 2723
FORSYTH
SR 2377(OLD GREENSBOROROAD NE)
IN PROGRESS - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5109 20925 20925DIVISION 9 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVDAVIDSON
DAVIEFORSYTHROWANSTOKES
VARIOUS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF WINSTON-SALEM - MUNICIPAL BRIDGE
B-2882 577REPLACE BRIDGE 330387 OVER PETERS CREEK IN WINSTON-SALEM.
DIV
STPOFF R 105 L R 10 STPOFF C 420 L C 42
FORSYTH
GLADE STREET
UNDER CONSTRUCTION BY CITY OF WINSTON-SALEM - MUNICIPAL BRIDGE
B-5004 3395 3395REPLACE BRIDGE 330086 OVER SALEM CREEK AND BRIDGE 330087 OVER BRUSHY FORK CREEK IN WINSTON-SALEM.TRNFORSYTH
REYNOLDS PARKROAD
9-23 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BRIDGE PROJECTS
PLANNING / DESIGN IN PROGRESS
B-5770 4683 150REPLACE BRIDGE 330243 OVER NC 150 IN WINSTON-SALEM.
DIV
STPOFF R 216 STPOFF C 2159 2158C
FORSYTH
SALISBURY RIDGEROAD
PLANNING / DESIGN IN PROGRESS BY CITY OF WINSTON-SALEM - MUNICIPAL BRIDGE
B-5007 1374 604REPLACE BRIDGE 330296 OVER NORFOLK SOUTHERN RAILWAY IN WINSTON-SALEM.
DIV
STPOFF R 56 L R 14 STPOFF 560C L 140C
FORSYTH
WEST FIRST STREET
MITIGATION PROJECTS
IN PROGRESS
EE-4909 17551 17551ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 9 PROJECT MITIGATION.DAVIDSON
DAVIEFORSYTHROWANSTOKES
VARIOUS
HIGHWAY SAFETY PROJECTS
UNDER CONSTRUCTION
SF-4909F 29 29EAST OF SR 3652 (CRESTVIEW ROAD) AND WEST OF SR 1175 (HAUSER ROAD). INSTALL GUARDRAIL AT TWO CULVERTS.FORSYTH
SR 1173(WILLIAMS ROAD)
UNDER CONSTRUCTION
W-5304 2090 2090SR 2693 (SAWMILL ROAD) AND SR 4203 (REID ROAD). IMPROVE INTERSECTIONS.
FORSYTH
SR 2692(GUMTREE ROAD)
UNDER CONSTRUCTION
W-5510 7034 7034SR 4315 (SOUTH MAIN STREET), BUSINESS 40 / US 421 / NC 150 TO NORTH OF SR 4278 (SOUTH CHERRY STREET), AND SR 2648 (OLD WINSTON ROAD), WEST OF SOUTH CHERRY STREET TO SOUTH MAIN STREET IN KERNERSVILLE. SAFETY IMPROVEMENTS, INCLUDING RAISED MEDIAN, TURN LANES, ADDITIONAL LANE, ROUNDABOUT, AND INTERSECTION RELOCATION.
0.7
DIVFORSYTH
SR 4315 (SOUTHMAIN STREET);SR 2648 (OLDWINSTON ROAD)
9-24 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)HIGHWAY SAFETY PROJECTS
W-5709 895 195SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 9.
HSIP R 30 DIV HSIP C 180 DIV HSIP R 30 RE HSIP C 180 RE HSIP R 40 SW HSIP C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
DAVIDSONDAVIEFORSYTHROWANSTOKES
VARIOUS
IN PROGRESS
W-5209 5068 5068DIVISION 9 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.DAVIDSON
DAVIEFORSYTHROWANSTOKES
VARIOUS
CONGESTION MITIGATION PROJECTSC-5620 4908PROJECTS TO IMPROVE CONGESTION AND
AIR QUALITY IN THE WINSTON-SALEM URBAN AREA MPO.
EX
CMAQ PE 194 PE 198 L PE 49 PE 50 CMAQ R 194 R 198 L R 49 R 50 CMAQ C 1167 C 1188 L C 292 C 297 CMAQ O 194 O 198 L O 49 O 50 CMAQ I 194 I 198 L I 49 I 50
DAVIDSONDAVIEFORSYTH
VARIOUS
9-25 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)CONGESTION MITIGATION PROJECTS
C-5609 3255PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE HIGH POINT MPO.
EX
CMAQ PE 129 PE 131 L PE 32 PE 33 CMAQ R 129 R 131 L R 32 R 33 CMAQ C 775 C 789 L C 194 C 197 CMAQ O 129 O 131 L O 32 O 33 CMAQ I 129 I 131 L I 32 I 33
DAVIDSONFORSYTHGUILFORD
VARIOUS
IN PROGRESS BY PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION
C-4936 714 714PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION (PART). IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM.
EXCASWELLDAVIDSONFORSYTHGUILFORDMONTGOMERYRANDOLPHROCKINGHAM
VARIOUS
INTERSTATE PROJECTS
CONSTRUCTION INCLUDED WITH I-5741
I-5505 300 300US 52 (INNES STREET) AND US 601 (JAKE ALEXANDER BOULEVARD) INTERCHANGES. STABILIZE SLOPES, REPLACE EMERGENCY LANE / SHOULDER , AND RESEAL JOINTS.
ROWANI-85
PROJECT COMPLETE - GARVEE BOND FUNDING $3.4 MILLION; PAYBACK FY 2007 - FY 2018
I-4718 7595 7264CABARRUS COUNTY LINE TO NC 152. REPAIR PAVEMENT AND OVERLAY.
5TRN
NHP CG 331
ROWANI-85
INCLUDED IN I-3802B - DESIGN-BUILD PROJECT
I-3804 SR 1221 (OLD BEATTY FORD ROAD) NEAR LANDIS. CONVERT GRADE SEPARATION TO INTERCHANGE.DIVROWAN
I-85
9-26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)INTERSTATE PROJECTS
PART B INCLUDES B-5365 AND I-3610
I-3802 416189 414289NC 73 IN CABARRUS COUNTY (EXIT 55) TO US 29 / US 601 CONNECTOR (EXIT 68) IN ROWAN COUNTY. WIDEN TO EIGHT LANES.
13.6 CMAQ C 1900 AA
A NC 73 IN CABARRUS COUNTY (EXIT 55) TO SR 2180 (LANE STREET) IN CABARRUS COUNTY. - UNDER CONSTRUCTIONTRNAA ITS FOR I-3802 ATRNB SR 2180 (LANE STREET) IN CABARRUS COUNTY TO US 29 / US 601 CONNECTOR IN ROWAN COUNTY - UNDER CONSTRUCTION - DESIGN-BUILD PROJECTSW
CABARRUSROWAN
I-85
PLANNING / DESIGN IN PROGRESS
I-5858 15218 75US 29 / US 601 IN CHINA GROVE TO US 601 (JAKE ALEXANDER BOULEVARD) IN SALISBURY AND FROM SOUTH OF US 52 IN SALISBURY TO NORTH OF SR 2120 (LONG FERRY ROAD) IN SPENCER. PAVEMENT REHABILITATION.
11.2SW
NHPIM C 15143
ROWANI-85
INCLUDES B-3833; GARVEE BOND FUNDING: $14.3 MILLION FOR RIGHT OF WAY, SECTIONS AC & AD, PAYBACK FY 2009-2021; $111.7 MILLION FOR CONSTRUCTION, SECTIONS AC, PAYBACK FY 2010-2021; TIGER AWARD / INTERSTATE MAINTENANCE DISCRETIONARY FUNDING $11.7 MILLION
I-2304 302258 259195NORTH OF SR 2120 (LONG FERRY ROAD) IN ROWAN COUNTY TO US 29 / US 52 / US 70 / BUSINESS 85 IN DAVIDSON COUNTY. ADDITIONAL LANES AND YADKIN RIVER BRIDGE RECONSTRUCTION. (PROJECT INCLUDES B-3833).
6.8
TRN
NHP RG 505 AC RG 495 AC RG 533 AC 533RG AC NHP CG 16198 AC CG 14672 AC CG 4110 AC 4110CG AC NHP RG 466 AD RG 457 AD RG 492 AD 492RG AD
AC NORTH OF SR 2120 (LONG FERRY ROAD) IN ROWAN COUNTY TO NORTH OF NC 150 IN DAVIDSON COUNTY, INCLUDING YADKIN RIVER BRIDGE - COMPLETEEXAD NORTH OF NC 150 TO US 29-70-52/BUSINESS 85 IN DAVIDSON COUNTY - COMPLETETRNAE NORTH CAROLINA RAILROAD MP 327.4 - CURVE REALIGNMENT - COMPLETEAF IMPLEMENTATION OF INTELLIGENT TRANSPORTATION SYSTEM (ITS) - COMPLETETRN
DAVIDSONROWAN
I-85
INCLUDED IN I-3802 - UNDER CONSTRUCTION
I-3610 WEST OF US 29 / US 601 TO EAST OF I-85 IN CHINA GROVE. REVISE INTERCHANGES WITH US 29 / US 601 AND WITH I-85, AND IMPROVE CORRIDOR.
ROWANNC 152
RURAL PROJECTSR-5860 42314PROPOSED MISENHEIMER BYPASS TO
PROPOSED ROCKWELL BYPASS. WIDEN TO MULTILANES.
4.6
DIV
T R 4989 T U 599 T 24484C C 12242
ROWAN
US 52
UNDER CONSTRUCTION
R-5789 350 350DIVISION 9 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVDAVIDSONDAVIEFORSYTHROWANSTOKES
VARIOUS
9-27 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
U-6075 78867GRANITE QUARRY BYPASS. CONSTRUCT MULTILANE FACILITY ON NEW LOCATION.
4.6
REG
T R 12962 T U 1555 T 48262C C 16088
ROWAN
US 52
PLANNING / DESIGN IN PROGRESS
U-5900 58639 750SR 1514 (AIRPORT ROAD) TO WEST OF GRANT'S CREEK IN SALISBURY. WIDEN TO MULTILANES.
REG
T R 13832 R 13832 T U 1660 U 1660 T 13452C C 13453
ROWAN
NC 150
PLANNING / DESIGN IN PROGRESS
U-5738 12614 1100US 601 (JAKE ALEXANDER BOULEVARD) TO SR 2667 (SUMMIT PARK DRIVE) IN SALISBURY. WIDEN TO MULTILANES.
1.3
DIV
T R 814 T U 98 T C 10602
ROWAN
SR 2528(JULIAN ROAD)
COORDINATE WITH EB-5921
U-6062 5960SR 2000 (JACKSON PARK ROAD) / NORTH LOOP ROAD IN KANNAPOLIS TO SR 1211 (KIMBALL ROAD) IN CHINA GROVE. UPGRADE ROADWAY INCORPORATING BICYCLE LANES AND SIDEWALKS.
4.3
DIV
T R 100 T U 100 T C 5760
CABARRUSROWAN
SR 2739(NORTH MAINSTREET / SOUTHMAIN STREET)
PLANNING / DESIGN IN PROGRESS - FUNDING FOR PART B REFLECTS REIMBURSEMENT TO CITY OF SALISBURY
U-5820 6175 3175SR 2576 (BENDIX DRIVE) TO US 52 (EAST INNES STREET) AT NEWSOME ROAD IN SALISBURY. CONSTRUCT A NEW MULTILANE ROADWAY.
0.6 T C 1900 A T C 1100 B
A SR 2576 (BENDIX DRIVE) TO SR 1006 (FAITH ROAD) IN SALISBURY. - RIGHT OF WAY IN PROGRESSDIVB SR 1006 (FAITH ROAD) TO US 52 (EAST INNES STREET) IN SALISBURY.DIV
ROWAN
NEW ROUTE
RIGHT OF WAY IN PROGRESS
U-5608 7725 4525SR 1211 (KIMBALL ROAD) EXTENSION, NORTH CHAPEL STREET TO SR 1221 (BOSTIAN ROAD) IN LANDIS. CONSTRUCT TWO-LANE CONNECTOR ON NEW LOCATION.
0.6
DIV
STBGDA C 2560 S(M) C 640
ROWAN
NEW ROUTE
9-28 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
PLANNING / DESIGN IN PROGRESS
U-5901 34425 1000AIRPORT PARKWAY, SR 1710 (HARRISON ROAD) NEAR US 70 / US 601 (JAKE ALEXANDER BOULEVARD) TO SR 2539 (PEACH ORCHARD ROAD) AT US 29 IN SALISBURY. CONSTRUCT 2-LANE ROADWAY ON MULTILANE RIGHT OF WAY.
DIV
T 2880R T 500U T C 10015 C 10015 C 10015
ROWAN
NEW ROUTE
U-5614 23200STBG-DA IN THE CABARRUS-ROWAN METROPOLITAN PLANNING ORGANIZATION (MPO) AREA.DIV
STBGDA 2800C2800C1736C C 2800 C 2800 C 2800 C 2800L 700C700C464C C 700 C 700 C 700 C 700
CABARRUSROWAN
VARIOUS
BRIDGE PROJECTS
INCLUDED IN I-3802
B-5365 150 150REPLACE BRIDGE 790021 AND BRIDGE 790034 OVER NORFOLK SOUTHERN RAILROAD AND US 29 IN CHINA GROVE.ROWAN
US 29;NC 152
PLANNING / DESIGN IN PROGRESS
B-4626 6898 133REPLACE BRIDGE 790003 AND APPLY DECK PRESERVATION TREATEMENT TO BRIDGE 790008 OVER YADKIN RIVER AND WINSTON-SALEM SOUTHBOUND RAILROAD.SW
NHPB R 300 NHPB U 300 NHPB C 3083 3082C
ROWAN
NC 8 / NC 49
UNDER CONSTRUCTION
B-5778 3570 3570REPLACE BRIDGE 790061 OVER FOURTH CREEK.HFROWAN
NC 801
PLANNING / DESIGN IN PROGRESS
B-5772 1725 100REPLACE BRIDGE 790066 OVER NORFOLK SOUTHERN RAILROAD.
DIV
STPOFF R 77 STPOFF 1548C
ROWAN
SR 1724 (HURLEYSCHOOL ROAD)
UNDER CONSTRUCTION
B-5160 755 755REPLACE BRIDGE 790050 OVER NAILS BRANCH.
DIVROWAN
SR 1986(MT. VERNON ROAD)
9-29 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BRIDGE PROJECTS
PLANNING / DESIGN IN PROGRESS
B-5769 727 150REPLACE BRIDGE 790200 OVER TOWN CREEK.
DIV
T C 577
ROWAN
SR 2539 (PEACHORCHARD ROAD)
IN PROGRESS - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5109 20925 20925DIVISION 9 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVDAVIDSON
DAVIEFORSYTHROWANSTOKES
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4909 17551 17551ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 9 PROJECT MITIGATION.DAVIDSON
DAVIEFORSYTHROWANSTOKES
VARIOUS
HIGHWAY SAFETY PROJECTS
UNDER CONSTRUCTION
W-5316 2930 2930SR 2342 (GOLD KNOB ROAD), SR 2319 (CRESCENT ROAD), AND SR 2382 (ANTHONY ROAD). INTERSECTION IMPROVEMENTS.SWROWAN
US 52
RIGHT OF WAY IN PROGRESS
W-5314 3123 1123NC 801 AT SR 2048 (COOL SPRINGS ROAD / WOODLEAF ROAD), SR 1951 (PARKS ROAD) AT SR 2048 (WOODLEAF ROAD) AND NC 801 AT SR 2004 (WOODLEAF BARBER ROAD / QUARRY ROAD). WIDENING, INTERSECTION REALIGNMENT, TURN LANES AND GEOMETRIC IMPROVEMENTS.
DIV
HSIP C 500 STBG C 1500
ROWAN
NC 801;SR 1951(PARKS ROAD)
UNDER CONSTRUCTION - LET WITH B-4257
W-5303 230 230SR 2380 (ODDIE ROAD). INTERSECTION IMPROVEMENTS.
ROWAN
SR 1004(STOKES FERRYROAD)
9-30 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)HIGHWAY SAFETY PROJECTS
UNDER CONSTRUCTION
W-5516 17693 17693SR 1210 (OLD BEATTY FORD ROAD) / SR1221 (BOSTIAN ROAD) TO SR 1337 (LENTZ ROAD). RELOCATE EXISTINGROAD WITH GRADE SEPARATION OVER I-85.
2.9
DIVROWAN
SR 1221(OLD BEATTY FORDROAD)
UNDER CONSTRUCTION
W-5313 18327 18327SR 2335 (LOWER STONE CHURCH ROAD) TO SR 1337 (LENTZ ROAD). WIDEN AND INSTALL RUMBLE STRIPS.
7.4
DIVROWAN
SR 1221(OLD BEATTYFORD ROAD)
W-5709 895 195SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 9.
HSIP R 30 DIV HSIP C 180 DIV HSIP R 30 RE HSIP C 180 RE HSIP R 40 SW HSIP C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
DAVIDSONDAVIEFORSYTHROWANSTOKES
VARIOUS
IN PROGRESS
W-5209 5068 5068DIVISION 9 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.DAVIDSON
DAVIEFORSYTHROWANSTOKES
VARIOUS
CONGESTION MITIGATION PROJECTS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF SALISBURY - IN PROGRESS
C-5160 1657 151CITY OF SALISBURY - CONSTRUCT BIKE LANES.
EX
CMAQ C 1205 C C 301
ROWAN
NEWSOME ROAD
9-31 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)CONGESTION MITIGATION PROJECTS
C-5603 4141PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE CABARRUS-ROWAN MPO.
EX
CMAQ PE 164 PE 167 L PE 41 PE 42 CMAQ R 164 R 167 L R 41 R 42 CMAQ C 985 C 1003 L C 246 C 251 CMAQ O 164 O 167 L O 41 O 42 CMAQ I 164 I 167 L I 41 I 42
CABARRUSROWAN
VARIOUS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY TOWN OF GRANITE QUARRY - IN PROGRESS
C-5158 50 50CONSTRUCT SIDEWALKS ON KERN STREET, SALISBURY AVENUE, CROOK STREET, OAK STREET AND BALFOUR QUARRY ROAD IN GRANITE QUARRY.
EXROWANVARIOUS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF SALISBURY
C-4908 536 536CONSTRUCT SIDEWALKS AT SELECTED LOCATIONS IN SALISBURY.EX A BRENNER AVENUE TO PARTEE STREET - PROJECT DELETED AT MPO REQUESTEX
B SPORTS COMPLEX, RYAN STREET TO CELEBRATION DRIVE AND SOUTH BOUNDARY STREET, HILLBORO STREET TO HILLS STREET - COMPLETEEXC SALISBURY HIGH SCHOOL, ON VARIOUS STREETS AROUND HIGH SCHOOL - COMPLETEEXD ARLINGTON AVENUE TO WALMART PARKING LOT - COMPLETEEXE LONG STREET TO NEWSOME ROAD - PLANNING / DESIGN IN PROGRESSEXF SR 1002 (BRINGLE FERRY ROAD) TO SR 1004 (STOKES FERRY ROAD) - PROJECT DELETED AT MPO REQUESTEXG US 601 (JAKE ALEXANDER BOULEVARD) - RIGHT OF WAY IN PROGRESSEXH "D" AVENUE TO SUNSET DRIVE - IN PROGRESSEX
ROWANVARIOUS
IN PROGRESS
C-5536 624 624MECKLENBURG COUNTY AIR QUALITY -GRADE (GRANTS TO REPLACE AGING DIESEL ENGINS). REPLACE, REPOWER OR RETROFIT AGING DIESEL VEHICLES AND EQUIPMENT.
EXCABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANUNION
CHARLOTTE
9-32 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)INTERSTATE PROJECTS
I-5887 7860SR 1102 (TRINITY CHURCH ROAD) NEAR KING. CONVERT EXISTING GRADE SEPARATION TO FULL-MOVEMENT INTERCHANGE.DIV
T 1380R T 500U T C 5980
STOKES
US 52 / FUTURE I-74
RURAL PROJECTS
PLANNING / DESIGN IN PROGRESS
R-5828 1100 200SR 1918 (FIRST STREET) IN WALNUT COVE. CONSTRUCT ROUNDABOUT.
DIV
T R 150 T U 100 T C 650
STOKES
US 311(NORTH MAINSTREET)
PLANNING / DESIGN IN PROGRESS
R-5768 6150 750NC 65 IN WALNUT COVE. UPGRADE INTERSECTION AND IMPROVE RAILROAD CROSSING.
DIV
STBG R 1800 STBG U 300 STBG C 3300
STOKES
US 311
UNDER CONSTRUCTION
R-5789 350 350DIVISION 9 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVDAVIDSONDAVIEFORSYTHROWANSTOKES
VARIOUS
URBAN PROJECTS
FORMERLY U-9999D - IN PROGRESS
U-4951 8250 5250WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION PLANNING (PL) SUPPLEMENT.DIV
STBGDA PL 600 PL 600 PL 600 600PL L PL 150 PL 150 PL 150 150PL
DAVIDSONDAVIEFORSYTHSTOKES
VARIOUS
9-33 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY OTHERS - IN PROGRESS
U-4742 10956 5956INTERSECTION IMPROVEMENT PROJECTS IN THE WINSTON-SALEM URBAN AREAMETROPOLITAN PLANNING ORGANIZATION (WSUAMPO) AREA.
DIV
STBGDA PE 100 PE 100 PE 100 100PE L PE 25 PE 25 PE 25 25PE STBGDA R 200 R 200 R 200 200R L R 50 R 50 R 50 50R STBGDA C 700 C 700 C 700 700C L C 175 C 175 C 175 175C
DAVIDSONDAVIEFORSYTHSTOKES
VARIOUS
U-5022 39612WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION (WSUAMPO) STPDA FUNDS - RESERVED FOR FUTURE PROGRAMMING.
DIV
STBGDA C 2504 C 192 5304C5304C5092C C 5304 C 5304 C 5304 C 5304
DAVIDSONDAVIEFORSYTHSTOKES
VARIOUS
BRIDGE PROJECTS
PLANNING / DESIGN IN PROGRESS
B-5784 1314 175REPLACE BRIDGE 840125 OVER NORTH DOUBLE CREEK.
DIV
T R 54 T C 1085
STOKES
SR 1484 (DANGEORGE ROAD)
PLANNING / DESIGN IN PROGRESS
B-5766 4668 100REPLACE BRIDGE 840082 OVER DAN RIVER IN DANBURY.
DIV
STPOFF 218R STPOFF 4350C
STOKES
SR 1674 (SHEPPARDMILL ROAD)
IN PROGRESS - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5109 20925 20925DIVISION 9 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVDAVIDSON
DAVIEFORSYTHROWANSTOKES
VARIOUS
9-34 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)MITIGATION PROJECTS
IN PROGRESS
EE-4909 17551 17551ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 9 PROJECT MITIGATION.DAVIDSON
DAVIEFORSYTHROWANSTOKES
VARIOUS
HIGHWAY SAFETY PROJECTSW-5709 895 195SAFETY IMPROVEMENTS AT VARIOUS
LOCATIONS IN DIVISION 9.HSIP R 30 DIV HSIP C 180 DIV HSIP R 30 RE HSIP C 180 RE HSIP R 40 SW HSIP C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
DAVIDSONDAVIEFORSYTHROWANSTOKES
VARIOUS
IN PROGRESS
W-5209 5068 5068DIVISION 9 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.DAVIDSON
DAVIEFORSYTHROWANSTOKES
VARIOUS
9-35 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)AVIATION PROJECTS
RIGHT OF WAY IN PROGRESS
AV-5749 3513 1119INSTALL RUNWAY 6 MEDIUM INTENSITY APPROACH LIGHTING SYSTEM WITH RUNWAY ALIGNMENT INDICATOR LIGHTS ACROSS I-85, INCLUDING INTERCHANGE LIGHTING.
DIV
T C 1077 1077C L C 120 120C
DAVIDSON
DAVIDSON COUNTYAIRPORT (EXX)
AV-5831 3616UPGRADE AND STRENGTHEN RUNWAY TO ACCOMMODATE LARGER PRIVATE AIRCRAFT.DIV
T C 3254 L C 362
DAVIDSON
DAVIDSON COUNTYAIRPORT (EXX)
BICYCLE AND PEDESTRIAN PROJECTS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY OTHERS - IN PROGRESS
U-4741 21861 13475BICYCLE, PEDESTRIAN, AND TRANSPORTATION ALTERNATIVES PROGRAM (TAP)-ELIGIBLE PROJECTS IN THE WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION (MPO) AREA..
DIV
STBGDA PE 70 PE 70 PE 70 70PE TAPDA PE 39 PE 39 PE 39 39PE39PE39PE PE 39 PE 39 L PE 28 PE 28 PE 28 10PE10PE28PE PE 10 PE 10 STBGDA R 140 R 140 R 140 140R TAPDA R 79 R 79 R 79 79R79R79R R 79 R 79 L R 55 R 55 R 55 20R20R55R R 20 R 20 STBGDA C 490 C 490 C 490 490C TAPDA C 276 C 276 C 276 276C276C276C C 276 C 276 C 529 C 409L C 192 C 192 C 192 69C69C192C C 69 C 69
DAVIDSONDAVIEFORSYTHSTOKES
VARIOUS
PUBLIC TRANSPORTATION PROJECTSTA-9001 200 200CAPITAL - PURCHASE OF SERVICE
HF
FEPD L S
DAVIDSON
DAVIDSON COUNTY
TA-6245 528 528CAPITALHF
FNU
DAVIDSONDAVIDSON COUNTY
FUNDS AUTHORIZED IN PROGRESS
TK-6125 2891 1637ADMINISTRATION
HF
FNU AD 168 AD 168 AD 168 168AD168AD168AD L AD 31 AD 31 AD 31 31AD31AD31AD S AD 10 AD 10 AD 10 10AD10AD10AD
DAVIDSON
DAVIDSON COUNTY
9-36 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TO-5215 180 180OPERATING FUNIDING FOR DAVIDSON COUNTY TRANSPORATION FOR SERVICE IN THE HIGH POINT URBAN AREA - THROUGH NCDOT
HF
FUZ L
DAVIDSON
DAVIDSON COUNTY
FUNDS AUTHORIZED IN PROGRESS
TQ-9024 250 250CAPITAL - PURCHASE OF SERVICE
HF
FEPD L S
DAVIDSON
DAVIDSON COUNTY
TA-5129 175 175REPLACEMENT PARATRANSIT VEHICLES
HF
FUZ L
DAVIDSONGUILFORDRANDOLPH
HIGH POINT TRANSIT SYSTEM / HI-TRAN
TA-5170 6472 5972PURCHASE REPLACEMENT BUSES
HF
CMAQ CP 400 FUZ L CP 100
DAVIDSON
HIGH POINT TRANSIT SYSTEM / HI-TRAN
FUNDS AUTHORIZED IN PROGRESS
TG-4814 3006 1632ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETC ($40K CAPITAL COST OF CONTRACTING)
HF
FUZ CP 181 CP 181 CP 181 181CP181CP181CP L CP 48 CP 48 CP 48 48CP48CP48CP
DAVIDSONGUILFORDRANDOLPH
HIGH POINT TRANSIT SYSTEM / HI-TRAN
FUNDS AUTHORIZED IN PROGRESS
TO-4790 42594 24104OPERATING ASSISTANCE
HF
FUZ O 1830 O 1202 O 1202 1202O1202O1202O L O 1830 O 1202 O 1202 1202O1202O1202O SMAP O 435 O 475 O 475 475O475O475O
DAVIDSONGUILFORDRANDOLPH
HIGH POINT TRANSIT SYSTEM / HI-TRAN
9-37 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TS-5113 220 124SAFETY & SECURITY - MIN. 1% SET ASIDE
HF
FUZ CP 14 CP 14 CP 14 14CP14CP14CP L CP 2 CP 2 CP 2 2CP2CP2CP
DAVIDSONGUILFORDRANDOLPH
HIGH POINT TRANSIT SYSTEM / HI-TRAN
TA-5126 124 124EXPANSION VAN - VANPOOL
HF
CMAQ
DAVIDSON
PIEDMONT AUTHORITY FOR REGIONAL TRANS.
TA-5197A 475BUS REPLACEMENT
HF
CMAQ CP 380 L CP 95
DAVIDSONFORSYTHGUILFORDRANDOLPH
PIEDMONT AUTHORITY FOR REGIONAL TRANS.
FUNDS AUTHORIZED IN PROGRESS
TO-5212 574 574OPERATING FUNDING
HF
CMAQ L
DAVIDSONFORSYTHGUILFORDRANDOLPH
PIEDMONT AUTHORITY FOR REGIONAL TRANS.
TO-5205 700 700OPERATING ASSISTANCE
HF
FUZ L
DAVIDSON
PIEDMONT AUTHORITY FOR REGIONAL TRANS.
9-38 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
TG-6187 3751URBANIZED FORMULA PROGRAMFUNDS MANAGED BY NCDOT FORORANGE, ALAMANCE, DAVIDSON, GUILFORD, CABARRUS, IREDELL, HOKE, CUMBERLAND, HARNETT, UNION, MECKLENBURG TRANSPORTATION SYSTEMS – CAPITAL PROGRAM
HF
FUZ CP 500 CP 550 CP 600 700CP650CP L CP 125 CP 138 CP 150 175CP163CP
ALAMANCECABARRUSCUMBERLANDDAVIDSONGUILFORDHARNETTHOKEIREDELLMECKLENBURGORANGEUNION
STATEWIDE
TQ-9009 150 150CAPITAL - PURCHASE OF SERVICE
HF
FEPD L S
DAVIDSON
THE LIFE CENTER
FUNDS AUTHORIZED IN PROGRESS
TQ-9026 160 160CAPITAL - PURHASE OF SERVICE
HF
FEPD L S
DAVIDSON
THE WORKSHOP OF DAVIDSON
TQ-9008 160 160CAPITAL - PURCHASE OF SERVICE
HF
FEPD
DAVIDSON
THE WORKSHOP OF DAVIDSON
FREIGHT RAIL PROJECTS
"O" FUNDING REFLECTS PARTICIPATION BY NORFOLK SOUTHERN CORPORATION
P-5731 11000CROSSING 722306Y (EAST 7TH AVENUE) IN LEXINGTON. CONSTRUCT GRADE SEPARATION.
DIV
T R 2000 T C 8550 O C 450
DAVIDSON
NORFOLK SOUTHERN
"O" FUNDING REFLECTS PARTICIPATION BY NORFOLK SOUTHERN CORPORATION
P-5722 2038KIMBERLY CLARK IN LEXINGTON. CONSTRUCT LEAD.
REG
T 1019C O 1019C
DAVIDSON
NORFOLK SOUTHERN
9-39 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PASSENGER RAIL PROJECTS
IN PROGRESS
P-4405 10291 10291PRIVATE CROSSING SAFETY INITIATIVE TO CLOSE OR ENHANCE PROTECTION AT RAILROAD CROSSINGS BETWEEN RALEIGH AND CHARLOTTE.
TRNALAMANCECABARRUSDAVIDSONDURHAMGUILFORDMECKLENBURGORANGEROWANWAKE
VARIOUS
P-5719 18000PIEDMONT SERVICE EXPANSION. PURCHASE 5 BI-LEVEL PASSENGER CARS.REG
T A 18000
ALAMANCECABARRUSDAVIDSONDURHAMGUILFORDMECKLENBURGORANGERANDOLPHROWANWAKE
NCRR
P-5732 30000YADKIN VALLEY STATION IN LEXINGTON. CONSTRUCT NEW STATION AND PASSENGER PLATFORMS.DIV
T R 4634 T 12683C C 12683
DAVIDSON
NORFOLK SOUTHERN
P-2918 158562 158562TRAIN 74 / 75 OPERATIONS BETWEEN CHARLOTTE AND RALEIGH, EQUIPMENT AND CAPITAL YARD MAINTENANCE FACILITY.
EX A EQUIPMENT REBUILD - 2 F59PHI LOCOMOTIVES - IN PROGRESSB PURCHASE 2 USED LOCOMOTIVES - COMPLETEC EQUIPMENT REHABILITATION - 3 LOCOMOTIVES - IN PROGRESSD EQUIPMENT REHABILITATION - 3 PASSENGER CARS - COMPLETEE PASSENGER TRAIN SECURITY SYSTEM, CCTV DATA NETWORK AND GENERATORS - IN PROGRESSF CRISP CHARLOTTE MAINTENANCE FACILITY - TRACK EXTENSION AND SHOP BUILDING - IN PROGRESSG PURCHASE 4 USED PASSENGER CARS AND REHABILITATE 7 PASSENGER CARS - IN PROGRESSH CAPITAL YARD PHASE 1 IMPROVEMENTS - EXTEND TRACKS 1 AND 2, MAJOR WORK TRACK 3 - IN PROGRESSI EQUIP 9 STATIONS AND PLATFORMS WITH ADA/FRA PIDS - IN PROGRESS
ALAMANCECABARRUSDAVIDSONDURHAMGUILFORDMECKLENBURGORANGERANDOLPHROWANWAKE
PIEDMONT CORRIDOR
9-40 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BICYCLE AND PEDESTRIAN PROJECTS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY OTHERS - IN PROGRESS
U-4741 21861 13475BICYCLE, PEDESTRIAN, AND TRANSPORTATION ALTERNATIVES PROGRAM (TAP)-ELIGIBLE PROJECTS IN THE WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION (MPO) AREA..
DIV
STBGDA PE 70 PE 70 PE 70 70PE TAPDA PE 39 PE 39 PE 39 39PE39PE39PE PE 39 PE 39 L PE 28 PE 28 PE 28 10PE10PE28PE PE 10 PE 10 STBGDA R 140 R 140 R 140 140R TAPDA R 79 R 79 R 79 79R79R79R R 79 R 79 L R 55 R 55 R 55 20R20R55R R 20 R 20 STBGDA C 490 C 490 C 490 490C TAPDA C 276 C 276 C 276 276C276C276C C 276 C 276 C 529 C 409L C 192 C 192 C 192 69C69C192C C 69 C 69
DAVIDSONDAVIEFORSYTHSTOKES
VARIOUS
PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TQ-9028 486 486CAPIATAL - PURCHASE OF SERVICE
HF
FEPD L S
COLUMBUSDAVIEMOOREROBESONSTANLY
MONARCH
TD-4920D 1551 1551VAN POOL REPLACEMENT TO SUPPORT NEW ROUTES
HF
CMAQ
DAVIERANDOLPH
PIEDMONT AUTHORITY FOR REGIONAL TRANS.
FUNDS AUTHORIZED IN PROGRESS
TA-6139 2746 2746CAPITAL
HF
FNU L S
DAVIESTOKESSURRYYADKIN
YADKIN VALLEY ECONOMIC DEVELOPMENT DISTRICT
9-41 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TK-6174 6002 3446ADMINISTRATION
HF
FNU O 341 O 341 O 341 341O341O341O FNU L O 64 O 64 O 64 64O64O64O S O 21 O 21 O 21 21O21O21O
DAVIESTOKESSURRYYADKIN
YADKIN VALLEY ECONOMIC DEVELOPMENT DISTRICT
TN-6122 12 12OPERATING
HF
FNF
DAVIESTOKESSURRYYADKIN
YADKIN VALLEY ECONOMIC DEVELOPMENT DISTRICT
FUNDS AUTHORIZED IN PROGRESS
TO-6113 534 534OPERATING ASSISTANCE
HF
FNU L
DAVIESTOKESSURRYYADKIN
YADKIN VALLEY ECONOMIC DEVELOPMENT DISTRICT
TQ-8004 44 44CAPITAL - MOBILITY MANAGEMENT
HF
FNF L S
DAVIESTOKESSURRYYADKIN
YADKIN VALLEY ECONOMIC DEVELOPMENT DISTRICT
9-42 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TQ-8013 44 44CAPITAL - MOBILITY MANAGEMENT
HF
FEPD L S
DAVIESTOKESSURRYYADKIN
YADKIN VALLEY ECONOMIC DEVELOPMENT DISTRICT
FUNDS AUTHORIZED IN PROGRESS
TQ-6927 124 124OPERATING
HF
FEPD L
DAVIESTOKESSURRYYADKIN
YADKIN VALLEY ECONOMIC DEVELOPMENT DISTRICT
TQ-6798 100 100OPERATING
HF
FEPD L
DAVIESTOKESSURRYYADKIN
YADKIN VALLEY ECONOMIC DEVELOPMENT DISTRICT
AVIATION PROJECTS
PLANNING / DESIGN IN PROGRESS BY AIRPORT
AV-5738 2081 172ACQUIRE LAND AND CLEAR TERRAIN OBSTRUCTIONS EAST OF RUNWAY 15-33 TO DRAIN AND GRADE MATERIAL IN PLACE.DIV
T C 1718 L C 191
FORSYTH
SMITH REYNOLDSAIRPORT (INT)
AV-5832 6200CONSTRUCT NEW TAXILANE.
DIV
T 5580C L 620C
FORSYTH
SMITH REYNOLDSAIRPORT (INT)
9-43 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BICYCLE AND PEDESTRIAN PROJECTS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF WINSTON-SALEM
EB-5840 2026GREEN STREET TO THE STROLLWAY IN WINSTON-SALEM. CONSTRUCT MULTIUSE PATH.
0.5
DIV
TAP PE 324 L PE 81 TAP C 1297 L C 324
FORSYTH
US 158 / US 421 /NC 150(SALEM PARKWAY)
EB-5722 495BOLTON STREET TO LOCKLAND AVENUE IN WINSTON-SALEM. CONSTRUCT SIDEWALK ON NORTH SIDE TO CONNECT EXISTING SECTIONS.
1.5
DIV
TAP PE 36 L PE 9 TAP C 360 L C 90
FORSYTH
NC 67(SILAS CREEK PARKWAY)
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF WINSTON-SALEM
EB-5920 250SR 3153 (HANES MALL BOULEVARD) TO SR 1001 (COUNTRY CLUB ROAD) IN WINSTON-SALEM. CONSTRUCT SIDEWALK.
0.6
DIV
TAP 20PE L 5PE TAP R 40 L R 10 TAP C 140 L C 35
FORSYTH
SR 1122(JONESTOWN ROAD)
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF WINSTON-SALEM
EB-5811 2640 240CONSTRUCT PEDESTRIAN BRIDGE OVER THE SALEM CREEK CONNECTOR.
DIV
TAP C 1920 L C 480
FORSYTH
NEW MULTIUSE PATH
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF WINSTON-SALEM
EB-5810 220 20BARBARA JANE AVENUE, BYERLY ROAD, AND BARRY STREET IN WINSTON-SALEM. CONSTRUCT SIDEWALKS.DIV
TAP C 160 L C 40
FORSYTH
VARIOUS
9-44 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BICYCLE AND PEDESTRIAN PROJECTS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY OTHERS - IN PROGRESS
U-4741 21861 13475BICYCLE, PEDESTRIAN, AND TRANSPORTATION ALTERNATIVES PROGRAM (TAP)-ELIGIBLE PROJECTS IN THE WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION (MPO) AREA..
DIV
STBGDA PE 70 PE 70 PE 70 70PE TAPDA PE 39 PE 39 PE 39 39PE39PE39PE PE 39 PE 39 L PE 28 PE 28 PE 28 10PE10PE28PE PE 10 PE 10 STBGDA R 140 R 140 R 140 140R TAPDA R 79 R 79 R 79 79R79R79R R 79 R 79 L R 55 R 55 R 55 20R20R55R R 20 R 20 STBGDA C 490 C 490 C 490 490C TAPDA C 276 C 276 C 276 276C276C276C C 276 C 276 C 529 C 409L C 192 C 192 C 192 69C69C192C C 69 C 69
DAVIDSONDAVIEFORSYTHSTOKES
VARIOUS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF WINSTON-SALEM
EB-4020 2198 998WATERWORKS ROAD TO REYNOLDS PARK ROAD IN WINSTON-SALEM. PAVED MULTIUSE TRAIL.
2.2
TRN
STBGDA R 20 C L R 5 C STPEB C 300 C STBGDA C 700 C L C 175 C
A WATERWORKS ROAD TO OLD GREENSBORO ROAD - COMPLETEB OLD GREENSBORO ROAD TO LOWERY STREET - COMPLETEC LOWERY STREET TO REYNOLDS PARK ROAD - PLANNING / DESIGN IN PROGRESSTRN
FORSYTH
BRUSHY FORK GREENWAY
UNDER CONSTRUCTION BY CITY OF WINSTON-SALEM
EB-5523 925 925CEDAR TRAIL TO MUDDY CREEK GREENWAY IN WINSTON-SALEM. CONSTRUCT MULTIUSE PATH AND PEDESTRIAN BRIDGE OVER MUDDY CREEK.
0.6
TRNFORSYTH
MUDDY CREEK /CEDAR TRAILCONNECTION
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF WINSTON-SALEM
EB-5812 1650 150FORSYTH TECHNICAL COMMUNITY COLLEGE TO EXISTING GREENWAY AT MARKETPLACE MALL IN WINSTON-SALEM. CONSTRUCT GREENWAY.
1.2
DIV
TAP C 1200 L C 300
FORSYTH
SALEM CREEKGREENWAY
9-45 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TI-6103 12802 7522INTERCITY BUS - GREENSBORO TO BOONE
HF
FNU O 360 O 360 O 360 360O360O360O L O 161 O 161 O 161 161O359O161O S O 359 O 359 O 359 359O161O359O
FORSYTHGUILFORDWATAUGAWILKESYADKIN
COACH AMERICA
TA-6678 70AIRPORT AREA HUB SHUTTLE SERVICE. PURCHASE ONE EXPANSION LIGHT TRANSIT VEHICLE.
REG
FEDT A 56 T A 7 L A 7
FORSYTHGUILFORD
PIEDMONT AUTHORITYFOR REGIONALTRANSPORTATION(PART)
TA-6680 80AIRPORT AREA HUB SHUTTLE SERVICE. PURCHASE ONE EXPANSION LIGHT TRANSIT VEHICLE.
REG
FEDT A 64 T A 8 L A 8
FORSYTHGUILFORD
PIEDMONT AUTHORITYFOR REGIONALTRANSPORTATION(PART)
TA-6681 466PURCHASE EXPANSION FLEET VEHICLE TO EXPAND SERVICE ON PART SURRY EXPRESS #1
REG
FEDT A 372 L A 47 T A 47
FORSYTHSURRY
PIEDMONT AUTHORITYFOR REGIONALTRANSPORTATION(PART)
TA-6682 465WINSTON-SALEM EXPRESS. PURCHASE ONE EXPANSION 40-FT BUS.
REG
FEDT A 372 T A 47 L A 46
FORSYTH
PIEDMONT AUTHORITYFOR REGIONALTRANSPORTATION(PART)
9-46 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TA-5198 465 465BUS REPLACEMENT
HF
CMAQ L
FORSYTH
PIEDMONT AUTHORITY FOR REGIONAL TRANS.
TA-5220 1000PURCHASE REPLACEMENT VEHICLES
HF
L CP 200 STPDA CP 800
FORSYTH
PIEDMONT AUTHORITY FOR REGIONAL TRANS.
TA-6522 750 750PURCHASE VANS
HF
L STPDA
FORSYTHGUILFORD
PIEDMONT AUTHORITY FOR REGIONAL TRANS.
TA-5197A 475BUS REPLACEMENT
HF
CMAQ CP 380 L CP 95
DAVIDSONFORSYTHGUILFORDRANDOLPH
PIEDMONT AUTHORITY FOR REGIONAL TRANS.
TA-4991B 845 845REPLACEMENT BUS
HF
CMAQ
FORSYTH
PIEDMONT AUTHORITY FOR REGIONAL TRANS.
TA-5220b 525REPLACEMENT VEHICLE
HF
CMAQ CP 420 L CP 105
FORSYTH
PIEDMONT AUTHORITY FOR REGIONAL TRANS.
TG-5226 1312 1312PREVENTIVE MAINTENANCE
HF
STPDA
FORSYTHGUILFORD
PIEDMONT AUTHORITY FOR REGIONAL TRANS.
9-47 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
TG-6173 375 375ROUTINE CAPITAL
HF
FUZ L
FORSYTHGUILFORD
PIEDMONT AUTHORITY FOR REGIONAL TRANS.
TG-6173B 1684 188ROUTINE CAPITAL, PASSENGER SHELTERS, PASSENGER AMENITIES, SHOP EQUIPMENT, CAPITAL COST OF CONTRACTING SPARE PARTS FOR SERVICE IN THE HIGH POINT URBAN AREA
HF
FUZ CP 150 CP 150 CP 150 150CP150CP150CP CP 150 CP 150 L CP 37 CP 37 CP 37 37CP37CP37CP CP 37 CP 37
FORSYTHGUILFORD
PIEDMONT AUTHORITY FOR REGIONAL TRANS.
FUNDS AUTHORIZED IN PROGRESS
TM-5135 800 800OPERATING ASSISTANCE
HF
JARC O 0 O 0 O 0
FORSYTH
PIEDMONT AUTHORITY FOR REGIONAL TRANS.
TM-6139 634 634OPERATING ASSISTANCE
HF
JARC L
FORSYTHGUILFORD
PIEDMONT AUTHORITY FOR REGIONAL TRANS.
FUNDS AUTHORIZED IN PROGRESS
TO-5212 574 574OPERATING FUNDING
HF
CMAQ L
DAVIDSONFORSYTHGUILFORDRANDOLPH
PIEDMONT AUTHORITY FOR REGIONAL TRANS.
TO-5134B 1800 1800OPERATING ASSISTANCE
HF
FUZ L
FORSYTHGUILFORD
PIEDMONT AUTHORITY FOR REGIONAL TRANS.
9-48 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
TO-5134C 1000 700OPERATING ASSISTANCE FOR SERVICE IN THE HIGH POINT URBAN AREA
HF
FUZ O 150 L O 150
FORSYTHGUILFORD
PIEDMONT AUTHORITY FOR REGIONAL TRANS.
FUNDS AUTHORIZED IN PROGRESS
TS-5115 39 27SAFETY & SECURITY - MIN. 1% SET ASIDE
HF
FUZ CP 2 CP 2 CP 2 2CP2CP2CP
ALAMANCEFORSYTHGUILFORD
PIEDMONT AUTHORITY FOR REGIONAL TRANS.
TQ-6170 60 60OPERATING ASSISTANCE -PURCHASE OF SERVICE
HF
FEPD L S
FORSYTH
TOWN OF KERNERSVILLE
TA-5127 4118 4118REPLACEMENT BUSES - LARGE AND SMALL
HF
CMAQ
FORSYTH
WINSTON SALEM TRANSIT
FUNDS AUTHORIZED IN PROGRESS
TA-5180 3050 1525PURCHASE OF TWELVE (12) SMALL, LOW-FLOOR, LIGHT DUTY GASOLINE ENGINE EXPANSION BUSES FOR PARATRANSIT ADA SERVICE
HF
FBUS CP 1296 L CP 229
FORSYTH
WINSTON SALEM TRANSIT
TA-5228 1200REPLACEMENT BUS
HF
FUZ CP 1000 L CP 200
FORSYTH
WINSTON SALEM TRANSIT
TA-4795A 14240 14240REPLACEMENT BUS
HF
CMAQ FBUS FUZ STPDA
FORSYTH
WINSTON SALEM TRANSIT
9-49 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TG-6180 2232 650ROUTINE CAPITAL
HF
FUZ CP 186 CP 520 L CP 746 CP 130
FORSYTH
WINSTON SALEM TRANSIT
TG-4805 11289 3817ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETCHF
FUZ CP 685 CP 685 CP 685 685CP685CP685CP CP 685 CP 685 L CP 296 CP 171 CP 171 170CP171CP171CP CP 171 CP 171 STPDA CP 500
FORSYTH
WINSTON SALEM TRANSIT
FUNDS AUTHORIZED IN PROGRESS
TG-5241 17414 9722PREVENTIVE MAINTENANCE
HF
FUZ CP 4054 CP 2100 L CP 1013 CP 525
FORSYTH
WINSTON SALEM TRANSIT
FUNDS AUTHORIZED IN PROGRESS
TG-4795A 8470 4235REPLACEMENT BUS
HF
CMAQ CP 3600 L CP 635
FORSYTH
WINSTON SALEM TRANSIT
TM-5309 1100 220FTA SECTION 5307 WINSTON-SALEM URBANIZED AREA SET ASIDE FOR JOB ACCESS REVERSE COMMUTE (JARC) PROJECTS
HF
JARC O 55 O 55 O 55 55O55O55O O 55 O 55 L O 55 O 55 O 55 55O55O55O O 55 O 55
FORSYTH
WINSTON SALEM TRANSIT
FUNDS AUTHORIZED IN PROGRESS
TO-5126 42631 19662OPERATING ASSISTANCE
HF
FUZ O 1406 O 906 O 906 906O906O906O O 906 O 906 L O 1406 O 906 O 906 906O906O906O O 906 O 906 SMAP O 1131 O 906 O 906 906O906O906O O 906 O 906
FORSYTH
WINSTON SALEM TRANSIT
FUNDS AUTHORIZED IN PROGRESS
TP-5105 1581 721PLANNING ASSISTANCE - 5303
HF
FMPL CP 111 CP 83 CP 83 83CP83CP83CP CP 83 CP 83 L CP 14 CP 10 CP 10 10CP10CP10CP CP 10 CP 10 S CP 14 CP 10 CP 10 10CP10CP10CP CP 10 CP 10
FORSYTH
WINSTON SALEM TRANSIT
FUNDS AUTHORIZED IN PROGRESS
TQ-7001 136 68ENHANCED MOBILITY OF SENIORS AND INDIVIDUALS WITH DISABILITES (SECTION 5310) ADMINISTRATIVEHF
FEPD AD 34 AD 34
FORSYTH
WINSTON SALEM TRANSIT
9-50 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
TQ-6782 3910 714FTA SECTION 5310 WINSTON-SALEM ALLOCATION SET ASIDE FOR COMPET GRANT TO ELIGIBLE AGENCIES TO ASSIST IN MEETING THE TRANSPORTATION NEEDS OF LOW INCOME, DISABLED, AND ELDERLY POPULATIONS
HF
FEPD O 336 O 303 O 336 303O336O303O O 336 O 303 L O 84 O 76 O 84 76O84O76O O 84 O 76
FORSYTH
WINSTON SALEM TRANSIT
TS-5120 578 210SAFETY & SECURITY - MIN. 1% SET ASIDE
HF
FUZ CP 41 CP 41 CP 41 33CP33CP41CP CP 33 CP 33 L CP 10 CP 10 CP 10 8CP8CP10CP CP 8 CP 8 SMAP
FORSYTH
WINSTON SALEM TRANSIT
UNDER CONSTRUCTION BY WINSTON-SALEM TRANSIT AUTHORITY
TD-4743 16550 16550WINSTON-SALEM INTERMODAL TRANSPORTATION FACILITY, RESTORE FORMER PASSENGER RAIL STATION FOR USE AS A REGIONAL / LOCAL BUS TERMINAL AND FUTURE RAIL STATION.
DIVFORSYTH
WINSTON-SALEMTRANSIT
AVIATION PROJECTSAV-5820 400ACQUIRE RIGHT OF WAY FOR AIRCRAFT
APRON / HELIPAD.DIV
T R 360 L R 40
ROWAN
ROWAN COUNTYAIRPORT (RUQ)
BICYCLE AND PEDESTRIAN PROJECTS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF KANNAPOLIS - COORDINATE WITH U-6062
EB-5921 150012TH STREET TO 22ND STREET IN KANNAPOLIS. CONSTRUCT SIDEWALK.
1
DIV
TAP 200PE L 50PE TAP R 200 L R 50 TAP C 800 L C 200
ROWAN
SR 2739(NORTH MAINSTREET)
U-5545 2313CABARRUS ROWAN MPO TRANSPORTATION ALTERNATIVES (TA) PROGRAM.
DIV
TAPDA R 20 20R20R20R R 20 R 20 R 20 R 20L R 5 5R5R5R R 5 R 5 R 5 R 5TAPDA C 90 C 200 200C200C200C C 200 C 200 C 200 C 200L C 23 C 50 50C50C50C C 50 C 50 C 50 C 50
CABARRUSROWAN
VARIOUS
9-51 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BICYCLE AND PEDESTRIAN PROJECTS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF SALISBURY
EB-5619 875KELSEY SCOTT PARK TO CATAWBA COLLEGE. CONSTRUCT MULTIUSE PATH.
DIV
TAPDA PE 12 L PE 3 TAPDA R 68 L R 17 TAPDA C 620 L C 155
ROWAN
GRANTS CREEKGREENWAY
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY TOWN OF LANDIS
EB-5813 200LANDIS SPUR, SR 1210 (WEST RYDER AVENUE) TO WEST OF SR 1211 (KIMBALL ROAD) IN LANDIS. CONSTRUCT GREENWAY.DIV
TAP C 160 L C 40
ROWAN
GRANT'S CREEKGREENWAY
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY TOWN OF SPENCER
EB-5861 44723RD STREET TO YADKIN RIVER IN SPENCER. CONSTRUCT ALTERNATE ROUTE, INCLUDING SPUR FROM GRANTS CREEK.
3.1
DIV
TAP C 3578 L C 894
ROWAN
THIRD STREETGREENWAY
PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TQ-8012 139 139CAPITAL - MOBILITY MANAGEMENT
HF
FEPD L S
ANSONCABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANSTANLYUNION
CENTRALINA COUNCIOF GOVERNMENTS
9-52 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TQ-6924 158 158OPERATING
HF
FEPD L
ANSONCABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANSTANLYUNION
CENTRALINA COUNCIOF GOVERNMENTS
TQ-6171 490 490MOBILITY MANAGEMENT
HF
FEPD L S
ANSONCABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANSTANLYUNION
CENTRALINA COUNCIOF GOVERNMENTS
FUNDS AUTHORIZED IN PROGRESS
TA-6240 514 514CAPITAL
HF
FNU L S
ROWAN
CITY OF SALISBURY
FUNDS AUTHORIZED IN PROGRESS
TA-5181 7320 3660REPLACMENT BUSES
HF
FUZ CP 1464 CP 1464 L CP 183 CP 183 S CP 183 CP 183
ROWAN
CITY OF SALISBURY
FUNDS AUTHORIZED IN PROGRESS
TA-5182 110 110EXPANSION VEHICLE
HF
FBUS L
ROWAN
CITY OF SALISBURY
9-53 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TG-5232 3336 834PREVENTIVE MAINTENANCE - BUS, FACILITIES
HF
FUZ CP 334 CP 334 CP 334 334CP334CP334CP L CP 83 CP 83 CP 83 83CP83CP83CP
ROWAN
CITY OF SALISBURY
FUNDS AUTHORIZED IN PROGRESS
TG-6179 280 280AVL SYSTEM
HF
FBUS L
ROWAN
CITY OF SALISBURY
FUNDS AUTHORIZED IN PROGRESS
TG-5233 2240 560BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETC.HF
FUZ CP 224 CP 224 CP 224 224CP224CP224CP L CP 56 CP 56 CP 56 56CP56CP56CP
ROWAN
CITY OF SALISBURY
FUNDS AUTHORIZED IN PROGRESS
TG-5260 632 158ROUTINE CAPITAL - ADA SERVICES
HF
FUZ CP 63 CP 63 CP 63 63CP63CP63CP L CP 16 CP 16 CP 16 16CP16CP16CP
ROWAN
CITY OF SALISBURY
FUNDS AUTHORIZED IN PROGRESS
TO-5135 5280 1320OPERATING
HF
FUZ O 285 O 285 O 285 285O285O285O L O 160 O 160 O 160 160O160O160O SMAP O 215 O 215 O 215 215O215O215O
ROWAN
CITY OF SALISBURY
FUNDS AUTHORIZED IN PROGRESS
TO-5139 336 84OPERATING - FREE FARE
HF
CMAQ O 34 O 34 O 34 34O34O34O L O 8 O 8 O 8 8O8O8O
ROWAN
CITY OF SALISBURY
FUNDS AUTHORIZED IN PROGRESS
TO-5201 4475 3119OPERATING ASSISTANCE
HF
CMAQ SMAP O 226 O 226 O 226 226O226O226O
ROWAN
CITY OF SALISBURY
FUNDS AUTHORIZED IN PROGRESS
TP-5150 304 76PLANNING ASSISTANCE - 5303
HF
FMPL PL 30 PL 30 PL 30 30PL30PL30PL L PL 4 PL 4 PL 4 4PL4PL4PL S PL 4 PL 4 PL 4 4PL4PL4PL
ROWAN
CITY OF SALISBURY
9-54 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TS-5133 56 14SAFETY & SECURITY MIN. 1% SET ASIDEHF
FUZ CP 7 CP 7 CP 7 7CP7CP7CP
ROWANCITY OF SALISBURY
FUNDS AUTHORIZED IN PROGRESS
TG-5103A 7243 3493ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETC
HF
FUZ CP 500 CP 500 CP 500 500CP500CP500CP L CP 125 CP 125 CP 125 125CP125CP125CP
CABARRUSROWAN
RIDER TRANSIT / CONCORD
FUNDS AUTHORIZED IN PROGRESS
TG-5103B 3446 1252ROUTINE CAPITAL - ADA SERVICES
HF
FUZ O 250 O 250 O 300 350O300O300O L O 63 O 68 O 75 88O75O75O
CABARRUSROWAN
RIDER TRANSIT / CONCORD
FUNDS AUTHORIZED IN PROGRESS
TG-5103C 14975 5225PREVENTIVE MAINTENANCE
HF
FUZ O 1200 O 1200 O 1200 1400O1400O1400O L O 300 O 300 O 300 350O350O350O
CABARRUSROWAN
RIDER TRANSIT / CONCORD
FUNDS AUTHORIZED IN PROGRESS
TA-6214 682 682CAPITAL
HF
FNU L S
ROWAN
ROWAN COUNTY
FUNDS AUTHORIZED IN PROGRESS
TK-6160 2555 1463ADMINISTRATION
HF
FNU O 146 O 146 O 146 146O146O146O FNU L O 27 O 27 O 27 27O27O27O S O 9 O 9 O 9 9O9O9O
ROWAN
ROWAN COUNTY
TM-6132 480 480OPERATING ASSISTANCE
HF
JARC L
ROWAN
ROWAN COUNTY
9-55 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TQ-9025 250 250CAPITAL - PURCHASE OF SERVICE
HF
FEPD L S
ROWAN
ROWAN COUNTY
TQ-6169 670 670OPERATING ASSISTANCE
HF
FEPD L
ROWAN
ROWAN COUNTY
FREIGHT RAIL PROJECTS
"O" FUNDING REFLECTS PARTICIPATION BY NORFOLK SOUTHERN CORPORATION
P-5723 12200VICINITY OF 22ND STREET IN KANNAPOLIS. CONSTRUCT GRADE SEPARATION AND CLOSE CROSSINGS 724399C AND 724398V.
REG
T R 2013 O R 87 T C 9682 O C 418
ROWAN
NORFOLK SOUTHERN
"O" FUNDING REFLECTS PARTICIPATION BY NORFOLK SOUTHERN CORPORATION
P-5726 7800NS MAINLINE IN ROWAN COUNTY. CONSTRUCT TRACK IMPROVEMENTS, SECOND PLATFORM, PEDESTRIAN UNDERPASS, SITEWORK, RETAINING WALL AND SIGNAL EQUIPMENT.
REG
T R 1638 T C 5382 O C 780
ROWAN
NORFOLK SOUTHERN
PASSENGER RAIL PROJECTS
IN PROGRESS
P-4405 10291 10291PRIVATE CROSSING SAFETY INITIATIVE TO CLOSE OR ENHANCE PROTECTION AT RAILROAD CROSSINGS BETWEEN RALEIGH AND CHARLOTTE.
TRNALAMANCECABARRUSDAVIDSONDURHAMGUILFORDMECKLENBURGORANGEROWANWAKE
VARIOUS
9-56 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PASSENGER RAIL PROJECTS
P-5719 18000PIEDMONT SERVICE EXPANSION. PURCHASE 5 BI-LEVEL PASSENGER CARS.REG
T A 18000
ALAMANCECABARRUSDAVIDSONDURHAMGUILFORDMECKLENBURGORANGERANDOLPHROWANWAKE
NCRR
P-5733 3000CITY OF SALISBURY. UPGRADE STATION BUILDING, EXPAND WAITING SPACE AND SURFACE PARKING.
DIV
T R 630 T C 2070 L C 300
ROWAN
NORFOLK SOUTHERN
UNDER CONSTRUCTION
U-3459 20434 20434SR 2541 (KLUMAC ROAD) IN SALISBURY. CONSTRUCT A GRADE SEPARATION.
0.4
ROWAN
NORTH CAROLINARAILROAD
UNDER CONSTRUCTION
P-5206 93893 93893RESTORE DOUBLE TRACK, REID TO NORTH KANNAPOLIS.TRNROWAN
PIEDMONT CORRIDOR
P-2918 158562 158562TRAIN 74 / 75 OPERATIONS BETWEEN CHARLOTTE AND RALEIGH, EQUIPMENT AND CAPITAL YARD MAINTENANCE FACILITY.
EX A EQUIPMENT REBUILD - 2 F59PHI LOCOMOTIVES - IN PROGRESSB PURCHASE 2 USED LOCOMOTIVES - COMPLETEC EQUIPMENT REHABILITATION - 3 LOCOMOTIVES - IN PROGRESSD EQUIPMENT REHABILITATION - 3 PASSENGER CARS - COMPLETEE PASSENGER TRAIN SECURITY SYSTEM, CCTV DATA NETWORK AND GENERATORS - IN PROGRESSF CRISP CHARLOTTE MAINTENANCE FACILITY - TRACK EXTENSION AND SHOP BUILDING - IN PROGRESSG PURCHASE 4 USED PASSENGER CARS AND REHABILITATE 7 PASSENGER CARS - IN PROGRESSH CAPITAL YARD PHASE 1 IMPROVEMENTS - EXTEND TRACKS 1 AND 2, MAJOR WORK TRACK 3 - IN PROGRESSI EQUIP 9 STATIONS AND PLATFORMS WITH ADA/FRA PIDS - IN PROGRESS
ALAMANCECABARRUSDAVIDSONDURHAMGUILFORDMECKLENBURGORANGERANDOLPHROWANWAKE
PIEDMONT CORRIDOR
9-57 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BICYCLE AND PEDESTRIAN PROJECTS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY OTHERS - IN PROGRESS
U-4741 21861 13475BICYCLE, PEDESTRIAN, AND TRANSPORTATION ALTERNATIVES PROGRAM (TAP)-ELIGIBLE PROJECTS IN THE WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION (MPO) AREA..
DIV
STBGDA PE 70 PE 70 PE 70 70PE TAPDA PE 39 PE 39 PE 39 39PE39PE39PE PE 39 PE 39 L PE 28 PE 28 PE 28 10PE10PE28PE PE 10 PE 10 STBGDA R 140 R 140 R 140 140R TAPDA R 79 R 79 R 79 79R79R79R R 79 R 79 L R 55 R 55 R 55 20R20R55R R 20 R 20 STBGDA C 490 C 490 C 490 490C TAPDA C 276 C 276 C 276 276C276C276C C 276 C 276 C 529 C 409L C 192 C 192 C 192 69C69C192C C 69 C 69
DAVIDSONDAVIEFORSYTHSTOKES
VARIOUS
PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TA-6139 2746 2746CAPITAL
HF
FNU L S
DAVIESTOKESSURRYYADKIN
YADKIN VALLEY ECONOMIC DEVELOPMENT DISTRICT
FUNDS AUTHORIZED IN PROGRESS
TK-6174 6002 3446ADMINISTRATION
HF
FNU O 341 O 341 O 341 341O341O341O FNU L O 64 O 64 O 64 64O64O64O S O 21 O 21 O 21 21O21O21O
DAVIESTOKESSURRYYADKIN
YADKIN VALLEY ECONOMIC DEVELOPMENT DISTRICT
9-58 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
TN-6122 12 12OPERATING
HF
FNF
DAVIESTOKESSURRYYADKIN
YADKIN VALLEY ECONOMIC DEVELOPMENT DISTRICT
FUNDS AUTHORIZED IN PROGRESS
TO-6113 534 534OPERATING ASSISTANCE
HF
FNU L
DAVIESTOKESSURRYYADKIN
YADKIN VALLEY ECONOMIC DEVELOPMENT DISTRICT
TQ-6798 100 100OPERATING
HF
FEPD L
DAVIESTOKESSURRYYADKIN
YADKIN VALLEY ECONOMIC DEVELOPMENT DISTRICT
FUNDS AUTHORIZED IN PROGRESS
TQ-6927 124 124OPERATING
HF
FEPD L
DAVIESTOKESSURRYYADKIN
YADKIN VALLEY ECONOMIC DEVELOPMENT DISTRICT
9-59 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 9
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
TQ-8004 44 44CAPITAL - MOBILITY MANAGEMENT
HF
FNF L S
DAVIESTOKESSURRYYADKIN
YADKIN VALLEY ECONOMIC DEVELOPMENT DISTRICT
FUNDS AUTHORIZED IN PROGRESS
TQ-8013 44 44CAPITAL - MOBILITY MANAGEMENT
HF
FEPD L S
DAVIESTOKESSURRYYADKIN
YADKIN VALLEY ECONOMIC DEVELOPMENT DISTRICT
9-60 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
UNDER CONSTRUCTION
R-5708 1300 1300INTERSECTION OF US 74 AND SR 1714 (STANBACK FERRY ROAD). CONSTRUCT INTERSECTION IMPROVEMENTS.REGANSON
US 74
R-5798 16800GRAHAM STREET TO SR 1749. CONSTRUCT MEDIAN.
2.9
SW
T R 4900 T U 600 T C 11300
ANSON
US 74 (ANDREWJACKSON HIGHWAY)
UNDER CONSTRUCTION
R-5790 745 745DIVISION 10 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVANSONCABARRUSMECKLENBURGSTANLYUNION
VARIOUS
BRIDGE PROJECTS
DP FUNDS ARE FY 15 ACCELERATED INNOVATION DEPLOYMENT (AID) DEMO FUNDS - PE WORK DONE UNDER 17BP.10.R.55
B-5935 500 500REPLACE BRIDGE 030201 OVER BIG BRANCH CREEK.
DIVANSON
SR 1600 (ROCKYMOUNT CHURCHROAD)
UNDER CONSTRUCTION
B-2506 1772 1772REPLACE BRIDGE 030008 OVER BROWN CREEK.
DIVANSON
SR 1627(PINKSTON-RIVER)
STATE MATCHING FUNDS FROM DIVISION 10 17BP FUNDS
B-5817 3333REPLACE BRIDGE 030007 OVER BROWN CREEK.
EX
FLAP PE 80 S(M) PE 20 FLAP R 24 S(M) R 6 FLAP U 32 S(M) U 8 FLAP C 2530 S(M) C 633
ANSON
SR 1634 (GRASSYISLAND ROAD)
10-3 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BRIDGE PROJECTS
UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5110 16007 16007DIVISION 10 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVANSON
CABARRUSMECKLENBURGSTANLYUNION
VARIOUS
UNDER CONSTRUCTION - PROJECT ADMINISTERED BY THE TOWN OF WADESBORO - MUNICIPAL BRIDGE
B-5009 724 724REPLACE BRIDGE 030090 OVER MOSS CREEK.
DIVANSON
WADESBORO(EAST WADE STREET)
MITIGATION PROJECTS
IN PROGRESS
EE-4910 30304 30304ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 10 PROJECT MITIGATION.ANSON
CABARRUSMECKLENBURGSTANLYUNION
VARIOUS
HIGHWAY SAFETY PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5210 11865 11865DIVISION 10 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS. DIV DIVISION 10 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN DIVISION CATEGORY.DIV
REG DIVISION 10 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN REGIONAL CATEGORY.REGSW DIVISION 10 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN STATEWIDE CATEGORY.SW
ANSONCABARRUSMECKLENBURGSTANLYUNION
VARIOUS
10-4 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)HIGHWAY SAFETY PROJECTS
W-5710 1678 278SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 10.
HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
ANSONCABARRUSMECKLENBURGSTANLYUNION
VARIOUS
INTERSTATE PROJECTS
PART B INCLUDES B-5365 AND I-3610
I-3802 416189 414289NC 73 IN CABARRUS COUNTY (EXIT 55) TO US 29 / US 601 CONNECTOR (EXIT 68) IN ROWAN COUNTY. WIDEN TO EIGHT LANES.
13.6 CMAQ C 1900 AA
A NC 73 IN CABARRUS COUNTY (EXIT 55) TO SR 2180 (LANE STREET) IN CABARRUS COUNTY. - UNDER CONSTRUCTIONTRNAA ITS FOR I-3802 ATRNB SR 2180 (LANE STREET) IN CABARRUS COUNTY TO US 29 / US 601 CONNECTOR IN ROWAN COUNTY - UNDER CONSTRUCTION - DESIGN-BUILD PROJECTSW
CABARRUSROWAN
I-85
SECTION B, GARVEE BOND FUNDING $103 MILLION; CONSTRUCTION - PAYBACK FY 2010 - FY 2021
I-3803 317995 272811US 29/NC 49 CONNECTOR, MECKLENBURG COUNTY TO NC 73 IN CABARRUS COUNTY. ADD ADDITIONAL LANES. (COORDINATE WITH U-3415).
12.8 NHP CG 11296 B CG 11296 B CG 11296 B 11296CG B
A SOUTH OF US 29/NC 49 CONNECTOR TO SR 2894 (CONCORD MILLS - BRUTON SMITH BOULEVARD) - COMPLETEB SOUTH OF SR 2894 (CONCORD MILLS - BRUTON SMITH BOULEVARD) TO NC 73 IN CABARRUS COUNTY - COMPLETETRNBA ITS FOR I-3803 B - COMPLETETRN
CABARRUSMECKLENBURG
I-85
RURAL PROJECTS
PLANNING/DESIGN IN PROGRESS.
R-5706 141750 750SR 2693 (DAVIDSON-CONCORD ROAD) TO US 29. WIDEN TO MULTI-LANES.
10.9 T R 2900 A T U 500 A T 5675C A5675C A C 5675 A C 5675 A T R 17700 B T U 2100 B T 23775C B23775C B C 23775 B C 23775 B
A SR 2693 (DAVIDSON-CONCORD ROAD) TO SR 1394 (POPLAR TENT ROAD).REGB SR 1394 (POPLAR TENT ROAD) TO US 29.REG
CABARRUSMECKLENBURG
NC 73 (DAVIDSONHIGHWAY)
10-5 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
UNDER CONSTRUCTION
R-5790 745 745DIVISION 10 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVANSONCABARRUSMECKLENBURGSTANLYUNION
VARIOUS
UNDER CONSTRUCTION
R-5778 840 840SR 1119 (WALLACE ROAD) TO PROPOSED INDUSTRIAL SITE. IMPROVE EXISTING ROAD AND EXTEND TO PROPOSED INDUSTRIAL SITE.
0.5DIVCABARRUS
BILL MCGEE ROAD
R-2246 93026 76026NC 49 TO SOUTH OF I-85. WIDEN TO FOUR LANES DIVIDED, SOME NEW LOCATION.
6.5 STBG 4400R A STBG 12600C A
A NC 49 TO SR 1304 (ROBERTA ROAD)B SR 1304 (ROBERTA ROAD) TO SR 1431 (WEDDINGTON ROAD) - UNDER CONSTRUCTIONC SR 1431 (WEDDINGTON ROAD) TO SOUTH OF I-85 - COMPLETE
CABARRUS
GEORGE LILESPARKWAY
URBAN PROJECTSU-5956 4500REALIGN UNION CEMETERY ROAD TO
INTERSECT US 29 AT ROCK HILL CHURCH ROAD.
REG
T R 1000 T U 500 T C 3000
CABARRUS
US 29
UNDER CONSTRUCTION
U-3440 43190 43190PROPOSED WEST SIDE BYPASS (U-2009) TO SR 1691 (LOOP ROAD) IN KANNAPOLIS. WIDEN TO A FOUR-LANE DIVIDED FACILITY.
2.5TRNCABARRUS
NC 3
U-5773 98450DALE EARNHARDT BOULEVARD TO US 601. WIDEN TO MULTI-LANES.
8 T 12450R A T 1500U A T C 27400 A C 27400 A T 1700R B T 500U B T C 27500 B
A DALE EARNHARDT BOULEVARD TO NC 73. WIDEN TO MULTI-LANES.REGB NC 73 TO US 601. WIDEN TO MULTI-LANES.REG
CABARRUS
NC 3 (CONCORD LAKERD/BRANCHVIEW DRIVE)
10-6 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
U-5761 1030 100INTERSECTION OF NC 3 (DALE EARNHARDT BOULEVARD) AND US 29/601 (CANNON BOULEVARD). CONSTRUCT INTERSECTION IMPROVEMENTS.REG
T R 180 T C 750
CABARRUS
NC 3 (DALE EARNHARDTBOULEVARD)
U-3415 62000SR 1445 (DERITA ROAD) TO US 29/601 BYPASS. WIDEN TO MULTI-LANES.
6.1 T 4400R A T 600U A T 16200C A T 9900R B T 1200U B T 29700C B
A SR 1445 (DERITA ROAD) TO GEORGE LILES PARKWAYDIVB GEORGE LILES PARKWAY TO US 29/601
CABARRUS
SR 1394 (POPLARTENT ROAD)
SEGMENTS A AND B LET TOGETHER
U-4910 21593 21593SR 2894 (CONCORD MILLS BOULEVARD) TO SR 1394 (POPLAR TENT ROAD) IN CONCORD. WIDEN TO MULTI-LANES.
2.6
A SR 2894 (CONCORD MILLS BOULEVARD) TO AVIATION BOULEVARD. WIDEN TO MULTI-LANES. - UNDER CONSTRUCTIONDIVB AVIATION BOULEVARD TO SR 1394 (POPLAR TENT ROAD). WIDEN TO MULTI-LANES. - UNDER CONSTRUCTIONTRN
CABARRUS
SR 1445 (DERITAROAD)
U-6032 13400I-485 TO CONCORD MILLS BOULEVARD. WIDEN TO FOUR-LANES DIVIDED.
0.9
DIV
T R 2400 T U 500 T 3500C3500C3500C
CABARRUSMECKLENBURG
SR 2464 (ODELLSCHOOL ROAD)
COORDINATE WITH EB-5921
U-6062 5960SR 2000 (JACKSON PARK ROAD) / NORTH LOOP ROAD IN KANNAPOLIS TO SR 1211 (KIMBALL ROAD) IN CHINA GROVE. UPGRADE ROADWAY INCORPORATING BICYCLE LANES AND SIDEWALKS.
4.3
DIV
T R 100 T U 100 T C 5760
CABARRUSROWAN
SR 2739(NORTH MAINSTREET / SOUTHMAIN STREET)
RIGHT OF WAY IN PROGRESS. $1,500,000 BY CITY OF CONCORD
U-5806 8500 1100INTERSECTION OF SR 2894 (CONCORD MILLS BOULEVARD) AND ENTRANCE #1 - KINGS GRANT PAVILION. CONSTRUCT 2-LANE GRADE SEPARATED DIRECTIONAL LEFT FLYOVER.
DIV
T C 5900 L C 1500
CABARRUS
SR 2894 (CONCORDMILLS BOULEVARD)
10-7 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
U-5614 23200STBG-DA IN THE CABARRUS-ROWAN METROPOLITAN PLANNING ORGANIZATION (MPO) AREA.DIV
STBGDA 2800C2800C1736C C 2800 C 2800 C 2800 C 2800L 700C700C464C C 700 C 700 C 700 C 700
CABARRUSROWAN
VARIOUS
UNDER CONSTRUCTION - FY 2012 TRANSPORTATION, COMMUNITY, AND SYSTEM PRESERVATION PROGRAM (TCSP) GRANT
U-5522 2200 2200CONCORD TRAFFIC MANAGEMENT SYSTEMTRNCABARRUS
CONCORD
U-6029 52800DERITA ROAD TO NC 73. WIDEN TO FOUR-LANES.
4.2
DIV
T 8200R T 1000U T 10900C C 10900 C 10900 C 10900
CABARRUSMECKLENBURG
POPLAR TENT ROAD
BRIDGE PROJECTSB-5808 5455 100REPLACE BRIDGE 120057 AND BRIDGE
120059 OVER IRISH BUFFALO CREEK.REG
NHPB R 255 NHPB C 2550 C 2550
CABARRUS
US 29US 601
UNDER CONSTRUCTION
B-5123 9295 9295REPLACE BRIDGE 120014 AND BRIDGE 120019 OVER ROCKY RIVER AND ACCESS ROAD.HFCABARRUS
US 29
UNDER CONSTRUCTION
B-5136 16906 16906REPLACE BRIDGE 120066 AND BRIDGE 120069 OVER SOUTHERN RAILROAD.REGCABARRUS
US 29/US 601
UNDER CONSTRUCTION
B-5548 3653 3653REPLACE BRIDGE 120103 OVER DUTCH BUFFALO CREEK.SWCABARRUS
NC 49
UNDER CONSTRUCTION
B-3421 8798 8798REPLACE BRIDGE 120266 OVER SOUTHERN RAILWAY.
DIVCABARRUS
SR 1002(CABARRUS AVENUE)
10-8 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BRIDGE PROJECTS
UNDER CONSTRUCTION
B-4972 4007 4007REPLACE BRIDGE 120227 OVER ROCKY RIVER.
DIVCABARRUS
SR 1006(MAIN STREET)
UNDER CONSTRUCTION
B-4973 2802 2802REPLACE BRIDGE 120271 OVER IRISH BUFFALO CREEK.
DIVCABARRUS
SR 1157(WILSHIRE AVENUE)
UNDER CONSTRUCTION - WORK TO BE DONE UNDER I-3802 A CONTRACT
B-5804 2274 2274REPLACE BRIDGE 120056 OVER LAKE FISHER.
HFCABARRUS
SR 2000(BRANTLEY ROAD)
RIGHT OF WAY IN PROGRESS
B-5793 470 120REPLACE BRIDGE 120201 OVER LITTLE BUFFALO CREEK.
DIV
STPOFF C 350
CABARRUS
SR 2443(CROWELL ROAD)
UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5110 16007 16007DIVISION 10 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVANSON
CABARRUSMECKLENBURGSTANLYUNION
VARIOUS
UNDER CONSTRUCTION
B-5000 2226 2226REPLACE BRIDGE 120151 OVER THREE MILE BRANCH.
DIVCABARRUS
CONCORD(BURRAGE ROAD)
10-9 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)MITIGATION PROJECTS
IN PROGRESS
EE-4910 30304 30304ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 10 PROJECT MITIGATION.ANSON
CABARRUSMECKLENBURGSTANLYUNION
VARIOUS
HIGHWAY SAFETY PROJECTSW-5710 1678 278SAFETY IMPROVEMENTS AT VARIOUS
LOCATIONS IN DIVISION 10.HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
ANSONCABARRUSMECKLENBURGSTANLYUNION
VARIOUS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5210 11865 11865DIVISION 10 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS. DIV DIVISION 10 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN DIVISION CATEGORY.DIV
REG DIVISION 10 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN REGIONAL CATEGORY.REGSW DIVISION 10 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN STATEWIDE CATEGORY.SW
ANSONCABARRUSMECKLENBURGSTANLYUNION
VARIOUS
CONGESTION MITIGATION PROJECTS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF KANNAPOLIS
C-4916 1168 1168CONSTRUCT SIDEWALKS AT SELECTED LOCATIONS IN KANNAPOLIS.EX A HUDSON STREET TO SOUTH CANNON BOULEVARD - UNDER CONSTRUCTIONEX
B FUNDS TRANSFERRED TO C-4918BEXC WINDSOR DRIVE TO ROGERS LAKE ROAD - UNDER CONSTRUCTIONEX
CABARRUSVARIOUS
10-10 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)CONGESTION MITIGATION PROJECTS
C-5603 4141PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE CABARRUS-ROWAN MPO.
EX
CMAQ PE 164 PE 167 L PE 41 PE 42 CMAQ R 164 R 167 L R 41 R 42 CMAQ C 985 C 1003 L C 246 C 251 CMAQ O 164 O 167 L O 41 O 42 CMAQ I 164 I 167 L I 41 I 42
CABARRUSROWAN
VARIOUS
C-4918 2478 2478INTERSECTION IMPROVEMENTS AND ADDITIONAL TURN LANES AT SELECTED LOCATIONS IN CONCORD.EX A SR 1394 (POPLAR TENT ROAD) - INTERSECTION IMPROVEMENTS - UNDER CONSTRUCTIONEX
B NC 3 - ADDITIONAL TURN LANES - UNDER CONSTRUCTIONEX
CABARRUSVARIOUS
IN PROGRESS
C-5536 624 624MECKLENBURG COUNTY AIR QUALITY -GRADE (GRANTS TO REPLACE AGING DIESEL ENGINS). REPLACE, REPOWER OR RETROFIT AGING DIESEL VEHICLES AND EQUIPMENT.
EXCABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANUNION
CHARLOTTE
UNDER CONSTRUCTION
C-5557 420 420CITY OF CONCORD'S NE SUBSET SIDEWALKS. INSTALL SIDEWALKS AT VARIOUS LOCATIONS.EXCABARRUS
CONCORD
UNDER CONSTRUCTION
C-5157 451 451CONSTRUCT SIDEWALKS ON TOM QUERY ROAD, ROBINSON CHURCH ROAD AND STALLINGS ROAD IN HARRISBURG.EXCABARRUS
HARRISBURG
UNDER CONSTRUCTION
C-5159 540 540ROXIE STREET, NC 3 AND DALE EARNHARDT BOULEVARD IN KANNAPOLIS. STREET IMPROVEMENTS.EXCABARRUS
KANNAPOLIS
10-11 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)CONGESTION MITIGATION PROJECTS
C-5161 2787 263IRISH BUFFALO CREEK GREENWAY IN KANNAPOLIS. CONSTRUCT GREENWAY.
EX
CMAQ C 2019 L C 505
CABARRUS
KANNAPOLIS
C-5502 206 30LITTLE TEXAS ROAD IN KANNAPOLIS, FOREST PARK DRIVE TO EXISTING SIDEWALK SOUTH OF MISSION TRIPP STREET. CONSTRUCT 800 FEET OF SIDEWALK.
EX
CMAQ C 132 L C 44
CABARRUS
LITTLE TEXAS ROAD
INTERSTATE PROJECTS
RIGHT OF WAY IN PROGRESS
I-5714 12400 600SR 2136 (GILEAD ROAD) INTERCHANGE. UPGRADE EXISTING INTERCHANGE.SW
NHP C 11800
MECKLENBURGI-77
UNDER CONSTRUCTION
I-5769 3500 3500I-277 TO 0.7 MILE NORTH OF NC 27. PAVEMENT REHABILITATION.
1SWMECKLENBURG
I-77
UNDER CONSTRUCTION
I-5768 13166 7066SOUTH CAROLINA LINE TO SR 1577 (WEST TYVOLA ROAD). PAVEMENT REHABILITATION.
4.8SW
NHPIM C 6100
MECKLENBURGI-77
PROJECT COMPLETE - GARVEE BOND FUNDING $2.52 MILLION; PAYBACK FY 2007 - FY 2018
I-4720 3673 3397I-277 (EXIT 9) TO THE SOUTH CAROLINA STATE LINE. RESURFACE WITH NOVACHIP.
9.3TRN
NHP CG 276
MECKLENBURGI-77
10-12 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)INTERSTATE PROJECTS
I-5718 1230300I-485 (EXIT 1) TO I-277/NC 16 (BROOKSHIRE FREEWAY) (EXIT 11). WIDEN EXISTING FREEWAY TO TEN LANES BY CONSTRUCTING MANAGED LANES.
9.6 NHP R 72900 A R 72900 A NHP U 500 A BOND R 84000C A C 28000 ANHP 135000C A C 45000 ANHP R 37900 B R 37900 B NHP U 500 B BOND R 84000C B C 28000 BNHP 16500C B C 5500 BNHP 60000R C NHP 500U C BOND R 14400C C NHP 275600C C NHP 22200R D NHP 100U D NHP 107300C D NHP R 17400 E NHP U 100 E NHP 63075C E C 21025 E
A I-485 (EXIT 1) TO WOODLAWN ROAD (EXIT 6). WIDEN EXISTING FREEWAY TO TEN LANES BY CONSTRUCTING MANAGED LANES.SWB WOODLAWN ROAD (EXIT 6) TO I-277/US 74 (BELK FREEWAY (EXIT 9). WIDEN EXISTING FREEWAY TO TEN LANES BY CONSTRUCTING MANAGED LANES.SWC I-277/US 74 (BELK FREEWAY) (EXIT 9) TO I-277/NC 16 (BROOKSHIRE FREEWAY) (EXIT 11). WIDEN EXISTING FREEWAY TO TEN LANES BY CONSTRUCTING MANAGED LANES.D I-277/US 74/NC 27 INTERCHANGE. CONSTRUCT INTERCHANGE IMPROVEMENTS.E I-277/NC 16 (BROOKSHIRE FREEWAY), US 21 INTERCHANGE. CONSTRUCT INTERCHANGE IMPROVEMENTS.SW
MECKLENBURG
I-77
I-5715 18050 500NC 73 INTERCHANGE. UPGRADE EXISTING INTERCHANGE TO SPLIT DIAMOND CONFIGURATION.SW
NHP R 1550 NHP C 16000
MECKLENBURG
I-77
I-5825 6800SR 1577 (TYVOLA ROAD) TO I-277 IN CHARLOTTE. PAVEMENT REHABILITATION.
4.7SW
NHPIM C 6800
MECKLENBURGI-77 / US 21
UNDER CONSTRUCTION
I-5961 2370 2370WEST TRADE STREET TO IREDELL COUNTY LINE. PAVEMENT REHABILITATION.
19.9SWMECKLENBURG
I-77
10-13 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)INTERSTATE PROJECTS
PLANNING/DESIGN IN PROGRESS - FUNDING FOR I-4750 AA INCLUDED IN I-5405
I-4750 507256 8681SR 5544 (WEST CATAWBA AVENUE - EXIT 28) TO I-40. WIDEN AND RECONSTRUCT ROADWAY.
23 NHP 10500R AB NHP 675U AB NHP 133000C AB NHP 11700R B NHP 105200C B NHP 17500R C NHP 220000C C
AA SR 5544 (WEST CATAWBA AVENUE - EXIT 28) TO NC 150 (EXIT 36). CONSTRUCT HIGH OCCUPANCY/TOLL (HOT) LANES. - UNDER CONSTRUCTION WITH PROJECT I-5405AB SR 5544 (WEST CATAWBA AVENUE - EXIT 28) TO NC 150 (EXIT 36). CONSTRUCT ONE ADDITIONAL LANE IN EACH DIRECTION.AC I-77/EXIT 30 (GRIFFITH STREET) INTERCHANGE. CONSTRUCT ROUNDABOUTS AT NORTHBOUND AND SOUTHBOUND RAMP TERMINI. - UNDER CONSTRUCTIONEXB NC 150 (EXIT 36) TO NC 115/US 21 (EXIT 42)C NC 115/US 21 (EXIT 42) TO I-40
IREDELLMECKLENBURG
I-77
UNDER CONSTRUCTION - INCLUDES FUNDING FOR I-3311 C AND I-4750 AA
I-5405 731678 683265I-277 (BROOKSHIRE FREEWAY) TO WEST CATAWBA AVENUE (EXIT 28). CONSTRUCT HIGH OCCUPANCY TOLL (HOT) LANES AND CONVERT EXISTING HIGH OCCUPANCY VEHICLE (HOV) LANES TO HIGH OCCUPANCY TOLL (HOT) LANES.
17 NHPBA C 12334 A C 12333 A NHPBA C 11334 B C 11333 B STBG I 531 C I 548 C
A I-77/LAKEVIEW ROAD INTERCHANGE. CONVERT GRADE SEPARATION TO HOT LANE DIRECT CONNECTION INTERCHANGE. - UNDER CONSTRUCTIONEXB I-77/HAMBRIGHT ROAD INTERCHANGE. CONVERT GRADE SEPARATION TO HOT LANE DIRECT CONNECTION INTERCHANGE. - UNDER CONSTRUCTIONEXC PROVIDE ADDITIONAL EXPRESS BUS SERVICE TO MITIGATE TRAFFIC CONGESTION DURING CONSTRUCTION. - IN PROGRESSEX
IREDELLMECKLENBURG
I-77
PLANNING/DESIGN IN PROGRESS - FUNDING FOR I-3311 C INCLUDED IN I-5405
I-3311 155839 108739I-277 (BROOKSHIRE FREEWAY) IN CHARLOTTE TO SR 5544 (WEST CATAWBA AVENUE - EXIT 28). ADDITIONAL LANES.
17.4 NHP 100R B NHP 47000C B
A I-85 TO NORTH OF I-485 (CHARLOTTE OUTER LOOP) - COMPLETEAA NC 73 (SAM FURR ROAD), WEST OF I-77 TO EAST OF I-77; SR 2136 (GILEAD ROAD), WEST OF I-77 TO EAST OF I-77 - COMPLETEB I-485 (CHARLOTTE OUTER LOOP) TO SR 5544 (WEST CATAWBA AVENUE) EXIT 28.C I-277 TO NORTH OF I-85. CONSTRUCT HIGH OCCUPANCY TOLL (HOT) LANES AND CONVERT EXISTING HIGH OCCUPANCY VEHICLE (HOV) LANES TO HOT LANES. I-277 (BROOKSHIRE
FREEWAY), I-77 TO NORTH BREVARD STREET. CONSTRUCT HOT LANES. - UNDER CONSTRUCTION WITH PROJECT I-5405D I-485 (CHARLOTTE OUTER LOOP) TO SR 2136 (GILEAD ROAD) - COMPLETEE NORTH OF I-277/NC 16 (BROOKSHIRE FREEWAY) TO NORTH OF I-85. WORK TO BE ACCOMPLISHED IN I-3311 C.
MECKLENBURG
I-77
I-5770 64000.7 MILE NORTH OF GASTON COUNTY LINE TO 0.1 MILE NORTH OF SR 5901 (BILLY GRAHAM PARKWAY). PAVEMENT REHABILITATION.
5SW
NHPIM C 6400
MECKLENBURGI-85
I-5837 500GASTON COUNTY LINE TO 0.7 MILES NORTH OF GASTON COUNTY LINE. PAVEMENT REHABILITATION.
0.7SW
NHPIM C 500
MECKLENBURGI-85
10-14 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)INTERSTATE PROJECTS
SECTION B, GARVEE BOND FUNDING $103 MILLION; CONSTRUCTION - PAYBACK FY 2010 - FY 2021
I-3803 317995 272811US 29/NC 49 CONNECTOR, MECKLENBURG COUNTY TO NC 73 IN CABARRUS COUNTY. ADD ADDITIONAL LANES. (COORDINATE WITH U-3415).
12.8 NHP CG 11296 B CG 11296 B CG 11296 B 11296CG B
A SOUTH OF US 29/NC 49 CONNECTOR TO SR 2894 (CONCORD MILLS - BRUTON SMITH BOULEVARD) - COMPLETEB SOUTH OF SR 2894 (CONCORD MILLS - BRUTON SMITH BOULEVARD) TO NC 73 IN CABARRUS COUNTY - COMPLETETRNBA ITS FOR I-3803 B - COMPLETETRN
CABARRUSMECKLENBURG
I-85
I-5797 350I-77 TO MILEMARKER 42.1. PAVEMENT REHABILITATION.
3.8SW
NHPIM C 350
MECKLENBURGI-85
I-5860 5500SR 2472 (W. MALLARD CREEK CHURCH RD) TO 0.8 MILE NORTH OF SR 2467 (MALLARD CREEK RD). PAVEMENT REHABILITATION.
2.5SW
NHPIM C 5500
MECKLENBURGI-85
UNDER CONSTRUCTION
I-5796 5625 56250.1 MILE NORTH OF SR 5901 (BILLY GRAHAM PKWY) TO 0.3 MILE NORTH OF NC 16. PAVEMENT REHABILITATION.
3.2SWMECKLENBURG
I-85
I-5826 5000MILEMARKER 42.1 TO MILEMARKER 46.3. PAVEMENT REHABILITATION.
4.2SW
NHPIM C 5000
MECKLENBURGI-85
I-5905 40000.2 MILE WEST OF NC 16 (BROOKSHIRE BOULEVARD) TO I-77. PAVEMENT REHABILITATION.
2.4SW
NHPIM 4000C
MECKLENBURGI-85
I-5906 6150I-77 TO US 29/49 CONNECTOR. PAVEMENT REHABILITATION.
3.7SW
NHPIM 3075C3075C
MECKLENBURGI-85
PROJECT COMPLETE - GARVEE BOND FUNDING $1.04 MILLION; PAYBACK FY 2007 - FY 2018
I-5006 1602 1488GASTON COUNTY LINE TO CONCRETE PAVEMENT IN MECKLENBURG COUNTY NEAR SR 1601. PAVEMENT REHABILITATION.
0.7TRN
NHP CG 114
MECKLENBURGI-85
FEASIBILITY STUDY IN PROGRESS
FS-1610A I-277/US 74 (BELK FREEWAY) - EXIT 9 TO I-277/NC 16 (BROOKSHIRE FREEWAY) - EXIT 11. UPGRADE FACILITY.MECKLENBURG
I-277
10-15 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)INTERSTATE PROJECTS
SEGMENTS A AND BE LET TOGETHER AND FUNDED UNDER I-5746B
I-5746 33490 5930I-77 TO EAST 10TH STREET. RESURFACING AND BRIDGE REHABILITATION.
3.5 NHPIM C 10490 C NHPIM C 7070 D NHPIM C 10000 E
A I-77 TO EAST STONEWALL STREET. BRIDGE REHABILITATION. - UNDER CONSTRUCTIONSWB EAST STONEWALL STREET TO EAST 10TH STREET. BRIDGE REHABILITATION. - UNDER CONSTRUCTIONSWC EAST 10TH STREET TO NORTH GRAHAM STREET. BRIDGE REHABILITATION.SWD NORTH GRAHAM STREET TO NORTH OF JOHNSON STREET. BRIDGE REHABILITATION.SWE I-77 TO EAST 10TH STREET. RESURFACE ROADWAY.SW
MECKLENBURG
I-277 (BROOKSHIREFRWY)
I-5904 4500MILEMARKER 43 TO MILEMARKER 49. PAVEMENT REHABILITATION.
6SW
NHPIM 4500C
MECKLENBURGI-485
I-5903 1400SR 1601 TO 1 MILE NORTH OF SR 1601. PAVEMENT REHABILITATION.
1SW
NHPIM 1400C
MECKLENBURGI-485
I-5902 900SR 1786 TO NC 27. PAVEMENT REHABILITATION.
0.7SW
NHPIM 900C
MECKLENBURGI-485
UNDER CONSTRUCTION - PROJECT LET WITH I-5748
I-5871 20 20IDLEWILD RD TO NC 51. PAVEMENT REHABILITATION
5.6SWMECKLENBURG
I-485
UNDER CONSTRUCTION
I-5960 4250 4250MILEMARKER 35.8 TO MILEMARKER 39.7. PAVEMENT REHABILITATION.
3.9SWMECKLENBURG
I-485
I-5861 70000.3 MILE EAST OF SR 2042 (OAKDALE RD) TO 0.2 MILE EAST OF NC 115. PAVEMENT REHABILITATION.
5.4SW
NHPIM C 7000
MECKLENBURGI-485
I-5828 3000I-77 TO 1.1 MILES NORTH OF I-77 / US 21. PAVEMENT REHABILITATION.
1.1SW
NHPIM C 3000
MECKLENBURGI-485
I-5827 3000IDLEWILD ROAD TO US 74. PAVEMENT REHABILITATION.
2.2SW
NHPIM C 3000
MECKLENBURGI-485
I-5800 5001.9 MILES WEST OF SR 3649 (ELM LANE) TO SR 1126 (NATIONS FORD ROAD). BRIDGE REHABILITATION.
5SW
NHPIM C 500
MECKLENBURGI-485
10-16 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)INTERSTATE PROJECTS
I-5798 8300I-85 TO ROCKY RIVER ROAD. PAVEMENT REHABILITATION.
4.8SW
NHPIM C 8300
MECKLENBURGI-485
UNDER CONSTRUCTION - PROJECT LET WITH I-5871
I-5748 1275 1275IDELWILD ROAD TO US 74. PAVEMENT REHABILITATION.
2.2SWMECKLENBURG
I-485
UNDER CONSTRUCTION
I-5747 1090 1090I-85 TO SR 2808 (CAMP STEWART ROAD). PAVEMENT REHABILITATION.
9.3SWMECKLENBURG
I-485
UNDER CONSTRUCTION
I-5318 7069 7069MILE MARKER 51 TO MILE MARKER 59. PAVEMENT REHABILITATION.
8SWMECKLENBURG
I-485
DESIGN-BUILD PROJECT
I-5507 289500 2000I-485, I-77 SOUTH OF CHARLOTTE TO US 74 (INDEPENDENCE BOULEVARD). ADD ONE EXPRESS LANE IN EACH DIRECTION.
16.7
SW
T R 1600 T C 71475 C 71475 C 71475 71475C
MECKLENBURG
I-485
I-5973 14200I-485/NC 16 (BROOKSHIRE BOULEVARD). CONSTRUCT INTERCHANGE IMPROVEMENTS.
REG
NHP 2800R NHP 500U NHP 3633C C 3634 C 3633
MECKLENBURG
I-485
I-5963 41300I-485 AND NC 16 (PROVIDENCE ROAD). CONSTRUCT INTERCHANGE IMPROVEMENTS.
SW
NHP 5550R5550R NHP 1300U NHP 14450C C 14450
MECKLENBURG
I-485
RURAL PROJECTS
COORDINATE WITH PROJECT I-5507
R-0211 280729 256629WEST OF I-77 TO US 74. MULTI-LANE FREEWAY ON NEW LOCATION.
16.6 T R 6100 EC T C 9000 EC C 9000 EC
EC SR 3468 (WEDDINGTON ROAD). CONSTRUCT INTERCHANGE.DIVMECKLENBURG
I-485 (CHARLOTTESOUTHERN OUTERLOOP)
10-17 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
PART COMPLETE - GARVEE BOND FUNDING $50 MILLION; CONSTRUCTION - PAYBACK FY 2010 - FY 2021
R-2123 350747 328811US 74 EAST (INDEPENDENCE BOULEVARD) TO I-85 NORTH. CONSTRUCT FREEWAY ON NEW LOCATION.
18.8 NHP CG 5484 CE CG 5484 CE CG 5484 CE 5484CG CE
CE AT I-85 INTERCHANGE. RE-CONSTRUCT INTERCHANGE. - COMPLETETRNCG SEPARATE ITS CONTRACT FOR R-2123 CE - COMPLETETRN
MECKLENBURG
I-485 (CHARLOTTEEASTERN OUTERLOOP)
GARVEE BOND FUNDING $50 MILLION; CONSTRUCTION - PAYBACK FY 2010 - FY 2021
R-2248 790629 768693WEST OF I-77 TO I-85 NORTH. FREEWAY ON NEW LOCATION.
28 NHP CG 5484 E CG 5484 E CG 5484 E 5484CG E
A WEST OF I-77 SOUTH TO US 29-74 - COMPLETEBA NORTH OF US 29/US 74 (WILKINSON BOULEVARD) TO NORTH OF I-85 - COMPLETEBB NORTH OF I-85 TO NORTH OF NC 27 - COMPLETEC NORTH OF NC 27 (MOUNT HOLLY ROAD) TO EAST OF SR 2042 (OAKDALE ROAD) - COMPLETED EAST OF SR 2042 (OAKDALE ROAD) TO EAST OF NC 115 (OLD STATESVILLE ROAD) - COMPLETEE EAST OF NC 115 (OLD STATESVILLE ROAD) TO I-85 NORTH - COMPLETETRNEA ITS FOR R-2248 E - UNDER CONSTRUCTIONTRNEB EDINMEADOW DRIVE NEPA STUDYF I-485, WEST OF I-77 TO ARROWOOD ROAD-BROWN GRIER ROAD - COMPLETEG I-485 INTERCHANGE WITH SR 2042 (OAKDALE ROAD) - UNDER CONSTRUCTIONTRNH I-485 INTERCHANGE WITH SR 1148 (GARRISON ROAD) - COMPLETE
MECKLENBURG
I-485(CHARLOTTEWESTERN OUTERLOOP)
UNDER CONSTRUCTION - NC TURNPIKE AUTHORITY PROJECT
R-3329 814000 814000I-485 (CHARLOTTE OUTER LOOP) TO PROJECT R-2559 (US 74 MONROE BYPASS). MULTI-LANE FREEWAY ON NEW LOCATION.
10.5TRNMECKLENBURG
UNION
US 74 BYPASS
R-2632 50268 30468US 21 TO SR 2693 (DAVIDSON-CONCORD ROAD). WIDEN TO MULTI-LANES.
4.3 STBG R 1100 AB STBG U 500 AB STBG 4550C AB4550C AB C 4550 AB C 4550 AB
AA US 21 TO NC 115. - COMPLETEAB NC 115 TO SR 2693 (DAVIDSON-CONCORD ROAD).REGAC NC 73 AT NC 115. CONVERT RIGHT TURN LANE ON NC 115 SOUTHBOUND TO A THROUGH LANE AND WIDEN FOR MERGING TAPER. - COMPLETETRN
MECKLENBURG
NC 73
10-18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
PLANNING/DESIGN IN PROGRESS.
R-5706 141750 750SR 2693 (DAVIDSON-CONCORD ROAD) TO US 29. WIDEN TO MULTI-LANES.
10.9 T R 2900 A T U 500 A T 5675C A5675C A C 5675 A C 5675 A T R 17700 B T U 2100 B T 23775C B23775C B C 23775 B C 23775 B
A SR 2693 (DAVIDSON-CONCORD ROAD) TO SR 1394 (POPLAR TENT ROAD).REGB SR 1394 (POPLAR TENT ROAD) TO US 29.REG
CABARRUSMECKLENBURG
NC 73 (DAVIDSONHIGHWAY)
PLANNING/DESIGN IN PROGRESS.
R-5721 151900 500NC 16 BUSINESS IN LINCOLN COUNTY TO SR 5544 (WEST CATAWBA AVENUE) IN MECKLENBURG COUNTY. WIDEN TO MULTI-LANES.
9.1 T R 30000 A T U 6000 A T 14500C A14500C A C 14500 A C 14500 A T R 45000 B T U 1000 B T 2850C B2850C B C 2850 B C 2850 B
A NC 16 BUSINESS TO VANCE ROAD EXTENSION/BEATTIES FORD ROAD.REGB VANCE ROAD EXTENSION/BEATTIES FORD ROAD TO SR 5544 (WEST CATAWBA AVENUE).REG
LINCOLNMECKLENBURG
NC 73
R-2555 51482 19282NC 73 (SAM FURR ROAD) TO EAST OF SR 2195 (TORRENCE CHAPEL ROAD). WIDEN TO FOUR-LANES DIVIDED.
3.4 T R 18000 B T U 3500 B T C 9500 B L C 1200 B
A SR 2151 (JETTON ROAD) TO SR 2195 (TORRENCE CHAPEL ROAD) - COMPLETEB NC 73 (SAM FURR ROAD) TO SR 2151 (JETTON ROAD)DIV
MECKLENBURG
SR 5544WEST CATAWBAAVENUE
UNDER CONSTRUCTION
R-5790 745 745DIVISION 10 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVANSONCABARRUSMECKLENBURGSTANLYUNION
VARIOUS
URBAN PROJECTS
PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY
U-5904 1000SUNSET ROAD TO NC 24 (W.T. HARRIS BOULEVARD). WIDEN ROADWAY.
1.9
EX
BA PE 1000
MECKLENBURG
US 21 (STATESVILLEROAD)
10-19 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
PLANNING/DESIGN IN PROGRESS.
U-5771 20000 500SR 2136 (GILEAD ROAD) TO HOLLY POINT DRIVE. WIDEN TO MULTI-LANES.
2.2
REG
T R 2700 T U 300 T 5500C5500C5500C
MECKLENBURG
US 21
U-6069 57500NC 24 (HARRIS BOULEVARD) TO SR 2136 (GILEAD ROAD). WIDEN TO MULTI-LANES.
5.6
REG
T R 1000 T U 500 T 18667C C 18667 C 18666
MECKLENBURG
US 21 (STATESVILLEROAD)
PLANNING/DESIGN IN PROGRESS
U-5767 23800 600NORTHCROSS CENTER COURT TO SR 2147 (WESTMORELAND ROAD). WIDEN TO MULTI-LANES.
1.2
REG
T R 800 T U 1400 T 5250C5250C5250C C 5250
MECKLENBURG
US 21 (STATESVILLEROAD)
PLANNING/DESIGN IN PROGRESS. DESIGN-BUILD PROJECT
U-2509 507745 745CHARLOTTE OUTER LOOP TO WEST OF IDLEWILD ROAD IN CHARLOTTE. CONSTRUCT MANAGED LANES.
6.4
SW
NHP R 85000 NHP U 10000 NHP C 20600 97850C97850C97850C C 97850
MECKLENBURG
US 74(INDEPENDENCEBOULEVARD)
PLANNING/DESIGN IN PROGRESS - IMPROVEMENTS FROM WALLACE LANE TO I-485 TO BE COMPLETED BY PROJECT U-2509
U-5526 26877 2977I-277 TO I-485. CONVERT EXISTING AND PROPOSED BUSWAY TO MANAGED LANES FROM I-277 TO WALLACE LANE AND CONSTRUCT NEW MANAGED LANES FROM WALLACE LANE TO I-485.
12 NHP C 19500 A CMAQ C 1400 A T O 3000 A
A I-277 TO WALLACE LANE. CONVERT EXISTING AND PROPOSED BUSWAY TO MANAGED LANES. INCLUDES WORK PROPOSED UNDER PROJECT U-209 BA. - RIGHT OF WAY IN PROGRESSSWMECKLENBURG
US 74INDEPENDENCE BLVD
PART COMPLETE - GARVEE BOND FUNDING $50 MILLION FOR RIGHT OF WAY - PAYBACK FY 2010 - FY 2021; GARVEE BOND FUNDING $2 MILLION FOR CONSTRUCTION - PAYBACK FY 2013 - FY 2024
U-0209 341567 318196BROOKSHIRE FREEWAY TO IDLEWILD ROAD IN CHARLOTTE. ADD ADDITIONAL LANES AND CONSTRUCT INTERCHANGES WITH SHARON AMITY ROAD AND IDLEWILD ROAD AND SAFETY IMPROVEMENTS.
1.4 NHP RG 5484 B RG 5484 B RG 5484 B 5484RG B NHP CG 205 B CG 205 B CG 205 B 205CG B205CG B205CG B CG 205 B
B NC 24/NC 27 (ALBEMARLE ROAD) TO IDLEWILD ROAD - UNDER CONSTRUCTIONTRNBA SEPARATE ITS CONTRACT FOR U-209 B - WORK TO BE CONSTRUCTED BY PROJECT U-5526ATRN
MECKLENBURG
US 74(INDEPENDENCEBOULEVARD)
10-20 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
FEASIBILITY STUDY IN PROGRESS
FS-1510A I-77 TO I-85. UPGRADE TO FREEWAY. 2.2
MECKLENBURG
NC 16(BROOKSHIREBOULEVARD)
U-6084 6000NC 16 (BROOKSHIRE BOULEVARD) AT SR 2004 (MOUNT HOLLY HUNTERSVILLE ROAD). CONSTRUCT INTERSECTION IMPROVEMENTS.REG
T C 3000 C 3000
MECKLENBURG
NC 16 BROOKSHIREBOULEVARD)
U-5955 9500I-85 TO IDAHO DRIVE. ADD WESTBOUND THROUGH LANE ON NC 16 BETWEEN A POINT WEST OF IDAHO DR AND I-85. IMPROVE I-85 NORTHBOUND RAMP TO EASTBOUND NC 16.
REG
T 1900R T 300U T 7300C
MECKLENBURG
NC 16 (BROOKSHIREBOULEVARD)
U-5957 17100SR 1644 (TODDVILLE ROAD) TO SR 1600 (MOORES CHAPEL ROAD). WIDEN TO 4-LANES.
1.3
REG
T 3800R T 500U T 12800C
MECKLENBURG
NC 27 (FREEDOMDRIVE)
U-5768 41825 2000NC 49, JOHN KIRK DRIVE TO I-485. WIDEN EXISTING ROADWAY. REALIGN BACK CREEK CHURCH ROAD ON NEW LOCATION TO THE NC 49 AND MALLARD CREEK CHURCH ROAD INTERSECTION. CLOSE EXISTING AT GRADE RAIL CROSSING AT NC 49 AND BACK CREEK CHURCH ROAD.
1.2
REG
T R 100 L R 1200 T U 1300 L M 925 T 6000C6000C6000C C 6000 L 12300C
MECKLENBURG
NC 49 &BACK CREEK CHURCHRD
U-5007 43850 600MATTHEWS TOWNSHIP PARKWAY TO SR 3128 (LAWYERS ROAD). WIDEN TO MULTI-LANES.
4
REG
T 4125R4125R T 2250U2250U T 15250C C 15250
MECKLENBURG
NC 51
U-5763 4100 200SR 3356 (SARDIS ROAD) TO SR 1010 (EAST JOHN STREET/ MONROE ROAD). WIDEN EXISTING ROADWAY.
0.7
REG
T R 1600 T U 200 T 2100C
MECKLENBURG
NC 51 (MATTHEWSTOWNSHIP PARKWAY
10-21 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
U-5765 11400SR 5544 (WEST CATAWBA AVENUE) TO SR 2316 (NORTHCROSS AVENUE). WIDEN EXISTING ROADWAY.
1.1
REG
T R 3900 T U 500 T 3500C3500C
MECKLENBURG
NC 73 (SAM FURR ROAD)
U-5772 34800 500NC 24 (HARRIS BOULEVARD) TO I-485. WIDEN TO MULTI-LANES.
2.2
REG
T 4500R4500R T 1100U T 12100C C 12100
MECKLENBURG
NC 115 (OLD STATESVILLEROAD)
U-5766 60200 600SOUTH CAROLINA LINE TO I-485. WIDEN TO MULTI-LANES.
6.8 T R 2600 A T U 500 A T 4375C A4375C A4375C A C 4375 A T R 3100 B T U 4600 B T 7825C B7825C B7825C B C 7825 B
A SOUTH CAROLINA LINE TO NC 49 (SOUTH TRYON ROAD). WIDEN TO MULTI-LANES.REGB NC 49 (SOUTH TRYON ROAD) TO I-485. WIDEN TO MULTI-LANES.REG
MECKLENBURG
NC 160
RIGHT OF WAY IN PROGRESS
U-5762 1550 250INTERSECTION OF NC 160 (STEELE CREEK ROAD) AND SR 1106 (HAMILTON ROAD). INTERSECTION IMPROVEMENTS.REG
T C 1300
MECKLENBURG
NC 160 (STEELECREEK ROAD)
U-5805 3910 510INTERSECTION OF SR 1009 (MONROE ROAD) AND RAMA ROAD/IDLEWILD ROAD. CONSTRUCT INTERSECTION IMPROVEMENTS.DIV
T R 750 T 2650C
MECKLENBURG
SR 1009 (MONROEROAD)
10-22 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
U-4714 107500 1000SR 3448-SR 3474 (TRADE STREET) TO SR 1377 (WESLEY CHAPEL-STOUTS ROAD). WIDEN TO MULTI-LANES.
6.5 STBGDA R 9500 A S(M) R 2400 A STBG R 9700 A STBGDA 1925C A1925C A1925C A C 1925 A S(M) 481C A481C A481C A C 482 A STBG 1925C A1925C A1925C A C 1925 A T R 1000 AB T C 19000 AB STBGDA R 14540 B S(M) R 1860 B L R 10000 B STBGDA 4235C B4235C B4235C B C 4235 B S(M) 1059C B1059C B1059C B C 1058 B
A SR 3448-SR 3474 (TRADE STREET) TO WEST OF MORNINGSIDE MEADOW LANE. (EXCLUDING I-485 INTERCHANGE)DIVAB I-485. IMPROVE INTERCHANGE - TO BE LET WITH I-5507DIVB WEST OF MORNINGSIDE MEADOW LANE TO EAST OF SR 1377 (WESLEY CHAPEL-STOUTS ROAD).DIV
MECKLENBURGUNION
SR 1009 (JOHNSTREET-OLDMONROE ROAD)
U-5905 7400 400REAMES ROAD TO NC 115. UPGRADE ROADWAY.
2.1
EX
BA R 1000 BA U 500 BA C 5500
MECKLENBURG
SR 2112 (LAKEVIEWROAD)
U-5807 15600 300US 21 (STATESVILLE ROAD) TO NC 115. WIDEN TO MULTI-LANES.
0.7
DIV
T 3750R3750R T 450U450U T C 6900
MECKLENBURG
SR 2136(GILEAD ROAD)
U-6032 13400I-485 TO CONCORD MILLS BOULEVARD. WIDEN TO FOUR-LANES DIVIDED.
0.9
DIV
T R 2400 T U 500 T 3500C3500C3500C
CABARRUSMECKLENBURG
SR 2464 (ODELLSCHOOL ROAD)
PLANNING/DESIGN IN PROGRESS
U-2507 63147 63147SR 2480 (SUGAR CREEK ROAD) TO SR 2472 (MALLARD CREEK CHURCH ROAD) IN CHARLOTTE. WIDEN TO MULTI-LANES, PART ON NEW LOCATION.
4.1
A SR 2480 (SUGAR CREEK ROAD) TO SR 2665 (HARRIS BOULEVARD) - UNDER CONSTRUCTIONTRNAA SR 2467 (MALLARD CREEK ROAD) TO IBM DRIVE. CONSTRUCT NEW CONNECTOR ROAD AND MULTI-USE PATH. - IMPROVEMENTS CONSTRUCTED UNDER U-2507ATRNB SR 2665 (W.T. HARRIS BOULEVARD) TO SR 2472 (MALLARD CREEK CHURCH ROAD) - COMPLETE
MECKLENBURG
SR 2467 (MALLARDCREEK ROAD)
10-23 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
U-6028 20100SR 2833 (MALLARD CREEK CHURCH ROAD) TO BREEZEWOOD DRIVE. WIDEN TO FOUR-LANES.
1.5
DIV
T 2000R2000R T 250U250U T C 15600
MECKLENBURG
SR 2472 (MALLARDCREEK ROAD)
UNDER CONSTRUCTION
U-5008 45060 45060CONSTRUCT GRADE SEPARATION OVER NORTH CAROLINA RAILROAD/NORFOLK SOUTHERN RAILWAY CROSSING 715 352H AND THE CLOSURE OF CRAIGHEAD ROAD CROSSING 715 355D.
TRNMECKLENBURG
SR 2975 (SUGARCREEK ROAD)
U-5804 2734 234FULLWOOD LANE TO WEDDINGTON ROAD. WIDEN TO MULTI-LANES.
0.5 T C 2500 B
A FULLWOOD LANE TO FOUR MILE CREEK - UNDER CONSTRUCTION BY TOWN OF MATTHEWS USING TOWN FUNDS.B FOUR MILE CREEK TO WEDDINGTON ROAD. - RIGHT OF WAY IN PROGRESS.DIV
MECKLENBURG
SR 3448 (SOUTHTRADE STREET)
U-6030 31100ANNALEXA LANE TO WILLIAMS POND LANE. WIDEN TO FOUR-LANES.
1.7
DIV
T 6700R T 800U T 5900C C 5900 C 5900 C 5900
MECKLENBURG
SR 4979 (BALLANTYNECOMMONS PKWY)
U-4713 11706 2506SR 3457 (CAMPUS RIDGE ROAD) TO SR 3448 (PLEASANT PLAINS ROAD) IN MATTHEWS. CONSTRUCT TWO LANE ROADWAY ON NEW LOCATION.
1.1 STBG R 2600 A STBG U 500 A STBG C 4100 A L C 2000 A
A SR 3448 (PLEASANT PLAINS ROAD) TO SR 1009 (JOHN STREET)DIVB SR 1009 (JOHN STREET) TO SR 3457 (CAMPUS RIDGE ROAD) - COMPLETETRN
MECKLENBURG
NEW ROUTE
U-4744 150501STBG-DA IN CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION (CRTPO).DIV
STBGDA 15400C15400C28001C C 15400 C 15400 C 15400 C 15400L 3850C3850C7000C C 3850 C 3850 C 3850 C 3850
IREDELLMECKLENBURGUNION
VARIOUS
FORMERLY U-9999C - IN PROGRESS
U-4950 10000CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION (CRTPO) PLANNING (PL) SUPPLEMENT.DIV
STBGDA PE 800 PE 800 PE 800 800PE800PE800PE PE 800 PE 800 PE 800 PE 800L PE 200 PE 200 PE 200 200PE200PE200PE PE 200 PE 200 PE 200 PE 200
IREDELLMECKLENBURGUNION
VARIOUS
10-24 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
UNDER CONSTRUCTION BY OTHERS
U-5107 624 624CONSTRUCT TRANSPORTATION IMPROVEMENTS AT THE MARION DIEHL CENTER (QUEENS UNIVERSITY) IN CHARLOTTE.
TRNMECKLENBURGCHARLOTTE
LOCAL CONTRIBUTION OF $5 M BY CITY OF CHARLOTTE
U-5803 13000SR 2940 (EASTWAY DRIVE) AND SHAMROCK DRIVE. CONSTRUCT INTERSECTION IMPROVEMENTS.
DIV
T R 3000 T U 300 T 2350C2350C L 2500C2500C
MECKLENBURG
CHARLOTTE
U-5873 6900 900INTERSECTION OF NC 115 AND POTTS STREET. CONSTRUCT IMPROVEMENTS.
EX
BA R 1200 BA C 4800
MECKLENBURG
CORNELIUS
U-5906 5500 500SR 2195 (TORRENCE CHAPEL ROAD) AND SR 5544 (WEST CATAWBA AVENUE). INTERSECTION IMPROVEMENTS.EX
BA R 2000 BA C 3000
MECKLENBURG
CORNELIUS
FUNDING IS SUBJECT TO ROADS BEING ADDED TO STATE MAINTAINED SYSTEM
U-5907 2200 150POTTS-SLOAN-BEATTY CONNECTOR. CONSTRUCT ROADWAY ON NEW LOCATION.
0.9
EX
BA R 530 BA C 1520
MECKLENBURG
DAVIDSON
RIGHT OF WAY IN PROGRESS
U-5908 9050 1050MAIN STREET, NC 115 (OLD STATESVILLE ROAD)/SR 2004 (MOUNT HOLLY-HUNTERSVILLE ROAD) TO SOUTH OF RAMAH CHURCH ROAD. WIDEN AND REALIGN.
1
EX
STBGBA C 4000 L C 4000
MECKLENBURG
HUNTERSVILLE
RIGHT OF WAY ACQUISITION IN PROGRESS
U-5114 14725 4225INTERSECTION OF US 21 AND GILEAD ROAD IN HUNTERSVILLE. CONSTRUCT INTERSECTION IMPROVEMENTS, INCLUDING BICYCLE AND PEDESTRIAN ACCOMMODATIONS.
TRN
BA C 3850 T C 6650
MECKLENBURG
HUNTERSVILLE
10-25 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
U-4913 8595 1545I-485 TO SR 1524 (STEVENS MILL ROAD). WIDEN EXISTING ROADWAY.
0.8
DIV
T R 150 T U 900 T 2000C2000C2000C
MECKLENBURGUNION
IDLEWILD ROAD
UNDER CONSTRUCTION
U-5115 1785 1785INTERSECTION OF NC 51 AND IDLEWILD ROAD. CONSTRUCT INTERSECTION IMPROVEMENTS.TRNMECKLENBURG
MATTHEWSMINT HILL
PRELIMINARY ENGINEERING AND RIGHT-OF-WAY FUNDED BY CITY OF CHARLOTTE
U-5874 9325 75SR 2722 (LOUIS ROSE PLACE) TO DOUG MAYES PLACE. CONSTRUCT NEW ROUTE.
0.4
DIV
STBGDA C 7400 L C 1850
MECKLENBURG
NORTH UNIVERSITYRESEARCH PARKI-85 OVERPASS
FUNDING IS SUBJECT TO ROADS BEING FUNCTIONALLY CLASSIFIED AT A LEVEL THAT MAKES THEM ELIGIBLE FOR FEDERAL AID FUNDING
U-5108 10232 500END OF NORTHCROSS DRIVE TO WESTMORELAND ROAD IN CORNELIUS. CONSTRUCT ROAD ON NEW LOCATION.
1.2
TRN
STBGDA R 955 BA R 500 L R 489 STBGDA C 4765 BA C 1000 L C 2023
MECKLENBURG
NORTHCROSS DRIVEEXTENSION
U-6029 52800DERITA ROAD TO NC 73. WIDEN TO FOUR-LANES.
4.2
DIV
T 8200R T 1000U T 10900C C 10900 C 10900 C 10900
CABARRUSMECKLENBURG
POPLAR TENT ROAD
BRIDGE PROJECTS
UNDER CONSTRUCTION
B-4779 6732 6732REPLACE BRIDGE 590147 (SBL) AND BRIDGE 590140 (NBL) OVER MALLARD CREEK.
REGMECKLENBURG
US 29 (SOUTH ANDNORTHBOUND LANES
10-26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BRIDGE PROJECTS
UNDER CONSTRUCTION
B-5105 3361 3361REPLACE BRIDGE 590049 OVER LITTLE SUGAR CREEK.
DIVMECKLENBURG
SR 4982(SOUTH POLKSTREET)
UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5110 16007 16007DIVISION 10 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVANSON
CABARRUSMECKLENBURGSTANLYUNION
VARIOUS
UNDER CONSTRUCTION - PROJECT ADMINISTERED BY CITY OF CHARLOTTE - MUNICIPAL BRIDGE
B-5242 1811 1811REPLACE BRIDGE 590376 OVER IRWIN CREEK IN CHARLOTTE.DIVMECKLENBURG
BARRINGER DRIVE
UNDER CONSTRUCTION - PROJECT ADMINISTERED BY CITY OF CHARLOTTE - MUNICIPAL BRIDGE
B-5378 1847 1847REPLACE BRIDGE 590210 OVER BRIAR CREEK IN CHARLOTTE.
DIVMECKLENBURG
MICHAEL BAKERROAD
PLANNING/DESIGN BY CITY OF CHARLOTTE
B-5931 3580 480REPLACE BRIDGE 590443 OVER SOUTHERN RAILROAD.
DIV
STPOFF R 120 L R 30 STPOFF U 160 L U 40 STPOFF C 2200 L C 550
MECKLENBURG
MORRIS FIELD DRIVE
RIGHT OF WAY IN PROGRESS - PROJECT ADMINISTERED BY CITY OF CHARLOTTE
B-5930 1036 255REPLACE BRIDGE 590433 OVER MCALPINE CREEK.
DIV
STPOFF C 625 L C 156
MECKLENBURG
SARDIS LANE
10-27 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)MITIGATION PROJECTS
IN PROGRESS
EE-4910 30304 30304ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 10 PROJECT MITIGATION.ANSON
CABARRUSMECKLENBURGSTANLYUNION
VARIOUS
HIGHWAY SAFETY PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5210 11865 11865DIVISION 10 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS. DIV DIVISION 10 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN DIVISION CATEGORY.DIV
REG DIVISION 10 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN REGIONAL CATEGORY.REGSW DIVISION 10 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN STATEWIDE CATEGORY.SW
ANSONCABARRUSMECKLENBURGSTANLYUNION
VARIOUS
W-5710 1678 278SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 10.
HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
ANSONCABARRUSMECKLENBURGSTANLYUNION
VARIOUS
10-28 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)CONGESTION MITIGATION PROJECTS
C-5613 20901PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION (CRTPO) AREA.
EX
CMAQ PE 828 PE 844 L PE 207 PE 211 CMAQ R 828 R 844 L R 207 R 211 CMAQ C 4971 C 5062 L C 1243 C 1265 CMAQ O 828 O 844 L O 207 O 211 CMAQ I 828 I 844 L I 207 I 211
IREDELLMECKLENBURGUNION
VARIOUS
C-5534 1494SR 4979 (BALLANTYNE COMMONS PARKWAY-MCKEE ROAD) AND NC 16 (PROVIDENCE ROAD) IN CHARLOTTE. CONSTRUCT AN ADDITIONAL LEFT TURN LANE ON SR 4979 AND A SECOND LEFT TURN LANE ON SOUTHBOUND NC 16.
EX
CMAQ C 1113 L C 381
MECKLENBURG
CHARLOTTE
C-5225 3348 2148TOBY CREEK GREENWAY (PHASE II). CONNECT UNCC TO NEARBY RETAIL AND RESIDENTIAL DEVELOPMENT.
1.3 CMAQ C 840 B L C 360 B
A TOBY CREEK GREENWAY, UNIVERSTIY CITY BOULEVARD TO ROCKLAND DRIVE. - UNDER CONSTRUCTIONEXB TOBY CREEK GREENWAY, ROCKLAND DRIVE TO BLUE ROCK DRIVE.EX
MECKLENBURG
CHARLOTTE
RIGHT OF WAY IN PROGRESS
C-5533 2008 258SR 5469 (SHOPTON ROAD) AND SR 1156 (BEAM ROAD) IN CHARLOTTE. CONSTRUCT ROUNDABOUT.
DIV
CMAQ C 867 L C 403 STBGDA C 384 L C 96
MECKLENBURG
CHARLOTTE
IN PROGRESS
C-5536 624 624MECKLENBURG COUNTY AIR QUALITY -GRADE (GRANTS TO REPLACE AGING DIESEL ENGINS). REPLACE, REPOWER OR RETROFIT AGING DIESEL VEHICLES AND EQUIPMENT.
EXCABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANUNION
CHARLOTTE
10-29 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)CONGESTION MITIGATION PROJECTS
UNDER CONSTRUCTION
C-5537 882 882BARTON CREEK GREENWAY IN CHARLOTTE. CONSTRUCT A CONNECTOR BETWEEN CLARK'S CREEK AND MALLARD CREEK GREENWAYS.
EXMECKLENBURGCHARLOTTE
RIGHT OF WAY IN PROGRESS
C-5538 3976 300INTERSECTION OF TUCKASEEGEE-BERRYHILL-THRIFT ROADS IN CHARLOTTE. CONSTRUCT A TRAFFIC CIRCLE.
DIV
CMAQ C 1797 L C 563 STBGDA C 1053 L C 263
MECKLENBURG
CHARLOTTE
UNDER CONSTRUCTION
C-5540 819 819NAVIN ROAD, ALPINE DRIVE TO GIBBON ROAD. CONSTRUCT SIDEWALK ON NORTH SIDE. GIBBON ROAD, NEVIN ROAD TO SUGAR CREEK ROAD. CONSTRUCT SIDEWALK ON SOUTH SIDE.WEST SUGAR ROAD, BISANER STREET AND MALLARD CREEK ROAD. FILL GAPS IN SIDEWALK NETWORK ON EAST SIDE.
EXMECKLENBURGCHARLOTTE
C-5621 9208 250US 21 AND CATAWBA AVENUE. RELOCATE INTERSECTION OF US 21 AND CATAWBA AVENUE TO THE EAST AND CONSTRUCT ROUNDABOUT.
EX
CMAQ R 1000 L R 250 BA R 3000 CMAQ C 806 L C 202 BA C 3700
MECKLENBURG
CORNELIUS
RIGHT OF WAY IN PROGRESS
C-5541 788 350PROVIDENCE ROAD IN CHARLOTTE. CONSTRUCT A SIDEWALK ON SOUTHWEST SIDE.EX
CMAQ C 350 L C 88
MECKLENBURG
PROVIDENCE ROAD
UNDER CONSTRUCTION
C-5542 685 685SOUTH TRYON STREET, QUEEN ANNE DRIVE TO NATIONS FORD ROAD IN CHARLOTTE. CONSTRUCT SIDEWALK ON SOUTHEAST SIDE.EXMECKLENBURG
SOUTH TRYONSTREET
10-30 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)CONGESTION MITIGATION PROJECTS
UNDER CONSTRUCTION
C-5543 1386 1386SUNSET ROAD, I-77 TO STATESVILLE ROAD IN CHARLOTTE. CONSTRUCT SIDEWALKS ON SOUTH SIDE AND INSTALL SIDEWALK ON THE I-77 OVERPASS.
EXMECKLENBURGSUNSET ROAD
RURAL PROJECTS
PLANNING/DESIGN IN PROGRESS
R-2530 93656 45556SR 1963 (ST. MARTIN ROAD) IN ALBEMARLE TO NC 73. WIDEN TO MULTI- LANES. (COORDINATE WITH B-4974).
8.9 T C 12025 B C 12025 B 12025C B12025C B
A SR 1963 (ST. MARTIN ROAD) TO BIRD ROAD IN ALBEMARLE - COMPLETEB BIRD ROAD IN ALBEMARLE TO WEST OF THE PEE DEE RIVER - RIGHT OF WAY IN PROGRESSREG
STANLYNC 24/NC 27
UNDER CONSTRUCTION
R-5790 745 745DIVISION 10 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVANSONCABARRUSMECKLENBURGSTANLYUNION
VARIOUS
BRIDGE PROJECTS
RIGHT OF WAY IN PROGRESS
B-4974 17900REPLACE BRIDGE 830051 OVER PEE DEE RIVER, (COORDINATE WITH R-2530).HF
HFB C 17900
STANLYNC 24/NC 27/NC 73
UNDER CONSTRUCTION
B-5800 310 310REPLACE BRIDGE 830160 OVER RAMSEY BRANCH.
DIVSTANLY
SR 1253(SAM ROAD)
UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5110 16007 16007DIVISION 10 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVANSON
CABARRUSMECKLENBURGSTANLYUNION
VARIOUS
10-31 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)MITIGATION PROJECTS
IN PROGRESS
EE-4910 30304 30304ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 10 PROJECT MITIGATION.ANSON
CABARRUSMECKLENBURGSTANLYUNION
VARIOUS
HIGHWAY SAFETY PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5210 11865 11865DIVISION 10 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS. DIV DIVISION 10 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN DIVISION CATEGORY.DIV
REG DIVISION 10 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN REGIONAL CATEGORY.REGSW DIVISION 10 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN STATEWIDE CATEGORY.SW
ANSONCABARRUSMECKLENBURGSTANLYUNION
VARIOUS
W-5710 1678 278SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 10.
HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
ANSONCABARRUSMECKLENBURGSTANLYUNION
VARIOUS
RURAL PROJECTS
NORTH CAROLINA TURNPIKE AUTHORITY PROJECT - SEE R-3329 FOR ADDITIONAL FUNDING
R-2559 29663 29663FOUR LANES DIVIDED ON NEW LOCATION. 9.2
UNION
US 74MONROE BYPASS
UNDER CONSTRUCTION - NC TURNPIKE AUTHORITY PROJECT
R-3329 814000 814000I-485 (CHARLOTTE OUTER LOOP) TO PROJECT R-2559 (US 74 MONROE BYPASS). MULTI-LANE FREEWAY ON NEW LOCATION.
10.5TRNMECKLENBURG
UNION
US 74 BYPASS
10-32 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
UNDER CONSTRUCTION
R-5790 745 745DIVISION 10 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVANSONCABARRUSMECKLENBURGSTANLYUNION
VARIOUS
URBAN PROJECTS
LET WITH U-5931
U-5764 16800 300HANOVER DRIVE TO SR 1007 (ROCKY RIVER ROAD). WIDEN EXISTING ROADWAY.
2.8
REG
T R 500 T U 500 T 5167C5166C5167C
UNION
US 74
LET WITH U-5764
U-5931 4500INTERSECTION OF US 74 AND SECREST SHORTCUT ROAD. CONSTRUCT IMPROVEMENTS.
SW
T R 1200 T U 300 T 3000C
UNION
US 74
U-5703 2350 200SR 1514 (ROCKY RIVER ROAD) INTERSECTION. RECONFIGURE TO SUPERSTREET.SW
T R 400 T C 1750
UNION
US 74 (ROOSEVELTBLVD)
COORDINATE WITH U-5723
U-4024 14250EXISTING US 74 TO THE MONROE BYPASS. WIDEN TO MULTI-LANES.
0.9
REG
T R 500 T U 750 T C 13000
UNION
US 601
U-5769 82500SR 1316 (REA ROAD EXTENSION) TO SR 3530 (WAXHAW PARKWAY) IN WAXHAW. WIDEN TO MULTI-LANES.
5.7 T 5800R A5800R A T 1400U A T 19600C A C 19600 A T 4800R B4800R B T 1200U B T 19500C B
A SR 1316 (REA ROAD EXTENSION) TO SR 1321 (CUTHBERTSON ROAD) IN WEDDINGTON. WIDEN TO MULTI-LANES.REGB SR 1321 (CUTHBERTSON ROAD) IN WEDDINGTON TO SR 3530 (WAXHAW PARKWAY) IN WAXHAW. WIDEN TO MULTI-LANES.REG
UNION
NC 16 (PROVIDENCEROAD SOUTH)
10-33 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
U-3467 49875 1325NC 16 TO SR 1008 (WAXHAW-INDIAN TRAIL ROAD) IN WESLEY CHAPEL. CONSTRUCT FOUR LANE ROADWAY, PART ON NEW LOCATION.
4.3
REG
STBG R 15250 STBG U 800 STBG C 10833 C 10834 10833C
UNION
NC 84
U-4714 107500 1000SR 3448-SR 3474 (TRADE STREET) TO SR 1377 (WESLEY CHAPEL-STOUTS ROAD). WIDEN TO MULTI-LANES.
6.5 STBGDA R 9500 A S(M) R 2400 A STBG R 9700 A STBGDA 1925C A1925C A1925C A C 1925 A S(M) 481C A481C A481C A C 482 A STBG 1925C A1925C A1925C A C 1925 A T R 1000 AB T C 19000 AB STBGDA R 14540 B S(M) R 1860 B L R 10000 B STBGDA 4235C B4235C B4235C B C 4235 B S(M) 1059C B1059C B1059C B C 1058 B
A SR 3448-SR 3474 (TRADE STREET) TO WEST OF MORNINGSIDE MEADOW LANE. (EXCLUDING I-485 INTERCHANGE)DIVAB I-485. IMPROVE INTERCHANGE - TO BE LET WITH I-5507DIVB WEST OF MORNINGSIDE MEADOW LANE TO EAST OF SR 1377 (WESLEY CHAPEL-STOUTS ROAD).DIV
MECKLENBURGUNION
SR 1009 (JOHNSTREET-OLDMONROE ROAD)
U-6031 6800SEYMOUR STREET TO NC 200 (DICKERSON BOULEVARD). WIDEN TO FOUR-LANES DIVIDED.
0.4
DIV
T 950R950R T 500U T C 4400
UNION
SR 1009 (CHARLOTTEAVENUE)
U-5808 4790 1050SR 1367 (MATTHEWS INDIAN TRAIL ROAD) TO SR 1368 (GRIBBLE ROAD). CONSTRUCT ROAD ON NEW LOCATION.
0.4
DIV
T R 300 T U 40 T 3400C
UNION
SR 1362 (CHESTNUTLANE CONNECTOR)
U-4744 150501STBG-DA IN CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION (CRTPO).DIV
STBGDA 15400C15400C28001C C 15400 C 15400 C 15400 C 15400L 3850C3850C7000C C 3850 C 3850 C 3850 C 3850
IREDELLMECKLENBURGUNION
VARIOUS
10-34 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
FORMERLY U-9999C - IN PROGRESS
U-4950 10000CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION (CRTPO) PLANNING (PL) SUPPLEMENT.DIV
STBGDA PE 800 PE 800 PE 800 800PE800PE800PE PE 800 PE 800 PE 800 PE 800L PE 200 PE 200 PE 200 200PE200PE200PE PE 200 PE 200 PE 200 PE 200
IREDELLMECKLENBURGUNION
VARIOUS
COORDINATE WITH U-4024
U-5723 8000 200US 601 INTERCHANGE. CONSTRUCT IMPROVEMENTS.
SW
T R 300 T C 7500
UNION
EXISTING US 74
U-4913 8595 1545I-485 TO SR 1524 (STEVENS MILL ROAD). WIDEN EXISTING ROADWAY.
0.8
DIV
T R 150 T U 900 T 2000C2000C2000C
MECKLENBURGUNION
IDLEWILD ROAD
RIGHT OF WAY IN PROGRESS
U-5987 2510 270UNIONVILLE-INDIAN TRAIL ROAD AND SARDIS ROAD. CONSTRUCT INTERSECTION IMPROVEMENTS.DIV
STBGDA C 1680 L C 560
UNION
INDIAN TRAIL
RIGHT OF WAY IN PROGRESS - PROJECT TO BE ADMINISTERED BY THE TOWN OF STALLINGS
U-5112 2825 325SR 1364 (PLEASANT PLAINS ROAD) AT SR 1357 (POTTERS ROAD) IN STALLINGS. CONSTRUCT INTERSECTION IMPROVEMENTS INCLUDING LEFT TURN LANES AND MODIFICATION OF TRAFFIC SIGNAL.
TRN
STBGDA C 1600 L C 400 HSIP C 500
UNION
STALLINGS
BRIDGE PROJECTSB-5949 2620REPLACE BRIDGE 890053 OVER STEWARTS
CREEK.REG
T R 120 T C 1250 C 1250
UNION
NC 200
UNDER CONSTRUCTION
B-5243 2557 2557REPLACE BRIDGE 890258 OVER SOUTH FORK CROOKED CREEK.
DIVUNION
SR 1008(INDIAN TRAIL ROAD)
10-35 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BRIDGE PROJECTS
RIGHT OF WAY IN PROGRESS
B-5374 605 130REPLACE BRIDGE 890448 OVER BUFFALO CREEK.
DIV
STPOFF C 475
UNION
SR 2154(GULLEDGE ROAD)
RIGHT OF WAY IN PROGRESS
B-5801 365 115REPLACE BRIDGE 890163 OVER POLE CAT CREEK.
DIV
STPOFF C 250
UNION
SR 2166(PLYLER ROAD)
B-5377 572 100REPLACE BRIDGE 890157 OVER POLE CAT CREEK.
DIV
STPOFF R 22 STPOFF C 450
UNION
SR 2170(CENTER PROSPECT)
UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5110 16007 16007DIVISION 10 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVANSON
CABARRUSMECKLENBURGSTANLYUNION
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4910 30304 30304ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 10 PROJECT MITIGATION.ANSON
CABARRUSMECKLENBURGSTANLYUNION
VARIOUS
HIGHWAY SAFETY PROJECTS
UNDER CONSTRUCTION
W-5520 7755 7755FAIRVIEW ROAD TO WESLEY CHAPEL STOUTS ROAD IN INDIAN TRAIL. CONVERT EXISTING FULL MOVEMENT SIGNALIZED INTERSECTIONS TO SIGNALIZED SUPERSTREET DESIGN.
REGUNIONUS 74
10-36 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)HIGHWAY SAFETY PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5210 11865 11865DIVISION 10 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS. DIV DIVISION 10 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN DIVISION CATEGORY.DIV
REG DIVISION 10 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN REGIONAL CATEGORY.REGSW DIVISION 10 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN STATEWIDE CATEGORY.SW
ANSONCABARRUSMECKLENBURGSTANLYUNION
VARIOUS
W-5710 1678 278SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 10.
HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
ANSONCABARRUSMECKLENBURGSTANLYUNION
VARIOUS
CONGESTION MITIGATION PROJECTSC-5613 20901PROJECTS TO IMPROVE CONGESTION AND
AIR QUALITY IN THE CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION (CRTPO) AREA.
EX
CMAQ PE 828 PE 844 L PE 207 PE 211 CMAQ R 828 R 844 L R 207 R 211 CMAQ C 4971 C 5062 L C 1243 C 1265 CMAQ O 828 O 844 L O 207 O 211 CMAQ I 828 I 844 L I 207 I 211
IREDELLMECKLENBURGUNION
VARIOUS
10-37 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)CONGESTION MITIGATION PROJECTS
C-5617 249PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE ROCKY RIVER RPO.
EX
CMAQ PE 10 PE 10 L PE 2 PE 3 CMAQ R 10 R 10 L R 2 R 3 CMAQ C 59 C 60 L C 15 C 15 CMAQ O 10 O 10 L O 2 O 3 CMAQ I 10 I 10 L I 2 I 3
UNION
VARIOUS
IN PROGRESS
C-5536 624 624MECKLENBURG COUNTY AIR QUALITY -GRADE (GRANTS TO REPLACE AGING DIESEL ENGINS). REPLACE, REPOWER OR RETROFIT AGING DIESEL VEHICLES AND EQUIPMENT.
EXCABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANUNION
CHARLOTTE
C-4957 1049 1049CONSTRUCT SIDEWALKS AT SELECTED LOCATIONS IN INDIAN TRAIL.EX A SUN VALLEY HIGH SCHOOL AND MIDDLE SCHOOL - UNDER CONSTRUCTIONEX
B SOUTH SIDE OF UNION-INDIAN TRAIL ROAD AND ON THE NORTH SIDE OF SARDIS ROAD - COMPLETEEX
UNIONINDIAN TRAIL
10-38 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TA-6170 489 489CAPITAL
HF
FNU L S
ANSON
ANSON COUNTY
FUNDS AUTHORIZED IN PROGRESS
TK-6106 2867 1637ADMINISTRATION
HF
FNU AD 164 AD 164 AD 164 164AD164AD164AD L AD 31 AD 31 AD 31 31AD31AD31AD S AD 10 AD 10 AD 10 10AD10AD10AD
ANSON
ANSON COUNTY
FUNDS AUTHORIZED IN PROGRESS
TQ-8012 139 139CAPITAL - MOBILITY MANAGEMENT
HF
FEPD L S
ANSONCABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANSTANLYUNION
CENTRALINA COUNCIOF GOVERNMENTS
FUNDS AUTHORIZED IN PROGRESS
TQ-6924 158 158OPERATING
HF
FEPD L
ANSONCABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANSTANLYUNION
CENTRALINA COUNCIOF GOVERNMENTS
10-39 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
TQ-6171 490 490MOBILITY MANAGEMENT
HF
FEPD L S
ANSONCABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANSTANLYUNION
CENTRALINA COUNCIOF GOVERNMENTS
FUNDS AUTHORIZED IN PROGRESS
TI-6102 10518 6642INTERCITY BUS - CHARLOTTE TO WILMINGTON
HF
FNU O 265 O 265 O 265 265O265O265O L O 116 O 116 O 116 116O116O116O S O 265 O 265 O 265 265O265O265O
ANSONCUMBERLANDHOKEMOORERICHMONDUNION
COACH AMERICA
AVIATION PROJECTS
UNDER CONSTRUCTION
AV-5732 300 300COMMERCIAL SERVICES TERMINAL (DESIGN & CONSTRUCTION)
REGCABARRUS
CONCORD REGIONALAIRPORT (JQF)
AV-5731 7917SOUTH DEVELOPMENT AREA APRON EXPANSION - PHASE II: APRON EXPANSION (DESIGN & CONSTRUCTION)REG
T C 300 O C 7617
CABARRUS
CONCORD REGIONALAIRPORT (JQF)
BICYCLE AND PEDESTRIAN PROJECTSU-5545 2313CABARRUS ROWAN MPO TRANSPORTATION
ALTERNATIVES (TA) PROGRAM.
DIV
TAPDA R 20 20R20R20R R 20 R 20 R 20 R 20L R 5 5R5R5R R 5 R 5 R 5 R 5TAPDA C 90 C 200 200C200C200C C 200 C 200 C 200 C 200L C 23 C 50 50C50C50C C 50 C 50 C 50 C 50
CABARRUSROWAN
VARIOUS
10-40 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BICYCLE AND PEDESTRIAN PROJECTS
EB-5732 6241 241US 29 TO WEDDINGTON ROAD. CONSTRUCT SIDEWALK ON BOTH SIDES OF THE ROAD, INCLUDING A PORTION OF WEDDINGTON ROAD.
1.7
DIV
TAP C 4800 L C 1200
CABARRUS
BRUTON SMITH BLVD/CONCORD MILLS BLVD/PORTION OF WEDDINGTONROAD
EB-5903 410UNION STREET. CONSTRUCT SIDEWALK EXTENSION.
DIV
L R 10 TAPDA C 320 L C 80
CABARRUS
CONCORD
EB-5902 312DOWNTOWN PEDESTRIAN SIGNAL UPGRADES.
DIV
TAPDA C 250 L C 62
CABARRUS
CONCORD
EB-5844 2400LITTLE TEXAS ROAD, LANE STREET TO DALE EARNHARDT BOULEVARD. CONSTRUCT SIDEWALK AND CURB AND GUTTER.
DIV
TAP 320PE L 80PE TAP 320R L 80R TAP C 1280 L C 320
CABARRUS
KANNAPOLIS
PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TA-6537 762 762CAPITAL
HF
FNU L S
CABARRUS
CABARRUS COUNTY
TA-6547 242 242CAPITAL - EXPANSION VEHICLES
HF
FEPD L S
CABARRUS
CABARRUS COUNTY
10-41 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TK-6113 2034 2034ADMINISTRATION
HF
FNU L S
CABARRUS
CABARRUS COUNTY
TM-6146 292 292OPERATING
HF
JARC L
CABARRUS
CABARRUS COUNTY
TQ-6784 660 660OPERATINGHF
FEPD
CABARRUSCABARRUS COUNTY
FUNDS AUTHORIZED IN PROGRESS
TQ-6924 158 158OPERATING
HF
FEPD L
ANSONCABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANSTANLYUNION
CENTRALINA COUNCIOF GOVERNMENTS
TQ-6171 490 490MOBILITY MANAGEMENT
HF
FEPD L S
ANSONCABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANSTANLYUNION
CENTRALINA COUNCIOF GOVERNMENTS
10-42 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TQ-8012 139 139CAPITAL - MOBILITY MANAGEMENT
HF
FEPD L S
ANSONCABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANSTANLYUNION
CENTRALINA COUNCIOF GOVERNMENTS
OTHER FUNDS ARE CHARLOTTE AREA TRANSIT (CATS) FUNDS
TA-6672 3000PURCHASE 6 BUSES FOR THE UNIVERSITY TO CONCORD MILLS BUS ROUTE.
REG
O A 2700 T A 300
CABARRUSMECKLENBURG
CHARLOTTE AREATRANSIT SYSTEM
TA-4961 6675 5125REPLACEMENT BUS
HF
FUZ CP 1240 L CP 155 S CP 155
CABARRUS
RIDER TRANSIT / CONCORD
FUNDS AUTHORIZED IN PROGRESS
TA-5125 2029 620EXPANSION BUS
HF
FUZ CP 1170 L CP 239
CABARRUS
RIDER TRANSIT / CONCORD
TA-5173 1630 1630PURCHASE REPLACEMENT BUSES
HF
FUZ L
CABARRUS
RIDER TRANSIT / CONCORD
FUNDS AUTHORIZED IN PROGRESS
TA-5128A 4250 7505310 PROGRAM PROJECTS - CAPITAL
HF
FEPD CP 400 CP 400 CP 500 500CP500CP500CP L CP 100 CP 100 CP 125 125CP125CP125CP
CABARRUS
RIDER TRANSIT / CONCORD
10-43 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TA-5130B 3626 7505339 BUS AND BUS FACILITIES - EXPANSION VEHICLES
HF
FBUS CP 350 CP 350 CP 400 400CP400CP400CP L CP 88 CP 88 CP 100 100CP100CP100CP
CABARRUS
RIDER TRANSIT / CONCORD
FUNDS AUTHORIZED IN PROGRESS
TA-5128B 2610 5405310 PROGRAM PROJECTS - OPERATING
HF
FEPD O 180 O 180 O 225 225O225O L O 180 O 180 O 225 225O225O
CABARRUS
RIDER TRANSIT / CONCORD
FUNDS AUTHORIZED IN PROGRESS
TA-5128C 340 60ADMINISTRATION OF 5310 PROGRAM
HF
FEPD AD 40 AD 40 AD 50 50AD50AD50AD
CABARRUS
RIDER TRANSIT / CONCORD
FUNDS AUTHORIZED IN PROGRESS
TG-5103A 7243 3493ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETC
HF
FUZ CP 500 CP 500 CP 500 500CP500CP500CP L CP 125 CP 125 CP 125 125CP125CP125CP
CABARRUSROWAN
RIDER TRANSIT / CONCORD
FUNDS AUTHORIZED IN PROGRESS
TG-5103B 3446 1252ROUTINE CAPITAL - ADA SERVICES
HF
FUZ O 250 O 250 O 300 350O300O300O L O 63 O 68 O 75 88O75O75O
CABARRUSROWAN
RIDER TRANSIT / CONCORD
FUNDS AUTHORIZED IN PROGRESS
TG-5103C 14975 5225PREVENTIVE MAINTENANCE
HF
FUZ O 1200 O 1200 O 1200 1400O1400O1400O L O 300 O 300 O 300 350O350O350O
CABARRUSROWAN
RIDER TRANSIT / CONCORD
FUNDS AUTHORIZED IN PROGRESS
TO-5138 34868 18590OPERATING ASSISTANCE
HF
FUZ O 1300 O 1300 O 1300 1300O1300O1300O L O 1100 O 1100 O 1100 1100O1100O1100O SMAP O 313 O 313 O 313 313O313O313O
CABARRUS
RIDER TRANSIT / CONCORD
10-44 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
TO-5138B 1050 1050OPERATING ASSISTANCE - NEW SUNDAY SERVICE
HF
CMAQ
CABARRUS
RIDER TRANSIT / CONCORD
FUNDS AUTHORIZED IN PROGRESS
TP-5118 760 304PLANNING ASSISTANCE - CABARRUS-ROWAN
HF
FMPL CP 60 CP 60 CP 60 60CP60CP60CP L CP 8 CP 8 CP 8 8CP8CP8CP S CP 8 CP 8 CP 8 8CP8CP8CP
CABARRUS
RIDER TRANSIT / CONCORD
FUNDS AUTHORIZED IN PROGRESS
TS-5116 303 153SAFETY & SECURITY - MIN. 1% SET ASIDE
HF
FUZ CP 25 CP 25 CP 25 25CP25CP25CP
CABARRUS
RIDER TRANSIT / CONCORD
TG-6187 3751URBANIZED FORMULA PROGRAMFUNDS MANAGED BY NCDOT FORORANGE, ALAMANCE, DAVIDSON, GUILFORD, CABARRUS, IREDELL, HOKE, CUMBERLAND, HARNETT, UNION, MECKLENBURG TRANSPORTATION SYSTEMS – CAPITAL PROGRAM
HF
FUZ CP 500 CP 550 CP 600 700CP650CP L CP 125 CP 138 CP 150 175CP163CP
ALAMANCECABARRUSCUMBERLANDDAVIDSONGUILFORDHARNETTHOKEIREDELLMECKLENBURGORANGEUNION
STATEWIDE
FREIGHT RAIL PROJECTSP-5725 5950CONSTRUCT TRACK IMPROVEMENTS,
SECOND PLATFORM, PEDESTRIAN UNDERPASS, SITEWORK, RETAINING WALL, SIGNALING EQUIPMENT
REG
T 1250R T C 4700
CABARRUS
KANNAPOLIS
OTHER FUNDS BY NORFOLK SOUTHERN
Y-4810K 15600GRADE SEPARATION AT ROGERS LAKE ROAD CROSSING (724408Y) IN KANNAPOLIS.
SW
T R 2800 T C 12350 O C 450
CABARRUS
NORFOLK SOUTHERNMAINLINE
10-45 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PASSENGER RAIL PROJECTS
IN PROGRESS
P-4405 10291 10291PRIVATE CROSSING SAFETY INITIATIVE TO CLOSE OR ENHANCE PROTECTION AT RAILROAD CROSSINGS BETWEEN RALEIGH AND CHARLOTTE.
TRNALAMANCECABARRUSDAVIDSONDURHAMGUILFORDMECKLENBURGORANGEROWANWAKE
VARIOUS
P-5719 18000PIEDMONT SERVICE EXPANSION. PURCHASE 5 BI-LEVEL PASSENGER CARS.REG
T A 18000
ALAMANCECABARRUSDAVIDSONDURHAMGUILFORDMECKLENBURGORANGERANDOLPHROWANWAKE
NCRR
UNDER CONSTRUCTION
P-5208 140295 140295PIEDMONT CORRIDOR, RESTORE DOUBLE TRACK, HAYDOCK TO JUNKER.TRNCABARRUS
MECKLENBURG
PIEDMONT CORRIDOR
10-46 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PASSENGER RAIL PROJECTS
P-2918 158562 158562TRAIN 74 / 75 OPERATIONS BETWEEN CHARLOTTE AND RALEIGH, EQUIPMENT AND CAPITAL YARD MAINTENANCE FACILITY.
EX A EQUIPMENT REBUILD - 2 F59PHI LOCOMOTIVES - IN PROGRESSB PURCHASE 2 USED LOCOMOTIVES - COMPLETEC EQUIPMENT REHABILITATION - 3 LOCOMOTIVES - IN PROGRESSD EQUIPMENT REHABILITATION - 3 PASSENGER CARS - COMPLETEE PASSENGER TRAIN SECURITY SYSTEM, CCTV DATA NETWORK AND GENERATORS - IN PROGRESSF CRISP CHARLOTTE MAINTENANCE FACILITY - TRACK EXTENSION AND SHOP BUILDING - IN PROGRESSG PURCHASE 4 USED PASSENGER CARS AND REHABILITATE 7 PASSENGER CARS - IN PROGRESSH CAPITAL YARD PHASE 1 IMPROVEMENTS - EXTEND TRACKS 1 AND 2, MAJOR WORK TRACK 3 - IN PROGRESSI EQUIP 9 STATIONS AND PLATFORMS WITH ADA/FRA PIDS - IN PROGRESS
ALAMANCECABARRUSDAVIDSONDURHAMGUILFORDMECKLENBURGORANGERANDOLPHROWANWAKE
PIEDMONT CORRIDOR
BICYCLE AND PEDESTRIAN PROJECTSU-5544 16263CHARLOTTE REGIONAL TRANSPORTATION
PLANNING ORGANIZATION (CRTPO) TRANSPORTATION ALTERNATIVES (TA) PROGRAM.
DIV
TAPDA R 100 R 100 100R100R100R R 100 R 100 R 100 R 100L R 25 R 25 25R25R25R R 25 R 25 R 25 R 25TAPDA C 2210 C 1100 C 1100 1100C1100C1100C C 1100 C 1100 C 1100 C 1100L C 553 C 275 C 275 275C275C275C C 275 C 275 C 275 C 275
IREDELLMECKLENBURGUNION
VARIOUS
EB-5820 1094 250CHARLOTTE B-CYCLE EXPANSION.
DIV
TAPDA C 675 L C 169
MECKLENBURG
CHARLOTTE
EB-5832 1591SR 2833 (MALLARD CREEK CHURCH ROAD), SR 2472 (MALLARD CREEK ROAD) TO SR 2746 (CLAUDE FREEMAN DRIVE). CONSTRUCT MULTI-USE TRAIL ON SOUTH SIDE OF ROAD.
DIV
TAP PE 110 L PE 27 TAP R 421 L R 105 TAP C 542 L C 136 TAPDA C 200 L C 50
MECKLENBURG
CHARLOTTE
EB-5784 1099IRVINS CREEK GREENWAY, IDLEWILD ROAD TO LAKEVIEW CIRCLE. CONSTRUCT GREENWAY.DIV
STBGDA C 879 L C 220
MECKLENBURG
CHARLOTTE
10-47 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BICYCLE AND PEDESTRIAN PROJECTS
EB-5842 1154NC 16 (PROVIDENCE ROAD), GREENTREE DRIVE TO KNOB OAK LANE. CONSTRUCT SIDEWALK ON WEST SIDE OF ROAD.
DIV
TAP 69PE L 23PE TAP 355R L 118R TAP C 442 L C 147
MECKLENBURG
CHARLOTTE
EB-5781 1363STEWART CREEK GREENWAY, STATE STREET TO ROZZELLES FERRY ROAD. CONSTRUCT GREENWAY.DIV
STBGDA C 1090 L C 273
MECKLENBURG
CHARLOTTE
EB-5782 7876MCALPINE CREEK GREENWAY, GREEN REA ROAD TO FOUR MILE CREEK GREENWAY. CONSTRUCT GREENWAY.
DIV
TAP PE 175 L PE 58 TAP C 1673 L C 558 CMAQ C 2826 L C 1211 STBGDA C 1100 L C 275
MECKLENBURG
CHARLOTTE
SEGMENTS A AND D LET TOGETHER
EB-4715 7964 7964LITTLE SUGAR CREEK GREENWAY.
A 7TH STREET TO BAXTER STREET - COMPLETEB PORTION OF LITTLE SUGAR CREEK GREENWAY - COMPLETED 7TH STREET TO BAXTER STREET - COMPLETEE TYVOLA ROAD TO I-485 - UNDER CONSTRUCTIONTRN
MECKLENBURGCHARLOTTE
EB-5777 3000MCDOWELL CREEK TRIBUTARY GREENWAY; CONSTRUCT GREENWAY FROM SMITHVILLE PARK TO J.V. WASHAM ELEMENTARY. CONSTRUCT MULTI-USE PATH ALONG WESTMORELAND ROAD TO LAKE PINES DRIVE.DIV
TAPDA R 300 L R 75 TAPDA C 2100 L C 525
MECKLENBURG
CORNELIUS
UNDER CONSTRUCTION
EB-5775 840 840SOUTH PRONG ROCKY RIVER GREENWAY (SOUTH STREET - MAIN STREET). CONSTRUCT GREENWAY.DIVMECKLENBURG
CORNELIUS
10-48 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BICYCLE AND PEDESTRIAN PROJECTS
UNDER CONSTRUCTION
EB-5010 3162 3162CALDWELL STATION CREEK GREENWAY, CALDWELL COMMONS ON US 21 TO BAILEY ROAD PARK.
2.6TRNMECKLENBURG
CORNELIUS
UNDER CONSTRUCTION
EB-5817 1850 1850MCDOWELL CREEK GREENWAY, MAGNOLIA PLAZA TO WESTMORELAND ROAD. CONSTRUCT GREENWAY.DIVMECKLENBURG
CORNELIUS
COORDINATE WITH PROJECT U-5873
EB-5776 307NC 115 SIDEWALK AND BIKE LANE MODERNIZATION (SMITH ROAD - POTTS STREET).DIV
STBGDA C 246 L C 61
MECKLENBURG
CORNELIUS
EB-5785 2000MCDOWELL CREEK GREENWAY, CHILGROVE LANE TO TORRENCE CREEK GREENWAY. CONSTRUCT GREENWAY.DIV
STBGDA C 1600 L C 400
MECKLENBURG
HUNTERSVILLE
EB-5829 1393CONSTRUCT FOUR MILE CREEKGREENWAY CROSSING UNDERSR 3448 (SOUTH TRADE STREET)DIV
STBGDA C 1114 L C 279
MECKLENBURG
MATTHEWS
EB-5779 275PLEASANT PLAINS ROAD BICYCLE LANES (TRADE STREET - MCKEE ROAD). CONSTRUCT BIKE LANES.
DIV
STBGDA R 57 L R 14 STBGDA C 163 L C 41
MECKLENBURG
MATTHEWS
EB-5783 400SAM NEWELL ROAD MULTI-USE PATH, RICE ROAD TO CROWN POINT ELEMENTARY SCHOOL. CONSTRUCT GREENWAY.
DIV
STBGDA PE 120 L PE 30 STBGDA R 200 L R 50
MECKLENBURG
MATTHEWS
UNDER CONSTRUCTION
EB-5786 2200 2200LITTLE SUGAR CREEK GREENWAY EXTENSION, RAMBLEWOOD LANE IN CHARLOTTE TO CADILLAC STREET IN PINEVILLE. CONSTRUCT GREENWAY.
DIVMECKLENBURG
MECKLENBURG COUNTY
10-49 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BICYCLE AND PEDESTRIAN PROJECTS
FEASIBILITY STUDY IN PROGRESS
EB-5749 CONSTRUCT IMPROVEMENTS TO ACCOMMODATE BICYCLE AND PEDESTRIAN TRAVEL OVER THE CATAWBA RIVER.DIVGASTON
MECKLENBURG
MOUNT HOLLY
PUBLIC TRANSPORTATION PROJECTSTQ-6171 490 490MOBILITY MANAGEMENT
HF
FEPD L S
ANSONCABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANSTANLYUNION
CENTRALINA COUNCIOF GOVERNMENTS
FUNDS AUTHORIZED IN PROGRESS
TQ-6924 158 158OPERATING
HF
FEPD L
ANSONCABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANSTANLYUNION
CENTRALINA COUNCIOF GOVERNMENTS
10-50 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TQ-8012 139 139CAPITAL - MOBILITY MANAGEMENT
HF
FEPD L S
ANSONCABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANSTANLYUNION
CENTRALINA COUNCIOF GOVERNMENTS
OTHER FUNDS ARE CHARLOTTE AREA TRANSIT (CATS) FUNDS
TA-6672 3000PURCHASE 6 BUSES FOR THE UNIVERSITY TO CONCORD MILLS BUS ROUTE.
REG
O A 2700 T A 300
CABARRUSMECKLENBURG
CHARLOTTE AREATRANSIT SYSTEM
FUNDS AUTHORIZED IN PROGRESS
TA-4710 171464 52151REPLACEMENT BUSES
HF
CMAQ FUZ CP 16657 CP 11804 CP 8548 10885CP9895CP11219CP CP 16624 CP 8728 L CP 2082 CP 1476 CP 1069 1361CP2598CP1402CP CP 2078 CP 1091 S CP 2082 CP 1476 CP 1069 1361CP1237CP1402CP CP 2078 CP 1091
MECKLENBURG
CHARLOTTE AREA TRANSIT SYSTEM
FUNDS AUTHORIZED IN PROGRESS
TA-5227 9660 4830REPLACEMENT BUS- CMAQ APPLICATION MU#2012-3
HF
CMAQ CP 3864 L CP 966
MECKLENBURG
CHARLOTTE AREA TRANSIT SYSTEM
FUNDS AUTHORIZED IN PROGRESS
TA-4960 6302 2691REPLACEMENT VAN - VANPOOL
HF
FUZ CP 321 CP 397 434CP421CP408CP CP 446 CP 460 L CP 40 CP 50 54CP53CP51CP CP 56 CP 58 S CP 40 CP 50 54CP53CP51CP CP 56 CP 58
MECKLENBURG
CHARLOTTE AREA TRANSIT SYSTEM
10-51 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TA-4711 29773 14629REPLACEMENT - PARATRANSIT VEHICLE
HF
FUZ CP 1224 CP 1482 CP 1454 1590CP1543CP1498CP CP 1637 CP 1686 L CP 153 CP 185 CP 182 199CP193CP187CP CP 205 CP 211 S CP 153 CP 185 CP 182 199CP193CP187CP CP 205 CP 211
MECKLENBURG
CHARLOTTE AREA TRANSIT SYSTEM
FUNDS AUTHORIZED IN PROGRESS
TA-4785C 7450 7450REPLACEMENT BUS - (CMAQ APPLICATION MU-10)
HF
CMAQ L
MECKLENBURG
CHARLOTTE AREA TRANSIT SYSTEM
FUNDS AUTHORIZED IN PROGRESS
TD-4702 4920 3900FACILITY - TRANSIT CENTER - UPGRADES
HF
FUZ C 160 C 80 C 96 96C96C96C C 96 C 96 L C 20 C 10 C 12 12C12C12C C 12 C 12 S C 20 C 10 C 12 12C12C12C C 12 C 12
MECKLENBURG
CHARLOTTE AREA TRANSIT SYSTEM
FUNDS AUTHORIZED IN PROGRESS
TD-4701 53291 24008FACILITY - SOUTH TRYON STREET GARAGE -DEBT SERVICE
HF
FUZ C 2928 C 2930 C 2928 2930C2930C2927C C 2928 C 2926 L C 366 C 366 C 366 366C366C366C C 366 C 366 S C 366 C 366 C 366 366C366C366C C 366 C 366
MECKLENBURG
CHARLOTTE AREA TRANSIT SYSTEM
TD-4704D 5000 5000BUS PURCHASE
HF
CMAQ L S
MECKLENBURG
CHARLOTTE AREA TRANSIT SYSTEM
FUNDS AUTHORIZED IN PROGRESS
TE-4901 1105515 929952FIXED GUIDEWAY - BLUE LINE EXTENSION - PLANS, DESIGN, ACQUISITION, CONSTRUCTION, TIFIA LOAN
HF
FNS C 59235 L S C 25000 C 25000 C 25000 16328C25000C
MECKLENBURG
CHARLOTTE AREA TRANSIT SYSTEM
FUNDS AUTHORIZED IN PROGRESS
TE-4905 150000 150000STREETCAR CITYLYNX GOLD LINE PHASE 2
HF
FNS L
MECKLENBURG
CHARLOTTE AREA TRANSIT SYSTEM
10-52 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TE-4902 49068 48468RAPID TRANSIT CORRIDOR STUDIES
HF
FED FUZ C 160 C 160 C 160 L C 20 C 20 C 20 S C 20 C 20 C 20
MECKLENBURG
CHARLOTTE AREA TRANSIT SYSTEM
FUNDS AUTHORIZED IN PROGRESS
TE-4702 24929 24929FIXED GUIDEWAY - SOUTH CORRIDOR
HF
FBUS S
MECKLENBURG
CHARLOTTE AREA TRANSIT SYSTEM
FUNDS AUTHORIZED IN PROGRESS
TG-6176 3500 3500REPLACEMENT OF FAREBOXES ON CATS BUSES
HF
L STPDA
MECKLENBURG
CHARLOTTE AREA TRANSIT SYSTEM
FUNDS AUTHORIZED IN PROGRESS
TG-4726 35817 14635ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, ETC
HF
FMOD FUZ CP 1206 CP 1580 CP 1627 2680CP2614CP1676CP CP 2746 CP 2815 L CP 302 CP 396 CP 406 670CP654CP420CP CP 686 CP 704
MECKLENBURG
CHARLOTTE AREA TRANSIT SYSTEM
FUNDS AUTHORIZED IN PROGRESS
TG-4827 5579 2368ROUTINE CAPITAL - SERVICE VEHICLE
HF
FUZ CP 550 CP 183 CP 183 331CP331CP331CP CP 331 CP 331 L CP 138 CP 46 CP 46 82CP82CP82CP CP 82 CP 82
MECKLENBURG
CHARLOTTE AREA TRANSIT SYSTEM
FUNDS AUTHORIZED IN PROGRESS
TG-5119 74248 38968PREVENTIVE MAINTENANCE - RAIL, BUS AND FACILITIES
HF
FUZ CP 3528 CP 3528 CP 3528 3528CP3528CP3528CP CP 3528 CP 3528 L CP 882 CP 882 CP 882 882CP882CP882CP CP 882 CP 882
MECKLENBURG
CHARLOTTE AREA TRANSIT SYSTEM
FUNDS AUTHORIZED IN PROGRESS
TG-5118A 59522 4415STATE OF GOOD REPAIR - RAIL
HF
FSGR 13368CPCP 2085 CP 2148 CP 2212 2417CP2347CP2278CP CP 2879 CP 2965 CP 5612 CP 5718L 1697CPCP 261 CP 269 CP 276 302CP293CP285CP CP 360 CP 371 CP 702 CP 723S 1697CPCP 261 CP 269 CP 276 302CP293CP285CP CP 360 CP 371 CP 702 CP 723
MECKLENBURG
CHARLOTTE AREA TRANSIT SYSTEM
FUNDS AUTHORIZED IN PROGRESS
TG-5118B 30238 15561LIGHT RAIL VEHICLE OVERHAUL
HF
FUZ CP 1321 CP 1360 CP 1401 1531CP1486CP1443CP CP 1577 CP 1624 L CP 330 CP 340 CP 350 382CP372CP360CP CP 394 CP 406
MECKLENBURG
CHARLOTTE AREA TRANSIT SYSTEM
10-53 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TO-5137 200670 100254OPERATING ASSISTANCE
HF
SMAP O 12552 O 12552 O 12552 12552O12552O12552O O 12552 O 12552
MECKLENBURG
CHARLOTTE AREA TRANSIT SYSTEM
TO-5137A 31352 1752OPERATING ASSISTANCE - LYNX BLUE LINE STARTUP OPERATIONAL SUPPORT - CMAQ APP #MU11AHF
CMAQ O 3511 O 3511 L O 11289 O 11289
MECKLENBURG
CHARLOTTE AREA TRANSIT SYSTEM
FUNDS AUTHORIZED IN PROGRESS
TP-5114 6066 2602PLANNING ASSISTANCE
HF
FMPL PL 347 PL 347 PL 347 347PL347PL347PL PL 347 PL 347 L PL 43 PL 43 PL 43 43PL43PL43PL PL 43 PL 43 S PL 43 PL 43 PL 43 43PL43PL43PL PL 43 PL 43
MECKLENBURG
CHARLOTTE AREA TRANSIT SYSTEM
FUNDS AUTHORIZED IN PROGRESS
TQ-6957 6444 1710OPERATING PROJECTS FOR ENHANCED MOBILITY OF SERNIOR AND INDIVIDUALS WITH DISABILITIESHF
FEPD O 305 O 314 O 323 353O 333O O 364 O 375 L O 305 O 314 O 323 353O 333O O 364 O 375
MECKLENBURG
CHARLOTTE AREA TRANSIT SYSTEM
FUNDS AUTHORIZED IN PROGRESS
TQ-7009 367 103ADMINISTRATIVE OVERSIGHT FOR 5310
HF
FEPD AD 34 AD 35 AD 36 39AD 37AD AD 41 AD 42
MECKLENBURG
CHARLOTTE AREA TRANSIT SYSTEM
FUNDS AUTHORIZED IN PROGRESS
TQ-9033 9937 2399ENHANCED MOBILITY OF SENIORS AND INDIVIDUALS WITH DISABILITIES
HF
FEPD CP 678 CP 699 CP 720 786CP764CP741CP CP 810 CP 834 L CP 85 CP 87 CP 90 98CP95CP93CP CP 101 CP 104 S CP 85 CP 87 CP 90 98CP95CP93CP CP 101 CP 104
MECKLENBURG
CHARLOTTE AREA TRANSIT SYSTEM
FUNDS AUTHORIZED IN PROGRESS
TS-5107 8500 3512SAFETY & SECURITY - MIN. 1% SET ASIDE
HF
FUZ CP 502 CP 520 CP 520 490CP490CP490CP CP 490 CP 490 L CP 126 CP 130 CP 130 122CP122CP122CP CP 122 CP 122
MECKLENBURG
CHARLOTTE AREA TRANSIT SYSTEM
FUNDS AUTHORIZED IN PROGRESS
TW-4901 13095 4249STATE OF GOOD REPAIR - BUS
HF
FMOD FSGR 1333CPCP 391 CP 403 CP 518 567CP550CP534CP CP 584 CP 601 CP 619 CP 638L 167CPCP 49 CP 50 CP 276 71CP69CP67CP CP 73 CP 75 CP 77 CP 80S 167CPCP 49 CP 50 CP 276 71CP69CP67CP CP 73 CP 75 CP 77 CP 80
MECKLENBURG
CHARLOTTE AREA TRANSIT SYSTEM
10-54 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TW-5102A 4074 1674BRIDGE INSPECTIONS AND REPAIRS
HF
FUZ C 240 C 240 C 240 240C240C240C C 240 C 240 L C 30 C 30 C 30 30C30C30C C 30 C 30 S C 30 C 30 C 30 30C30C30C C 30 C 30
MECKLENBURG
CHARLOTTE AREA TRANSIT SYSTEM
FUNDS AUTHORIZED IN PROGRESS
TW-5104B 39710 21713STATE OF GOOD REPAIR - BUS
HF
FSGR CP 1619 CP 1668 CP 1718 1877CP1822CP1769CP CP 1933 CP 1991 FUZ L CP 202 CP 208 CP 215 235CP228CP221CP CP 242 CP 249 S CP 202 CP 208 CP 215 235CP228CP221CP CP 242 CP 249
MECKLENBURG
CHARLOTTE AREA TRANSIT SYSTEM
FUNDS AUTHORIZED IN PROGRESS
TW-5102B 3255 1515FIXED GUIDEWAY MODERNIZATION - BRIDGE INSPECTION & EMERGENCY REPAIRSHF
FMOD C 240 C 240 C 240 240C240C240C L C 50 C 50 C 50 50C50C50C
MECKLENBURG
CHARLOTTE AREA TRANSIT SYSTEM
FUNDS AUTHORIZED IN PROGRESS
TI-6101 8823 5247INTERCITY BUS - BOONE TO CHARLOTTE
HF
FNU O 246 O 246 O 246 246O246O246O L O 106 O 106 O 106 106O106O106O S O 244 O 244 O 244 244O244O244O
CALDWELLCATAWBALINCOLNMECKLENBURGWATAUGA
COACH AMERICA
TQ-6172 286 286MOBILITY MANAGEMENT
HF
FEPD L S
MECKLENBURG
MAINSTREAMING CONSULTANTS
OTHER FUNDS ARE CHARLOTTE AREA TRANSIT (CATS) FUNDS
TA-6673 2500EXPAND PARATRANSIT FLEET BY PURCHASING ADDITIONAL BUSES.
DIV
T 250A O 2250A
MECKLENBURG
MECKLENBURGCOUNTY
10-55 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TA-6269 700 700CAPITAL
HF
FNU L S
MECKLENBURG
MECKLENBURG TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TK-6145 3479 1949ADMINISTRATION
HF
FNU AD 21 AD 21 AD 21 21AD21AD21AD L AD 38 AD 38 AD 38 38AD38AD38AD S AD 196 AD 196 AD 196 196AD196AD196AD
MECKLENBURG
MECKLENBURG TRANSPORTATION
TG-6187 3751URBANIZED FORMULA PROGRAMFUNDS MANAGED BY NCDOT FORORANGE, ALAMANCE, DAVIDSON, GUILFORD, CABARRUS, IREDELL, HOKE, CUMBERLAND, HARNETT, UNION, MECKLENBURG TRANSPORTATION SYSTEMS – CAPITAL PROGRAM
HF
FUZ CP 500 CP 550 CP 600 700CP650CP L CP 125 CP 138 CP 150 175CP163CP
ALAMANCECABARRUSCUMBERLANDDAVIDSONGUILFORDHARNETTHOKEIREDELLMECKLENBURGORANGEUNION
STATEWIDE
10-56 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)FREIGHT RAIL PROJECTS
DP FUNDS ARE FISCAL YEAR 2015 TIGER GRANT FUNDS. STBG-DA FUNDS BEING USED ON PROJECT ARE EXEMPT BECAUSE P-5705 B IS A REGIONAL CATEGORY PROJECT.
P-5705 93264 4864CHARLOTTE GATEWAY STATION. T R 1000 A T C 8150 A O C 500 A T C 30000 BA DP C 25000 BA STBGDA C 2000 BA S(M) C 500 BA DP C 5000 BB STBGDA C 4800 BB S(M) C 1200 BB STBGDA C 8200 BC S(M) C 2050 BC
A WYE CONNECTION TRACK AT CHARLOTTE JUNCTIONSWB CHARLOTTE GATEWAY STATION - RIGHT-OF-WAY - RIGHT-OF-WAY ACQUISITION IN PROGRESSREGBA CHARLOTTE GATEWAY STATION - TRACK, STRUCTURE, AND SIGNALSREGBB CHARLOTTE GATEWAY STATION - PLATFORM AND CANOPYREGBC CHARLOTTE GATEWAY STATION - STATION AND PASSENGER SERVICE RELOCATIONREG
MECKLENBURG
CHARLOTTE
P-5730 20400EXTEND CLANTON ROAD TO US 29/74 (WILKINSON BOULEVARD) WITH A GRADE SEPARATION OF NORFOLK SOUTHERN RAILROAD AND CLOSE THE DONALD ROSS ROAD CROSSING.
DIV
T 3200R T C 17200
MECKLENBURG
CLANTON ROAD
"OTHER" FUNDING REPRESENTS PARTICIPATION BY NORFOLK SOUTHERN CORPORATION
P-5702 976ESTABLISH A NEW THOROUGHBRED BULK TRANSFER (TBT) FACILITY IN CHARLOTTE.
DIV
T 488C O 488C
MECKLENBURG
NORFOLK SOUTHERNMAIN LINE (TRACKMILEPOST 376)
10-57 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PASSENGER RAIL PROJECTS
IN PROGRESS
P-4405 10291 10291PRIVATE CROSSING SAFETY INITIATIVE TO CLOSE OR ENHANCE PROTECTION AT RAILROAD CROSSINGS BETWEEN RALEIGH AND CHARLOTTE.
TRNALAMANCECABARRUSDAVIDSONDURHAMGUILFORDMECKLENBURGORANGEROWANWAKE
VARIOUS
P-5719 18000PIEDMONT SERVICE EXPANSION. PURCHASE 5 BI-LEVEL PASSENGER CARS.REG
T A 18000
ALAMANCECABARRUSDAVIDSONDURHAMGUILFORDMECKLENBURGORANGERANDOLPHROWANWAKE
NCRR
P-5200 8797 7947RAIL CORRIDOR BETWEEN GASTONIA AND MOUNT HOLLY INCLUDING THE BELMONT SPUR. REACTIVATION OF RAIL CORRIDOR.
STPE C 850 D
A CROSSING SIGNAL CONSTRUCTION - COMPLETEB CROSSING SIGN/PAVEMENT MARKING INSTALLATION - COMPLETEC RAIL TRACK CONSTRUCTION ENGINEERING OVERSIGHT - COMPLETED BELMONT SPUR - RIGHT OF WAY IN PROGRESSTRNEA THRIFT DEPOT RELOCATION - UNDER CONSTRUCTIONTRNEB THRIFT DEPOT STABILIZATION - UNDER CONSTRUCTIONTRN
GASTONMECKLENBURG
PIEDMONT ANDNORTHERNRAILROAD
10-58 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PASSENGER RAIL PROJECTS
P-2918 158562 158562TRAIN 74 / 75 OPERATIONS BETWEEN CHARLOTTE AND RALEIGH, EQUIPMENT AND CAPITAL YARD MAINTENANCE FACILITY.
EX A EQUIPMENT REBUILD - 2 F59PHI LOCOMOTIVES - IN PROGRESSB PURCHASE 2 USED LOCOMOTIVES - COMPLETEC EQUIPMENT REHABILITATION - 3 LOCOMOTIVES - IN PROGRESSD EQUIPMENT REHABILITATION - 3 PASSENGER CARS - COMPLETEE PASSENGER TRAIN SECURITY SYSTEM, CCTV DATA NETWORK AND GENERATORS - IN PROGRESSF CRISP CHARLOTTE MAINTENANCE FACILITY - TRACK EXTENSION AND SHOP BUILDING - IN PROGRESSG PURCHASE 4 USED PASSENGER CARS AND REHABILITATE 7 PASSENGER CARS - IN PROGRESSH CAPITAL YARD PHASE 1 IMPROVEMENTS - EXTEND TRACKS 1 AND 2, MAJOR WORK TRACK 3 - IN PROGRESSI EQUIP 9 STATIONS AND PLATFORMS WITH ADA/FRA PIDS - IN PROGRESS
ALAMANCECABARRUSDAVIDSONDURHAMGUILFORDMECKLENBURGORANGERANDOLPHROWANWAKE
PIEDMONT CORRIDOR
UNDER CONSTRUCTION
P-5208 140295 140295PIEDMONT CORRIDOR, RESTORE DOUBLE TRACK, HAYDOCK TO JUNKER.TRNCABARRUS
MECKLENBURG
PIEDMONT CORRIDOR
AVIATION PROJECTSAV-5817 4636ACQUIRE LAND FOR EXPANSION AND
PERFORM ESA TO DETERMINE STATUS OF STRUCTURES ON PROPERTY. CLEAR AND GRUBB LAND REQUIRED FOR EXPANSION AND DEMOLISH HOUSES ON PROPERTY ACQUIRED.DIV
T 1287R1287R O 143R143R T 799C799C O 89C89C
STANLY
STANLY COUNTYAIRPORT (VUJ)
BICYCLE AND PEDESTRIAN PROJECTS
UNDER CONSTRUCTION
EB-5526 440 440LEONARD AVENUE, MAIN STREET TO NC 24/NC 27. CONSTRUCT SIDEWALKS.TRNSTANLY
ALBEMARLE
EB-5855 390PARK RIDGE ROAD, NORTH SECOND STREET TO PARK LANE. CONSTRUCT SIDEWALK.
DIV
TAP 24PE L 6PE TAP R 48 L R 12 TAP C 240 L C 60
STANLY
ALBEMARLE
10-59 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BICYCLE AND PEDESTRIAN PROJECTS
EB-5841 2000US 52, WEST MAIN STREET TO SNUGGES STREET. CONSTRUCT SIDEWALK ON EAST SIDE OF ROAD
DIV
TAP 80PE L 20PE TAP 240R L 60R TAP C 1280 L C 320
STANLY
ALBEMARLE
UNDER CONSTRUCTION - PROJECT ADMINISTERED BY TOWN OF LOCUST
EB-4717 250 250CONSTRUCT BIKE/PEDESTRIAN TRAIL ALONG TOWN SEWER EASEMENTS IN LOCUST.TRNSTANLY
LOCUST
EB-5857 285NC 200, NORTH LOVE CHAPEL TO CARMEL ROAD. CONSTRUCT SIDEWALKS AND ADA RAMPS ON WEST SIDE OF STREET.
DIV
TAP 8PE L 2PE TAP 40R L 10R TAP C 180 L C 45
STANLY
STANFIELD
PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TQ-8012 139 139CAPITAL - MOBILITY MANAGEMENT
HF
FEPD L S
ANSONCABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANSTANLYUNION
CENTRALINA COUNCIOF GOVERNMENTS
10-60 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TQ-6924 158 158OPERATING
HF
FEPD L
ANSONCABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANSTANLYUNION
CENTRALINA COUNCIOF GOVERNMENTS
TQ-6171 490 490MOBILITY MANAGEMENT
HF
FEPD L S
ANSONCABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANSTANLYUNION
CENTRALINA COUNCIOF GOVERNMENTS
FUNDS AUTHORIZED IN PROGRESS
TQ-9028 486 486CAPIATAL - PURCHASE OF SERVICE
HF
FEPD L S
COLUMBUSDAVIEMOOREROBESONSTANLY
MONARCH
10-61 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
TQ-6173 477 477OPERATING ASSISTANCE - PURCHASE OF SERVICE
HF
FEPD L S
COLUMBUSCUMBERLANDSTANLY
MONARCH
FUNDS AUTHORIZED IN PROGRESS
TA-6219 364 364CAPITAL
HF
FNU L S
STANLY
SCUSA TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TK-6164 3164 1808ADMINISTRATION
HF
FNU O 181 O 181 O 181 181O181O181O FNU L O 34 O 34 O 34 34O34O34O S O 11 O 11 O 11 11O11O11O
STANLY
SCUSA TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TQ-9027 60 60CAPITAL - PURCHASE OF SERVICE
HF
FEPD L S
STANLY
Stanly County
FREIGHT RAIL PROJECTSP-5703 2450MILEPOST 27.5 TO 29.6. UPGRADE THE RAIL
ON US 52 TO ALLOW FOR FREIGHT.REG
T C 2450
STANLY
NORFOLK SOUTHERNN LINE
AVIATION PROJECTS
LOCAL FUNDS (L) FROM CITY OF MONROE
AV-5824 3232CONSTRUCT A PARALLEL TAXIWAY ON THE EAST SIDE OF RUNWAY 5-23.
DIV
T 2909C L 323C
UNION
CHARLOTTE-MONROE EXECUTIVEAIRPORT (EQY)
10-62 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)AVIATION PROJECTS
AV-5825 410CONSTRUCT TAXILINE AND APRON FOR ADDITIONAL CORPORATE HANGER DEVELOPMENT.
DIV
T 369R L 41R
UNION
CHARLOTTE-MONROE EXECUTIVEAIRPORT (EQY)
LOCAL (L) FUNDS FROM THE CITY OF MONROE
AV-5814 1324RELOCATE AND WIDEN THE EXISTING PARALLEL TAXIWAY SECTION BETWEEN THE EXISTING RAMP AND THE RUNWAY 5 TAXIWAY EXTENSION.
DIV
T 596C596C L 66C66C
UNION
CHARLOTTE-MONROEEXECUTIVE AIRPORT(EQY)
BICYCLE AND PEDESTRIAN PROJECTSEB-5723 3740SR 1520 (INDIAN TRAIL FAIRVIEW ROAD) TO
SR 1367 (UNIONVILLE INDIAN TRAIL ROAD). CONSTRUCT A MULTI-USE PATH. SR 1367 (UNIONVILLE INDIAN TRAIL ROAD) TO OAKWOOD LANE. CONSTRUCT A MULTI-USE GREENWAY.
0.6
DIV
TAP PE 145 L PE 36 TAP R 100 L R 25 TAP C 868 L C 687 STBGDA C 1879
UNION
US 74
U-5544 16263CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION (CRTPO) TRANSPORTATION ALTERNATIVES (TA) PROGRAM.
DIV
TAPDA R 100 R 100 100R100R100R R 100 R 100 R 100 R 100L R 25 R 25 25R25R25R R 25 R 25 R 25 R 25TAPDA C 2210 C 1100 C 1100 1100C1100C1100C C 1100 C 1100 C 1100 C 1100L C 553 C 275 C 275 275C275C275C C 275 C 275 C 275 C 275
IREDELLMECKLENBURGUNION
VARIOUS
UNDER CONSTRUCTION
EB-5011 1640 1640BEARSKIN CREEK GREENWAY, DICKENSON PARK TO CREFT PARK IN MONROE.TRNUNION
MONROE
EB-5819 1210 180DOWNTOWN WAXHAW PEDESTRIAN AND BICYCLE FACILITY ENHANCEMENTS.
DIV
TAPDA C 515 L C 515
UNION
WAXHAW
10-63 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TQ-8012 139 139CAPITAL - MOBILITY MANAGEMENT
HF
FEPD L S
ANSONCABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANSTANLYUNION
CENTRALINA COUNCIOF GOVERNMENTS
FUNDS AUTHORIZED IN PROGRESS
TQ-6924 158 158OPERATING
HF
FEPD L
ANSONCABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANSTANLYUNION
CENTRALINA COUNCIOF GOVERNMENTS
TQ-6171 490 490MOBILITY MANAGEMENT
HF
FEPD L S
ANSONCABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANSTANLYUNION
CENTRALINA COUNCIOF GOVERNMENTS
10-64 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 10
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TI-6102 10518 6642INTERCITY BUS - CHARLOTTE TO WILMINGTON
HF
FNU O 265 O 265 O 265 265O265O265O L O 116 O 116 O 116 116O116O116O S O 265 O 265 O 265 265O265O265O
ANSONCUMBERLANDHOKEMOORERICHMONDUNION
COACH AMERICA
TG-6187 3751URBANIZED FORMULA PROGRAMFUNDS MANAGED BY NCDOT FORORANGE, ALAMANCE, DAVIDSON, GUILFORD, CABARRUS, IREDELL, HOKE, CUMBERLAND, HARNETT, UNION, MECKLENBURG TRANSPORTATION SYSTEMS – CAPITAL PROGRAM
HF
FUZ CP 500 CP 550 CP 600 700CP650CP L CP 125 CP 138 CP 150 175CP163CP
ALAMANCECABARRUSCUMBERLANDDAVIDSONGUILFORDHARNETTHOKEIREDELLMECKLENBURGORANGEUNION
STATEWIDE
FUNDS AUTHORIZED IN PROGRESS
TA-6149 417 417CAPITAL
HF
FNU L S
UNION
UNION COUNTY
FUNDS AUTHORIZED IN PROGRESS
TK-6169 2515 1417ADMINISTRATION
HF
FNU AD 147 AD 147 AD 147 147AD147AD147AD L AD 27 AD 27 AD 27 27AD27AD27AD S AD 9 AD 9 AD 9 9AD9AD9AD
UNION
UNION COUNTY
FREIGHT RAIL PROJECTS
"OTHER" FUNDING REPRESENTS PARTICIPATION BY CSX CORPORATION
P-5704 12320 1320MILEPOST 311.8 TO MILEPOST 316.9. 10,000 FEET SIDING EXTENSION AT STOUTS IN UNION COUNTY.REG
T C 3500 C 2000 O C 3500 C 2000
UNION
CSX SF LINE
10-65 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
STATE TRANSPORTATION IMPROVEMENT PROGRAM
11
Division 11AlleghanyAsheAveryCaldwellSurryWataugaWilkesYadkin
HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
UNDER CONSTRUCTION
R-3101 38088 38088ROARING GAP TO SPARTA. UPGRADE ROADWAY TO TWENTY-FOUR FEET WITH TWO FOOT PAVED SHOULDERS.
12TRNALLEGHANY
US 21
UNDER CONSTRUCTION
R-4060 11137 11137SR 1172 (GRANDVIEW DRIVE) TO US 21. TWO LANES ON NEW LOCATION.
0.8
DIVALLEGHANY
US 21SPARTA WESTERNLOOP
UNDER CONSTRUCTION
R-5791 597 597DIVISION 11 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVALLEGHANYASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
BRIDGE PROJECTS
UNDER CONSTRUCTION
B-4701 1445 1445REPLACE BRIDGE 020015 OVER ELK CREEK.
DIVALLEGHANY
SR 1341(OSBORNEMEMORIAL ROAD)
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5111 20202 20202DIVISION 11 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVALLEGHANY
ASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
11-3 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)MITIGATION PROJECTS
IN PROGRESS
EE-4911 14611 14611ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 11 PROJECT MITIGATION.ALLEGHANY
ASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
HIGHWAY SAFETY PROJECTSW-5711 1400SAFETY IMPROVEMENTS AT VARIOUS
LOCATIONS IN DIVISION 11.HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS. - IN PROGRESSDIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS. - IN PROGRESSREGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS. - IN PROGRESSSW
ALLEGHANYASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5211 292 292DIVISION 11 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS. REG DIVISION 11 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN REGIONAL CATEGORY.REGALLEGHANY
ASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
11-4 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
R-5833 1700US 221 BUSINESS (SOUTH JEFFERSON AVENUE), NC 194 AND SR 1248 (BEAVER CREEK SCHOOL ROAD). CONSTRUCT SUPERSTREET INTERSECTION.DIV
T 300R T 100U T C 1300
ASHE
US 221 BUSINESS
PLANNING/DESIGN IN PROGRESS
R-2915 253919 186444US 421 IN WATAUGA COUNTY TO US 221 BUSINESS/NC 88 IN JEFFERSON. WIDEN TO FOUR LANES DIVIDED.
16.1 STBG C 15425 C C 15425 C C 15425 C STBG C 10600 E C 10600 E
A US 421 IN WATAUGA COUNTY TO SR 1003 (IDLEWILD ROAD) IN ASHE COUNTY - UNDER CONSTRUCTION WITH R-2915BTRNB SR 1003 (IDLEWILD ROAD) TO NORTH OF SOUTH FORK NEW RIVER - UNDER CONSTRUCTION WITH R-2915ATRNC NORTH OF SOUTH FORK NEW RIVER TO SOUTH OF NC 194 - UNDER CONSTRUCTIONDIVD SOUTH OF NC 194 TO US 221 BYPASS - UNDER CONSTRUCTIONTRNE US 221 BYPASS TO US 221 BUSINESS/NC 88 IN JEFFERSON - RIGHT OF WAY IN PROGRESSDIV
ASHEWATAUGA
US 221
R-5832 4900NC 88 TO NC 194. UPGRADE ROADWAY. 3.8
DIV
T 100R T 100U T C 4700
ASHE
NC 88
UNDER CONSTRUCTION
R-5791 597 597DIVISION 11 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVALLEGHANYASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
BRIDGE PROJECTS
UNDER CONSTRUCTION
B-4705 987 987REPLACE BRIDGE 040069 OVER LITTLE HELTON CREEK.
DIVASHE
SR 1376(JOE THOMAS ROAD)
UNDER CONSTRUCTION
B-5147 944 944REPLACE BRIDGE 040327 OVER LITTLE BUFFALO CREEK.
HFASHE
SR 1509(CLAYBANK ROAD)
11-5 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BRIDGE PROJECTS
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5111 20202 20202DIVISION 11 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVALLEGHANY
ASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4911 14611 14611ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 11 PROJECT MITIGATION.ALLEGHANY
ASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
HIGHWAY SAFETY PROJECTSW-5711 1400SAFETY IMPROVEMENTS AT VARIOUS
LOCATIONS IN DIVISION 11.HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS. - IN PROGRESSDIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS. - IN PROGRESSREGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS. - IN PROGRESSSW
ALLEGHANYASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
11-6 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)HIGHWAY SAFETY PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5211 292 292DIVISION 11 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS. REG DIVISION 11 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN REGIONAL CATEGORY.REGALLEGHANY
ASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
RURAL PROJECTSR-2520 74939 739MULTI-LANE SECTION EAST OF SPRUCE
PINE TO US 221. WIDEN TO MULTI-LANES.9.4 T 6700R A
T 800U A T C 12267 A C 12266 A C 12267 AT 4300R B T 25600C B
A MULTI-LANES EAST OF SPRUCE PINE TO SR 1106. WIDEN TO MULTI-LANES.DIVB SR 1106 TO US 221. WIDEN TO MULTI-LANES.
AVERYMITCHELL
US 19E-NC 194
PLANNING/DESIGN IN PROGRESS
R-2566 126161 4011US 221 TO SR 1107 (NC 105 BYPASS) IN BOONE. WIDEN TO MULTI-LANES.
14.8 NHP 1000R A NHP 60350C A NHP 5000R B5000R B NHP 3400U B3400U B NHP 10625C B C 10625 B C 10625 B C 10625 B NHP R 100 BA NHP C 1400 BA
A US 221 IN AVERY COUNTY TO SR 1136 (CLARKS CREEK ROAD) IN WATAUGA COUNTY.B SR 1136 (CLARKS CREEK ROAD) TO SR 1107 (NC 105 BYPASS) IN BOONE.REGBA CONSTRUCT NEW BRIDGE OVER WATAUGA RIVER AND LEFT-TURN LANE AT SR 1112 (BROADSTONE ROAD). - WITHIN THE LIMITS OF R-2566 BDIV
AVERYWATAUGA
NC 105
11-7 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
UNDER CONSTRUCTION
R-5791 597 597DIVISION 11 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVALLEGHANYASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
BRIDGE PROJECTS
UNDER CONSTRUCTION
B-5380 1022 1022REPLACE BRIDGE 050141 OVER CREEK.
HFAVERY
SR 1114(BIG PLUMTREECREEK ROAD)
B-5835 890 100REPLACE BRIDGE 050125 OVER ELK RIVER.
DIV
STPOFF 40R STPOFF 750C
AVERY
SR 1306(HICKS HOLLOW ROAD)
UNDER CONSTRUCTION
B-5383 1346 1346REPLACE BRIDGE 050143 OVER LINVILLE RIVER.
HFAVERY
SR 1536(GREENE ROAD)
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5111 20202 20202DIVISION 11 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVALLEGHANY
ASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
11-8 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)MITIGATION PROJECTS
IN PROGRESS
EE-4911 14611 14611ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 11 PROJECT MITIGATION.ALLEGHANY
ASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
HIGHWAY SAFETY PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5211 292 292DIVISION 11 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS. REG DIVISION 11 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN REGIONAL CATEGORY.REGALLEGHANY
ASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
W-5711 1400SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 11.
HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS. - IN PROGRESSDIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS. - IN PROGRESSREGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS. - IN PROGRESSSW
ALLEGHANYASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
11-9 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
UNDER CONSTRUCTION
R-5745 1225 1225INTERSECTION OF US 64/NC 90/NC 18 (WILKESBORO BOULEVARD) AND US 64/NC 90 (TAYLORSVILLE ROAD). CONSTRUCT INTERSECTION IMPROVEMENTS.DIVCALDWELL
US 64/NC 90/NC 18(WILKESBORO BLVD)
R-3430 79307 807CATAWBA RIVER TO SR 1933 (SOUTH-WEST BOULEVARD) IN LENOIR. WIDEN TO MULTI-LANES.
7.1
DIV
T 27500R T 4000U T C 15667 C 15666 C 15667
CALDWELL
SR 1001 (CONNELLYSPRINGS ROAD)
UNDER CONSTRUCTION
R-5791 597 597DIVISION 11 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVALLEGHANYASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
UNDER CONSTRUCTION - PE AND ROW DONE UNDER PROJECT SS-4911 U - STATE MATCH WILL BE SPOT SAFETY FUNDS
R-5805 708 708INTERSECTION OF CONNELLY SPRINGS ROAD AND CAJAH'S MOUNTAIN ROAD. CONSTRUCT LEFT TURN LANE.DIVCALDWELL
CAJAH'S MOUNTAIN
RIGHT OF WAY IN PROGRESS. PROJECT IS IN EXEMPT CATEGORY BECAUSE STBG-DA FUNDS ARE BEING USED ON REGIONAL CATEGORY PROJECT - STATE MATCH IS SPOT SAFETY (SS-4911 AL)
R-5775 1430 430INTERSECTION OF US 321 AND SR 1109 (PINEWOODS ROAD EXTENSION). CONSTRUCT INTERSECTION IMPROVEMENTS.
EX
STBGDA C 800 S(M) C 200
CALDWELL
GRANITE FALLS
URBAN PROJECTSU-6033 450US 64 (NC 18) AND SR 1142 (CALLICO
ROAD). INTERSECTION IMPROVEMENTS.
DIV
T R 100 T U 100 T C 250
CALDWELL
US 64 (NC 18)
11-10 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
PLANNING/DESIGN IN PROGRESS - INCLUDES B-4450 - $2.8 M IN STBG-DA AND $700 K IN MATCHING FUNDS IS FOR CATAWBA RIVER BRIDGE ENHANCEMENTS - $2.8 M IS EXEMPT BECAUSE IT IS STBG-DA SPENT ON A SW TIER PROJECT
U-4700 297810 4790NORTH OF US 70 IN HICKORY TO SR 1933 (SOUTHWEST BOULEVARD). WIDEN TO SIX LANES.
13.3 NHP R 11886 A R 21500 A HP R 9614 A NHP U 2000 A NHP 29100C A29100C A29100C A C 29100 A STBGDA 2800C A L 700C A NHP 4000U B NHP 35000R B NHP 57500C B NHP 2000U C NHP 10000R C NHP 12000C C NHP R 420 CA NHP C 1750 CA NHP U 100 CB NHP R 400 CB NHP C 2200 CB NHP U 100 CC NHP R 450 CC NHP C 2200 CC
A NORTH OF US 70 IN HICKORY TO US 321A - STBGDA FUNDS ARE EXEMPT BECAUSE THEY ARE BEING USED ON STATEWIDE CATEGORY PROJECTSWB US 321A TO SR 1108 (MISSION ROAD)C SR 1108 (MISSION ROAD) TO SR 1933 (SOUTHWEST BOULEVARD).CA SR 1160 (MOUNT HERMAN ROAD). UPGRADE INTERSECTION TO SUPERSTREET DESIGN - WITHIN THE LIMITS OF U-4700 C. - DESIGN BY DIVISIONREGCB SR 1809/1952 (PINE MOUNTAIN ROAD). UPGRADE INTERSECTION TO SUPERSTREET DESIGN - WITHIN THE LIMITS OF U-4700 C.SWCC SR 1108 (MISSION ROAD). UPGRADE INTERSECTION TO SUPERSTREET DESIGN - WITHIN THE LIMITS OF U-4700 C.SW
BURKECALDWELLCATAWBA
US 321
U-6034 1850SR 1109 (PINEWOOD ROAD) TO SR 1106 (DUKE STREET). UPGRADE ROADWAY.
1.3
DIV
T R 100 T U 100 T 1650C
CALDWELL
US 321 ALT
U-6035 1030SR 1002 (DUDLEY SHOALS ROAD) AND SR 1751 (GRACE CHAPEL ROAD/CAMPGROUND ROAD)/SR 1752 (PEACH ORCHARD ROAD). CONSTRUCT ROUNDABOUT.DIV
T R 150 T U 100 T C 780
CALDWELL
SR 1002 (DUDLEYSHOALS ROAD)
U-6036 6350US 321 TO SR 1931 (BERT HUFFMAN ROAD). UPGRADE ROADWAY.
0.6
DIV
T R 1250 T U 500 T C 2300 2300C
CALDWELL
SR 1109 (PINEWOODROAD)
11-11 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
U-5615 32510STBG-DA IN THE GREATER HICKORY METROPOLITAN PLANNING ORGANIZATION (MPO) AREA.DIV
STBGDA C 1074 C 2770 C 2770 2770C2770C2770C C 2770 C 2770 C 2770 C 2770L C 269 C 693 C 693 693C693C693C C 693 C 693 C 693 C 693
ALEXANDERBURKECALDWELLCATAWBA
VARIOUS
U-5924 1250GREATER HICKORY METROPOLITAN PLANNING ORGANIZATION (MPO) PLANNING (PL) SUPPLEMENT.DIV
STBGDA PE 100 PE 100 PE 100 100PE100PE100PE PE 100 PE 100 PE 100 PE 100L PE 25 PE 25 PE 25 25PE25PE25PE PE 25 PE 25 PE 25 PE 25
ALEXANDERBURKECALDWELLCATAWBA
VARIOUS
RIGHT OF WAY IN PROGRESS
U-5776 3396 896INTERSECTION OF SR 1106 (DUKE STREET) AND US 321A. REALIGN INTERSECTION.REG
T C 2500
CALDWELLGRANITE FALLS
BRIDGE PROJECTS
TO BE CONSTRUCTED WITH U-4700
B-4450 17 17REPLACE BRIDGE 130367 OVER CATAWBA RIVER.CALDWELL
US 321
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5111 20202 20202DIVISION 11 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVALLEGHANY
ASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
UNDER CONSTRUCTION - CITY OF LENOIR - MUNICIPAL PROJECT
B-5011 923 923REPLACE BRIDGE 130074 OVER LOWER CREEK.
DIVCALDWELL
LENOIR(FAIRVIEW DRIVE)
11-12 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)MITIGATION PROJECTS
IN PROGRESS
EE-4911 14611 14611ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 11 PROJECT MITIGATION.ALLEGHANY
ASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
HIGHWAY SAFETY PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5211 292 292DIVISION 11 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS. REG DIVISION 11 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN REGIONAL CATEGORY.REGALLEGHANY
ASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
W-5711 1400SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 11.
HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS. - IN PROGRESSDIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS. - IN PROGRESSREGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS. - IN PROGRESSSW
ALLEGHANYASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
11-13 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)ROADSIDE ENVIRONMENTAL PROJECTS (SCENIC)
UNDER CONSTRUCTION - 2012 NATIONAL SCENIC BYWAYS GRANT
S-5504 57 57UPPER YADKIN WAY SCENIC BYWAY. INSTALL WAYSHOWING SIGNAGE.
CALDWELLWILKES
UPPER YADKINWAY SCENICBYWAY
INTERSTATE PROJECTSI-5907 4300I-77 TO US 601. PAVEMENT REHABILITATION. 6.6SW
NHPIM C 4300
SURRYI-74
PROJECT COMPLETE - GARVEE BOND FUNDING $4.69 MILLION; PAYBACK FY 2007 - FY 2018
I-5002 12090 11576I-77 TO US 601. PAVEMENT REHABILITATION. 6TRN
NHP CG 514
SURRYI-74
UNDER CONSTRUCTION
I-5862 3450 3450VIRGINIA STATE LINE TO I-77. PAVEMENT REHABILITATION.
4.9SWSURRY
I-74
UNDER CONSTRUCTION
I-5863 3950 3950US 601 TO MILEMARKER 17.7. PAVEMENT REHABILITATION.
6.2SWSURRY
I-74
I-5909 2600MILEMARKER 86.9 TO MILEMARKER 91. PAVEMENT REHABILITATION.
4.1SW
NHPIM C 2600
SURRYI-77
SECTION A - GARVEE BOND FUNDING $35 MILLION; PAYBACK FY 2007 - FY 2018
I-2808 139806 75060SOUTH OF SR 1125 (MILE MARKER 71) IN YADKIN COUNTY TO US 21 BYPASS (MILE MARKER 83.5) IN SURRY COUNTY (EXIT 83). PAVEMENT REHABILITATION.
12 NHP CG 3746 A NHP 61000C B
A SOUTH OF SR 1125 (ASHBURY CHURCH ROAD-MILEPOST 71) TO US 21 IN YADKIN COUNTY (EXIT 79) - COMPLETETRNB US 21 IN YADKIN COUNTY (EXIT 79) TO US 21 BYPASS (EXIT 83) IN SURRY COUNTY
SURRYYADKIN
I-77
UNDER CONSTRUCTION
I-5801 900 900MILEMARKER 83.4 TO MILEMARKER 85.9. PAVEMENT REHABILITATION.
2.5SWSURRY
I-77
UNDER CONSTRUCTION
I-5802 850 850MILEMARKER 85.9 TO MILEMARKER 86.9. PAVEMENT REHABILITATION.
1SWSURRY
I-77
11-14 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)INTERSTATE PROJECTS
UNDER CONSTRUCTION
I-5829 3050 3050MILEMARKER 91 TO MILEMARKER 95. PAVEMENT REHABILITATION.
4SWSURRY
I-77
UNDER CONSTRUCTION
I-5830 1750 1750MILEMARKER 99 TO I-74. PAVEMENT REHABILITATION.
2.3SWSURRY
I-77
I-5910 3500MILEMARKER 95 TO MILEMARKER 99. PAVEMENT REHABILITATION.
4SW
NHPIM C 3500
SURRYI-77
I-5912 6000US 21 IN YADKIN COUNTY (EXIT 79) TO MILEMARKER 83.4 IN SURRY COUNTY . PAVEMENT REHABILITATION.
5SW
NHPIM 6000C
SURRYYADKIN
I-77
RURAL PROJECTSR-5714 6700 500US 52 TO SR 1365 (FORREST DRIVE).
UPGRADE ROADWAY.1
REG
T R 1700 T U 200 T C 4300
SURRY
US 601
R-5836 54700I-74 TO SR 1104 (CODY TRAIL). WIDEN TO 4-LANES.
7.2
DIV
T R 3200 T U 500 T C 17000 17000C17000C
SURRY
US 601
UNDER CONSTRUCTION BY MOUNT AIRY-SURRY COUNTY AIRPORT
R-5309 1000 1000JANICE DRIVE TO COTTAGE DRIVE. RELOCATE ROADWAY FOR MOUNT AIRY-SURRY COUNTY AIRPORT RUNWAY EXTENSION.
1.2
TRNSURRY
SR 1627 (HOLLYSPRINGS ROAD)
11-15 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
UNDER CONSTRUCTION
R-5791 597 597DIVISION 11 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVALLEGHANYASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
BRIDGE PROJECTSB-5831 13099 100REPLACE BRIDGE 850006 OVER NC 268,
SOUTHERN RR, AND YADKIN RIVER.SW
NHPB 600R NHPB 4133C4133C C 4133
SURRY
I-77 NORTH
B-5527 4650 100REPLACE BRIDGE 850122 OVER TOMS CREEK.
SW
NHPB R 400 NHPB C 2075 2075C
SURRY
US 52 (NORTH-BOUND LANE)
B-5971 6700REPLACE BRIDGE 850387 OVER ELKIN CREEK.
DIV
STPOFF R 300 STPOFF C 6400
SURRY
SR 1149(ELK SPUR STREET)
UNDER CONSTRUCTION
B-5173 1346 1346REPLACE BRIDGE 850039 OVER MITCHELL RIVER.
DIVSURRY
SR 1328(HAYSTACK ROAD)
B-5832 3900 100REPLACE BRIDGE 850152 OVER ARARAT RIVER.
DIV
STPOFF 200R STPOFF 3600C
SURRY
SR 2080(QUAKER CHURCHROAD)
11-16 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BRIDGE PROJECTS
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5111 20202 20202DIVISION 11 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVALLEGHANY
ASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4911 14611 14611ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 11 PROJECT MITIGATION.ALLEGHANY
ASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
HIGHWAY SAFETY PROJECTS
UNDER CONSTRUCTION
W-5307 2478 2478SOUTH OF NC 18 TO SOUTH OF NC 18. CURVE RE-ALIGNMENT, PAVEMENT WIDENING, AND PAVED SHOULDERS.
0.2SURRYNC 89
11-17 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)HIGHWAY SAFETY PROJECTS
W-5711 1400SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 11.
HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS. - IN PROGRESSDIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS. - IN PROGRESSREGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS. - IN PROGRESSSW
ALLEGHANYASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5211 292 292DIVISION 11 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS. REG DIVISION 11 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN REGIONAL CATEGORY.REGALLEGHANY
ASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
ROADSIDE ENVIRONMENTAL PROJECTS (SCENIC)
IN PROGRESS - 2012 NATIONAL SCENIC BYWAYS GRANT
S-5503 68 68YADKIN VALLEY SCENIC BYWAY WAYFINDING PROGRAM.
SURRYYADKIN
YADKIN VALLEYSCENIC BYWAY
11-18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
PLANNING/DESIGN IN PROGRESS
R-2915 253919 186444US 421 IN WATAUGA COUNTY TO US 221 BUSINESS/NC 88 IN JEFFERSON. WIDEN TO FOUR LANES DIVIDED.
16.1 STBG C 15425 C C 15425 C C 15425 C STBG C 10600 E C 10600 E
A US 421 IN WATAUGA COUNTY TO SR 1003 (IDLEWILD ROAD) IN ASHE COUNTY - UNDER CONSTRUCTION WITH R-2915BTRNB SR 1003 (IDLEWILD ROAD) TO NORTH OF SOUTH FORK NEW RIVER - UNDER CONSTRUCTION WITH R-2915ATRNC NORTH OF SOUTH FORK NEW RIVER TO SOUTH OF NC 194 - UNDER CONSTRUCTIONDIVD SOUTH OF NC 194 TO US 221 BYPASS - UNDER CONSTRUCTIONTRNE US 221 BYPASS TO US 221 BUSINESS/NC 88 IN JEFFERSON - RIGHT OF WAY IN PROGRESSDIV
ASHEWATAUGA
US 221
R-2615 59150 750US 321/US 421 JUNCTION NEAR VILAS TO SR 1107 (105 BYPASS) - TERMINI OF PROPOSED BOONE BYPASS (U-2703). WIDEN TO MULTI-LANES.
3.5
REG
T 13250R13250R T 1600U1600U T C 9567 C 9566 C 9567
WATAUGA
US 421/US 321
PLANNING/DESIGN IN PROGRESS
R-2566 126161 4011US 221 TO SR 1107 (NC 105 BYPASS) IN BOONE. WIDEN TO MULTI-LANES.
14.8 NHP 1000R A NHP 60350C A NHP 5000R B5000R B NHP 3400U B3400U B NHP 10625C B C 10625 B C 10625 B C 10625 B NHP R 100 BA NHP C 1400 BA
A US 221 IN AVERY COUNTY TO SR 1136 (CLARKS CREEK ROAD) IN WATAUGA COUNTY.B SR 1136 (CLARKS CREEK ROAD) TO SR 1107 (NC 105 BYPASS) IN BOONE.REGBA CONSTRUCT NEW BRIDGE OVER WATAUGA RIVER AND LEFT-TURN LANE AT SR 1112 (BROADSTONE ROAD). - WITHIN THE LIMITS OF R-2566 BDIV
AVERYWATAUGA
NC 105
R-5830 3450STATE FARM ROAD TO SR 1523 (WILSON RIDGE ROAD). UPGRADE ROADWAY.
1
DIV
T R 150 T U 100 T C 3200
WATAUGA
SR 1522 (DEERFIELDROAD)
11-19 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
UNDER CONSTRUCTION
R-5791 597 597DIVISION 11 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVALLEGHANYASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
UNDER CONSTRUCTION. ARC PROJECT NO. 17476
R-5525 5296 5296BLOWING ROCK POST ACUTE CARE FACILITY. CONSTRUCT ACCESS ROAD.
0.25TRNWATAUGA
BLOWING ROCK
URBAN PROJECTSU-5705 2650 300NC 105 INTERSECTION. CONSTRUCT
UPGRADES.SW
T R 450 T 1900C
WATAUGA
US 221/321
U-5715 265 30COLLEGE STREET INTERSECTION. CONSTRUCT IMPROVEMENTS.
SW
T R 45 T C 190
WATAUGA
US 321/421, NC 194(KING STREET)
U-5603 10520 1020US 321 (BLOWING ROCK ROAD) TO NC 105 BYPASS. UPGRADE ROADWAY.
2.1
DIV
T R 1100 T U 3000 T 5400C
WATAUGA
NC 105
U-5810 3600 500US 421/US 221 TO SR 1522 (DEERFIELD ROAD). WIDEN ROADWAY TO 12-FEET LANES WITH 4-FEET PAVED SHOULDERS.
1.9
DIV
T R 100 T C 3000
WATAUGA
SR 1514 (BAMBOOROAD); SR 1523(WILSON RIDGE)
BRIDGE PROJECTS
BRIDGE BEING REPLACED AS PART OF R-2566B
B-5829 4100REPLACE BRIDGE 940005 OVER WATAUGA RIVER.
SW
NHPB R 200 NHPB 1300C1300C1300C
WATAUGA
NC 105
11-20 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BRIDGE PROJECTS
UNDER CONSTRUCTION
B-5118 1108 1108REPLACE BRIDGE 940055 OVER CREEK.
DIVWATAUGA
SR 1557(SHULL'S MILL ROAD)
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5111 20202 20202DIVISION 11 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVALLEGHANY
ASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
B-5979 1600REPLACE BRIDGE NO. 940346 OVER SOUTH FORK OF NEW RIVER IN BOONE.
DIV
STPOFF R 80 L R 20 STPOFF C 1200 L C 300
WATAUGA
HUNTING HILLS LANE
MITIGATION PROJECTS
IN PROGRESS
EE-4911 14611 14611ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 11 PROJECT MITIGATION.ALLEGHANY
ASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
11-21 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)HIGHWAY SAFETY PROJECTS
W-5711 1400SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 11.
HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS. - IN PROGRESSDIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS. - IN PROGRESSREGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS. - IN PROGRESSSW
ALLEGHANYASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5211 292 292DIVISION 11 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS. REG DIVISION 11 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN REGIONAL CATEGORY.REGALLEGHANY
ASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
RURAL PROJECTS
UNDER CONSTRUCTION
R-5755 850 850INTERSECTION OF US 421 RAMPS, SR 1001, AND SR 2461. CONSTRUCT ROUNDABOUT.REGWILKES
US 421
UNDER CONSTRUCTION
R-3405 26962 26962SR 1002 (MOUNTAIN VIEW ROAD) TO SR 1717. WIDEN TO THREE LANES.
3.5WILKESNC 18
R-5759 36600 1000US 421 TO 2ND STREET. WIDEN ROADWAY. 3
DIV
T R 7500 T U 900 T 13600C13600C
WILKES
NC 115
11-22 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
UNDER CONSTRUCTION
R-2603 35831 35831NC 18 TO SR 1966 (AIRPORT ROAD). CONSTRUCT SIDEWALK FROM NC 18 TO SHAVER STREET. WIDEN TO FIVE-LANES FROM SHAVER STREET TO FAIRPLAINS ROAD. WIDEN TO FOUR-LANES DIVIDED FROM FAIRPLAINS ROAD TO SR 1966 (AIRPORT ROAD).
3.6TRNWILKES
NC 268
R-5772 21100 1000US 421 TO NC 268 (EAST MAIN STREET). UPGRADE ROADWAY.
1.3
DIV
T R 5500 T U 1000 T 6800C6800C
WILKES
SR 1001 (OAKWOODSROAD)
R-0616 77268 568WILKESBORO-NORTH WILKESBORO BYPASS, NC 18 TO US 421. CONSTRUCT MULTI-LANE FACILITY, PART ON NEW LOCATION.
4.2
DIV
T 19500R T 2300U T C 54900
WILKES
NEW ROUTE
UNDER CONSTRUCTION
R-5791 597 597DIVISION 11 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVALLEGHANYASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
URBAN PROJECTSU-5312 28350 2050NC 16 TO US 421 BUSINESS. CONVERT
EXISTING ROADWAY TO SUPER STREET AND ADD SERVICE ROADS.
3.4
REG
NHP R 2600 NHP U 4500 NHP C 4800 4800C4800C4800C
WILKES
US 421
BRIDGE PROJECTSB-5951 17000REPLACE BRIDGE 960730 OVER YADKIN
RIVER.
DIV
STPOFF R 800 STPOFF C 8100 C 8100
WILKES
SR 1185(CURTIS BRIDGE ROAD)
11-23 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BRIDGE PROJECTS
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5111 20202 20202DIVISION 11 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVALLEGHANY
ASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4911 14611 14611ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 11 PROJECT MITIGATION.ALLEGHANY
ASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
HIGHWAY SAFETY PROJECTS
UNDER CONSTRUCTION
W-5521 2250 400US 421 NEAR SR 1301 (FALL CREEK ROAD). REALIGNMENT, MEDIAN BARRIER INSTALLATION, AND RUMBLE STRIPS.SW
HSIP C 1850
WILKESUS 421
UNDER CONSTRUCTION
W-5503 3850 3850NC 268 EAST OF NORTH WILKESBORO. WIDEN MULTIPLE SECTIONS, IMPROVE SHOULDERS, AND INSTALL GUARDRAIL, RUMBLE STRIPS, AND PAVEMENT MARKINGS.
REGWILKESNC 268
UNDER CONSTRUCTION
W-5511 2260 2260SR 2324 (RED, WHITE, AND BLUE ROAD) NEAR SR 2326 (RUTH LINNEY ROAD). IMPROVE HORIZONTAL AND VERTICAL ALIGNMENTS ON SR 2324 NEAR SR 2326 AND REPLACE BRIDGE 960193.
DIVWILKESSR 2324
11-24 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)HIGHWAY SAFETY PROJECTS
W-5711 1400SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 11.
HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS. - IN PROGRESSDIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS. - IN PROGRESSREGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS. - IN PROGRESSSW
ALLEGHANYASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5211 292 292DIVISION 11 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS. REG DIVISION 11 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN REGIONAL CATEGORY.REGALLEGHANY
ASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
ROADSIDE ENVIRONMENTAL PROJECTS (SCENIC)
UNDER CONSTRUCTION - 2012 NATIONAL SCENIC BYWAYS GRANT
S-5504 57 57UPPER YADKIN WAY SCENIC BYWAY. INSTALL WAYSHOWING SIGNAGE.
CALDWELLWILKES
UPPER YADKINWAY SCENICBYWAY
INTERSTATE PROJECTSI-5865 2200MILEMARKER 75.8 TO US 21 (EXIT 79).
PAVEMENT REHABILITATION.2.6
SW
NHPIM C 2200
YADKINI-77
I-5911 2100IREDELL COUNTY LINE TO MILEMARKER 71.8. PAVEMENT REHABILITATION.
3.1SW
NHPIM C 2100
YADKINI-77
11-25 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)INTERSTATE PROJECTS
I-5912 6000US 21 IN YADKIN COUNTY (EXIT 79) TO MILEMARKER 83.4 IN SURRY COUNTY . PAVEMENT REHABILITATION.
5SW
NHPIM 6000C
SURRYYADKIN
I-77
SECTION A - GARVEE BOND FUNDING $35 MILLION; PAYBACK FY 2007 - FY 2018
I-2808 139806 75060SOUTH OF SR 1125 (MILE MARKER 71) IN YADKIN COUNTY TO US 21 BYPASS (MILE MARKER 83.5) IN SURRY COUNTY (EXIT 83). PAVEMENT REHABILITATION.
12 NHP CG 3746 A NHP 61000C B
A SOUTH OF SR 1125 (ASHBURY CHURCH ROAD-MILEPOST 71) TO US 21 IN YADKIN COUNTY (EXIT 79) - COMPLETETRNB US 21 IN YADKIN COUNTY (EXIT 79) TO US 21 BYPASS (EXIT 83) IN SURRY COUNTY
SURRYYADKIN
I-77
I-5864 4500MILEMARKER 71.8 TO MILEMARKER 75.8. PAVEMENT REHABILITATION.
4SW
NHPIM C 4500
YADKINI-77
RURAL PROJECTSR-5831 820US 601 (CAROLINA AVENUE) AND NC 67
(MAIN STREET). UPGRADE INTERSECTION.
DIV
T R 135 T U 100 T C 585
YADKIN
US 601
R-5730 1900 250SR 1146 (SHACKTOWN ROAD) TO SR 1711 (SPEER BRIDGE ROAD). CONSTRUCT NEW ROADWAY TO REALIGN SR 1605 WITH SR 1711 AND CONSTRUCT A ROUNDABOUT AT THE INTERSECTION WITH SR 1146.
0.2
DIV
T R 300 T U 100 T C 1250
YADKIN
SR 1605 (OLD US 421)
UNDER CONSTRUCTION
R-5791 597 597DIVISION 11 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVALLEGHANYASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
11-26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
U-5809 11050 750US 421 TO SR 1146 (LEE AVENUE). CONSTRUCT MEDIAN AND ROUNDABOUTS.
0.6
DIV
T R 1500 T U 200 T C 8600
YADKIN
US 601 (STATESTREET)
BRIDGE PROJECTSB-5833 6500 100REPLACE BRIDGE 980029 OVER I-77.
REG
NHPB 300R NHPB 3050C3050C
YADKIN
US 21 BUSINESS
B-5825 17430 100REPLACE BRIDGE 980035 OVER YADKIN RIVER.
REG
T R 830 T 5500C5500C5500C
YADKIN
NC 67
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5111 20202 20202DIVISION 11 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVALLEGHANY
ASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4911 14611 14611ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 11 PROJECT MITIGATION.ALLEGHANY
ASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
11-27 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)HIGHWAY SAFETY PROJECTS
W-5711 1400SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 11.
HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS. - IN PROGRESSDIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS. - IN PROGRESSREGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS. - IN PROGRESSSW
ALLEGHANYASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5211 292 292DIVISION 11 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS. REG DIVISION 11 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN REGIONAL CATEGORY.REGALLEGHANY
ASHEAVERYCALDWELLSURRYWATAUGAWILKESYADKIN
VARIOUS
ROADSIDE ENVIRONMENTAL PROJECTS (SCENIC)
IN PROGRESS - 2012 NATIONAL SCENIC BYWAYS GRANT
S-5503 68 68YADKIN VALLEY SCENIC BYWAY WAYFINDING PROGRAM.
SURRYYADKIN
YADKIN VALLEYSCENIC BYWAY
11-28 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
TA-6527 9 9CAPITAL
HF
FEPD L S
ALLEGHANY
ALLEGHANY COUNTY
FUNDS AUTHORIZED IN PROGRESS
TA-6169 250 250CAPITAL
HF
FNU L S
ALLEGHANY
ALLEGHANY COUNTY
FUNDS AUTHORIZED IN PROGRESS
TK-6105 2162 1232ADMINISTRATION
HF
FNU AD 124 AD 124 AD 124 124AD124AD124AD L AD 23 AD 23 AD 23 23AD23AD23AD S AD 8 AD 8 AD 8 8AD8AD8AD
ALLEGHANY
ALLEGHANY COUNTY
FUNDS AUTHORIZED IN PROGRESS
TQ-6925 48 48OPERATING
HF
FEPD L
ALLEGHANY
ALLEGHANY COUNTY
TQ-6174 84 84OPERATING ASSISTANCEHF
FEPD
ALLEGHANYALLEGHANY COUNTY
AVIATION PROJECTSAV-5848 2699CONSTRUCT APRON EXPANSONS.
DIV
T 2429C O 270C
ASHE
ASHE COUNTYAIRPORT (GEV)
AV-5750 350ACQUIRE LAND AND EXISTING HANGARS NORTH OF RUNWAY 10 THRESHOLD AND ADJACENT TO AIRPORT PROPERTY.
DIV
T R 315 O R 35
ASHE
ASHE COUNTY AIRPORT(GEV)
PUBLIC TRANSPORTATION PROJECTSTA-6674 76PURCHASE EXPANSION VEHICLE TO
PROVIDE TRANSPORTATION SERVICES TO PERSONS OVER 65 YEARS OF AGE AND PERSONS WITH A DISABILITY.DIV
FNU A 60 T A 8 L A 8
ASHE
ASHE COUNTYTRANSPORTATION
11-29 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TA-6171 867 867CAPITAL
HF
FNU L S
ASHE
ASHE COUNTY TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TK-6108 2738 1562ADMINISTRATION
HF
FNU AD 157 AD 157 AD 157 157AD157AD157AD L AD 29 AD 29 AD 29 29AD29AD29AD S AD 10 AD 10 AD 10 10AD10AD10AD
ASHE
ASHE COUNTY TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TQ-6926 52 52OPERATING
HF
FEPD L
ASHE
ASHE COUNTY TRANSPORTATION
TQ-6803 90 90OPERATING
HF
FEPD L
ASHE
ASHE COUNTY TRANSPORTATION
PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TQ-9029 42 42CAPITAL - PURCHASE OF SERVICE
HF
FEPD L S
AVERY
Avery Association for Exceptional Citizens
FUNDS AUTHORIZED IN PROGRESS
TA-6161 177 177CAPITAL
HF
FNU L S
AVERY
AVERY COUNTY TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TK-6109 1356 1356ADMINISTRATION
HF
FNU L S
AVERY
AVERY COUNTY TRANSPORTATION
11-30 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BICYCLE AND PEDESTRIAN PROJECTS
U-5546 4125GREATER HICKORY MPO TRANSPORTATION ALTERNATIVES (TA) PROGRAM.
DIV
TAPDA R 120 R 20 R 20 20R20R20R R 20 R 20 R 20 R 20L R 30 R 5 R 5 5R5R5R R 5 R 5 R 5 R 5TAPDA C 1200 C 200 C 200 200C200C200C C 200 C 200 C 200 C 200L C 300 C 50 C 50 50C50C50C C 50 C 50 C 50 C 50
ALEXANDERBURKECALDWELLCATAWBA
VARIOUS
EB-5808 402UPGRADE CURRENT PEDESTRIAN SIGNALS AND INSTALL NEW PEDESTRIAN SIGNALS.
DIV
STBGDA C 322 L C 80
BURKECALDWELLCATAWBA
HICKORY
RIGHT OF WAY IN PROGRESS
EB-5806 930 280HOSPITAL AVENUE, HARPER AVENUE TO US 321 (BLOWING ROCK BOULEVARD). CONSTRUCT SIDEWALK.DIV
TAPDA C 520 L C 130
CALDWELL
LENOIR
PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TI-6101 8823 5247INTERCITY BUS - BOONE TO CHARLOTTE
HF
FNU O 246 O 246 O 246 246O246O246O L O 106 O 106 O 106 106O106O106O S O 244 O 244 O 244 244O244O244O
CALDWELLCATAWBALINCOLNMECKLENBURGWATAUGA
COACH AMERICA
FUNDS AUTHORIZED IN PROGRESS
TA-6507 2934 1554REPLACEMENT - LIGHT TRANSIT VEHICLE
HF
FNU CP 184 CP 184 CP 207 184CP184CP184CP L CP 23 CP 23 23CP23CP23CP S CP 23 CP 23 CP 23 23CP23CP23CP
ALEXANDERBURKECALDWELLCATAWBA
TRANSPORTATION ADMIN. OF CLEVELAND COUNTY
11-31 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TP-5106 553 325PLANNING ASSISTANCE - 5303
HF
FMPL CP 34 CP 34 CP 34 34CP L CP 4 CP 4 CP 4 34CP S CP 4 CP 4 CP 4 34CP
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT COUNCIL OF GOVERNMENTS
TQ-6511 95 95ELDERLY AND DISABLED FUNDING - MOBLITY MANAGEMENT
HF
FEPD L
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT COUNCIL OF GOVERNMENTS
FUNDS AUTHORIZED IN PROGRESS
TA-6544 360 360CAPITAL
HF
FNU L S
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
TA-6556 339 339CAPITAL
HF
FNU L S
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
11-32 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TA-5189 900 450REPLACEMENT BUS
HF
FBUS CP 360 L CP 90
ALEXANDERCALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
TA-5188 450REPLACEMENT BUS
HF
FUZ CP 360 L CP 90
ALEXANDERCALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TA-6501 908 586REPLACEMENT VAN
HF
FNU CP 72 CP 36 CP 41 36CP36CP36CP L CP 10 CP 5 5CP5CP5CP S CP 10 CP 5 CP 5 5CP5CP5CP
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TA-4927 1434 894REPLACEMENT BUS
HF
FUZ CP 144 CP 144 144CP L CP 18 CP 18 18CP S CP 18 CP 18 18CP
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
TA-4928 1086 362EXPANSION BUS
HF
FUZ CP 290 290CP L CP 36 36CP S CP 36 36CP
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
11-33 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TA-4929 812 380REPLACEMENT VAN
HF
FUZ CP 72 72CP72CP72CP L CP 18 18CP18CP18CP S CP 18 18CP18CP18CP
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TA-5187 480 60REPLACEMENT VANS
HF
FUZ CP 336 L CP 84
ALEXANDERCALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
TA-4928B 122 122EXPANSION - LIGHT TRANSIT VEHICLE - CMAQ APP#HU5
HF
CMAQ
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TC-5015 180 180OPERATING
HF
ADTAP L
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TC-5101 471 314MOBILITY MANAGER
HF
FUZ CP 126 L CP 31
ALEXANDERCALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
11-34 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TG-6159 392 272ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETCHF
FNU CP 16 CP 16 CP 16 16CP16CP16CP L CP 2 CP 2 CP 2 2CP2CP2CP S CP 2 CP 2 CP 2 2CP2CP2CP
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TG-4774 738 438ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETCHF
FUZ CP 40 CP 40 CP 40 40CP40CP40CP L CP 10 CP 10 CP 10 10CP10CP10CP
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TG-5264 525 225ROUTINE CAPITAL
HF
FUZ CP 120 CP 120 L CP 30 CP 30
ALEXANDERCALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TG-4774A 5925 2925PREVENTIVE MAINTENANCE
HF
FUZ O 400 O 400 O 400 500O400O400O L O 100 O 100 O 100 100O100O
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
11-35 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TG-6142A 121 82ROUTINE CAPITAL - SERVICE VEHICLE
HF
FNU 35CP L 4CP
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TG-4774B 1463 797OPERATING ASSISTANCE - ADA PARATRANSIT SERVICE
HF
FUZ O 100 O 100 O 100 100O100O100O L O 11 O 11 O 11 11O11O11O
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TK-5181 4976 2846ADMINISTRATION
HF
FNU O 284 O 284 O 284 284O284O284O FNU L O 53 O 53 O 53 53O53O53O S O 18 O 18 O 18 18O18O18O
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TM-6108 2638 1534OPERATING ASSISTANCE - NON-URBAN
HF
JARC O 92 O 92 O 92 92O92O92O L O 92 O 92 O 92 92O92O92O
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
11-36 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TN-6109 390 210OPERATING ASSISTANCE - SMALL-URBAN
HF
FNF O 15 O 15 O 15 15O15O15O L O 15 O 15 O 15 15O15O15O
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TO-4733 25358 16154OPERATING ASSISTANCE
HF
FUZ O 1500 O 1000 O 1000 1000O1000O1000O L O 1296 O 46 O 46 46O 46O SMAP O 204 O 204 O 204 204O204O204O
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TO-6109 2586 1410OPERATING ASSISTANCE
HF
FNU O 98 O 98 O 98 98O98O98O L O 98 O 98 O 98 98O98O98O
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TP-4733A 2281 1651PLANNING ASSISTANCE
HF
FUZ CP 210 CP 210 CP 210
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
11-37 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TP-4733B 681 531PLANNING ASSISTANCE
HF
FUZ CP 40 CP 40 CP 40 L CP 5 CP 5 CP 5 S CP 5 CP 5 CP 5
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TQ-6503 137 77PREVENTIVE MAINTENANCE - PARATRANSIT
HF
FEPD O 9 O 9 O 9 9O9O9O L O 1 O 1 O 1 S O 1 O 1 O 1
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TQ-6507 792 483OPERATING ASSISTANCE - ELDERLY AND DISABLED PERSONS
HF
FEPD O 34 O 34 O 34 34O 34O L O 35 O 35 O 35 34O
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
TQ-6955 254CAPITAL - PURCHASE OF SERVICE
HF
FEPD CP 203 L CP 51
ALEXANDERCALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
11-38 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TQ-7008 23 235310 PROGRAM ADMININSTRATION
HF
FEPD
ALEXANDERCALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TS-5128 279 209SAFETY & SECURITY
HF
FUZ CP 18 CP 18 CP 19 L CP 5 CP 5 CP 5
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
AVIATION PROJECTSAV-5859 5972CONSTRUCT GENERAL AVIATION APRON
AND AIRCRAFT STORAGE HANGARS.
DIV
T 2687C C 2687 O 299C C 299
SURRY
MOUNT AIRY -SURRY COUNTYAIRPORT (MWK)
BICYCLE AND PEDESTRIAN PROJECTS
UNDER CONSTRUCTION
EB-5014 2130 2130MOUNT AIRY GREENWAY LOOP. 2.2TRNSURRY
MOUNT AIRY
EB-5845 575S. SOUTH STREET, WORTH STREET TO ROCKFORD STREET. ROCKFORD STREET, PENN STREET TO US 52. WORTH STREET, SOUTH STREET TO US 52. CONSTRUCT SIDEWALK.
DIV
TAP 86PE L 22PE TAP 86R L 22R TAP C 287 L C 72
SURRY
MOUNT AIRY
11-39 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
TA-6681 466PURCHASE EXPANSION FLEET VEHICLE TO EXPAND SERVICE ON PART SURRY EXPRESS #1
REG
FEDT A 372 L A 47 T A 47
FORSYTHSURRY
PIEDMONT AUTHORITYFOR REGIONALTRANSPORTATION(PART)
FUNDS AUTHORIZED IN PROGRESS
TA-6139 2746 2746CAPITAL
HF
FNU L S
DAVIESTOKESSURRYYADKIN
YADKIN VALLEY ECONOMIC DEVELOPMENT DISTRICT
FUNDS AUTHORIZED IN PROGRESS
TK-6174 6002 3446ADMINISTRATION
HF
FNU O 341 O 341 O 341 341O341O341O FNU L O 64 O 64 O 64 64O64O64O S O 21 O 21 O 21 21O21O21O
DAVIESTOKESSURRYYADKIN
YADKIN VALLEY ECONOMIC DEVELOPMENT DISTRICT
TN-6122 12 12OPERATING
HF
FNF
DAVIESTOKESSURRYYADKIN
YADKIN VALLEY ECONOMIC DEVELOPMENT DISTRICT
11-40 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TO-6113 534 534OPERATING ASSISTANCE
HF
FNU L
DAVIESTOKESSURRYYADKIN
YADKIN VALLEY ECONOMIC DEVELOPMENT DISTRICT
FUNDS AUTHORIZED IN PROGRESS
TQ-8013 44 44CAPITAL - MOBILITY MANAGEMENT
HF
FEPD L S
DAVIESTOKESSURRYYADKIN
YADKIN VALLEY ECONOMIC DEVELOPMENT DISTRICT
TQ-6798 100 100OPERATING
HF
FEPD L
DAVIESTOKESSURRYYADKIN
YADKIN VALLEY ECONOMIC DEVELOPMENT DISTRICT
FUNDS AUTHORIZED IN PROGRESS
TQ-6927 124 124OPERATING
HF
FEPD L
DAVIESTOKESSURRYYADKIN
YADKIN VALLEY ECONOMIC DEVELOPMENT DISTRICT
11-41 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
TQ-8004 44 44CAPITAL - MOBILITY MANAGEMENT
HF
FNF L S
DAVIESTOKESSURRYYADKIN
YADKIN VALLEY ECONOMIC DEVELOPMENT DISTRICT
BICYCLE AND PEDESTRIAN PROJECTS
PROJECT TO BE ADMINISTERED BY THE TOWN OF BLOWING ROCK
EB-5798 1201 87MAIN STREET IN BLOWING ROCK TO MOSES H CONE MEMORIAL PARK AND BASS LAKE. CONSTRUCT SIDEWALK.
0.6
EX
FLAP C 891 L C 223
WATAUGA
US 221
UNDER CONSTRUCTION
EB-5612 600 600SOUTH SIDE OF US 421 TO NORTH SIDE OF US 421 AT THE NEW RIVER. CONSTRUCT UNDERPASS ALONG THE WESTERN BANK OF RIVER.
0.1TRNWATAUGA
BOONE GREENWAY
PROJECT TO BE ADMINISTERED BY TOWN OF BLOWING ROCK
EB-5924 2573MIDDLE FORK GREENWAY, SECTION 1. CONSTRUCT GREENWAY
EX
FLAP C 2058 L C 515
WATAUGA
TOWN OF BLOWINGROCK
PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TA-6101 6667 6667CAPITAL
HF
FNU L S
WATAUGA
APPALCART
FUNDS AUTHORIZED IN PROGRESS
TC-5010 906 906OPERATING
HF
ADTAP L
WATAUGA
APPALCART
FUNDS AUTHORIZED IN PROGRESS
TC-5011 150 150CAPITAL
HF
ADTAP L
WATAUGA
APPALCART
11-42 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TK-6107 6558 3750ADMINISTRATION
HF
FNU AD 375 AD 375 AD 375 375AD375AD375AD L AD 70 AD 70 AD 70 70AD70AD70AD S AD 23 AD 23 AD 23 23AD23AD23AD
WATAUGA
APPALCART
TM-6149 672 672OPERATING
HF
JARC L
WATAUGA
APPALCART
TM-6133 450 450OPERATING ASSISTANCE
HF
JARC L
WATAUGA
APPALCART
FUNDS AUTHORIZED IN PROGRESS
TO-5211 606 606OPERATING ASSISTANCE FOR A ROUTE THAT INCLUDES THE COMMUNITY COLLEGE, STUDENT HOUSING AND BUSINESSES OFF NC HWY 105
HF
JARC L
WATAUGA
APPALCART
FUNDS AUTHORIZED IN PROGRESS
TO-6101 33212 18896OPERATING ASSISTANCE
HF
FNU O 453 O 453 O 453 453O453O453O L O 1933 O 1933 O 1933 1933O1933O1933O
WATAUGA
APPALCART
FUNDS AUTHORIZED IN PROGRESS
TO-6104 9212 5264OPERATING ASSISTANCEHF
SMAP O 658 O 658 O 658 658O658O658O
WATAUGAAPPALCART
TA-6675 500PURCHASE EXPANSION VEHICLE FOR STATE FARM SHUTTLE ROUTE.
DIV
JARC A 400 T A 50 L A 50
WATAUGA
BOONE
11-43 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TI-6101 8823 5247INTERCITY BUS - BOONE TO CHARLOTTE
HF
FNU O 246 O 246 O 246 246O246O246O L O 106 O 106 O 106 106O106O106O S O 244 O 244 O 244 244O244O244O
CALDWELLCATAWBALINCOLNMECKLENBURGWATAUGA
COACH AMERICA
FUNDS AUTHORIZED IN PROGRESS
TI-6103 12802 7522INTERCITY BUS - GREENSBORO TO BOONE
HF
FNU O 360 O 360 O 360 360O360O360O L O 161 O 161 O 161 161O359O161O S O 359 O 359 O 359 359O161O359O
FORSYTHGUILFORDWATAUGAWILKESYADKIN
COACH AMERICA
FUNDS AUTHORIZED IN PROGRESS
TA-6662 124 124CAPITAL
HF
FEPD L S
WATAUGA
GOLDSBORO-WAYNE TRANSPORTATION AUTHORITY
PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TI-6103 12802 7522INTERCITY BUS - GREENSBORO TO BOONE
HF
FNU O 360 O 360 O 360 360O360O360O L O 161 O 161 O 161 161O359O161O S O 359 O 359 O 359 359O161O359O
FORSYTHGUILFORDWATAUGAWILKESYADKIN
COACH AMERICA
11-44 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TA-6138 818 818CAPITAL
HF
FNU L S
WILKES
WILKES TRANSPORTATION AUTHORITY
FUNDS AUTHORIZED IN PROGRESS
TK-6172 3192 1824ADMINISTRATION
HF
FNU O 183 O 183 O 183 183O183O183O FNU L O 34 O 34 O 34 34O34O34O S O 11 O 11 O 11 11O11O11O
WILKES
WILKES TRANSPORTATION AUTHORITY
BICYCLE AND PEDESTRIAN PROJECTS
UNDER CONSTRUCTION
EB-5529 545 545NORTH LEE AVENUE, MAIN STREET TO US 601 IN YADKINVILLE. CONSTRUCT SIDEWALK ON NORTH SIDE OF ROAD.TRNYADKIN
YADKINVILLE
PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TI-6103 12802 7522INTERCITY BUS - GREENSBORO TO BOONE
HF
FNU O 360 O 360 O 360 360O360O360O L O 161 O 161 O 161 161O359O161O S O 359 O 359 O 359 359O161O359O
FORSYTHGUILFORDWATAUGAWILKESYADKIN
COACH AMERICA
FUNDS AUTHORIZED IN PROGRESS
TA-6139 2746 2746CAPITAL
HF
FNU L S
DAVIESTOKESSURRYYADKIN
YADKIN VALLEY ECONOMIC DEVELOPMENT DISTRICT
11-45 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TK-6174 6002 3446ADMINISTRATION
HF
FNU O 341 O 341 O 341 341O341O341O FNU L O 64 O 64 O 64 64O64O64O S O 21 O 21 O 21 21O21O21O
DAVIESTOKESSURRYYADKIN
YADKIN VALLEY ECONOMIC DEVELOPMENT DISTRICT
TN-6122 12 12OPERATING
HF
FNF
DAVIESTOKESSURRYYADKIN
YADKIN VALLEY ECONOMIC DEVELOPMENT DISTRICT
FUNDS AUTHORIZED IN PROGRESS
TO-6113 534 534OPERATING ASSISTANCE
HF
FNU L
DAVIESTOKESSURRYYADKIN
YADKIN VALLEY ECONOMIC DEVELOPMENT DISTRICT
TQ-6798 100 100OPERATING
HF
FEPD L
DAVIESTOKESSURRYYADKIN
YADKIN VALLEY ECONOMIC DEVELOPMENT DISTRICT
11-46 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 11
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TQ-6927 124 124OPERATING
HF
FEPD L
DAVIESTOKESSURRYYADKIN
YADKIN VALLEY ECONOMIC DEVELOPMENT DISTRICT
TQ-8004 44 44CAPITAL - MOBILITY MANAGEMENT
HF
FNF L S
DAVIESTOKESSURRYYADKIN
YADKIN VALLEY ECONOMIC DEVELOPMENT DISTRICT
FUNDS AUTHORIZED IN PROGRESS
TQ-8013 44 44CAPITAL - MOBILITY MANAGEMENT
HF
FEPD L S
DAVIESTOKESSURRYYADKIN
YADKIN VALLEY ECONOMIC DEVELOPMENT DISTRICT
11-47 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
STATE TRANSPORTATION IMPROVEMENT PROGRAM
12
Division 12AlexanderCatawbaClevelandGastonIredellLincoln
HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
R-5762 235INTERSECTION OF NC 16 AND SR 1609 (COUNTY HOME ROAD). CONSTRUCT INTERSECTION IMPROVMENTS.DIV
T R 45 T C 190
ALEXANDER
NC 16
R-3603 56400 600SR 1400 (CLONINGER MILL ROAD) - SR 1351 (1ST STREET NW) IN CATAWBA COUNTY TO US 64-NC 90 IN ALEXANDER COUNTY. UPGRADE TWO LANES AND PROVIDE SOME MULTI-LANE CURB AND GUTTER.
10.8 T 3400R A T 100U A T 13650C A C 13650 A T 1800R B T 23200C B
A SR 1400 (CLONINGER MILL ROAD) TO SR 1156 (RICHEY ROAD).DIVB SR 1156 (RICHEY ROAD) TO US 64/NC 90.
ALEXANDERCATAWBA
NC 127
UNDER CONSTRUCTION
R-5792 663 663DIVISION 12 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN
VARIOUS
URBAN PROJECTSU-6041 400US 64 AND SR 1124. ADD LEFT TURN LANE
ON WESTBOUND US 64/NC 90
DIV
T 100R T 100U T 200C
ALEXANDER
US 64
UNDER CONSTRUCTION
U-5801 238 238INTERSECTION OF NC 16 AND US 64. INTERSECTION IMPROVEMENTS.REGALEXANDER
NC 16
U-6040 450NC 127 AND SR 1146 (BETHLEHEM SCHOOL ROAD). ADD RIGHT TURN LANE ON NC 127.
DIV
T 100R T 100U T 250C
ALEXANDER
NC 127
12-3 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
U-5924 1250GREATER HICKORY METROPOLITAN PLANNING ORGANIZATION (MPO) PLANNING (PL) SUPPLEMENT.DIV
STBGDA PE 100 PE 100 PE 100 100PE100PE100PE PE 100 PE 100 PE 100 PE 100L PE 25 PE 25 PE 25 25PE25PE25PE PE 25 PE 25 PE 25 PE 25
ALEXANDERBURKECALDWELLCATAWBA
VARIOUS
U-5615 32510STBG-DA IN THE GREATER HICKORY METROPOLITAN PLANNING ORGANIZATION (MPO) AREA.DIV
STBGDA C 1074 C 2770 C 2770 2770C2770C2770C C 2770 C 2770 C 2770 C 2770L C 269 C 693 C 693 693C693C693C C 693 C 693 C 693 C 693
ALEXANDERBURKECALDWELLCATAWBA
VARIOUS
BRIDGE PROJECTSB-5954 4900REPLACE BRIDGE 010001 OVER DUCK
CREEK.REG
T R 200 T C 2350 C 2350
ALEXANDER
NC 127
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5112 15782 15782DIVISION 12 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVALEXANDER
CATAWBACLEVELANDGASTONIREDELLLINCOLN
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4912 14212 14212ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 12 PROJECT MITIGATION.ALEXANDER
CATAWBACLEVELANDGASTONIREDELLLINCOLN
VARIOUS
12-4 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5712 2930 1530SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 12.
HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
ALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN
VARIOUS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5212 5973 5348DIVISION 12 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
HSIP R 50 DIV HSIP C 575 DIV
DIV DIVISION 12 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN THE DIVISION CATEGORY.DIVREG DIVISION 12 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN THE REGIONAL CATEGORY.REG
ALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN
VARIOUS
INTERSTATE PROJECTSI-5914 5200BURKE COUNTY LINE TO MILEMARKER
129.3. PAVEMENT REHABILITATION.9.6
SW
NHPIM C 5200
CATAWBAI-40
I-5915 3000MILEMARKER 132.9 TO MILEMARKER 138.6. PAVEMENT REHABILITATION.
5.6SW
NHPIM C 3000
CATAWBAI-40
I-5716 1360 200SR 1007 (LENOIR RHYNE BOULEVARD) INTERCHANGE. CONSTRUCT INTERCHANGE IMPROVEMENTS.SW
NHP R 160 NHP C 1000
CATAWBA
I-40
COMPLETE - GARVEE BOND FUNDING $19.71 MILLION; CONSTRUCTION - PAYBACK FY 2008 - FY 2019
I-5003 38988 34664EXIT 119 IN BURKE COUNTY TO SR 1753 (MILE MARKER 146) IN IREDELL COUNTY. PAVEMENT REHABILITATION.
27TRN
NHP CG 2162 CG 2162
BURKECATAWBAIREDELL
I-40
12-5 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)INTERSTATE PROJECTS
I-5991 137700EXIT 123 (US 321) TO EXIT 128 (SR 1476 (FAIRGROVE CHURCH ROAD)). WIDEN TO SIX LANES.
5.3
SW
NHP R 10000 NHP U 2000 NHP 62850C C 31425 C 31425
CATAWBA
I-40
RURAL PROJECTS
PLANNING/DESIGN IN PROGRESS
R-3100 75364 54454SR 1895 TO SR 1800 SOUTHEAST OF NEWTON. WIDEN TO FOUR LANES.
9.1 STBG C 20910 A
A SR 1895 (TOWER ROAD) TO SR 1814 (CALDWELL ROAD) - UNDER CONSTRUCTIONDIVB SR 1814 (CALDWELL ROAD) TO SR 1801 (CLAREMONT ROAD) - UNDER CONSTRUCTION WITH SEGMENT ADIVC SR 1801 (CLAREMONT ROAD) TO SR 1800 (CALEB SETZER ROAD) - COMPLETE
CATAWBANC 16
R-3603 56400 600SR 1400 (CLONINGER MILL ROAD) - SR 1351 (1ST STREET NW) IN CATAWBA COUNTY TO US 64-NC 90 IN ALEXANDER COUNTY. UPGRADE TWO LANES AND PROVIDE SOME MULTI-LANE CURB AND GUTTER.
10.8 T 3400R A T 100U A T 13650C A C 13650 A T 1800R B T 23200C B
A SR 1400 (CLONINGER MILL ROAD) TO SR 1156 (RICHEY ROAD).DIVB SR 1156 (RICHEY ROAD) TO US 64/NC 90.
ALEXANDERCATAWBA
NC 127
PLANNING/DESIGN IN PROGRESS - COORDINATE WITH PROJECT I-5717
R-2307 257620 2220RELOCATED NC 16 (TIP PROJECT R-2206) TO US 21. WIDEN TO MULTI-LANES.
15 STBG 25000R A R 25000 A STBG 3400U A STBG 22000C A C 22000 A C 22000 A C 22000 ASTBG C 27250 B C 27250 B 27250C B27250C B STBGBA C 5000 B
A RELOCATED NC 16 (TIP PROJECT R-2206) TO EAST OF SR 1840 (GREENWOOD ROAD)REGB EAST OF SR 1840 (GREENWOOD ROAD) IN CATAWBA COUNTY TO US 21 IN IREDELL COUNTY - RIGHT OF WAY IN PROGRESSREG
CATAWBAIREDELLLINCOLN
NC 150
R-5113 56362 512US 70 TO NC 10. WIDEN TO MULTI-LANES. 4.6
DIV
T 10400R T 1250U T C 11050 C 11050 C 11050 C 11050
CATAWBA
SR 1005 (STARTOWNROAD)
12-6 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
UNDER CONSTRUCTION
R-5792 663 663DIVISION 12 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN
VARIOUS
URBAN PROJECTS
PLANNING/DESIGN IN PROGRESS - INCLUDES B-4450 - $2.8 M IN STBG-DA AND $700 K IN MATCHING FUNDS IS FOR CATAWBA RIVER BRIDGE ENHANCEMENTS - $2.8 M IS EXEMPT BECAUSE IT IS STBG-DA SPENT ON A SW TIER PROJECT
U-4700 297810 4790NORTH OF US 70 IN HICKORY TO SR 1933 (SOUTHWEST BOULEVARD). WIDEN TO SIX LANES.
13.3 NHP R 11886 A R 21500 A HP R 9614 A NHP U 2000 A NHP 29100C A29100C A29100C A C 29100 A STBGDA 2800C A L 700C A NHP 4000U B NHP 35000R B NHP 57500C B NHP 2000U C NHP 10000R C NHP 12000C C NHP R 420 CA NHP C 1750 CA NHP U 100 CB NHP R 400 CB NHP C 2200 CB NHP U 100 CC NHP R 450 CC NHP C 2200 CC
A NORTH OF US 70 IN HICKORY TO US 321A - STBGDA FUNDS ARE EXEMPT BECAUSE THEY ARE BEING USED ON STATEWIDE CATEGORY PROJECTSWB US 321A TO SR 1108 (MISSION ROAD)C SR 1108 (MISSION ROAD) TO SR 1933 (SOUTHWEST BOULEVARD).CA SR 1160 (MOUNT HERMAN ROAD). UPGRADE INTERSECTION TO SUPERSTREET DESIGN - WITHIN THE LIMITS OF U-4700 C. - DESIGN BY DIVISIONREGCB SR 1809/1952 (PINE MOUNTAIN ROAD). UPGRADE INTERSECTION TO SUPERSTREET DESIGN - WITHIN THE LIMITS OF U-4700 C.SWCC SR 1108 (MISSION ROAD). UPGRADE INTERSECTION TO SUPERSTREET DESIGN - WITHIN THE LIMITS OF U-4700 C.SW
BURKECALDWELLCATAWBA
US 321
U-5777 830 1251ST AVENUE SE TO 2ND AVENUE SE. ADD TURN LANES.
REG
T R 135 T C 570
CATAWBA
NC 127
12-7 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
U-2530 34120 12120WIDEN NC 127 TO MULTI-LANES, SR 1132 TO SR 1008. UPGRADE AND EXTEND SR 1213 (CURRENTLY NC 127), PROPOSED US 321-NC 127 INTERCHANGE TO NORTH OF SR 1182.
4.5 T R 6700 A T U 800 A T 7250C A7250C A
A SR 1132 (HUFFMAN FARM ROAD) TO SR 1008 (ZION CHURCH ROAD).DIVB NORTH OF US 321-NC 127 INTERCHANGE TO NORTH OF SR 1182 - COMPLETE
CATAWBA
NC 127
U-6042 2500SR 1124 (33RD STREET SW) AND (34TH STREET NW). REALIGN INTERSECTION.
DIV
T 1400R T 200U T C 900
CATAWBA
SR 1124
RIGHT OF WAY IN PROGRESS - DP FUNDS ARE UNUSED TCSP FUNDS FROM PE PHASE
U-5510 6570 3370US 70 TO SR 1148 (STARTOWN ROAD). CONSTRUCT A THREE-LANE FACILITY IN HICKORY.
0.5
DIV
DP C 965 T C 2235
CATAWBA
SR 1468SWEETWATER ROADEXTENSION
U-5924 1250GREATER HICKORY METROPOLITAN PLANNING ORGANIZATION (MPO) PLANNING (PL) SUPPLEMENT.DIV
STBGDA PE 100 PE 100 PE 100 100PE100PE100PE PE 100 PE 100 PE 100 PE 100L PE 25 PE 25 PE 25 25PE25PE25PE PE 25 PE 25 PE 25 PE 25
ALEXANDERBURKECALDWELLCATAWBA
VARIOUS
U-5615 32510STBG-DA IN THE GREATER HICKORY METROPOLITAN PLANNING ORGANIZATION (MPO) AREA.DIV
STBGDA C 1074 C 2770 C 2770 2770C2770C2770C C 2770 C 2770 C 2770 C 2770L C 269 C 693 C 693 693C693C693C C 693 C 693 C 693 C 693
ALEXANDERBURKECALDWELLCATAWBA
VARIOUS
U-2307 87010 56010EAST SIDE THOROUGHFARE (MCDONALD PARKWAY), US 70-321 TO NC 127. MULTI-LANES, PART ON NEW LOCATION.
6.6 T 4600R B4600R B T 1100U B T 6900C B C 6900 B C 6900 B
AA US 70-321 TO NORTH OF I-40. - COMPLETEAB NORTH OF I-40 TO SR 1453 (SPRINGS ROAD) - COMPLETEAD NORTH OF I-40 TO NORTH OF SR 1692 (TATE BOULEVARD) - COMPLETEAE NORTH OF SR 1692 (TATE BOULEVARD) TO SR 1453 (SPRINGS ROAD) - COMPLETEB SR 1453 (SPRINGS ROAD) TO NC 127DIVC HICKORY EAST SIDE THOROUGHFARE TO 15TH AVE SE - COMPLETE
CATAWBA
HICKORY
12-8 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BRIDGE PROJECTS
UNDER CONSTRUCTION
B-5150 2281 2281REPLACE BRIDGE 170034 OVER FALLING CREEK.
DIVCATAWBA
SR 1404(29TH AVENUE NE)
B-5847 4700 100REPLACE BRIDGE 170173 OVER I-40.
DIV
NHPB 200R NHPB C 2200 C 2200
CATAWBA
SR 1709(ROCK BARN ROAD)
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5112 15782 15782DIVISION 12 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVALEXANDER
CATAWBACLEVELANDGASTONIREDELLLINCOLN
VARIOUS
UNDER CONSTRUCTION
B-5542 290 290PRESERVATION OF BUNKER HILL COVERED BRIDGE.DIVCATAWBA
CLAREMOUNT
UNDER CONSTRUCTION - PROJECT ADMINISTERED BY CITY OF HICKORY - MUNICIPAL BRIDGE
B-5549 1600 1600REPLACE BRIDGE 170327 ON FALLING CREEK ROAD OVER FALLING CREEK. .DIVCATAWBA
HICKORY
MITIGATION PROJECTS
IN PROGRESS
EE-4912 14212 14212ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 12 PROJECT MITIGATION.ALEXANDER
CATAWBACLEVELANDGASTONIREDELLLINCOLN
VARIOUS
12-9 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)HIGHWAY SAFETY PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5212 5973 5348DIVISION 12 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
HSIP R 50 DIV HSIP C 575 DIV
DIV DIVISION 12 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN THE DIVISION CATEGORY.DIVREG DIVISION 12 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN THE REGIONAL CATEGORY.REG
ALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN
VARIOUS
IN PROGRESS
W-5712 2930 1530SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 12.
HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
ALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN
VARIOUS
CONGESTION MITIGATION PROJECTSC-5608 2031PROJECTS TO IMPROVE CONGESTION AND
AIR QUALITY IN THE HICKORY MPO AND UNIFOUR RPO.
EX
CMAQ PE 81 PE 82 L PE 20 PE 20 CMAQ R 81 R 82 L R 20 R 20 CMAQ C 483 C 492 L C 121 C 123 CMAQ O 81 O 82 L O 20 O 20 CMAQ I 81 I 82 L I 20 I 20
CATAWBA
VARIOUS
C-5195 655 35CONSTRUCT SIDEWALKS AT VARIOUS LOCATIONS IN CLAREMONT.
EX
CMAQ C 496 L C 124
CATAWBA
CLAREMONT
12-10 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)CONGESTION MITIGATION PROJECTS
UNDER CONSTRUCTION
C-5624 CONOVER BIKE LANE PROJECT (1ST STREET/US 70)EXCATAWBA
CONOVER
RIGHT OF WAY IN PROGRESS
C-5196 4385 98316TH STREET (SANDY RIDGE ROAD) AT 29 TH. AVENUE NE AND 21 ST. AVENUE NE IN HICKORY. CONSTRUCT ROUNDABOUTS.EX
CMAQ C 2722 L C 680
CATAWBA
HICKORY
INTERSTATE PROJECTSI-5916 4200SOUTH CAROLINA LINE TO GASTON
COUNTY LINE. PAVEMENT REHABILITATION.8.2
SW
NHPIM 4200C
CLEVELANDI-85
I-5985 143400US 74 TO SOUTH CAROLINA LINE. WIDEN TO SIX LANES.
10.2
SW
NHP R 9700 NHP U 700 NHP 66500C C 33250 C 33250
CLEVELANDGASTON
I-85
RURAL PROJECTSR-2707 381230 211280FOUR LANE DIVIDED FREEWAY ON NEW
LOCATION.18.6 T G 32000 C
T R 5900 D T U 650 D T 9800C D9800C D9800C D C 9800 D T R 10400 E T U 700 E T 11000C E11000C E11000C E C 11000 E T P 18600 F T P 18500 G
A WEST OF SR 1162 (PEACHTREE ROAD) TO EAST OF SR 1315 (PLATO LEE ROAD). RIGHT-OF-WAY ONLY. - COMPLETEAA WEST OF SR 1162 (PEACHTREE ROAD) TO EAST OF SR 1318 (KIMBRELL ROAD). GRADING, STRUCTURES, PAVING - UNDER CONSTRUCTIONAB EAST OF SR 1318 (KIMBRELL ROAD) TO EAST OF SR 1315 (PLATO LEE ROAD). GRADING AND STRUCTURES - UNDER CONSTRUCTIONTRNB EAST OF SR 1315 (PLATO LEE ROAD) TO EAST OF NC 226. GRADING AND STRUCTURES - UNDER CONSTRUCTIONTRNC EAST OF NC 226 TO EAST OF NC 150. GRADING AND STRUCTURES - UNDER CONSTRUCTIONREGD EAST OF NC 150 TO EXISTING US 74 WEST OF SR 2238 (LONG BRANCH ROAD). GRADING, STRUCTURE, PAVING.REGE US 74 WEST OF SR 2238 TO WEST OF SR 1001 (STONEY POINT ROAD). GRADING, STRUCTURES, PAVING.REGF EAST OF SR 1318 (KIMBRELL ROAD) TO EAST OF NC 226. PAVINGTRNG WEST OF NC 226 TO WEST OF NC 150. PAVINGREG
CLEVELAND
US 74 SHELBYBYPASS
12-11 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
R-5713 3680 480US 74 BUSINESS TO NC 226. CONSTRUCT ACCESS MANAGEMENT IMPROVEMENTS.
6
REG
T R 100 T U 100 T C 3000
CLEVELAND
US 74
R-5849 1875CONSTRUCT IMPROVEMENTS TO SR 1313 (WASHBURN SWITCH ROAD) AND A NEW 3-LANE ROAD OFF SR 1313 (WASHBURN SWITCH ROAD) FOR ACCESS TO NEW INDUSTRIAL SITES.
DIV
S C 1875
CLEVELANDNEW ROUTE
UNDER CONSTRUCTION
R-5792 663 663DIVISION 12 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN
VARIOUS
URBAN PROJECTSU-2567 13200 1500NC 150 (DEKALB STREET) INTERSECTION.
CONSTRUCT INTERCHANGE.
SW
T 2200R T 500U T 9000C
CLEVELAND
US 74 (DIXON BLVD)
$300,000 FROM CITY OF SHELBY
U-5775 2010 150INTERSECTION OF US 74 BUSINESS (MARION STREET) AND NC 150 (CHERRYVILLE ROAD). REALIGN INTERSECTION.
REG
T R 360 T C 1200 L C 300
CLEVELAND
US 74 BUSINESS(MARION STREET)
U-5929 17000INTERSECTION OF US 74 (DIXON BOULEVARD) AND NC 226 (EARL ROAD). CONSTRUCT IMPROVEMENTS.
SW
T 5300R T 700U T 11000C
CLEVELAND
US 74 (DIXONBOULEVARD)
12-12 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
U-2221 41589 16189NC 226 TO NC 150. WIDEN TO MULTI-LANES. 4.9 T 1200R A T 6100C A T 7600R C T 900U C T C 9600 C
A NC 226 TO SR 2200.B SR 2200 TO SR 2052. - COMPLETEC SR 2052 TO NC 150.REG
CLEVELAND
NC 180
BRIDGE PROJECTSB-5946 1470REPLACE BRIDGE 220040 OVER POTTS
CREEK.DIV
T R 70 T C 1400
CLEVELAND
SR 1001(OAK GROVE ROAD)
B-5849 1035 25REPLACE BRIDGE 220104 OVER ASHWORTH CREEK.
DIV
STPOFF R 50 STPOFF C 960
CLEVELAND
SR 1002(NUMBER ONE SCHOOLROAD)
B-5848 4000 100REPLACE BRIDGE 220072 OVER BUFFALO CREEK.
DIV
STPOFF 200R STPOFF 1850C C 1850
CLEVELAND
SR 2226(LAVENDAR ROAD)
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5112 15782 15782DIVISION 12 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVALEXANDER
CATAWBACLEVELANDGASTONIREDELLLINCOLN
VARIOUS
12-13 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)MITIGATION PROJECTS
IN PROGRESS
EE-4912 14212 14212ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 12 PROJECT MITIGATION.ALEXANDER
CATAWBACLEVELANDGASTONIREDELLLINCOLN
VARIOUS
HIGHWAY SAFETY PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5212 5973 5348DIVISION 12 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
HSIP R 50 DIV HSIP C 575 DIV
DIV DIVISION 12 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN THE DIVISION CATEGORY.DIVREG DIVISION 12 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN THE REGIONAL CATEGORY.REG
ALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN
VARIOUS
IN PROGRESS
W-5712 2930 1530SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 12.
HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
ALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN
VARIOUS
12-14 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)CONGESTION MITIGATION PROJECTS
IN PROGRESS
C-5606 3804 116PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE GASTON-CLEVELAND-LINCOLN MPO.
EX
CMAQ PE 146 PE 149 L PE 37 PE 37 CMAQ R 146 R 149 L R 37 R 37 CMAQ C 877 C 893 L C 219 C 223 CMAQ O 146 O 149 L O 37 O 37 CMAQ I 146 I 149 L I 37 I 37
CLEVELANDGASTONLINCOLN
VARIOUS
INTERSTATE PROJECTSI-5713 1360 200SR 2200 (COX ROAD) INTERCHANGE.
CONSTRUCT INTERCHANGE IMPROVEMENTS. (COORDINATE WITH I-5719)SW
NHP R 160 NHP C 1000
GASTON
I-85
I-5985 143400US 74 TO SOUTH CAROLINA LINE. WIDEN TO SIX LANES.
10.2
SW
NHP R 9700 NHP U 700 NHP 66500C C 33250 C 33250
CLEVELANDGASTON
I-85
I-5921 4200CLEVELAND COUNTY LINE TO MILEMARKER 14. PAVEMENT REHABILITATION.
5.9SW
NHPIM 4200C
GASTONI-85
UNDER CONSTRUCTION
I-5894 7000 3500MILE MARKER 22 TO MECKLENBURG COUNTY LINE. PAVEMENT REHABILITATION.
5.5SW
NHPIM C 3500
GASTONI-85
DESIGN-BUILD
I-5719 257509 2009US 321 TO NC 273. WIDEN TO EIGHT LANES. (COORDINATE WITH I-5713)
9.8
SW
NHP 18800R18800R NHP 2900U NHP 51063C51062C10750C C 51063 C 51062
GASTON
I-85
12-15 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)INTERSTATE PROJECTS
UNDER CONSTRUCTION
I-5000 22847 15574I-85/US 321. GEOMETRIC SAFETY IMPROVEMENTS TO INTERCHANGE.SW
NHP C 7273
GASTONI-85
PROJECT COMPLETE - GARVEE BOND FUNDING $3.05 MILLION; PAYBACK FY 2007 - FY 2018
I-5007 6506 6172SOUTH FORK RIVER BRIDGE TO EXIT 27. PAVEMENT REHABILITATION.
3.1TRN
NHP CG 334
GASTONI-85
UNDER CONSTRUCTION
I-4928 35826 35826CONSTRUCT NEW I-85 NBL WEIGH STATION FROM SR 1302 (CROWDERS MOUNTAIN ROAD) TO SR 1307 (EDGEWOOD ROAD).TRNGASTON
I-85
UNDER CONSTRUCTION
I-5893 9118 9118MILE MARKER 14 TO MILE MARKER 22. PAVEMENT REHABILITATION.
8SWGASTON
I-85
RURAL PROJECTSR-0617 69201 35801NC 279 AT CHERRYVILLE TO RELOCATED US
321. WIDEN TO MULTI-LANES, PART ON NEW LOCATION.
10.6 T 5300R BB T 1600U BB T C 13250 BB C 13250 BB
A NC 279 AT CHERRYVILLE TO THE LINCOLN COUNTY LINE. - COMPLETEBA GASTON COUNTY LINE TO WEST OF INDIAN CREEK. - COMPLETEBB WEST OF INDIAN CREEK TO US 321 AT LINCOLNTON.REGC US 321 AT LINCOLNTON TO US 321 BYPASS.
GASTONLINCOLN
NC 150
UNDER CONSTRUCTION
R-5792 663 663DIVISION 12 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN
VARIOUS
URBAN PROJECTSU-6043 9200SR 2200 (COX ROAD) TO 400 FEET EAST OF
LINEBERGER ROAD. ADD LANE IN THE EASTBOUND DIRECTION.
1.1
DIV
T 2400R T 500U T 6300C
GASTON
US 29 (FRANKLINBOULEVARD), US 74
12-16 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
U-5965 3000US 29 (FRANKLIN BOULEVARD) AND NC 274. CONSTRUCT INTERSECTION IMPROVEMENTS.
REG
T R 500 T U 100 T 2400C
GASTON
US 29 (FRANKLINBOULEVARD)
U-5959 700US 74 (WILKINSON BOULEVARD) AT NC 273 (PARK STREET). CONSTRUCT INTERSECTION IMPROVEMENTS.
REG
T R 100 T U 100 T 500C
GASTON
US 74 (WILKINSONBOULEVARD)
U-6038 715NC 7 (CATAWBA STREET) TO SR 2209 (WESLEYAN DRIVE). IMPLEMENT ADAPTIVE SIGNAL SYSTEM.
3.9
DIV
T U 40 T C 675
GASTON
US 74 (WILKINSONBOULEVARD)
U-5970 460019TH AVENUE TO CLYDE. CONSTRUCT ACCESS MANAGEMENT IMPROVEMENTS.
REG
T 1300R T 500U T C 2800
GASTON
US 321 (SOUTHYORK ROAD)
U-5800 565 100INTERSECTION OF NC 7/US 74 AND NC 7/US 29. CONSTRUCT NORTHBOUND THROUGH LANE AND INTERSECTION IMPROVEMENTS.REG
T R 90 T 375C
GASTON
NC 7
U-3608 4715 500I-85 TO US 29/74. WIDEN TO MULTI-LANES. 0.3
DIV
T R 460 T U 55 T 3700C
GASTON
NC 7
U-5819 2550 200INTERSECTION OF NC 27 (WEST CHARLOTTE AVENUE) AND SR 2534 (HAWTHORNE STREET). CONSTRUCT INTERSECTION IMPROVEMENTS.DIV
T R 450 T C 1900
GASTON
NC 27 (WESTCHARLOTTE AVENUE)
UNDER CONSTRUCTION
U-3633 19904 12805TUCKASEEGEE ROAD (AT BEATTY DRIVE) TO HIGHLAND STREET (AT A & E DRIVE) IN MOUNT HOLLY. WIDEN TO FOUR-LANES DIVIDED.
1.3
REG
NHP C 7099
GASTON
NC 273 (SOUTH MAINSTREET)
12-17 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
"L" FUNDS ARE FROM CITY OF GASTONIA
U-5961 11600OSCEOLA STREET TO NIBLICK DRIVE. UPGRADE ROADWAY.
1
REG
T 1750R1750R T 500U L C 5000 T C 2600
GASTON
NC 274 (UNION ROAD)
U-6078 900INTERSECTION OF NC 275 AND NC 274, INTERSECTION OF NC 275 AND SR 1327 (FAIRVIEW ROAD), AND INTERSECTION OF SR 1456 (WHITE JENKINS ROAD) AND SR 1327 (FAIRVIEW ROAD). IMPROVE INTERSECTIONS AND CLOSE INTERSECTION OF NC 275 AND SR 1456 (WHITE JENKINS ROAD)
DIV
T 150R T 100U T 650C
GASTON
NC 275
U-5821 28730 600SR 2478 (TITMAN ROAD) TO SR 2435 (UNION-NEW HOPE ROAD). WIDEN TO 3-LANES.
3.8
DIV
T R 1100 T U 130 T 13450C13450C
GASTON
NC 279 (NEWHOPE ROAD)
COORDINATE WITH PROJECT U-2523B
U-5778 3150 150INTERSECTION OF NC 279 (LOWER DALLAS HIGHWAY) AND NC 275 (DALLAS STANLEY HIGHWAY). INTERSECTION IMPROVEMENTS
REG
T R 500 T U 100 T 2400C
GASTON
NC 279 (LOWERDALLAS HIGHWAY)
U-2523 31623 17423NC 7 TO WEST OF NC 275 IN DALLAS. WIDEN TO MULTI-LANES.
3.6 T R 3700 B T U 500 B T 3333C B3334C B3333C B
A NC 7 (OZARK AVENUE) TO NORTH OF SR 2275 (ROBINSON-CLEMMER ROAD). - COMPLETEB NORTH OF SR 2275 (ROBINSON-CLEMMER ROAD) TO WEST OF NC 275 IN DALLAS. - COORDINATE WITH U-5778REG
GASTON
NC 279
U-6044 31700I-85 TO US 29/74. SELECTIVE WIDENING AND OPERATIONAL IMPROVEMENTS.
0.3
DIV
T R 4900 T U 600 T 8733C C 8733 C 8734
GASTON
SR 2200 (COXROAD)
BRIDGE PROJECTS
UNDER CONSTRUCTION
B-4751 1002 1002REPLACE BRIDGE 350203 OVER STANLEY CREEK.
HFGASTON
SR 1935(WILLOW SIDE DRIVE)
12-18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BRIDGE PROJECTS
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5112 15782 15782DIVISION 12 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVALEXANDER
CATAWBACLEVELANDGASTONIREDELLLINCOLN
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4912 14212 14212ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 12 PROJECT MITIGATION.ALEXANDER
CATAWBACLEVELANDGASTONIREDELLLINCOLN
VARIOUS
HIGHWAY SAFETY PROJECTS
UNDER CONSTRUCTION
W-5311 1338 1338US 321 AT SR 2416 (ROBINSON ROAD), AND US 321 JUST NORTH OF SR 2416. REPLACE OVERHEAD RAILROAD BRIDGE TO ALLOW FOR CONSTRUCTION OF TWO-LANE, TWO-WAY ROAD FOR SR 2416, CONSTRUCT RIGHT TURN LANE FOR US 321 NORTHBOUND APPROACH AND CONSTRUCT TWO LIMITED MOVEMENT CROSSOVERS, AND REVISE EXISTING FLASHER.
SWGASTONUS 321
12-19 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5712 2930 1530SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 12.
HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
ALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN
VARIOUS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5212 5973 5348DIVISION 12 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
HSIP R 50 DIV HSIP C 575 DIV
DIV DIVISION 12 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN THE DIVISION CATEGORY.DIVREG DIVISION 12 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN THE REGIONAL CATEGORY.REG
ALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN
VARIOUS
CONGESTION MITIGATION PROJECTS
UNDER CONSTRUCTION
C-4934 2764 2764NC 279 (NEW HOPE ROAD), BURTONWOOD DRIVE TO SR 2466 (GARRISON BOULEVARD) IN GASTONIA. ADD TURN LANE.
0.53
EXGASTON
NC 279 (NEW HOPEROAD)
12-20 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)CONGESTION MITIGATION PROJECTS
IN PROGRESS
C-5606 3804 116PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE GASTON-CLEVELAND-LINCOLN MPO.
EX
CMAQ PE 146 PE 149 L PE 37 PE 37 CMAQ R 146 R 149 L R 37 R 37 CMAQ C 877 C 893 L C 219 C 223 CMAQ O 146 O 149 L O 37 O 37 CMAQ I 146 I 149 L I 37 I 37
CLEVELANDGASTONLINCOLN
VARIOUS
UNDER CONSTRUCTION
C-5505 1040 1040RAIL TRAIL, WOODLAWN AVENUE TO BELMONT ABBEY COLLEGE AND DOWNTOWN. CONVERT ABANDONED NCDOT RAILROAD LINE TO A PEDESTRIAN TRAIL.
EXGASTONBELMONT
IN PROGRESS
C-5536 624 624MECKLENBURG COUNTY AIR QUALITY -GRADE (GRANTS TO REPLACE AGING DIESEL ENGINS). REPLACE, REPOWER OR RETROFIT AGING DIESEL VEHICLES AND EQUIPMENT.
EXCABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANUNION
CHARLOTTE
RIGHT OF WAY IN PROGRESS
C-5623 527 57BALTIMORE DRIVE TO SOUTH NEW HOPE ROAD. CONSTRUCT SIDEWALK.
EX
CMAQ C 360 L C 110
GASTON
CRAMER MOUNTAINROAD
UNDER CONSTRUCTION
C-5508 190 190DALLAS-HIGH SHOALS ROAD (OLD US 321), DALLAS CHERRYVILLE HIGHWAY TO PARK ROAD AND EAST ON PARK ROAD TO SAM RHYME COURT. CONSTRUCT SIDEWALKS.
EXGASTONDALLAS
12-21 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)CONGESTION MITIGATION PROJECTS
UNDER CONSTRUCTION
C-5622 420 420HIGHLAND BRANCH GREENWAY, PHASE I. CONSTRUCT GREENWAYEXGASTON
GASTON COUNTY
IN PROGRESS
C-5566 256 256GPS AUTHOMATIC VEHICLE LOCATOR PROGRAM FOR FLEET VEHICLES.EXGASTON
GASTONIA
UNDER CONSTRUCTION
C-5562 595 595BIKE AND PEDESTRIAN IMPROVEMENTS BETWEEN DOWNTOWN AND LINEBERGER PARK.EXGASTON
GASTONIA
IN PROGRESS
C-5186 78 78GASTONIA CCTV CAMERAS. INSTALL 6 CCTV CAMERAS TO THE EXISTING COMPURIZED TRAFFIC SIGNAL SYSTEM ON I-85 AT NC 7 (OZARK AVENUE); US 29/US 74 AT FRANKLIN SQUARE II; NC 279 (NEW HOPE ROAD) AT OZARK AVENUE; US 321 (CHESTER STREET) AT TULIP DRIVE-BULB AVENUE; NC 274 (BESSEMER CITY ROAD) AT NC 275 (DALLAS-BESSEMER CITY ROAD AND US 274 (UNION ROAD) AT SR 1255 (HUDSON BOULEVARD).
EXGASTONGASTONIA
INTERSTATE PROJECTS
GARVEE BOND FUNDING $10 MILLION; CONSTRUCTION - PAYBACK FY 2012 - FY 2023
I-3819 364125 153943STATESVILLE, MODIFICATION OF I-40/I-77 INTERCHANGE AREA.
NHP CG 1097 A CG 1097 A CG 1097 A 1097CG A1097CG A1097CG A NHP R 100 B NHP C 50875 B C 50875 B C 50875 B 50875C B
A INITIAL I-40/I-77 INTERCHANGE IMPROVEMENTS - UNDER CONSTRUCTIONTRNB FINAL I-40/I-77 INTERCHANGE IMPROVEMENTSSW
IREDELL
I-40/I-77
COMPLETE - GARVEE BOND FUNDING $19.71 MILLION; CONSTRUCTION - PAYBACK FY 2008 - FY 2019
I-5003 38988 34664EXIT 119 IN BURKE COUNTY TO SR 1753 (MILE MARKER 146) IN IREDELL COUNTY. PAVEMENT REHABILITATION.
27TRN
NHP CG 2162 CG 2162
BURKECATAWBAIREDELL
I-40
I-5772 102501.4 MILES EAST OF I-77 TO SR 2167 (WARD ROAD). PAVEMENT REHABILITATION.
4.6SW
NHPIM C 10250
IREDELLI-40
12-22 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)INTERSTATE PROJECTS
I-5804 3500SR 1639 (MEACHAM ROAD) TO 0.3 MILE EAST OF US 21. PAVEMENT REHABILITATION.
3SW
NHPIM 3500C
IREDELLI-40
I-5805 6400SR 2167 (WARD ROAD) TO DAVIE COUNTY LINE. PAVEMENT REHABILITATION.
4SW
NHPIM C 6400
IREDELLI-40
I-5917 4600MILEMARKER 139.3 TO US 64. PAVEMENT REHABILITATION.
8.6SW
NHPIM C 4600
IREDELLI-40
I-5919 1100SR 1892 (JENNINGS ROAD) TO MILEMARKER 56.8. PAVEMENT REHABILITATION.
2SW
NHPIM 1100C
IREDELLI-77
I-5918 800MILEMARKER 39.2 TO MILEMARKER 40.8. PAVEMENT REHABILITATION.
1.5SW
NHPIM 800C
IREDELLI-77
I-5920 5300MILEMARKER 58.9 TO YADKIN COUNTY LINE. PAVEMENT REHABILITATION.
9.9SW
NHPIM 5300C
IREDELLI-77
RIGHT OF WAY IN PROGRESS - COORDINATE WITH PROJECT R-2307
I-5717 11850 1650NC 150 INTERCHANGE. CONSTRUCT INTERCHANGE IMPROVEMENTS.SW
NHP C 10200
IREDELLI-77
OTHER FUNDS PROVIDED BY TOWN OF MOORESVILLE
I-5962 27300I-77 AT SR 1302 (CORNELIUS ROAD). CONVERT GRADE SEPARATION TO INTERCHANGE.
SW
NHP 1900R NHP 500U NHP 7554C7553C C 7553 O 2240C
IREDELL
I-77
PROJECT COMPLETE - GARVEE BOND FUNDING $9.76 MILLION; PAYBACK FY 2007 - FY 2018
I-4723 15329 14259MECKLENBURG COUNTY LINE TO EXIT 45. MILL AND RESURFACE.
15.1TRN
NHP CG 1070
IREDELLI-77
12-23 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)INTERSTATE PROJECTS
PLANNING/DESIGN IN PROGRESS - FUNDING FOR I-4750 AA INCLUDED IN I-5405
I-4750 507256 8681SR 5544 (WEST CATAWBA AVENUE - EXIT 28) TO I-40. WIDEN AND RECONSTRUCT ROADWAY.
23 NHP 10500R AB NHP 675U AB NHP 133000C AB NHP 11700R B NHP 105200C B NHP 17500R C NHP 220000C C
AA SR 5544 (WEST CATAWBA AVENUE - EXIT 28) TO NC 150 (EXIT 36). CONSTRUCT HIGH OCCUPANCY/TOLL (HOT) LANES. - UNDER CONSTRUCTION WITH PROJECT I-5405AB SR 5544 (WEST CATAWBA AVENUE - EXIT 28) TO NC 150 (EXIT 36). CONSTRUCT ONE ADDITIONAL LANE IN EACH DIRECTION.AC I-77/EXIT 30 (GRIFFITH STREET) INTERCHANGE. CONSTRUCT ROUNDABOUTS AT NORTHBOUND AND SOUTHBOUND RAMP TERMINI. - UNDER CONSTRUCTIONEXB NC 150 (EXIT 36) TO NC 115/US 21 (EXIT 42)C NC 115/US 21 (EXIT 42) TO I-40
IREDELLMECKLENBURG
I-77
COMPLETE - GARVEE BOND FUNDING $4 MILLION; CONSTRUCTION - PAYBACK FY 2009-2020
I-5106 6476 5159MILE MARKER 57.83 TO MILE POST 61.74. PAVEMENT REHABILITATION.
3.9TRN
NHP CG 439 CG 439 CG 439
IREDELLI-77
UNDER CONSTRUCTION - INCLUDES FUNDING FOR I-3311 C AND I-4750 AA
I-5405 731678 683265I-277 (BROOKSHIRE FREEWAY) TO WEST CATAWBA AVENUE (EXIT 28). CONSTRUCT HIGH OCCUPANCY TOLL (HOT) LANES AND CONVERT EXISTING HIGH OCCUPANCY VEHICLE (HOV) LANES TO HIGH OCCUPANCY TOLL (HOT) LANES.
17 NHPBA C 12334 A C 12333 A NHPBA C 11334 B C 11333 B STBG I 531 C I 548 C
A I-77/LAKEVIEW ROAD INTERCHANGE. CONVERT GRADE SEPARATION TO HOT LANE DIRECT CONNECTION INTERCHANGE. - UNDER CONSTRUCTIONEXB I-77/HAMBRIGHT ROAD INTERCHANGE. CONVERT GRADE SEPARATION TO HOT LANE DIRECT CONNECTION INTERCHANGE. - UNDER CONSTRUCTIONEXC PROVIDE ADDITIONAL EXPRESS BUS SERVICE TO MITIGATE TRAFFIC CONGESTION DURING CONSTRUCTION. - IN PROGRESSEX
IREDELLMECKLENBURG
I-77
UNDER CONSTRUCTION
I-5606 10077 10077EXIT 45 TO EXIT 54, EXCLUDING PROJECT AREA FOR I-3819 A. PAVEMENT REHABILITATION.
9IREDELLI-77
I-5813 19000.3 MILE NORTH OF SR 2321 (EAST BROAD STREET) TO SR 1892 (JENNINGS ROAD). PAVEMENT REHABILITATION.
5.2SW
NHPIM C 1900
IREDELLI-77
RURAL PROJECTSR-5711 1875 375INTERSECTION OF US 21 AND SR 2375
(HOUSTON ROAD)/SR 1312 (FLOWER HOUSE ROAD). REALIGN AND SIGNALIZE.
REG
T R 250 T U 250 T C 1000
IREDELL
US 21
12-24 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
R-2522 35300 500CEDAR LANE IN TROUTMAN TO BARIUM LANE IN BARIUM SPRINGS. WIDEN TO MULTI-LANES.
2.2
REG
T 11850R11850R T 2900U T 8200C
IREDELL
US 21 - NC 115
PLANNING/DESIGN IN PROGRESS - COORDINATE WITH PROJECT I-5717
R-2307 257620 2220RELOCATED NC 16 (TIP PROJECT R-2206) TO US 21. WIDEN TO MULTI-LANES.
15 STBG 25000R A R 25000 A STBG 3400U A STBG 22000C A C 22000 A C 22000 A C 22000 ASTBG C 27250 B C 27250 B 27250C B27250C B STBGBA C 5000 B
A RELOCATED NC 16 (TIP PROJECT R-2206) TO EAST OF SR 1840 (GREENWOOD ROAD)REGB EAST OF SR 1840 (GREENWOOD ROAD) IN CATAWBA COUNTY TO US 21 IN IREDELL COUNTY - RIGHT OF WAY IN PROGRESSREG
CATAWBAIREDELLLINCOLN
NC 150
$890,000 CONTRIBUTION FROM TOWN OF MOORESVILLE
R-3833 132295 120895SR 1177 (CHUCKWOOD ROAD) TO US 21. WIDEN TO MULTI-LANES WITH INTERCHANGE AT I-77.
5.9 T R 5200 C T C 5310 C L C 890 C
A SR 1177 (CHUCKWOOD ROAD) TO SR 1109 (CENTRE CHURCH ROAD) - COMPLETEB SR 1109 (CENTRE CHURCH ROAD) TO I-77 - COMPLETEC I-77 TO US 21DIV
IREDELL
SR 1100BRAWLEY SCHOOLROAD
COORDINATE WITH U-5817
R-5100 50076 1076I-77 TO NC 150. WIDEN TO MULTI-LANES. 3.2 T R 8000 A T U 1000 A T 15200C A15200C A T R 3000 B T U 1500 B T C 5100 B
A I-77 TO SR 1100 (BRAWLEY SCHOOL ROAD). WIDEN TO MULTI-LANES.DIVB SR 1100 (BRAWLEY SCHOOL ROAD) TO NC 150. WIDEN TO MULTI-LANES.DIV
IREDELL
SR 1109(WILLIAMSON ROAD)
PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY - PLANNING BY TOWN OF MOORESVILLE
R-4757 745 745RELOCATION OF ROADWAY IN MOORESVILLE.
IREDELL
SR 1206ALCOVE ROAD
12-25 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
UNDER CONSTRUCTION
R-5792 663 663DIVISION 12 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN
VARIOUS
URBAN PROJECTSU-5799 17200 500SR 1933 TO FORT DOBBS ROAD. WIDEN TO
MULTI-LANES AND REALIGN OFFSET INTERSECTIONS OF SR 1922 AND SR 2171.
0.8
REG
T R 3200 T U 400 T 6550C6550C
IREDELL
US 21
U-6037 35100NC 150 (PLAZA DRIVE) TO SR 1245 (MEDICAL PARK ROAD). WIDEN TO 4-LANES DIVIDED.
2.7
DIV
T 6500R T 800U T C 27800
IREDELL
US 21 (CHARLOTTEHIGHWAY)
U-5964 1100US 64 (DAVIE AVENUE) AND US 21 (SULLIVAN ROAD). CONVERT 5-APPROACH INTERSECTION TO A SINGLE LANE ROUNDABOUT.REG
T R 200 T U 100 T C 800
IREDELL
US 64 (DAVIEAVENUE)
U-5963 480SR 1135 (WATERLYNN ROAD) TO YELLOW WOOD DRIVE. INSTALL CLOSED LOOP SIGNAL SYSTEM.
REG
T U 50 T C 430
IREDELL
NC 115 (MECKLENBURGHIGHWAY)
U-5779 14200 500SR 1645 (OLD WILKESBORO ROAD) TO HARTNESS ROAD. WIDEN TO MULTI LANES.
0.9
REG
T R 2500 T U 300 T 3634C3633C C 3633
IREDELL
NC 115
U-5780 1055 125INTERSECTION OF NC 150 AND SR 2399 (WIGGINS ROAD). REALIGN INTERSECTION.
REG
T R 180 T C 750
IREDELL
NC 150
12-26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
U-5960 28700NC 115 TO NC 801 (PARK AVENUE). WIDEN TO 4-LANES.
2.6
REG
T 1700R T 500U T C 13250 C 13250
IREDELL
NC 150 (OAK RIDGEFARM HIGHWAY)
COORDINATE WITH R-5100
U-5817 14500 400EXTEND SR 1246 (FAIRVIEW ROAD) OVER I-77 TO CONNECT WITH SR 1206 (ALCOVE ROAD) AND CONSTRUCT PARALLEL NORTH-SOUTH CONNECTOR ROADS TO SR 1109 (WILLIAMSON ROAD).
0.1
DIV
T R 1100 BA R 8000 T U 200 T 4800C
IREDELL
SR 1246 (FAIRVIEWROAD)
U-5816 10100 500US 21 (CHARLOTTE HIGHWAY) TO SR 1474 (BLUEFIELD ROAD). WIDEN TO THREE-LANES WITH OVERPASS OVER I-77.
1.5
DIV
T R 1500 T U 1000 T 7100C
IREDELL
SR 1305 (OATES ROAD- MIDNIGHT LANE)
U-6039 13400VINE STREET TO SR 2422 (SIGNAL HILL DRIVE). UPGRADE ROADWAY AND IMPLEMENT ACCESS MANAGEMENT SOLUTIONS.
0.7
DIV
T 2200R T 500U T C 10700
IREDELL
SR 2321 (EAST BROADSTREET)
FORMERLY U-9999C - IN PROGRESS
U-4950 10000CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION (CRTPO) PLANNING (PL) SUPPLEMENT.DIV
STBGDA PE 800 PE 800 PE 800 800PE800PE800PE PE 800 PE 800 PE 800 PE 800L PE 200 PE 200 PE 200 200PE200PE200PE PE 200 PE 200 PE 200 PE 200
IREDELLMECKLENBURGUNION
VARIOUS
U-4744 150501STBG-DA IN CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION (CRTPO).DIV
STBGDA 15400C15400C28001C C 15400 C 15400 C 15400 C 15400L 3850C3850C7000C C 3850 C 3850 C 3850 C 3850
IREDELLMECKLENBURGUNION
VARIOUS
U-6054 2728CONSTRUCT BROOKDALE DRIVE-US 21 CONNECTOR.
DIV
STBGDA R 1063 L R 477 STBGDA C 820 L C 368
IREDELL
STATESVILLE
12-27 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BRIDGE PROJECTS
UNDER CONSTRUCTION
B-4766 2079 2079REPLACE BRIDGE 480069 OVER ROCKY CREEK.HFIREDELL
NC 115
UNDER CONSTRUCTION
B-5142 6202 6202REPLACE BRIDGE 480057 OVER CORNELIUS CREEK.
DIVIREDELL
SR 1302(CORNELIUS ROAD)
B-5846 4400 100REPLACE BRIDGE 480189 OVER SOUTH YADKIN RIVER.
DIV
STPOFF 200R STPOFF 4100C
IREDELL
SR 1892(JENNINGS ROAD)
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5112 15782 15782DIVISION 12 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVALEXANDER
CATAWBACLEVELANDGASTONIREDELLLINCOLN
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4912 14212 14212ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 12 PROJECT MITIGATION.ALEXANDER
CATAWBACLEVELANDGASTONIREDELLLINCOLN
VARIOUS
12-28 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5712 2930 1530SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 12.
HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
ALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN
VARIOUS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5212 5973 5348DIVISION 12 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
HSIP R 50 DIV HSIP C 575 DIV
DIV DIVISION 12 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN THE DIVISION CATEGORY.DIVREG DIVISION 12 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN THE REGIONAL CATEGORY.REG
ALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN
VARIOUS
CONGESTION MITIGATION PROJECTSC-5613 20901PROJECTS TO IMPROVE CONGESTION AND
AIR QUALITY IN THE CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION (CRTPO) AREA.
EX
CMAQ PE 828 PE 844 L PE 207 PE 211 CMAQ R 828 R 844 L R 207 R 211 CMAQ C 4971 C 5062 L C 1243 C 1265 CMAQ O 828 O 844 L O 207 O 211 CMAQ I 828 I 844 L I 207 I 211
IREDELLMECKLENBURGUNION
VARIOUS
12-29 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)CONGESTION MITIGATION PROJECTS
IN PROGRESS
C-5536 624 624MECKLENBURG COUNTY AIR QUALITY -GRADE (GRANTS TO REPLACE AGING DIESEL ENGINS). REPLACE, REPOWER OR RETROFIT AGING DIESEL VEHICLES AND EQUIPMENT.
EXCABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANUNION
CHARLOTTE
UNDER CONSTRUCTION
C-5200 1283 1283NC 115 AND NC 150 IN MOORESVILLE. CONSTRUCT SOUTHBOUND NC 115 RIGHT TURN LANE AT NC 150 AND WESTBOUND NC 150 SHARED THROUGH-RIGHT LANE AT NC 115.
EXIREDELLMOORESVILLE
UNDER CONSTRUCTION
C-5531 802 802KISTLER FARM-BRIARCLIFF-BELLINGHAM-WHITE OAK SIDEWALK NETWORK IN MOORESVILLE. CONSTRUCT SIDEWALKS IN VARIOUS LOCATIONS.
EXIREDELLMOORESVILLE
RIGHT OF WAY IN PROGRESS; STBGDA FUNDS SPENT ON REGIONAL PROJECT ARE EXEMPT
C-5529 3446 552INTERSECTION OF NC 115 AND FAITH ROAD-CAMPUS LANE IN MOORESVILLE. REALIGN FAITH ROAD TO TIE INTO EXISTING NC 115/CAMPUS LANE INTERSECTION AND CONSTRUCT DEDICATED TURN LANES ON FAITH ROAD AND CAMPUS LANE APPROACHES TO THE INTERSECTION.
EX
CMAQ C 996 L C 332 STBGDA C 750 L C 816
IREDELL
MOORESVILLE
UNDER CONSTRUCTION
C-5701 396 396INTERSECTION OF NC 801 AND NC 150. CONSTRUCT INTERSECTION IMPROVEMENTS.EXIREDELL
MOORESVILLE
ROADSIDE ENVIRONMENTAL PROJECTS (REST AREA)
UNDER CONSTRUCTION
K-4908 21939 21939I-77, NEW REST AREA PAIR ON NEW LOCATION TO REPLACE TWO EXISTING PAIRS. ONE IN IREDELL COUNTY (LAKE NORMAN) AND THE OTHER AT THE IREDELL-YADKIN COUNTY LINE. TO IMPROVE SPACING AND REDUCE MAINTENANCE COST.
TRNIREDELLI-77
12-30 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
R-5859 51800NC 73 TO SR 1389 (FAIRFIELD FOREST ROAD). WIDEN TO MULTI-LANES.
3.8
DIV
T 13000R T 1600U T 12400C C 12400 C 12400
LINCOLN
NC 16 BUSINESS
R-5712 1163 233INTERSECTION OF NC 16 BUSINESS AND SR 1439 (UNITY CHURCH ROAD)/SR 1387 (TRIANGLE CIRCLE). ADD TURN LANES.REG
T R 180 T C 750
LINCOLN
NC 16 BUSINESS
PLANNING/ENVIRONMENTAL DOCUMENT TO BE COMPLETED UNDER PROJECT R-5721
R-5710 1230INTERSECTION OF NC 73 AND NC 16 BUSINESS. INTERSECTION IMPROVEMENTS.
REG
T R 180 T U 100 T 950C
LINCOLN
NC 73
PLANNING/DESIGN IN PROGRESS.
R-5721 151900 500NC 16 BUSINESS IN LINCOLN COUNTY TO SR 5544 (WEST CATAWBA AVENUE) IN MECKLENBURG COUNTY. WIDEN TO MULTI-LANES.
9.1 T R 30000 A T U 6000 A T 14500C A14500C A C 14500 A C 14500 A T R 45000 B T U 1000 B T 2850C B2850C B C 2850 B C 2850 B
A NC 16 BUSINESS TO VANCE ROAD EXTENSION/BEATTIES FORD ROAD.REGB VANCE ROAD EXTENSION/BEATTIES FORD ROAD TO SR 5544 (WEST CATAWBA AVENUE).REG
LINCOLNMECKLENBURG
NC 73
PLANNING/DESIGN IN PROGRESS - COORDINATE WITH PROJECT I-5717
R-2307 257620 2220RELOCATED NC 16 (TIP PROJECT R-2206) TO US 21. WIDEN TO MULTI-LANES.
15 STBG 25000R A R 25000 A STBG 3400U A STBG 22000C A C 22000 A C 22000 A C 22000 ASTBG C 27250 B C 27250 B 27250C B27250C B STBGBA C 5000 B
A RELOCATED NC 16 (TIP PROJECT R-2206) TO EAST OF SR 1840 (GREENWOOD ROAD)REGB EAST OF SR 1840 (GREENWOOD ROAD) IN CATAWBA COUNTY TO US 21 IN IREDELL COUNTY - RIGHT OF WAY IN PROGRESSREG
CATAWBAIREDELLLINCOLN
NC 150
12-31 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
R-0617 69201 35801NC 279 AT CHERRYVILLE TO RELOCATED US 321. WIDEN TO MULTI-LANES, PART ON NEW LOCATION.
10.6 T 5300R BB T 1600U BB T C 13250 BB C 13250 BB
A NC 279 AT CHERRYVILLE TO THE LINCOLN COUNTY LINE. - COMPLETEBA GASTON COUNTY LINE TO WEST OF INDIAN CREEK. - COMPLETEBB WEST OF INDIAN CREEK TO US 321 AT LINCOLNTON.REGC US 321 AT LINCOLNTON TO US 321 BYPASS.
GASTONLINCOLN
NC 150
UNDER CONSTRUCTION
R-5792 663 663DIVISION 12 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN
VARIOUS
URBAN PROJECTS
"L" REPRESENTS FUNDS FROM LINCOLN COUNTY
U-5962 4750NC 16 BUSINESS, SR 1373 (CAMPGROUND ROAD), SR 1386 (WILL PROCTOR ROAD). REALIGN OFFSET INTERSECTIONS.
REG
T 900R T 100U L 288C T 3462C
LINCOLN
NC 16 BUSINESS
BRIDGE PROJECTS
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5112 15782 15782DIVISION 12 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVALEXANDER
CATAWBACLEVELANDGASTONIREDELLLINCOLN
VARIOUS
12-32 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)MITIGATION PROJECTS
IN PROGRESS
EE-4912 14212 14212ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 12 PROJECT MITIGATION.ALEXANDER
CATAWBACLEVELANDGASTONIREDELLLINCOLN
VARIOUS
HIGHWAY SAFETY PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5212 5973 5348DIVISION 12 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
HSIP R 50 DIV HSIP C 575 DIV
DIV DIVISION 12 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN THE DIVISION CATEGORY.DIVREG DIVISION 12 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN THE REGIONAL CATEGORY.REG
ALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN
VARIOUS
IN PROGRESS
W-5712 2930 1530SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 12.
HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
ALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN
VARIOUS
12-33 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)CONGESTION MITIGATION PROJECTS
IN PROGRESS
C-5606 3804 116PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE GASTON-CLEVELAND-LINCOLN MPO.
EX
CMAQ PE 146 PE 149 L PE 37 PE 37 CMAQ R 146 R 149 L R 37 R 37 CMAQ C 877 C 893 L C 219 C 223 CMAQ O 146 O 149 L O 37 O 37 CMAQ I 146 I 149 L I 37 I 37
CLEVELANDGASTONLINCOLN
VARIOUS
IN PROGRESS
C-5536 624 624MECKLENBURG COUNTY AIR QUALITY -GRADE (GRANTS TO REPLACE AGING DIESEL ENGINS). REPLACE, REPOWER OR RETROFIT AGING DIESEL VEHICLES AND EQUIPMENT.
EXCABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANUNION
CHARLOTTE
RIGHT OF WAY IN PROGRESS
C-5532 527 58GENERAL BOULEVARD-MAIN STREET PEDESTRIAN IMPROVEMENTS IN LINCOLNTON. CONSTRUCT HIGH VISIBILITY CROSSWALKS, PEDESTRIAN REFUGE ISLANDS AND INSTALL COUNTDOWN TIMERS.
EX
CMAQ C 375 L C 94
LINCOLN
LINCOLNTON
12-34 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BICYCLE AND PEDESTRIAN PROJECTS
U-5546 4125GREATER HICKORY MPO TRANSPORTATION ALTERNATIVES (TA) PROGRAM.
DIV
TAPDA R 120 R 20 R 20 20R20R20R R 20 R 20 R 20 R 20L R 30 R 5 R 5 5R5R5R R 5 R 5 R 5 R 5TAPDA C 1200 C 200 C 200 200C200C200C C 200 C 200 C 200 C 200L C 300 C 50 C 50 50C50C50C C 50 C 50 C 50 C 50
ALEXANDERBURKECALDWELLCATAWBA
VARIOUS
PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TQ-9030 194 194CAPITAL - PURCHASE OF SERVICE
HF
FEPD L S
ALEXANDER
Alexander County
FUNDS AUTHORIZED IN PROGRESS
TA-6507 2934 1554REPLACEMENT - LIGHT TRANSIT VEHICLE
HF
FNU CP 184 CP 184 CP 207 184CP184CP184CP L CP 23 CP 23 23CP23CP23CP S CP 23 CP 23 CP 23 23CP23CP23CP
ALEXANDERBURKECALDWELLCATAWBA
TRANSPORTATION ADMIN. OF CLEVELAND COUNTY
FUNDS AUTHORIZED IN PROGRESS
TP-5106 553 325PLANNING ASSISTANCE - 5303
HF
FMPL CP 34 CP 34 CP 34 34CP L CP 4 CP 4 CP 4 34CP S CP 4 CP 4 CP 4 34CP
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT COUNCIL OF GOVERNMENTS
TQ-6511 95 95ELDERLY AND DISABLED FUNDING - MOBLITY MANAGEMENT
HF
FEPD L
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT COUNCIL OF GOVERNMENTS
12-35 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TA-5187 480 60REPLACEMENT VANS
HF
FUZ CP 336 L CP 84
ALEXANDERCALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TA-5189 900 450REPLACEMENT BUS
HF
FBUS CP 360 L CP 90
ALEXANDERCALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
TA-5188 450REPLACEMENT BUS
HF
FUZ CP 360 L CP 90
ALEXANDERCALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TA-6544 360 360CAPITAL
HF
FNU L S
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TA-6501 908 586REPLACEMENT VAN
HF
FNU CP 72 CP 36 CP 41 36CP36CP36CP L CP 10 CP 5 5CP5CP5CP S CP 10 CP 5 CP 5 5CP5CP5CP
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
12-36 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TA-4927 1434 894REPLACEMENT BUS
HF
FUZ CP 144 CP 144 144CP L CP 18 CP 18 18CP S CP 18 CP 18 18CP
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
TA-4928 1086 362EXPANSION BUS
HF
FUZ CP 290 290CP L CP 36 36CP S CP 36 36CP
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TA-4929 812 380REPLACEMENT VAN
HF
FUZ CP 72 72CP72CP72CP L CP 18 18CP18CP18CP S CP 18 18CP18CP18CP
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
TA-6556 339 339CAPITAL
HF
FNU L S
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
12-37 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
TA-4928B 122 122EXPANSION - LIGHT TRANSIT VEHICLE - CMAQ APP#HU5
HF
CMAQ
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TC-5015 180 180OPERATING
HF
ADTAP L
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TC-5101 471 314MOBILITY MANAGER
HF
FUZ CP 126 L CP 31
ALEXANDERCALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TG-6159 392 272ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETCHF
FNU CP 16 CP 16 CP 16 16CP16CP16CP L CP 2 CP 2 CP 2 2CP2CP2CP S CP 2 CP 2 CP 2 2CP2CP2CP
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
12-38 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TG-4774 738 438ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETCHF
FUZ CP 40 CP 40 CP 40 40CP40CP40CP L CP 10 CP 10 CP 10 10CP10CP10CP
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TG-5264 525 225ROUTINE CAPITAL
HF
FUZ CP 120 CP 120 L CP 30 CP 30
ALEXANDERCALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TG-4774A 5925 2925PREVENTIVE MAINTENANCE
HF
FUZ O 400 O 400 O 400 500O400O400O L O 100 O 100 O 100 100O100O
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TG-6142A 121 82ROUTINE CAPITAL - SERVICE VEHICLE
HF
FNU 35CP L 4CP
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
12-39 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TG-4774B 1463 797OPERATING ASSISTANCE - ADA PARATRANSIT SERVICE
HF
FUZ O 100 O 100 O 100 100O100O100O L O 11 O 11 O 11 11O11O11O
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TK-5181 4976 2846ADMINISTRATION
HF
FNU O 284 O 284 O 284 284O284O284O FNU L O 53 O 53 O 53 53O53O53O S O 18 O 18 O 18 18O18O18O
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TM-6108 2638 1534OPERATING ASSISTANCE - NON-URBAN
HF
JARC O 92 O 92 O 92 92O92O92O L O 92 O 92 O 92 92O92O92O
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TN-6109 390 210OPERATING ASSISTANCE - SMALL-URBAN
HF
FNF O 15 O 15 O 15 15O15O15O L O 15 O 15 O 15 15O15O15O
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
12-40 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TO-4733 25358 16154OPERATING ASSISTANCE
HF
FUZ O 1500 O 1000 O 1000 1000O1000O1000O L O 1296 O 46 O 46 46O 46O SMAP O 204 O 204 O 204 204O204O204O
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TO-6109 2586 1410OPERATING ASSISTANCE
HF
FNU O 98 O 98 O 98 98O98O98O L O 98 O 98 O 98 98O98O98O
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TP-4733A 2281 1651PLANNING ASSISTANCE
HF
FUZ CP 210 CP 210 CP 210
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TP-4733B 681 531PLANNING ASSISTANCE
HF
FUZ CP 40 CP 40 CP 40 L CP 5 CP 5 CP 5 S CP 5 CP 5 CP 5
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
12-41 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TQ-7008 23 235310 PROGRAM ADMININSTRATION
HF
FEPD
ALEXANDERCALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TQ-6503 137 77PREVENTIVE MAINTENANCE - PARATRANSIT
HF
FEPD O 9 O 9 O 9 9O9O9O L O 1 O 1 O 1 S O 1 O 1 O 1
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
TQ-6955 254CAPITAL - PURCHASE OF SERVICE
HF
FEPD CP 203 L CP 51
ALEXANDERCALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TQ-6507 792 483OPERATING ASSISTANCE - ELDERLY AND DISABLED PERSONS
HF
FEPD O 34 O 34 O 34 34O 34O L O 35 O 35 O 35 34O
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TS-5128 279 209SAFETY & SECURITY
HF
FUZ CP 18 CP 18 CP 19 L CP 5 CP 5 CP 5
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
12-42 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)AVIATION PROJECTS
AV-5752 600LAND ACQUISITION AND OBSTRUCTION REMOVAL.
DIV
T R 540 O R 60
CATAWBA
HICKORY REGIONALAIRPORT (HKY)
UNDER CONSTRUCTION
AV-5741 3460 3460600 FEET EXTENSION OF RUNWAY 6 - PHASE I AND II.
DIVCATAWBA
HICKORY REGIONALAIRPORT (HKY)
BICYCLE AND PEDESTRIAN PROJECTSEB-5825 1900CONSTRUCT WEST A STREET BIKE AND
PEDESTRIAN IMPROVEMENTS.DIV
STBGDA C 1520 L C 380
CATAWBA
NEWTON
U-5546 4125GREATER HICKORY MPO TRANSPORTATION ALTERNATIVES (TA) PROGRAM.
DIV
TAPDA R 120 R 20 R 20 20R20R20R R 20 R 20 R 20 R 20L R 30 R 5 R 5 5R5R5R R 5 R 5 R 5 R 5TAPDA C 1200 C 200 C 200 200C200C200C C 200 C 200 C 200 C 200L C 300 C 50 C 50 50C50C50C C 50 C 50 C 50 C 50
ALEXANDERBURKECALDWELLCATAWBA
VARIOUS
EB-5828 573CENTENNIAL BOULEVARD, NORTH OXFORD STREET TO NORTH LOOKOUT STREET. CONSTRUCT SIDEWALK.DIV
STBGDA C 458 L C 115
CATAWBA
CLAREMONT
UNDER CONSTRUCTION
EB-5803 399 3991ST AVENUE AREA BICYCLE AND PEDESTRIAN IMPROVEMENTS.DIVCATAWBA
CONOVER
EB-5808 402UPGRADE CURRENT PEDESTRIAN SIGNALS AND INSTALL NEW PEDESTRIAN SIGNALS.
DIV
STBGDA C 322 L C 80
BURKECALDWELLCATAWBA
HICKORY
12-43 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BICYCLE AND PEDESTRIAN PROJECTS
EB-5750 141007TH AVENUE NE TO 9TH STREET NW. CONSTRUCT GREENWAY WITH PARK NODES AND PEDESTRIAN BRIDGE OVER NC 127.
1.2
DIV
TAP C 7680 L C 1920 STBGDA C 3600 L C 900
CATAWBA
MAIN AVENUENW/NE
EB-5911 44009TH STREET NW TO GEITNER ROAD. CONSTRUCT A 12-FEET WIDE MULTI-USE PATH.DIV
L 880C TAP 3520C
CATAWBA
OLD LENOIR ROAD
PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TQ-9031 126 126CAPITAL - PURCHASE OF SERVICE
HF
FEPD L S
CATAWBA
CATAWBA COUNTY DEPT SOCIAL SERVICES
TQ-6175 500 500OPERATING ASSISTANCE - PURCHASE OF SERVICE
HF
FEPD L S
CATAWBA
CATAWBA COUNTY DEPT SOCIAL SERVICES
FUNDS AUTHORIZED IN PROGRESS
TI-6101 8823 5247INTERCITY BUS - BOONE TO CHARLOTTE
HF
FNU O 246 O 246 O 246 246O246O246O L O 106 O 106 O 106 106O106O106O S O 244 O 244 O 244 244O244O244O
CALDWELLCATAWBALINCOLNMECKLENBURGWATAUGA
COACH AMERICA
TA-6549 162 162CAPITAL - REPLACEMENT VEHICLES
HF
FEPD L S
CATAWBA
THE MENTAL HEALTHFUND
12-44 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TA-6507 2934 1554REPLACEMENT - LIGHT TRANSIT VEHICLE
HF
FNU CP 184 CP 184 CP 207 184CP184CP184CP L CP 23 CP 23 23CP23CP23CP S CP 23 CP 23 CP 23 23CP23CP23CP
ALEXANDERBURKECALDWELLCATAWBA
TRANSPORTATION ADMIN. OF CLEVELAND COUNTY
FUNDS AUTHORIZED IN PROGRESS
TP-5106 553 325PLANNING ASSISTANCE - 5303
HF
FMPL CP 34 CP 34 CP 34 34CP L CP 4 CP 4 CP 4 34CP S CP 4 CP 4 CP 4 34CP
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT COUNCIL OF GOVERNMENTS
TQ-6511 95 95ELDERLY AND DISABLED FUNDING - MOBLITY MANAGEMENT
HF
FEPD L
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT COUNCIL OF GOVERNMENTS
TA-6556 339 339CAPITAL
HF
FNU L S
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
12-45 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TA-6544 360 360CAPITAL
HF
FNU L S
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TA-6501 908 586REPLACEMENT VAN
HF
FNU CP 72 CP 36 CP 41 36CP36CP36CP L CP 10 CP 5 5CP5CP5CP S CP 10 CP 5 CP 5 5CP5CP5CP
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
TA-5188 450REPLACEMENT BUS
HF
FUZ CP 360 L CP 90
ALEXANDERCALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TA-5187 480 60REPLACEMENT VANS
HF
FUZ CP 336 L CP 84
ALEXANDERCALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
12-46 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TA-4929 812 380REPLACEMENT VAN
HF
FUZ CP 72 72CP72CP72CP L CP 18 18CP18CP18CP S CP 18 18CP18CP18CP
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
TA-4928 1086 362EXPANSION BUS
HF
FUZ CP 290 290CP L CP 36 36CP S CP 36 36CP
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TA-4927 1434 894REPLACEMENT BUS
HF
FUZ CP 144 CP 144 144CP L CP 18 CP 18 18CP S CP 18 CP 18 18CP
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TA-5189 900 450REPLACEMENT BUS
HF
FBUS CP 360 L CP 90
ALEXANDERCALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
12-47 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
TA-4928B 122 122EXPANSION - LIGHT TRANSIT VEHICLE - CMAQ APP#HU5
HF
CMAQ
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TC-5015 180 180OPERATING
HF
ADTAP L
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TC-5101 471 314MOBILITY MANAGER
HF
FUZ CP 126 L CP 31
ALEXANDERCALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TG-5261 338 338PREVENTIVE MAINTENANCE
HF
L STPDA
CATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TG-5264 525 225ROUTINE CAPITAL
HF
FUZ CP 120 CP 120 L CP 30 CP 30
ALEXANDERCALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
12-48 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TG-4774 738 438ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETCHF
FUZ CP 40 CP 40 CP 40 40CP40CP40CP L CP 10 CP 10 CP 10 10CP10CP10CP
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TG-6159 392 272ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETCHF
FNU CP 16 CP 16 CP 16 16CP16CP16CP L CP 2 CP 2 CP 2 2CP2CP2CP S CP 2 CP 2 CP 2 2CP2CP2CP
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TG-4774A 5925 2925PREVENTIVE MAINTENANCE
HF
FUZ O 400 O 400 O 400 500O400O400O L O 100 O 100 O 100 100O100O
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TG-6142A 121 82ROUTINE CAPITAL - SERVICE VEHICLE
HF
FNU 35CP L 4CP
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
12-49 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TG-4774B 1463 797OPERATING ASSISTANCE - ADA PARATRANSIT SERVICE
HF
FUZ O 100 O 100 O 100 100O100O100O L O 11 O 11 O 11 11O11O11O
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TK-5181 4976 2846ADMINISTRATION
HF
FNU O 284 O 284 O 284 284O284O284O FNU L O 53 O 53 O 53 53O53O53O S O 18 O 18 O 18 18O18O18O
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TM-6108 2638 1534OPERATING ASSISTANCE - NON-URBAN
HF
JARC O 92 O 92 O 92 92O92O92O L O 92 O 92 O 92 92O92O92O
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TN-6109 390 210OPERATING ASSISTANCE - SMALL-URBAN
HF
FNF O 15 O 15 O 15 15O15O15O L O 15 O 15 O 15 15O15O15O
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
12-50 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TO-4733 25358 16154OPERATING ASSISTANCE
HF
FUZ O 1500 O 1000 O 1000 1000O1000O1000O L O 1296 O 46 O 46 46O 46O SMAP O 204 O 204 O 204 204O204O204O
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TO-6109 2586 1410OPERATING ASSISTANCE
HF
FNU O 98 O 98 O 98 98O98O98O L O 98 O 98 O 98 98O98O98O
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TP-4733A 2281 1651PLANNING ASSISTANCE
HF
FUZ CP 210 CP 210 CP 210
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TP-4733B 681 531PLANNING ASSISTANCE
HF
FUZ CP 40 CP 40 CP 40 L CP 5 CP 5 CP 5 S CP 5 CP 5 CP 5
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
12-51 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
TQ-6955 254CAPITAL - PURCHASE OF SERVICE
HF
FEPD CP 203 L CP 51
ALEXANDERCALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TQ-7003 22 22SECTION 5310 PROGRAM ADMINISTRATION
HF
FEPD
CATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
TQ-6808 300CAPITAL PURCHASE OF SERVICE
HF
FEPD CP 120 CP 120 L CP 30 CP 30
CATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TQ-6503 137 77PREVENTIVE MAINTENANCE - PARATRANSIT
HF
FEPD O 9 O 9 O 9 9O9O9O L O 1 O 1 O 1 S O 1 O 1 O 1
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TQ-6507 792 483OPERATING ASSISTANCE - ELDERLY AND DISABLED PERSONS
HF
FEPD O 34 O 34 O 34 34O 34O L O 35 O 35 O 35 34O
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
12-52 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TQ-7008 23 235310 PROGRAM ADMININSTRATION
HF
FEPD
ALEXANDERCALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TS-5128 279 209SAFETY & SECURITY
HF
FUZ CP 18 CP 18 CP 19 L CP 5 CP 5 CP 5
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
AVIATION PROJECTSAV-5849 6410EXTEND RUNWAY AND TAXIWAY.
DIV
T 810R O 90R T 2479C O 276C C 276 T C 2479
CLEVELAND
SHELBY-CLEVELANDCOUNTY REGIONALAIRPORT (EHO)
PUBLIC TRANSPORTATION PROJECTSTA-6290 REPLACEMENT VAN
HFCLEVELAND
TRANSPORTATION ADMIN. OF CLEVELAND COUNTY
FUNDS AUTHORIZED IN PROGRESS
TA-6538 461 461CAPITAL
HF
FNU L S
CLEVELAND
TRANSPORTATION ADMIN. OF CLEVELAND COUNTY
12-53 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TK-6166 4165 2371ADMINISTRATION
HF
FNU O 239 O 239 O 239 239O239O239O FNU L O 45 O 45 O 45 45O45O45O S O 15 O 15 O 15 15O15O15O
CLEVELAND
TRANSPORTATION ADMIN. OF CLEVELAND COUNTY
FUNDS AUTHORIZED IN PROGRESS
TQ-6668 282 282CAPITAL
HF
FEPD L S
CLEVELAND
TRANSPORTATION ADMIN. OF CLEVELAND COUNTY
BICYCLE AND PEDESTRIAN PROJECTS
RIGHT OF WAY IN PROGRESS
EB-5701 1210 116SR 2200 (COX ROAD) TO CITY LIMITS. CONSTRUCT MISSING SIDEWALK ON NORTH SIDE.
1.5
DIV
TAP C 875 L C 219
GASTON
US 29/74 (EAST FRANKLINBOULEVARD)
EB-5791 429SR 2044 (TUCKASEEGEE ROAD) TO SUMMIT AVENUE. CONSTRUCT MISSING SIDEWALK ON BOTH SIDES OF ROAD.DIV
TAP C 344 L C 85
GASTON
NC 273 (HIGHLANDSTREET)
EB-5746 610SR 2044 (TUCKASEEGE ROAD) TO ROSE STREET. CONSTRUCT SIDEWALKS ON BOTH SIDES OF ROAD.
1.3
DIV
TAP C 488 L C 122
GASTON
NC 273 (SOUTHMAIN STREET)
EB-5745 1399SR 1255 (HUDSON BOULEVARD) FROM SR 2200 (GASTON DAY SCHOOL ROAD) TO SR 2466 (REDBUD DRIVE). SR 2466 (REDBUD DRIVE) FROM SR 1255 (HUDSON BOULEVARD) TO NC 279 (SOUTH NEW HOPE ROAD). CONSTRUCT SIDEWALK ON ONE SIDE.
1.2
DIV
TAP 280PE L 70PE TAP 56R L 14R TAP 783C L 196C
GASTON
SR 1255 (HUDSON BLVD)SR 2466 (REDBUD DR)
EB-5713 160 21CONSTRUCT PEDESTRIAN IMPROVEMENTS AT THE INTERSECTION OF WILKINSON BOULEVARD AND LAKEWOOD ROAD, WILKINSON BOULEVARD AND MARKET STREET, AND EIGHTH AVENUE AND MARKET STREET.
1DIV
SRTS C 139
GASTONVARIOUS
12-54 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BICYCLE AND PEDESTRIAN PROJECTS
EB-5748 380SMITH STREET TO FERSTL AVENUE. CONSTRUCT SIDEWALK ON ONE SIDE.
0.3
DIV
TAP 38PE L 10PE TAP 266C L 66C
GASTON
BEATY ROAD
UNDER CONSTRUCTION
EB-5531 300 300PHASE I: 12TH STREET, CHADWICK COURT TO KAISER ROAD. PHASE II: YELLOW JACKET LANE/BESS TOWN ROAD, 12TH STREET TO 14TH STREET (NC 274). CONSTRUCT SIDEWALKS.
TRNGASTONBESSEMER CITY
EB-5913 518SR 2014 (LAKEWOOD ROAD), SR 2565 (EAGLE ROAD) TO LAKE DRIVE. CONSTRUCT SIDEWALK AND PEDESTRIAN BRIDGE OVER SOUTH FORK RIVER INLET.
DIV
TAP PE 131 L PE 33 TAP 283C L 71C
GASTON
CRAMERTON
UNDER CONSTRUCTION
EB-5535 836 836LAKEWOOD PARK TRAIL, LAKEWOOD PARK TO US 29/US 74. CONSTRUCT 10 FEET WIDE TRAIL.TRNGASTON
CRAMERTON
UNDER CONSTRUCTION
EB-5534 410 410CATAWBA CREEK GREENWAY EXTENSION, FERGUSON PARK TO DOWNTOWN. CONSTRUCT GREENWAY.TRNGASTON
GASTONIA
UNDER CONSTRUCTION
EB-5533 875 875POSTON PARK TO SOUTH FORK RIVER GREENWAY. CONSTRUCT TRAIL.TRNGASTON
GASTONIA
FEASIBILITY STUDY IN PROGRESS
EB-5749 CONSTRUCT IMPROVEMENTS TO ACCOMMODATE BICYCLE AND PEDESTRIAN TRAVEL OVER THE CATAWBA RIVER.DIVGASTON
MECKLENBURG
MOUNT HOLLY
12-55 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BICYCLE AND PEDESTRIAN PROJECTS
EB-5912 1001SR 2044 (TUCKASEEGEE ROAD), NC 273 TO MARINA VILLAGE DRIVE. CONSTRUCT SIDEWALK.
DIV
TAP PE 72 L PE 18 TAP 50R L 13R TAP C 678 L C 170
GASTON
MOUNT HOLLY
EB-5914 1350SR 2044 (TUCKASSEEGEE ROAD), BROOME STREET (TUCKASEEGEE PARK ENTRANCE) TO MARINA VILLAGE DRIVE. CONSTRUCT SIDEWALK AND PEDESTRIAN BRIDGE
DIV
TAP PE 80 L PE 20 TAP 20R L 5R TAP C 980 L C 245
GASTON
MOUNT HOLLY
UNDER CONSTRUCTION
EB-5114 800 800MOUNT HOLLY RIVERFRONT GREENWAY. 1.7TRNGASTON
MOUNT HOLLY
EB-5768 663DIXON CIRCLE TO HUDSON BOULEVARD. CONSTRUCT SIDEWALK ON ONE SIDE OF ROAD.
0.5
DIV
TAP 103PE L 26PE TAP 24R L 6R TAP 403C L 101C
GASTON
SOUTH MARIETTA STREET/HILLTOP DRIVE
12-56 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TQ-8012 139 139CAPITAL - MOBILITY MANAGEMENT
HF
FEPD L S
ANSONCABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANSTANLYUNION
CENTRALINA COUNCIOF GOVERNMENTS
TQ-6171 490 490MOBILITY MANAGEMENT
HF
FEPD L S
ANSONCABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANSTANLYUNION
CENTRALINA COUNCIOF GOVERNMENTS
FUNDS AUTHORIZED IN PROGRESS
TQ-6924 158 158OPERATING
HF
FEPD L
ANSONCABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANSTANLYUNION
CENTRALINA COUNCIOF GOVERNMENTS
12-57 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
TD-4704C 1000 1000FACILITY - PARK & RIDE - CATS X85 CITY OF BELMONT (CMAQ APP GA-11)
HF
CMAQ
GASTON
CHARLOTTE AREA TRANSIT SYSTEM
FUNDS AUTHORIZED IN PROGRESS
TA-6113 898 898CAPITAL
HF
FNU L S
GASTON
GASTON COUNTY ACCESS
FUNDS AUTHORIZED IN PROGRESS
TK-6128 3169 1765ADMINISTRATION
HF
FNU AD 98 AD 98 AD 98 98AD98AD98AD L AD 35 AD 35 AD 35 35AD35AD35AD S AD 101 AD 101 AD 101 101AD101AD101AD
GASTON
GASTON COUNTY ACCESS
FUNDS AUTHORIZED IN PROGRESS
TQ-6666 253 253CAPITAL
HF
FEPD L S
GASTON
GASTON COUNTY ACCESS
FUNDS AUTHORIZED IN PROGRESS
TA-5201 90 90BUS REPLEACEMENT PROJECT FOR GASTONIA EXPRESS MID-DAY ROUTTE
HF
CMAQ L
GASTON
GASTONIA TRANSIT
TA-5137 20SUPERVISOR'S VEHICLE REPLACEMENT
HF
FUZ CP 16 L CP 2 S CP 2
GASTON
GASTONIA TRANSIT
TA-5136 160 160ADA VAN REPLACEMENT (3 VANS)
HF
FUZ L S
GASTON
GASTONIA TRANSIT
TA-4926 2984 1742EXPANSION BUS
HF
FUZ CP 994 L CP 124 S CP 124
GASTON
GASTONIA TRANSIT
12-58 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
TA-5138 1225 1225BUS REPLACEMENT (3 BUSES)
HF
FUZ L S
GASTON
GASTONIA TRANSIT
TD-5254 750 750FACILITY - PARK & RIDE - GASTON EXP BETWEEN BELMONT AND CHARLOTTEHF
CMAQ
GASTONGASTONIA TRANSIT
TD-5270 344 344GASTONIA TRANSIT
HF
FUZ L
GASTON
GASTONIA TRANSIT
FUNDS AUTHORIZED IN PROGRESS
TG-5117 3568 1888ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETC
HF
FUZ CP 309 CP 312 CP 181 181CP181CP181CP L CP 77 CP 78 CP 45 45CP45CP45CP
GASTON
GASTONIA TRANSIT
FUNDS AUTHORIZED IN PROGRESS
TG-5117A 6665 3130PREVENTIVE MAINTENANCE
HF
FUZ O 412 O 416 O 500 500O500O500O L O 103 O 104 O 125 125O125O125O
GASTON
GASTONIA TRANSIT
FUNDS AUTHORIZED IN PROGRESS
TG-5117B 6052 2537ADA SERVICE
HF
FUZ O 312 O 500 O 500 500O500O500O L O 78 O 125 O 125 125O125O125O
GASTON
GASTONIA TRANSIT
FUNDS AUTHORIZED IN PROGRESS
TO-5142 17668 13903OPERATING ASSISTANCE
HF
FUZ O 1076 L O 1076 SMAP O 278 O 267 O 267 267O267O267O
GASTON
GASTONIA TRANSIT
FUNDS AUTHORIZED IN PROGRESS
TO-5218 150 150OPERATIONAL ASSISTANCE FOR GASTONIA EXPRESS MID-DAY ROUTE (C-5606G)
HF
CMAQ L
GASTON
GASTONIA TRANSIT
12-59 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TP-5115 336 168PLANNING ASSISTANCE
HF
FMPL CP 22 CP 22 CP 22 22CP22CP22CP L CP 3 CP 3 CP 3 3CP3CP3CP S CP 3 CP 3 CP 3 3CP3CP3CP
GASTON
GASTONIA TRANSIT
FUNDS AUTHORIZED IN PROGRESS
TS-5110 242 139SAFETY & SECURITY - MIN. 1% SET ASIDE
HF
FUZ CP 21 CP 20 CP 20 2CP 20CP L CP 5 CP 5 CP 5 5CP
GASTON
GASTONIA TRANSIT
TA-5185 62ONE EXPANSION LIGHT TRANSIT VEHICLE
DIV
FEPD CP 50 L CP 6 T CP 6
GASTONLINCOLN
LINCOLN COUNTY
PASSENGER RAIL PROJECTSP-5200 8797 7947RAIL CORRIDOR BETWEEN GASTONIA AND
MOUNT HOLLY INCLUDING THE BELMONT SPUR. REACTIVATION OF RAIL CORRIDOR.
STPE C 850 D
A CROSSING SIGNAL CONSTRUCTION - COMPLETEB CROSSING SIGN/PAVEMENT MARKING INSTALLATION - COMPLETEC RAIL TRACK CONSTRUCTION ENGINEERING OVERSIGHT - COMPLETED BELMONT SPUR - RIGHT OF WAY IN PROGRESSTRNEA THRIFT DEPOT RELOCATION - UNDER CONSTRUCTIONTRNEB THRIFT DEPOT STABILIZATION - UNDER CONSTRUCTIONTRN
GASTONMECKLENBURG
PIEDMONT ANDNORTHERNRAILROAD
BICYCLE AND PEDESTRIAN PROJECTSU-5544 16263CHARLOTTE REGIONAL TRANSPORTATION
PLANNING ORGANIZATION (CRTPO) TRANSPORTATION ALTERNATIVES (TA) PROGRAM.
DIV
TAPDA R 100 R 100 100R100R100R R 100 R 100 R 100 R 100L R 25 R 25 25R25R25R R 25 R 25 R 25 R 25TAPDA C 2210 C 1100 C 1100 1100C1100C1100C C 1100 C 1100 C 1100 C 1100L C 553 C 275 C 275 275C275C275C C 275 C 275 C 275 C 275
IREDELLMECKLENBURGUNION
VARIOUS
12-60 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BICYCLE AND PEDESTRIAN PROJECTS
EB-5787 666BELLINGHAM PARK GREENWAY EXTENSION TO JOHNSON DAIRY ROAD. CONSTRUCT GREENWAY.
DIV
STBGDA R 107 L R 27 STBGDA C 426 L C 106
IREDELL
MOORESVILLE
UNDER CONSTRUCTION
EB-5818 1650 1650CONSTRUCT GREENWAY CONNECTOR UNDER US 21 (TURNERSBURG HIGHWAY).DIVIREDELL
STATESVILLE
EB-5788 754SHELTON AVENUE MULTI-USE PATH, GARNER BAGNAL BOULEVARD TO AMITY HILL ROAD. CONSTRUCT GREENWAY.
DIV
STBGDA PE 402 L PE 101 STBGDA R 201 L R 50
IREDELL
STATESVILLE
UNDER CONSTRUCTION
EB-5532 430 430NORTH MAIN STREET GREENWAY, SR 2551 (OLD MURDOCK ROAD) TO SR 2350 (MURDOCK ROAD). CONSTRUCT 10 FEET WIDE GREEWAY.
TRNIREDELLTROUTMAN
UNDER CONSTRUCTION
EB-5530 480 480OLD MOUNTAIN ROAD, NORTH MAIN STREET TO SOUTH IREDELL HIGH SCHOOL IN TROUTMAN. CONSTRUCT SIDEWALK ON SOUTH SIDE OF ROAD.
TRNIREDELLTROUTMAN
PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TQ-6924 158 158OPERATING
HF
FEPD L
ANSONCABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANSTANLYUNION
CENTRALINA COUNCIOF GOVERNMENTS
12-61 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TQ-8012 139 139CAPITAL - MOBILITY MANAGEMENT
HF
FEPD L S
ANSONCABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANSTANLYUNION
CENTRALINA COUNCIOF GOVERNMENTS
TQ-6171 490 490MOBILITY MANAGEMENT
HF
FEPD L S
ANSONCABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANSTANLYUNION
CENTRALINA COUNCIOF GOVERNMENTS
FUNDS AUTHORIZED IN PROGRESS
TA-5178 390 390PURCHASE EIGHT REPLACEMENT BUSES
HF
L STPDA
IREDELL
IREDELL COUNTY
TA-6528 207 207CAPITAL
HF
FEPD L S
IREDELL
IREDELL COUNTY
FUNDS AUTHORIZED IN PROGRESS
TA-6128 1083 1083CAPITAL
HF
FNU L S
IREDELL
IREDELL COUNTY
12-62 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
TD-5276 60ICATS OFFICE EXPANSION (FEASIBILITY STUDY/PRELIMINARY ENGINEERING)
HF
L PE 12 STPDA PE 48
IREDELL
IREDELL COUNTY
FUNDS AUTHORIZED IN PROGRESS
TK-6179 3120 1560ADMINISTRATIONHF
FNU O 260 O 260 O 260 260O260O260O
IREDELLIREDELL COUNTY
FUNDS AUTHORIZED IN PROGRESS
TK-6136 1504 1504ADMINISTRATION
HF
FNU L S
IREDELL
IREDELL COUNTY
TM-6134 350 350OPERATING ASSISTANCE
HF
JARC L
IREDELL
IREDELL COUNTY
TM-6152 200 200OPERATING
HF
JARC L
IREDELL
IREDELL COUNTY
FUNDS AUTHORIZED IN PROGRESS
TO-5149 2614 1087OPERATING ASSISTANCE FOR THE IREDELL COUNTY AREA TRANSPORTATION SYSTEM (ICATS)HF
FUZ O 210 O 210 O 210 200O L O 210 O 210 O 210 67O
IREDELL
IREDELL COUNTY
TQ-6176 250 250OPERATING ASSISTANCE
HF
FEPD L
IREDELL
IREDELL COUNTY
TQ-6795 200 200OPERATING
HF
FEPD L
IREDELL
IREDELL COUNTY
FUNDS AUTHORIZED IN PROGRESS
TQ-6928 200 200OPERATING
HF
FEPD L
IREDELL
IREDELL COUNTY
12-63 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
TG-6187 3751URBANIZED FORMULA PROGRAMFUNDS MANAGED BY NCDOT FORORANGE, ALAMANCE, DAVIDSON, GUILFORD, CABARRUS, IREDELL, HOKE, CUMBERLAND, HARNETT, UNION, MECKLENBURG TRANSPORTATION SYSTEMS – CAPITAL PROGRAM
HF
FUZ CP 500 CP 550 CP 600 700CP650CP L CP 125 CP 138 CP 150 175CP163CP
ALAMANCECABARRUSCUMBERLANDDAVIDSONGUILFORDHARNETTHOKEIREDELLMECKLENBURGORANGEUNION
STATEWIDE
AVIATION PROJECTSAV-5753 295OBSTRUCTION REMOVAL IN RUNWAY 5
APPROACH.DIV
T R 266 O R 29
LINCOLN
LINCOLNTON-LINCOLNCOUNTY AIRPORT (IPJ
AV-5755 176LAND ACQUISITION FOR RUNWAY 5 APPROACH.
DIV
T R 158 O R 18
LINCOLN
LINCOLNTON-LINCOLNCOUNTY AIRPORT (IPJ
PUBLIC TRANSPORTATION PROJECTSTQ-6171 490 490MOBILITY MANAGEMENT
HF
FEPD L S
ANSONCABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANSTANLYUNION
CENTRALINA COUNCIOF GOVERNMENTS
12-64 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TQ-6924 158 158OPERATING
HF
FEPD L
ANSONCABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANSTANLYUNION
CENTRALINA COUNCIOF GOVERNMENTS
FUNDS AUTHORIZED IN PROGRESS
TQ-8012 139 139CAPITAL - MOBILITY MANAGEMENT
HF
FEPD L S
ANSONCABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANSTANLYUNION
CENTRALINA COUNCIOF GOVERNMENTS
FUNDS AUTHORIZED IN PROGRESS
TI-6101 8823 5247INTERCITY BUS - BOONE TO CHARLOTTE
HF
FNU O 246 O 246 O 246 246O246O246O L O 106 O 106 O 106 106O106O106O S O 244 O 244 O 244 244O244O244O
CALDWELLCATAWBALINCOLNMECKLENBURGWATAUGA
COACH AMERICA
12-65 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 12
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
TA-5185 62ONE EXPANSION LIGHT TRANSIT VEHICLE
DIV
FEPD CP 50 L CP 6 T CP 6
GASTONLINCOLN
LINCOLN COUNTY
FUNDS AUTHORIZED IN PROGRESS
TA-6112 731 731CAPITAL
HF
FNU L S
LINCOLN
LINCOLN COUNTY
TA-6676 62PURCHASE EXPANSION VEHICLE FOR ROUTE CONNECTING LINCOLNTON WITH THE NC 16 CORRIDOR NEAR LAKE NORMAN.
DIV
FNU A 50 T A 6 L A 6
LINCOLN
LINCOLN COUNTY
FUNDS AUTHORIZED IN PROGRESS
TK-6141 3061 1747ADMINISTRATION
HF
FNU AD 175 AD 175 AD 175 175AD175AD175AD L AD 33 AD 33 AD 33 33AD33AD33AD S AD 11 AD 11 AD 11 11AD11AD11AD
LINCOLN
LINCOLN COUNTY
FUNDS AUTHORIZED IN PROGRESS
TQ-6667 282 282CAPITAL
HF
FEPD L S
LINCOLN
LINCOLN COUNTY
TQ-9004 50 50CAPITAL - PURCHASE OF SERVICE
HF
FEPD L S
LINCOLN
LINCOLN SENIOR SERVICES
12-66 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
STATE TRANSPORTATION IMPROVEMENT PROGRAM
13
Division 13BuncombeBurkeMadisonMcDowellMitchellRutherfordYancey
HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)INTERSTATE PROJECTS
UNDER CONSTRUCTION AS DESIGN-BUILD PROJECT
I-5504 67789 39779NC 191 (BREVARD ROAD). UPGRADE INTERCHANGE.SW
NHP C 14005 C 14005
BUNCOMBEI-26
GARVEE BOND FUNDING $7.92 MILLION; CONSTRUCTION - PAYBACK FY 2008 - FY 2019; INCLUDES PROJECT I-4920
I-5005 29542 27806MILE MARKER 37.1 IN BUNCOMBE COUNTY TO SR 1783 (MILE MARKER 53.3) IN HENDERSON COUNTY. PAVEMENT REHABILITATION.
16.2 NHP CG 868 A CG 868 A
A MILEPOST 37.1 IN BUNCOMBE COUNTY TO MILEPOST 50.3 (CONCRETE SECTION) - COMPLETETRNB MILEPOST 50.3 TO SR 1783 (MILEPOST 53.3 - ASPHALT SECTION) - COMPLETE
BUNCOMBEHENDERSON
I-26
PLANNING/DESIGN IN PROGRESS
I-4700 196670 2670NC 280 (EXIT 40) TO I-40 AT ASHEVILLE. ADD ADDITIONAL LANES.
8.6 NHP R 2000 A NHP C 17500 A C 17500 A 17500C A17500C A NHP R 2000 B NHP C 30000 B C 30000 B 30000C B30000C B
A NC 280 (EXIT 40) TO NC 146 - LONG SHOALS ROAD (EXIT 37) - DESIGN-BUILD PROJECTSWB NC 146 - LONG SHOALS ROAD (EXIT 37) TO I-40 - DESIGN-BUILD PROJECTSW
BUNCOMBEHENDERSON
I-26
PLANNING/DESIGN IN PROGRESS
I-4400 226925 5325US 25 (EXIT 54) TO NC 280 (EXIT 40). WIDEN TO ADD ADDITIONAL LANES.
13.6 NHP 2000R A NHP 77500C A NHP R 2000 B NHP 38750C B C 19375 B C 19375 BNHP R 2000 C NHP C 15150 C C 15150 C 15150C C15150C C
A US 25 (EXIT 54) TO US 64 (EXIT 49)B US 64 (EXIT 49) TO US 25 BUSINESS (EXIT 44)SWC US 25 BUSINESS (EXIT 44) TO NC 280 (EXIT 40)REG
BUNCOMBEHENDERSON
I-26
UNDER CONSTRUCTION
I-5501 10824 10824I-26/NC 280 INTERCHANGE. RETROFIT EXISTING INTERCHANGE TO A DIVERGING DIAMOND CONFIGURATION.TRNBUNCOMBE
HENDERSON
I-26
FEASIBILITY STUDY IN PROGRESS
FS-1513A NC 191 (BREVARD ROAD) - EXIT 47 TO NC 9 - EXIT 64. WIDEN ROADWAY.
17BUNCOMBEI-40
I-5888 6000MILEMARKER 37 TO MILEMARKER 43.5. PAVEMENT REHABILITATION.
6.5SW
NHPIM C 6000
BUNCOMBEI-40
13-3 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)INTERSTATE PROJECTS
UNDER CONSTRUCTION
I-5886 250 250US 25A (SWEETEN CREEK ROAD). CONSTRUCT INTERCHANGE IMPROVEMENTS.DIVBUNCOMBE
I-40
UNDER CONSTRUCTION
I-5885 610 610US 25 (HENDERSONVILLE ROAD). CONSTRUCT INTERCHANGE IMPROVEMENTS.DIVBUNCOMBE
I-40
UNDER CONSTRUCTION
I-5750 4090 4090WEST OF US 25 (HENDERSONVILLE ROAD) TO EAST OF SR 3075 (ONTEORA BOULEVARD). BRIDGE REHABILITATION.
2.2SWBUNCOMBE
I-40
I-5890 7550MILEMARKER 55 TO MILEMARKER 67.5. PAVEMENT REHABILITATION.
12.5SW
NHPIM C 7550
BUNCOMBEI-40
COMPLETE - GARVEE BOND FUNDING $6.1 MILLION; CONSTRUCTION - PAYBACK FY 2009-2020
I-5109 9678 7671HAYWOOD COUNTY LINE TO MILE MARKER 43 IN BUNCOMBE COUNTY. PAVEMENT REHABILITATION.
7TRN
NHP CG 669 CG 669 CG 669
BUNCOMBEI-40
I-5889 5000MILEMARKER 46 TO MILEMARKER 50. PAVEMENT REHABILITATION.
4SW
NHPIM C 5000
BUNCOMBEI-40
COMPLETE - GARVEE BOND FUNDING $4.67 MILLION; CONSTRUCTION - PAYBACK FY 2009-2020
I-5108 7539 6003MILE MARKER 45 TO MILE POST 50. PAVEMENT REHABILITATION.
5TRN
NHP CG 512 CG 512 CG 512
BUNCOMBEI-40
PLANNING/DESIGN IN PROGRESS
I-4759 39300 1500I-40/SR 1228 (LIBERTY ROAD). CONVERT GRADE SEPARATION TO AN INTERCHANGE AND CONSTRUCT TWO LANE ROADWAY NORTH OF I-40 TO SR 1224 AND FOUR LANE ROADWAY SOUTH OF I-40 TO US 19/US 23/NC 151 WITH PARTS ON NEW LOCATION.
SW
STBG R 11500 STBG U 2300 STBG C 6000 6000C6000C6000C
BUNCOMBE
I-40
I-5901 5300MILEMARKER 4 TO MILEMARKER 9. PAVEMENT REHABILITATION.
5SW
NHPIM 5300C
BUNCOMBEI-240
UNDER CONSTRUCTION
I-5608 6067 6067I-40/I-26 TO SR 1781 (BROADWAY STREET). PAVEMENT REHABILITATION.
5SWBUNCOMBE
I-240
13-4 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)INTERSTATE PROJECTS
I-4409 13250CONVERT I-40/SR 2500 (BLUE RIDGE ROAD) GRADE SEPARATION TO INTERCHANGE. WIDEN SR 2500 (BLUE RIDGE ROAD) TO THREE LANES FROM US 70 TO SOUTH OF I-40 AND UPGRADE ROADWAY SOUTH OF I-40 TO SR 2713.
SW
NHP R 2600 NHP U 500 NHP 3383C3384C3383C
BUNCOMBE
SR 2500(BLUE RIDGE ROAD)
PLANNING/DESIGN IN PROGRESS - COORDINATE WITH U-5868 - GARVEE BOND FUNDING: SEGMENT B, $30 M FOR ROW, $174 M FOR CONST; SEGMENT C, $12.75 M FOR ROW, $152.5 M FOR CONST
I-2513 750541 17461I-26 CONNECTOR, I-40 TO US 19/US 23/US 70. MULTI-LANE FREEWAY, PART ON NEW LOCATION.
4.7 NHP 29000R A NHP 105700C A S(M) R 10000 B NHP 18018RG B RG 2574 B 2574RG B2574RG B2574RG B RG 2574 B RG 2574 B RG 2574 B RG 2574 BS(M) C 2905 B 13799C B13799C B13798C B C 13799 B NHP 104503CG B CG 14929 B 14929CG B14929CG B14929CG B CG 14929 B CG 14929 B CG 14929 B CG 14929 BS(M) R 4250 C NHP 7658RG C RG 1094 C 1094RG C1094RG C1094RG C RG 1094 C RG 1094 C RG 1094 C RG 1094 CS(M) C 2540 C 12065C C12065C C12065C C C 12065 C NHP 91595CG C CG 13085 C 13085CG C13085CG C13085CG C CG 13085 C CG 13085 C CG 13085 C CG 13085 C
A NORTH OF I-26/I-40 SPLIT TO NORTH OF SR 3548 (HAYWOOD ROAD)B NORTH OF SR 3548 (HAYWOOD ROAD) TO EXISTING US 19/US 23/US 70SWC I-26/I-40/I-240 INTERCHANGESW
BUNCOMBE
ASHEVILLE
UNDER CONSTRUCTION
I-5892 6090 6090MILEMARKER 18 TO MILEMARKER 12.5. PAVEMENT REHABILITATION.
5.5SWBUNCOMBE
FUTURE I-26
UNDER CONSTRUCTION
I-5321 5562 5562WEAVERVILLE CITY LIMITS TO US 23 BUSINESS. PAVEMENT REHABILITATION.
9.8SWBUNCOMBE
FUTURE I-26
13-5 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
PLANNING/DESIGN IN PROGRESS - COORDINATE WITH B-4442, B-4443, B-4444
A-0010 504026 303926SR 1781 (BROADWAY STREET) IN ASHEVILLE TO TENNESSEE STATE LINE AT SAMS GAP. MULTI-LANE FREEWAY, PART ON NEW LOCATION.
28.3 NHP R 10000 AA NHP C 4506 AA 21398C AA21398C AA21399C AA C 21399 AA NHP 500R AB NHP 72000C AB NHP 500R AC NHP 27000C AC
AA SR 1781 (BROADWAY STREET) - EXIT 25 IN ASHEVILLE TO US 25 - DESIGN-BUILDREGAB US 25 TO SR 2207AC SR 2207 TO SOUTH OF SR 2148BA SOUTH OF SR 2148 IN BUNCOMBE COUNTY TO NORTH OF NC 213 - COMPLETEBB NORTH OF NC 213 TO NORTH OF US 19 - COMPLETEC NORTH OF US 19 TO SR 1318 (BIG LAUREL ROAD) AT LAUREL CREEK - COMPLETED SR 1318 (BIG LAUREL ROAD) AT LAUREL CREEK TO THE TENNESSEE STATE LINE AT SAMS GAP - COMPLETE
BUNCOMBEMADISON
I-26 (US 19/US 23)
R-5524 2578 2578CONSTRUCT IMPROVEMENTS TO OLD FANNING BRIDGE ROAD AND CONSTRUCT NEW ACCESS ROAD INTO FERNCLIFF INDUSTRIAL PARK.
A INSTALL TRAFFIC SIGNAL. - COMPLETEB NC 280 TO SR 1419 (OLD FANNING BRIDGE ROAD). RESURFACE AND ADD BIKE LANES. - UNDER CONSTRUCTIONC CONSTRUCT ROUNDABOUT. - UNDER CONSTRUCTIONTRND CONSTRUCT NEW ACCESS ROAD INTO FERNCLIFF INDUSTRIAL PARK. - UNDER CONSTRUCTION
BUNCOMBEHENDERSON
SR 2277/SR 3526(OLD FANNINGBRIDGE ROAD)
UNDER CONSTRUCTION
R-5793 2149 2149DIVISION 13 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVBUNCOMBEBURKEMADISONMCDOWELLMITCHELLRUTHERFORDYANCEY
VARIOUS
URBAN PROJECTSU-6048 4635 100SR 1836 (CHESTNUT MOUNTAIN ROAD) TO
SR 1200 (WIGGINS ROAD). UPGRADE ROADWAY.
3.9
DIV
T R 135 T U 100 T 4300C
BUNCOMBEHAYWOOD
US 19, US 23
13-6 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
U-5782 325 90INTERSECTION OF US 25 (MERRIMON AVENUE) AND W. T. WEAVER BOULEVARD. IMPROVE INTERSECTION.REG
T R 45 T C 190
BUNCOMBE
US 25 (MERRIMON AVENUE)
U-2801 49526 22226US 25 (HENDERSONVILLE ROAD) TO ROBERTS ROAD IN ASHEVILLE. WIDEN TO MULTI-LANES.
7.3 STBG R 7200 A STBG 6700C A6700C A C 6700 A
A US 25 (HENDERSONVILLE ROAD) TO SR 3081 (ROCK HILL ROAD)REGB SR 3081 (ROCK HILL ROAD) TO SR 3079 (ROBERTS ROAD) - COMPLETE
BUNCOMBE
US 25A (SWEETENCREEK ROAD)
UNDER CONSTRUCTION
U-5189 2479 2479I-40 SOUTH TO NC 146 (LONG SHOALS ROAD). CONSTRUCT SIDEWALK AND CROSSING IMPROVEMENTS.
TRNBUNCOMBE
US 25HENDERSONVILLE ROAD
UNDER CONSTRUCTION
U-4014 2876 2876US 25 (MCDOWELL STREET) IN ASHEVILLE. UPGRADE TUNNEL.
0.1
BUNCOMBE
US 25 (MCDOWELLSTREET)
U-5781 1066 136INTERSECTION OF US 25 (MERRIMON AVENUE) AND EDGEWOOD ROAD. IMPROVE INTERSECTION.REG
T R 180 T C 750
BUNCOMBE
US 25 (MERRIMON AVENUE)
UNDER CONSTRUCTION - DESIGN BUILD PROJECT
U-3301 52312 52312SR 1615 (GILBERT ROAD) TO WEST OF SR 1004 (NEWFOUND ROAD) IN ASHEVILLE. WIDEN TO MULTI-LANES, SOME RELOCATION.
4.3
TRNBUNCOMBE
NC 63 (LEICESTERHIGHWAY)
U-5832 11050 500SR 3214 (BILTMORE AVENUE) TO US 74A (SOUTH TUNNEL ROAD). WIDEN EXISTING ROADWAY.
1.5
DIV
T R 2800 T U 350 T 7400C
BUNCOMBE
NC 81 (SWANNANOARIVER ROAD)
U-6046 22950US 70 (TUNNEL ROAD) TO US 74 (SOUTH TUNNEL ROAD). UPGRADE ROADWAY.
2.3
REG
T 6850R T 850U T C 7625 C 7625
BUNCOMBE
NC 81 (SWANNANOARIVER ROAD)
13-7 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
U-6047 40300NC 191 (BREVARD ROAD) TO US 19/23 (SMOKEY PARK HIGHWAY). WIDEN ROADWAY.
3.6
DIV
T 1300R T 1600U T C 12467 C 12466 C 12467
BUNCOMBE
NC 112 (SARDISROAD/SANDHILL ROAD)
LET WITH I-2513 - DESIGN-BUILD PROJECT
U-5868 14600 1000NC 251/SR 1781 (BROADWAY) TO I-40/SR 1231 (HILL STREET). WIDEN ROADWAY.
1.4
DIV
T R 1200 T U 500 T C 11900
BUNCOMBE
SR 1477(RIVERSIDE DRIVE)
U-5837 2250 250US 70 (TUNNEL ROAD) TO SR 2285 (CLEAR VISTA LANE). UPGRADE ROADWAY.
1.1
DIV
T R 100 T C 1900
BUNCOMBE
SR 2002 (RICEVILLEROAD)
U-5834 3346 246US 25 (HENDERSONVILLE ROAD) TO SR 3157 (WESTON ROAD). UPGRADE EXISTING ROADWAY.
1.9
DIV
T R 100 T 3000C
BUNCOMBE
SR 3116 (MILLSGAP ROAD)
U-4739 49922 622I-240 TO SR 3214 (BILTMORE AVENUE). WIDEN TO MULTI-LANES WITH NEW BRIDGE OVER THE FRENCH BROAD RIVER.
2.7
DIV
T 13200R T 1600U T C 11500 C 11500 C 11500
BUNCOMBE
SR 3556 (AMBOYROAD/MEADOWROAD)
RIGHT OF WAY IN PROGRESS - PROJECT ADMINISTERED BY CITY OF ASHEVILLE
U-5190 3717 395NEW LEICESTER HIGHWAY, CITY LIMITS TO PATTON AVENUE IN ASHEVILLE. CONSTRUCT SIDEWALK.TRN
STBGDA C 2658 L C 664
BUNCOMBE
NEW LEICESTERHIGHWAY
UNDER CONSTRUCTION - ARC PROJECT NO. 18718
U-6053 1000 1000CONSTRUCT ACCESS ROAD TO AVADIM TECHNOLOGIES FACILITY NEAR THE INTERSECTION OF I-40 AND SR 2500 (NORTH BLUE RIDGE ROAD).
EXBUNCOMBENEW ROUTE
13-8 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
U-5616 2500FRENCH BROAD RIVER METROPOLITAN PLANNING ORGANIZATION PLANNING (PL) SUPPLEMENT.DIV
STBGDA PE 200 PE 200 PE 200 200PE200PE200PE PE 200 PE 200 PE 200 PE 200L PE 50 PE 50 PE 50 50PE50PE50PE PE 50 PE 50 PE 50 PE 50
BUNCOMBEHAYWOODHENDERSONMADISONTRANSYLVANIA
VARIOUS
U-5100 41974STBG-DA IN THE FRENCH BROAD RIVER METROPOLITAN PLANNING ORGANIZATION.
DIV
STBGDA C 999 C 3620 C 3620 3620C3620C3620C C 3620 C 3620 C 3620 C 3620L C 250 C 905 C 905 905C905C905C C 905 C 905 C 905 C 905
BUNCOMBEHAYWOODHENDERSON
VARIOUS
U-5971 2700US 19 (PATTON AVENUE) AND NC 63 (NEW LEICESTER HIGHWAY). CONSTRUCTION INTERSECTION IMPROVEMENTS.
REG
T R 400 T U 100 T 2200C
BUNCOMBE
ASHEVILLE
U-5972 28400NC 63 (NEW LEICESTER HIGHWAY), US 19/23 (PATTON AVENUE) TO NEWFOUND ROAD. CONSTRUCT ACCESS MANAGEMENT IMPROVEMENTS.
4.4
REG
T 5900R5900R T 1400U T C 15200
BUNCOMBE
ASHEVILLE
U-3403 65063 16263NC 191 (BREVARD ROAD - OLD HAYWOOD ROAD), NC 280 TO NC 112 (SARDIS ROAD). WIDEN TO MULTI-LANES.
9.1 T 9000R A T 17700C A T 5100R B T 600U B T 5467C B C 5466 B C 5467 B
A NC 280 (BOYLSTON HIGHWAY) TO NC 146.B NC 146 TO NORTH OF BLUE RIDGE PARYWAY.REGC NORTH OF BLUE RIDGE PARKWAY TO NC 112 (SARDIS ROAD) - COMPLETE
BUNCOMBEHENDERSON
ASHEVILLE
13-9 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
U-5019 17864 6114CONSTRUCT INTERCONNECTED NETWORK OF PEDESTRIAN, BICYCLE, ROADWAY, AND STREETSCAPE IMPROVEMENTS. PROJECT INCLUDES: CLINGMAN FOREST AND TOWN BRANCH GREENWAYS, FRENCH BROAD RIVER WEST GREENWAY, WILMA DIKEMAN RIVERWAY AND FIVE POINTS ROUNDABOUT, LIVINGSTON STREET COMPLETE STREET IMPROVEMENTS, AND CRAVEN STREET BRIDGE IMPROVEMENTS.
L 3900C A L 1100C B L 1500C D STBG C 4200 E L C 1050 E
A CLINGMAN FOREST AND TOWN BRANCH GREENWAYSDIVB FRENCH BROAD RIVER WEST GREENWAYDIVC WILMA DYKEMAN RIVERWAY - RADTIP AND FIVE POINTS ROUNDABOUT - UNDER CONSTRUCTIONDIVD LIVINGSTON STREET COMPLETE STREETS IMPROVEMENTSDIV
BUNCOMBE
ASHEVILLE EAST OFTHE RIVERWAYMULTI-MODAL NETWORK
A PORTION OF THE SIGNALS ARE NOT ELIGIBLE FOR FEDERAL FUNDING DUE THE ROAD'S FUNCTIONAL CLASSIFICATION. THE RESULTING FUNDING SPLIT IS 74% FEDERAL AND 26% STATE
U-4715 17058 17058ASHEVILLE SIGNAL SYSTEM.
AA SIGNAL IMPROVEMENTS - COMPLETEAB SIGNAL IMPROVEMENTS - COMPLETEB SIGNAL IMPROVEMENTS - UNDER CONSTRUCTIONDIV
BUNCOMBECITYWIDE
U-5973 1300US 19 BUSINESS (WEAVERVILLE HIGHWAY) AND SR 1740 (NEW STOCK ROAD). CONSTRUCT INTERSECTION IMPROVEMENTS.REG
T R 200 T U 100 T C 1000
BUNCOMBE
WEAVERVILLE
BRIDGE PROJECTS
UNDER CONSTRUCTION - COORDINATE WITH I-2513
B-5178 14871 14871REPLACE BRIDGE 100235 AND BRIDGE 100238 OVER SR 3431 (POND ROAD) AND HOMINY CREEK.SWBUNCOMBE
I-26
COORDINATE WITH A-10 A
B-4442 2222 22REPLACE BRIDGE 100370, AND BRIDGE 100373 OVER REEMS CREEK.
SW
NHPB 200R NHPB 1000C1000C
BUNCOMBE
US 19/US 23/US 25/US 70
COORDINATE WITH A-10 A
B-4443 8101 181REPLACE BRIDGE 100345, AND BRIDGE 100346 OVER SR 1839.
SW
NHPB 720R NHPB 2400C2400C C 2400
BUNCOMBE
US 19/US 23/US 25/US 70
B-5953 21900REPLACE BRIDGE 100649 OVER FRENCH BROAD RIVER AND SOUTHERN RAILROAD.
DIV
T R 1000 T 6966C C 6967 C 6967
BUNCOMBE
SR 1002(OLD LEICESTER HWY
13-10 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BRIDGE PROJECTS
UNDER CONSTRUCTION
B-5396 1791 1791REPLACE BRIDGE 100416 OVER STONY FORK CREEK.
DIVBUNCOMBE
SR 1103(SOUTH HOMINYROAD)
B-5888 540 100REPLACE BRIDGE 100100 OVER ASHWORTH CREEK.
DIV
STPOFF R 20 STPOFF C 420
BUNCOMBE
SR 2815(VILLAGE ROAD)
UNDER CONSTRUCTION
B-5244 1161 1161REPLACE BRIDGE 100363 OVER ROBINSON CREEK.
HFBUNCOMBE
SR 3197(MILLS GAP ROAD)
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5113 19262 19262DIVISION 13 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVBUNCOMBE
BURKEMADISONMcDOWELLMITCHELLRUTHERFORDYANCEY
VARIOUS
RIGHT OF WAY IN PROGRESS - MUNICIPAL BRIDGE
B-5196 860 285REPLACE BRIDGE 100528 OVER FLAT CREEK.
DIV
STPOFF C 575
BUNCOMBE
MONTREAT(TEXAS ROAD)
MITIGATION PROJECTS
IN PROGRESS
EE-4913 29630 29630ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 13 PROJECT MITIGATION.BUNCOMBE
BURKEMADISONMcDOWELLMITCHELLRUTHERFORDYANCEY
VARIOUS
13-11 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5713 2794 1394SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 13.
HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
BUNCOMBEBURKEMADISONMcDOWELLMITCHELLRUTHERFORDYANCEY
VARIOUS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5213 4097 2872DIVISION 13 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
HSIP C 1225 DIV
DIV DIVISION 13 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN THE DIVISION CATEGORY.DIVBUNCOMBEBURKEMADISONMcDOWELLMITCHELLRUTHERFORDYANCEY
VARIOUS
CONGESTION MITIGATION PROJECTS
IN PROGRESS
C-5564 167 167LAND OF SKY RPO TO WORK WITH REGIONAL CLEAN AIR CAMPAIGN AND CLEAN VEHICLE COALITION TO IMPLEMENT AN EDUCATIONAL AND OUTREACH PROGRAM IN COMMUNITIES ADJACENT TO GREAT SMOKY MOUNTAINS NATIONAL PARK.
EXBUNCOMBEHAYWOODMADISONTRANSYLVANIA
VARIOUS
13-12 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)ENHANCEMENT (CALL PROJECTS)
UNDER CONSTRUCTION
E-5501 24 24FREEDOM ROADS. INSTALL INTERACTIVE WAYSIDE SIGNAGE FOR DESIGNATED SITES.TRNALAMANCE
BEAUFORTBRUNSWICKBUNCOMBECAMDENCHOWANCRAVENDAREDURHAMEDGECOMBEGUILFORDHALIFAXLENOIRPASQUOTANKWASHINGTONWAYNE
VARIOUS
UNDER CONSTRUCTION BY DEPARTMENT OF CULTURAL RESOURCES
E-5504 60 60ZEBULON B. VANCE BIRTHPLACE STATE HISTORIC SITE. RENOVATION OF VISITOR CENTER TO INCLUDE UPDATED EXHIBITS, IMPROVED THEATER SPACE, EXPANDED GIFT SHOP, AND RELATED AMENITIES WITH EXHIBITS FOCUSING ON TRANSPORTATION ISSUES IN THE 19TH CENTURY.
TRNBUNCOMBE
ZEBULON B. VANCEBIRTHPLACE STATEHISTORIC SITE
INTERSTATE PROJECTSI-5990 13500EXIT 118 - SR 1761 (OLD NC 10). CONTRUCT
INTERCHANGE IMPROVEMENTS.
DIV
NHP 2600R NHP 500U NHP 10400C
BURKE
I-40
COMPLETE - GARVEE BOND FUNDING $19.71 MILLION; CONSTRUCTION - PAYBACK FY 2008 - FY 2019
I-5003 38988 34664EXIT 119 IN BURKE COUNTY TO SR 1753 (MILE MARKER 146) IN IREDELL COUNTY. PAVEMENT REHABILITATION.
27TRN
NHP CG 2162 CG 2162
BURKECATAWBAIREDELL
I-40
13-13 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)INTERSTATE PROJECTS
I-5008 3610 250SR 1734 (CAROLINA STREET SE)/SR 1826 - EXIT 111. REVISE INTERCHANGE.
REG
NHP R 460 NHP C 2900
BURKE
I-40
I-5009 1410 250US 64 (BURKEMONT ROAD). IMPROVE INTERCHANGE.
REG
NHP R 160 NHP C 1000
BURKE
I-40
I-5874 2425 250SR 1142 (JAMESTOWN ROAD) - EXIT 100. UPGRADE INTERCHANGE.
2
REG
NHP R 300 NHP C 1875
BURKE
I-40
I-5875 16100 400SR 1712 (DREXEL ROAD). UPGRADE INTERCHANGE.
REG
NHP R 2200 NHP C 13500
BURKE
I-40
I-5975 18400 2400SR 1744 (MINERAL SPRINGS MOUNTAIN ROAD)/SR 1744 (ELDRED STREET SE) - EXIT 112. CONSTRUCT INTERCHANGE IMPROVEMENTS.REG
NHP R 2800 NHP U 500 NHP 4234C4233C C 4233
BURKE
I-40
I-5971 12400SR 1761 (OLD HIGHWAY NC 10) - EXIT 116. UPGRADE INTERCHANGE AND REMOVE TWO-WAY TRAFFIC.
SW
NHP R 2100 NHP U 800 NHP 3166C3167C C 3167
BURKE
I-40
I-5891 23500MILEMARKER 95.2 TO MILEMARKER 119. PAVEMENT REHABILITATION.
23.8SW
NHPIM C 23500
BURKEI-40
RURAL PROJECTS
UNDER CONSTRUCTION
R-5793 2149 2149DIVISION 13 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVBUNCOMBEBURKEMADISONMCDOWELLMITCHELLRUTHERFORDYANCEY
VARIOUS
13-14 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
PLANNING/DESIGN IN PROGRESS - INCLUDES B-4450 - $2.8 M IN STBG-DA AND $700 K IN MATCHING FUNDS IS FOR CATAWBA RIVER BRIDGE ENHANCEMENTS - $2.8 M IS EXEMPT BECAUSE IT IS STBG-DA SPENT ON A SW TIER PROJECT
U-4700 297810 4790NORTH OF US 70 IN HICKORY TO SR 1933 (SOUTHWEST BOULEVARD). WIDEN TO SIX LANES.
13.3 NHP R 11886 A R 21500 A HP R 9614 A NHP U 2000 A NHP 29100C A29100C A29100C A C 29100 A STBGDA 2800C A L 700C A NHP 4000U B NHP 35000R B NHP 57500C B NHP 2000U C NHP 10000R C NHP 12000C C NHP R 420 CA NHP C 1750 CA NHP U 100 CB NHP R 400 CB NHP C 2200 CB NHP U 100 CC NHP R 450 CC NHP C 2200 CC
A NORTH OF US 70 IN HICKORY TO US 321A - STBGDA FUNDS ARE EXEMPT BECAUSE THEY ARE BEING USED ON STATEWIDE CATEGORY PROJECTSWB US 321A TO SR 1108 (MISSION ROAD)C SR 1108 (MISSION ROAD) TO SR 1933 (SOUTHWEST BOULEVARD).CA SR 1160 (MOUNT HERMAN ROAD). UPGRADE INTERSECTION TO SUPERSTREET DESIGN - WITHIN THE LIMITS OF U-4700 C. - DESIGN BY DIVISIONREGCB SR 1809/1952 (PINE MOUNTAIN ROAD). UPGRADE INTERSECTION TO SUPERSTREET DESIGN - WITHIN THE LIMITS OF U-4700 C.SWCC SR 1108 (MISSION ROAD). UPGRADE INTERSECTION TO SUPERSTREET DESIGN - WITHIN THE LIMITS OF U-4700 C.SW
BURKECALDWELLCATAWBA
US 321
U-5978 18400SR 1440 TO SR 1419. WIDEN TO 3-LANES. 2.8
REG
T 4100R T 500U T 13800C
BURKE
NC 181
U-5836 10900 200SR 1414 (ST MARY'S CHURCH ROAD) TO MORGANTON ETJ. WIDEN EXISTING ROADWAY.
0.9
REG
T R 900 T U 100 T 3233C3234C3233C
BURKE
NC 181
13-15 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
UNDER CONSTRUCTION
U-2551 35757 35757SR 2026 (ARNOLD DRIVE) TO NC 18 (SOUTH STERLING STREET) IN MORGANTON. WIDEN TO MULTI-LANES AND UPGRADE INTERCHANGE.
2
BURKE
SR 1922 (ENOLAROAD)-SR 1924 (OLDNC 18)
U-5615 32510STBG-DA IN THE GREATER HICKORY METROPOLITAN PLANNING ORGANIZATION (MPO) AREA.DIV
STBGDA C 1074 C 2770 C 2770 2770C2770C2770C C 2770 C 2770 C 2770 C 2770L C 269 C 693 C 693 693C693C693C C 693 C 693 C 693 C 693
ALEXANDERBURKECALDWELLCATAWBA
VARIOUS
U-5924 1250GREATER HICKORY METROPOLITAN PLANNING ORGANIZATION (MPO) PLANNING (PL) SUPPLEMENT.DIV
STBGDA PE 100 PE 100 PE 100 100PE100PE100PE PE 100 PE 100 PE 100 PE 100L PE 25 PE 25 PE 25 25PE25PE25PE PE 25 PE 25 PE 25 PE 25
ALEXANDERBURKECALDWELLCATAWBA
VARIOUS
UNDER CONSTRUCTION - ARC PROJECT NO. 18703
U-6057 1375 1375SOUTH STERLING STREET TO WEST PARKER ROAD. CONSTRUCT CONNECTOR ROAD.
0.3EXBURKE
MORGANTON
BRIDGE PROJECTSB-5869 9967 100REPLACE BRIDGE 110099 OVER SOUTHERN
RAILROAD.REG
NHPB R 3167 NHPB 3350C3350C
BURKE
US 64US 70
UNDER CONSTRUCTION
B-4983 2207 2207REPLACE BRIDGE 110313 OVER SOUTHERN RAILROAD.
DIVBURKE
SR 1618(ICARD SCHOOLROAD)
13-16 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BRIDGE PROJECTS
UNDER CONSTRUCTION
B-5398 1964 1232REPLACE BRIDGE 110021 OVER HENRY FORK RIVER.
DIV
STPOFF C 732
BURKE
SR 1803(JOHNSON BRIDGEROAD)
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5113 19262 19262DIVISION 13 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVBUNCOMBE
BURKEMADISONMcDOWELLMITCHELLRUTHERFORDYANCEY
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4913 29630 29630ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 13 PROJECT MITIGATION.BUNCOMBE
BURKEMADISONMcDOWELLMITCHELLRUTHERFORDYANCEY
VARIOUS
HIGHWAY SAFETY PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5213 4097 2872DIVISION 13 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
HSIP C 1225 DIV
DIV DIVISION 13 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN THE DIVISION CATEGORY.DIVBUNCOMBEBURKEMADISONMcDOWELLMITCHELLRUTHERFORDYANCEY
VARIOUS
13-17 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5713 2794 1394SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 13.
HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
BUNCOMBEBURKEMADISONMcDOWELLMITCHELLRUTHERFORDYANCEY
VARIOUS
INTERSTATE PROJECTS
UNDER CONSTRUCTION
I-5753 490 490TENNESSEE STATE LINE TO TRIBUTARY OF LITTLE CREEK. PAVEMENT REHABILITATION.
1SWMADISON
I-26
I-5831 5000MILEMARKER 4 TO MILEMARKER 9. PAVEMENT REHABILITATION.
5SW
NHPIM C 5000
MADISONI-26
I-5867 3600TENNESSEE STATE LINE TO MILEMARKER 4. PAVEMENT REHABILITATION.
3.9SW
NHPIM C 3600
MADISONI-26
UNDER CONSTRUCTION
I-5372 2195 2195MILE MARKER 9 TO BUNCOMBE COUNTY LINE. PAVEMENT REHABILITATION.
3.7SWMADISON
I-26
13-18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
PLANNING/DESIGN IN PROGRESS - COORDINATE WITH B-4442, B-4443, B-4444
A-0010 504026 303926SR 1781 (BROADWAY STREET) IN ASHEVILLE TO TENNESSEE STATE LINE AT SAMS GAP. MULTI-LANE FREEWAY, PART ON NEW LOCATION.
28.3 NHP R 10000 AA NHP C 4506 AA 21398C AA21398C AA21399C AA C 21399 AA NHP 500R AB NHP 72000C AB NHP 500R AC NHP 27000C AC
AA SR 1781 (BROADWAY STREET) - EXIT 25 IN ASHEVILLE TO US 25 - DESIGN-BUILDREGAB US 25 TO SR 2207AC SR 2207 TO SOUTH OF SR 2148BA SOUTH OF SR 2148 IN BUNCOMBE COUNTY TO NORTH OF NC 213 - COMPLETEBB NORTH OF NC 213 TO NORTH OF US 19 - COMPLETEC NORTH OF US 19 TO SR 1318 (BIG LAUREL ROAD) AT LAUREL CREEK - COMPLETED SR 1318 (BIG LAUREL ROAD) AT LAUREL CREEK TO THE TENNESSEE STATE LINE AT SAMS GAP - COMPLETE
BUNCOMBEMADISON
I-26 (US 19/US 23)
R-5837 30200US 25/70 BUSINESS (NORTH MAIN STREET) TO SR 1143 (BRUSH CREEK ROAD). WIDEN TO MULTI-LANES.
2.5
REG
T 5450R5450R T 1300U T 6000C C 6000 C 6000
MADISON
US 25
RIGHT OF WAY IN PROGRESS - ARC PROJECT NO. 18339
R-5779 1930 350EXTEND SR 1631 (CROSSROADS PARKWAY) TO SR 1632.
EX
APD C 1580
MADISON
SR 1631 (CROSSROADSPARKWAY)
UNDER CONSTRUCTION
R-5793 2149 2149DIVISION 13 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVBUNCOMBEBURKEMADISONMCDOWELLMITCHELLRUTHERFORDYANCEY
VARIOUS
13-19 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
U-5616 2500FRENCH BROAD RIVER METROPOLITAN PLANNING ORGANIZATION PLANNING (PL) SUPPLEMENT.DIV
STBGDA PE 200 PE 200 PE 200 200PE200PE200PE PE 200 PE 200 PE 200 PE 200L PE 50 PE 50 PE 50 50PE50PE50PE PE 50 PE 50 PE 50 PE 50
BUNCOMBEHAYWOODHENDERSONMADISONTRANSYLVANIA
VARIOUS
BRIDGE PROJECTS
UNDER CONSTRUCTION
B-4984 1514 1514REPLACE BRIDGE 560138 OVER BIG PINE CREEK.
DIVMADISON
SR 1151(BIG PINE ROAD)
CONSTRUCTION FUNDED WITH STATE LEGISLATIVE BRIDGE PROGRAM FUNDS (17BP.13.R.105)
B-4182 147 147REPLACE BRIDGE 560246 OVER LAUREL CREEK.
DIVMADISON
SR 1503(LAUREL VALLEY)
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5113 19262 19262DIVISION 13 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVBUNCOMBE
BURKEMADISONMcDOWELLMITCHELLRUTHERFORDYANCEY
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4913 29630 29630ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 13 PROJECT MITIGATION.BUNCOMBE
BURKEMADISONMcDOWELLMITCHELLRUTHERFORDYANCEY
VARIOUS
13-20 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5713 2794 1394SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 13.
HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
BUNCOMBEBURKEMADISONMcDOWELLMITCHELLRUTHERFORDYANCEY
VARIOUS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5213 4097 2872DIVISION 13 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
HSIP C 1225 DIV
DIV DIVISION 13 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN THE DIVISION CATEGORY.DIVBUNCOMBEBURKEMADISONMcDOWELLMITCHELLRUTHERFORDYANCEY
VARIOUS
CONGESTION MITIGATION PROJECTS
IN PROGRESS
C-5564 167 167LAND OF SKY RPO TO WORK WITH REGIONAL CLEAN AIR CAMPAIGN AND CLEAN VEHICLE COALITION TO IMPLEMENT AN EDUCATIONAL AND OUTREACH PROGRAM IN COMMUNITIES ADJACENT TO GREAT SMOKY MOUNTAINS NATIONAL PARK.
EXBUNCOMBEHAYWOODMADISONTRANSYLVANIA
VARIOUS
INTERSTATE PROJECTS
UNDER CONSTRUCTION
I-5833 8490 4290BUNCOMBE COUNTY LINE TO SR 1103 (SOUTH CATAWBA AVENUE / BAT CAVE ROAD). PAVEMENT REHABILITATION.
5.6SW
NHPIM C 4200
McDOWELLI-40
13-21 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)INTERSTATE PROJECTS
UNDER CONSTRUCTION
I-5809 8942 4577MILEMARKER 86.4 TO MILEMARKER 92.8. PAVEMENT REHABILITATION.
6.4SW
NHPIM C 4365
McDOWELLI-40
I-5900 13000MILEMARKER 73 TO MILEMARKER 86. PAVEMENT REHABILITATION.
13SW
NHPIM 6500C C 6500
McDOWELLI-40
GARVEE BOND FUNDING $10.1 MILLION; CONSTRUCTION - PAYBACK FY 2008-2019
I-4908 23008 20792BUNCOMBE COUNTY LINE TO NC 226 (MILE MARKER 86). PAVEMENT REHABILIATION.
20TRN
NHP CG 1108 BB CG 1108 BB
A BUNCOMBE COUNTY LINE TO EXIT 73 - COMPLETEBA MILEPOST 72.8 (SR 1103) TO MILEPOST 74.4 - COMPLETEBB MILEPOST 74.4 TO MILEPOST 86 - COMPLETETRN
McDOWELLI-40
RURAL PROJECTSR-0204 73700SR 1434 TO SR 1153. WIDEN TO MULTI-
LANES, WITH A BYPASS OF MARION.12.4 NHP 3000R D
NHP 500U D NHP 32500C D NHP 2200R E NHP 500U E NHP 11667C E C 11666 E C 11667 E
A SR 1434 NORTH OF MARION TO US 221-NC 226 BUSINESS - COMPLETEB US 221-NC 226 BUSINESS TO SOUTH OF SOUTHERN RAILWAY. - COMPLETEC SOUTH OF SOUTHERN RAILWAY TO US 221-NC 226 INTERSECTION SOUTH OF MARION - COMPLETED US 221-NC 226 INTERSECTION SOUTH OF MARION TO NORTH OF I-40E NORTH OF I-40 TO SR 1153 (GOOSE CREEK ROAD)DIV
McDOWELL
US 221 - NC 226
UNDER CONSTRUCTION
R-5793 2149 2149DIVISION 13 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVBUNCOMBEBURKEMADISONMCDOWELLMITCHELLRUTHERFORDYANCEY
VARIOUS
13-22 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
U-5835 9420 250US 221/NC 226 TO GEORGIA AVENUE. WIDEN EXISTING ROADWAY.
1.5
DIV
T R 1400 T U 170 T 7600C
McDOWELL
US 221 BUSINESS
U-5818 4085 250I-40 WESTBOUND RAMPS TO 0.3 MILE WEST OF I-40 EASTBOUND RAMPS. WIDEN ROADWAY.
0.3
DIV
T R 25 T U 10 T C 3800
McDOWELL
SR 1001 (SUGARHILL ROAD)
BRIDGE PROJECTS
UNDER CONSTRUCTION
B-3673 7482 7482REPLACE BRIDGE 580017 OVER SECOND BROAD RIVER.SWMCDOWELL
US 221
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5113 19262 19262DIVISION 13 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVBUNCOMBE
BURKEMADISONMcDOWELLMITCHELLRUTHERFORDYANCEY
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4913 29630 29630ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 13 PROJECT MITIGATION.BUNCOMBE
BURKEMADISONMcDOWELLMITCHELLRUTHERFORDYANCEY
VARIOUS
13-23 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5713 2794 1394SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 13.
HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
BUNCOMBEBURKEMADISONMcDOWELLMITCHELLRUTHERFORDYANCEY
VARIOUS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5213 4097 2872DIVISION 13 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
HSIP C 1225 DIV
DIV DIVISION 13 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN THE DIVISION CATEGORY.DIVBUNCOMBEBURKEMADISONMcDOWELLMITCHELLRUTHERFORDYANCEY
VARIOUS
RURAL PROJECTSR-2519 195724 195724SR 1336 (JACK'S CREEK ROAD) TO MULTI-
LANE SECTION WEST OF SPRUCE PINE. WIDEN TO MULTI-LANES. (INCLUDES B-3268).
15.5
A EAST OF SR 1336 (JACKS CREEK ROAD) IN YANCEY COUNTY. TO NC 80 IN YANCEY COUNTY - UNDER CONSTRUCTIONB NC 80 IN YANCEY COUNTY TO MULTI-LANES WEST OF SPRUCE PINE IN MITCHELL COUNTY - UNDER CONSTRUCTIONTRN
MITCHELLYANCEY
US 19E
R-2520 74939 739MULTI-LANE SECTION EAST OF SPRUCE PINE TO US 221. WIDEN TO MULTI-LANES.
9.4 T 6700R A T 800U A T C 12267 A C 12266 A C 12267 AT 4300R B T 25600C B
A MULTI-LANES EAST OF SPRUCE PINE TO SR 1106. WIDEN TO MULTI-LANES.DIVB SR 1106 TO US 221. WIDEN TO MULTI-LANES.
AVERYMITCHELL
US 19E-NC 194
13-24 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
R-5804 29200BLUE RIDGE PARKWAY TO SR 1274 (SUMMIT AVENUE). WIDEN TO 3-LANES.
4.3
REG
T 1200R T 500U T 27500C
MITCHELL
NC 226
PART COMPLETE
R-5528 415 415CONSTRUCT ACCESS ROAD OFF SR 1129 (HENREDON ROAD).
0.26EX A CONSTRUCT ACCESS ROAD OFF SR 1129 (HENREDON ROAD) FROM THE END OF PHASE I PROJECT. - UNDER CONSTRUCTIONEXMITCHELL
NEW ROUTE
UNDER CONSTRUCTION
R-5793 2149 2149DIVISION 13 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVBUNCOMBEBURKEMADISONMCDOWELLMITCHELLRUTHERFORDYANCEY
VARIOUS
BRIDGE PROJECTS
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5113 19262 19262DIVISION 13 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVBUNCOMBE
BURKEMADISONMcDOWELLMITCHELLRUTHERFORDYANCEY
VARIOUS
13-25 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)MITIGATION PROJECTS
IN PROGRESS
EE-4913 29630 29630ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 13 PROJECT MITIGATION.BUNCOMBE
BURKEMADISONMcDOWELLMITCHELLRUTHERFORDYANCEY
VARIOUS
HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5713 2794 1394SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 13.
HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
BUNCOMBEBURKEMADISONMcDOWELLMITCHELLRUTHERFORDYANCEY
VARIOUS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5213 4097 2872DIVISION 13 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
HSIP C 1225 DIV
DIV DIVISION 13 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN THE DIVISION CATEGORY.DIVBUNCOMBEBURKEMADISONMcDOWELLMITCHELLRUTHERFORDYANCEY
VARIOUS
13-26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
PLANNING/DESIGN IN PROGRESS
R-2233 344487 120987SOUTH CAROLINA STATE LINE TO NORTH OF SR 1366 (ROPER LOOP ROAD). WIDEN TO MULTI-LANES WITH BYPASS OF RUTHERFORDTON ON NEW LOCATION.
18.2 T R 24500 BA T U 1700 BA T 23250C BA23250C BA C 23250 BA C 23250 BA T R 19900 BB T U 3000 BB T C 20350 BB 20350C BB20350C BB20350C BB
AA SOUTH CAROLINA STATE LINE TO SOUTH OF FLOYD'S CREEK - COMPLETEAB SOUTH OF FLOYD'S CREEK TO NORTH OF US 74 BYPASS - COMPLETEBA NORTH OF US 74 BYPASS TO SOUTH OF US 74 BUSINESSDIVBB SOUTH OF US 74 BUSINESS TO NORTH OF SR 1366 (ROPER LOOP ROAD)DIV
RUTHERFORD
US 221
UNDER CONSTRUCTION
R-5793 2149 2149DIVISION 13 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVBUNCOMBEBURKEMADISONMCDOWELLMITCHELLRUTHERFORDYANCEY
VARIOUS
URBAN PROJECTS
RIGHT OF WAY IN PROGRESS
U-5833 4000 700SR 2159 (PINE RIDGE ROAD) TO US 74. WIDEN EXISTING ROADWAY.
0.6
DIV
T C 3300
RUTHERFORD
SR 2241 (OAKSTREET)
BRIDGE PROJECTS
UNDER CONSTRUCTION
B-4811 3274 3274REPLACE BRIDGE 800087 OVER BROAD RIVER.HFRUTHERFORD
US 64
B-5876 9540 300REPLACE BRIDGE 800083 AND BRIDGE 800084 OVER SECOND BROAD RIVER.
SW
NHPB 440R NHPB 4400C4400C
RUTHERFORD
US 74
B-5871 5450 200REPLACE BRIDGE 800628 OVER LAKE LURE DAM AND BROAD RIVER.
DIV
STPOFF 250R STPOFF 5000C
RUTHERFORD
SR 1306(BILLS CREEK ROAD)
13-27 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BRIDGE PROJECTS
UNDER CONSTRUCTION
B-5395 1259 1259REPLACE BRIDGE 800577 OVER HUNTING CREEK.
HFRUTHERFORD
SR 1538(GREEN STREET)
UNDER CONSTRUCTION
B-5397 1875 1175REPLACE BRIDGE 800051 OVER FLOYDS CREEK.
DIV
STPOFF C 700
RUTHERFORD
SR 2213(CHURCH STREET)
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5113 19262 19262DIVISION 13 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVBUNCOMBE
BURKEMADISONMcDOWELLMITCHELLRUTHERFORDYANCEY
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4913 29630 29630ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 13 PROJECT MITIGATION.BUNCOMBE
BURKEMADISONMcDOWELLMITCHELLRUTHERFORDYANCEY
VARIOUS
13-28 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5713 2794 1394SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 13.
HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
BUNCOMBEBURKEMADISONMcDOWELLMITCHELLRUTHERFORDYANCEY
VARIOUS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5213 4097 2872DIVISION 13 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
HSIP C 1225 DIV
DIV DIVISION 13 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN THE DIVISION CATEGORY.DIVBUNCOMBEBURKEMADISONMcDOWELLMITCHELLRUTHERFORDYANCEY
VARIOUS
RURAL PROJECTSR-2519 195724 195724SR 1336 (JACK'S CREEK ROAD) TO MULTI-
LANE SECTION WEST OF SPRUCE PINE. WIDEN TO MULTI-LANES. (INCLUDES B-3268).
15.5
A EAST OF SR 1336 (JACKS CREEK ROAD) IN YANCEY COUNTY. TO NC 80 IN YANCEY COUNTY - UNDER CONSTRUCTIONB NC 80 IN YANCEY COUNTY TO MULTI-LANES WEST OF SPRUCE PINE IN MITCHELL COUNTY - UNDER CONSTRUCTIONTRN
MITCHELLYANCEY
US 19E
UNDER CONSTRUCTION
R-5793 2149 2149DIVISION 13 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVBUNCOMBEBURKEMADISONMCDOWELLMITCHELLRUTHERFORDYANCEY
VARIOUS
13-29 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BRIDGE PROJECTS
B-5867 460 100REPLACE BRIDGE 990156 OVER COLBERT CREEK.
DIV
STPOFF R 20 STPOFF 340C
YANCEY
SR 1158(COLBERTS CREEK)
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5113 19262 19262DIVISION 13 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVBUNCOMBE
BURKEMADISONMcDOWELLMITCHELLRUTHERFORDYANCEY
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4913 29630 29630ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 13 PROJECT MITIGATION.BUNCOMBE
BURKEMADISONMcDOWELLMITCHELLRUTHERFORDYANCEY
VARIOUS
HIGHWAY SAFETY PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5213 4097 2872DIVISION 13 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
HSIP C 1225 DIV
DIV DIVISION 13 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN THE DIVISION CATEGORY.DIVBUNCOMBEBURKEMADISONMcDOWELLMITCHELLRUTHERFORDYANCEY
VARIOUS
13-30 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5713 2794 1394SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 13.
HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
BUNCOMBEBURKEMADISONMcDOWELLMITCHELLRUTHERFORDYANCEY
VARIOUS
13-31 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)AVIATION PROJECTS
UNDER CONSTRUCTION
AV-5735 300 300AIRFIELD IMPROVEMENTS PROGRAM - RUNWAY CONSTRUCTION
REGBUNCOMBE
ASHEVILLE REGIONALAIRPORT (AVL)
AV-5775 3000WRIGHT BROTHERS WAY ROAD EXTENSION
SW
T C 500 O C 2500
BUNCOMBE
ASHEVILLE REGIONALAIRPORT (AVL)
AV-5866 300CONSTRUCT TWO TAXIWAY CONNECTORS.
REG
T C 300
BUNCOMBE
ASHEVILLE REGIONALAIRPORT (AVL)
BICYCLE AND PEDESTRIAN PROJECTS
RIGHT OF WAY IN PROGRESS
EB-5774 3736 536SR 1684 (ELK MOUNTAIN ROAD) TO EXIT 25 ON US 19/23/70. CONSTRUCT MULTI-USE PATH.DIV
STBGDA C 2400 L C 800
BUNCOMBE
NC 251 (RIVERSIDEDRIVE)
EB-5547 2092 261CONSTRUCT NEW MULTI-USE PATH FROM EXISTING FLAT CREEK GREENWAY TRAILHEAD NEAR STATE STREET AND CHARLOTTE STREET TO EXISTING RIVERSIDE GREENWAY NEAR RIVERSIDE PARK AND EXTENSION WEST OF NC 9 NEAR EXISTING CULVERT.
DIV
STBGDA R 80 L R 20 STBGDA C 1385 L C 346
BUNCOMBE
NEW ROUTE
U-5535 4125FRENCH BROAD RIVER MPO TRANSPORTATION ALTERNATIVES (TA) PROGRAM.DIV
TAPDA C 686 C 290 C 290 290C290C290C C 290 C 290 C 290 C 290L C 172 C 73 C 73 73C73C73C C 73 C 73 C 73 C 73
BUNCOMBEHAYWOODHENDERSONMADISONTRANSYLVANIA
VARIOUS
EB-5831 525COXE AVENUE, PATTON AVENUE TO SHORT COXE AVENUE. IMPROVE BICYCLE AND PEDESTRIAN INFRASTRUCTURE.DIV
STBGDA PE 420 L PE 105
BUNCOMBE
ASHEVILLE
EB-5790 1146 96ON-STREET CROSSINGS AND CONNECTIONS FOR BICYCLISTS AND PEDESTRIANS IN ASHEVILLE'S EAST OF THE RIVERWAY.DIV
TAPDA C 840 L C 210
BUNCOMBE
ASHEVILLE
13-32 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BICYCLE AND PEDESTRIAN PROJECTS
EB-5830 675LEXINGTON AVENUE, PATTON AVENUE TO SOUTHSIDE AVENUE. IMPROVE BICYCLE AND PEDESTRIAN INFRASTRUCTURE.DIV
STBGDA PE 540 L PE 135
BUNCOMBE
ASHEVILLE
EB-5925 2000NC 251 TO US 25. CONSTRUCT MULTI-USE PATH.
DIV
STBGDA C 1600 L C 400
BUNCOMBE
BEAVERDAMCREEKGREENWAY
EB-5823 400CONSTRUCT MULTI-USE PATH FROM HOMINY CREEK RIVER PARK TO WESTERN NC FARMER'S MARKETDIV
L PE 80 STBGDA PE 320
BUNCOMBE
BENT CREEKGREENWAY
EB-5824 400CONSTRUCT MULTI-USE PATH FROM HOMINY VALLEY PARK AND ENKA HIGH SCHOOL TO EAST OF SAND HILL ROADDIV
L PE 80 STBGDA PE 320
BUNCOMBE
HOMINY CREEKGREENWAY
EB-5919 446SOUTHSIDE AVENUE TO CHOCTAW STREET AT BILTMORE AVENUE. CONSTRUCT PEDESTRIAN IMPROVEMENTS.
DIV
TAP PE 80 L PE 20 TAP 21R L 5R TAP C 256 L C 64
BUNCOMBE
MCDOWELL STREETCHOCTAW STREET
EB-5822 300CONSTRUCT MULTI-USE PATH ALONG RIVERSIDE DRIVE FROM HILL STREET TO US 19/23/70 AT BROADWAYDIV
L PE 60 STBGDA PE 240
BUNCOMBE
NORTH RAD GREENWAY
EB-5821 600CONSTRUCT MULTI-USE PATH ALONG REEMS CREEK CORRIDOR FROM WESTERN EDGE OF TOWN OF WEAVERVILLE TO KARPEN SOCCER FIELDSDIV
L PE 120 STBGDA PE 480
BUNCOMBE
REEMS CREEKGREENWAY
PUBLIC TRANSPORTATION PROJECTSTA-5164 450REPLACEMENT BUSES
HF
L CP 90 STPDA CP 360
BUNCOMBE
ASHEVILLE REDEFINES TRANSIT
13-33 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
TD-5282 964TRANSIT STATION RENOVATION
HF
FBUS CP 214 L CP 750
BUNCOMBE
ASHEVILLE REDEFINES TRANSIT
FUNDS AUTHORIZED IN PROGRESS
TG-4704 2450 2450ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETC
HF
FUZ CP 0 CP 0 CPCPCP L CP 0 CP 0 CPCPCP
BUNCOMBE
ASHEVILLE REDEFINES TRANSIT
TG-6175 110CONSTRUCT BUS SHELTERS ON US-70
HF
L C 22 STPDA C 88
BUNCOMBE
ASHEVILLE REDEFINES TRANSIT
FUNDS AUTHORIZED IN PROGRESS
TG-6182A 975 325ADA PARATRANSIT
HF
FUZ CP 260 CP 260 L CP 65 CP 65
BUNCOMBE
ASHEVILLE REDEFINES TRANSIT
FUNDS AUTHORIZED IN PROGRESS
TG-6183B 3000 1000TRANSIT PREVENTATIVE MAINTENANCE AND ROUTINE CAPITAL
HF
FUZ CP 800 CP 800 L CP 200 CP 200
BUNCOMBE
ASHEVILLE REDEFINES TRANSIT
TM-5163 93 44CITY OF ASHEVILLE ADMINISTRATIVE OVERSIGHT OF 5316 JARC PROJECTS IN THE ASHEVILLE URBANIZED AREA (JARC FUNDING)
HF
FUZ AD 49
BUNCOMBE
ASHEVILLE REDEFINES TRANSIT
TM-5315 534 160ART LIMITED SUNDAY SERVICE ON NINE ROUTES OPERATING ASSISTANCE (JARC FUNDING)
HF
FUZ O 187 JARC L O 187
BUNCOMBE
ASHEVILLE REDEFINES TRANSIT
FUNDS AUTHORIZED IN PROGRESS
TM-5006 2454 2454OPERATING ASSISTANCE
HF
JARC L
BUNCOMBE
ASHEVILLE REDEFINES TRANSIT
13-34 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TM-5138 678 512BUNCOMBE COUNTY - BLACK MOUNTAIN TRAILBLAZER SERVICE JOB ACCESS REVERSE COMMUTE OPERATING ASSISTANCE
HF
JARC O 83 L O 83
BUNCOMBE
ASHEVILLE REDEFINES TRANSIT
TM-6144 1106 1106FTA 5307 ASHEVILLE URBANIZED AREA ALLOCATION SET ASIDE FOR JOB ACCESS REVERSE COMMUTE PROJECTSHF
FUZ L
BUNCOMBE
ASHEVILLE REDEFINES TRANSIT
TM-5137 210CITY OF ASHEVILLE BLACK MOUNTAIN TRANSIT SERVICE OPERATING ASSISTANCE (JARC FUNDING)HF
FUZ O 105 L O 105
BUNCOMBE
ASHEVILLE REDEFINES TRANSIT
TM-5320 534 534FY 2011 FTA SECTION 5316 JARC (STATEWIDE ALLOCATION) OPERATING ASSISTANCE FOR JARC PROJECTS IN ASHEVILLE URBANIZED AREA INCLUDING MOUNTAIN MOBILITY (BUNCOMBE), MOUNTAIN PROJECTS (HAYWOOD AND ASHEVILLE TRANSIT)
HF
JARC L
BUNCOMBEHAYWOOD
ASHEVILLE REDEFINES TRANSIT
FUNDS AUTHORIZED IN PROGRESS
TN-5007 1554 1554OPERATING ASSISTANCE - NEW FREEDOM - URBAN
HF
FNF O 0 O 0 O 0 OOO L O 0 O 0 O 0 OOO
BUNCOMBE
ASHEVILLE REDEFINES TRANSIT
FUNDS AUTHORIZED IN PROGRESS
TO-4705 21225 16530OPERATING ASSISTANCE
HF
FUZ O 600 O 600 L O 600 O 600 SMAP O 765 O 765 O 765
BUNCOMBE
ASHEVILLE REDEFINES TRANSIT
FUNDS AUTHORIZED IN PROGRESS
TP-5113 852 408PLANNING ASSISTANCE
HF
FMPL CP 60 CP 60 CP 60 60CP60CP60CP L CP 7 CP 7 CP 7 7CP7CP7CP S CP 7 CP 7 CP 7 7CP7CP7CP
BUNCOMBE
ASHEVILLE REDEFINES TRANSIT
TQ-6186 4745310 TRADITIONAL PROJECTS
HF
FEPD CP 179 CP 200 L CP 45 CP 50
BUNCOMBE
ASHEVILLE REDEFINES TRANSIT
13-35 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
TQ-6187 4165310 OTHER PROJECTS
HF
FEPD O 114 O 94 L O 114 O 94
BUNCOMBE
ASHEVILLE REDEFINES TRANSIT
TQ-7010 665310 ADMINISTRATIVE OVERSIGHT
HF
FEPD AD 33 AD 33
BUNCOMBE
ASHEVILLE REDEFINES TRANSIT
FUNDS AUTHORIZED IN PROGRESS
TS-5102 95 53SAFETY & SECURITY - MIN. 1% SET ASIDE
HF
FUZ CP 6 CP 6 CP 6 6CP6CP6CP L CP 1 CP 1 CP 1 1CP1CP1CP
BUNCOMBE
ASHEVILLE REDEFINES TRANSIT
TQ-9034 2295310 TRADITIONAL PROJECTS
HF
FEPD CP 183 L CP 46
BUNCOMBE
CITY OF ASHEVILLE
FUNDS AUTHORIZED IN PROGRESS
TA-6287 1213 1213CAPITAL
HF
FNU L S
BUNCOMBE
MOUNTAIN MOBILITY BUNCOMBE
FUNDS AUTHORIZED IN PROGRESS
TC-5009 45 45ADMINISTRATIVE FUNDING FOR A PLANNING STUDY TO DEVELOP SERVICE MODEL AND RECOMMENDED OPTIONS TO IMPROVE CONNECTIVITY TO OTHER TRNSIT SYSTEMS
HF
ADTAP L
BUNCOMBE
MOUNTAIN MOBILITY BUNCOMBE
FUNDS AUTHORIZED IN PROGRESS
TC-5008 72 72CAPITAL FUNDING FOR PURCHASE AND INSTALLATION OF NOTIFICATION MODULE SOFTWARE FOR ROUTING AND SCHEDULINGHF
ADTAP L
BUNCOMBE
MOUNTAIN MOBILITY BUNCOMBE
FUNDS AUTHORIZED IN PROGRESS
TK-6148 6152 3428ADMINISTRATION
HF
FNS FNU O 211 O 211 O 211 211O211O211O FNU L O 68 O 68 O 68 68O68O68O S O 175 O 175 O 175 175O175O175O
BUNCOMBE
MOUNTAIN MOBILITY BUNCOMBE
13-36 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BICYCLE AND PEDESTRIAN PROJECTS
U-5546 4125GREATER HICKORY MPO TRANSPORTATION ALTERNATIVES (TA) PROGRAM.
DIV
TAPDA R 120 R 20 R 20 20R20R20R R 20 R 20 R 20 R 20L R 30 R 5 R 5 5R5R5R R 5 R 5 R 5 R 5TAPDA C 1200 C 200 C 200 200C200C200C C 200 C 200 C 200 C 200L C 300 C 50 C 50 50C50C50C C 50 C 50 C 50 C 50
ALEXANDERBURKECALDWELLCATAWBA
VARIOUS
EB-5827 786 160FONTA FLORA STATE TRAIL, INTERSECTION OF LAUREL RIDGE COURT AND NORTH POWERHOUSE ROAD TO THE PROPOSED HARRIS WHISNANT TRAILHEAD AT THE INTERSECTION OF HARRY WHISNANT ROAD AND COBB ROAD. CONSTRUCT BICYCLE AND PEDESTRIAN FACILITY.
DIV
STBGDA R 410 L R 216
BURKE
FONTA FLORATRAIL
EB-5808 402UPGRADE CURRENT PEDESTRIAN SIGNALS AND INSTALL NEW PEDESTRIAN SIGNALS.
DIV
STBGDA C 322 L C 80
BURKECALDWELLCATAWBA
HICKORY
UNDER CONSTRUCTION
EB-5807 1335 1335MORGANTON DOWNTOWN GREENWAY CONNECTOR.DIVBURKE
MORGANTON
PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TA-6275 CAPITAL
HFBURKE
APPLE COUNTRY TRANSIT, W. CAROLINA COMMUNITY
TM-5321 21 21CITY OF ASHEVILLE SECTION 5316 PROGRAM ADMINISTRATION OF STATEWIDE ALLOCATION OF 5316 FUNDSHF
JARC
BURKE
ASHEVILLE REDEFINES TRANSIT
13-37 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TA-6507 2934 1554REPLACEMENT - LIGHT TRANSIT VEHICLE
HF
FNU CP 184 CP 184 CP 207 184CP184CP184CP L CP 23 CP 23 23CP23CP23CP S CP 23 CP 23 CP 23 23CP23CP23CP
ALEXANDERBURKECALDWELLCATAWBA
TRANSPORTATION ADMIN. OF CLEVELAND COUNTY
FUNDS AUTHORIZED IN PROGRESS
TP-5106 553 325PLANNING ASSISTANCE - 5303
HF
FMPL CP 34 CP 34 CP 34 34CP L CP 4 CP 4 CP 4 34CP S CP 4 CP 4 CP 4 34CP
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT COUNCIL OF GOVERNMENTS
TQ-6511 95 95ELDERLY AND DISABLED FUNDING - MOBLITY MANAGEMENT
HF
FEPD L
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT COUNCIL OF GOVERNMENTS
TA-6556 339 339CAPITAL
HF
FNU L S
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
13-38 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TA-6544 360 360CAPITAL
HF
FNU L S
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TA-6501 908 586REPLACEMENT VAN
HF
FNU CP 72 CP 36 CP 41 36CP36CP36CP L CP 10 CP 5 5CP5CP5CP S CP 10 CP 5 CP 5 5CP5CP5CP
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TA-4929 812 380REPLACEMENT VAN
HF
FUZ CP 72 72CP72CP72CP L CP 18 18CP18CP18CP S CP 18 18CP18CP18CP
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TA-4927 1434 894REPLACEMENT BUS
HF
FUZ CP 144 CP 144 144CP L CP 18 CP 18 18CP S CP 18 CP 18 18CP
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
13-39 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
TA-4928 1086 362EXPANSION BUS
HF
FUZ CP 290 290CP L CP 36 36CP S CP 36 36CP
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
TA-4928B 122 122EXPANSION - LIGHT TRANSIT VEHICLE - CMAQ APP#HU5
HF
CMAQ
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TC-5015 180 180OPERATING
HF
ADTAP L
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TG-4774 738 438ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETCHF
FUZ CP 40 CP 40 CP 40 40CP40CP40CP L CP 10 CP 10 CP 10 10CP10CP10CP
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
13-40 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TG-6159 392 272ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETCHF
FNU CP 16 CP 16 CP 16 16CP16CP16CP L CP 2 CP 2 CP 2 2CP2CP2CP S CP 2 CP 2 CP 2 2CP2CP2CP
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TG-4774A 5925 2925PREVENTIVE MAINTENANCE
HF
FUZ O 400 O 400 O 400 500O400O400O L O 100 O 100 O 100 100O100O
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TG-6142A 121 82ROUTINE CAPITAL - SERVICE VEHICLE
HF
FNU 35CP L 4CP
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TG-4774B 1463 797OPERATING ASSISTANCE - ADA PARATRANSIT SERVICE
HF
FUZ O 100 O 100 O 100 100O100O100O L O 11 O 11 O 11 11O11O11O
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
13-41 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TK-5181 4976 2846ADMINISTRATION
HF
FNU O 284 O 284 O 284 284O284O284O FNU L O 53 O 53 O 53 53O53O53O S O 18 O 18 O 18 18O18O18O
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TM-6108 2638 1534OPERATING ASSISTANCE - NON-URBAN
HF
JARC O 92 O 92 O 92 92O92O92O L O 92 O 92 O 92 92O92O92O
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TN-6109 390 210OPERATING ASSISTANCE - SMALL-URBAN
HF
FNF O 15 O 15 O 15 15O15O15O L O 15 O 15 O 15 15O15O15O
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TO-6109 2586 1410OPERATING ASSISTANCE
HF
FNU O 98 O 98 O 98 98O98O98O L O 98 O 98 O 98 98O98O98O
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
13-42 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TO-4733 25358 16154OPERATING ASSISTANCE
HF
FUZ O 1500 O 1000 O 1000 1000O1000O1000O L O 1296 O 46 O 46 46O 46O SMAP O 204 O 204 O 204 204O204O204O
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TP-4733A 2281 1651PLANNING ASSISTANCE
HF
FUZ CP 210 CP 210 CP 210
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TP-4733B 681 531PLANNING ASSISTANCE
HF
FUZ CP 40 CP 40 CP 40 L CP 5 CP 5 CP 5 S CP 5 CP 5 CP 5
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TQ-6503 137 77PREVENTIVE MAINTENANCE - PARATRANSIT
HF
FEPD O 9 O 9 O 9 9O9O9O L O 1 O 1 O 1 S O 1 O 1 O 1
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
13-43 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TQ-6507 792 483OPERATING ASSISTANCE - ELDERLY AND DISABLED PERSONS
HF
FEPD O 34 O 34 O 34 34O 34O L O 35 O 35 O 35 34O
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TS-5128 279 209SAFETY & SECURITY
HF
FUZ CP 18 CP 18 CP 19 L CP 5 CP 5 CP 5
ALEXANDERBURKECALDWELLCATAWBA
WESTERN PIEDMONT REGIONAL TRANSPORTATION
BICYCLE AND PEDESTRIAN PROJECTSU-5535 4125FRENCH BROAD RIVER MPO
TRANSPORTATION ALTERNATIVES (TA) PROGRAM.DIV
TAPDA C 686 C 290 C 290 290C290C290C C 290 C 290 C 290 C 290L C 172 C 73 C 73 73C73C73C C 73 C 73 C 73 C 73
BUNCOMBEHAYWOODHENDERSONMADISONTRANSYLVANIA
VARIOUS
UNDER CONSTRUCTION
EB-5536 570 570GABRIEL CREEK GREENWAY, PHASE I. CONSTRUCT 10 FEET WIDE GREENWAY NEAR OR ADJACENT TO GABRIEL CREEK.
0.8TRNMADISON
MARS HILL
EB-5918 195US 25/70, SR 1601 (DERINGER DRIVE) TO BEGINNING OF INGLE'S PARKING LOT. CONSTRUCT SIDEWALKS, INSTALL CROSSWALKS, ADA RAMPS, PEDESTRIAN SIGNAL AND PEDESTRIAN REFUGE.DIV
TAP PE 36 L PE 9 TAP 120C L 30C
MADISON
MARSHALL
13-44 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TQ-6929 90 90OPERATING
HF
FEPD L
MADISONTRANSYLVANIA
LAND OF SKY REGIONAL COUNCIL OF GOVERNMENTS
FUNDS AUTHORIZED IN PROGRESS
TA-6199 242 242CAPITAL
HF
FNU L S
MADISON
MADISON COUNTY TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TK-6143 1907 1085ADMINISTRATION
HF
FNU AD 110 AD 110 AD 110 110AD110AD110AD L AD 20 AD 20 AD 20 20AD20AD20AD S AD 7 AD 7 AD 7 7AD7AD7AD
MADISON
MADISON COUNTY TRANSPORTATION
BICYCLE AND PEDESTRIAN PROJECTSEB-5753 285PERRY STREET TO WAYNE STREET.
CONSTRUCT CURB, GUTTER, AND SIDEWALK ALONG EAST SIDE AND INSTALL CROSSWALKS.
0.3
DIV
TAP 20PE L 5PE TAP 80R L 20R TAP 128C L 32C
McDOWELL
SR 1703(BALDWIN AVENUE)
EB-5917 1750PEA VINE RAIL TRAIL, STATE STREET TO COLLEGE DRIVE. CONSTRUCT RAIL TRAIL IMPROVEMENTS.
DIV
TAP PE 200 L PE 50 TAP 1200C L 300C
McDOWELL
MARION
EB-5916 1000US 70 TO RESISTOFLEX ROAD. CONSTRUCT GREENWAY.
DIV
TAP PE 80 L PE 20 TAP 120R L 30R TAP C 600 L C 150
McDOWELL
MCDOWELL CREEKGREENWAY
13-45 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TA-6201 613 613CAPITAL
HF
FNU
MITCHELL
MITCHELL COUNTY TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TK-6146 2545 1453ADMINISTRATION
HF
FNU AD 146 AD 146 AD 146 146AD146AD146AD L AD 27 AD 27 AD 27 27AD27AD27AD S AD 9 AD 9 AD 9 9AD9AD9AD
MITCHELL
MITCHELL COUNTY TRANSPORTATION
AVIATION PROJECTSAV-5774 4500RUNWAY EXTENSION.
DIV
T C 4050 O C 450
RUTHERFORD
RUTHERFORD COUNT(MARCHMAN FIELD-FQD)
BICYCLE AND PEDESTRIAN PROJECTSEB-5915 3500OAKLAND ROAD TO FORREST HUNT DRIVE.
CONSTRUCT MULTI-USE TRAIL ALONG RAIL CORRIDOR.
DIV
TAP PE 400 L PE 100 TAP 2400C L 600C
RUTHERFORD
THERMAL BELTRAIL TRAIL
PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TA-6215 645 645CAPITAL
HF
FNU L S
RUTHERFORD
RUTHERFORD COUNT
FUNDS AUTHORIZED IN PROGRESS
TC-5001 88 88OPERATING ASSISTANCE FOR INCREASED DIALYSIS TRANSPORTATION AND EXTEND GROCERY SHUTTLE AND BEGIN NEW SERVICE
HF
ADTAP L
RUTHERFORD
RUTHERFORD COUNT
13-46 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 13
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TK-6161 2753 1571ADMINISTRATION
HF
FNU O 158 O 158 O 158 158O158O158O FNU L O 29 O 29 O 29 29O29O29O S O 10 O 10 O 10 10O10O10O
RUTHERFORD
RUTHERFORD COUNT
PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TA-6228 283 283CAPITAL
HF
FNU L S
YANCEY
YANCEY COUNTY TRANSPORTATION AUTHORITY
FUNDS AUTHORIZED IN PROGRESS
TK-6175 2030 1160ADMINISTRATION
HF
FNU O 116 O 116 O 116 116O116O116O FNU L O 22 O 22 O 22 22O22O22O S O 7 O 7 O 7 7O7O7O
YANCEY
YANCEY COUNTY TRANSPORTATION AUTHORITY
TQ-6177 80 80OPERATING ASSISTANCE
HF
FEPD L
YANCEY
YANCEY COUNTY TRANSPORTATION AUTHORITY
FUNDS AUTHORIZED IN PROGRESS
TQ-6930 44 44OPERATING
HF
FEPD L
YANCEY
YANCEY COUNTY TRANSPORTATION AUTHORITY
13-47 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
STATE TRANSPORTATION IMPROVEMENT PROGRAM
14
Division 14CherokeeClayGrahamHaywoodHendersonJacksonMaconPolkSwainTransylvania
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
R-5735 11988 628END OF 4-LANE DIVIDED SECTION TO SR 1556 (MARTINS CREEK ROAD). IMPROVE ROADWAY.
1.2
DIV
T R 1300 T U 160 T C 9900
CHEROKEE
US 19/US 74/US 64/US 129
R-5861 30200GEORGIA STATE LINE TO US 64. WIDEN ROADWAY.
5.6
DIV
NHP 2000R NHP 500U NHP C 9233 C 9234 C 9233
CHEROKEE
US 19/129
R-5847 93300 100US 64 BUSINESS WEST OF HAYESVILLE TO EAST OF NC 141. WIDEN TO FOUR-LANES DIVIDED.
8.9
DIV
T R 18100 T U 2200 T 48600C C 24300
CHEROKEECLAY
US 64
R-5803 19400 100END OF DIVIDED HIGHWAY IN CHEROKEE COUNTY TO BEGINNING OF DIVIDED HIGHWAY IN ALMOND. CONSTRUCT 5 FEET WIDE PAVED SHOULDERS FOR ENTIRE LENGTH, CONSTRUCT TRUCK CLIMBING LANES NEAR MILEMARKER 48, AND CONSTRUCT AUXILIARY LANES AT THE CHEROKEE/MACON COUNTY LINE.
20.9
REG
NHP 100R NHP 100U NHP C 19100
CHEROKEEMACONSWAIN
US 74
R-3622 22218 22218US 64/US 74 AT RANGER TO TENNESSEE STATE LINE. UPGRADE EXISTING ROADWAY.
13.5TRN AA REPLACE BRIDGE NO. 50 - COMPLETE
AB SR 1309 TO SR 1130 (SUNNY POINT ROAD) - EXCLUDING BRIDGE REPLACEMENT - COMPLETEB SR 1130 (SUNNY POINT ROAD) TO SR 1312 (BEAR PAW ROAD). - UNDER CONSTRUCTIONTRNBA SR 1130 (SUNNY POINT ROAD) TO SR 1312 (BEAR PAW ROAD). CLEARING AND GRUBBING ONLY. - COMPLETETRN
CHEROKEENC 294
14-3 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
UNDER CONSTRUCTION
R-5794 711 711DIVISION 14 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVCHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
A-0009 864153 83928CORRIDOR "K", US 19/US 74/US 129 AT ANDREWS TO NC 28 EAST OF ALMOND. FOUR LANE DIVIDED FACILITY, PRIMARILY ON NEW LOCATION.
27.1 APD 14300R A APD 925U A APD 366000C A APD 14900R B APD 2300U B APD 78000C B APD R 14500 C APD G 21075 CA G 21075 CA G 21075 CA G 21075 CAAPD C 46500 CB C 46500 CB C 46500 CB C 46500 CBAPD 19000P CC
A US 19 BUSINESS IN ANDREWS TO US 129B US 129 TO NC 143 AT SR 1223 (BEECH CREEK) - DESIGN-BUILD CONTRACTC NC 143 AT SR 1223 (BEECH CREEK) TO NC 28 AT STECOAH - RIGHT OF WAY ONLY - DESIGN-BUILD CONTRACTREGCA NC 143 AT SR 1223 (BEECH CREEK) TO NC 28 AT STECOAH. GRADING AND STRUCTURES ( EXCEPT TUNNELS). - DESIGN-BUILD CONTRACTEXCB TUNNELS AT APPALACHIAN TRAIL - DESIGN-BUILD CONTRACTEXCC NC 143 AT SR 1223 (BEECH CREEK) TO NC 28 AT STECOAH. PAVING. - DESIGN-BUILD CONTRACTDA SR 1121 (WATTIA ROAD) AT ALMONDS TO EXISTING US 19/NC 28 - COMPLETEDB EAST OF CALFPEN GAP IN GRAHAM COUNTY TO SR 1121 (WATTIA ROAD) AT ALMONDS IN SWAIN COUNTY - COMPLETEDC WEST OF SR 1231 (TOBACCO BRANCH ROAD) TO CALFPEN GAP - COMPLETEDD NC 28 AT STECOAH TO WEST OF SR 1231 (TOBACCO BRANCH ROAD) - COMPLETE
CHEROKEEGRAHAMSWAIN
FUTURE US 74
14-4 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BRIDGE PROJECTS
UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5114 16377 16377DIVISION 14 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVCHEROKEE
CLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4914 26175 26175ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 14 PROJECT MITIGATION.CHEROKEE
CLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
HIGHWAY SAFETY PROJECTS
IN PROGRESS - DIVISION PURCHASE ORDER CONTRACT (DPOC)
W-5214 6908 6908DIVISION 14 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.CHEROKEE
CLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
14-5 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5714 1420 20SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 14.
HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
RURAL PROJECTSA-0011 104332 31132NC 69, GEORGIA STATE LINE TO US 64.
WIDEN TO FOUR LANES DIVIDED. US 64, NC 69 TO EAST OF NC 175. WIDEN TO MULTI-LANES.
4.5 APD R 14700 C APD C 14500 C 14500C C APD 14800R D APD 14700C D
A GEORGIA STATE LINE TO US 64 (HAYESVILLE BYPASS). UPGRADE EXISTING TWO-LANES - COMPLETEBA NC 69 IN HAYESVILLE TO EAST OF THE HIWASSEE RIVER - COMPLETEBB EAST OF THE HIWASSEE RIVER TO EAST OF NC 175 - COMPLETEC GEORGIA STATE LINE TO US 64 (HAYESVILLE BYPASS). WIDEN TO FOUR-LANESEXD EAST OF THE HIWASSEE RIVER TO EAST OF NC 175. WIDEN TO FOUR-LANES.
CLAY
US 64/NC 69
R-5847 93300 100US 64 BUSINESS WEST OF HAYESVILLE TO EAST OF NC 141. WIDEN TO FOUR-LANES DIVIDED.
8.9
DIV
T R 18100 T U 2200 T 48600C C 24300
CHEROKEECLAY
US 64
UNDER CONSTRUCTION
R-4416 7585 7585CHUNKY GAL GAP WESTWARD FOR TWO MILES. CONSTRUCT TRUCK CLIMBING LANE.
2TRN A CHUNKY GAL GAP WESTWARD FOR TWO MILES - CLEARING AND GRUBBING ONLY - COMPLETETRNCLAY
US 64
14-6 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
RIGHT OF WAY IN PROGRESS - INCLUDES WORK FROM PROJECT W-5119
R-5742 14219 1519GEORGIA STATE LINE TO US 64. UPGRADE ROADWAY.
4.1DIV
T C 6350 C 6350
CLAYNC 175
UNDER CONSTRUCTION
R-5794 711 711DIVISION 14 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVCHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
R-5863 1500US 64 BUSINESS, US 64 TO SR 1307 (MAIN STREET). UPGRADE ROADWAY.
1.2
DIV
T 100R T 100U T C 1300
CLAY
HAYESVILLE
BRIDGE PROJECTS
UNDER CONSTRUCTION
B-4733 4072 4072REPLACE BRIDGE 210011 OVER CHATUGE LAKE.REGCLAY
NC 175
B-5918 420 100REPLACE BRIDGE 210060 OVER LEFT FORK EAGLE CREEK.
DIV
STPOFF 20R STPOFF 300C
CLAY
SR 1169(LEFORD ROAD)
B-5911 470 100REPLACE BRIDGE 210041 OVER SWEETWATER CREEK.
DIV
STPOFF 20R STPOFF 350C
CLAY
SR 1302(LOWER SWEETWATER)
14-7 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BRIDGE PROJECTS
UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5114 16377 16377DIVISION 14 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVCHEROKEE
CLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4914 26175 26175ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 14 PROJECT MITIGATION.CHEROKEE
CLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
14-8 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5714 1420 20SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 14.
HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
IN PROGRESS - DIVISION PURCHASE ORDER CONTRACT (DPOC)
W-5214 6908 6908DIVISION 14 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.CHEROKEE
CLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
RURAL PROJECTSR-5839 25000 100NC 143 TO US 129. UPGRADE ROADWAY. 20.6
DIV
T R 100 T U 100 T 6175C6175C6175C C 6175
GRAHAMSWAIN
NC 28 (FONTANAROAD)
14-9 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
R-2822 18193 2158NC 143, WEST BUFFALO CREEK TO NC 143 BUSINESS. UPGRADE CORRIDOR.
T 500R B T 635U B T C 14900 B
A NC 143 BUSINESS, SOUTH OF SR 1115 TO NORTH OF SR 1125 - COMPLETEB WEST BUFFALO CREEK TO NC 143 BUSINESS. UPGRADE CORRIDOR.REG
GRAHAM
NC 143
UNDER CONSTRUCTION
R-5770 4557 4557TENNESSEE STATE LINE TO SR 1127 (JOYCE KILMER ROAD). PAVEMENT REHABILITATION. NC FLAP DOT 143(1).
18.4EXGRAHAM
NC 143
UNDER CONSTRUCTION
R-5794 711 711DIVISION 14 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVCHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
14-10 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
A-0009 864153 83928CORRIDOR "K", US 19/US 74/US 129 AT ANDREWS TO NC 28 EAST OF ALMOND. FOUR LANE DIVIDED FACILITY, PRIMARILY ON NEW LOCATION.
27.1 APD 14300R A APD 925U A APD 366000C A APD 14900R B APD 2300U B APD 78000C B APD R 14500 C APD G 21075 CA G 21075 CA G 21075 CA G 21075 CAAPD C 46500 CB C 46500 CB C 46500 CB C 46500 CBAPD 19000P CC
A US 19 BUSINESS IN ANDREWS TO US 129B US 129 TO NC 143 AT SR 1223 (BEECH CREEK) - DESIGN-BUILD CONTRACTC NC 143 AT SR 1223 (BEECH CREEK) TO NC 28 AT STECOAH - RIGHT OF WAY ONLY - DESIGN-BUILD CONTRACTREGCA NC 143 AT SR 1223 (BEECH CREEK) TO NC 28 AT STECOAH. GRADING AND STRUCTURES ( EXCEPT TUNNELS). - DESIGN-BUILD CONTRACTEXCB TUNNELS AT APPALACHIAN TRAIL - DESIGN-BUILD CONTRACTEXCC NC 143 AT SR 1223 (BEECH CREEK) TO NC 28 AT STECOAH. PAVING. - DESIGN-BUILD CONTRACTDA SR 1121 (WATTIA ROAD) AT ALMONDS TO EXISTING US 19/NC 28 - COMPLETEDB EAST OF CALFPEN GAP IN GRAHAM COUNTY TO SR 1121 (WATTIA ROAD) AT ALMONDS IN SWAIN COUNTY - COMPLETEDC WEST OF SR 1231 (TOBACCO BRANCH ROAD) TO CALFPEN GAP - COMPLETEDD NC 28 AT STECOAH TO WEST OF SR 1231 (TOBACCO BRANCH ROAD) - COMPLETE
CHEROKEEGRAHAMSWAIN
FUTURE US 74
URBAN PROJECTS
RIGHT OF WAY IN PROGRESS
U-5866 4765 965US 129 (RODNEY ORR BYPASS) TO ROBINSVILLE HIGH SCHOOL AND MIDDLE SCHOOL. CONSTRUCT NEW ROUTE INCLUDING BRIDGE OVER CHEOAH RIVER.
0.3DIV
T C 3800
GRAHAMNEW ROUTE
BRIDGE PROJECTSB-5923 360 100REPLACE BRIDGE 370119 OVER MILL CREEK.
DIV
STPOFF R 10 STPOFF C 250
GRAHAM
SR 1105(MILL CREEK ROAD)
UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (DPOC)
B-3458 1163 1163REPLACE BRIDGE 370114 OVER STECOAH CREEK.
DIVGRAHAM
SR 1237(JENKINS ROAD)
14-11 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BRIDGE PROJECTS
UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5114 16377 16377DIVISION 14 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVCHEROKEE
CLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4914 26175 26175ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 14 PROJECT MITIGATION.CHEROKEE
CLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
HIGHWAY SAFETY PROJECTS
IN PROGRESS - DIVISION PURCHASE ORDER CONTRACT (DPOC)
W-5214 6908 6908DIVISION 14 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.CHEROKEE
CLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
14-12 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5714 1420 20SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 14.
HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
INTERSTATE PROJECTS
UNDER CONSTRUCTION
I-5756 20118 20118MILEMARKER 20 TO MILEMARKER 27. PAVEMENT REHABILITATION.
7SWHAYWOOD
I-40
I-5928 2200MILEMARKER 34 TO BUNCOMBE COUNTY LINE. PAVEMENT REHABILITATION.
2.2SW
NHPIM C 2200
HAYWOODI-40
UNDER CONSTRUCTION
I-5512 4491 4491REHABILITATE TUNNELS 15, 17, AND 104.SWHAYWOOD
I-40
COMPLETE - GARVEE BOND FUNDING $12.87 MILLION; PAYBACK FY 2008 - FY 2019
I-4910 24728 21906TENNESSEE STATE LINE (MILE MARKER 0.0) TO EXIT 15 (MILE MARKER 14.8). PAVEMENT REHABILITATION.
14.8TRN
NHP CG 1411 CG 1411
HAYWOODI-40
COMPLETE - GARVEE BOND FUNDING $8.37 MILLION; PAYBACK FY 2007 - FY 2018
I-5004 12404 11486US 74 (MILE MARKER 27) TO BUNCOMBE COUNTY LINE. PAVEMENT REHABILITATION.
7TRN
NHP CG 918
HAYWOODI-40
I-5922 7000TENNESSEE STATE LINE TO MILEMARKER 7. PAVEMENT REHABILITATION.
7SW
NHPIM 3500C3500C
HAYWOODI-40
14-13 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)INTERSTATE PROJECTS
UNDER CONSTRUCTION
I-5508 7759 7759I-40 NEAR MILEPOST 7. SLOPE STABILIZATION, ROCK BOLTING, AND ROCKFALL BARRIER FENCE AND MESH.TRNHAYWOOD
I-40
I-5924 5800MILEMARKER 15 TO MILEMARKER 20.5. PAVEMENT REHABILITATION.
5.5SW
NHPIM C 5800
HAYWOODI-40
I-5834 7400MILE MARKER 27 TO MILE MARKER 34. PAVEMENT REHABILITATION.
7SW
NHPIM C 7400
HAYWOODI-40
I-5923 7800MILEMARKER 7 TO MILEMARKER 15. PAVEMENT REHABILITATION.
8SW
NHPIM 3900C3900C
HAYWOODI-40
RURAL PROJECTS
UNDER CONSTRUCTION - INCLUDES R-2210 B
R-4047 36641 36641US 23 BUSINESS TO NORTH OF SR 1523 (OLD CLYDE ROAD) AT LAKE JUNALUSKA. WIDEN TO A MULTI-LANE FACILITY AND REPLACE RAILROAD STRUCTURE R-32. (INCLUDES R-2210B).
0.3TRNHAYWOOD
NC 209
STATE MATCHING FUNDS FROM DIVISION 14 MAINTENANCE FUNDING
R-5864 600APPROXIMATELY 3 MILES WEST OF US 276. REPAIR SLIDE AREA.
EX
FLAP PE 20 S(M) PE 5 FLAP R 80 S(M) R 20 FLAP C 380 S(M) C 95
HAYWOOD
SR 1395 (COVECREEK ROAD)
14-14 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
UNDER CONSTRUCTION
R-5794 711 711DIVISION 14 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVCHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
URBAN PROJECTSU-6048 4635 100SR 1836 (CHESTNUT MOUNTAIN ROAD) TO
SR 1200 (WIGGINS ROAD). UPGRADE ROADWAY.
3.9
DIV
T R 135 T U 100 T 4300C
BUNCOMBEHAYWOOD
US 19, US 23
U-5888 2675 125INTERSECTION OF US 23 BUSINESS (NORTH MAIN STREET) AND WALNUT STREET. CONSTRUCT INTERSECTION IMPROVEMENTS.DIV
T R 950 T U 350 T C 1250
HAYWOOD
US 23 BUSINESS
U-4712 44900 100SR 1164 (HYATT CREEK ROAD) TO US 276 (PIGEON STREET). WIDEN TO MULTI-LANES.
2.1
DIV
T R 10000 10000R T U 2400 T 5600C C 5600 C 5600 C 5600
HAYWOOD
US 23 BUSINESS(SOUTH MAIN STREET
U-5839 19383 1633US 23/74 TO US 23 BUSINESS (MAIN STREET). UPGRADE CORRIDOR.
1.1
DIV
T R 6200 T U 750 T C 10800
HAYWOOD
US 276 (RUSSAVENUE)
UNDER CONSTRUCTION
U-4412 24528 24528US 276 TO US 23 BUSINESS IN WAYNESVILLE. UPGRADE TWO LANES AND CONSTRUCT RAILROAD GRADE SEPARATION.
1.5
HAYWOOD
SR 1184 (HOWELLMILL ROAD)
14-15 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
U-5100 41974STBG-DA IN THE FRENCH BROAD RIVER METROPOLITAN PLANNING ORGANIZATION.
DIV
STBGDA C 999 C 3620 C 3620 3620C3620C3620C C 3620 C 3620 C 3620 C 3620L C 250 C 905 C 905 905C905C905C C 905 C 905 C 905 C 905
BUNCOMBEHAYWOODHENDERSON
VARIOUS
U-5616 2500FRENCH BROAD RIVER METROPOLITAN PLANNING ORGANIZATION PLANNING (PL) SUPPLEMENT.DIV
STBGDA PE 200 PE 200 PE 200 200PE200PE200PE PE 200 PE 200 PE 200 PE 200L PE 50 PE 50 PE 50 50PE50PE50PE PE 50 PE 50 PE 50 PE 50
BUNCOMBEHAYWOODHENDERSONMADISONTRANSYLVANIA
VARIOUS
U-5548 540 40REALIGNMENT OF BROWN AVENUE FROM BOYD AVENUE TO APPROXIMATELY 1200 FEET SOUTH OF THE INTERSECTION. PROJECT INCLUDES CONSTRUCTION OF NEW ROADWAY (SCHOOL STREET), RAISED CROSSWALK, PAINTED CROSSWALKS, REFUGE ISLAND, BULBOUT AND SIGNAGE.
DIV
STBGDA C 400 L C 100
HAYWOOD
BROWN AVENUE
STP-DA FUNDS ARE EXEMPT BECAUSE THEY ARE BEING USED ON REGIONAL CATEGORY PROJECT - STATE IS PAYING MATCH BECAUSE PROJECT CAME IN RANK ORDER OFF P3.0 PRIORITIZATION LIST
U-6055 1037 16NC 110 (PISGAH DRIVE) AT LOCUST STREET. IMPROVE INTERSECTION.
EX
STBGDA R 177 S(M) R 44 STBGDA C 640 S(M) C 160
HAYWOOD
CANTON
BRIDGE PROJECTSB-5898 3350 100REPLACE BRIDGE 430168 OVER US 19 AND
US 23.SW
NHPB R 150 NHPB 1550C1550C
HAYWOOD
US 23US 74
B-3186 6400 100REPLACE BRIDGE 430155, AND BRIDGE 430158 OVER RICHLAND CREEK.
SW
NHPB R 800 NHPB 2750C2750C
HAYWOOD
US 23/US 74
B-5920 740 100REPLACE BRIDGE 430246 OVER WEST FORK PIGEON CREEK.
DIV
STPOFF 30R STPOFF 610C
HAYWOOD
SR 1216(STEEL BRIDGEROAD)
14-16 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BRIDGE PROJECTS
UNDER CONSTRUCTION
B-4762 1241 1241REPLACE BRIDGE 430072 OVER JONATHAN CREEK.
DIVHAYWOOD
SR 1407(MEDLEY DRIVE)
UNDER CONSTRUCTION
B-4763 2000 2000REPLACE BRIDGE 430035 OVER BALD CREEK.
DIVHAYWOOD
SR 1503(UPPER CRABTREEROAD)
B-5900 360 100REPLACE BRIDGE 430382 OVER DUTCH COVE CREEK.
DIV
STPOFF R 10 STPOFF 250C
HAYWOOD
SR 1835(WINDING STAIRS)
B-5909 380 100REPLACE BRIDGE 430375 OVER DUTCH COVE CREEK.
DIV
STPOFF 10R STPOFF 270C
HAYWOOD
SR 1856(JENKINS ROAD)
UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5114 16377 16377DIVISION 14 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVCHEROKEE
CLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY BY THE TOWN OF WAYNESVILLE - MUNICIPAL BRIDGE
B-5013 REPLACE BRIDGE 430262 OVER RICHLAND CREEK.
DIVHAYWOOD
WAYNESVILLE(DEPOT STREET)
14-17 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)MITIGATION PROJECTS
IN PROGRESS
EE-4914 26175 26175ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 14 PROJECT MITIGATION.CHEROKEE
CLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
HIGHWAY SAFETY PROJECTS
IN PROGRESS - DIVISION PURCHASE ORDER CONTRACT (DPOC)
W-5214 6908 6908DIVISION 14 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.CHEROKEE
CLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
14-18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5714 1420 20SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 14.
HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
CONGESTION MITIGATION PROJECTSC-5612 124PROJECTS TO IMPROVE CONGESTION AND
AIR QUALITY IN THE LAND OF SKY RPO AND SOUTHWESTERN RPO.
EX
CMAQ PE 5 PE 5 L PE 1 PE 1 CMAQ R 5 R 5 L R 1 R 1 CMAQ C 30 C 30 L C 8 C 8 CMAQ O 5 O 5 L O 1 O 1 CMAQ I 5 I 5 L I 1 I 1
HAYWOODSWAIN
VARIOUS
IN PROGRESS
C-5564 167 167LAND OF SKY RPO TO WORK WITH REGIONAL CLEAN AIR CAMPAIGN AND CLEAN VEHICLE COALITION TO IMPLEMENT AN EDUCATIONAL AND OUTREACH PROGRAM IN COMMUNITIES ADJACENT TO GREAT SMOKY MOUNTAINS NATIONAL PARK.
EXBUNCOMBEHAYWOODMADISONTRANSYLVANIA
VARIOUS
14-19 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)CONGESTION MITIGATION PROJECTS
C-5151 242GREAT SMOKIES NATIONAL PARK. CONSTRUCT A MIXED-USE PATHWAY.
EX
CMAQ C 177 L C 65
HAYWOODSWAIN
EASTERN BANDOF CHEROKEEINDIANS (EBCI)
IN PROGRESS
C-5202 270 270TRANSPORTATION CHOICES. INCREASE EDUCATION EFFORTS THAT INFORM VISITORS ABOUT THE ROLE THEIR TRANSPORTATION CHOICES HAVE IN RELATION TO AIR POLLUTION ISSUES IN GSMNP.EXHAYWOOD
SWAIN
GREAT SMOKYMOUNTAINSNATIONAL PARK(GSMNP)
ROADSIDE ENVIRONMENTAL PROJECTS (REST AREA)
UNDER CONSTRUCTION - INCLUDES WORK PREVIOUSLY IN PROJECT K-3803B
K-5002 12641 12641US 23/US 74, ADD NEW SOUTHBOUND REST AREA ON NEW LOCATION AS A COMPANION TO EXISTING NORTHBOUND REST AREA. CONNECT NEW REST AREA TO MUNICIPAL WATER AND SEWER SYSTEM. RENOVATE EXISTING NORTHBOUND REST AREA TO INCLUDE ADA COMPLIANT FAMILY RESTROOM, UPGRADE FIXTURES AND FINISHES AND CONNECT TO MUNICIPAL SEWER SYSTEM.
TRNHAYWOODUS 23/US 74
INTERSTATE PROJECTS
GARVEE BOND FUNDING $7.92 MILLION; CONSTRUCTION - PAYBACK FY 2008 - FY 2019; INCLUDES PROJECT I-4920
I-5005 29542 27806MILE MARKER 37.1 IN BUNCOMBE COUNTY TO SR 1783 (MILE MARKER 53.3) IN HENDERSON COUNTY. PAVEMENT REHABILITATION.
16.2 NHP CG 868 A CG 868 A
A MILEPOST 37.1 IN BUNCOMBE COUNTY TO MILEPOST 50.3 (CONCRETE SECTION) - COMPLETETRNB MILEPOST 50.3 TO SR 1783 (MILEPOST 53.3 - ASPHALT SECTION) - COMPLETE
BUNCOMBEHENDERSON
I-26
UNDER CONSTRUCTION
I-5501 10824 10824I-26/NC 280 INTERCHANGE. RETROFIT EXISTING INTERCHANGE TO A DIVERGING DIAMOND CONFIGURATION.TRNBUNCOMBE
HENDERSON
I-26
14-20 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)INTERSTATE PROJECTS
PLANNING/DESIGN IN PROGRESS
I-4400 226925 5325US 25 (EXIT 54) TO NC 280 (EXIT 40). WIDEN TO ADD ADDITIONAL LANES.
13.6 NHP 2000R A NHP 77500C A NHP R 2000 B NHP 38750C B C 19375 B C 19375 BNHP R 2000 C NHP C 15150 C C 15150 C 15150C C15150C C
A US 25 (EXIT 54) TO US 64 (EXIT 49)B US 64 (EXIT 49) TO US 25 BUSINESS (EXIT 44)SWC US 25 BUSINESS (EXIT 44) TO NC 280 (EXIT 40)REG
BUNCOMBEHENDERSON
I-26
PLANNING/DESIGN IN PROGRESS
I-4700 196670 2670NC 280 (EXIT 40) TO I-40 AT ASHEVILLE. ADD ADDITIONAL LANES.
8.6 NHP R 2000 A NHP C 17500 A C 17500 A 17500C A17500C A NHP R 2000 B NHP C 30000 B C 30000 B 30000C B30000C B
A NC 280 (EXIT 40) TO NC 146 - LONG SHOALS ROAD (EXIT 37) - DESIGN-BUILD PROJECTSWB NC 146 - LONG SHOALS ROAD (EXIT 37) TO I-40 - DESIGN-BUILD PROJECTSW
BUNCOMBEHENDERSON
I-26
I-5925 7300MILEMARKER 50 TO POLK COUNTY LINE. PAVEMENT REHABILITATION.
7.4SW
NHPIM 3650C3650C
HENDERSONI-26
UNDER CONSTRUCTION - LET WITH I-5758
I-5759 14 14MILEMARKER 45 TO MILEMARKER 50. PAVEMENT REHABILITATION.
5SWHENDERSON
I-26
UNDER CONSTRUCTION - LET WITH I-5759
I-5758 15409 15409MILEMARKER 40 TO MILEMARKER 45. PAVEMENT REHABILITATION.
5SWHENDERSON
I-26 / US 74
RURAL PROJECTSR-2588 85626 1326US 25 IN HENDERSONVILLE TO NC 280
SOUTH OF MILLS RIVER. WIDEN TO MULTI-LANES.
7.2 STBG 15200R A STBG 1800U A STBG 18800C A STBG R 4500 B STBG U 500 B STBG 14500C B C 14500 B C 14500 B
A US 25 TO SR 1381 (MOUNTAIN ROAD).B SR 1381 (MOUNTAIN ROAD) TO NC 280 SOUTH OF MILLS RIVER.DIV
HENDERSON
NC 191
14-21 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
R-5207 30170 29320US 25 IN FLETCHER TO US 64. UPGRADE ROADWAY.
7.6 T C 850 C
A US 64 TO HENDERSON COUNTY BRIDGE NO. 20 - UNDER CONSTRUCTIONTRNB HENDERSON COUNTY BRIDGE NO. 20 TO SR 1539 (JACKSON ROAD) - UNDER CONSTRUCTIONTRNC SR 1539 (JACKSON ROAD) TO US 25 IN FLETCHER - RIGHT OF WAY IN PROGRESSTRN
HENDERSON
SR 1006 (HOWARDGAP ROAD)
PLANNING/DESIGN BY DIVISION
R-5748 14580 1530US 25 BUSINESS (CHURCH STREET) TO SR 1123 (LITTLE RIVER ROAD). UPGRADE ROADWAY.
4
DIV
T R 450 T U 100 T 6250C6250C
HENDERSON
SR 1127(KANUGA ROAD)
UNDER CONSTRUCTION
R-5780 820 820NC 280 TO END OF PAVEMENT. RESURFACE. 5
EXHENDERSON
SR 1345 (NORTHMILLS RIVER RD)
ARC PROJECT NO. 18340 - UNDER CONSTRUCTION
R-5771 1685 1685IMPROVE EXISTING SR 1690 (BROADPOINTE DRIVE) TO 24 FEET PAVED ROADWAY AND REPLACE BRIDGE 440107.
EXHENDERSON
SR 1690 (BROADPOINTEDRIVE)
R-5524 2578 2578CONSTRUCT IMPROVEMENTS TO OLD FANNING BRIDGE ROAD AND CONSTRUCT NEW ACCESS ROAD INTO FERNCLIFF INDUSTRIAL PARK.
A INSTALL TRAFFIC SIGNAL. - COMPLETEB NC 280 TO SR 1419 (OLD FANNING BRIDGE ROAD). RESURFACE AND ADD BIKE LANES. - UNDER CONSTRUCTIONC CONSTRUCT ROUNDABOUT. - UNDER CONSTRUCTIONTRND CONSTRUCT NEW ACCESS ROAD INTO FERNCLIFF INDUSTRIAL PARK. - UNDER CONSTRUCTION
BUNCOMBEHENDERSON
SR 2277/SR 3526(OLD FANNINGBRIDGE ROAD)
14-22 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
UNDER CONSTRUCTION
R-5794 711 711DIVISION 14 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVCHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
R-5744 157800 1000NC 191 TO US 64. CONSTRUCT NEW 4-LANE ROADWAY.
4.6 T 10100R A T 500U A T 49700C A T 8000R B T 500U B T C 9800 B C 9800 B C 9800 B C 9800 BT 8200R C T 500U C T 40100C C
A NC 191 (BREVARD ROAD) TO US 25 BUSINESS. CONSTRUCT NEW 4-LANE ROADWAY.B US 25 BUSINESS TO I-26. CONSTRUCT NEW 4-LANE ROADWAY.DIVC I-26 TO US 64. CONSTRUCT NEW 4-LANE ROADWAY.
HENDERSON
BALFOUR PARKWAY
URBAN PROJECTS
RIGHT OF WAY IN PROGRESS - PROJECT IS IN EXEMPT CATEGORY BECAUSE STP-DA FUNDS ARE BEING USED ON REGIONAL CATEGORY PROJECT
U-5872 2115 171SR 1545 (CANE CREEK ROAD) TO SR 1006 (HOWARD GAP ROAD). CONSTRUCT ROADWAY IMPROVEMENTS.
0.5
EX
STBGDA C 1555 L C 389
HENDERSON
US 25 (HENDERSONVILLEROAD)
U-5783 8770 1500SR 1180 (BLYTHE STREET) TO SR 1173 (WHITE PINE DRIVE)/SR 1186 (DANIEL DRIVE). WIDEN ROADWAY.
1
REG
T R 1850 T U 220 T 5200C
HENDERSON
US 64
14-23 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
U-6049 4750 100SOUTH MAIN STREET AT SOUTH KING STREET TO US 176. WIDEN BRIDGE 143 TO 5-LANES.
0.2
REG
T R 950 T U 500 T 3200C
HENDERSON
NC 225 (SOUTHMAIN STREET)
U-5886 7920 720SR 1171 (WILLOW ROAD) TO US 176 (SPARTANBURG HIGHWAY). REALIGN AND EXTEND ROADWAY.
0.4
DIV
T R 3500 T U 400 T 3300C
HENDERSON
SR 1170 (WHITESTREET)
RIGHT OF WAY IN PROGRESS
U-5840 5115 1015US 25 TO MILLS GAP ROAD. WIDEN ROADWAY.
0.9
DIV
T C 4100
HENDERSON
SR 1545 (OLDAIRPORT ROAD)
U-5887 2970 270NC 225 TO US 176. UPGRADE ROADWAY. 1.1
DIV
T R 100 T 2600C
HENDERSON
SR 1783 (HIGHLANDLAKE ROAD)
U-5100 41974STBG-DA IN THE FRENCH BROAD RIVER METROPOLITAN PLANNING ORGANIZATION.
DIV
STBGDA C 999 C 3620 C 3620 3620C3620C3620C C 3620 C 3620 C 3620 C 3620L C 250 C 905 C 905 905C905C905C C 905 C 905 C 905 C 905
BUNCOMBEHAYWOODHENDERSON
VARIOUS
U-5616 2500FRENCH BROAD RIVER METROPOLITAN PLANNING ORGANIZATION PLANNING (PL) SUPPLEMENT.DIV
STBGDA PE 200 PE 200 PE 200 200PE200PE200PE PE 200 PE 200 PE 200 PE 200L PE 50 PE 50 PE 50 50PE50PE50PE PE 50 PE 50 PE 50 PE 50
BUNCOMBEHAYWOODHENDERSONMADISONTRANSYLVANIA
VARIOUS
U-3403 65063 16263NC 191 (BREVARD ROAD - OLD HAYWOOD ROAD), NC 280 TO NC 112 (SARDIS ROAD). WIDEN TO MULTI-LANES.
9.1 T 9000R A T 17700C A T 5100R B T 600U B T 5467C B C 5466 B C 5467 B
A NC 280 (BOYLSTON HIGHWAY) TO NC 146.B NC 146 TO NORTH OF BLUE RIDGE PARYWAY.REGC NORTH OF BLUE RIDGE PARKWAY TO NC 112 (SARDIS ROAD) - COMPLETE
BUNCOMBEHENDERSON
ASHEVILLE
14-24 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)URBAN PROJECTS
DIVISION PROJECT - RIGHT OF WAY IN PROGRESS
U-5105 2550 400NC 225/SR 1164 (ERKWOOD DRIVE)/SR 1779(SHEPHERD STREET) IN HENDERSONVILLE. IMPROVE INTERSECTION.
TRN
STBG C 2150
HENDERSONHENDERSONVILLE
BRIDGE PROJECTSB-5901 2300 100REPLACE BRIDGE 440121 OVER FRENCH
BROAD RIVER OVERFLOW.REG
NHPB R 100 NHPB 2100C
HENDERSON
NC 191
B-5913 1150 100REPLACE BRIDGE 440100 OVER ROCK CREEK.
DIV
STPOFF 50R STPOFF 1000C
HENDERSON
SR 1108(ROCK CREEK ROADEAST)
B-5907 360 100REPLACE BRIDGE 440208 OVER CABIN CREEK.
DIV
STPOFF R 10 STPOFF C 250
HENDERSON
SR 1109(CABIN CREEK ROAD)
B-5917 500 100REPLACE BRIDGE 440089 OVER BIG WILLOW CREEK.
DIV
STPOFF 20R STPOFF 380C
HENDERSON
SR 1210(BIG WILLOW ROAD)
B-5906 370 100REPLACE BRIDGE 440182 OVER SWEET WATER BRANCH CREEK.
DIV
STPOFF 10R STPOFF 260C
HENDERSON
SR 1328(GASH ROAD)
UNDER CONSTRUCTION (COMBINED WITH B-4765)
B-5149 562 562REPLACE BRIDGE 440038 OVER CLEAR CREEK.
DIVHENDERSON
SR 1574(FRUITLAND ROAD)
UNDER CONSTRUCTION (COMBINED WITH B-5149)
B-4765 2654 2654REPLACE BRIDGE 440113 OVER KYLES CREEK.
DIVHENDERSON
SR 1574(HAYWOOD AVENUE)
UNDER CONSTRUCTION
B-3346 2058 2058REPLACE BRIDGE 440042 OVER SACONON CREEK.
DIVHENDERSON
SR 1734(STEPP MILL ROAD)
14-25 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BRIDGE PROJECTS
UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5114 16377 16377DIVISION 14 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVCHEROKEE
CLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
PLANNING/DESIGN BY CITY OF HENDERSONVILLE - MUNICIPAL BRIDGE
B-5929 1010 120REPLACE BRIDGE 440350 OVER DEVILS FORK CREEK.
DIV
STPOFF R 40 L R 10 STPOFF C 672 L C 168
HENDERSON
OLD DANA ROAD
MITIGATION PROJECTS
IN PROGRESS
EE-4914 26175 26175ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 14 PROJECT MITIGATION.CHEROKEE
CLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
14-26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)HIGHWAY SAFETY PROJECTS
RIGHT OF WAY IN PROGRESS
W-5506 5848 1373SR 1381 (MOUNTAIN ROAD) TO NORTH OF SR 1365 (NORTH RUGBY ROAD). CONSTRUCT A THREE-LANE SECTION BETWEEN N/S RUGBY AND COUNTRY ROAD, EXTEND RIGHT TURN LANE INTO WEST HENDERSON SCHOOL, REVISE AND INSTALL GUARDRAIL AT VARIOUS LOCATIONS, CONSTRUCT ENTRANCE TO RUGBY MIDDLE SCHOOL ON NEW LOCATION, AND CONSTRUCT PAVED SHOULDERS.
REG
HSIP C 1975 STBG C 2500
HENDERSON
NC 191
IN PROGRESS - DIVISION PURCHASE ORDER CONTRACT (DPOC)
W-5214 6908 6908DIVISION 14 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.CHEROKEE
CLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
IN PROGRESS
W-5714 1420 20SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 14.
HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
14-27 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
DIVISION PROJECT - PLANNING/DESIGN IN PROGRESS
R-2409 32607 26607NC 107 AT CASHIERS TO US 178 AT ROSMAN. SAFETY IMPROVEMENTS AND CLIMBING LANES AT SELECTED LOCATIONS.
STBG 1000R D STBG 5000C D
A CASHIERS TO JACKSON-TRANSYLVANIA COUNTY LINE - COMPLETEB 1.1 MILES EAST OF CASHIERS TO 1.6 MILES EAST OF CASHIERS - COMPLETEC WEST OF NC 281 N NEAR LAKE TOXAWAY TO INDIAN CREEK. WIDENING AND REALIGNMENT. - UNDER CONSTRUCTIONTRND INDIAN CREEK TO FLAT CREEK VALLEY ROAD. WIDENING AND REALIGNMENT
JACKSONTRANSYLVANIA
US 64
UNDER CONSTRUCTION
R-4753 50295 30246SR 1002 TO NC 281. UPGRADE EXISTING ROADWAY.
4.1DIV
STBG C 20049
JACKSONNC 107
R-5841 180700 100NC 281 TO APPROXIMATELY 1 MILE NORTH OF SR 1157 (PINE CREEK ROAD). WIDEN PAVEMENT TO 24 FEET WITH 5 FEET PAVED SHOULDERS.
7.1 T 4300R A T 200U A T 17400C A T R 6400 B T U 300 B T 152000C B
A NC 281 TO 1000 FEET NORTH OF THE LAKE TUCKASEEGEE DAM.DIVB 1000 FEET NORTH OF THE LAKE TUCKASEEGEE DAM TO APPROXIMATELY 1 MILE NORTH OF SR 1157 (PINE CREEK ROAD).DIV
JACKSON
NC 107
R-5600 35275 2000NC 107, NC 116 TO US 23 BUSINESS. US 23 BUSINESS, SR 1432 (SKYLAND DRIVE) TO MUNICIPAL DRIVE. UPGRADE ROADWAY.
2.9
REG
STBG R 13100 STBG U 1575 STBG C 6200 6200C6200C
JACKSON
NC 107US 23 BUSINESS
UNDER CONSTRUCTION
R-5206 5765 5765SR 1710 TO US 23/US 74. SAFETY IMPROVEMENTS AND WIDENING TO 10 FEET LANES.
1.9
TRN A SR 1710 TO US 23/US 74. CLEARING AND GRUBBING ONLY. - COMPLETETRNJACKSON
SR 1449 (COPECREEK ROAD)
UNDER CONSTRUCTION
R-5000 30047 30047NC 116 TO NC 107 IN WEBSTER. CONSTRUCT CONNECTOR ON NEW LOCATION.
0.7JACKSONNEW ROUTE
PROGRAM IN PROGRESS
R-5500 INDIAN RESERVATION ROAD (IRR) PROGRAM. ROAD AND BRIDGE IMPROVEMENTS TO BE CONSTRUCTED BY EASTERN BAND OF CHEROKEE INDIANS.
EXJACKSONSWAIN
VARIOUS
14-28 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
UNDER CONSTRUCTION
R-5794 711 711DIVISION 14 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVCHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
BRIDGE PROJECTS
UNDER CONSTRUCTION
B-4554 8502 8502REPLACE BRIDGE 490145 OVER SR 1705, SOUTHERN RAILROAD, AND SCOTT CREEK.SWJACKSON
US 23/US 74
RIGHT OF WAY IN PROGRESS
B-5905 5970 570REPLACE BRIDGE 490027 OVER SCOTT CREEK AND SOUTHERN RAILROAD.REG
STPON C 2700 C 2700
JACKSONUS 23 BUSINESS
UNDER CONSTRUCTION
B-4159 10954 10954REPLACE BRIDGE 490108 OVER TUCKASEGEE RIVER.
DIVJACKSON
SR 1002(ROGER ROAD)
B-5899 520 100REPLACE BRIDGE 490001 OVER HORSE PASTURE RIVER.
DIV
STPOFF R 20 STPOFF 400C
JACKSON
SR 1119(SAPPHIRE POSTOFFICE ROAD)
B-5921 520 100REPLACE BRIDGE 490008 CEDAR CREEK.
DIV
STPOFF R 20 STPOFF C 400
JACKSON
SR 1120(CEDAR CREEKROAD)
14-29 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BRIDGE PROJECTS
UNDER CONSTRUCTION
B-5404 1275 1275REPLACE BRIDGE 490136 OVER PINE CREEK.
DIVJACKSON
SR 1163(BIG PINE CREEK)
UNDER CONSTRUCTION
B-5410 1890 1890REPLACE BRIDGE 490221 OVER LITTLE SAVANNAH CREEK.
DIVJACKSON
SR 1367(LITTLE SAVANNAHROAD)
B-5902 360 100REPLACE BRIDGE 490099 OVER FISHER CREEK.
DIV
STPOFF R 10 STPOFF 250C
JACKSON
SR 1447(DILLS BRANCHROAD)
UNDER CONSTRUCTION BY FEDERAL HIGHWAY ADMINISTRATION - FEDERAL LANDS ACCESS PROGRAM (FLAP) PROJECT
B-4472 2955 2955REPLACE BRIDGE 490080 OVER CANEY CREEK. NANTAHALA NATIONAL FOREST, FEDERAL AID NUMBER NC FLAP DOT BR80(1).
DIVJACKSON
SR 1737FH 102(CANEY FORK ROAD)
UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5114 16377 16377DIVISION 14 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVCHEROKEE
CLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
14-30 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)MITIGATION PROJECTS
IN PROGRESS
EE-4914 26175 26175ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 14 PROJECT MITIGATION.CHEROKEE
CLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5714 1420 20SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 14.
HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
14-31 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)HIGHWAY SAFETY PROJECTS
IN PROGRESS - DIVISION PURCHASE ORDER CONTRACT (DPOC)
W-5214 6908 6908DIVISION 14 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.CHEROKEE
CLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
RURAL PROJECTSR-5734 38151 861US 64 TO SR 1649 (PRENTISS BRIDGE
ROAD). IMPLEMENT ACCESS MANAGEMENT STRATEGIES.
3.2 T R 530 A T U 60 A T C 5700 A T 12600R B T 1300U B T C 17100 B
A US 64 TO SR 1652 (WIDE HORIZON DRIVE)/SR 1152 (BELDEN CIRCLE).DIVB SR 1652 (WIDE HORIZON DRIVE)/SR 1152 (BELDEN CIRCLE) TO SR 1649 (PRENTISS BRIDGE ROAD).REG
MACON
US 23/US 441
UNDER CONSTRUCTION
R-5115 2484 2484US 23/US 441 IN FRANKLIN TO NC 106 IN HIGHLANDS. CONSTRUCT TRUCK INFORMATION STATIONS AND TRUCK TURN-AROUNDS.
19TRNMACON
US 64/NC 28
R-5803 19400 100END OF DIVIDED HIGHWAY IN CHEROKEE COUNTY TO BEGINNING OF DIVIDED HIGHWAY IN ALMOND. CONSTRUCT 5 FEET WIDE PAVED SHOULDERS FOR ENTIRE LENGTH, CONSTRUCT TRUCK CLIMBING LANES NEAR MILEMARKER 48, AND CONSTRUCT AUXILIARY LANES AT THE CHEROKEE/MACON COUNTY LINE.
20.9
REG
NHP 100R NHP 100U NHP C 19100
CHEROKEEMACONSWAIN
US 74
R-5846 16160 100GEORGIA STATE LINE TO US 64 (MAIN STREET) IN HIGHLANDS. UPGRADE ROADWAY.
11
DIV
T R 360 T U 100 T C 15600
MACON
NC 106 (DILLARDROAD)
14-32 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
UNDER CONSTRUCTION
R-5794 711 711DIVISION 14 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVCHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
URBAN PROJECTS
RIGHT OF WAY IN PROGRESS
U-5604 8340 2640US 23/US 64/US 441 TO PORTER STREET. INTERSECTION IMPROVEMENTS AT WOMAK STREET, MAPLE STREET, PORTER STREET, AND DEPOT STREET IN FRANKLIN.
1.4REG
T C 5700
MACONUS 441 BUSINESS
BRIDGE PROJECTS
UNDER CONSTRUCTION
B-5125 4220 4220REPLACE BRIDGE 550022 OVER LITTLE TENNESSEE RIVER.HFMACON
US 441 BUSINESS
RIGHT OF WAY IN PROGRESS - DIVISION PURCHASE ORDER CONTRACT (DPOC)
B-4775 647 197REPLACE BRIDGE 550017 OVER WAYAH CREEK.
DIV
STPOFF C 450
MACON
SR 1309(CRANFORD ROAD)
B-5912 360 100REPLACE BRIDGE 550181 OVER TELLICO CREEK.
DIV
STPOFF 10R STPOFF 250C
MACON
SR 1369(BYRD ROAD)
B-5914 360 100REPLACE BRIDGE 550180 OVER SUGAR COVE CREEK.
DIV
STPOFF 10R STPOFF 250C
MACON
SR 1369(BYRD ROAD)
B-5908 460 100REPLACE BRIDGE 550127 OVER RAY CREEK.
DIV
STPOFF 20R STPOFF 340C
MACON
SR 1387(OLIVE HILL ROAD)
14-33 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BRIDGE PROJECTS
UNDER CONSTRUCTION
B-3868 3955 3955REPLACE BRIDGE 550172 OVER LITTLE TENNESSEE RIVER AND CONSTRUCT IMPROVEMENTS TO NC 28.DIVMACON
SR 1456
B-5919 520 100REPLACE BRIDGE 550043 OVER MIDDLE CREEK.
DIV
STPOFF 20R STPOFF 400C
MACON
SR 1635(MIDDLE CREEKROAD)
UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5114 16377 16377DIVISION 14 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVCHEROKEE
CLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4914 26175 26175ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 14 PROJECT MITIGATION.CHEROKEE
CLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
14-34 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5714 1420 20SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 14.
HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
IN PROGRESS - DIVISION PURCHASE ORDER CONTRACT (DPOC)
W-5214 6908 6908DIVISION 14 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.CHEROKEE
CLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
INTERSTATE PROJECTSI-5926 7300HENDERSON COUNTY LINE TO MILEMARKER
65. PAVEMENT REHABILITATION.7.4
SW
NHPIM 3650C C 3650
POLKI-26
I-5927 5800MILEMARKER 65 TO SOUTH CAROLINA STATE LINE. PAVEMENT REHABILITATION.
5.8SW
NHPIM 2900C C 2900
POLKI-26
14-35 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)INTERSTATE PROJECTS
SEGMENT A - DESIGN-BUILD PROJECT
I-4729 25773 773US 74/NC 108 INTERCHANGE (EXIT 67). REVISE INTERCHANGE AND CONSTRUCT IMPROVEMENTS TO NC 108.
T R 1200 A T C 16000 A T R 1000 B T 3400C B3400C B
A REVISE THE I-26/US 74/NC 108 INTERCHANGE. CONSTRUCT RAMPS FROM I-26 WESTBOUND TO US 74 EASTBOUND, AND FROM US 74 WESTBOUND TO I-26 EASTBOUND.REGB CONSTRUCT IMPROVEMENTS ON NC 108 AT EXIT 67.REG
POLK
I-26
RURAL PROJECTSR-5840 3300 100US 74 TO NC 108. ADD PAVED SHOULDERS. 3.1
DIV
T R 300 T U 100 T 1400C1400C
POLK
NC 9
R-5838 47700 100I-26 TO US 176. WIDEN ROADWAY. 3.5
DIV
T 9400R T 1200U T 12334C12333C C 12333
POLK
NC 108
UNDER CONSTRUCTION
R-5756 1800 1800REALIGNMENT OF SR 1326 (PEA RIDGE ROAD) AND JOHN SHEEHAN ROAD AND CONSTRUCTION OF A ROUNDABOUT AT THE INTERSECTION WITH US 74.DIVPOLK
SR 1326 (PEARIDGE ROAD)
UNDER CONSTRUCTION
R-5794 711 711DIVISION 14 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVCHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
14-36 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BRIDGE PROJECTS
UNDER CONSTRUCTION
B-4792 675 675REPLACE BRIDGE 740004 OVER FORK CREEK (SMALL BRANCH OF PACOLET RIVER).DIVPOLK
SR 1102(PEARSON FALLS)
B-5916 400 100REPLACE BRIDGE 740022 OVER WOLFE CREEK.
DIV
STPOFF 10R STPOFF 290C
POLK
SR 1501(HUNTING COUNTRY)
UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5114 16377 16377DIVISION 14 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVCHEROKEE
CLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4914 26175 26175ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 14 PROJECT MITIGATION.CHEROKEE
CLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
14-37 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5714 1420 20SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 14.
HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
IN PROGRESS - DIVISION PURCHASE ORDER CONTRACT (DPOC)
W-5214 6908 6908DIVISION 14 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.CHEROKEE
CLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
RURAL PROJECTSR-4751 9100 100SR 1152 (HUGHES BRANCH ROAD) IN
BRYSON CITY TO SR 1195 (US 19A). MODERNIZE ROADWAY.
6
REG
T 400R T 100U T C 8500
SWAIN
US 19
14-38 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
R-5803 19400 100END OF DIVIDED HIGHWAY IN CHEROKEE COUNTY TO BEGINNING OF DIVIDED HIGHWAY IN ALMOND. CONSTRUCT 5 FEET WIDE PAVED SHOULDERS FOR ENTIRE LENGTH, CONSTRUCT TRUCK CLIMBING LANES NEAR MILEMARKER 48, AND CONSTRUCT AUXILIARY LANES AT THE CHEROKEE/MACON COUNTY LINE.
20.9
REG
NHP 100R NHP 100U NHP C 19100
CHEROKEEMACONSWAIN
US 74
R-5839 25000 100NC 143 TO US 129. UPGRADE ROADWAY. 20.6
DIV
T R 100 T U 100 T 6175C6175C6175C C 6175
GRAHAMSWAIN
NC 28 (FONTANAROAD)
R-5845 6200 100US 74 TO SR 1137 (DEEP GAP ROAD). UPGRADE ROADWAY.
4.1
DIV
T R 100 T U 100 T C 5900
SWAIN
SR 1140 (ALARKAROAD)
R-5843 674 100SR 1323 (SLOPE STREET) TO SR 1336 (DEEP CREEK ROAD). IMPROVE INTERSECTIONS.
0.7
DIV
T R 100 T U 4 T C 470
SWAIN
SR 1321 (BRYSONWALK), SR 1336(DEPOT STREET)
PROGRAM IN PROGRESS
R-5500 INDIAN RESERVATION ROAD (IRR) PROGRAM. ROAD AND BRIDGE IMPROVEMENTS TO BE CONSTRUCTED BY EASTERN BAND OF CHEROKEE INDIANS.
EXJACKSONSWAIN
VARIOUS
14-39 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
UNDER CONSTRUCTION
R-5794 711 711DIVISION 14 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVCHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
A-0009 864153 83928CORRIDOR "K", US 19/US 74/US 129 AT ANDREWS TO NC 28 EAST OF ALMOND. FOUR LANE DIVIDED FACILITY, PRIMARILY ON NEW LOCATION.
27.1 APD 14300R A APD 925U A APD 366000C A APD 14900R B APD 2300U B APD 78000C B APD R 14500 C APD G 21075 CA G 21075 CA G 21075 CA G 21075 CAAPD C 46500 CB C 46500 CB C 46500 CB C 46500 CBAPD 19000P CC
A US 19 BUSINESS IN ANDREWS TO US 129B US 129 TO NC 143 AT SR 1223 (BEECH CREEK) - DESIGN-BUILD CONTRACTC NC 143 AT SR 1223 (BEECH CREEK) TO NC 28 AT STECOAH - RIGHT OF WAY ONLY - DESIGN-BUILD CONTRACTREGCA NC 143 AT SR 1223 (BEECH CREEK) TO NC 28 AT STECOAH. GRADING AND STRUCTURES ( EXCEPT TUNNELS). - DESIGN-BUILD CONTRACTEXCB TUNNELS AT APPALACHIAN TRAIL - DESIGN-BUILD CONTRACTEXCC NC 143 AT SR 1223 (BEECH CREEK) TO NC 28 AT STECOAH. PAVING. - DESIGN-BUILD CONTRACTDA SR 1121 (WATTIA ROAD) AT ALMONDS TO EXISTING US 19/NC 28 - COMPLETEDB EAST OF CALFPEN GAP IN GRAHAM COUNTY TO SR 1121 (WATTIA ROAD) AT ALMONDS IN SWAIN COUNTY - COMPLETEDC WEST OF SR 1231 (TOBACCO BRANCH ROAD) TO CALFPEN GAP - COMPLETEDD NC 28 AT STECOAH TO WEST OF SR 1231 (TOBACCO BRANCH ROAD) - COMPLETE
CHEROKEEGRAHAMSWAIN
FUTURE US 74
14-40 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BRIDGE PROJECTS
UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5114 16377 16377DIVISION 14 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVCHEROKEE
CLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4914 26175 26175ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 14 PROJECT MITIGATION.CHEROKEE
CLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
14-41 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5714 1420 20SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 14.
HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
IN PROGRESS - DIVISION PURCHASE ORDER CONTRACT (DPOC)
W-5214 6908 6908DIVISION 14 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.CHEROKEE
CLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
14-42 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)CONGESTION MITIGATION PROJECTS
C-5612 124PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE LAND OF SKY RPO AND SOUTHWESTERN RPO.
EX
CMAQ PE 5 PE 5 L PE 1 PE 1 CMAQ R 5 R 5 L R 1 R 1 CMAQ C 30 C 30 L C 8 C 8 CMAQ O 5 O 5 L O 1 O 1 CMAQ I 5 I 5 L I 1 I 1
HAYWOODSWAIN
VARIOUS
C-5203 241BIG COVE MIXED USE PATH, CHEROKEE CENTRAL SCHOOL NORTHWARD ON BOTH SIDES OF THE OCONALUFTEE RIVER TO THE EXISTING BIG COVE ROAD MIXED USE TRAIL. CONSTRUCT PEDESTRIAN AND BIKE PATH, PHASES 3 AND 4.
EX
CMAQ PE 39 L PE 10 CMAQ R 77 L R 19 CMAQ C 77 L C 19
SWAIN
EASTERN BANDOF CHEROKEEINDIANS (EBCI)
C-5151 242GREAT SMOKIES NATIONAL PARK. CONSTRUCT A MIXED-USE PATHWAY.
EX
CMAQ C 177 L C 65
HAYWOODSWAIN
EASTERN BANDOF CHEROKEEINDIANS (EBCI)
IN PROGRESS
C-5202 270 270TRANSPORTATION CHOICES. INCREASE EDUCATION EFFORTS THAT INFORM VISITORS ABOUT THE ROLE THEIR TRANSPORTATION CHOICES HAVE IN RELATION TO AIR POLLUTION ISSUES IN GSMNP.EXHAYWOOD
SWAIN
GREAT SMOKYMOUNTAINSNATIONAL PARK(GSMNP)
14-43 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
DIVISION PROJECT - PLANNING/DESIGN IN PROGRESS
R-2409 32607 26607NC 107 AT CASHIERS TO US 178 AT ROSMAN. SAFETY IMPROVEMENTS AND CLIMBING LANES AT SELECTED LOCATIONS.
STBG 1000R D STBG 5000C D
A CASHIERS TO JACKSON-TRANSYLVANIA COUNTY LINE - COMPLETEB 1.1 MILES EAST OF CASHIERS TO 1.6 MILES EAST OF CASHIERS - COMPLETEC WEST OF NC 281 N NEAR LAKE TOXAWAY TO INDIAN CREEK. WIDENING AND REALIGNMENT. - UNDER CONSTRUCTIONTRND INDIAN CREEK TO FLAT CREEK VALLEY ROAD. WIDENING AND REALIGNMENT
JACKSONTRANSYLVANIA
US 64
R-5799 1850 250US 64, US 276, NC 280 AND US 64. CONSTRUCT INTERSECTION IMPROVEMENTS.
REG
T 250R T 100U T 1250C
TRANSYLVANIA
US 64, US 276, NC 280
R-5800 16450 250FORTUNE COVE ROAD TO US 64 BUSINESS (NORTH CALDWELL STREET). CONSTRUCT MEDIAN AND ACCESS CONTROL MEASURES.
1.5
REG
T 2500R2500R T 300U300U T C 10600
TRANSYLVANIA
US 64, US 276
STATE MATCHING FUNDS FROM DIVISION 14 MAINTENANCE FUNDING
R-5865 3400US 64 TO AVERY CREEK TRAIL HEAD. WIDEN TO 3-LANES WITH BICYCLE LANES.
EX
FLAP PE 200 S(M) PE 50 FLAP C 2520 S(M) C 630
TRANSYLVANIA
US 276
R-5763 10980 1210SR 1504 (OLD US 64) TO US 276. UPGRADE ROADWAY.
3.7
DIV
T R 270 T U 100 T 4700C4700C
TRANSYLVANIA
SR 1540 (WILSONROAD)
14-44 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
UNDER CONSTRUCTION
R-5794 711 711DIVISION 14 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIVCHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
UNDER CONSTRUCTION
R-5605 10965 10965US 64 TO US 276/US 64 IN PISGAH FOREST. 0.8
DIVTRANSYLVANIA
DAVIDSON RIVERVILLAGECONNECTOR
URBAN PROJECTS
UNDER CONSTRUCTION
U-5104 7329 7329SR 1348 (PROBART STREET) TO US 64 IN BREVARD. WIDEN ROADWAY.
0.6
TRNTRANSYLVANIA
US 64 BUSINESS(CALDWELL STREET)
U-5616 2500FRENCH BROAD RIVER METROPOLITAN PLANNING ORGANIZATION PLANNING (PL) SUPPLEMENT.DIV
STBGDA PE 200 PE 200 PE 200 200PE200PE200PE PE 200 PE 200 PE 200 PE 200L PE 50 PE 50 PE 50 50PE50PE50PE PE 50 PE 50 PE 50 PE 50
BUNCOMBEHAYWOODHENDERSONMADISONTRANSYLVANIA
VARIOUS
BRIDGE PROJECTS
UNDER CONSTRUCTION AS DESIGN-BUILD PROJECT - FEDERAL LANDS ACCESS PROGRAM (FLAP) PROJECT
B-5555 895 895REPLACE BRIDGE 870046 OVER NORTH FORK FRENCH BROAD RIVER. FEDERAL AID NUMBER: NC FLAP DOT 215(2).EXTRANSYLVANIA
NC 215
14-45 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BRIDGE PROJECTS
UNDER CONSTRUCTION AS DESIGN-BUILD PROJECT - FEDERAL LANDS ACCESS PROGRAM (FLAP) PROJECT
B-5554 746 746REPLACE BRIDGE 870073 OVER NORTH FORK FRENCH BROAD RIVER. FEDERAL AID NUMBER: NC FLAP DOT 215(1).EXTRANSYLVANIA
NC 215
UNDER CONSTRUCTION
B-4288 1470 1470REPLACE BRIDGE 870085 OVER EAST FORK FRENCH BROAD RIVER.
DIVTRANSYLVANIA
SR 1107(EAST FORK ROAD)
UNDER CONSTRUCTION
B-4822 1312 1312REPLACE BRIDGE 870013 OVER NICHOLSON CREEK.
DIVTRANSYLVANIA
SR 1119(SUGAR LOAF ROAD)
B-5915 370 100REPLACE BRIDGE 870029 OVER NORTH FORK FLAT CREEK.
DIV
STPOFF 10R STPOFF 260C
TRANSYLVANIA
SR 1318(OLD QUEBECROAD)
UNDER CONSTRUCTION
B-4289 1656 1656REPLACE BRIDGE 870093 OVER NORTH FORK FRENCH BROAD RIVER.
DIVTRANSYLVANIA
SR 1324(TENNESSEE GAP ROAD)
UNDER CONSTRUCTION
B-5403 1233 1233REPLACE BRIDGE 870196 OVER CRAB CREEK.
DIVTRANSYLVANIA
SR 1532(ISLAND COVE ROAD)
RIGHT OF WAY IN PROGRESS
B-4823 1045 620REPLACE BRIDGE 870012 OVER HOGSED CREEK.
DIV
STPOFF C 425
TRANSYLVANIA
SR 1538(SEA OFF MOUNTAINROAD)
14-46 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BRIDGE PROJECTS
UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5114 16377 16377DIVISION 14 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.DIVCHEROKEE
CLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
PLANNING/DESIGN BY CITY OF BREVARD
B-5550 1124 224REPLACE BRIDGE 870102 ON RAILROAD AVENUE OVER KINGS CREEK. .
DIV
STPON R 120 L R 30 STPON C 600 L C 150
TRANSYLVANIA
BREVARD
MITIGATION PROJECTS
IN PROGRESS
EE-4914 26175 26175ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 14 PROJECT MITIGATION.CHEROKEE
CLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
14-47 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5714 1420 20SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 14.
HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
CHEROKEECLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
IN PROGRESS - DIVISION PURCHASE ORDER CONTRACT (DPOC)
W-5214 6908 6908DIVISION 14 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.CHEROKEE
CLAYGRAHAMHAYWOODHENDERSONJACKSONMACONPOLKSWAINTRANSYLVANIA
VARIOUS
CONGESTION MITIGATION PROJECTS
IN PROGRESS
C-5564 167 167LAND OF SKY RPO TO WORK WITH REGIONAL CLEAN AIR CAMPAIGN AND CLEAN VEHICLE COALITION TO IMPLEMENT AN EDUCATIONAL AND OUTREACH PROGRAM IN COMMUNITIES ADJACENT TO GREAT SMOKY MOUNTAINS NATIONAL PARK.
EXBUNCOMBEHAYWOODMADISONTRANSYLVANIA
VARIOUS
14-48 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TA-6178 364 364CAPITAL
HF
FNU L S
CHEROKEE
CHEROKEE COUNTY
FUNDS AUTHORIZED IN PROGRESS
TK-6118 2505 1437ADMINISTRATION
HF
FNU AD 142 AD 142 AD 142 142AD142AD142AD L AD 27 AD 27 AD 27 27AD27AD27AD S AD 9 AD 9 AD 9 9AD9AD9AD
CHEROKEE
CHEROKEE COUNTY
TM-6145 28 28OPERATING
HF
JARC L
CHEROKEE
CHEROKEE COUNTY
TQ-6807 138 138OPERATING
HF
FEPD L
CHEROKEE
CHEROKEE COUNTY
FUNDS AUTHORIZED IN PROGRESS
TQ-6931 150 150OPERATING
HF
FEPD L
CHEROKEE
CHEROKEE COUNTY
TA-6529 71 71CAPITAL
HF
FEPD
CHEROKEE
EASTERN BAND OF CHEROKE INDIANS
FUNDS AUTHORIZED IN PROGRESS
TA-6163 442 442CAPITAL
HF
FNU L S
CHEROKEEGRAHAMJACKSONSWAIN
EASTERN BAND OF CHEROKE INDIANS
14-49 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TK-6127 1646 950ADMINISTRATION
HF
FNU AD 93 AD 93 AD 93 93AD93AD93AD L AD 6 AD 6 AD 6 6AD6AD6AD S AD 17 AD 17 AD 17 17AD17AD17AD
CHEROKEEGRAHAMJACKSONSWAIN
EASTERN BAND OF CHEROKE INDIANS
TM-6153 110 110OPERATING
HF
JARC L
CHEROKEE
EASTERN BAND OF CHEROKE INDIANS
TM-6135 190 190OPERATING ASSISTANCE
HF
JARC L
CHEROKEE
EASTERN BAND OF CHEROKE INDIANS
TN-6118 131 131MOBILITY MANAGEMENT
HF
FNF L S
CHEROKEE
EASTERN BAND OF CHEROKE INDIANS
TQ-6805 222 222OPERATING
HF
FEPD L
CHEROKEE
EASTERN BAND OF CHEROKE INDIANS
TQ-8005 52 52CAPITAL - MOBILITY MANAGEMENT
HF
FNF L
CHEROKEE
EASTERN BAND OF CHEROKE INDIANS
FUNDS AUTHORIZED IN PROGRESS
TQ-6933 200 200OPERATING
HF
FUZ L
CHEROKEE
EASTERN BAND OF CHEROKE INDIANS
FUNDS AUTHORIZED IN PROGRESS
TQ-8014 76 76CAPITAL - MOBILITY MANAGEMENT
HF
FEPD L S
CHEROKEE
EASTERN BAND OF CHEROKE INDIANS
14-50 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TA-6162 1845 1845CAPITAL
HF
FNU L S
CLAY
CLAY COUNTY
FUNDS AUTHORIZED IN PROGRESS
TC-5014 122 122OPERATING
HF
ADTAP L
CLAY
CLAY COUNTY
FUNDS AUTHORIZED IN PROGRESS
TK-6120 2497 1441ADMINISTRATION
HF
FNU AD 141 AD 141 AD 141 141AD141AD141AD L AD 26 AD 26 AD 26 26AD26AD26AD S AD 9 AD 9 AD 9 9AD9AD9AD
CLAY
CLAY COUNTY
TQ-6178 72 72MOBILITY MANAGEMENT
HF
FEPD L S
CLAY
CLAY COUNTY
FUNDS AUTHORIZED IN PROGRESS
TQ-6932 48 48OPERATING
HF
FEPD L
CLAY
CLAY COUNTY
PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TA-6163 442 442CAPITAL
HF
FNU L S
CHEROKEEGRAHAMJACKSONSWAIN
EASTERN BAND OF CHEROKE INDIANS
14-51 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TK-6127 1646 950ADMINISTRATION
HF
FNU AD 93 AD 93 AD 93 93AD93AD93AD L AD 6 AD 6 AD 6 6AD6AD6AD S AD 17 AD 17 AD 17 17AD17AD17AD
CHEROKEEGRAHAMJACKSONSWAIN
EASTERN BAND OF CHEROKE INDIANS
FUNDS AUTHORIZED IN PROGRESS
TA-6125 229 229CAPITAL
HF
FNU L S
GRAHAM
GRAHAM COUNTY
FUNDS AUTHORIZED IN PROGRESS
TK-6130 1097 1097ADMINISTRATION
HF
FNU L S
GRAHAM
GRAHAM COUNTY
FUNDS AUTHORIZED IN PROGRESS
TQ-6944 62 62OPERATING
HF
FEPD L
GRAHAM
GRAHAM COUNTY
TQ-8001 42 42CAPITAL - MOBILITY MANAGEMENT
HF
FEPD L S
GRAHAM
GRAHAM COUNTY
TQ-6801 202 202OPERATINGHF
FEPD
GRAHAMGRAHAM COUNTY
FUNDS AUTHORIZED IN PROGRESS
TQ-8015 42 42CAPITAL - MOBILITY MANAGEMENT
HF
FEPD L S
GRAHAM
GRAHAM COUNTY
14-52 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BICYCLE AND PEDESTRIAN PROJECTS
EB-5926 1975US 276 TO FIE TOP ROAD. CONSTRUCT BICYCLE AND PEDESTRIAN IMPROVEMENTS.
DIV
STBGDA PE 140 L PE 35 STBGDA C 1440 L C 360
HAYWOOD
US 19 (SOCOROAD)
U-5535 4125FRENCH BROAD RIVER MPO TRANSPORTATION ALTERNATIVES (TA) PROGRAM.DIV
TAPDA C 686 C 290 C 290 290C290C290C C 290 C 290 C 290 C 290L C 172 C 73 C 73 73C73C73C C 73 C 73 C 73 C 73
BUNCOMBEHAYWOODHENDERSONMADISONTRANSYLVANIA
VARIOUS
EB-5757 270 40US 23 BUSINESS (SOUTH MAIN STREET) TO BELLE MEADE DRIVE. REDUCE ROADWAY LANES TO THREE AND CONSTRUCT BIKE LANES.
0.3
DIV
STBGDA C 184 L C 46
HAYWOOD
BROWN AVENUE
EB-5859 125HAZELWOOD AVENUE (PLOTT CREEK ROAD), RICHLAND CREEK BRIDGE TO WILL HYATT ROAD. CONSTRUCT PEDESTRIAN IMPROVEMENTS.
DIV
TAP 20PE L 5PE TAP 20R L 5R TAP 60C L 15C
HAYWOOD
HAZELWOOD AVENUE(PLOTT CREEK ROAD)
PUBLIC TRANSPORTATION PROJECTSTM-5320 534 534FY 2011 FTA SECTION 5316 JARC
(STATEWIDE ALLOCATION) OPERATING ASSISTANCE FOR JARC PROJECTS IN ASHEVILLE URBANIZED AREA INCLUDING MOUNTAIN MOBILITY (BUNCOMBE), MOUNTAIN PROJECTS (HAYWOOD AND ASHEVILLE TRANSIT)
HF
JARC L
BUNCOMBEHAYWOOD
ASHEVILLE REDEFINES TRANSIT
TA-6531 41 41CAPITAL
HF
FEPD L S
HAYWOOD
MOUNTAIN PROJECTS, INC.
14-53 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
TA-6132 728 728CAPITAL
HF
FNU
HAYWOOD
MOUNTAIN PROJECTS, INC.
FUNDS AUTHORIZED IN PROGRESS
TK-6149 3264 1866ADMINISTRATION
HF
FNU O 186 O 186 O 186 186O186O186O FNU L O 35 O 35 O 35 35O35O35O S O 12 O 12 O 12 12O12O12O
HAYWOOD
MOUNTAIN PROJECTS, INC.
TM-5314 80 805316 OPERATING FOR EMPLOYMENT TRIPS TO BUNCOMBE COUNTY
HF
JARC L
HAYWOOD
MOUNTAIN PROJECTS, INC.
FUNDS AUTHORIZED IN PROGRESS
TQ-8017 58 58CAPITAL - MOBILITY MANAGEMENT
HF
FEPD L S
HAYWOOD
MOUNTAIN PROJECTS, INC.
TQ-6183 127 127MOBILITY MANAGEMENT
HF
FEPD L S
HAYWOOD
MOUNTAIN PROJECTS, INC.
TQ-6182 270 270OPERATING ASSISTANCE
HF
FEPD L
HAYWOOD
MOUNTAIN PROJECTS, INC.
FUNDS AUTHORIZED IN PROGRESS
TQ-6947 114 114OPERATING
HF
FEPD L
HAYWOOD
MOUNTAIN PROJECTS, INC.
14-54 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BICYCLE AND PEDESTRIAN PROJECTS
U-5535 4125FRENCH BROAD RIVER MPO TRANSPORTATION ALTERNATIVES (TA) PROGRAM.DIV
TAPDA C 686 C 290 C 290 290C290C290C C 290 C 290 C 290 C 290L C 172 C 73 C 73 73C73C73C C 73 C 73 C 73 C 73
BUNCOMBEHAYWOODHENDERSONMADISONTRANSYLVANIA
VARIOUS
EB-5860 960BLYTHE STREET, US 64 (BREVARD ROAD) TO NC 191 (HAYWOOD ROAD). CONSTRUCT SIDEWALKS.
DIV
TAP 96PE L 24PE TAP 192R L 48R TAP 480C L 120C
HENDERSON
BLYTHE STREET
UNDER CONSTRUCTION
EB-5537 1300 1300OKLAWAHA GREENWAY, PATTON PARK TO BALFOUR ROAD/BERKLEY MILLS IN HENDERSONVILLE. CONSTRUCT GREENWAY.
TRNHENDERSONHENDERSONVILLE
PUBLIC TRANSPORTATION PROJECTSTA-5217 56PURCHASE REPLACEMENT PARATRANSIT
VEHICLEHF
FUZ CP 35 L CP 21
HENDERSON
APPLE COUNTRY TRANSIT
TA-5229 180REPLACEMENT TRANSIT VEHICLE ACQUISITION
HF
FUZ CP 48 CP 48 CP 48 L CP 12 CP 12 CP 12
HENDERSON
APPLE COUNTRY TRANSIT
TA-6533 93 93CAPITAL
HF
FEPD L S
HENDERSON
APPLE COUNTRY TRANSIT
TA-6558 106 106CAPITAL
HF
FNU L S
HENDERSON
APPLE COUNTRY TRANSIT
14-55 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
TG-6181 2277TRANSIT ROUTINE CAPITAL
HF
FUZ CP 234 CP 243 CP 252 L CP 336 CP 357 CP 160 SMAP CP 160 CP 160 CP 375
HENDERSON
APPLE COUNTRY TRANSIT
TQ-6185 282 282OPERATING ASSISTANCE
HF
FEPD
HENDERSON
APPLE COUNTRY TRANSIT
FUNDS AUTHORIZED IN PROGRESS
TQ-6950 70 70OPERATING
HF
FEPD L
HENDERSON
APPLE COUNTRY TRANSIT
FUNDS AUTHORIZED IN PROGRESS
TG-4951 6428 3545ROUTINE CAPITAL - COST OF CONTRACTING
HF
FUZ O 175 O 175 O 175 175O175O175O L O 130 O 130 O 130 130O130O130O SMAP O 176 O 176 O 176 175O175O175O
HENDERSON
APPLE COUNTRY TRANSIT, W. CAROLINA COMMUNITY
FUNDS AUTHORIZED IN PROGRESS
TG-6143 514 280ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETC
HF
FNU FUZ CP 31 CP 31 CP 31 31CP31CP31CP L CP 8 CP 8 CP 8 8CP8CP8CP
HENDERSON
APPLE COUNTRY TRANSIT, W. CAROLINA COMMUNITY
FUNDS AUTHORIZED IN PROGRESS
TK-5176 2140 1330ADMINISTRATION
HF
FNU O 108 O 135 O 135 135O135O135O FNU L O 20 S O 7
HENDERSON
APPLE COUNTRY TRANSIT, W. CAROLINA COMMUNITY
FUNDS AUTHORIZED IN PROGRESS
TO-6106 672 336OPERATING ASSISTANCE
HF
FNU O 28 O 28 O 28 28O28O28O L O 28 O 28 O 28 28O28O28O
HENDERSON
APPLE COUNTRY TRANSIT, W. CAROLINA COMMUNITY
14-56 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TS-5101 50 33SAFETY & SECURITY - MIN. 1% SET ASIDE
HF
FUZ CP 2 CP 2 CP 2 1CP1CP1CP L CP 1 CP 1 2CP2CP2CP
HENDERSON
APPLE COUNTRY TRANSIT, W. CAROLINA COMMUNITY
TD-5265 321 321CITY OF HENDERSONVILLE - - US 64 PEDESTRIAN ACCESS TO BUS STOPS IMPROVEMENTS (SIDEWALKS AND CROSSWALKS) FOR FY 2013-2016
HF
FNF
HENDERSON
ASHEVILLE REDEFINES TRANSIT
BICYCLE AND PEDESTRIAN PROJECTSEB-5923 425SR 1429 (CHIPPER CURVE ROAD) TO US 23
BUSINESS. CONSTRUCT SIDEWALK.
DIV
TAP PE 40 L PE 10 TAP R 29 L R 7 TAP 271C L 68C
JACKSON
SR 1432 (SKYLANDDRIVE)
PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TA-6163 442 442CAPITAL
HF
FNU L S
CHEROKEEGRAHAMJACKSONSWAIN
EASTERN BAND OF CHEROKE INDIANS
FUNDS AUTHORIZED IN PROGRESS
TK-6127 1646 950ADMINISTRATION
HF
FNU AD 93 AD 93 AD 93 93AD93AD93AD L AD 6 AD 6 AD 6 6AD6AD6AD S AD 17 AD 17 AD 17 17AD17AD17AD
CHEROKEEGRAHAMJACKSONSWAIN
EASTERN BAND OF CHEROKE INDIANS
14-57 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
TA-6266 335 335CAPITALHF
FNU
JACKSONJACKSON COUNTY
FUNDS AUTHORIZED IN PROGRESS
TK-6137 2632 1504ADMINISTRATION
HF
FNU AD 151 AD 151 AD 151 151AD151AD151AD L AD 28 AD 28 AD 28 28AD28AD28AD S AD 9 AD 9 AD 9 9AD9AD9AD
JACKSON
JACKSON COUNTY
FUNDS AUTHORIZED IN PROGRESS
TQ-6945 200 200OPERATING
HF
FEPD L
JACKSON
JACKSON COUNTY
TQ-7180 77 77MOBILITY MANAGEMENT
HF
FEPD L S
JACKSON
JACKSON COUNTY
TQ-6179 276 276OPERATING ASSISTANCE
HF
FEPD L
JACKSON
JACKSON COUNTY
FUNDS AUTHORIZED IN PROGRESS
TQ-8016 48 48CAPITAL - MOBILITY MANAGEMENT
HF
FEPD L S
JACKSON
JACKSON COUNTY
TA-6192 457 457REPLACEMENT VAN
HF
FNU
JACKSON
TRANSPORTATION ADMIN. OF CLEVELAND COUNTY
AVIATION PROJECTSAV-5850 5000EXTEND RUNWAY.
DIV
T 149R L 17R T 4351C L 483C
MACON
MACON COUNTYAIRPORT
14-58 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BICYCLE AND PEDESTRIAN PROJECTS
EB-5756 318US 441 BUSINESS (EAST MAIN STREET) TO SR 1667 (WAYAH STREET). CONSTRUCT MISSING SECTIONS OF SIDEWALK ALONG WEST SIDE AND CONSTRUCT NEW SIDEWALK ALONG EAST SIDE.
0.6
DIV
TAP 14PE L 4PE TAP 19R L 5R TAP 221C L 55C
MACON
SR 1729(DEPOT STREET)
PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TA-6103 234 234CAPITAL
HF
FNU L S
MACON
MACON COUNTY
TA-6198 39 39CAPITALHF
FNU
MACONMACON COUNTY
TA-6530 7 7CAPITAL
HF
FEPD L S
MACON
MACON COUNTY
FUNDS AUTHORIZED IN PROGRESS
TC-5012 38 38OPERATING
HF
ADTAP L
MACON
MACON COUNTY
FUNDS AUTHORIZED IN PROGRESS
TC-5013 275 275CAPITAL
HF
ADTAP L
MACON
MACON COUNTY
FUNDS AUTHORIZED IN PROGRESS
TK-6142 2813 1667ADMINISTRATION
HF
FNU AD 152 AD 152 AD 152 152AD152AD152AD L AD 29 AD 29 AD 29 29AD29AD29AD S AD 10 AD 10 AD 10 10AD10AD10AD
MACON
MACON COUNTY
14-59 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TN-6123 80 80SECTION 5317 OPERATING
HF
FNF L
MACON
MACON COUNTY
FUNDS AUTHORIZED IN PROGRESS
TQ-8006 18 18MACON COUNTY 5317 CAPITAL
HF
FNF L S
MACON
MACON COUNTY
FUNDS AUTHORIZED IN PROGRESS
TQ-6946 154 154OPERATING
HF
FEPD L
MACON
MACON COUNTY
TQ-6781 356 356OPERATING ASSISTANCE
HF
FEPD L
MACON
MACON COUNTY
BICYCLE AND PEDESTRIAN PROJECTSEB-5759 230 5WALKER ROAD TO WHEELER ROAD.
CONSTRUCT SIDEWALK.0.4
DIV
TAP R 60 L R 15 TAP C 120 L C 30
POLK
PENIEL ROAD
PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TA-6208 677 677CAPITAL
HF
FNU L S
POLK
POLK COUNTY TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TC-5005 25 25CAPITAL FUNDING TO SUPPORT A DEVIATED FIXED ROUTE
HF
ADTAP L
POLK
POLK COUNTY TRANSPORTATION
14-60 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TK-6155 2703 1599ADMINISTRATION
HF
FNU O 147 O 147 O 147 147O147O147O FNU L O 28 O 28 O 28 28O28O28O S O 9 O 9 O 9 9O9O9O
POLK
POLK COUNTY TRANSPORTATION
FUNDS AUTHORIZED IN PROGRESS
TQ-6948 164 164OPERATING
HF
FEPD L
POLK
POLK COUNTY TRANSPORTATION
BICYCLE AND PEDESTRIAN PROJECTS
FEASIBILITY STUDY IN PROGRESS
EB-5797 44 44SR 1336 TO GREAT SMOKY MOUNTAINS NATIONAL PARK BOUNDARY. CONSTRUCT IMPROVEMENTS TO ACCOMMODATE BICYCLES AND PEDESTRIANS.EXSWAIN
SR 1337 (WESTDEEP CREEK ROAD)
PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TA-6163 442 442CAPITAL
HF
FNU L S
CHEROKEEGRAHAMJACKSONSWAIN
EASTERN BAND OF CHEROKE INDIANS
FUNDS AUTHORIZED IN PROGRESS
TK-6127 1646 950ADMINISTRATION
HF
FNU AD 93 AD 93 AD 93 93AD93AD93AD L AD 6 AD 6 AD 6 6AD6AD6AD S AD 17 AD 17 AD 17 17AD17AD17AD
CHEROKEEGRAHAMJACKSONSWAIN
EASTERN BAND OF CHEROKE INDIANS
14-61 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
TA-6557 2400 2400CAPITAL
HF
FNU L S
SWAIN
SWAIN COUNTY FOCAL POINT ON AGING, INC.
FUNDS AUTHORIZED IN PROGRESS
TA-6545 2429 2429CAPITAL
HF
FNU L S
SWAIN
SWAIN COUNTY FOCAL POINT ON AGING, INC.
TA-6532 5 5CAPITAL
HF
FEPD L S
SWAIN
SWAIN COUNTY FOCAL POINT ON AGING, INC.
FUNDS AUTHORIZED IN PROGRESS
TK-6165 1892 1130ADMINISTRATION
HF
FNU AD 102 AD 127 AD 127 127AD127AD127AD L AD 19 S AD 6
SWAIN
SWAIN COUNTY FOCAL POINT ON AGING, INC.
TQ-6184 59 59MOBILITY MANAGEMENT
HF
FEPD L S
SWAIN
SWAIN COUNTY FOCAL POINT ON AGING, INC.
TQ-6804 60 60OPERATING
HF
FEPD L
SWAIN
SWAIN COUNTY FOCAL POINT ON AGING, INC.
FUNDS AUTHORIZED IN PROGRESS
TQ-6949 68 68OPERATING
HF
FEPD L
SWAIN
SWAIN COUNTY FOCAL POINT ON AGING, INC.
14-62 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 14
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TQ-8018 33 33CAPITAL - MOBILITY MANAGEMENT
HF
FEPD L S
SWAIN
SWAIN COUNTY FOCAL POINT ON AGING, INC.
BICYCLE AND PEDESTRIAN PROJECTSU-5535 4125FRENCH BROAD RIVER MPO
TRANSPORTATION ALTERNATIVES (TA) PROGRAM.DIV
TAPDA C 686 C 290 C 290 290C290C290C C 290 C 290 C 290 C 290L C 172 C 73 C 73 73C73C73C C 73 C 73 C 73 C 73
BUNCOMBEHAYWOODHENDERSONMADISONTRANSYLVANIA
VARIOUS
EB-5858 400CONSTRUCT BIKE/PEDESTRIAN BRIDGE FROM CITY OF BREVARD EXISTING SHARED USE PATH ACROSS DAVIDSON RIVER.
DIV
TAP 80PE L 20PE TAP 240C L 60C
TRANSYLVANIA
BREVARD
PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TQ-6929 90 90OPERATING
HF
FEPD L
MADISONTRANSYLVANIA
LAND OF SKY REGIONAL COUNCIL OF GOVERNMENTS
TA-6272 118 118CAPITAL
HF
FNU L S
TRANSYLVANIA
TRANSYLVANIA COUNTY
FUNDS AUTHORIZED IN PROGRESS
TK-6167 2341 1375ADMINISTRATION
HF
FNU O 143 O 161 O 161 161O161O161O FNU L O 9 S O 9
TRANSYLVANIA
TRANSYLVANIA COUNTY
14-63 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMSTATEWIDE
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)INTERSTATE PROJECTS
I-9999 306960INTERSTATE MAINTENANCE BALANCE.SW
NHPIM C 5000 C 5000 C 5000 5000C5000C5000C C 5000 C 75460 C 96500 C 100000
STATEWIDEVARIOUS
RURAL PROJECTSM-0479 7130 2130STATEWIDE PROJECT DEVELOPMENT AND
ENVIRONMENTAL ANALYSIS, PRELIMINARY ENGINEERING FOR MISCELLANEOUS PROJECTS.
T PE 150 DIV PE 150 DIV PE 150 DIV 150PE DIV150PE DIV150PE DIV PE 150 DIV PE 150 DIV PE 150 DIV PE 150 DIVT PE 150 RE PE 150 RE PE 150 RE 150PE RE150PE RE150PE RE PE 150 RE PE 150 RE PE 150 RE PE 150 RET PE 200 SW PE 200 SW PE 200 SW 200PE SW200PE SW200PE SW PE 200 SW PE 200 SW PE 200 SW PE 200 SW
DIV STATEWIDE PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS, PRELIMINARY ENGINEERING FOR MISCELLANEOUS PROJECTS.DIVREG STATEWIDE PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS, PRELIMINARY ENGINEERING FOR MISCELLANEOUS PROJECTS.REGSW STATEWIDE PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS, PRELIMINARY ENGINEERING FOR MISCELLANEOUS PROJECTS.SW
STATEWIDE
VARIOUS
M-0515 2750 250RIGHT-OF-WAY BRANCH, REVIEW OF LOCAL PUBLIC AGENCY (LPA) PROJECTS BY THE APPRAISAL SECTION.DIV
T R 250 R 250 R 250 250R250R250R R 250 R 250 R 250 R 250
STATEWIDEVARIOUS
IN PROGRESS
M-0392 4280 2680HYDRAULICS, PRELIMINARY ENGINEERING FOR MISCELLANEOUS PROJECTS.
T PE 48 DIV PE 48 DIV PE 48 DIV 48PE DIV48PE DIV48PE DIV PE 48 DIV PE 48 DIV PE 48 DIV PE 48 DIVT PE 48 RE PE 48 RE PE 48 RE 48PE RE48PE RE48PE RE PE 48 RE PE 48 RE PE 48 RE PE 48 RET PE 64 SW PE 64 SW PE 64 SW 64PE SW64PE SW64PE SW PE 64 SW PE 64 SW PE 64 SW PE 64 SW
DIV HYDRAULICS, PRELIMINARY ENGINEERING FOR MISCELLANEOUS PROJECTS.DIVREG HYDRAULICS, PRELIMINARY ENGINEERING FOR MISCELLANEOUS PROJECTS.REGSW HYDRAULICS, PRELIMINARY ENGINEERING FOR MISCELLANEOUS PROJECTS.SW
STATEWIDE
VARIOUS
IN PROGRESS
M-0391 8076 4076STRUCTURE DESIGN, PRELIMINARY ENGINEERING FOR MISCELLANEOUS PROJECTS.
T PE 120 DIV PE 120 DIV PE 120 DIV 120PE DIV120PE DIV120PE DIV PE 120 DIV PE 120 DIV PE 120 DIV PE 120 DIVT PE 120 RE PE 120 RE PE 120 RE 120PE RE120PE RE120PE RE PE 120 RE PE 120 RE PE 120 RE PE 120 RET PE 160 SW PE 160 SW PE 160 SW 160PE SW160PE SW160PE SW PE 160 SW PE 160 SW PE 160 SW PE 160 SW
DIV STRUCTURE DESIGN, PRELIMINARY ENGINEERING FOR MISCELLANEOUS PROJECTS.DIVREG STRUCTURE DESIGN, PRELIMINARY ENGINEERING FOR MISCELLANEOUS PROJECTS.REGSW STRUCTURE DESIGN, PRELIMINARY ENGINEERING FOR MISCELLANEOUS PROJECTS.SW
STATEWIDE
VARIOUS
IN PROGRESS
M-0376 21257 12167STATEWIDE GEOTECHNICAL STUDIES AND INVESTIGATIONS PROJECT TO COVER NON-PROJECT SPECIFIC WORK.
T PE 270 DIV PE 270 DIV PE 270 DIV 270PE DIV270PE DIV270PE DIV PE 270 DIV PE 270 DIV PE 270 DIV PE 360 DIVT PE 270 RE PE 270 RE PE 270 RE 270PE RE270PE RE270PE RE PE 270 RE PE 270 RE PE 270 RE PE 360 RET PE 360 SW PE 360 SW PE 360 SW 360PE SW360PE SW360PE SW PE 360 SW PE 360 SW PE 270 SW PE 360 SW
DIV STATEWIDE GEOTECHNICAL STUDIES AND INVESTIGATIONS PROJECT TO COVER NON-PROJECT SPECIFIC WORK.DIVREG STATEWIDE GEOTECHNICAL STUDIES AND INVESTIGATIONS PROJECT TO COVER NON-PROJECT SPECIFIC WORK.REGSW STATEWIDE GEOTECHNICAL STUDIES AND INVESTIGATIONS PROJECT TO COVER NON-PROJECT SPECIFIC WORK.SW
STATEWIDE
VARIOUS
S-3 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMSTATEWIDE
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
IN PROGRESS
M-0360 23328 13328DESIGN SERVICES, PRELIMINARY ENGINEERING FOR MISCELLANEOUS PROJECTS.
T PE 300 DIV PE 300 DIV PE 300 DIV 300PE DIV300PE DIV300PE DIV PE 300 DIV PE 300 DIV PE 300 DIV PE 300 DIVT PE 300 RE PE 300 RE PE 300 RE 300PE RE300PE RE300PE RE PE 300 RE PE 300 RE PE 300 RE PE 300 RET PE 400 SW PE 400 SW PE 400 SW 400PE SW400PE SW400PE SW PE 400 SW PE 400 SW PE 400 SW PE 400 SW
DIV DESIGN SERVICES, PRELIMINARY ENGINEERING FOR MISCELLANEOUS PROJECTS.DIVREG DESIGN SERVICES, PRELIMINARY ENGINEERING FOR MISCELLANEOUS PROJECTS.REGSW DESIGN SERVICES, PRELIMINARY ENGINEERING FOR MISCELLANEOUS PROJECTS.SW
STATEWIDE
VARIOUS
M-0219 4808 2308PHOTOGRAMMETRY, PRELIMINARY ENGINEERING FOR MISCELLANEOUS PROJECTS
SW
T PE 75 DIV PE 75 DIV PE 75 DIV 75PE DIV75PE DIV75PE DIV PE 75 DIV PE 75 DIV PE 75 DIV PE 75 DIVT PE 75 RE PE 75 RE PE 75 RE 75PE RE75PE RE75PE RE PE 75 RE PE 75 RE PE 75 RE PE 75 RET PE 100 SW PE 100 SW PE 100 SW 100PE SW100PE SW100PE SW PE 100 SW PE 100 SW PE 100 SW PE 100 SW
DIV PHOTOGRAMMETRY, PRELIMINARY ENGINEERING FOR MISCELLANEOUS PROJECTSDIVREG PHOTOGRAMMETRY, PRELIMINARY ENGINEERING FOR MISCELLANEOUS PROJECTSREGSW PHOTOGRAMMETRY, PRELIMINARY ENGINEERING FOR MISCELLANEOUS PROJECTSSW
STATEWIDE
VARIOUS
IN PROGRESS
M-0521 600 300TRANSPORTATION PLANNING BRANCH, TRAFFIC FORECASTING FOR MISCELLANEOUS PROJECTS.
T PE 100 DIV T PE 100 RE T PE 100 SW
DIV TRANSPORTATION PLANNING BRANCH, TRAFFIC FORECASTING FOR MISCELLANEOUS PROJECTS ON THE DIVISION TIER.DIVREG TRANSPORTATION PLANNING BRANCH, TRAFFIC FORECASTING FOR MISCELLANEOUS PROJECTS ON THE REGIONAL TIER.REGSW TRANSPORTATION PLANNING BRANCH, TRAFFIC FORECASTING FOR MISCELLANEOUS PROJECTS ON THE STATEWIDE TIER.SW
STATEWIDE
VARIOUS
PROGRAM IN PROGRESS
R-5753 FEDERAL LANDS TRANSPORTATION PROGRAM (FLTP). ROAD AND BRIDGE IMPROVEMENTS TO BE CONSTRUCTED ON TRANSPORTATION FACILITIES THAT ARE OWNED BY THE FEDERAL GOVERNMENT THAT PROVIDE ACCESS TO FEDERAL LANDS.
EXSTATEWIDEVARIOUS
IN PROGRESS
R-4049 158759 158759TRAFFIC OPERATIONS (INCIDENT MANAGEMENT, 511, SMARTLINK, TEC, TMC).STATEWIDE
VARIOUS
IN PROGRESS
R-4067 89398 89398POSITIVE GUIDANCE PROGRAM (PAVEMENT MARKINGS AND MARKERS, LED SIGNAL HEAD REPLACEMENT).STATEWIDE
VARIOUS
S-4 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMSTATEWIDE
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)RURAL PROJECTS
IN PROGRESS
R-4073 20305 20305ASPHALT MATERIALS TESTING LABORATORIES CORRECTIVE ACTION PLAN FOR GROUNDWATER CLEAN-UP AT 54 SITES.STATEWIDE
VARIOUS
IN PROGRESS
R-4436 67523 37523NPDES PERMIT, RETROFIT FOURTEEN SITES PER YEAR TO PROTECT WATER QUALITY.
STBG C 900 DIV C 900 DIV C 900 DIV 900C DIV900C DIV900C DIV C 900 DIV C 900 DIV C 900 DIV C 900 DIVSTBG C 900 RE C 900 RE C 900 RE 900C RE900C RE900C RE C 900 RE C 900 RE C 900 RE C 900 RESTBG C 1200 SW C 1200 SW C 1200 SW 1200C SW1200C SW1200C SW C 1200 SW C 1200 SW C 1200 SW C 1200 SW
DIV NPDES PERMIT, RETROFIT FOURTEEN SITES PER YEAR TO PROTECT WATER QUALITY - DIVISION CATEGORY. - IN PROGRESSDIVREG NPDES PERMIT, RETROFIT FOURTEEN SITES PER YEAR TO PROTECT WATER QUALITY - REGIONAL CATEGORY. - IN PROGRESSREGSW NPDES PERMIT, RETROFIT FOURTEEN SITES PER YEAR TO PROTECT WATER QUALITY - STATEWIDE CATEGORY. - IN PROGRESSSW
STATEWIDE
VARIOUS
IN PROGRESS
R-4701 265523 265523TRAFFIC SYSTEM OPERATIONS PROGRAM (SIGNAL MAINTENANCE).STATEWIDE
VARIOUS
IN PROGRESS
R-9999WM 82759 72759ENVIRONMENTAL MITIGATION AND MINIMIZATION.
NHP M 150 DIV M 150 DIV M 150 DIV 150M DIV150M DIV150M DIV M 150 DIV M 150 DIV M 150 DIV M 150 DIVNHP M 150 RE M 150 RE M 150 RE 150M RE150M RE150M RE M 150 RE M 150 RE M 150 RE M 150 RENHP M 200 SW M 200 SW M 200 SW 200M SW200M SW200M SW M 200 SW M 200 SW M 200 SW M 200 SWT M 150 DIV M 150 DIV M 150 DIV 150M DIV150M DIV150M DIV M 150 DIV M 150 DIV M 150 DIV M 150 DIVT M 150 RE M 150 RE M 150 RE 150M RE150M RE150M RE M 150 RE M 150 RE M 150 RE M 150 RET M 200 SW M 200 SW M 200 SW 200M SW200M SW200M SW M 200 SW M 200 SW M 200 SW M 200 SW
DIV ENVIRONMENTAL MITIGATION AND MINIMIZATION.DIVREG ENVIRONMENTAL MITIGATION AND MINIMIZATION.REGSW ENVIRONMENTAL MITIGATION AND MINIMIZATION.SW
STATEWIDE
VARIOUS
URBAN PROJECTSM-0505 3300 300TRANSPORTATION PROGRAM
MANAGEMENT UNIT (TPMU) OVERSIGHT FOR LOCALLY-ADMINISTERED PROJECTS INCLUDING PREPARATION OF AGREEMENTS AND FUNDING AUTHORIZATION REQUESTS.
DIV
T PE 300 PE 300 PE 300 300PE300PE300PE PE 300 PE 300 PE 300 PE 300
STATEWIDEVARIOUS
FEASIBILITY STUDIESM-0452 3064 1064TOLLING/FINANCIAL FEASIBILITY STUDIES.SW
T PE 200 PE 200 PE 200 200PE200PE200PE PE 200 PE 200 PE 200 PE 200
STATEWIDEVARIOUS
S-5 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMSTATEWIDE
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BRIDGE PROJECTS
IN PROGRESS
B-9999 339692 229692BRIDGE INSPECTION PROGRAM. STBG I 3300 DIV I 3300 DIV I 3300 DIV 3300I DIV3300I DIV3300I DIV I 3300 DIV I 3300 DIV I 3300 DIV I 3300 DIVSTBG I 3300 RE I 3300 RE I 3300 RE 3300I RE3300I RE3300I RE I 3300 RE I 3300 RE I 3300 RE I 3300 RESTBG I 4400 SW I 4400 SW I 4400 SW 4400I SW4400I SW4400I SW I 4400 SW I 4400 SW I 4400 SW I 4400 SW
DIV BRIDGE INSPECTION PROGRAM.DIVREG BRIDGE INSPECTION PROGRAM.REGSW BRIDGE INSPECTION PROGRAM.SW
STATEWIDE
VARIOUS
IN PROGRESS
BK-5100 5000 5000ESTABLISH BRIDGE MANAGEMENT SYSTEM.DIVSTATEWIDE
VARIOUS
UNDER CONSTRUCTION
BK-5101 7747 7747DECK PRESERVATION AT 15 SELECTED LOCATIONS.DIVSTATEWIDE
VARIOUS
IN PROGRESS
BK-5102 2027 2027BRIDGE PAINTING AT 19 SELECTED LOCATIONS.DIVSTATEWIDE
VARIOUS
UNDER CONSTRUCTION
BK-5131 1500 1500BRIDGE PRESERVATION AT SELECTED LOCATIONS.DIVSTATEWIDE
VARIOUS
IN PROGRESS
BK-5132 1000 1000IN-DEPTH ENGINEERING EVALUATION OF WEIGHT RESTRICTIONS ON LOAD POSTED BRIDGES ON US AND NC DESIGNATED ROUTES.
REGSTATEWIDEVARIOUS
BP-5500 23151 23151BRIDGE PRESERVATION ISSUES AT SELECTED SITES.
DIV BRIDGE PRESERVATION ISSUES AT SELECTED SITES.DIVREG BRIDGE PRESERVATION ISSUES AT SELECTED SITES.REGSW BRIDGE PRESERVATION ISSUES AT SELECTED SITES.SW
STATEWIDEVARIOUS
IN PROGRESS
M-0379 3100 3100SCOUR EVALUATION PROGRAM OF EXISTING BRIDGES.DIVSTATEWIDE
VARIOUS
S-6 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMSTATEWIDE
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BRIDGE PROJECTS
UNDER CONSTRUCTION
M-0418 5860 5860STORM WATER RUNOFF. RESEARCH, DESIGN, CONSTRUCT, MAINTAIN AND MONITOR STORM WATER DRAINAGE FROM 50 BRIDGES OVER WATERWAYS. (HB 2346, SECTION 25.18)
DIVSTATEWIDEVARIOUS
HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5300 6608 6608SIGNAL RETIMING TO IMPROVE SAFETY.
DIV SIGNAL RETIMING TO IMPROVE SAFETY.DIVREG SIGNAL RETIMING TO IMPROVE SAFETY.REGSW SIGNAL RETIMING TO IMPROVE SAFETY.SW
STATEWIDEVARIOUS
W-5517 71601 16601SAFETY MANAGEMENT PROGRAM, PROJECT IDENTIFICATION, ANALYSIS AND PRELIMINARY ENGINEERING.
HSIP PE 1650 DIV PE 1650 DIV PE 1650 DIV 1650PE DIV1650PE DIV1650PE DIV PE 1650 DIV PE 1650 DIV PE 1650 DIV PE 1650 DIVHSIP PE 1650 RE PE 1650 RE PE 1650 RE 1650PE RE1650PE RE1650PE RE PE 1650 RE PE 1650 RE PE 1650 RE PE 1650 REHSIP PE 2200 SW PE 2200 SW PE 2200 SW 2200PE SW2200PE SW2200PE SW PE 2200 SW PE 2200 SW PE 2200 SW PE 2200 SW
DIV SAFETY MANAGEMENT PROGRAM, PROJECT IDENTIFICATION, ANALYSIS AND PRELIMINARY ENGINEERING.DIVREG SAFETY MANAGEMENT PROGRAM, PROJECT IDENTIFICATION, ANALYSIS AND PRELIMINARY ENGINEERING.REGSW SAFETY MANAGEMENT PROGRAM, PROJECT IDENTIFICATION, ANALYSIS AND PRELIMINARY ENGINEERING.SW
STATEWIDE
VARIOUS
IN PROGRESS
W-5601 180736 82736RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
HSIP R 420 DIV R 420 DIV R 420 DIV 420R DIV420R DIV420R DIV R 420 DIV R 420 DIV R 420 DIV R 420 DIVHSIP C 2520 DIV C 2520 DIV C 2520 DIV 2520C DIV2520C DIV2520C DIV C 2520 DIV C 2520 DIV C 2520 DIV C 2520 DIVHSIP R 420 RE R 420 RE R 420 RE 420R RE420R RE420R RE R 420 RE R 420 RE R 420 RE R 420 REHSIP C 2520 RE C 2520 RE C 2520 RE 2520C RE2520C RE2520C RE C 2520 RE C 2520 RE C 2520 RE C 2520 REHSIP R 560 SW R 560 SW R 560 SW 560R SW560R SW560R SW R 560 SW R 560 SW R 560 SW R 560 SWHSIP C 3360 SW C 3360 SW C 3360 SW 3360C SW3360C SW3360C SW C 3360 SW C 3360 SW C 3360 SW C 3360 SW
DIV RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS ON DIVISION CATEGORY.DIVREG RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS ON REGIONAL CATEGORY.REGSW RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS ON STATWIDE CATEGORY.SW
STATEWIDE
VARIOUS
W-9999 223850HIGHWAY SAFETY IMPROVEMENT PROGRAM BALANCE.
HSIP C 3600 DIV C 6750 DIV C 7035 DIV 7110C DIV7110C DIV7110C DIV C 7110 DIV C 7110 DIV C 7110 DIV C 7110 DIVHSIP C 3600 RE C 6750 RE C 7035 RE 7110C RE7110C RE7110C RE C 7110 RE C 7110 RE C 7110 RE C 7110 REHSIP C 4800 SW C 9000 SW C 9380 SW 9480C SW9480C SW9480C SW C 9480 SW C 9480 SW C 9480 SW C 9480 SW
DIV HIGHWAY SAFETY IMPROVEMENT PROGRAM BALANCE.DIVREG HIGHWAY SAFETY IMPROVEMENT PROGRAM BALANCE.REGSW HIGHWAY SAFETY IMPROVEMENT PROGRAM BALANCE.SW
STATEWIDE
VARIOUS
S-7 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMSTATEWIDE
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)HIGHWAY SAFETY PROJECTS
W-5508 1500 1500HIGHWAY SYSTEM DATA COLLECTION. TRAFFIC ENGINEERING BRANCH TO PARTICIPATE IN A THREE YEAR DATA COLLECTION PROGRAM.
STATEWIDEVARIOUS
IN PROGRESS
W-5700 17000 2000SIGNAL RETIMING TO IMPROVE SAFETY. HSIP C 450 DIV C 450 DIV C 450 DIV 450C DIV450C DIV450C DIV C 450 DIV C 450 DIV C 450 DIV C 450 DIVHSIP C 450 RE C 450 RE C 450 RE 450C RE450C RE450C RE C 450 RE C 450 RE C 450 RE C 450 REHSIP C 600 SW C 600 SW C 600 SW 600C SW600C SW600C SW C 600 SW C 600 SW C 600 SW C 600 SW
DIV SIGNAL RETIMING TO IMPROVE SAFETY.DIVREG SIGNAL RETIMING TO IMPROVE SAFETY.REGSW SIGNAL RETIMING TO IMPROVE SAFETY.SW
STATEWIDE
VARIOUS
CONGESTION MITIGATION PROJECTSC-5600 60260 18379STATEWIDE CMAQ PROJECTS TO IMPROVE
AIR QUALITY WITHIN NONATTAINMENT AND MAINTENANCE AREAS.
EX
CMAQ PE 1634 PE 1664 S(M) PE 408 PE 416 CMAQ R 1634 R 1664 S(M) R 408 R 416 CMAQ C 9803 C 9983 S(M) C 2451 C 2496 CMAQ O 1634 O 1664 S(M) O 408 O 416 CMAQ I 1634 I 1664 S(M) I 408 I 416 S(M) I 327 I 333
STATEWIDE
VARIOUS
IN PROGRESS BY DEPARTMENT OF MOTOR VEHICLES
C-3600 6702 6702DEPARTMENT OF MOTOR VEHICLES (DMV), VEHICLE EMISSION COMPLIANCE SYSTEM. UPGRADE NORTH CAROLINA'S MOTOR VEHICLE EMISSIONS INSPECTION AND MAINTENANCE (I/M) PROGRAM.
EXSTATEWIDEVARIOUS
C-5702 4869 2994NORTH CAROLINA CLEAN ENERGY TECHNOLOGY CENTER. CONDUCT A CLEAN-FUEL ADVANCED TECHNOLOGY OUTREACH AND AWARENESS PROGRAM, INCLUDING EMISSIONS-REDUCING SUB-AWARDS, IN ALL CMAQ-ELIGIBLE COUNTIES.
EX
CMAQ OT 1500 C L OT 375 C
A NORTH CAROLINA CLEAN ENERGY TECHNOLOGY CENTER. CONDUCT A CLEAN-FUEL ADVANCED TECHNOLOGY OUTREACH AND AWARENESS PROGRAM IN ALL CMAQ-ELIGIBLE COUNTIES. - IN PROGRESS
EX
B NORTH CAROLINA CLEAN ENERGY TECHNOLOGY CENTER. EMISSIONS-REDUCING SUB-AWARDS IN ALL CMAQ-ELIGIBLE COUNTIES. - IN PROGRESSEXC NORTH CAROLINA CLEAN ENERGY TECHNOLOGY CENTER. EMISSIONS-REDUCING SUB-AWARDS IN ALL CMAQ-ELIGIBLE COUNTIES.EX
STATEWIDE
VARIOUS
S-8 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMSTATEWIDE
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)CONGESTION MITIGATION PROJECTS
C-5601 5922CMAQ PROJECTS TO IMPROVE AIR QUALITY ACROSS MULTIPLE NONATTAINMENT AND MAINTENANCE AREAS.
EX
CMAQ PE 235 PE 239 L PE 59 PE 60 CMAQ R 235 R 239 L R 59 R 60 CMAQ C 1407 C 1433 L C 352 C 358 CMAQ O 235 O 239 L O 59 O 60 CMAQ I 235 I 239 L I 59 I 60
STATEWIDE
VARIOUS
IN PROGRESS BY NORTH CAROLINA STATE UNIVERSITY
C-4902 4694 4694NORTH CAROLINA STATE UNIVERSITY SOLAR CENTER CLEAN TRANSPORTATION PROGRAM. DEVELOP AND ADMINISTER A SEVEN YEAR CLEAN FUEL-ADVANCED TECHNOLOGY REBATE PROGRAM IN ALL CMAQ ELIGIBLE COUNTIES TO REDUCE EMISSIONS.
EX A PHASE 2 OF IMPLEMENTATIONEXSTATEWIDE
NORTH CAROLINASTATE UNIVERSITY
IN PROGRESS BY NCDENR DIVISION OF AIR QUALITY
C-4903 1500 1500NORTH CAROLINA AIR AWARENESS OUTREACH PROGRAM TO PROVIDE EDUCATION AND PRODUCE DAILY AIR QUALITY FORECAST.
EXSTATEWIDE
NORTH CAROLINADEPARTMENT OFENVIRONMENT ANDNATURAL RESOURCE
C-9999 300000CONGESTION MITIGATION AIR QUALITY (CMAQ) PROGRAM BALANCE IN NON-ATTAINMENT AREAS.EX
CMAQ C 30000 C 30000 C 30000 30000C30000C30000C C 30000 C 30000 C 30000 C 30000
STATEWIDESTATEWIDE
ENHANCEMENT (ROADSIDE PROJECTS)
IN PROGRESS
ER-5600 42182 2182VEGETATION MANAGEMENT - CLEAR ZONE IMPROVEMENT AND MANAGEMENT STATEWIDE.
STBG C 1200 DIV C 1200 DIV C 1200 DIV 1200C DIV1200C DIV1200C DIV C 1200 DIV C 1200 DIV C 1200 DIV C 1200 DIVSTBG C 1200 RE C 1200 RE C 1200 RE 1200C RE1200C RE1200C RE C 1200 RE C 1200 RE C 1200 RE C 1200 RESTBG C 1600 SW C 1600 SW C 1600 SW 1600C SW1600C SW1600C SW C 1600 SW C 1600 SW C 1600 SW C 1600 SW
DIV VEGETATION MANAGEMENT - CLEAR ZONE IMPROVEMENT AND MANAGEMENT STATEWIDE - DIVISION CATEGORY. - IN PROGRESSDIVREG VEGETATION MANAGEMENT - CLEAR ZONE IMPROVEMENT AND MANAGEMENT STATEWIDE - REGIONAL CATEGORY. - IN PROGRESSREGSW VEGETATION MANAGEMENT - CLEAR ZONE IMPROVEMENT AND MANAGEMENT STATEWIDE - STATEWIDE CATEGORY. - IN PROGRESSSW
STATEWIDE
VARIOUS
S-9 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMSTATEWIDE
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)ENHANCEMENT (ROADSIDE PROJECTS)
M-0451 1312 612STATEWIDE LANDSCAPE PLANS FOR STIP CONSTRUCTION PROJECTS.
T PE 21 DIV PE 21 DIV PE 21 DIV 21PE DIV21PE DIV21PE DIV PE 21 DIV PE 21 DIV PE 21 DIV PE 21 DIVT PE 21 RE PE 21 RE PE 21 RE 21PE RE21PE RE21PE RE PE 21 RE PE 21 RE PE 21 RE PE 21 RET PE 28 SW PE 28 SW PE 28 SW 28PE SW28PE SW28PE SW PE 28 SW PE 28 SW PE 28 SW PE 28 SW
DIV STATEWIDE LANDSCAPE PLANS FOR STIP CONSTRUCTION PROJECTS.DIVREG STATEWIDE LANDSCAPE PLANS FOR STIP CONSTRUCTION PROJECTS.REGSW STATEWIDE LANDSCAPE PLANS FOR STIP CONSTRUCTION PROJECTS.SW
STATEWIDE
VARIOUS
SAFE ROUTES TO SCHOOLS PROJECTS
IN PROGRESS
SR-5000 6435 6435SAFE ROUTES TO SCHOOL PROGRAM. EDUCATIONAL,TRAINING AND OTHER NON-INFRASTRUCTURE NEEDS.DIVSTATEWIDE
VARIOUS
IN PROGRESS - $200,800 IN STPDA FUNDS ALLOCATED TO SR-5001C
SR-5001 13519 13519SAFE ROUTES TO SCHOOL PROGRAM. PROJECTS TO IMPROVE SAFETY, REDUCE TRAFFIC, FUEL CONSUMPTION AND AIR POLLUTION IN VICINITY OF SCHOOLS.
DIVSTATEWIDEVARIOUS
S-10 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMSTATEWIDE
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)BICYCLE AND PEDESTRIAN PROJECTS
IN PROGRESS
E-4018 12645 645NATIONAL RECREATIONAL TRAILS.DIV
TAP C 1200 C 1200 C 1200 1200C1200C1200C C 1200 C 1200 C 1200 C 1200
STATEWIDEVARIOUS
IN PROGRESS
EB-4411 ROADWAY IMPROVEMENTS FOR BICYCLE SAFETY ON STATE AND LOCAL DESIGNATED BIKE ROUTES.STATEWIDE
VARIOUS
EB-5542 11503 1503STATEWIDE BICYCLE-PEDESTRIAN PROGRAM.DIV
STBG PE 1000 PE 1000 PE 1000 1000PE1000PE1000PE PE 1000 PE 1000 PE 1000 PE 1000
STATEWIDEVARIOUS
UNDER CONSTRUCTION
EB-3314 6476 6476STATEWIDE PEDESTRIAN FACILITIES PROGRAM.TRNSTATEWIDE
VARIOUS
IN PROGRESS - $182,000 IN STPDA FUNDS ALLOCATED TO ER-2971E
ER-2971 25408 25408SIDEWALK PROGRAM IN ALL FOURTEEN HIGHWAY DIVISIONS.TRNSTATEWIDE
VARIOUS
PUBLIC TRANSPORTATION PROJECTSTI-6105 1402 1402INTERCITY BUS SERVICE FROM RALEIGH TO
NORFOLK ALONG US 64 AND US 258 WITH STOPS AT RALEIGH, ROCKY MOUNT, AHOSKIE, AND SUFFOLK
HF
FNF L
STATEWIDE
GREYHOUND LINES
TI-6108 4081 4081INTERCITY BUS SERVICE FROM RALEIGH TO JACKSONVILLE VIA WILMINGTON ALONG US 70, US 117, AND US 17 AND FROM JACKSONVILLE TO MYRTLE BEACH VIA WILMINGTON ALONG US 17
HF
FNU L
STATEWIDE
GREYHOUND LINES
TI-6107 1910 1910INTERCITY BUS SERVICE FROM RALEIGH TO JACKSONVILLE ALONG US 70 AND US 17 WITH STOPS AT RALEIGH, SMITHFIELD, GOLDSBORO, KINSTON, AND NEW BERN
HF
FNU
STATEWIDEGREYHOUND LINES
TI-6106 1592 1592INTERCITY BUS SERVICE FROM RALEIGH TO WILMINGTON ALONG US 70 AND US 117 WITH STOPS AT RALEIGH, SMITHFIELD, GOLDSBORO, WALLACE, AND WILMINGTON
HF
FNU
STATEWIDEGREYHOUND LINES
S-11 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMSTATEWIDE
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
TA-6535 789 789CAPITAL
HF
FNF S
STATEWIDE
NCDOT FERRY DIVISION
FUNDS AUTHORIZED IN PROGRESS
TP-4901 7769 5579PLANNING ASSISTANCE - RESEARCH SUPPORT ACTIVITIES
HF
FSPR CP 600 CP 600 CP 600 S CP 150 CP 120 CP 120
STATEWIDE
REGIONAL COORDINATED AREA TRANSPORTION
TT-9702A 50 50TECHNOLOGY - ADMINISTRATION (ITRE)
HF
UTCH
STATEWIDE
REGIONAL COORDINATED AREA TRANSPORTION
TA-6520 443 443SECTION 5317 NEW FREEDOM CAPITAL FUNDING ASSISTANCE TO COMMUNITY TRANSPORTATION SYSTEMS AND NON-PROFIT AGENCIES ACROSS THE STATE
HF
FNF
STATEWIDESTATEWIDE
FUNDS AUTHORIZED IN PROGRESS
TA-6665 18676 118235311 CAPITAL PROJECTS FOR RURAL AREAS
HF
FNU CP 4262 L CP 620 S CP 1971
STATEWIDE
STATEWIDE
FUNDS AUTHORIZED IN PROGRESS
TA-6666 3735 1527PURCHASE REPLACEMENT VEHICLES
HF
FBUS CP 1806 L CP 201 S CP 201
STATEWIDE
STATEWIDE
FUNDS AUTHORIZED IN PROGRESS
TC-5004 5129 23105311 ADTAP CAPITAL PROJECTS FOR RURAL AREAS
HF
ADTAP CP 2264 L CP 278 S CP 277
STATEWIDE
STATEWIDE
FUNDS AUTHORIZED IN PROGRESS
TH-2000 126 126TRAVELER'S AID PROGRAM
HF
L S
STATEWIDE
STATEWIDE
S-12 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMSTATEWIDE
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TI-6109 9043 9043INTERCITY BUS SERVICE
HF
FNU L S
STATEWIDE
STATEWIDE
FUNDS AUTHORIZED IN PROGRESS
TK-6181 35682 179735311 ADMINISTRATIVE PROJECTS FOR RURAL AREAS
HF
FNU AD 13423 L AD 2630 S AD 1656
STATEWIDE
STATEWIDE
FUNDS AUTHORIZED IN PROGRESS
TK-4902 561 330STATE ADMINISTRATION OF APPALACHIAN DEVELOPMENT TRANSPORTATION ASSISTANCE PROGRAMHF
ADTAP AD 231
STATEWIDESTATEWIDE
FUNDS AUTHORIZED IN PROGRESS
TK-4900Z 19423 12180STATE ADMINISTRATION - RURAL AREA GENERAL PUBLIC TRANSIT SERVICESHF
FNU AD 1743 AD 1100 AD 1100 1100AD1100AD1100AD
STATEWIDESTATEWIDE
FUNDS AUTHORIZED IN PROGRESS
TM-6155 350 350OPERATING FUNDING FOR EXISTING PROJECTS STATEWIDE
HF
JARC L
STATEWIDE
STATEWIDE
FUNDS AUTHORIZED IN PROGRESS
TO-6135 4293 42935311 OPERATING PROJECTS FOR RURAL AREAS
HF
FNU L
STATEWIDE
STATEWIDE
TO-6142 18778URBANIZED FORMULA PROGRAMFUNDS MANAGED BY NCDOT FORORANGE, ALAMANCE, DAVIDSON, GUILFORD, CABARRUS, IREDELL, HOKE, CUMBERLAND, HARNETT, UNION, MECKLENBURG TRANSPORTATION SYSTEMS - OPERATING
HF
FUZ CP 1975 CP 1799 CP 1835 1909CP1871CP L CP 1975 CP 1799 CP 1835 1909CP1871CP
STATEWIDE
STATEWIDE
FUNDS AUTHORIZED IN PROGRESS
TP-4902 3710 3710STATEWIDE SUPPORT TO UPDATE LOCAL COMMUNITY TRANSPORTATION SERVICE PLANS - 5311HF
FNU
STATEWIDESTATEWIDE
S-13 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMSTATEWIDE
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TQ-9039 657 6575310 MOBILITY MANAGEMENT PROJECTS FOR RURAL AREAS
HF
FEPD L S
STATEWIDE
STATEWIDE
FUNDS AUTHORIZED IN PROGRESS
TQ-6954 8670 42085310 OPERATING PROJECTS FOR RURAL AREAS
HF
FEPD O 2231 L O 2231
STATEWIDE
STATEWIDE
FUNDS AUTHORIZED IN PROGRESS
TQ-9038 7551 32265310 CAPITAL PROJECTS FOR RURAL AREAS AND SMALL URBAN AREAS
HF
FEPD CP 3459 L CP 433 S CP 433
STATEWIDE
STATEWIDE
TS-7000 844 844DEVELOP AMD IMPLEMENT AN ENHANCED STATE SAFETY OVERSIGHT PROGRAMHF
SSO
STATEWIDESTATEWIDE
FUNDS AUTHORIZED IN PROGRESS
TS-4900Z 2285 1873STATEWIDE TRAINING AND SUPPORT SERVICES RTAP (RURAL, SMALL-URBAN AND PARATRANSIT)HF
RTAP AD 412
STATEWIDESTATEWIDE
FUNDS AUTHORIZED IN PROGRESS
TT-5205 66 66NCDOT FERRY DIVISION WILL PURCHASE AND INSTALL VISUALS, PAGING SYSTEMS ON BOARD FIVE CLASS FERRY VESSELSHF
FNF S
STATEWIDE
STATEWIDE
FUNDS AUTHORIZED IN PROGRESS
TM-5301 5592 4092STATE ADMINISTRATION - JOB ACCESS NON-URBANHF
JARC AD 500 AD 500 AD 500
STATEWIDESUB REGIONAL
FUNDS AUTHORIZED IN PROGRESS
TN-5112 4270 3184STATE ADMINISTRATION - NEW FREEDOM - 5317HF
FNF AD 386 AD 350 AD 350
STATEWIDESUB REGIONAL
FUNDS AUTHORIZED IN PROGRESS
TV-4903 9749 5930STATE ADMINISTRATION - ELDERLY AND DISABLED PERSONS (FEDERAL PROGRAM)HF
FEPD AD 569 AD 650 AD 650 650AD650AD650AD
STATEWIDESUB REGIONAL
S-14 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMSTATEWIDE
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2018
UNFUNDED
FUTURE YEARSFY 2019 FY 2021FY 2020 FY 2022
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027(Miles)PASSENGER RAIL PROJECTS
P-5602 12001 2001STATEWIDE RAIL PRELIMINARY ENGINEERING
T PE 300 DIV PE 300 DIV PE 300 DIV 300PE DIV300PE DIV300PE DIV PE 300 DIV PE 300 DIV PE 300 DIV PE 300 DIVT PE 300 RE PE 300 RE PE 300 RE 300PE RE300PE RE300PE RE PE 300 RE PE 300 RE PE 300 RE PE 300 RET PE 400 SW PE 400 SW PE 400 SW 400PE SW400PE SW400PE SW PE 400 SW PE 400 SW PE 400 SW PE 400 SW
DIV STATEWIDE RAIL PRELIMINARY ENGINEERINGDIVREG STATEWIDE RAIL PRELIMINARY ENGINEERINGREGSW STATEWIDE RAIL PRELIMINARY ENGINEERINGSW
STATEWIDE
VARIOUS
IN PROGRESS
Y-5500 31087 1087TRAFFIC SEPARATION STUDY IMPLEMENTATION AND CLOSURES.
DIV
RR R 500 R 500 R 500 500R500R500R R 500 R 500 R 500 R 500RR C 2500 C 2500 C 2500 2500C2500C2500C C 2500 C 2500 C 2500 C 2500
STATEWIDE
VARIOUS
Z-5800 10500HIGHWAY-RAIL GRADE CROSSING SAFETY IMPROVEMENTS.
DIV
RR R 500 R 500 500R RR C 3000 C 3000 3000C
STATEWIDE
VARIOUS
IN PROGRESS
Z-5700 7404 404HIGHWAY-RAIL GRADE CROSSING SAFETY IMPROVEMENTS.
DIV
RR R 500 R 500 RR C 3000 C 3000
STATEWIDE
VARIOUS
IN PROGRESS
Z-5400 23316 23316HIGHWAY-RAIL GRADE CROSSING SAFETY IMPROVEMENTS.DIVSTATEWIDE
VARIOUS
Z-9999 17500HIGHWAY-RAIL GRADE CROSSING SAFETY IMPROVEMENTS - UNPROGRAMMED BALANCE.DIV
RR 500R R 500 R 500 R 500 R 500RR 3000C C 3000 C 3000 C 3000 C 3000
STATEWIDE
VARIOUS
IN PROGRESS
C-5571 2456 2456NCDOT PIEDMONT AND CAROLINIAN PASSENGER RAIL SERVICES. PUBLIC OUTREACH AND AWARENESS PROGRAM.EXSTATEWIDE
NORTH CAROLINARAILROAD
S-15 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
G-3
The Governor’s Highway Safety Program The Governor’s Highway Safety Program (GHSP) was created in 1967 by legislation which empowered the Governor to contract with the U.S. Department of Transportation for the purpose of securing funding through the Highway Safety Act of 1966, Section 402. This funding provides for the administration of a highway safety program designed to reduce traffic crashes and the resulting deaths, injuries and property damage. Today, the GHSP is under the supervision, guidance and support of the Secretary of Transportation, specifically the Deputy Secretary for Communications. Funding for the GHSP projects and activities is provided through federal traffic safety grants. The nine major areas of funding are occupant protection, police traffic services, speed control, traffic records, emergency medical services, motorcycles, pedestrians/bicycles, roadside safety and prevention of alcohol/drug-related crashes.
The GHSP consists of 13 staff positions representing planning, programs, evaluation, fiscal management, public information and education. The GHSP’s mission is to plan and execute a comprehensive highway traffic safety program for North Carolina to reduce the number of fatalities and injuries on the state’s roadways.
The GHSP developed a statewide safety belt campaign that utilizes enhanced law enforcement and public education to increase statewide safety belt usage rates. This campaign, “Click It or Ticket”, became a national model and is now utilized throughout the United States. , “Click It or Ticket” was adopted by the National Highway Traffic Safety Administration (NHTSA) as its’ primary seat belt program. Prior to the implementation of “Click It or Ticket” North Carolina safety belt use was about 60 percent. North Carolina now boasts a safety belt usage rate of 91.7 percent. Before “Click It or Ticket” 2.6 percent of drivers and occupants in crashes in NC were killed or seriously injured. In 2015, the percent of drivers and occupants killed or seriously injured was only 0.48 percent. “Click It or Ticket,” along with other highway safety initiatives, are a key factor in this dramatic reduction in deaths and serious injuries. If all drivers and occupants in crashes during 2015 had been buckled, NC would have realized an estimated savings of over $48 million in health care costs.1
A companion campaign to address impaired driving, “Booze It & Lose It” was developed shortly after “Click It or Ticket” was launched in 1993. The “Booze It & Lose It” campaign, through the implementation of high profile checkpoints utilizing the state’s seven mobile breath alcohol testing units, or BAT Mobiles, is partially responsible for reducing late-night impaired driving. All 100 counties have joined the GHSP’s “Click It or Ticket” and “Booze It & Lose It” campaigns by establishing county law enforcement coordinators that organize local agencies participating in the efforts. Regional Law Enforcement Liaisons coordinate efforts with the 100 county coordinators. The U.S. Department of Transportation has praised the initiative as an outstanding example for the U.S. DOT’s campaign to reduce alcohol-related fatalities and increase safety belt use. The GHSP has also focused additional attention on motorcycle safety since 2005. Motorcyclists are overrepresented in the number of fatal crashes and serious injuries. Motorcycling has become more popular in recent years increasing the exposure to crashes of those riding. GHSP, in conjunction with law enforcement agencies across the state has implemented an advanced rider education program, BikeSafeNC, which utilizes certified law enforcement motor officers to help motorcyclists improve their riding skills, making the rider safer in their riding habits and skill set.
The following represents the GHSP plan:
1 William Hall, 2017 Apr. Estimated Medical Cost Savings from Increased Seat Belt Use in North Carolina. Chapel Hill (NC): UNC Highway Safety Research Center
The Governor's Highway Safety Program
G-4
Planning & Administration Description Federal Share (in thousands)
State / Local Share (in thousands)
402 GHSP P&A 291.10 291.10
Alcohol Description Federal Share(in thousands)
State / Local Share (in thousands)
402 GHSP AL Support 80.00 NC Department Of Public-ALE 20.00
154AL NC Department Of Health-BAT 1000.00 NC Department Of Public-Overtime 125.00 NC Department Of Public-Robeson 336.51
NC Department Of Public-Cumberland 353.81 NC Department Of Health-Science 280.38 Charlotte-Meck Police Department 179.92 179.92 NC Judicial-Conference Of District Attorneys 357.99 MADD North Carolina 104.18 Union County 281.86 64.19 Wake County 84.00 84.00 GHSP Sports Marketing-Al 562.50 GHSP Media Buys-Al 700.00
405d City Of Wilmington 180.26 Wake/Raleigh CCBI 169.51 72.65 Pitt County-Blood Lab 55.00 55.00 NC Department Of Health-Bat 105.61 NC Department Of Health-Science 280.38 Cumberland County 98.35 NC Judicial-Buncombe 53.37 Buncombe County-Treatment 107.89 NC JUDICIAL- Conference Of District Attorneys 352.69 Charlotte-Meck Police Department 179.92 179.92 City Of Wilson 40.94 40.94 Town Of Garner 38.98 38.97
The Governor's Highway Safety Program
G-5
Alcohol Description Federal Share(in thousands)
State / Local Share (in thousands)
405d Guilford County-Educator 52.12 22.34 Wake County Task Force 85.11 85.11 City Of Raleigh Task Force 196.76 196.76 City Of Winston-Salem 129.83 389.48 Town Of Cornelius 42.82 18.35 Town Of Kernersville 63.92 11.28 Guilford County-Task Force 52.47 157.41 City Of Asheville Task Force 102.83 102.83 Wayne County 202.66 35.76 Brunswick County 80.14 80.14 Union County 81.86 64.19 NC Department Of Public-Robeson 136.51 NC Department Of Public-Cumberland 227.83 NC Department Of Public-Overtime 125.00 NC Department Of Health-SFST 178.80 NC Department Of Health-DRE 390.88 NC DMV Fiscal 25.78 MADD North Carolina 104.18 GHSP-DWI Team Support 30.00 NC Department Of Public-ABC Commission 56.90
The Governor's Highway Safety Program
G-6
Occupant Protection Description Federal Share(in thousands)
State / Local Share (in thousands)
402 GHSP Op Support 8.00 University Of NC-Cps 220.28 NC State University-Seatbelt Surveys 175.89 GHSP Sports Marketing-Op 562.50
405b WNC Safe Kids 100.61 NC Department Of Public-Op Overtime 250.00 GHSP Media Buys-Op 500.00 NC Department Of Insurance 370.00 370.00 City Of Wilson 40.94 40.94 Town Of Cornelius 42.82 18.35 Guilford County-Task Force 52. 47 157.41 Brunswick County 60.00 60.00
Motorcycle Description Federal Share(in thousands)
State / Local Share (in thousands)
402 GHSP Motorcycle Initiatives 150.00 Lenoir Community 75.00 75.00 Lenoir Community 60.00 City Of Raleigh 5.00 NC Department Of Public-Bike Safe 2.00
405f Guilford County-Bike Safe 5.00
City Of Hendersonville 5.00 University Of NC 172.28 City Of New Bern Bike Safe 7.00 City Of Jacksonville Bike Safe 5.00
Pedestrian & Bicycle Safety Description Federal Share(in thousands)
State / Local Share (in thousands)
402 NC Department Of Transportation 130.00 Outer Banks Bike And Ped 22.11 GHSP Ped Media Buys 15.00
The Governor's Highway Safety Program
G-7
Police Traffic Services Description Federal Share(in thousands)
State / Local Share (in thousands)
402 GHSP Statewide Traffic Enforcement Program 3000.00 Town Of Tarboro-LEL 20.00 Town Of Ayden-LEL 40.00 Orange County So-LEL 40.00 Town Of Kitty Hawk-LEL 20.00 New Hanover County LEL 40.00
Rockingham Police Department-LEL 20.00 City Of Asheville LEL 20.00 Guilford County-LEL 20.00 Charlotte-Meck Police Department LEL 20.00 Jackson County LEL 20.00 City Of Marion LEL 20.00 City Of Asheville Task Force 102.83 102.83 Fayetteville Police Department 130.82 130.82 Town Of Waxhaw 32.03 32.03 City Of Dunn 825.55 35.38 NC Judicial-Conference Of District Attorneys 240.00 NC Department Of Justice 164.88 City Of Lumberton 81.19 34.79 Town Of Holly Springs 61.77 61.77 Town Of Tabor City 27.67 27.67 NC DMV Fiscal 25.78 NC Sheriffs Association 53.95 Columbus Police Department 17.50 Brunswick County So Vehicle 35.00 35.00 New Bern Police Department Vehicle 17.50 Macon County So Vehicle 17.50
The Governor's Highway Safety Program
G-8
Traffic Records Description Federal Share(in thousands)
State / Local Share (in thousands)
402 GHSP Traffic Records 119.80 University Of NC-Quick Response 24.69 University Of NC-TRCC 72.30
405c NC Judicial-Printers 300.42 NC Judicial-E-citation 711.66 NC State University-Vision Zero 290.25 University Of NC 215.56
Drivers Education Description Federal Share(in thousands)
State / Local Share (in thousands)
University of NC - Teen Driver 154.94
Safe Communities Description Federal Share(in thousands)
State / Local Share (in thousands)
402 GHSP Sa Support 1060.00
University Of NC-Statewide Traffic Enforcement Program Reporting And Website 22.05
University Of NC-HSP 97.60 Pitt Memorial 93.82 4.30 Carolinas Medical Center 64.14 NC Department Of Administration - SADD 150.00 University Of NC-Sr. Drivers 94.82 NC State University-Older Driver 91.73
School Bus Description Federal Share(in thousands)
State / Local Share (in thousands)
402 Department of Public Instruction Transportation 57.00
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
BURLINGTON-ALAMANCE REGIONAL AIRPORT (BUY)
DELETEDAV-5768 ACQUIRE RUNWAY PROTECTION ZONE, DEMOLISH STRUCTURES AND CLEAR APPROACHES. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUNDOF PRIORITIZATION.
ALAMANCE
SR 1122 (EULISS ROAD) COMPLETEDB-4400 REPLACE BRIDGE 000160 OVER PRONGOF STINKING QUARTER CREEK.
ALAMANCE
SR 1124 (STAFFORD MILL ROAD)
COMPLETEDB-4401 REPLACE BRIDGE 000161 OVER NORTH PRONG OF STINKING QUARTER CREEK.
ALAMANCE
SR 1912 (DICKEY MILL ROAD)
COMPLETEDB-4953 REPLACE BRIDGE 000064 OVER QUAKER CREEK.
ALAMANCE
SR 1148 (ANTHONY ROAD)
COMPLETEDB-5342 REPLACE BRIDGE 000169 OVER GUM CREEK.
ALAMANCE
SR 1529 (DURHAM STREET)
DELETEDB-5346 REPLACE BRIDGE 000003 OVER AN UNNAMED CREEK. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
ALAMANCE
SR 1149 (HUFFMAN MILL ROAD)
DELETEDB-5349 REPLACE BRIDGE 000173 OVER LITTLE ALAMANCE CREEK IN BURLINGTON. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
ALAMANCE
SR 1768 (HUGHES MILL ROAD)
DELETEDB-5350 REPLACE BRIDGE 000044 OVER JORDAN'S CREEK. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
ALAMANCE
SR 1154 (TUCKER STREET)
DELETEDB-5727 REPLACE BRIDGE 000178 OVER LITTLE ALAMANCE CREEK IN BURLINGTON. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
ALAMANCE
NC 87 DELETEDB-5728 REPLACE BRIDGE 000112 OVER REEDY FORK CREEK IN OSSIPEE. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
ALAMANCE
SR 1936 (STONE STREET EXTENSION)
DELETEDB-5735 REPLACE BRIDGE 000307 OVER BACK CREEK. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
ALAMANCE
VARIOUS DELETEDBF-5307 SCREEN AND EVALUATE POTENTIAL FEDERAL FUNDED BRIDGE PROJECTS DIVISION 7.
ALAMANCE
VARIOUS DELETEDBS-5407 SCREEN AND EVALUATE POTENTIAL STATE FUNDED BRIDGE PROJECTS DIVISION 7.
ALAMANCE
VARIOUS DELETEDI-5207 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 7.
ALAMANCE
I-40 / I-85 DELETEDI-5362 EAST OF NC 49 TO EAST OF NC 54. PAVEMENT REHABILITATION.
ALAMANCE
I-40 / I-85 DELETEDI-5380 EAST OF NC 54 IN ALAMANCE COUNTY TO WEST OF SR 1114 (BUCKHORN ROAD) IN ORANGE COUNTY. PAVEMENT REHABILITATION.
ALAMANCE
I-40 / I-85 DELETEDI-5392 EAST OF SR 3056 (ROCK CREEK DAIRY ROAD) IN GUILFORD COUNTY TO WEST OF SR 1226 (UNIVERSITY DRIVE) IN ALAMANCE COUNTY. PAVEMENT REHABILITATION.
ALAMANCE
US 70 DELETEDR-2910 SR 3056 (ROCK CREEK DAIRY ROAD) IN GUILFORD COUNTY TO SR 1309 (WESTBROOK AVENUE) IN ALAMANCE COUNTY. WIDEN TO MULTI-LANES WITH CURB AND GUTTER.
ALAMANCE
NC 54 DELETEDU-2907 NC 100 (MAPLE AVENUE) TO US 70 (CHURCH STREET) IN BURLINGTON. WIDEN TO MULTI- LANES WITH CURB AND GUTTER.
ALAMANCE
NC 87 (WEBB STREET) COMPLETEDU-5152 ELMIRA STREET IN BURLINGTON. INSTALL METAL SIGN POST.
ALAMANCE
SR 1452 (ROCKWOOD AVE.)
DELETEDU-5612 US 70 (CHURCH STREET) TO NC 87 (WEBB AVENUE) IN BURLINGTON. EXTEND AND WIDEN TO MULTILANE DIVIDED FACILITY WITH CURB AND GUTTER, SIDEWALK, BICYCLE LANES, STREET LIGHTS, AND MAST-ARM SIGNAL POLES.
ALAMANCE
C/D-3
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
ROAD / SOUTH WILLIAMSON AVENUE)
DELETEDU-5853 SR 1228 (BOONE STATION DRIVE) IN BURLINGTON TO EAST LEBANON AVENUE IN ELON. WIDEN TO MULTILANES. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUNDOF PRIORITIZATION.
ALAMANCE
SR 1605 (PAUL PAYNE STORE ROAD)
DELETEDB-4405 REPLACE BRIDGE 010130 OVER ELK SHOALS CREEK.
ALEXANDER
SR 1348 (OLD NC 90) DELETEDB-4980 REPLACE BRIDGE 010291 OVER DUCK CREEK.
ALEXANDER
SR 1609 (COUNTY HOME ROAD)
DELETEDB-5391 REPLACE BRIDGE 010139 OVER GLADE CREEK.
ALEXANDER
NC 16 DELETEDR-2403 CATAWBA RIVER TO WILKES COUNTY LINE. UPGRADE TWO LANE ROADWAY. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
ALEXANDER
NC 18 DELETEDB-5388 REPLACE BRIDGE 020021 OVER LITTLE RIVER.
ALLEGHANY
US 52 DELETEDB-4407 REPLACE BRIDGE 030070 OVER ROCKYRIVER.
ANSON
SR 1654 (MORTON ROAD) DELETEDB-5795 REPLACE BRIDGE 030217 OVER LANES CREEK.
ANSON
US 29 US 601 DELETEDB-5808 REPLACE BRIDGE 120057 AND 59 OVER IRISH BUFFALO CREEK.
ANSON
SR 1142 (CITY POND ROAD)
DELETEDB-5809 REPLACE BRIDGE 030075 OVER NORTH FORK JONES.
ANSON
SR 1634 (GRASSY ISLAND ROAD)
DELETEDB-5817 REPLACE BRIDGE 030007 OVER BROWN CREEK.
ANSON
NC 109 DELETEDB-5818 REPLACE BRIDGE 030011 OVER DEADFALL CREEK.
ANSON
SR 1811 (GATEWOOD ROAD)
DELETEDB-5927 REPLACE BRIDGE 030044 OVER REEDY FORK CREEK.
ANSON
NEW ROUTE DELETEDU-5602 US 74 TO NC 218. CONSTRUCT NEW GRADE SEPARATED CROSSING OF RAILROAD IN POLKTON. PROJECT DELETED DUE TO RE-PRIORITIZATION.
ANSON
SR 1351 (CAMPBELL ROAD)
DELETEDB-3804 REPLACE BRIDGE 040296 OVER NORTH FORK NEW RIVER.
ASHE
SR 1347 DELETEDB-4016 REPLACE BRIDGE 040273 OVER BIG HORSE CREEK.
ASHE
NC 88 DELETEDB-4704 REPLACE BRIDGE 040049 OVER BUFFALO CREEK.
ASHE
SR 1527 (HELTON ROAD) DELETEDB-4706 REPLACE BRIDGE 040048 OVER BIG HELTON CREEK.
ASHE
SR 1503 (LOW WATER BRIDGE ROAD)
DELETEDB-5504 REPLACE BRIDGE 040337 OVER NORTH FORK NEW RIVER.
ASHE
US 221 DELETEDB-5821 REPLACE BRIDGE 040010 OVER SOUTH FORK NEW RIVER.
ASHE
SR 1181 (HARTSOG FORD ROAD)
DELETEDB-5823 REPLACE BRIDGE 040355 OVER SOUTH FORK NEW RIVER.
ASHE
SR 1181 (HARTSOG FORD ROAD)
DELETEDB-5830 REPLACE BRIDGE 040177 OVER BEAVER CREEK.
ASHE
SR 1523 (SILAS CREEK ROAD)
DELETEDB-5838 REPLACE BRIDGE 040309 OVER SILAS CREEK.
ASHE
SR 1790 DELETEDB-5891 REPLACE BRIDGE 100715 OVER LEE CREEK.
ASHE
SR 1168 (TUCKER HOLLOW ROAD)
DELETEDB-5524 REPLACE BRIDGE 050149 OVER HORSE CREEK.
AVERY
SR 1166 COMPLETEDBK-5117 REPLACE BRIDGE 050016 OVER HORSE CREEK.
AVERY
US 19E / NC 194 DELETEDR-2520 MULTI-LANE SECTION EAST OF SPRUCE PINE TO US 221. WIDEN TO MULTI-LANES. PROJECT DELETED DUE TO RE-PRIORITIZATION.
AVERY
US 221 DELETEDR-2595 NC 194 TO NC 181 IN LINVILLE. WIDEN TO MULTI-LANES. PROJECT DELETED DUE TO RE-PRIORITIZATION.
AVERY
US 221 DELETEDR-2596 NC 226 TO NC 194. WIDEN TO MULTI-LANES. PROJECT DELETED DUE TO RE-PRIORITIZATION.
AVERY
US 321 DELETEDR-5016 TENNESSEE STATE LINE TO US 421. WIDEN TO MULTI-LANES. PROJECT DELETED DUE TO RE-PRIORITIZATION.
AVERY
C/D-4
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
NC 33 COMPLETEDb-4416 REPLACE BRIDGE 76 OVER THE CAROLINA & NORTHWEST RAILROAD.
BEAUFORT
SR 1003 COMPLETEDB-4421 REPLACE BRIDGE 42 OVER DURHAM CREEK.
BEAUFORT
NC 99 COMPLETEDB-5202 REPLACE BRIDGE 18 OVER A CANAL.BEAUFORT
SR 1625 COMPLETEDB-5204 REPLACE BRIDGE 141 OVER PANTEGO DISTRICT DRAINAGE CANAL.
BEAUFORT
US 17 COMPLETEDK-3800 ACQUIRE RIGHT OF WAY AND RELOCATE REST AREA AT NEW LOCATION WITH UNICIPAL WATER AND SEWER AVAILABLE(COORDINATE WITH R-2510B)
BEAUFORT
US 17 DELETEDR-2511 WASHINGTON BYPASS NORTH OF NC 171 TO MULTI-LANES SOUTH OF WILLIAMSTON. WIDEN TO MULTI-LANES.
BEAUFORT
SR 1306 (15TH STREET) DELETEDW-5008 US 17 BUSINESS (CAROLINA AVENUE) TO PEARCE STREET IN WASHINGTON. WIDEN TO FOUR LANE DIVIDED FACILITY WITH MEDIAN
BEAUFORT
SR 1200 (CONNARITSA ROAD)
COMPLETEDB-5106 REPLACE BRIDGE 070148 OVER WAHTON CREEK.
BERTIE
US 13 COMPLETEDB-5141 REPLACE BRIDGE 070053 OVER WHITE OAK SWAMP.
BERTIE
US 13 DELETEDR-2205 NC 42 AT POWELLSVILLE IN BERTIE COUNTY TO US 13 NORTH OF AHOSKIE IN HERTFORD COUNTY. MULTI-LANES WITH BYPASS OF AHOSKIE ON NEW LOCATION.
BERTIE
US 13 DELETEDR-2506 US 13 BUSINESS NORTH OF WINDSOR TO NC 42. WIDEN TO MULTI-LANES.
BERTIE
US 17 COMPLETEDR-5506 SR 1364 (LEDREW PERRY ROAD) TO CHOWAN RIVER. PAVEMENT STRENGTHENING AND RESURFACING.
BERTIE
US 17 DELETEDR-5731 SOUTH END OF CHOWAN RIVER BRIDGE TO US 17 BUSINESS IN EDENTON. UPGRADE FREEWAY TO INTERSTATE STANDARDS.
BERTIE
NC 11 COMPLETEDB-4028 REPLACE BRIDGE 080012, BRIDGE 080018, AND BRIDGE 080042 OVER CAPE FEAR RIVER AND OVERFLOW.
BLADEN
SR 1806 (MERCER MILL BROWN MARSH ROAD)
COMPLETEDB-4436 REPLACE BRIDGE 080031 OVER BROWNS CREEK
BLADEN
SR 1316 (TAR HEEL FERRY ROAD)
COMPLETEDB-4712 REPLACE BRIDGE 080188 OVER CAPE FEAR RIVER, AND BRIDGE 080189 OVERCAPE FEAR RIVER OVERFLOW.
BLADEN
SR 1318 (RIVER ROAD) COMPLETEDB-5411 REPLACE BRIDGE 080124 OVER JOHNSON POND SPILLWAY WITH A CULVERT.
BLADEN
SR 1100 (CENTER ROAD) DELETEDB-5707 REPLACE BRIDGE 080013 OVER CRAWLEY SWAMP.
BLADEN
SR 1145 (MARTIN LUTHER KING DRIVE)
DELETEDB-5956 REPLACE BRIDGE 080178 OVER BROWN'S CREEK.
BLADEN
VARIOUS COMPLETEDBD-5106 DIVISION 6 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
BLADEN
NC 87 DELETEDR-2561 US 74/US 76 TO ELIZABETHTOWN BYPASS. WIDEN TO MULTI-LANES.
BLADEN
SR 1342 (MAKATOKA ROAD)
DELETEDB-4439 REPLACE BRIDGE 090100 OVER BRANCH OF JUNIPER CREEK.
BRUNSWICK
SR 1500 (MIDWAY ROAD) DELETEDB-5311 REPLACE BRIDGE 090104 OVER MIDDLE SWAMP.
BRUNSWICK
SR 1357 (SMITH AVENUE) DELETEDB-5540 REPLACE BRIDGE 090202 OVER BRANCH OF SHALLOTTE RIVER.
BRUNSWICK
SR 1437 (OLD FAYETTEVILLE ROAD)
DELETEDB-5622 REPLACE BRIDGE 090181 OVER STURGEON CREEK.
BRUNSWICK
SR 1515 (OLD MILL CREEK / OLD MILL CREEK ROAD S.E.)
DELETEDB-5629 REPLACE BRIDGE 090040 OVER MILL CREEK.
BRUNSWICK
SR 1140 (OXPEN ROAD S.W.)
DELETEDB-5634 REPLACE BRIDGE 090055 OVER BRANCH OF LITTLE SHALOTTE RIVER.
BRUNSWICK
SR 1112 (SUNSET HARBOR ROAD S.E.)
DELETEDB-5638 REPLACE BRIDGE 090022 OVER MERCERSMILL POND.
BRUNSWICK
SR 1504 (OLD LENNON ROAD S.E.)
DELETEDB-5640 REPLACE BRIDGE 090123 OVER BRANCH OF LOCKWOD FOLLY RIVER.
BRUNSWICK
C/D-5
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
SR 1167 (PERSIMMON ROAD)
DELETEDEB-5799 BAT TRAIL DRIVE TO NC 179 (BEACH DRIVE). CONSTRUCT SIDEWALK.
BRUNSWICK
US 17 DELETEDK-5301 RENOVATE REST AREA TO INCLUDE ADA COMPLIANT FAMILY RESTROOM AND UPGRADE OF FIXTURES AND FINISHES.
BRUNSWICK
NEW ROUTE COMPLETEDR-3324 NC 211 TO NC 87 AT SR 1525 (BETHEL ROAD). TWO LANE CONNECTOR ON NEW LOCATION.
BRUNSWICK
SR 1500 (MIDWAY ROAD) SR 1401 (GALLOWAY ROAD)
DELETEDR-3434 NC 211 TO US 17 BYPASS. WIDEN TO MULTI-LANES, PART ON NEW LOCATION.
BRUNSWICK
SR 1472 (VILLAGE ROAD) DELETEDR-4063 WEST OF SR 1437 (OLD FAYETTEVILLE ROAD) TO SR 1438 (LANVALE ROAD). WIDEN TO MULTI-LANES.
BRUNSWICK
US 17 DELETEDR-5855 DELETED, WORK TO BE ACCOMPLISHED UNDER W-5601GA.
BRUNSWICK
US 74 / US 76 DELETEDU-3337 SR 1437 (OLD FAYETTEVILLE ROAD). CONVERT GRADE SEPARATION TO AN INTERCHANGE.
BRUNSWICK
NEW ROUTE DELETEDU-5920 US 17 BUSINESS (NORTH MAIN STREET) TO SR 1349 (BRIDGERS ROAD). CONSTRUCT ROUTE ON NEW LOCATION.
BRUNSWICK
ASHEVILLE REGIONAL AIPROT (AVL)
DELETEDAV-5775 WRIGHT BROTHERS WAY ROAD EXTENSION. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
BUNCOMBE
US 19/US 23/US 25/US 70 DELETEDB-4444 REPLACE BRIDGES 100353 AND BRIDGE 100354 OVER SR 1882.
BUNCOMBE
I-40 DELETEDB-4447 REPLACE BRIDGE 110160, AND BRIDGE 110162 OVER SR 1758.
BUNCOMBE
SR 1612 (BROWN ROAD)
DELETEDB-4714 REPLACE BRIDGE 100013 OVER TURKEY CREEK.
BUNCOMBE
SR 3466 (MCFEE ROAD) DELETEDB-5400 REPLACE BRIDGE 100259 OVER SOUTH HOMINY CREEK.
BUNCOMBE
SR 2426 (SHOPE CREEK ROAD)
DELETEDB-5510 REPLACE BRIDGE 100307 OVER SHOPE CREEK.
BUNCOMBE
SR 2500 (BLUE RIDGE ROAD)
DELETEDB-5866 REPLACE BRIDGE 100041 OVER SWANNONOA RIVER.
BUNCOMBE
SR 2816 (FAIR VIEW BAPTIST)
DELETEDB-5887 REPLACE BRIDGE 100099 OVER GARREN CREEK.
BUNCOMBE
SR 3548 (HAWOOD ROAD) COMPLETEDE-4966 SR 3548 (HAYWOOD ROAD), ROBERTS STREET TO THE WESTERN END OF WEST ASHEVILLE RIVERLINK BRIDGE OVER THE FRENCH BROAD RIVER STREETSCAPING.
BUNCOMBE
MCDOWELL ROAD DELETEDEB-5607 SOUTHSIDE AVENUE TO US 25/BILTMORE AVENUE. CONSTRUCT BIKE IMPROVEMENTS. PROJECT DELETED DUE TO RE-PRIORITIZATION.
BUNCOMBE
PATTON AVENUE DELETEDEB-5615 WESTGATE PARKWAY TO OLD HAYWOOD ROAD. PEDESTRIAN CROSSING IMPROVEMENTS AND SIDEWALK GAP CLOSURE. PROJECT DELETED DUE TO RE-PRIORITIZATION.
BUNCOMBE
SR 2002 (RICEVILLE ROAD)
DELETEDEB-5728 US 70 (TUNNEL ROAD) TO BULL MOUNTAIN ROAD. CONSTRUCT SIDEWALK. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
BUNCOMBE
MCDOWELL STREET ALL SOULS CRESCENT
DELETEDEB-5795 SOUTHSIDE AVENUE TO US 25 (HENDERSONVILLE ROAD). CONSTRUCT DEDICATED ON - ROAD BICYCLE LANE. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUNDOF PRIORITIZATION.
BUNCOMBE
BROADWAY STREET DELETEDEB-5796 NC 251 (RIVERSIDE DRIVE) TO I-240. CONSTRUCT BICYCLE IMPROVEMENTS. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUNDOF PRIORITIZATION.
BUNCOMBE
BLACK MOUNTAIN SOUTHEAST CONNECTOR
DELETEDR-5774 NC 9 TO US 70 BUSINESS (SLATE STREET) / SR 1522 (MCCOY COVE ROAD). CONSTRUCT ROADWAY ON NEW LOCATION. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUNDOF PRIORITIZATION.
BUNCOMBE
C/D-6
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
US 70 COMPLETEDU-5178 BLUE RIDGE ROAD TO GROVESTONE ROAD IN BLACK MOUNTAIN. CONSTRUCT SIDEWALKS.
BUNCOMBE
LYMAN STREET AND PORTIONS OF RIVERSIDE DRIVE
DELETEDU-5547 HILL STREET/ I-240 INTERCHANGE TO AMBOY ROAD WITH PORTIONS OF THE ROAD TO BE RE-LOCATED. CONSTRUCT ON-STREET PARKING, INTERSECTION AND SIGNAL UPGRADES, RAILROAD CROSSING IMPROVEMENTS, BRIDGE RE-CONSTRUCTION, SIDEWALKS, STREETSCAPE ELEMENTS, TRANSIT AMENITIES, AND PARALLEL GREENWAY FACILITIES. PROJECT TO BE IMPLEMENTED UNDER U-5019.
BUNCOMBE
US 70 (TUNNEL ROAD) DELETEDU-5784 I-240 TO BEVERLY ROAD. INTERSECTION IMPROVEMENTS AND ACCESS MANAGEMENT. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
BUNCOMBE
FOOTHILLS REGIONAL AIRPORT (MORGANTION-LENOIR AIRPORT0MRN)
DELETEDAV-5765 PARTIAL PARALLEL TAXIWAY - RUNWAY 3 END (DESIGN/CONSTRUCTION). PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
BURKE
FOOTHILLS REGIONAL AIRPORT (MORGANTON-LENIOR AIRPORT -MRN)
DELETEDAV-5766 LAND ACQUISTION-RUNWAY 3 APPROACH / NEW APPROACH LIGHTS. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
BURKE
I-40 DELETEDB-4448 REPLACE BRIDGE 110149, AND BRIDGE 110150 OVER SR 1744.
BURKE
2ND AVENUE DELETEDEB-5624 27TH STREET NW TO LONG VIEW RECREATION CENTER. CONSTRUCT SIDEWALKS. PROJECT DELETED DUE TO RE-PRIORITIZATION.
BURKE
NORTH GREEN STREET DELETEDEB-5793 US 64 WAMSUTTE MILL ROAD. CONSTRUCT SIDEWALK. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
BURKE
HILDEBRAN DELETEDEB-5809 NORTH CENTER STREET, FIRST AVENUE NE TO WILSON ROAD. CONSTRUCT SIDEWALK. DELETE AT REQUEST OF THE TOWN.
BURKE
US 221 DELETEDR-2596 NC 226 TO NC 194. WIDEN TO MULTI-LANES. PROJECT DELETED DUE TO RE-PRIORITIZATION.
BURKE
NC 18 DELETEDU-2550 US 70 BYPASS (FLEMING DRIVE) TO I-40 IN MORGANTON. WIDEN TO MULTI-LANES AND REVISE INTERCHANGE. PROJECT DELETED DUE TO RE-PRIORITIZATION.
BURKE
CONCORD REGIONAL AIRPORT (JQF)
DELETEDAV-5760 EMAS FOR RUNWAY 2 OVERRUN AREA (DESIGN & CONSTRUCT). PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
CABARRUS
SR 2114 (CENTERGROVE ROAD)
DELETEDB-5369 REPLACE BRIDGE 120053 OVER COLD WATER CREEK.
CABARRUS
SR 1706 (OAK AVENUE) DELETEDB-5372 REPLACE BRIDGE 120109 OVER US 29.CABARRUS
SR 1132 (MIAMI CHURCH ROAD)
DELETEDB-5375 REPLACE BRIDGE 120137 OVER DUTCH BUFFALO CREEK.
CABARRUS
SR 1006 (MAIN STREET) DELETEDB-5790 REPLACE BRIDGE 120239 OVER MCALLISTER CREEK.
CABARRUS
SR 2635 (OLD AIRPORT ROAD)
DELETEDB-5794 REPLACE BRIDGE 120129 OVER COLD WATER CREEK.
CABARRUS
NC 24 & NC 27 EAST DELETEDB-5810 REPLACE BRIDGE 120022 OVER ROCKYRIVER.
CABARRUS
NC 73 DELETEDB-5813 REPLACE BRIDGE 120132 OVER DUTCH BUFFALO CREEK.
CABARRUS
CONCORD DELETEDC-5155 RIDER TRANSIT - OPERATIONAL ASSISTANCE FOR SUNDAY SERVICE IN CONCORD. DELETE PROJECT - FUNDS FLEXED TO PUBLIC TRANSPORTATION PROGRAM.
CABARRUS
NC 49 DELETEDR-2533 HARRISBURG TO YADKIN RIVER. WIDEN TO MULTI-LANES. PROJECT DELETED DUE TO RE-PRIORITIZATION.
CABARRUS
C/D-7
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
SR 1394 (POPLAR TENT ROAD)
DELETEDU-3415 WOODHAVEN PLACE/GABLE OAKS LANE TO US 29/US 601 BYPASS IN CONCORD. WIDEN TO MULTI- LANES. (COORDINATE WITH I-3803 B AND C-4918 A). PROJECT DELETED DUE TO REPRIORITIZATION.
CABARRUS
SR 1001 (HIBRITEN DRIVE)
COMPLETEDU-2211 SR 1933 (SOUTHWEST BOULEVARD) TO SR 1712 (STARCROSS ROAD) EAST OF US 321 IN LENOIR. WIDEN TO MULTILANES WITH CURB AND GUTTER, PART ON NEW LOCATION AND CONSTRUCT AN INTERCHANGE AT US 321.
CALDWELL
HUDSON COMPLETEDU-3437 INTERSECTION OF SR 1160 (MT. HERMAN ROAD) AND ROY E. COFFEY DRIVE IN HUDSON. INTERSECTION IMPROVEMENTS.
CALDWELL
NEW ROUTE COMPLETEDU-5204 GRACE CHAPEL ROAD TO TOWN STREET IN HICKORY. CONSTRUCT A TWO-LANE FACILITY ON NEW LOCATION.
CALDWELL
US 17 DELETEDK-5300 RENOVATION OF REST AREA BUILDING AND GROUNDS TO UPGRADE FIXTURESAND FINISHES.
CAMDEN
US158/NC34 COMPLETEDR-2414 EAST OF PASQUOTANK RIVER IN ELIZABETH CITY TO EAST OF NC 34 IN BELCROSS.WIDEN TO MULTI-LANES
CAMDEN
NC 58 COMPLETEDEB-5102 EMERALD ISLE TO INDIAN BEACH. CONSTRUCT BIKE PATH.
CARTERET
US 70 DELETEDEB-5500 35TH STREET TO 25TH STREET. INSTALL SIDEWALKS ON THE NORTH SIDE.
CARTERET
US 70 DELETEDK-5100 REST AREA RENOVATIONS - BUILDINGS AND GROUNDS. UPGRADE FIXTURES AND FINISHES.
CARTERET
US 70 (ARENDELL STREET)
DELETEDU-5876 4TH STREET TO SR 1175 (RADION ISLAND ROAD). WIDEN TO MULTI-LANES.
CARTERET
SR 1554 (YARBOROUGHS MILL ROAD)
COMPLETEDB-4725 REPLACE BRIDGE 160012 OVER COUNTRY LINE CREEK.
CASWELL
SR 1523 (BLANCH RD) COMPLETEDb-5162 REPLACE BRIDGE 160035 OVER NORTH FORK RATTLESNAKE CREEK.
CASWELL
SR 1527 (RIVER BEND ROAD)
DELETEDB-5719 REPLACE BRIDGE 160053 OVER TRIBUTARY OF DAN RIVER.
CASWELL
SR 1710 (GRIERS CHURCH ROAD)
DELETEDB-5725 REPLACE BRIDGE 160007 OVER HYCO CREEK. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
CASWELL
NC 86 DELETEDB-5734 REPLACE BRIDGE 160060 OVER MOON CREEK. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
CASWELL
VARIOUS DELETEDBF-5307 SCREEN AND EVALUATE POTENTIAL FEDERAL FUNDED BRIDGE PROJECTS DIVISION 7.
CASWELL
VARIOUS DELETEDBS-5407 SCREEN AND EVALUATE POTENTIAL STATE FUNDED BRIDGE PROJECTS DIVISION 7.
CASWELL
US 29 DELETEDK-5303 RENOVATION AND UPGRADING OF REST AREA BUILDING AND GROUNDS.
CASWELL
US 158 DELETEDR-2575 NC 86 WEST OF YANCEYVILLE TO SR 1159 (THEE HESTER ROAD) WEST OF ROXBORO. WIDEN TO MULTI-LANES.
CASWELL
US 158 DELETEDR-2586 US 29 AT NC 14 TO NC 86 WEST OF YANCEYVILLE. WIDEN TO MULTI-LANES.
CASWELL
NC 86 COMPLETEDR-5767 SR 1503 (WALTER'S MILL ROAD). CONSTRUCT LEFT TURN LANE ON NC 86.
CASWELL
NC 62 COMPLETEDW-5325 NORTH OF SR 1111 (BYRDS SAWMILL ROAD) TO SOUTH OF SR 1759 (ROSCOE DAMERON ROAD). GEOMETRIC IMPROVEMENTS, PAVED SHOULDERS, AND RESURFACING.
CASWELL
SR 1817 (JOE JOHNSON ROAD)
DELETEDB-5852 REPLACE BRIDGE 170158 OVER NORTH FORK MOUNTAIN CREEK.
CATAWBA
SR 1712 DELETEDB-5854 REPLACE BRIDGE 170007 OVER LYLE CREEK.
CATAWBA
C/D-8
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
SR 1131 (PITTSTOWN ROAD)
DELETEDB-5862 REPLACE BRIDGE 170043 OVER HOP CREEK.
CATAWBA
2ND AVENUE DELETEDEB-5624 27TH STREET NW TO LONG VIEW RECREATION CENTER. CONSTRUCT SIDEWALKS. PROJECT DELETED DUE TO RE-PRIORITIZATION.
CATAWBA
1ST STREET DELETEDEB-5752 ROCK BARN ROAD TO I-40. DECREASE ROADWAY FROM 4-LANES TO 2-LANES AND ADD LANDSCAPED MEDIAN AND BICYCLE LANES. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUNDOF PRIORITIZATION.
CATAWBA
NEWTON DELETEDEB-5804 NEWTON CONOVER HIGH SCHOOL SIDEWALK CONNECTION. DELETED AT THE REQUEST OF THE CITY OF NEWTON.
CATAWBA
HICKORY DELETEDEB-5826 MAIN AVENUE NE/NW, LENOIR-RYHNE BOULEVARD TO 9TH STREET NW. CONSTRUCT PEDESTRIAN WALKWAY AND BRIDGE OVER NC 127. PROJECT DELETED AND FUNDING MOVED TO EB-5750. WORK PROPOSED BY EB-5826 AND EB-5750 IS THE SAME.
CATAWBA
US 321 DELETEDR-0085 NC 27/NC 150 IN LINCOLNTON TO NC 127 IN HICKORY. FOUR LANE DIVIDED FACILITY ON NEW LOCATION. PROJECTDELETED DUE TO RE-PRIORITIZATION.
CATAWBA
SR 1303 (BEN SMITH ROAD)
DELETEDB-4729 REPLACE BRIDGE 180306 OVER PRONGOF ROCKY RIVER. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
CHATHAM
SR 1549 (CASTLE ROCK FARM ROAD)
COMPLETEDB-4730 REPLACE BRIDGE 180108 OVER TERRELL CREEK.
CHATHAM
SR 2159 (ALSTON CHAPEL ROAD)
COMPLETEDB-4731 REPLACE BRIDGE 180129 OVER BRANCH OF ROCKY RIVER.
CHATHAM
SR 2145 (R JORDAN ROAD)
DELETEDB-5747 REPLACE BRIDGE 180157 OVER CEDAR CREEK. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
CHATHAM
VARIOUS DELETEDBF-5308 SCREEN AND EVALUATE POTENTIAL FEDERAL FUNDED BRIDGE PROJECTS DIVISION 8.
CHATHAM
VARIOUS DELETEDBL-5508 BRIDGE IMPROVEMENTS IN DIVISION 8.CHATHAM
VARIOUS DELETEDBS-5408 SCREEN AND EVALUATE POTENTIAL STATE FUNDED BRIDGE PROJECTS DIVISION 8.
CHATHAM
AMERICAN TOBACCO TRAIL (ATT)
COMPLETEDC-5176 AMERICAN TOBACCO TRAIL IN CHATHAM COUNTY, NEW HOPE CHURCH ROAD TRAILHEAD PARK AND RIDE LOT.
CHATHAM
VARIOUS DELETEDC-5565 TRIANGLE J COUNCIL OF GOVERNMENTS TRANSPORTATION DEMAND MANAGEMENT PROGRAM - PHASE II.
CHATHAM
US 15-501 (HILLSBORO STREET)
DELETEDEB-5628 LAUNIS STREET TO POWELL PLACE LANE IN PITTSBORO. CONSTRUCT SIDEWALKS AND CROSSWALK.
CHATHAM
SR 1008 (MT. CARMEL CHURCH ROAD)
DELETEDEB-5738 SR 1008 (OLD FARRINGTON POINT ROAD) TO ORANGE COUNTY LINE. CONSTRUCT BICYCLE LANES.
CHATHAM
SR 1532 (MANNS CHAPEL ROAD)
DELETEDEB-5739 SR 1534 (POYTHRESS ROAD) TO US 15 / US 501. CONSTRUCT BICYCLE LANES.
CHATHAM
VARIOUS DELETEDU-5206 DURHAM-CHAPEL HILL-CARRBORO MPO. RESERVE FOR FUNDS TO BE FLEXED TO FEDERAL TRANSIT ADMINISTRATION FOR TRANSIT PROJECTS.
CHATHAM
VARIOUS DELETEDU-5531 DCHC MPO ALTERNATIVES PROGRAM.CHATHAM
WESTERN CAROLINA REGIONAL AIRPORT (RHP)
DELETEDAV-5776 LAND ACQUISITION IN RUNWAY 8 AND 26 RUNWAY PROTECTION ZONE. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
CHEROKEE
WESTERN CAROLINA REGIONAL AIRPORT (RHP)
DELETEDAV-57777 LAND ACQUISITION IN RUNWAY 26 RUNWAY PROTECTION ZONE. PROJECTDELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
CHEROKEE
SR 1326 (JOE BROWN HIGHWAY)
DELETEDB-4069 REPLACE BRIDGE 190159 OVER HANGING DOG CREEK.
CHEROKEE
C/D-9
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
SR 1127(BELL HILL ROAD)
DELETEDB-4462 REPLACE BRIDGE 190148 OVER PERSIMMON CREEK.
CHEROKEE
SR 1548 (OLD HIGHWAY 64)
DELETEDB-5925 REPLACE BRIDGE 190223 OVER HIWASSEE RIVER.
CHEROKEE
CAMPUS OF MURPHY MIDDLE SCHOOL
DELETEDEB-5735 SR 1649 (BULLDOG DRIVE) TO SR 1680 (MURPHY MIDDLE SCHOOL DRIVE). CONSTRUCT SIDEWALK. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
CHEROKEE
US 19A / US 129 DELETEDK-5302 US 19A/US 129. RENOVATION OF REST AREA BUILDING AND GROUNDS TO INCLUDE ADA COMPLIANT FAMILY RESTROOM AND UPGRADE OF FIXTURES AND FINISHES. PROJECT DELETED DUE TO RE-PRIORITIZATION.
CHEROKEE
SR 2002 (TOBE BRIDGE ROAD)
DELETEDB-5390 REPLACE BRIDGE 220031 OVER MUDDYFORK CREEK.
CLEVELAND
SR 1641 (BRACKETT ROAD)
DELETEDB-5392 REPLACE BRIDGE 220201 OVER KNOB CREEK.
CLEVELAND
NC 150 DELETEDB-5531 REPLACE BRIDGE 220076 OVER BUFFALO CREEK.
CLEVELAND
SR 2245 (BETHLEHEM ROAD)
DELETEDB-5844 REPLACE BRIDGE 220067 OVER BEASON CREEK.
CLEVELAND
SR 2033 (OAK GROVE ROAD)
DELETEDB-5845 REPLACE BRIDGE 220025 OVER BUFFALO CREEK.
CLEVELAND
US 74 BUSINESS DELETEDB-5855 REPLACE BRIDGE 220009 OVER SEABOARD COAST LINE RALROAD.
CLEVELAND
SR 1207(McGRAW ROAD) DELETEDB-5856 REPLACE BRIDGE 220351 OVER CREEKCLEVELAND
SR 1607 (EASTRIDGE DRIVE)
DELETEDB-5858 REPLACE BRIDGE 220392 OVER BUFFALO CREEK.
CLEVELAND
SR 1504 (SHUFORD LAKE ROAD)
DELETEDB-5861 REPLACE BRIDGE 220229 OVER GRASSY BRANCH.
CLEVELAND
SR 1635 (CASAR-BELWOOD ROAD)
DELETEDB-5863 REPLACE BRIDGE 220165 OVER KNOB CREEK.
CLEVELAND
CLEVELAND COUNTY DELETEDEB-5546 CONSTRUCT SEGMENT OF GATEWAY TRAIL FROM GALILEE CHURCH ROAD TO BETHLEHEM ROAD. FEDERAL AID NUMBER NC FLAP CLVND TRL(1). PROJECT DROPPED AT THE REQUEST OF THE LOCAL GOVERNMENT.
CLEVELAND
SHELBY DELETEDEB-5773 INSTALL PEDESTRIAN SIGNAL IMPROVEMENTS AT SIX INTERSECTIONS IN DOWNTOWN SHELBY. PROJECT DELETED. WAS NOTRE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
CLEVELAND
SR 1119 WRIGHT ROAD COMPLETEDB-4475 TOM'S FORK CREEK. REPLACE BRIDGE NO. 85 - ADDED BACK TO STIP AND COMPLETED 2015
COLUMBUS
SR 1700 (RED HILL ROAD) COMPLETEDB-4478 REPLACE BRIDGE 230216 OVER WELCHES CREEK.
COLUMBUS
SR 1700 (RED HILL ROAD) DELETEDB-4479 REPLACE BRIDGE 230222, BRIDGE 230226, BRIDGE 230228 AND BRIDGE 230230 OVER RED HILL SWAMP.
COLUMBUS
SR 1831 (SWIMMING HOLE ROAD)
COMPLETEDB-4481 REPLACE BRIDGE 230279 OVER LIVINGSTON CREEK AND BRIDGE 230288 OVER LIVINGSTON CREEK OVERFLOW.
COLUMBUS
SR 1005 COMPLETEDB-5115 REPLACE BRIDGE 230094 AND BRIDGE 230095 OVER GRISSETT CREEK.
COLUMBUS
SR 1849 (DELCO PROSPER ROAD)
COMPLETEDB-5331 REPLACE BRIDGE 230269 OVER BIG BRANCH.
COLUMBUS
US 74 COMPLETEDR-5507 NC 214 BRUNSWICK COUNTY LINE.RESURFACE
COLUMBUS
US-74 COMPLETEDR-5511 ROBESON COUNTY LINE TO US 76.RESURFACE.
COLUMBUS
SR 1763 COMPLETEDB-4488 REPLACE BRIDGE 176 OVER SLOCUM CREEK.
CRAVEN
US 70 COMPLETEDK-5101 REST AREA RENOVATIONS - BUILDINGS AND GROUNDS. ENCLOSE LOBBY AND ADD ADA COMPLIANT FAMILY RESTROOM.
CRAVEN
C/D-10
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
US 17 DELETEDR-2513 SR 1438 (SPRUILL TOWN ROAD) TO SOUTH OF SR 1127 (POSSUM TRACK ROAD). WIDEN TO MULTI-LANES.
CRAVEN
NC 43 CONNECTOR COMPLETEDR-4463 NC 43/NC 55 TO US 17 IN NEW BERN. CONSTRUCT ROUTE ON NEW LOCATION WITH INTERCHANGE AT US 70. R-4463AA IS COMPLETE.
CRAVEN
US 70 DELETEDR-5603 NEUSE RIVER BRIDGE TO PROPOSED HAVELOCK BYPASS. UPGRADE TO A FREEWAY.
CRAVEN
SR 1278 (TRENT ROAD) DELETEDU-3448 US 17 (MLK JR., BOULEVARD) TO SR 1215 (SIMMONS STREET). WIDEN TO MULTI-LANES. - PROJECT ADDED BACK THEN DELETED FY 17 - WAS NOT FUNDED IN DRAFT 2017-2027 STIP .
CRAVEN
NC 24 COMPLETEDB-4090 REPLACE BRIDGE OVER CROSS CREEK IN FAYETTEVILLE.
CUMBERLAND
I-95 BUSINESS/US 301 COMPLETEDB-4091 REPLACE BRIDGE 250085 OVER CAPE FEAR RIVER, SR 1738, AND SR 1741 IN FAYETTEVILLE
CUMBERLAND
I-95/ US 301 BUSINESS COMPLETEDB-4949 REPLACE BRIDGE 250061 OVER CROSS CREEK.
CUMBERLAND
BIG CROSS CREEK GREENWAY
DELETEDEB-5541 LITTLE CROSS CREEK TO SMITH LAKE IN FORT BRAGG. CONSTRUCT MULTI-USE TRAIL.
CUMBERLAND
SR 1400 (CLIFFDALE DRIVE)
DELETEDEB-5614 SR 1403 (REILLY ROAD) TO SR 1414 (RAEFORD ROAD). CONSTRUCT SIDEWALK ON NORTH SIDE.
CUMBERLAND
SR 1112 (ROCKFISH ROAD)
DELETEDFS-1206A SR 1140 (STRICKLAND BRIDGE ROAD) TO SR 1169 (CAMDEN ROAD). WIDEN TO MULTI-LANES.
CUMBERLAND
I-95 DELETEDI-4745 I-95 BUSINESS (EXIT 56) NORTH OF FAYETTEVILLE IN CUMBERLAND COUNTY TO I-40 (EXIT 81) NORTH OF BENSON IN JOHNSTON COUNTY. REHABILITATE PAVEMENT AND STRUCTURES. WIDEN AND UPGRADE INTERCHANGES AND ADD ADDITIONAL LANES.
CUMBERLAND
I-95 DELETEDI-5336 ROBESON COUNTY LINE TO SOUTH OF I-95 BUSINESS (MILE POST 56). PAVEMENT REHABILITATION.
CUMBERLAND
I-95 DELETEDI-5361 SOUTH OF I-95 BUSINESS (MILE POST 56) IN CUMBERLAND COUNTY TO JOHNSTON COUNTY LINE (MILE POST 78). PAVEMENT REHABILITATION.
CUMBERLAND
NASHVILLE COMPLETEDP-4901 REMOVE HIGHWAY-RAILROAD AT-GRADE CROSSING CONFLICTS AND STREAMLINE RAIL NETWORK OPERATIONS DOWNTOWN INVOLVING CSX TRANSPORTATION, NORFOLK SOUTHERN RAILWAY AND THE ABERDEEN & ROCKFISH RAILROAD.
CUMBERLAND
US 401 DELETEDR-2609 MULTI-LANES NORTH OF FAYETTEVILLE IN CUMBERLAND COUNTY TO FUQUAY-VARINA IN WAKE COUNTY. WIDEN TO MULTI-LANES.
CUMBERLAND
NC 24 COMPLETEDR-5512 US 301, REPLACE BRIDGE 770036, WIDEN TO MULTI-LANES, JACKSON COURT TO SR 1791 (DAWN DRIVE), REVISE I-95 INTERCHANGE (EXIT 22) AND INSTALL SIGNAL.
CUMBERLAND
NC 24-NC 87 COMPLETEDR-5513 ROWAN STREET TO US 401 BYPASS. RESURFACE.
CUMBERLAND
SR 1132 (LEGION ROAD) COMPLETEDU-2809B SR 1363 (ELK ROAD) TO SR 1007 (OWENDRIVE).
CUMBERLAND
SR 1003 COMPLETEDU-2810 NC 59 (HOPE MILLS ROAD) TO SR1007 (OWEN DRIVE) IN FAYETTEVILLE. WIDEN ROADWAY TO MULTI-LANES, PART ON NEW LOCATION.
CUMBERLAND
NC 59 COMPLETEDU-2810A FROM NC 59 (HOPE MILLS ROAD) TO HOPE MILLS BYPASS. WIDEN ROADWAY TO MULTI-LANES.
CUMBERLAND
SR 1410/SR 1411 (BUNCE ROAD)
DELETEDU-3424 US 401 TO SR 1400 (CLIFFDALE ROAD) IN FAYETTEVILLE. WIDEN TO MULTI-LANES.
CUMBERLAND
SR 1007 (ALL AMERICAN FREEWAY)
DELETEDU-4414 SR 1151 (OWEN DRIVE) TO NORTH OF SR 1437 (SANTA FE DRIVE) IN FAYETTEVILLE. ADD AN ADDITIONAL LANE IN EACH DIRECTION.
CUMBERLAND
C/D-11
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
SR 1131 (CAMERON ROAD)
DELETEDU-4706 WEST OF NC 59 (MAIN STREET) TO EAST OF SR 1132 (LEGION ROAD) IN HOPE MILLS. WIDEN TO MULTI-LANES.
CUMBERLAND
I-295 COMPLETEDX-0002BC NC 87/NC 210 (MURCHISON ROAD) TO WEST OF US 401.
CUMBERLAND
I-295 COMPLETEDX-0002CA NC 87/NC 210 (MURCHISON ROAD) TO WEST OF US 401.
CUMBERLAND
I-295 COMPLETEDX-0002CB NC 87/NC 210 (MURCHISON ROAD) TO WEST OF US 401.
CUMBERLAND
NC 168 DELETEDF-5600 RIVER CLASS FERRY FOR CURRITUCK-KNOTTS ISLAND.
CURRITUCK
sr 1208 (WEST KITTY HAWK ROAD)
DELETEDb-5607 REPLACE BRIDGE 270040 OVER CANAL.DARE
NC 12 DELETEDf-5302 REPLACE M/V KINNAKEET. CONSTRUCT RIVER CLASS FERRY.
DARE
NC 12. DELETEDF-5303 REPLACE M/V FRISCO. CONSTRUCT A HATTERAS CLASS FERRY.
DARE
NC 12. DELETEDF-5304 REPLACE M/V CHICAMACOMICO. CONSTRUCT RIVER CLASS FERRY.
DARE
NC 12 DELETEDF-5305 REPLACE M/V CAPE POINT. CONSTRICT RIVER CLASS FERRY.
DARE
NC 12 DELETEDF-5505 HATTERAS INLET TO OCRACOKE ISLAND. REPOWER HATTERAS CLASS FERRIES WITH TIER III DIESEL
DARE
NC 12 COMPLETEDF-5506 HATTERAS FERRY DOCKS.REHABILITATE FERRY RAMPS.
DARE
US 64 DELETEDR-2544 EAST OF SR 1153 (OLD FERRY LANDING ROAD) TO US 264. WIDEN TO MULTI-LANES.
DARE
NC 12 DELETEDR-3116 NC 12 IMPROVEMENTS.DARE
US 158 DELETEDR-3419 US 64/NC 12 TO EASTERN END OF CURRITUCK. ADD ADDITIONAL LANES.
DARE
US 158 DELETEDR-4457 NC 12. IMPROVE INTERSECTION.DARE
SR 1194 (YADKIN COLLEGE ROAD)
COMPLETEDB-4740 REPLACE BRIDGE NO. 7 OVER DYKERS CREEK.
DAVIDSON
SR 1493 (FRYE BRIDGE ROAD)
COMPLETEDB-4741 REPLACE BRIDGE 280038 OVER MUDDYCREEK.
DAVIDSON
SR 1485 (HAMPTON ROAD)
DELETEDB-5165 REPLACE BRIDGE 280042 OVER MUDDYCREEK. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
DAVIDSON
SR 1711 (GUMTREE ROAD)
DELETEDB-5765 REPLACE BRIDGE 280115 OVER WINSTON-SALEM SOUTHBOUND RAILWAY. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
DAVIDSON
SR 3346 (SOUTH MAIN STREET)
DELETEDB-5773 REPLACE BRIDGE 280025 OVER WINSTON-SALEM SOUTHBOUND RAILWAY IN LEXINGTON. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
DAVIDSON
SR 1810 (CLODFELTER ROAD)
DELETEDB-5774 REPLACE BRIDGE 280099 OVER BUSHY FORK CREEK. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
DAVIDSON
SR 1810 (CLODFELTER ROAD)
DELETEDB-5776 REPLACE BRIDGE 280100 OVER ABBOTTS CREEK. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
DAVIDSON
NC 109 DELETEDB-5777 REPLACE BRIDGE 280058 OVER US 64. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
DAVIDSON
US 29 / US 70 / BUSINESS 85
DELETEDB-5785 REPLACE BRIDGE 280121 AND BRIDGE 280122 OVER LEONARD CREEK. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
DAVIDSON
NC 49 DELETEDB-5787 REPLACE BRIDGE 280029 OVER NC 109.PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
DAVIDSON
NC RAILROAD COMPLETEDC-4901A RAILROAD ROADBED, TRACKWORK, AND SIGNALS
DAVIDSON
C/D-12
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
NC RAILROAD COMPLETEDC-4901B PHASE 1 - GRADING, DRAINAGE, PAVING, STRUCTURE
DAVIDSON
NC RAILROAD COMPLETEDC-4901C BOWERS TO LAKE IN DAVIDSON COUNTY. RESTORE DOUBLE TRACK AND GRADE SEPARATE. BREAK "C" PHASE 2 - GRADING, DRAINAGE, PAVING, STRUCTURE
DAVIDSON
CITYWIDE COMPLETEDC-5208 CITY OF LEXINGTON HEAVY DUTY HYBRID REFUSE TRUCK. REPLACE EXISTING TRUCK WITH HYBRID TRUCK.
DAVIDSON
VARIOUS DELETEDC-5232 FEEDER ROUTE INFRASTRUCTURE AND MARKETING SUPPORT. BUS SHELTERS, SIGNAGE AND MARKETING SUPPORT FOR NEW FIXED TRANSIT SERVICE IN THOMASVILLE.
DAVIDSON
NEW GREENWAY DELETEDEB-5111 LAKE TOM-A-LEX TO FINCH PARK IN LEXINGTON. CONSTRUCT MULTI-USE PATH.
DAVIDSON
NORTH CAROLINA RAILROAD
COMPLETEDI-2304AE MP 327.4 - CURVE REALIGNMENTDAVIDSON
I-85 COMPLETEDI-2304AF IMPLEMENTATION OF INTELLIGENT TRANSPORTATION SYSTEM (ITS)
DAVIDSON
VARIOUS DELETEDI-5209 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 9.
DAVIDSON
I-85 DELETEDI-5342 NORTH OF US 64 TO SOUTH OF RANDOLPH COUNTY LINE. PAVEMENT REHABILITATION.
DAVIDSON
I-85 DELETEDI-5365 EAST OF US 29 / US 52 / US 70 / I-85 BUSINESS TO EAST OF US 64. PAVEMENT REHABILITATION.
DAVIDSON
I-85 DELETEDI-5366 WEST OF RANDOLPH COUNTY LINE TO RANDOLPH COUNTY LINE. PAVEMENT REPAIR AND OVERLAY.
DAVIDSON
I-85 DELETEDI-5739 0.9 MILES NORTH OF SR 3508 (7 OAKS DRIVE) TO 0.7 MILES NORTH OF SR 1133 (BELMONT ROAD). PAVEMENT REHABILITATION.
DAVIDSON
US 64 DELETEDR-2220 EAST OF I-85 BUSINESS IN LEXINGTON TO US 220 IN ASHEBORO. WIDEN TO FOUR LANES.
DAVIDSON
NC 8 DELETEDR-2300 NC 49 TO SR 2212 (FAIRVIEW DRIVE). WIDEN ROADWAY, PART TO MULTI-LANES.
DAVIDSON
NC 109 DELETEDR-2568 SOUTH OF I-85 BUSINESS IN THOMASVILLE TO I-40 / US 311 IN WINSTON-SALEM. WIDEN TO FOUR-LANE DIVIDED FACILITY WITH BYPASS OF WALLBURG, SOME NEW LOCATION.
DAVIDSON
US 52 / NC 8 (FUTURE I-285)
COMPLETEDR-4750 I-85 TO NORTH OF SR 1297 (GREEN NEEDLES ROAD). PAVEMENT REHABILITATION AND UPGRADING TO INTERSTATE STANDARDS.
DAVIDSON
NEW ROUTE DELETEDU-2545 US 29 / US 52 / US 70 / I-85 BUSINESS TO SR 2212 (FAIRVIEW ROAD) IN LEXINGTON. FOUR-LANE DIVIDED FACILITY ON NEW LOCATION.
DAVIDSON
VARIOUS DELETEDU-5209 WINSTON-SALEM MPO. RESERVE FOR FUNDS TO BE FLEXED TO FEDERAL TRANSIT ADMINISTRATION FOR TRANSIT PROJECTS.
DAVIDSON
NC 109 DELETEDU-5311 SOUTH OF SR 2067 (LAMBERT RD.) TO I-85 BUS. / US 29-70 IN THOMASVILLE. WIDEN TO A MODERN MULTI-LANE FACILITY WITH SOME NEW LOCATION.
DAVIDSON
VARIOUS DELETEDU-5506 SMALL ROADWAY PROJECTS IN THE WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION (MPO) AREA. PROJECT DELETED - NO AUTHORIZATIONS REQUESTED; USE OF GROUP PROJECTS DISCONTINUED FOR UNDEFINED ROADWAY SCOPES.
DAVIDSON
NC 150 DELETEDU-5902 US 64 TO FORSYTH COUNTY LINE. WIDEN TO MULTILANES.
DAVIDSON
NC 150 COMPLETEDW-5115 SR 1533 (LEONARD BARRIER ROAD) AND SR 1515 (MOUNT OLIVET CHURCH ROAD). CONSTRUCT LEFT TURN LANE.
DAVIDSON
NC 801 DELETEDB-5768 REPLACE BRIDGE 290038 OVER CEDAR CREEK. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
DAVIE
C/D-13
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION
COMPLETEDC-5222 IMPLEMENT A REGIONAL AIR QUALITY AWARENESS PROGRAM.
DAVIE
RICH PARK GREENWAY DELETEDEB-5005 US 158, SR 1400 (CAMPBELL ROAD), AND RICH PARK IN MOCKSVILLE. CONSTRUCT MULTIUSE PATH.
DAVIE
SR 1600 (MILLING ROAD) DELETEDEB-5522 US 158 (NORTH MAIN STREET) TO SR 1601 (BETHEL CHURCH ROAD) IN MOCKSVILLE. CONSTRUCT SIDEWALKS.
DAVIE
I-40 DELETEDI-0911 WEST OF NC 801 (EXIT 180) TO WEST OF JONESTOWN ROAD. PAVEMENT REHABILITATION AND CONSTRUCT FIFTH AND SIXTH LANES.
DAVIE
VARIOUS DELETEDI-5209 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 9.
DAVIE
I-40 DELETEDI-5341 WEST OF NC 801 IN DAVIE COUNTY TO WEST OF SR 1101 (HARPER ROAD) IN FORSYTH COUNTY. PAVEMENT REHABILITATION.
DAVIE
VARIOUS DELETEDU-5209 WINSTON-SALEM MPO. RESERVE FOR FUNDS TO BE FLEXED TO FEDERAL TRANSIT ADMINISTRATION FOR TRANSIT PROJECTS.
DAVIE
VARIOUS DELETEDU-5506 SMALL ROADWAY PROJECTS IN THE WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION (MPO) AREA. PROJECT DELETED - NO AUTHORIZATIONS REQUESTED; USE OF GROUP PROJECTS DISCONTINUED FOR UNDEFINED ROADWAY SCOPES.
DAVIE
NEW ROUTE COMPLETEDU-5540 ACCESS ROAD OFF SR 1345 (INTERSTATE DRIVE). CONSTRUCT ROADWAY TO SERVE NEW MANUFACTURING IN MOCKSVILLE.
DAVIE
SR 1004 (RONES CHAPEL ROAD)
DELETEDB-4501 REPLACE BRIDGE 300325 OVER BRANCH OF NE CAPE FEAR RIVER.
DUPLIN
SR 1704 (KITTY NOECKER ROAD)
DELETEDB-4502 REPLACE BRIDGE 300144 OVER PANTHER CREEK.
DUPLIN
SR 1105 (CARLTON CHAPLE CHURCH ROAD)
COMPLETEDB-5143 REPLACE BRIDGE 300408 OVER STEWARTS CREEK.
DUPLIN
SR 1162 (BAY STREET) DELETEDB-5303 REPLACE BRIDGE 300045 OVER ISLANDCREEK.
DUPLIN
SR 1301 (STOKES STREET)
DELETEDB-5625 REPLACE BRIDGE 300230 OVER GROVECREEK.
DUPLIN
SR 1102 WEST CHARITY ROAD)
DELETEDB-5630 REPLACE BRIDGE 300025 OVER ISLANDCREEK.
DUPLIN
SR 1307 (VEACH'S MILL ROAD)
DELETEDB-5635 REPLACE BRIDGE 300107 OVER NAHUNGA SWAMP.
DUPLIN
SR 1946 (NORTHEAST ROAD)
DELETEDB-5641 REPLACE BRIDGE 300201 OVER ISLANDCREEK.
DUPLIN
I-40 DELETEDI-5376 JOHNSTON COUNTY LINE TO SOUTH OF US 117 (MILE POST 369.4). PAVEMENT REHABILITATION.
DUPLIN
I-40 DELETEDI-5388 SOUTH OF US 117 (MILE POST 369.4) IN DUPLIN COUNTY TO NORTH OF US 117 IN PENDER COUNTY (MILE POST 389.5). PAVEMENT REHABILITATION.
DUPLIN
CSX RAIL LINE COMPLETEDP-5301 WALLACE TO CASTLE HAYNE. RESTORATION OF ABANDONED RAIL LINE.
DUPLIN
NC 41 DELETEDR-2531 NC 11 IN TIN CITY TO EAST OF I-40. WIDEN TO MULTI-LANES.
DUPLIN
SR 1902 (KEMP ROAD) DELETEDB-5512 REPLACE BRIDGE 310089 OVER LICK CREEK. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
DURHAM
NC 751 (HOPE VALLEY RD.)
DELETEDC-5182 CONSTRUCT SIDEWALKS AND BIKE LANES BETWEEN MLK, JR. PARKWAY AND US 15-501 BUSINESS IN DURHAM.
DURHAM
NC 751 (CAMERON BLVD.) SR 1320 (ERWIN RD.) AND DUKE UNIVERSITY RD.
DELETEDC-5183A CONSTRUCT SIDEWALKS IN DURHAM.DURHAM
VARIOUS DELETEDC-5565 TRIANGLE J COUNCIL OF GOVERNMENTS TRANSPORTATION DEMAND MANAGEMENT PROGRAM - PHASE II.
DURHAM
C/D-14
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
BENNETT MEMORIAL ROAD
COMPLETEDE-5502 BENNETT PLACE HISTORIC SITE IN DURHAM. RENOVATION OF VISITOR CENTER TO INCLUDE NEW EXHIBITS AND CLIMATE CONTROL SYSTEM, AND RENOVATION OF GIFT SHOP.
DURHAM
US 501 (NORTH DUKE STREET)
DELETEDEB-5620 MURRAY AVENUE TO US 501 BUSINESS (ROXBORO ROAD) IN DURHAM. CONSTRUCT SIDEWALKS.
DURHAM
I-40 COMPLETEDFS-1205A NC 86 IN ORANGE COUNTY TO SR 1728 (WADE AVENUE) IN WAKE COUNTY. CONSTRUCT MANAGED LANES.
DURHAM
NC 147 (DURHAM FREEWAY)
COMPLETEDFS-1205C I-40 TO EAST END CONNECTOR. WIDEN TO SIX LANES AND REHABILITATE PAVEMENT.
DURHAM
I-85/US 15 DELETEDI-4743 US 70 TO SR 1632 (RED MILL ROAD) IN DURHAM. WIDEN TO SIX LANES.
DURHAM
VARIOUS DELETEDI-5205 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 5.
DURHAM
I-540 COMPLETEDI-5307 I-40 IN DURHAM COUNTY TO NC 50 IN WAKE COUNTY. PAVEMENT REHABILITATION AND SHOULDER SEALS.
DURHAM
I-85/US 15 DELETEDI-5331 NORTH OF MILE POST 183 TO GRANVILLE COUNTY LINE. CLEAN AND RESEAL JOINTS AND REPAIR SPALLS.
DURHAM
I-85/US 15 /US 501 DELETEDI-5334 SOUTH OF US 15-501 TO NORTH OF US 70. CLEAN AND RESEAL JOINTS, AND REPAIR SPALLS.
DURHAM
I-40 DELETEDI-5705 NC 54 INTERCHANGE IN DURHAM. INTERCHANGE IMPROVEMENTS.
DURHAM
NORFOLK SOUTHERN H LINE
DELETEDP-5710 CONSTRUCT GRADE SEPARATIONS AT BLACKWELL STREET CROSSING (735229N) AND US 15 / US 501 BUSINESS SOUTHBOUND (MANGUM STREET) CROSSING (735231P) IN DURHAM.
DURHAM
SR 1978 (HOPSON ROAD) COMPLETEDU-4716A NORFOLK SOUTHERN RAILROAD-NORTH CAROLINA RAILROAD. CONSTRUCT RAILROAD GRADE SEPARATION AND SHIFT RAIL LINE
DURHAM
US 70 DELETEDU-4720 LYNN ROAD TO PROPOSED NORTHERN DURHAM PARKWAY / PROPOSED AVIATION PARKWAY EXTENSION IN DURHAM. UPGRADE TO FREEWAY.
DURHAM
SR 3097 (AVIATION PARKWAY) / NEW ROUTE (NORTHERN DURHAM PARKWAY)
DELETEDU-4721 I-540 IN RALEIGH / WAKE COUNTY TO US 501 (ROXBORO ROAD) IN DURHAM / DURHAM COUNTY. CONSTRUCT VARIABLE-WIDTH ROADWAY WITH MEDIAN ON MULTILANE SECTIONS, PART ON NEW LOCATION.
DURHAM
US 501 (ROXBORO ROAD) DELETEDU-4722 US 501 BYPASS (DUKE STREET) TO SR 1640 (GOODWIN ROAD) IN DURHAM. WIDEN TO SIX LANES WITH MEDIAN.
DURHAM
NC 147 COMPLETEDU-4763B TRIANGLE PARKWAY / TRIANGLE EXPRESSWAY, NC 540 TO I-40 - 3.5 MILES
DURHAM
VARIOUS DELETEDU-5206 DURHAM-CHAPEL HILL-CARRBORO MPO. RESERVE FOR FUNDS TO BE FLEXED TO FEDERAL TRANSIT ADMINISTRATION FOR TRANSIT PROJECTS.
DURHAM
VARIOUS DELETEDU-5531 DCHC MPO ALTERNATIVES PROGRAM.DURHAM
I-540 DELETEDU-5700 I-40 TO US 64 / US 264. WIDEN FROM SIX TO EIGHT LANES AND CONVERT TO TOLL FACILITY.
DURHAM
SR 1006 COMPLETEDB-5316 REPLACE BRIDGE 320059 OVER TRIBUTARY OF COKEY SWAMP.
EDGECOMBE
TARBORO COMPLETEDC-5113 MAIN STREET SIGNAL SYNCHRONIZATION
EDGECOMBE
ROCKY MOUNT DELETEDEB-5510 TAR RIVER TRAIL, EXISTING TAR RIVER TRAIL EASTWARD TO SR 1250 (SPRINGFIELD ROAD). CONSTRUCT MULTI-USE TRAIL.
EDGECOMBE
NC 111 (WILSON STREET) DELETEDU-4424 US 64 ALTERNATE (WESTERN BOULEVARD) TO NC 122 (MCNAIR ROAD) IN TARBORO. WIDEN TO THREE LANES.
EDGECOMBE
US 52 COMPLETEDB-4506 REHABILITATE BRIDGE 330319, AND BRIDGE 330335 OVER SR 1620 (TOBACCOVILLE ROAD) IN TOBACCOVILLE.
FORSYTH
C/D-15
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
(OLD GREENSBORO ROAD)
DELETEDB-4509 REPLACE BRIDGE 330210 OVER SALEM CREEK IN WINSTON-SALEM. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
FORSYTH
SR 2667 (HASTINGS HILL ROAD)
COMPLETEDB-4511 REPLACE BRIDGE 330201 OVER KERNER'S MILL CREEK IN WINSTON-SALEM.
FORSYTH
SR 2264 (AKRON DRIVE) DELETEDB-4746 REPLACE BRIDGE 330229 OVER NORFOLK SOUTHERN RAILROAD IN WINSTON-SALEM. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
FORSYTH
SR 1003 (HIGH POINT ROAD)
COMPLETEDB-5107 REPLACE BRIDGE 330034 OVER ABBOTTS CREEK.
FORSYTH
SR 1001 (COUNTRY CLUB ROAD)
DELETEDB-5148 REPLACE BRIDGE 330276 OVER NC 67 IN WINSTON-SALEM. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
FORSYTH
SR 1100 (LASATER ROAD) DELETEDB-5152 REPLACE BRIDGE 330095 OVER BLANKET CREEK IN CLEMMONS. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
FORSYTH
SR 1611 (MAIN STREET) DELETEDB-5771 REPLACE BRIDGE 330016 OVER MUDDYCREEK IN BETHANIA. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
FORSYTH
ROBINHOOD ROAD DELETEDB-5775 REPLACE BRIDGE 330275 OVER NC 67 (SILAS CREEK PARKWAY) IN WINSTON-SALEM. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
FORSYTH
SR 2999 (HAMPTON ROAD)
DELETEDB-5781 REPLACE BRIDGE 330109 OVER NORFOLK SOUTHERN RAILROAD. PROJECT DELETED; WORK TO BE ACCOMPLISHED UNDER U-2707.
FORSYTH
VARIOUS COMPLETEDC-4981 INSTALL INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICES AT SELECTED LOCATIONS IN WINSTON-SALEM.
FORSYTH
VARIOUS COMPLETEDC-5142B INTERIM WINSTON-SALEM TRAFFIC SIGNAL SYSTEM - PHASE II
FORSYTH
VARIOUS COMPLETEDC-5224A UPGRADE CITY OF WINSTON-SALEM SIGNAL SYSTEM. - PHASE A
FORSYTH
VARIOUS COMPLETEDC-5224B UPGRADE CITY OF WINSTON-SALEM SIGNAL SYSTEM - PHASE B
FORSYTH
PIEDMONT TRIAD RESEARCH PARK RAIL / TRAIL
DELETEDEB-5601 PHASE I, THIRD STREET TO SR 4325 (MARTIN LUTHER KING, JR. BOULEVARD) IN WINSTON-SALEM. CONSTRUCT MULTIUSE PATH ALONG NCDOT RAIL CORRIDOR THROUGH PIEDMONT TRIAD RESEARCH PARK.
FORSYTH
SR 4000 (UNIVERSITY PARKWAY)
DELETEDEB-5613 WAKE FOREST ROAD TO MERCANTILE DRIVE IN WINSTON-SALEM. CONSTRUCT SIDEWALK.
FORSYTH
US 52 DELETEDFS-1209A NC 65 IN WINSTON-SALEM TO I-74 IN SURRY COUNTY. CORRIDOR UPGRADE TO INTERSTATE STANDARDS.
FORSYTH
FORUM PARKWAY CONNECTOR
DELETEDFS-1509A FORUM PARKWAY TO NC 66 (UNIVERSITY PARKWAY) IN RURAL HALL. 2-LANE FACILITY ON NEW LOCATION. STUDY CANCELED AT REQUEST OF DIVISION - WORK TO BE ACCOMPLISHED UNDER U-5899.
FORSYTH
I-40 DELETEDI-0911 WEST OF NC 801 (EXIT 180) TO WEST OF JONESTOWN ROAD. PAVEMENT REHABILITATION AND CONSTRUCT FIFTH AND SIXTH LANES.
FORSYTH
VARIOUS DELETEDI-5209 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 9.
FORSYTH
I-40 DELETEDI-5315 WEST OF SR 1101 (HARPER ROAD) TO EAST OF US 421. PAVEMENT REHABILITATION.
FORSYTH
I-40 DELETEDI-5341 WEST OF NC 801 IN DAVIE COUNTY TO WEST OF SR 1101 (HARPER ROAD) IN FORSYTH COUNTY. PAVEMENT REHABILITATION.
FORSYTH
C/D-16
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
I-74 / US 311 DELETEDI-5510 I-40 IN FORSYTH COUNTY TO NC 68 IN GUILFORD COUNTY. MILL, FILL AND RESURFACE.
FORSYTH
I-74 / US 311 COMPLETEDI-5511 I-40 IN FORSYTH COUNTY TO EAST OF SR 1980 (OLD PLANK ROAD) IN GUILFORD COUNTY. INSTALL SIGNAGETO REFLECT INTERSTATE DESIGNATION.
FORSYTH
I-40 DELETEDI-5814 0.4 MILE EAST OF SR 2632 (OLD SALEM ROAD) IN FORSYTH COUNTY TO 0.3 MILE WEST OF SR 1860 (MACY GROVE ROAD) IN GUILFORD COUNTY. PAVEMENT REHABILITATION. PROJECT DELETED; WORK TO BE ACCOMPLISHED UNDER I-5795.
FORSYTH
I-40 DELETEDI-5857 0.3 MILE EAST OF SR 3153 (HANES MALL BOULEVARD) TO 1.8 MILES EAST OF SR 1003 (HIGH POINT ROAD) IN WINSTON-SALEM. PAVEMENT REHABILITATION. PROJECT DELETED; WORK TO BE ACCOMPLISHED UNDER I-5795.
FORSYTH
NEW ROUTE DELETEDR-2247A WINSTON-SALEM NORTHERN BELTWAY, WESTERN SECTION, US 158 TO I-40. FOUR LANE EXPRESSWAY ON NEW LOCATION.
FORSYTH
NC 109 DELETEDR-2568 SOUTH OF I-85 BUSINESS IN THOMASVILLE TO I-40 / US 311 IN WINSTON-SALEM. WIDEN TO FOUR-LANE DIVIDED FACILITY WITH BYPASS OF WALLBURG, SOME NEW LOCATION.
FORSYTH
WINSTION-SALEM NORTHERN BELTWAY (EASTERN SECTION)
COMPLETEDU-2579G BRIDGE NO. 366 OVER US 421 / NC 150 / BUS. 40
FORSYTH
SR 2601 (MACY GROVE ROAD)
COMPLETEDU-2800 INDUSTRIAL PARK DRIVE TO SR 1005 (EAST MOUNTAIN STREET) IN KERNERSVILLE. WIDEN TO FOUR LANES WITH WIDE OUTSIDE LANES, CURB AND GUTTER, PART ON NEW LOCATION; AND CONVERT GRADE SEPARATION AT I-40 BUSINESS TO AN INTERCHANGE.
FORSYTH
SR 4000 (UNIVERSITY PARKWAY)
DELETEDU-2924 SR 1528 (NORTH POINT BOULEVARD) TO SR 1672 (HANES MILL ROAD) IN WINSTON-SALEM. ADD LANES.
FORSYTH
SR 2643 (UNION CROSS ROAD)
COMPLETEDU-4909 SR 2691 (WALLBURG ROAD) TO SR 2632 (SEDGE GARDEN ROAD) IN WINSTON-SALEM AND KERNERSVILLE. WIDEN TO MULTILANES.
FORSYTH
VARIOUS DELETEDU-5209 WINSTON-SALEM MPO. RESERVE FOR FUNDS TO BE FLEXED TO FEDERAL TRANSIT ADMINISTRATION FOR TRANSIT PROJECTS.
FORSYTH
VARIOUS DELETEDU-5506 SMALL ROADWAY PROJECTS IN THE WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION (MPO) AREA. PROJECT DELETED - NO AUTHORIZATIONS REQUESTED; USE OF GROUP PROJECTS DISCONTINUED FOR UNDEFINED ROADWAY SCOPES.
FORSYTH
VARIOUS DELETEDU-5533 WINSTION-SALEM URBAN AREA MPO ALTERNATIVES PROGRAM.
FORSYTH
SR 1672 (HANES MILL ROAD)
DELETEDU-5755 MUSEUM DRIVE TO SR 4000 (UNIVERSITY PARKWAY) IN WINSTON-SALEM. WIDEN TO MULTILANES.
FORSYTH
SR 1433 (PERSON ROAD) DELETEDB-4516 REPLACE BRIDGE 340052 OVER SANDY CREEK. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
FRANKLIN
SR 1147 (HOLDEN ROAD) COMPLETEDB-4748 REPLACE BRIDGE 340002 OVER HORSE CREEK.
FRANKLIN
SR 1200 (WES SANDLING ROAD)
COMPLETEDB-4749 REPLACE BRIDGE NO. 27 OVER MIDDLE CREEK.
FRANKLIN
SR 1719 (BRANNON ROAD)
DELETEDB-4750 REPLACE BRIDGE 340090 OVER NORRIS CREEK. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
FRANKLIN
SR 1413 (SUTTON ROAD) DELETEDB-5330 REPLACE BRIDGE 340107 OVER DEVIL CRADLE CREEK. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
FRANKLIN
C/D-17
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
VARIOUS DELETEDC-5565 TRIANGLE J COUNCIL OF GOVERNMENTS TRANSPORTATION DEMAND MANAGEMENT PROGRAM - PHASE II.
FRANKLIN
CSX S-LINE DELETEDEB-5128 PROPOSED MULTIPURPOSE TRAIL IN VICINITY OF SOUTHEAST HIGH-SPEED RAIL CORRIDOR, FROM RALEIGH TO VIRGINIA STATE LINE.
FRANKLIN
VARIOUS DELETEDU-5205 CAPITAL AREA MPO.RESERVE FOR FUNDS TO BE FLEXED TO FEDERAL TRANSIT ADMINISTRATION FOR TRANSIT PROJECTS.
FRANKLIN
US 1 COMPLETEDW-5317 SR 1135 (WALL ROAD) IN FRANKLIN COUNTY TO US 1 BUSINESS IN VANCE COUNTY. INSTALL MEDIAN BARRIER.
FRANKLIN
SR 1819 (ALEXIS ROAD) DELETEDB-4981 REPLACE BRIDGE 350172 OVER HOYLE'S CREEK.
GASTON
SR 1909 (KILLIAN ROAD) DELETEDB-5535 REPLACE BRIDGE 350198 OVER JOHNSTON CREEK.
GASTON
SR 3217 (BRADFORD HEIGHTS ROAD)
DELETEDB-5851 REPLACE BRIDGE 350019 OVER CATAWBA CREEK.
GASTON
US 29/ US 74 DELETEDB-5857 REPLACE BRIDGE 350082 OVER SOUTH FORK CATAWBA RIVER.
GASTON
NC 273 DELETEDB-5926 REPLACE BRIDGE 350022 OVER DUKE POWER FEEDER CANAL.
GASTON
CRAMERTON DELETEDC-5563 FLEET VEHICLE CONVERSIONS (RETROFIT) TO LPG BI-FUEL. PROJECT DELETED AT THE REQUEST OF THE MPO. FUNDING SHIFTED TO C-5623.
GASTON
CRAMER MOUNTAIN ROAD
DELETEDEB-5611 CRAMERTON TOWN CENTER TO CRAMERTON MIDDLE SCHOOL. CONSTRUCT PAVED TRAIL. PROJECT DELETED DUE TO RE-PRIORITIZATION.
GASTON
NC 279 (NORTH NEW HOPE ROAD)
DELETEDEB-5702 US 29/74 (EAST FRANKLIN BOULEVARD) TO NC 7 (EAST OZARK AVENUE). CONSTRUCT MISSING SIDEWALK ON ONE SIDE OF ROAD. DELETED AT THE REQUEST OF THE
GASTON
SR 2200 (COX ROAD) DELETEDEB-5706 I-85 COURT DRIVE. CONSTRUCT MISSING SIDEWALK ON BOTH SIDES. DELETED AT REQUEST OF THE CITY OFGASTONIA.
GASTON
NC 279 (SOUTH NEW HOPE ROAD)
DELETEDEB-5743 SR 2200 (ARMSTRONG PARK ROAD) TO SR 1255 (EAST HUDSON BOULEVARD). CONSTRUCT MISSING SIDEWALKS ON BOTH SIDES OF ROAD, ADDRESS ADA COMPLIANCE OF EXISTING SIDEWALK, AND MAKE PEDESTRIAN IMPROVEMENTS TO INTERSECTIONS. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
GASTON
SECOND AVENUE DELETEDEB-5751 SR 2278 (SOUTH MARIETTA STREET) TO SR 1131 (LINWOOD ROAD). CONSTRUCT BIKE FACILITIES AND MISSING SIDEWALK. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
GASTON
SECOND AVENUE DELETEDEB-5767 SOUTH CHESTNUT STREET SOUTH BELVEDERE AVENUE. CONSTRUCT BIKE FACILITIES AND MISSING SIDEWALK. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
GASTON
WEST WALNUT AVENUE DELETEDEB-5769 WEST AIRLINE AVENUE TO NORTH FIRESTONE STREET. CONSTRUCT SIDEWALK. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
GASTON
HENDERSON STREET; MCARVER STREET; MOUNTAIN VIEW STREET
DELETEDEB-5771 MCARVER STREET; MOUNTAIN VIEW STREET; MCARVER STREET TO GAIL AVENUE; HENDERSON STREET; SOUTH YORK ROAD. CONSTRUCT SIDEWALK ON ONE SIDE. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUNDOF PRIORITIZATION.
GASTON
NC 274/BROAD STREET DELETEDEB-5772 EAST 4TH AVENUE TO NC 7 (LONG AVENUE). ADD BIKE FACILITIES, IMPROVE SIDEWALKS, AND MAKE BIKE/PEDESTRIAN IMPROVEMENTS TO INTERSECTIONS. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUNDOF PRIORITIZATION.
GASTON
C/D-18
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
I-85 DELETEDI-5869 MAIN STREET IN LOWELL (EXIT 22) TO SAM WILSON ROAD (EXIT 29). DEPLOY INTELLIGENT TRANSPORTATION SYSTEM (ITS) IMPROVEMENTS ALONG CORRIDOR. PROJECT DELETED-WORK TO BE ACCOMPLISHED IN C-5600G
GASTON
RE-LOCATED US 321 DELETEDR-2608 I-85 WEST OF GASTONIA TO US 321 NORTH OF GASTONIA. FOUR LANE DIVIDED FREEWAY ON NEW LOCATION. PROJECT DELETED DUE TO RE-PRIORITIZATION.
GASTON
NC 279 DELETEDR-3107 CHERRYVILLE TO US 321. WIDEN TO MULTI-LANES. PROJECT DELETED DUE TO RE-PRIORITIZATION.
GASTON
GARDEN PARKWAY DELETEDU-3321 I-85 IN GASTON COUNTY TO I-485/NC 160 NEAR THE CHARLOTTE DOUGLAS INTERNATIONAL AIRPORT IN MECKLENBURG COUNTY. FOUR LANES ON NEW LOCATION. PROJECT DELETED DUE TO RE-PRIORITIZATION.
GASTON, MECKL
US 13 DELETEDR-2507 SR 1202 (EURE ROAD-GATES SCHOOL ROAD) TO VIRGINIA STATE LINE.
GATES
US 158 DELETEDR-2578 US 13 TO NC 32 IN SUNBURY. WIDEN TO MULTI-LANES.
GATES
US 158 DELETEDR-2579 NC 32 IN SUNBURY IN GATES COUNTY TO US 17 AT MORGAN'S CORNER IN PASQUOTANK COUNTY. WIDEN TO MULTI-LANES.
GATES
NC 143 DELETEDR-2822 WEST BUFFALO CREEK TO NC 143 BUSINESS. UPGRADE CORRIDOR. PROJECT DELETED DUE TO RE-PRIORITIZATION.
GRAHAM
SR 1150 (GOOCHS MILL ROAD)
COMPLETEDB-4522 REPLACE BRIDGE 380102 OVER TAR RIVER.
GRANVILLE
SR 1432 (HERMAN WILKERSON ROAD)
COMPLETEDB-5151 REPLACE BRIDGE 380215 OVER LITTLE GRASSY CREEK.
GRANVILLE
SR 1304 (SUNSET ROAD) COMPLETEDB-5157 REPLACE BRIDGE 380178 OVER FOX CREEK.
GRANVILLE
SR 1300 (CORNWALL ROAD)
DELETEDB-5166 REPLACE BRIDGE 380138 OVER GRASSY CREEK. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
GRANVILLE
SR 1442 (DAVE WINSTON ROAD)
DELETEDB-5323 REPLACE BRIDGE 380143 OVER JOHNSTON CREEK. PROJECT DELETEDAT REQUEST OF STRUCTURES MANAGEMENT UNIT.
GRANVILLE
SR 1724 (NORTHSIDE ROAD)
DELETEDB-5677 REPLACE BRIDGE 380042 OVER LEDGE CREEK. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
GRANVILLE
SR 1400 (GRASSY CREEK - VIRGILINA ROAD)
DELETEDB-5682 REPLACE BRIDGE 380129 OVER BEECH CREEK. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
GRANVILLE
NEW GREENWAY COMPLETEDC-5114 CONSTRUCT SPUR OF "HIKE AND BIKE" PROJECT IN CREEDMOOR.
GRANVILLE
NEW MULTI-USE TRAIL COMPLETEDC-5144 CROSS-TOWN PEDESTRIAN- BICYCLE SIDEWALK AND TRAIL IN CREEDMOOR. CONSTRUCT A MULTI-USE TRAIL.
GRANVILLE
VARIOUS DELETEDC-5565 TRIANGLE J COUNCIL OF GOVERNMENTS TRANSPORTATION DEMAND MANAGEMENT PROGRAM - PHASE II.
GRANVILLE
NC 56 (C STREET) DELETEDEB-5626 SR 1103 (CENTRAL AVENUE) TO SR 1245 (29TH STREET) IN BUTNER. CONSTRUCT SIDEWALK.
GRANVILLE
VARIOUS DELETEDI-5205 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 5.
GRANVILLE
I-85/US 15 DELETEDI-5332 NORTH OF DURHAM COUNTY LINE TO NORTH OF US 15. CLEAN AND RESEAL JOINTS, AND REPAIR SPALLS.
GRANVILLE
I-85 DELETEDI-5377 NORTH OF NC 56 TO VANCE COUNTY LINE. CLEAN AND RESEAL JOINTS, AND REPAIR SPALLS.
GRANVILLE
C/D-19
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
US 158 DELETEDR-2257 OXFORD OUTER LOOP, US 158 BUSINESS WEST OF OXFORD TO US 158 BUSINESS EAST OF OXFORD. WIDEN TO MULTI-LANES.
GRANVILLE
US 158 DELETEDR-2585 SR 1159 (THEE HESTER ROAD) WEST OF ROXBORO TO OXFORD OUTER LOOP. WIDEN TO MULTI-LANES WITH BYPASS OF ROXBORO ON NEW LOCATION.
GRANVILLE
VARIOUS DELETEDU-5205 CAPITAL AREA MPO.RESERVE FOR FUNDS TO BE FLEXED TO FEDERAL TRANSIT ADMINISTRATION FOR TRANSIT PROJECTS.
GRANVILLE
26TH STREET DELETEDU-5829 NORTHWEST OF SR 1107 (WILKINS ROAD) TO SR 1104 (EAST LYON STATION ROAD) IN BUTNER. UPGRADE AND EXTEND ROADWAY, INCLUDING GRADE SEPARATION OVER I-85. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
GRANVILLE
SR 1215 (APPLE TREE ROAD)
COMPLETEDB-4755 REPLACE BRIDGE 390065 OVER APPLETREE SWAMP.
GREENE
SR 1253 (LINDELL ROAD) COMPLETEDB-5112 REPLACE BRIDGE 390072 OVER APPLETREE SWAMP.
GREENE
NC 903 DELETEDR-5300 SNOW HILL TO PITT COUNTY LINE. IMPROVE ROADWAY.
GREENE
US 258 COMPLETEDW-5329 NORTH OF SR 1117 (FRED HARRISON ROAD) TO SOUTH OF SR 1101 (BROWNTOWN ROAD). WIDEN TO PROVIDE A LEFT TURN LANE.
GREENE
PIEDMONT TRIAD INTERNATIONAL AIRPORT (GSO)
DELETEDAV-5783 RELOCATE AND UPGRADE ASR-9 FROMCURRENT LOCATION TO SITE OUTSIDE FUTURE AIRPORT EXPANSION AREA. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
GUILFORD
SR 2128 (BUNCH ROAD) COMPLETEDB-4756 REPLACE BRIDGE 400120 OVER REEDY FORK CREEK IN GREENSBORO.
GUILFORD
SR 2824 (CREEKVIEW ROAD)
COMPLETEDB-4758 REPLACE BRIDGE 400159 OVER NORTH BUFFALO CREEK.
GUILFORD
SR 1105 (EAST STEEPLE CHASE ROAD)
DELETEDB-4956 REPLACE BRIDGE 400025 OVER POLE CAT CREEK. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
GUILFORD
SR 1193 (BAKER ROAD) COMPLETEDB-4957 REPLACE BRIDGE 400056 OVER RICHLAND CREEK IN HIGH POINT.
GUILFORD
SR 2719 (HIGH ROCK ROAD)
COMPLETEDB-4959 REPLACE BRIDGE 400193 OVER BUFFALO CREEK.
GUILFORD
SR 2136 (FLEMING ROAD) DELETEDB-5345 REPLACE BRIDGE 400456 OVER BRUSH CREEK IN GREENSBORO. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
GUILFORD
US 29 / US 70 / BUSINESS 85
DELETEDB-5351 REPLACE BRIDGE 400237 AND BRIDGE 400242 OVER DEEP RIVER IN HIGH POINT. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
GUILFORD
US 29 / US 70 / BUSINESS 85
DELETEDB-5353 REPLACE BRIDGE 400147 OVER SR 1993 (SOUTH MAIN STREET) IN HIGH POINT. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
GUILFORD
SR 4771 (REEDY FORK PARKWAY)
DELETEDB-5354 REPLACE BRIDGE 400360 OVER US 29 IN GREENSBORO.
GUILFORD
SR 1523 (DEEP RIVER ROAD)
DELETEDB-5714 REPLACE BRIDGE 400067 OVER DEEP RIVER IN HIGH POINT. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
GUILFORD
SR 4240 (EAST LEE STREET - WESTBOUND)
DELETEDB-5717 REPLACE BRIDGE 400109 AND BRIDGE 400121 OVER SOUTH BUFFALO CREEK IN GREENSBORO. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
GUILFORD
SR 1158 (JACKSON LAKE ROAD)
DELETEDB-5723 REPLACE BRIDGE 400054 OVER TWO MILE CREEK IN HIGH POINT. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
GUILFORD
C/D-20
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
SR 3314 (WILEY LEWIS ROAD)
DELETEDB-5724 REPLACE BRIDGE 400293 OVER LITTLE ALAMANCE CREEK. PROJECT DELETEDAT REQUEST OF STRUCTURES MANAGEMENT UNIT.
GUILFORD
SR 1001 (NORTH CHURCH STREET)
DELETEDB-5726 REPLACE BRIDGE 400135 OVER AN UNNAMED BRANCH. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
GUILFORD
SR 2109 (EVERFIELD ROAD)
DELETEDB-5731 REPLACE BRIDGE 400112 OVER HAW RIVER IN OAK RIDGE AND STOKESDALE. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
GUILFORD
SR 2526 (SUMMIT AVENUE)
DELETEDB-5732 REPLACE BRIDGE 400412 OVER NORTH BUFFALO CREEK IN GREENSBORO. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
GUILFORD
NC 61 COMPLETEDB-5736 REPLACE BRIDGE 400038 OVER BEAVER CREEK.
GUILFORD
VARIOUS DELETEDBF-5307 SCREEN AND EVALUATE POTENTIAL FEDERAL FUNDED BRIDGE PROJECTS DIVISION 7.
GUILFORD
VARIOUS DELETEDBS-5407 SCREEN AND EVALUATE POTENTIAL STATE FUNDED BRIDGE PROJECTS DIVISION 7.
GUILFORD
FLORIDA STREET COMPLETEDC-5511 RANDOLPH STREET INTERSECTION IN GREENSBORO. CONSTRUCT LEFT TURN LANES.
GUILFORD
REGIONWIDE COMPLETEDC-5561 PIEDMONT AUTHORITY FOR REGIONAL TRANSPORTATION VANPOOL VEHICLE REPLACEMENT / EXPANSION.
GUILFORD
NEW MULTI-USE TRAIL DELETEDEB-4709 BATTLEGROUND AVENUE RAIL-TRAIL IN GREENSBORO.
GUILFORD
HILL STREET CONNECTOR
DELETEDEB-5602 BATTLEGROUND AVENUE TO MENDENHALL STREET IN GREENSBORO. REDUCE NUMBER OF THROUGH LANES AND CONSTRUCT SIDE PATH AND TURN LANES.
GUILFORD
SR 2526 (SUMMIT AVENUE)
DELETEDEB-5625 SOUTH OF 16TH STREET TO RANKIN ROAD IN GREENSBORO. CONSTRUCT SIDEWALK.
GUILFORD
DEEP RIVER GREENWAY EXTENSION
DELETEDEL-5104 GREENWAY TRAIL CONNECTING UNIVERSITY PARK WITH PIEDMONT ENVIRONMENTAL CENTER IN HIGH POINT.
GUILFORD
VARIOUS DELETEDI-5207 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 7.
GUILFORD
US 220 / I-73 / I-74 COMPLETEDI-5329 SOUTH OF ELLERBE IN RICHMOND COUNTY TO I-85 / US 421 IN GUILFORD COUNTY. UPGRADE SIGNING TO INTERSTATE STANDARDS.
GUILFORD
I-40 / US 421 DELETEDI-5337 BUSINESS 40 / US 421 TO EAST OF SR 1850 (SANDY RIDGE ROAD). PAVEMENTREHABILITATION.
GUILFORD
I-85 DELETEDI-5339 NORTH OF US 29 / US 70 (EXIT 118) TO SOUTH OF I-73 / US 421. PAVEMENT REHABILITATION.
GUILFORD
I-40 / I-85 DELETEDI-5363 I-785 / I-840 TO EAST OF SR 3056 (ROCK CREEK DAIRY ROAD). PAVEMENT REHABILITATION.
GUILFORD
I-40 / I-85 DELETEDI-5392 EAST OF SR 3056 (ROCK CREEK DAIRY ROAD) IN GUILFORD COUNTY TO WEST OF SR 1226 (UNIVERSITY DRIVE) IN ALAMANCE COUNTY. PAVEMENT REHABILITATION.
GUILFORD
I-74 / US 311 DELETEDI-5510 I-40 IN FORSYTH COUNTY TO NC 68 IN GUILFORD COUNTY. MILL, FILL AND RESURFACE.
GUILFORD
I-74 / US 311 COMPLETEDI-5511 I-40 IN FORSYTH COUNTY TO EAST OF SR 1980 (OLD PLANK ROAD) IN GUILFORD COUNTY. INSTALL SIGNAGETO REFLECT INTERSTATE DESIGNATION.
GUILFORD
I-40 DELETEDI-5814 0.4 MILE EAST OF SR 2632 (OLD SALEM ROAD) IN FORSYTH COUNTY TO 0.3 MILE WEST OF SR 1860 (MACY GROVE ROAD) IN GUILFORD COUNTY. PAVEMENT REHABILITATION. PROJECT DELETED; WORK TO BE ACCOMPLISHED UNDER I-5795.
GUILFORD
C/D-21
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
I-85 DELETEDI-5896 SR 1113 (KIVETT DRIVE) NEAR HIGH POINT. CONVERT GRADE SEPARATION TO INTERCHANGE. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
GUILFORD
US 158 DELETEDR-2580 US 220 TO US 29. WIDEN TO MULTI-LANES.
GUILFORD
SR 1008 (WEST MARKET STREET)
COMPLETEDR-2611 SR 2007 (BUNKER HILL ROAD) AT COLFAX TO NC 68 IN GREENSBORO. WIDEN TO MULTILANES.
GUILFORD
US 70 DELETEDR-2910 SR 3056 (ROCK CREEK DAIRY ROAD) IN GUILFORD COUNTY TO SR 1309 (WESTBROOK AVENUE) IN ALAMANCE COUNTY. WIDEN TO MULTI-LANES WITH CURB AND GUTTER.
GUILFORD
SR 2526 (SUMMIT AVENUE)
DELETEDR-4707 SR 2664 (BRYAN PARK ROAD) TO US 29-SR 4771 (REEDY FORK PARKWAY) INTERCHANGE. CONSTRUCT ROADWAY IMPROVEMENTS AND REVISE INTERCHANGE.
GUILFORD
US 70 DELETEDU-2581 SR 2851 (PENRY ROAD) TO SR 3056 (ROCK CREEK DAIRY ROAD) IN GREENSBORO AND SEDALIA. WIDEN TO MULTI-LANES, SOME RELOCATION.
GUILFORD
SR 1556 (GALLIMORE DAIRY ROAD)
DELETEDU-4015 NC 68 TO SR 1008 (MARKET STREET) IN GREENSBORO. WIDEN TO MULTI-LANES.
GUILFORD
VARIOUS COMPLETEDU-5157D RESURFACING AT SELECTED LOCATIONS. SECTIONS OF HOLDEN ROAD, FLORIDA STREET, BESSEMER AVENUE, MEADOWVIEW ROAD, CONE BOULEVARD AND YANCEYVILLE STREET
GUILFORD
ELM-EUGENE STREET COMPLETEDU-5157E RESURFACING AT SELECTED LOCATIONS. PATTON AVENUE TO JJ DRIVE;RANDLEMAN ROAD FROM FLORIDA STREET TO FREEMAN MILL ROAD; SPRING GARDEN STREET FROM HOLDEN STREET TO MARKET STREET; MEADOWVIEW ROAD FROM RANDLEMAN ROAD TO ELM-EUGENE STREET; CONE BOULEVARD FROM SUMMIT AVENUE TO 16TH STREET; BENJAMIN PARKWAY FROM BATTLEGROUND AVENUE TO WESTMORELAND STREET
GUILFORD
LAKE JEANETTE RD. COMPLETEDU-5162 LAWNDALE DRIVE TO SR 2348 (BASS CHAPEL ROAD-ELM STREET) IN GREENSBORO. WIDENING, INTERSECTION IMPROVEMENTS AND SIDEWALKS.
GUILFORD
SOUTH ELM-EUGENE STREET
COMPLETEDU-5163 J. J. DRIVE TO VANDALIA ROAD IN GREENSBORO. MEDIAN AND SIDEWALK CONSTRUCTION.
GUILFORD
US 29 COMPLETEDU-5201 I-40 / I-85 BUSINESS TO PHILLIPS AVENUE IN GREENSBORO. UPGRADE ELECTRICAL WIRING SYSTEM AND REPLACE METAL BREAKWAY POLES.
GUILFORD
VARIOUS DELETEDU-5208 GREENSBORO URBAN AREA MPO. RESERVE FOR FUNDS TO BE FLEXED TO FEDERAL TRANSIT ADMINISTRATION FOR TRANSIT PROJECTS.
GUILFORD
US 220 (BATTLEGROUND AVENUE)
COMPLETEDU-5306D INTERSECTION WITH BRASSFIELD ROAD AND APPROACHES
GUILFORD
SR 1541 / SR 2254 (WENDOVER AVENUE)
COMPLETEDU-5322 CLIFTON ROAD IN GREENSBORO. INTERSECTION IMPROVEMENTS.
GUILFORD
SR 2136 (FLEMING ROAD) COMPLETEDU-5505 ISAACSON BOULEVARD IN GREENSBORO. REALIGN FLEMING ROAD AND CONSTRUCT NEW INTERSECTION.
GUILFORD
NC 68 DELETEDU-5607 SR 1008 (WEST MARKET STREET) TO SR 2133 (PLEASANT RIDGE ROAD) IN GREENSBORO. WIDEN TO SIX LANES WITH MEDIAN.
GUILFORD
C/D-22
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
AYCOCK STREET DELETEDU-5849 SR 4240 (WEST LEET STREET) TO SPRING GARDEN STREET IN GREENSBORO. REPLACE RAILROAD OVERPASS AND WIDEN ROADWAY.
GUILFORD
SR 1486 (GREENSBORO ROAD)
DELETEDU-5855 MONTLIEU AVENUE FROM NORTH COLLEGE DRIVE TO GREENSBORO ROAD AND GREENSBORO ROAD FROM MONTLIEU AVENUE TO I-74 / US 311 IN HIGH POINT. WIDEN ROADWAY. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
GUILFORD
US 220 (BATTLEGROUND AVENUE)
DELETEDU-5856 WESTRIDGE ROAD TO COTSWOLD AVENUE IN GREENSBORO. WIDEN FROM 5 LANES TO 6-LANE DIVIDED FACILITY.
GUILFORD
NC 68 DELETEDU-5897 SR 1008 (WEST MARKET STREET) TO FUTURE I-73 IN GREENSBORO. ADD LANES. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
GUILFORD
SR 1600 (AURELIAN SPRING ROAD)
DELETEDB-5963 REPLACE BRIDGE 410084 OVER LITTLE QUANKEY CREEK.
HALIFAX
I-95 DELETEDI-5327 SOUTH OF US 158 (MILE POST 172) TO NORTHAMPTON COUNTY LINE. PAVEMENT REHABILITATION.
HALIFAX
I-95 DELETEDI-5358 NORTH OF SR 1524 (MILEPOST 143) IN NASH COUNTY TO NC 481 (MILE POST 154) IN HALIFAX COUNTY. PAVEMENT REHABILITATION.
HALIFAX
I-95 DELETEDI-5389 NC 561 (MILE POST 159.9) TO SOUTH OF NC 903 (MILE PSOT 166.5). PAVEMENT REHABILITATION.
HALIFAX
I-95 COMPLETEDi-5724 NASH COUNTY LINE (MILEMARKER 150.9) TO BEGINNING OF OGFC SOUTH OF NC 481 (MILEMARKER 152.3). PAVEMENT REHABILITATION.
HALIFAX
US 158 / NC 903 DELETEDR-2581 SR 1405 (ROANOKE CHAPEL ROAD) EAST OF LITTLETON TO I-95 SOUTH OF ROANOKE RAPIDS. WIDEN TO MULTI-LANES.
HALIFAX
US 158 DELETEDR-2587 I-85 IN WARREN COUNTY TO SR 1405 (PICKLE PLANT ROAD) EAST OF LITTLETON IN HALIFAX COUNTY. WIDEN TO MULTI-LANES WITH BYPASSES OF NORLINA, MACON AND LITTLETON ON NEW LOCATION.
HALIFAX
NC 48 DELETEDU-2419 (ROANOKE AVENUE), NORTH OF JACKSON STREET IN HALIFAX COUNTY TO NC 46 IN GASTON IN NORTHAMPTON COUNTY. WIDEN TO MULTI-LANES. - PROJECT DELETED FY 17 - ADDED BACK THEN DELETED 2017.
HALIFAX
SR 1722 (THREE BRIDGES ROAD)
DELETEDB-4544 REPLACE BRIDGE 420133 OVER BLACK RIVER, AND REPLACE BRIDGE 420134 OVER BLACK RIVER OVERFLOW.
HARNETT
SR 1415 (RAWLS CHURCH ROAD)
DELETEDB-5505 REPLACE BRIDGE 420151 OVER HECTORS CREEK.
HARNETT
SR 2045 (ELLIOT BRIDGE ROAD)
DELETEDB-5513 REPLACE BRIDGE 420072 OVER ANDERSON CREEK.
HARNETT
SR 1718 (ERWIN ROAD) DELETEDB-5704 REPLACE BRIDGE 420246 OVER BLACK RIVER.
HARNETT
I-95 COMPLETEDI-5500 RESURFACING AND GUARDRAIL REPLACEMENT.
HARNETT
NC 24 / NC 27 DELETEDR-2529 CARTHAGE BYPASS TO NC 87. WIDEN TO MULTI-LANES.
HARNETT
SR 2215 (HARNETT CENTRAL ROAD)
COMPLETEDR-5523 REALIGN SR 2215 (HARNETT CENTRAL ROAD) AT US 401 AND EXTEND SR 1575 (NEIL SMITH ROAD).
HARNETT
I-95 COMPLETEDR-5526 SR 1808 (JONESBORO ROAD) (EXIT 75). RECONFIGURE INTERCHANGE RAMP AND REALIGN SERVICE ROAD.
HARNETT
VARIOUS DELETEDU-5205 CAPITAL AREA MPO.RESERVE FOR FUNDS TO BE FLEXED TO FEDERAL TRANSIT ADMINISTRATION FOR TRANSIT PROJECTS.
HARNETT
SR 1719 COMPLETEDW-5501 SR 1725 (ASHE AVENUE) IN DUNN.CONSTRUCT A ROUNDABOUT.
HARNETT
SR 1148 (WIGGINS ROAD) DELETEDB-5408 REPLACE BRIDGE 430386 OVER ALLENS CREEK.
HAYWOOD
C/D-23
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
I-40 DELETEDB-5541 REPLACE BRIDGE 430236 OVER SR 1513.
HAYWOOD
SR 1619 (WILSON COVE ROAD)
2015B-5904 REPLACE BRIDGE 430241 OVER BEAVERDAM CREEK.
HAYWOOD
I-40 COMPLETEDI-5322 MILE MARKER 15 TO MILE MARKER 20. PAVEMENT REHABILITATION.
HAYWOOD
I-40 DELETEDI-5834 MILE MARKER 27 TO MILE MARKER 34. PAVEMENT REHABILITATION. PROJECET DELETED - WORK TO BE ACCOMPLISHED IN I-5776.
HAYWOOD
US 23 / US 74 DELETEDK-3803 US 23/US 74, CONNECT REST AREA WATER AND SEWER TO MUNICIPAL SYSTEM. PROJECT DELETED DUE TO RE-PRIORITIZATION.
HAYWOOD
I-40 DELETEDK-5601 REST AREA RENOVATIONS - BUILDINGS AND GROUNDS. UPGRADE FIXTURES AND FINISHES. PROJECT DELETED DUE TO RE-PRIORITIZATION.
HAYWOOD
US 19 DELETEDR-5747 SR 1304 (FIE TOP ROAD) AT GHOST TOWN USA TO JENKINS CREEK ROAD. UPGRAD ROADWAY. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
HAYWOOD
SR 1812 (BLUE RIDGE ROAD)
DELETEDB-5897 REPLACE BRIDGE 440062 OVER KING CREEK.
HENDERSON
SR 1545 (OLD CANE CREEK ROAD)
DELETEDB-5922 REPLACE BRIDGE 440237 OVER SOUTHERN RAILROAD.
HENDERSON
US 13 DELETEDB-5605 REPLACE BRIDGE 450031 OVER NORTH CAROLINA & VIRGINIA RAILROAD.
HERTFORD
US 13 COMPLETEDR-2507 US 158 TO THE VIRGINIA STATE LINE. WIDEN TO MULTI-LANES.
HERTFORD
US 158 COMPLETEDR-2583 US 158,MURFREESBORIO BYPASS TO US 13 WEST OF WINTON. WIDEN TO MULTI-LANES,PART ON NEW LOCATION
HERTFORD
SR 1432 (GOLF COURSE ROAD)
DELETEDB-4550 REPLACE BRIDGE 460041 AND BRIDGE 460042 OVER ROCKFISH CREEK. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
HOKE
NC 211 COMPLETEDB-5127 REPLACE BRIDGE 460004 OVER RAFT SWAMP.
HOKE
SR 1436 (BALFOUR ROAD)
COMPLETEDB-5132 REPLACE BRIDGE 460037 OVER RAFT SWAMP.
HOKE
VARIOUS DELETEDBF-5308 SCREEN AND EVALUATE POTENTIAL FEDERAL FUNDED BRIDGE PROJECTS DIVISION 8.
HOKE
VARIOUS DELETEDBL-5508 BRIDGE IMPROVEMENTS IN DIVISION 8.HOKE
VARIOUS DELETEDBS-5408 SCREEN AND EVALUATE POTENTIAL STATE FUNDED BRIDGE PROJECTS DIVISION 8.
HOKE
US 401; NC 211 DELETEDFS-1208A US 401 FROM US 74 IN SCOTLAND COUNTY TO US 401 BUSINESS NORTHEAST OF RAEFORD IN HOKE COUNTY AND NC 211 FROM US 15-501 IN MOORE COUNTY TO US 401 IN HOKE COUNTY. WIDEN TO MULTILANES, PART ON NEW LOCATION.
HOKE
US 401 DELETEDR-3333 US 401 BUSINESS NORTH OF LAURINBURG TO US 401 BUSINESS NORTHEAST OF RAEFORD. WIDEN TO MULTILANES. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUNDOF PRIORITIZATION.
HOKE
US 401 DELETEDR-5750 US 401 BUSINESS NORTH OF LAURINBURG TO US 401 BUSINESS EAST OF RAEFORD. WIDEN TO 4-LANE DIVIDED FACILITY.
HOKE
SR 1413 (PITTMAN ROAD) DELETEDSF-4908M SR 1406 (ROCKFISH ROAD) INTERSECTION. GRADE MODIFICATIONS AND ROUNDABOUT CONSTRUCTION.
HOKE
SR 1311 (NORTH LAKE ROAD)
DELETEDB-5508 REPLACE BRIDGE 470021 OVER CANAL.HYDE
SR 1319 (ROPER LANE) DELETEDB-5600 REPLACE BRIDGE 470079 OVER CANAL.HYDE
NC 12 COMPLETEDF-5004 OCRACOKE GANTRY,REPAIR AND REPLACE
HYDE
NC 12 DELETEDF-5505 HATTERAS INLET TO OCRACOKE ISLAND. REPOWER HATTERAS CLASS FERRIES WITH TIER III DIESEL
HYDE
C/D-24
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
SR 2382 (BRAWLEY ROAD)
DELETEDB-4767 REPLACE BRIDGE 480014 OVER WEATHERS CREEK.
IREDELL
US 21/NC 115 DELETEDB-4982 REPLACE BRIDGE 480038 OVER THIRD CREEK
IREDELL
SR 1832 (EAGLE MILLS ROAD)
DELETEDB-5394 REPLACE BRIDGE 480279 OVER SOUTH HUNTING CREEK.
IREDELL
SR 2402 (HOOVER ROAD) DELETEDB-5843 REPLACE BRIDGE 480020 OVER CREEKIREDELL
SR 1930 (FORT DOBBS ROAD)
DELETEDB-5859 REPLACE BRIDGE 480179 OVER CREEKIREDELL
SR 1338 (WALLACE SPRINGS ROAD)
DELETEDB-5860 REPLACE BRIDGE 480077 OVER THIRD CREEK.
IREDELL
I-40 DELETEDI-5320 MILE MARKER 146 TO MILE MARKER 151. PAVEMENT REHABILITATION. PROJECT DELETED - EXISTING PAVEMENT IS IN GOOD CONDITION AND PROJECT IS NOT WARRANTED AT THIS TIME.
IREDELL
SR 1740(MOSES CREEK ROAD)
DELETEDB-5159 REPLACE BRIDGE 490101 OVER CANEY CREEK.
JACKSON
NC 116 DELETEDB-5910 REPLACE BRIDGE 490032 OVER SAVANNAH CREEK.
JACKSON
MILL STREET DELETEDEB-5627 SPRING STREET TO KEENER STREET. FILL SIDEWALK GAPS AND UPGRADE EXISTING SIDEWALKS. PROJECT DELETED DUE TO RE-PRIORITIZATION.
JACKSON
NEW ROUTE DELETEDR-4745 NC 107 TO US 23/US 74 EAST OF SYLVA. CONSTRUCT NEW FACILITY. PROJECT DELETED DUE TO RE-PRIORITIZATION.
JACKSON
US 19 DELETEDR-5747 SR 1304 (FIE TOP ROAD) AT GHOST TOWN USA TO JENKINS CREEK ROAD. UPGRAD ROADWAY. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
JACKSON
VARIOUS DELETEDC-5565 TRIANGLE J COUNCIL OF GOVERNMENTS TRANSPORTATION DEMAND MANAGEMENT PROGRAM - PHASE II.
JOHNSTON
VARIOUS DELETEDE-5503 BENTONVILLE BATTLEFIELD. INSTALLATION OF THREE VISITOR TOUR STOPS WITH WAYSIDE EXHIBITS.
JOHNSTON
I-95 DELETEDI-5304 FOUR OAKS (MILE POST 87) TO US 70 (MILE POST 97). PAVEMENT REHABILITATION.
JOHNSTON
I-95 DELETEDI-5328 SR 1208 )MILE POST 84) TO FOUR OAKS(MILE POST 87). PAVEMENT REHABILITATION.
JOHNSTON
I-95 DELETEDI-5359 SR 1001 (MILE POST 100) TO WILSON COUNTY LINE (MILE POST 108). PAVEMENT REHABILITATION.
JOHNSTON
I-40 DELETEDI-5390 WAKE COUNTY LINE TO SOUTH OF I-95 (MILE POST 328.8). PAVEMENT REHABILITATION.
JOHNSTON
I-40 DELETEDI-5782 0.3 MILE EAST OF I-95 (MILE POST 328) TP SR 1211 (MORGAN ROAD) (MILE POST 329). PAVEMENT REHABILITATION.
JOHNSTON
I-40 DELETEDi-5817 1.8 MILE EAST OF SR 1010 (CLEVELANDROAD) (MILE POST 313.6) TO 1 MILE EAST OF SR 1525 (CORNWALLIS ROAD) (MILE POST 315.3). PAVEMENT REHABILITATION.
JOHNSTON
NEW ROUTE DELETEDR-3618 SR 1553 (SHOTWELL ROAD) WEST OF US 70 TO NC 42 EAST OF CLAYTON. TWO LANES ON MULTI-LANE RIGHT OF WAY, NEW LOCATION. - DELETED FY 17- WENT THROUGH PRIORITIZATION 4.0 WAS ADDED NOW DELETED AGAIN.
JOHNSTON
NC 242 DELETEDR-5741 US 301 TO I-40. WIDEN TO FOUR LANE WITH A MEDIAN.
JOHNSTON
VARIOUS DELETEDU-5205 CAPITAL AREA MPO.RESERVE FOR FUNDS TO BE FLEXED TO FEDERAL TRANSIT ADMINISTRATION FOR TRANSIT PROJECTS.
JOHNSTON
US 15 / US 501 / NC 87 DELETEDB-4968 REPLACE BRIDGE 520010 OVER DEEP RIVER. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
LEE
C/D-25
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
VARIOUS DELETEDBF-5308 SCREEN AND EVALUATE POTENTIAL FEDERAL FUNDED BRIDGE PROJECTS DIVISION 8.
LEE
VARIOUS DELETEDBL-5508 BRIDGE IMPROVEMENTS IN DIVISION 8.LEE
VARIOUS DELETEDBS-5408 SCREEN AND EVALUATE POTENTIAL STATE FUNDED BRIDGE PROJECTS DIVISION 8.
LEE
US 421 / NC 87 COMPLETEDR-2417AA WEST OF SR 1400 (CUMNOCK ROAD) TO EAST OF US 1 / US 15 / US 501.
LEE
WATERFRONT INITIATIVE DELETEDEB-5101 PEDESTRIAN BRIDGE OVER NEUSE RIVER.
LENOIR
SR 1571 (CAREY ROAD EXTENSION)
DELETEDU-3618 US 258 TO SR 1572 (ROUSE ROAD) IN KINSTON. MULTI-LANES ON NEW LOCATION.
LENOIR
US 70 DELETEDW-5134 WEST OF US 70 BUSINESS/ NC 58 NORTH AND US 258 SOUTH TO WEST OF NC 58 SOUTH.
LENOIR
NC 182 DELETEDB-4571 REPLACE BRIDGE 540007 OVER INDIAN CREEK.
LINCOLN
NC 150 DELETEDB-5850 REPLACE BRIDGE 540044 OVER RELIEFLINCOLN
SR 1168 (JOHNSTOWN ROAD)
DELETEDB-5853 REPLACE BRIDGE 540071 OVER INDIAN CREEK.
LINCOLN
US 321 DELETEDR-0085 NC 27/NC 150 IN LINCOLNTON TO NC 127 IN HICKORY. FOUR LANE DIVIDED FACILITY ON NEW LOCATION. PROJECTDELETED DUE TO RE-PRIORITIZATION.
LINCOLN
SR 1513(RABBIT CREEK ROAD)
DELETEDB-5406 REPLACE BRIDGE 550067 OVER RABBIT CREEK.
MACON
US 23, US 441 COMPLETEDFS-1214A SR 1649 (PRENTISS BRIDGE ROAD) TO US 64. UPGRADE RAODWAY WITH ACCESS MANAGEMENT FEATURES.
MACON
SR 1538 (BUCK CREEK ROAD)
DELETEDR-3623 US 64/NC 28 TO IMPROVED SECTION OFSR 1538 NEAR CHOKEBERRY ROAD. UPGRADE ROADWAY. PROJECT DELETED DUE TO RE-PRIORITIZATION.
MACON
SR 1364-SR 1114 (NEEDMORE ROAD)
DELETEDR-4440 SR 1369 (BYRD ROAD) IN MACON COUNTYTO EXISTING PAVEMENT IN SWAIN COUNTY. UPGRADE TO SECONDARY ROAD STANDARDS. PROJECT DELETED DUE TO RE-PRIORITIZATION.
MACON
US 64 COMPLETEDS-5102 US 64. MOUNTAIN WATERS SCENIC BYWAY-DRY FALLS. RESTORATION AND IMPROVEMENTS IN THE CULLASAJA GORGE.
MACON
NC 251 DELETEDB-4777 REPLACE BRIDGE 560008 AND BRIDGE 560009 OVER IVY RIVER.
MADISON
SR 1155 (UPPER PAW PAW)
DELETEDB-5878 REPLACE BRIDGE 560353 OVER PAW PAW CREEK.
MADISON
US 25/ US 70 DELETEDB-5895 REPLACE BRIDGE 560067 OVER FRENCH BROAD RIVER.
MADISON
MARS HILL COMPLETEDE-4818 MARS HILL. RELOCATE VISITORS CENTER TO THE MONTAGUE BUILDING.
MADISON
SR 1505 (FRANK BARBER ROAD)
DELETEDB-5955 REPLACE BRIDGE 570194 OVER BRANCK OF PETER SWAMP.
MARTIN
US 17 DELETEDR-2511 WASHINGTON BYPASS NORTH OF NC 171 TO MULTI-LANES SOUTH OF WILLIAMSTON. WIDEN TO MULTI-LANES.
MARTIN
SR 1560 (OLD LINVILLE ROAD)
DELETEDB-5885 REPLACE BRIDGE 580108 OVER NORTH FORK RIVER.
McDOWELL
PEAVINE RAIL TRAIL DELETEDEB-5604 SR 1700 (STATE STREET) TO SR 1735 (FORD WAY). PAVE NEWLY CREATED RAIL TRAIL. PROJECT DELETED DUE TO RE-PRIORITIZATION.
McDOWELL
SR 1001 (SUGAR HILL ROAD)
DELETEDEB-5754 REID STREET TO I-40. CONSTRUCT SIDEWALKS. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
McDOWELL
US 70/US 221 B DELETEDEB-5755 LOGAN STREET TO WEST MCDOWELL JUNIOR HIGH SCHOOL ROAD. CONSTRUCT SIDEWALK. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
McDOWELL
C/D-26
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
US 221 / NC 226 DELETEDR-0204 SR 1434 TO SR 1153. WIDEN TO MULTI-LANES, WITH A BYPASS OF MARION. PROJECT DELETED DUE TO RE-PRIORITIZATION.
McDOWELL
US 221 DELETEDR-2596 NC 226 TO NC 194. WIDEN TO MULTI-LANES. PROJECT DELETED DUE TO RE-PRIORITIZATION.
McDOWELL
US 221 DELETEDR-2597 NORTH OF SR 1366 (ROPER LOOP ROAD) IN RUTHERFORD COUNTY TO SR1153 IN MCDOWELL COUNTY. WIDEN TO MULTI-LANES. PROJECT DELETED DUE TO RE-PRIORITIZATION.
McDOWELL
STANLY COUNTY AIRPORT (VUJ)
DELETEDAV-5756 RUNWAY 4R OBSTRUCTION REMOVAL. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
MECKLENBURG
SR 1155 DELETEDB-5789 REPLACE BRIDGE 590165 OVER COFFEY CREEK.
MECKLENBURG
NC 16 SOUTHBOUND DELETEDB-5792 REPLACE BRIDGE 590342 OVER ANDRILL TERRACE STREET AND IRWIN CREEK.
MECKLENBURG
SR 1138 WEST (ARROWOOD ROAD)
DELETEDB-5803 REPLACE BRIDGE 590001 OVER SUGARCREEK.
MECKLENBURG
SR 2442 (ASBURY CHURCH ROAD)
DELETEDB-5814 REPLACE BRIDGE 590090 OVER SOUTH PRONG OF CLARKS CREEK.
MECKLENBURG
CHARLOTTE DELETEDC-4951 INTEGRATE CAT'S AUTOMATIC VEHICLE LOCATION (AVL) SYSTEM ANDCITY OF CHALOTT'S DOT SIGNAL SYSTEM. DELETE PROJECT - FUNDS FLEXED TO FTA
MECKLENBURG
CHARLOTTE DELETEDC-4963 INSTALL PARTICULATE FILTERS ON 90 BUSES. DELETE PROJECT - FUNDS FLEXED TO FTA.
MECKLENBURG
MATHESON AVENUE CONVERSION AND BICYCLE ROUTE 10 EXTENSION
DELETEDEB-5603 STATESVILLE AVENUE TO PARKWOOD ROAD. EXTENSION OF SIGNED BICYCLE ROUTE 10 FROM STATESVILLE AVENUE TO PINCKNEY STREET, WITH A STREET CONVERSION TO INCLUDE BICYCLE LANES FROM TRYON STREET TO PARKWOOD ROAD. PROJECT DELETED DUE TO RE-PRIORITIZATION.
MECKLENBURG
EXIT 30 IMPROVEMENTS DELETEDEB-5617 I-77 AT EXIT 30 TO GRIFFITH STREET BRIDGE OVER I-77. CONSTRUCT BICYCLE AND PEDESTRIAN IMPROVEMENTS. PROJECT DELETED DUE TO RE-PRIORITIZATION.
MECKLENBURG
MATHESON AVENUE DELETEDEB-5710 US 29/NC 49 (NORTH TRYON STREET) TO THE PLAZA/PARKWOOD AVENUE. CONVERT ROADWAY TO INCLUDE BICYCLE LANES ALONG EACH SIDE.
MECKLENBURG
INDIAN TRAIL DELETEDEB-5778 SOUTH FORK CROOKED CREEK GREENWAY (INDIAN TRAIL-FAIRVIEW ROAD - US 74). CONSTRUCT GREENWAY. DELETED AT THE REQUEST OF THE TOWN OF INDIAN TRAIL.
MECKLENBURG
I-77 COMPLETEDFS-0810A SOUTH CAROLINA LINE TO 5TH STREETIN CHARLOTTE. ADD ADDITIONAL LANES.
MECKLENBURG
I-85 DELETEDI-5869 MAIN STREET IN LOWELL (EXIT 22) TO SAM WILSON ROAD (EXIT 29). DEPLOY INTELLIGENT TRANSPORTATION SYSTEM (ITS) IMPROVEMENTS ALONG CORRIDOR. PROJECT DELETED-WORK TO BE ACCOMPLISHED IN C-5600G
MECKLENBURG
I-485 (CHARLOTTE SOUTHERN OUTER
DELETEDR-0211 WEST OF I-77 TO US 74. MULTI-LANE FREEWAY ON NEW LOCATION. PROJECT DELETED DUE TO RE-PRIORITIZATION.
MECKLENBURG
I-485 COMPLETEDR-4902 I-77 SOUTH OF CHARLOTTE TO SR 3624 (REA ROAD). WIDEN TO SIX-LANES.
MECKLENBURG
I-277 (JOHN BELK FREEWAY)
DELETEDU-3850 I-277 (JOHN BELK FREEWAY) AT I-77. ADD WESTBOUND LANE THROUGH I-77 INTERCHANGE IN CHARLOTTE. PROJECT DELETED DUE TO RE-PRIORITIZATION.
MECKLENBURG
NORTH COMMUNITY HOUSE ROAD
COMPLETEDU-5519 NORTH COMMUNITY HOUSE ROAD EXTENSION AND BRIDGE ACROSS I-485
MECKLENBURG
SR 1002 (CRABTREE CREEK)
DELETEDB-5158 REPLACE BRIDGE 600100, BRIDGE 600101, AND BRIDGE 600102 OVER CRABTREE CREEK. DELETED AT REQUEST OF STRUCTURE MANAGEMENT.
MITCHELL
C/D-27
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
NC 226 DELETEDB-5170 REPLACE BRIDGE 600029 OVER ROCK CREEK.
MITCHELL
SR 1313 (MILLER ROAD) DELETEDB-5874 REPLACE BRIDGE 600183 OVER BRUMMETTS CREEK.
MITCHELL
SR 1325 (BEANS CREEK) DELETEDB-5892 REPLACE BRIDGE 600157 OVER BEAN CREEK.
MITCHELL
NC 226 DELETEDB-5893 REPLACE BRIDGE 600019 OVER CUB CREEK.
MITCHELL
US 19E / NC 194 DELETEDR-2520 MULTI-LANE SECTION EAST OF SPRUCE PINE TO US 221. WIDEN TO MULTI-LANES. PROJECT DELETED DUE TO RE-PRIORITIZATION.
MITCHELL
SR 1111 (LILLYS BRIDGE ROAD)
COMPLETEDB-4780 REPLACE BRIDGE 610022 OVER RICHLAND CREEK.
MONTGOMERY
NC 73 DELETEDB-5362 REPLACE BRIDGE 610053 OVER DROWNING CREEK. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
MONTGOMERY
SR 1541 (BREWER FARM ROAD)
DELETEDB-5743 REPLACE BRIDGE 610058 OVER THICKETY CREEK. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
MONTGOMERY
SR 1134 (TOWER ROAD) DELETEDB-5757 REPLACE BRIDGE 610149 OVER BARNES CREEK. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
MONTGOMERY
VARIOUS DELETEDBF-5308 SCREEN AND EVALUATE POTENTIAL FEDERAL FUNDED BRIDGE PROJECTS DIVISION 8.
MONTGOMERY
VARIOUS DELETEDBL-5508 BRIDGE IMPROVEMENTS IN DIVISION 8.MONTGOMERY
VARIOUS DELETEDBS-5408 SCREEN AND EVALUATE POTENTIAL STATE FUNDED BRIDGE PROJECTS DIVISION 8.
MONTGOMERY
VARIOUS DELETEDBS-5408 SCREEN AND EVALUATE POTENTIAL STATE FUNDED BRIDGE PROJECTS DIVISION 8.
MONTGOMERY
I-73 / I-74 / US 220 DELETEDI-4406 SOUTH OF STEEDS TO NORTH OF EMERY. UPGRADE TO INTERSTATE STANDARDS.
MONTGOMERY
VARIOUS DELETEDI-5208 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 8.
MONTGOMERY
US 220 / I-73 / I-74 COMPLETEDI-5329 SOUTH OF ELLERBE IN RICHMOND COUNTY TO I-85 / US 421 IN GUILFORD COUNTY. UPGRADE SIGNING TO INTERSTATE STANDARDS.
MONTGOMERY
I-73 / I-74 / US 220 DELETEDI-5340 US 220 ALTERNATE TO RANDOLPH COUNTY LINE. PAVEMENT REHABILITATION.
MONTGOMERY
NC 24 / NC 27 DELETEDR-2527 NC 73 TO THE TROY BYPASS. WIDEN TO A FOUR-LANE DIVIDED FACILITY.
MONTGOMERY
NC 24 / NC 27 DELETEDR-2528 US 220 TO THE CARTHAGE BYPASS. WIDEN TO MULTI-LANES.
MONTGOMERY
US 15 / US 501 / NC 211 COMPLETEDB-3680 REPLACE BRIDGE 620002 OVER CSX TRANSPORTATION IN ABERDEEN.
MOORE
SR 1484 (RITTER ROAD) COMPLETEDB-5164 REPLACE BRIDGE 620178 OVER BUFFALO CREEK.
MOORE
SR 1658 (WADSWORTH ROAD)
DELETEDB-5745 REPLACE BRIDGE 620047 OVER GOVERNORS CREEK. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
MOORE
SR 1209 (MURDOCKSVILLE ROAD)
DELETEDB-5754 REPLACE BRIDGE 620118 OVER LITTLE RIVER. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
MOORE
SR 1102 (ADDOR ROAD) DELETEDB-5758 REPLACE BRIDGE 620013 OVER ABERDEEN CREEK. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
MOORE
SR 1658 (WADSWORTH ROAD)
DELETEDB-5759 REPLACE BRIDGE 620046 OVER MCINTOSH CREEK. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
MOORE
C/D-28
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
SR 1947 (CYPRESS CHURCH ROAD)
DELETEDB-5764 REPLACE BRIDGE 620006 OVER BEAVER CREEK. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
MOORE
VARIOUS DELETEDBF-5308 SCREEN AND EVALUATE POTENTIAL FEDERAL FUNDED BRIDGE PROJECTS DIVISION 8.
MOORE
VARIOUS DELETEDBL-5508 BRIDGE IMPROVEMENTS IN DIVISION 8.MOORE
NC 2 (MIDLAND ROAD) DELETEDEB-5606 US 15-501 TO US 1 IN SOUTHERN PINES. CONSTRUCT WIDE OUTSIDE LANES AND INSTALL SHARED-LANE MARKINGS.
MOORE
US 401; NC 211 DELETEDFS-1208A US 401 FROM US 74 IN SCOTLAND COUNTY TO US 401 BUSINESS NORTHEAST OF RAEFORD IN HOKE COUNTY AND NC 211 FROM US 15-501 IN MOORE COUNTY TO US 401 IN HOKE COUNTY. WIDEN TO MULTILANES, PART ON NEW LOCATION.
MOORE
NC 24 / NC 27 DELETEDR-2212 CARTHAGE BYPASS, SR 1640 (KELLY PLANTATION ROAD) TO SR 1653 (PRIEST HILL ROAD). FOUR LANES DIVIDED ON NEW LOCATION.
MOORE
NC 24 / NC 27 DELETEDR-2528 US 220 TO THE CARTHAGE BYPASS. WIDEN TO MULTI-LANES.
MOORE
NC 24 / NC 27 DELETEDR-2529 CARTHAGE BYPASS TO NC 87. WIDEN TO MULTI-LANES.
MOORE
NC 211 COMPLETEDR-2812 NC 73 IN WEST END TO THE TRAFFIC CIRCLE IN PINEHURST. WIDEN TO MULTILANES.
MOORE
NC 22 / NC 24 / NC 27 DELETEDR-5746 COURTHOUSE WEST OF NC 22 (MCNEILL STREET) TO US 15 / US 501. WIDEN TO THREE LANES WITH CURB AND GUTTER, TO INCLUDE BICYCLE AND PEDESTRIAN ACCOMMODATIONS.
MOORE
ROCKY MOUNT COMPLETEDC-4970 INTERSECTION IMPROVEMENTS AT VARIOUS LOCATIONS.
NASH
ROCKY MOUNT COMPLETEDC-5112 EXPANSION AND UPGRADE OF TRAFFIC SIGNAL SYSTEM IN ROCKY MOUNT.
NASH
NASHVILLE COMPLETEDC-5545 WASHINGTON STREET, NC 58 (FIRST STREET) TO CHURCH STREET AND ALSTON STREET, CIRCLE DRIVE NORTH TO CIRCLE DRIVE SOUTH. CONSTRUCT SIDEWALKS.
NASH
ROCKY MOUNT COMPLETEDC-5547 NASHVILLE ROAD AND GRACE STREET. CONSTRUCT SIDEWALKS
NASH
SR 1544 (HALIFAX ROAD) DELETEDR-3316 SR 1770 (SUNSET AVENUE) TO SR 1714 (BETHLEHEM ROAD). UPGRADE EXISTING ROADWAY.
NASH
US 301 COMPLETEDW-5108 NORTH OF SR 1845 (PORTER ROAD) TO BURROWS STREET. SAFETY IMPROVEMENTS.
NASH
SR 1002 (HOLLY SHELTER ROAD)
COMPLETEDB-4591 REPLACE BRIDGE 640004 OVER ISLANDCREEK.
NEW HANOVER
SR 1627 (3RD STREET) COMPLETEDB-5103 REPLACE BRIDGE 640035 OVER ABANDONED RAILROAD.
NEW HANOVER
WOOSTER STREET DELETEDEB-5619 8TH STREET TO OLEANDER DRIVE. CONSTRUCT SIDEWALK.
NEW HANOVER
US 74 (EASTWOOD ROAD) COMPLETEDFS-1503A US 17 BUSINESS (MARKET STREET). CONVERT AT-GRADE INTERSECTION TO AN INTERCHANGE.
NEW HANOVER
I-140 DELETEDI-5325 I-40 TO US 421. PAVEMENT REHABILITATION.
NEW HANOVER
WILMINGTON DELETEDP-5001 TRACK AND STATION RIGHT OF WAY ACQUISITION.
NEW HANOVER
SR 2048 (GORDON ROAD) DELETEDU-3831 NC 132 INTERCHANGE RAMP TO WEST OF US 17 BUSINESS (MARKET STREET) IN WILMINGTON. WIDEN TO MULTI-LANES.
NEW HANOVER
SR 1209 (INDEPENDENCE BOULEVARD EXTENSION)
DELETEDU-4434 RANDALL PARKWAY TO US 74 (MLK, JR. PARKWAY). MULTI-LANES ON NEW LOCATION.
NEW HANOVER
I-140 / US 17 (WILMINGTON BYPASS)
DELETEDU-4436 SR 1318 (BULE CLAY ROAD) IN WILMINGTON. CONSTRUCT AN INTERCHANGE.
NEW HANOVER
US 117 / NC 132 DELETEDU-5300 SR 1272 (NEW CENTRE DRIVE) TO SR 2048 (GORDON ROAD) IN WILMINGTON. WIDEN TO MULTI-LANES.
NEW HANOVER
C/D-29
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
NC 132 (COLLEGE ROAD) DELETEDU-5721 SHIPYARD BOULEVARD TO WILSHIRE BOULEVARD. ADD ADDITIONAL NORTHBOUND LANE.
NEW HANOVER
NEW ROUTE COMPLETEDU-5871 SR 2432 (RALEIGH STREET) TO SR 1100 (RIVER ROAD) IN WILMINGTON. CONSTRUCT TWO LANE ROAD ON NEW LOCATION.
NEW HANOVER
US 17 (MARKET STREET) DELETEDU-5948 SR 1272 (NEW CENTER DRIVE). IMPROVE INTERSECTION.
NEW HANOVER
US 76 COMPLETEDW-5132 US 117/NC 132 (COLLEGE ROAD)IN WILMINGTON.CONSTRUCT A RIGHT TURN LANE ON US 76 WEST-BOUND ONTO US 117/NC32
NEW HANOVER
SR 1500 (FIRE TOWER ROAD)
DELETEDB-4919 REPLACE BRIDGE 650014 OVER POTECASI CREEK.
NORTHAMPTON
SR 1505 (NCHS EAST ROAD)
DELETEDB-4920 REPLACE BRIDGE 650015 OVER WILDCAT SWAMP.
NORTHAMPTON
I-95 DELETEDK-5600 REST AREA RENOVATIONS - BUILDINGS AND GROUNDS. UPGRADE FIXTURES AND FINISHES.
NORTHAMPTON
US 158 DELETEDR-2584 SR 1333 (MT. CARMEL CHURCH ROAD) EAST OF JACKSON TO MURFREESBORO BYPASS. WIDEN TO MULTI-LANES WITH BYPASS OF CONWAY ON NEW LOCATION.
NORTHAMPTON
US-258 COMPLETEDR-5505 NC 305 TO US 158. PAVEMENT STRENGTHENING AND RESURFACING.
NORTHAMPTON
NC 48 DELETEDU-2419 (ROANOKE AVENUE), NORTH OF JACKSON STREET IN HALIFAX COUNTY TO NC 46 IN GASTON IN NORTHAMPTON COUNTY. WIDEN TO MULTI-LANES. - PROJECT DELETED FY 17 - ADDED BACK THEN DELETED 2017.
NORTHAMPTON
SR 1333 (EMMETT LANE) DELETEDB-5309 REPLACE BRIDGE 660010 OVER WHITE OAK RIVER.
ONSLOW
SR 1109 (HARRIS CREEK ROAD)
DELETEDB-5636 REPLACE BRIDGE 660071 OVER HARRIS CREEK.
ONSLOW
JACKSONVILLE DELETEDEB-5503 SR 1336 (HENDERSON DRIVE), DORIS AVENUE TO US 17 (MARINE BOULEVARD). WIDEN TO INCLUDE 5 FOOT BIKE LANE.
ONSLOW
JACKSONVILLE DELETEDEB-5505 SR 1470 (WESTERN BOULEVARD), GATEWAY DRIVE TO SR 1308 (GUM BRANCH ROAD). WIDEN EXISTING SIDEWALK AND CONSTRUCT MULTI-USE TRAIL.
ONSLOW
SR 1470 (WESTERN BOULEVARD / LIBERTY DRIVE)
DELETEDEB-5609 GATEWAY NORTH TO NC 24. CONSTRUCT OFF-ROAD MULTI-USE TRAIL.
ONSLOW
SR 1470 (WESTERN BOULEVARD)
DELETEDEB-5616 MARINE BOULEVARD TO SR 2359 (LEJEUNE BOULEVARD). CONSTRUCT SIDEWALK AND CROSSWALKS ON WEST SIDE.
ONSLOW
NC 24 DELETEDEB-5623 SR 2219 (LESLIE ROAD) TO LISK DRIVE. CONSTRUCT SIDEWALK ON BOTH SIDE OF NC 24.
ONSLOW
US 17 (MARINE BOULEVARD)
DELETEDU-5708 SR 1406 )PINEY GREEN ROAD) INTERSECTION. UPGRADE TO CONTINUOUS T-INTERSECTION.
ONSLOW
NC 111 (CATHERINE LAKE ROAD)
DELETEDU-5733 US 258 (RICHLANDS HIGHWAY) TO SR 1308 (GUM BRANCH ROAD) CONSTRUCT EXTENSION OF NC 111 ON NEW LOCATION.
ONSLOW
SR 1308 (GUM BRANCH ROAD)
DELETEDU-5793 SR 1322 (SUMMERSILL SCHOOL ROAD) TO JACKSONVILLE URBAN AREA BOUNDARY. WIDEN EXISTING ROADWAY.
ONSLOW
NC 53 DELETEDU-5877 SR 1308 (GUM BRANCH ROAD). IMPROVE INTERSECTION.
ONSLOW
SR 1501 (SANDRIDGE ROAD)
COMPLETEDW-5106 SR 1500 (STARLING ROAD) TO SR 1509 (QUEENS CREEK ROAD). INSTALL PAVEMENT MARKINGS.
ONSLOW
SR 1501 (SANDRIDGE ROAD)
Deletedw-5322 SOUTH OF SR 1661 (FOXTRACE LANE) TO NORTH OF SR 1698 (SAVANNA COURT). WIDEN TO THREE LANES.
ONSLOW
SR 1501 (SANDRIDGE ROAD)
DELETEDW-5328 BUCKHEAD ROAD TO MILE POST 3.13. WIDEN TO THREE LANES.
ONSLOW
C/D-30
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
US 70 BYPASS DELETEDB-4962 REPLACE BRIDGE 670046 OVER ENO RIVER. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
ORANGE
SR 1336 (HALLS MILL ROAD)
DELETEDB-5720 REPLACE BRIDGE 670011 OVER ENO RIVER. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
ORANGE
SR 1010 (EAST FRANKLIN STREET)
DELETEDB-5733 REPLACE BRIDGE 670039 OVER BOOKER CREEK IN CHAPEL HILL. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
ORANGE
VARIOUS DELETEDBF-5307 SCREEN AND EVALUATE POTENTIAL FEDERAL FUNDED BRIDGE PROJECTS DIVISION 7.
ORANGE
VARIOUS DELETEDBS-5407 SCREEN AND EVALUATE POTENTIAL STATE FUNDED BRIDGE PROJECTS DIVISION 7.
ORANGE
ORANGE COUNTY PARK-AND-RIDE LOT
COMPLETEDC-4932A PARK AND RIDE FACILITY IN TOWN OF HILLSBOROUGH, INSTALL BUS SHELTERS AND BIKE RACKS.
ORANGE
ORANGE COUNTY PARK-AND-RIDE LOT
COMPLETEDC-4932B PARK AND RIDE FACILITY IN TOWN OF HILLSBOROUGH. PROVIDE OPERATING ASSISTANCE FOR THREE YEARS.
ORANGE
VARIOUS DELETEDC-5565 TRIANGLE J COUNCIL OF GOVERNMENTS TRANSPORTATION DEMAND MANAGEMENT PROGRAM - PHASE II.
ORANGE
SR 1006 (ORANGE GROVE ROAD)
DELETEDEB-5520 NC 54 TO SR 1115 (ARTHUR MINNIS ROAD). CONSTRUCT 4' PAVED SHOULDERS.
ORANGE
MORGAN CREEK GREENWAY
COMPLETEDEL-4601 EASTERN SECTION, US 15-501 AT SR 1994 (CULBRETH ROAD TO SR 1919 (SMITH LEVEL ROAD) IN CHAPEL HILL. TEN FOOT MULTI-USE ASPHALT PATH INCLUDING ACCESS TO MERRITT PASTURE.
ORANGE
VARIOUS COMPLETEDEL-5103 CARRBORO, INSTALL BUS SHELTERS AT SELECTED LOCATIONS.
ORANGE
I-40 COMPLETEDFS-1205A NC 86 IN ORANGE COUNTY TO SR 1728 (WADE AVENUE) IN WAKE COUNTY. CONSTRUCT MANAGED LANES.
ORANGE
I-85 DELETEDI-0305 I-40 AT HILLSBOROUGH TO DURHAM COUNTY LINE. WIDEN TO SIX LANES AND RECONSTRUCT INTERCHANGES AND STRUCTURES.
ORANGE
VARIOUS DELETEDI-5207 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 7.
ORANGE
I-85 COMPLETEDI-5312 EAST OF I-40 TO DURHAM COUNTY LINE. PAVEMENT REHABILITATION.
ORANGE
I-40 DELETEDI-5364 EAST OF SR 1734 (ERWIN ROAD) TO DURHAM COUNTY LINE. PAVEMENT REHABILITATION.
ORANGE
I-40 / I-85 DELETEDI-5380 EAST OF NC 54 IN ALAMANCE COUNTY TO WEST OF SR 1114 (BUCKHORN ROAD) IN ORANGE COUNTY. PAVEMENT REHABILITATION.
ORANGE
NC 86 (SOUTH COLUMBIA STREET)
COMPLETEDU-0624 PUREFOY ROAD TO SR 1902 (MANNING DRIVE) IN CHAPEL HILL. CORRIDOR UPGRADE TO INCLUDE BICYCLE
ORANGE
SR 1919 (SMITH LEVEL RD)
COMPLETEDU-2803 ROCK HAVEN ROAD TO BRIDGE 670088 IN CARRBORO. WIDEN TO ADD BICYCLE LANES, SIDEWALKS, AND TURN LANES WITH A CENTER MEDIAN.
ORANGE
SR 1733 (WEAVER DAIRY ROAD)
COMPLETEDU-3306 NC 86 (MARTIN LUTHER KING, JR. BOULEVARD) TO SR 1734 (ERWIN ROAD) IN CHAPEL HILL. CORRIDOR UPGRADE, PART ON NEW LOCATION.
ORANGE
VARIOUS DELETEDU-5206 DURHAM-CHAPEL HILL-CARRBORO MPO. RESERVE FOR FUNDS TO BE FLEXED TO FEDERAL TRANSIT ADMINISTRATION FOR TRANSIT PROJECTS.
ORANGE
VARIOUS DELETEDU-5531 DCHC MPO ALTERNATIVES PROGRAM.ORANGE
NEW ROUTE DELETEDU-5542 ACCESS ROAD OFF SR 1182 (BEN WILSON ROAD). CONSTRUCT ROADWAY TO SERVE NEW INDUSTRIAL SITE NEAR MEBANE.
ORANGE
C/D-31
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
SR 1009 (SOUTH CHURTON STREET)
DELETEDU-5845 I-40 TO ENO RIVER IN HILLSBOROUGH. WIDEN TO MULTILANES.
ORANGE
SR 1114 (BUCKHORN ROAD)
DELETEDU-5895 SR 1144 (WEST TEN ROAD) TO US 70 NEAR MEBANE. WIDEN TO MULTILANES WITH BICYCLE AND PEDESTRIAN ACCOMMODATIONS. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
ORANGE
NC 304 COMPLETEDB-5129 REPLACEMENT OF FIVE STRUCTURES ON NC 304 AS A PILOT PROJECT.
PAMLICO
SR 1103 (ESCLIP ROAD) DELETEDB-4783 REPLACE BRIDGE 690005 OVER BRANCH OF FLATTY CREEK.
PASQUOTANK
SR 1332 (CREEK ROAD) COMPLETEDB-5139 REPLACE BRIDGE 690021 OVER KNOBB'S CREEK.
PASQUOTANK
SR 1417 (MORGANS CORNER ROAD)
DELETEDB-5969 REPLACE BRIDGE 690015 OVER PASQUOTANK RIVER.
PASQUOTANK
SR 1336 (HORSE BRANCH ROAD)
DELETEDB-5643 REPLACE BRIDGE 700079 OVER LONG CREEK.
PENDER
SR 1306 (OLD MILL ROAD) DELETEDB-5645 REPLACE BRIDGE 700068 OVER SILL'S CREEK.
PENDER
SURF CITY DELETEDEB-5504 NC 50/NC 210 (ROLAND AVENUE), INTERCOASTAL WATERWAY TO SHORE DRIVE. CONSTRUCT SIDEWALKS.
PENDER
BURGAW DELETEDEB-5506 US 117 BUSINESS (WALKER STREET). CONSTRUCT SIDEWALK ALONG BOTH SIDES TO CONNECT THE SENOIR CENTER AND CENTRAL BUSINESS DISTRICT.
PENDER
I-40 DELETEDI-5326 NC 53 (MILE POST 398.9) TO NC 210 (MLIE POST 408.6). PAVEMENT REHABILITATION.
PENDER
CSX RAIL LINE COMPLETEDP-5301 WALLACE TO CASTLE HAYNE. RESTORATION OF ABANDONED RAIL LINE.
PENDER
US 17 (HAMPSTEAD BYPASS)
DELETEDR-3300 US 17 TO US 17 NORTH OF HAMPSTEAD. FOUR LANE DIVIDED FACILITY ON NEW LOCATION. DELETED, LOW PRIORITY IN 2002. ALSO DELETED IN 2015 BY P3.0 PRIORITIZATION.
PENDER
PERSON COUNTY AIRPORT (TDF)
DELETEDAV-5794 RUNWAY 24. EXTEND PARALLEL TAXIWAY APPROXIMATELY 300 FEET. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
PERSON
SR 1142 (PAYNES TAVERN ROAD)
COMPLETEDB-4785 REPLACE BRIDGE 720024 OVER NORTH FLAT RIVER.
PERSON
US 158 DELETEDB-5102 REPLACE BRIDGE 720011 OVER SOUTH HYCO CREEK. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
PERSON
SR 1343 (JOHN BREWER ROAD)
DELETEDB-5145 REPLACE BRIDGE 720050 OVER SOUTH HYCO CREEK. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
PERSON
SR 1536 (DENNY'S STORE ROAD)
COMPLETEDB-5220 REPLACE BRIDGE 720093 OVER AN UNNAMED CREEK.
PERSON
SR 1343 (JOHN BREWER ROAD)
DELETEDB-5322 REPLACE BRIDGE 720051 OVER RICHLAND CREEK. PROJECT DELETED;LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
PERSON
US 158 DELETEDR-2575 NC 86 WEST OF YANCEYVILLE TO SR 1159 (THEE HESTER ROAD) WEST OF ROXBORO. WIDEN TO MULTI-LANES.
PERSON
US 158 DELETEDR-2585 SR 1159 (THEE HESTER ROAD) WEST OF ROXBORO TO OXFORD OUTER LOOP. WIDEN TO MULTI-LANES WITH BYPASS OF ROXBORO ON NEW LOCATION.
PERSON
SR 1401 (OLD RIVER ROAD)
COMPLETEDB-4787 REPLACE BRIDGE 730095 OVER JOHNSON MILL RUN.
PITT
PARKERS CREEK GREENWAY
DELETEDEB-4997 TAR RIVER TO US 13.PITT
C/D-32
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
SR 1708 (FIRE TOWER ROAD EXTNSION)
DELETEDU-5006 SR 1127 (GROG LEVEL ROAD) TO NC 11/NC 903 IN GREENVILLE. CONSTRUCT MULTI-LANE FACILITY, PART ON NEW LOCATION.
PITT
SR 1598 (DICKINSON AVENUE)
DELETEDU-5606 NC 11 TO READE CIRCLE. IMPROVE ROADWAY.
PITT
SR 1711 (WORTHINGTON ROAD)
COMPLETEDW-5504 REPLACE BRIDGE 28 OVER FORK SWAMP.
PITT
SR 1520 (LANDRUM ROAD)
COMPLETEDB-4241 REPLACE BRIDGE 740024 OVER HOOPER CREEK.
POLK
SR 1311(ROCK SPRINGS ROAD)
DELETEDB-5407 REPLACE BRIDGE 740034 OVER WALNUT CREEK.
POLK
SR 1151 (GREEN RIVER COVE ROAD)
COMPLETEDSF-4914D SR 1150 TO BRIDGE #202. INSTALL GUARDRAIL ALONG STEEP FILL SECTIONS.
POLK
SR 1003 (ERECT ROAD) COMPLETEDB-4608 REPLACE BRIDGE 750208 OVER FORK CREEK.
RANDOLPH
SR 1163 COMPLETEDB-4609 REPLACE BRIDGE NO. 16 OVER TAYLOR CREEK.
RANDOLPH
SR 1107 (LASSITER MILL ROAD)
DELETEDB-4794 REPLACE BRIDGE 750018 OVER BETTIE MCGEES CREEK. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
RANDOLPH
SR 1112 (ABNER ROAD) DELETEDB-4795 REPLACE BRIDGE 750025 OVER AN UNNAMED CREEK. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
RANDOLPH
SR 1311 (BESCHER CHAPEL RD.)
COMPLETEDB-4799 REPLACE BRIDGE NO. 37 OVER JACKSON'S CREEK.
RANDOLPH
SR 1312 (GALLIMORE DAIRY ROAD)
DELETEDB-4800 REPLACE BRIDGE 750043 OVER JACKSON CREEK. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
RANDOLPH
SR 2440 (BROWER MEADOW ROAD)
DELETEDB-4969 REPLACE BRIDGE 7500154 OVER SANDY CREEK BRANCH.
RANDOLPH
SR 1713 (ALBEMARLE ROAD)
DELETEDB-5363 REPLACE BRIDGE 750171 OVER US 64 AND NC 49 IN ASHEBORO.
RANDOLPH
SR 3255 (FARMER ROAD) DELETEDB-5740 REPLACE BRIDGE 750038 OVER CEDAR CREEK IN ASHEBORO. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
RANDOLPH
SR 1174 (WAYNICK MEADOW ROAD)
DELETEDB-5742 REPLACE BRIDGE 750324 OVER UWHARRIE RIVER. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
RANDOLPH
SR 1002 (FORT CREEK MILL ROAD)
DELETEDB-5748 REPLACE BRIDGE 750384 OVER AN UNNAMED BRANCH. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
RANDOLPH
SR 2453 (KIDDS MILL ROAD)
DELETEDB-5752 REPLACE BRIDGE 750151 OVER SANDY CREEK. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
RANDOLPH
SR 1115 (COX MILL ROAD)
DELETEDB-5753 REPLACE BRIDGE 750373 OVER AN UNNAMED CREEK. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
RANDOLPH
SR 2103 (WHITT HUNT ROAD)
DELETEDB-5756 REPLACE BRIDGE 750106 OVER AN UNNAMED CREEK. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
RANDOLPH
SR 2448 (ROUTH ROAD) DELETEDB-5761 REPLACE BRIDGE 750152 OVER SANDY CREEK.
RANDOLPH
SR 2642 (OLD SILER CITY ROAD)
DELETEDB-5762 REPLACE BRIDGE 750164 OVER MILLSTONE CREEK. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
RANDOLPH
SR 2614 (GRANTVILLE LANE)
DELETEDB-5928 REPLACE BRIDGE 750175 OVER MILL CREEK. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
RANDOLPH
VARIOUS DELETEDBF-5308 SCREEN AND EVALUATE POTENTIAL FEDERAL FUNDED BRIDGE PROJECTS DIVISION 8.
RANDOLPH
VARIOUS DELETEDBL-5508 BRIDGE IMPROVEMENTS IN DIVISION 8.RANDOLPH
C/D-33
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
VARIOUS DELETEDBS-5408 SCREEN AND EVALUATE POTENTIAL STATE FUNDED BRIDGE PROJECTS DIVISION 8.
RANDOLPH
I-85 COMPLETEDFS-1008A SR 1009 (MAIN STREET) INTERCHANGE IN ARCHDALE. RECONSTRUCT EXISTING INTERCHANGE TO BETTER ACCOMMODATE TRAFFIC.
RANDOLPH
VARIOUS DELETEDI-5208 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 8.
RANDOLPH
I-73 / I-74 / US 220 DELETEDI-5313 MONTGOMERY COUNTY LINE TO US 220 BUSINESS. PAVEMENT REHABILITATION.
RANDOLPH
I-85 COMPLETEDI-5314 DAVIDSON COUNTY LINE TO EAST OF SR 1009 (MAIN STREET). REPLACE FUNNEL DRAINS, CONSTRUCT EXPRESSWAY GUTTER, REPAIR / REPLACE GUARDRAIL, AND RESURFACE.
RANDOLPH
US 220 / I-73 / I-74 COMPLETEDI-5329 SOUTH OF ELLERBE IN RICHMOND COUNTY TO I-85 / US 421 IN GUILFORD COUNTY. UPGRADE SIGNING TO INTERSTATE STANDARDS.
RANDOLPH
I-85 DELETEDI-5764 1.1 MILES NORTH OF SR 1547 (FINCH FARM ROAD) TO SR 1564 (RABBIT TOWN ROAD) IN TRINITY. PAVEMENT REHABILITATION.
RANDOLPH
I-85 DELETEDI-5792 SR 1564 (MEADOWBROOK DRIVE) TO SR 1009 (SOUTH MAIN STREET) IN ARCHDALE. PAVEMENT REHABILITATION.
RANDOLPH
US 64 DELETEDR-2220 EAST OF I-85 BUSINESS IN LEXINGTON TO US 220 IN ASHEBORO. WIDEN TO FOUR LANES.
RANDOLPH
NC 159 (ZOO PARKWAY) COMPLETEDU-5759 US 64 (DIXIE DRIVE) / ATLANTIC AVENUE IN ASHEBORO. INTERSECTION IMPROVEMENTS.
RANDOLPH
SR 1148 (GRASSY ISLAND ROAD)
DELETEDB-5750 REPLACE BRIDGE 760091 OVER COLEMAN'S CREEK. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
RICHMOND
SR 1162 (ALVIN HARRIS ROAD)
DELETEDB-5751 REPLACE BRIDGE 760164 OVER LITTLE HOMER CREEK. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
RICHMOND
SR 1424 (JONES SPRING CHURCH ROAD)
DELETEDB-5760 REPLACE BRIDGE 760079 OVER NAKED CREEK. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
RICHMOND
VARIOUS DELETEDBF-5308 SCREEN AND EVALUATE POTENTIAL FEDERAL FUNDED BRIDGE PROJECTS DIVISION 8.
RICHMOND
VARIOUS DELETEDBL-5508 BRIDGE IMPROVEMENTS IN DIVISION 8.RICHMOND
VARIOUS DELETEDBS-5408 SCREEN AND EVALUATE POTENTIAL STATE FUNDED BRIDGE PROJECTS DIVISION 8.
RICHMOND
US 220 / I-73 / I-74 COMPLETEDI-5329 SOUTH OF ELLERBE IN RICHMOND COUNTY TO I-85 / US 421 IN GUILFORD COUNTY. UPGRADE SIGNING TO INTERSTATE STANDARDS.
RICHMOND
FUTURE I-74 / US 74 DELETEDI-5899 US 74 ROCKINGHAM-HAMLET BYPASS IN RICHMOND COUNTY TO EXISTING I-74 IN ROBESON COUNTY. UPGRADE CORRIDOR TO INTERSTATE STANDARDS. PROJECT DELETED. WASNOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
RICHMOND
SR 2237 (HAPPY HILL ROAD)
COMPLETEDB-4251 REPLACE BRIDGE 770094 OVER OLD FIELD SWAMP.
ROBESON
SR 2262 (BETHESDA CHURCH ROAD)
COMPLETEDB-4619 REPLACE BRIDGE 770116 AND BRIDGE 770117 OVER HOG SWAMP.
ROBESON
SR 2455 (SAND HOLE ROAD)
DELETEDB-4620 REPLACE BRIDGE 770121 AND BRIDGE 770123 OVER ASHPOLE SWAMP.
ROBESON
SR 1741 (INMAN ROAD) DELETEDB-5511 REPLACE BRIDGE 770399 AND REPLACE BRIDGE 770400 OVER BIG MARSH SWAMP.
ROBESON
SR 1003 (CHICKEN ROAD) DELETEDB-5529 REPLACE BRIDGE 770434 OVER BACK SWAMP.
ROBESON
C/D-34
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
I-95 COMPLETEDI-4413 US 301, REPLACE BRIDGE 770036, WIDEN TO MULTI-LANES, JACKSON COURT TO SR 1791 (DAWN DRIVE), REVISE I-95 INTERCHANGE (EXIT 22) AND INSTALL SIGNAL.
ROBESON
I-95 DELETEDI-4927 CONSTRUCT NEW WEIGH STATION.ROBESON
I-95 DELETEDI-5379 SOUTH OF US 301 (MILE POST 24) TO CUMBERLAND COUNTY LINE (MILE POST 38.6). PAVEMENT REHABILITATION.
ROBESON
I-95 DELETEDI-5391 SOUTH CAROLINA STATE LINE TO LUMBERTON (MILE POST 16). PAVEMENT REHABILITATION.
ROBESON
I-95 COMPLETEDI-5509 I-95 AT US 301(EXIT33). SAFETY IMPROVEMENTS
ROBESON
I-74 DELETEDI-5846 US 74 TO EAST OF NC 710. PAVEMENT REHABILITATION.
ROBESON
I-95 DELETEDI-5848 1.0 MILE NORTH OF NC 72 (MILE POST 18.0) TO 0.2 MILE NORTH OF SR 1536 (CARTHAGE ROAD) (MILE POST 19.0). PAVEMENT REHABILITATION.
ROBESON
I-95 DELETEDI-5849 NORTH OF SR 1536 (CARTHAGE ROAD) (MILE POST 19.0) TO NORTH OF US 301 (MILE POST 23.0). PAVEMENT REHABILITATION.
ROBESON
FUTURE I-74 / US 74 DELETEDI-5899 US 74 ROCKINGHAM-HAMLET BYPASS IN RICHMOND COUNTY TO EXISTING I-74 IN ROBESON COUNTY. UPGRADE CORRIDOR TO INTERSTATE STANDARDS. PROJECT DELETED. WASNOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
ROBESON
I-95 DELETEDK-5603 REST AREA RENOVATIONS - BUILDINGS AND GROUNDS. UPGRADE FIXTURES AND FINISHES.
ROBESON
NC 211 COMPLETEDR-5515 RESURFACE FROM SR 1997 (PINE STREET) TO NC 72.
ROBESON
SR 1997 (FAYETTEVILLE ROAD/PINE STREET)
COMPLETEDW-5327 AT NC 211 (ROBERTS AVENUE). WIDEN SR 1997 (FAYETTEVILLE ROAD/PINE STREET) TO PROVIDE DUAL LEFT TURNLANES.
ROBESON
SR 1529 COMPLETEDW-5507 US 301 NC 211. CONSTRUCT PAVED SHOULDERS AND MAKE CURVE IMPROVEMENTS.
ROBESON
US 220 (NORTHBOUND) COMPLETEDB-4621 REPLACE BRIDGE 780150 OVER US 220 BUSINESS.
ROCKINGHAM
SR 1128 (SARDIS CHURCH ROAD)
COMPLETEDB-4623 REPLACE BRIDGE 780047 OVER HOGAN'S CREEK.
ROCKINGHAM
SR 1929 (ESTES ROAD) DELETEDB-4624 REPLACE BRIDGE 780080 OVER WOLF ISLAND CREEK. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
ROCKINGHAM
SR 1002 (SCALESVILLE ROAD)
DELETEDB-4802 REPLACE BRIDGE 780018 OVER HAW RIVER. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
ROCKINGHAM
SR 2406 (IRON WORKS ROAD)
DELETEDB-4805 REPLACE BRIDGE 780009 OVER PRONGOF TROUBLESOME CREEK. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
ROCKINGHAM
SR 2426 (CUNNINGHAM MILL ROAD)
DELETEDB-4807 REPLACE BRIDGE 780006 OVER HAW RIVER. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
ROCKINGHAM
US 311 / NC 770 DELETEDB-5343 REPLACE BRIDGE 780169 OVER CASCADE CREEK. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
ROCKINGHAM
SR 1902 (DIBRELL ROAD) DELETEDB-5355 REPLACE BRIDGE 780106 OVER WOLF ISLAND CREEK. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
ROCKINGHAM
SR 2715 (HAMPTON ROAD)
DELETEDB-5357 REPLACE BRIDGE 780078 OVER AN UNNAMED CREEK. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
ROCKINGHAM
SR 1138 (LINDSEY BRIDGE ROAD)
DELETEDB-5716 REPLACE BRIDGE 780140 OVER DAN RIVER IN MADISON. PROJECT DELETEDAT REQUEST OF STRUCTURES MANAGEMENT UNIT.
ROCKINGHAM
C/D-35
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
SR 2177 (DAN VALLEY ROAD)
DELETEDB-5721 REPLACE BRIDGE 780124 OVER MAYO RIVER IN MADISON. PROJECT DELETEDAT REQUEST OF STRUCTURES MANAGEMENT UNIT.
ROCKINGHAM
SR 1169 (ISLAND DRIVE) DELETEDB-5722 REPLACE BRIDGE 780277 OVER BEAVER CREEK. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT..
ROCKINGHAM
NC 700 DELETEDB-5729 REPLACE BRIDGE 780134 OVER DAN RIVER IN EDEN. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
ROCKINGHAM
NC 700 DELETEDB-5737 REPLACE BRIDGE 780108 OVER NC 14 / NC 87 / NC 770 IN EDEN. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
ROCKINGHAM
VARIOUS DELETEDBF-5307 SCREEN AND EVALUATE POTENTIAL FEDERAL FUNDED BRIDGE PROJECTS DIVISION 7.
ROCKINGHAM
VARIOUS DELETEDBS-5407 SCREEN AND EVALUATE POTENTIAL STATE FUNDED BRIDGE PROJECTS DIVISION 7.
ROCKINGHAM
US 158 DELETEDR-2580 US 220 TO US 29. WIDEN TO MULTI-LANES.
ROCKINGHAM
US 158 DELETEDR-2586 US 29 AT NC 14 TO NC 86 WEST OF YANCEYVILLE. WIDEN TO MULTI-LANES.
ROCKINGHAM
ROWAN COUNTY AIRPORT (RUQ)
DELETEDAV-5754 EXTEND RUNWAY 20 AND 600-FOOT EXTENDED RUNWAY SAFETY AREA, AND RELOCATE AND REPLACE EXISTING MEDIUM INTENSITY APPROACH LIGHTING SYSTEM WITH RUNWAY ALIGNMENT INDICATOR LIGHTS AND GLIDESLOPE. PROJECT DELETED - NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
ROWAN
SR 1759 (BELK ROAD) DELETEDB-4628 REPLACE BRIDGE 790006 OVER BACK CREEK. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
ROWAN
SR 1004 (STOKES FERRY ROAD)
DELETEDB-4808 REPLACE BRIDGE 790141 OVER SOUTH SECOND CREEK. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
ROWAN
SR 1735 (GOODNIGHT ROAD)
DELETEDB-5366 REPLACE BRIDGE 790019 OVER SLOANS CREEK. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
ROWAN
SR 1348 (GOLD FISH ROAD)
DELETEDB-5521 REPLACE BRIDGE 790122 OVER AN UNNAMED CREEK. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
ROWAN
NC 150 DELETEDB-5767 REPLACE BRIDGE 790063 OVER KERR CREEK. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
ROWAN
CATAWBA COLLEGE COMPLETEDC-4911 EXPANSION OF AIR QUALITY OUTREACH PROGRAM TO REDUCE OZONE AIR POLLUTION.
ROWAN
VARIOUS COMPLETEDC-5553 CITY OF SALISBURY SIGNAL SYSTEM REPLACEMENT.
ROWAN
LANDIS SPUR DELETEDEB-5610 SR 1210 (WEST RYDER AVENUE) TO WEST OF SR 1211 (KIMBALL ROAD) IN LANDIS. CONSTRUCT SPUR OF GRANT'S CREEK GREENWAY.
ROWAN
I-85 COMPLETEDI-2304AF IMPLEMENTATION OF INTELLIGENT TRANSPORTATION SYSTEM (ITS)
ROWAN
VARIOUS DELETEDI-5209 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 9.
ROWAN
I-85 / US 601 DELETEDI-5316 NORTH OF NC 152 TO SOUTH OF SR 1007 (JAKE ALEXANDER BOULEVARD). PAVEMENT REHABILITATION.
ROWAN
I-85 COMPLETEDI-5741 US 601 TO 0.5 MILE SOUTH OF US 52 IN SALISBURY. PAVEMENT REHABILITATION.
ROWAN
C/D-36
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
I-85 / US 601 DELETEDI-5824 SR 1505 (MOUNT HOPE CHURCH ROAD) TO 1.3 MILES NORTH OF SR 2539 (PEACH ORCHARD ROAD). PAVEMENT REHABILITATION. PROJECT DELETED; WORK TO BE ACCOMPLISHED UNDER I-5858.
ROWAN
I-85 DELETEDI-5859 0.5 MILE SOUTH OF US 52 IN SALISBURY TO SR 2120 (LONG FERRY ROAD) IN SPENCER. PAVEMENT REHABILITATION. PROJECT DELETED; WORK TO BE
ROWAN
PIEDMONT CORRIDOR COMPLETEDP-5206A SR 2538 (PEELER RD.), SR 1560 (CEDAR SPRINGS RD.) GRADE SEPARATION OVER NORFOLK SOUTHERN RR
ROWAN
NEW ROUTE COMPLETEDU-5541 ACCESS ROAD OFF SR 2528 (HEILIG ROAD). CONSTRUCT ROADWAY TO SERVE NEW MANUFACTURING SITE NEAR SALISBURY.
ROWAN
RUTHERFORD COUNTY - MARCHMAN FIELD (FQD)
DELETEDAV-5767 LAND ACQUISITION - RUNWAY 19 END. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
RUTHERFORD
SR 1520 DELETEDB-4812 REPLACE BRIDGE 800035 OVER HOLLAND'S CREEK.
RUTHERFORD
SR 1576 (EAST HIGH ROAD)
DELETEDB-4986 REPLACE BRIDGE 800076 OVER PUZZLE CREEK.
RUTHERFORD
SR 1793 (MCKINNEY MILL)
DELETEDB-5415 REPLACE BRIDGE 800088 OVER BRANCH OF SANDY RUN CREEK.
RUTHERFORD
SR 1178(MAPLE CREEK ROAD)
DELETEDB-5886 REPLACE BRIDGE 800058 OVER MOUNTAIN CREEK.
RUTHERFORD
SR 1194 (APPLE STREET) DELETEDB-5889 REPLACE BRIDGE 800265 OVER MAPLE CREEK.
RUTHERFORD
THERMAL BELT RAIL TRAIL 2
DELETEDEB-5730 US 64 TO SR 2169 (OAKLAND ROAD). GRADE AND PAVE EXISTING THERMAL BELT RAIL TRAIL. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUNDOF PRIORITIZATION.
RUTHERFORD
THERMAL BELT RAIL TRAIL 1
DELETEDEB-5733 SR 1531 TO US 64. WIDEN AND RESURFACE EXISTING TRAIL. PROJECTDELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
RUTHERFORD
US 221 DELETEDR-2597 NORTH OF SR 1366 (ROPER LOOP ROAD) IN RUTHERFORD COUNTY TO SR1153 IN MCDOWELL COUNTY. WIDEN TO MULTI-LANES. PROJECT DELETED DUE TO RE-PRIORITIZATION.
RUTHERFORD
US 221A DELETEDR-3612 SR 1920 (MAIN STREET) IN HENRIETTA TO SR 1941 (MELTON STREET) IN CAROLEEN. WIDENING AND RESURFACING. PROJECT DELETED DUE TO RE-PRIORITIZATION.
RUTHERFORD
SR 1703 (CHURCH ROAD) DELETEDB-4638 REPLACE BRIDGE 810195 OVER MERKLE SWAMP.
SAMPSON
SR 1004 (EDMOND MATTIS ROAD)
DELETEDB-4813 REPLACE BRIDGE 810018 OVER CRANE CREEK.
SAMPSON
NC 903 COMPLETEDB-4930 REPLACE BRIDGE 810066 OVER SIX RUNS CREEK.
SAMPSON
SR 1430 (CARROLL STORE ROAD)
DELETEDB-5305 REPLACE BRIDGE 810123 OVER BIG SWAMP.
SAMPSON
SR 1838 (BEAMAN STREET)
DELETEDB-5307 REPLACE BRIDGE 810376 OVER OLD MILL BRANCH.
SAMPSON
SR 1455 (PAYTON DANIELS ROAD)
DELETEDB-5308 REPLACE BRIDGE 810152 OVER CAESAR SWAMP.
SAMPSON
SR 1817 (BRADSHAW ROAD)
DELETEDB-5310 REPLACE BRIDGE 810188 OVER WARD SWAMP.
SAMPSON
SR 1214 (BOYLIN BRIDGE ROAD)
DELETEDB-5623 REPLACE BRIDGE 810085 OVER GREAT COHARIE CREEK OVERFLOW.
SAMPSON
SR 1005 (GREEN PATH ROAD)
DELETEDB-5628 REPLACE BRIDGE 810164 OVER BRANCH OF MONGO SWAMP.
SAMPSON
SR 1620 (TIMOTHY ROAD) DELETEDB-5631 REPALCE BRIDGE 810196 OVER JERNIGAN'S MILL RACE.
SAMPSON
SR 1746 (KEENER ROAD) DELETEDB-5633 REPLACE BRIDGE 810194 OVER GREAT COHARIE CREEK.
SAMPSON
US 401 COMPLETEDB-4273 REPLACE BRIDGE 820047 OVER LUMBER RIVER.
SCOTLAND
US 15 / US 401 COMPLETEDB-4639 REPLACE BRIDGE 820017 OVER GUM SWAMP IN LAURINBURG.
SCOTLAND
C/D-37
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
US 15 / US 501 COMPLETEDB-4816 REPLACE BRIDGE 820065 OVER JUNIPER CREEK.
SCOTLAND
US 74 COMPLETEDB-4817 REPLACE BRIDGE 820023 OVER GUM SWAMP CREEK.
SCOTLAND
SR 1128 (OLD STAGE ROAD)
COMPLETEDB-5131 REPLACE BRIDGE 820063 OVER JOES CREEK.
SCOTLAND
US 501 COMPLETEDB-5551 REPLACE BRIDGE 820018 OVER LEITH'S CREEK.
SCOTLAND
SR 1425 (LEE'S MILL ROAD)
DELETEDB-5741 REPLACE BRIDGE 820030 OVER JUNIPER CREEK. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
SCOTLAND
SR 1615 (HASTY ROAD) DELETEDB-5744 REPLACE BRIDGE 820050 OVER BRIDGE CREEK. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
SCOTLAND
SR 1645 (DIXIE GUANO ROAD)
DELETEDB-5746 REPLACE BRIDGE 820043 OVER LEITHS CREEK. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
SCOTLAND
SR 1421 (MCINTOSH ROAD)
DELETEDB-5749 REPLACE BRIDGE 820036 OVER BIG SHOE HEEL CREEK. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
SCOTLAND
VARIOUS DELETEDBF-5308 SCREEN AND EVALUATE POTENTIAL FEDERAL FUNDED BRIDGE PROJECTS DIVISION 8.
SCOTLAND
VARIOUS DELETEDBL-5508 BRIDGE IMPROVEMENTS IN DIVISION 8.SCOTLAND
VARIOUS DELETEDBS-5408 SCREEN AND EVALUATE POTENTIAL STATE FUNDED BRIDGE PROJECTS DIVISION 8.
SCOTLAND
US 401; NC 211 DELETEDFS-1208A US 401 FROM US 74 IN SCOTLAND COUNTY TO US 401 BUSINESS NORTHEAST OF RAEFORD IN HOKE COUNTY AND NC 211 FROM US 15-501 IN MOORE COUNTY TO US 401 IN HOKE COUNTY. WIDEN TO MULTILANES, PART ON NEW LOCATION.
SCOTLAND
FUTURE I-74 / US 74 DELETEDI-5899 US 74 ROCKINGHAM-HAMLET BYPASS IN RICHMOND COUNTY TO EXISTING I-74 IN ROBESON COUNTY. UPGRADE CORRIDOR TO INTERSTATE STANDARDS. PROJECT DELETED. WASNOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
SCOTLAND
US 401 DELETEDR-3333 US 401 BUSINESS NORTH OF LAURINBURG TO US 401 BUSINESS NORTHEAST OF RAEFORD. WIDEN TO MULTILANES. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUNDOF PRIORITIZATION.
SCOTLAND
US 401 DELETEDR-5750 US 401 BUSINESS NORTH OF LAURINBURG TO US 401 BUSINESS EAST OF RAEFORD. WIDEN TO 4-LANE DIVIDED FACILITY.
SCOTLAND
NC 49 COMPLETEDB-4643 REPLACE BRIDGE 830024 OVER CURL TAIL CREEK.
STANLY
SR 1542 COMPLETEDB-5137 REPLACED BRIDGE 830215 OVER LITTLE MOUNTAIN CREEK.
STANLY
SR 1506 (PRICES DAIRY ROAD)
DELETEDB-5370 REPLACE BRIDGE 890444 OVER EAST FORK STEWARTS CREEK.
STANLY
SR 1435 (KENDALLS CHURCH)
DELETEDB-5373 REPLACE BRIDGE 830044 OVER LONG CREEK.
STANLY
SR 2106 (MACEDONIA CHURCH ROAD)
DELETEDB-5515 REPLACE BRIDGE 890145 OVER LITTLE RICHARDSON CREEK.
STANLY
SR 1134 (RUNNING CREEK CHURCH ROAD)
DELETEDB-5537 REPLACE BRIDGE 830035 OVER LONG CREEK.
STANLY
SR 1315 (NEW TOWN ROAD)
DELETEDB-5797 REPLACE BRIDGE 890329 OVER BRANCH OF EAST FORK TWELVE MILE CREEK.
STANLY
SR 1137 (POTTER ROAD) DELETEDB-5805 REPLACE BRIDGE 890170 OVER CANE CREEK.
STANLY
C/D-38
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
SR 1968 (SAINT MARTIN ROAD)
DELETEDB-5807 REPLACE BRIDGE 830115 OVER STONY RUN CREEK.
STANLY
SR 1434 DELETEDB-5811 REPLACE BRIDGE 830042 OVER BIG BEAR CREEK.
STANLY
SR 1507 (GOLD BRANCH ROAD)
DELETEDB-5820 REPLACE BRIDGE 830221 OVER CURL TAIL CREEK.
STANLY
ALBERMARLE COMPLETEDEB-5525 US 52 BUSINESS, SOUTH STREET TO ROCK CREEK PARK. CONSTRUCT SIDEWALK.
STANLY
SALISBURY AVENUE DELETEDEB-5608 US 52 TO NORTH SECOND STREET. CONSTRUCT BIKE LANES BY RE-CONFIGURING EXISTING ROAD. PROJECT DELETED DUE TO RE-PRIORITIZATION.
STANLY
NC 49 DELETEDR-2533 HARRISBURG TO YADKIN RIVER. WIDEN TO MULTI-LANES. PROJECT DELETED DUE TO RE-PRIORITIZATION.
STANLY
US 52 DELETEDR-5302 SOUTH CITY LIMIT OF NORWOOD TO SOUTH CITY LIMIT OF ALBEMARLE. CONSTRUCT SAFETY IMPROVEMENTS. PROJECT DELETED DUE TO RE-PRIORITIZATION.
STANLY
VARIOUS COMPLETEDC-5554 DIVISION OF AIR QUALITY SCHOOL BUSREPLACEMENT PROGRAM. REPLACE BUSES WITH NEW BUSES THAT MEET THE NEW HEAVY DUTY DIESEL TRUCK AND BUS STANDARDS.
STATEWIDE
VARIOUS DELETEDEB-2956 STATEWIDE BICYCLE PROGRAM. PROJECT DELETED DUE TO RE-PRIORITIZATION.
STATEWIDE
VARIOUS DELETEDER-2973 ROADSIDE BEAUTIFICATION PROJECTSIN ALL FOURTEEN HIGHWAY DIVISIONS. PROJECT DELETED DUE TO RE-PRIORITIZATION.
STATEWIDE
VARIOUS DELETEDER-3100 PLANTING OF WILDFLOWERS AND PERENNIAL BULBS ON FEDERAL-AID SYSTEM. PROJECT DELETED DUE TO RE-PRIORITIZATION.
STATEWIDE
VARIOUS DELETEDER-3101 SPECIAL EVENTS PLANTING STATEWIDE. PROJECT DELETED DUE TO RE-PRIORITIZATION.
STATEWIDE
VARIOUS DELETEDER-3102 IMPLEMENTATION OF STATEWIDE SCENIC BYWAYS PROGRAM. PROJECT DELETED DUE TO RE-PRIORITIZATION.
STATEWIDE
VARIOUS DELETEDER-3611 COLOR CANOPY AND TREE PLANTING STATEWIDE. PROJECT DELETED DUE TO RE-PRIORITIZATION. PROJECT DELETED DUE TO RE-PRIORITIZATION.
STATEWIDE
STATEWIDE DELETEDK-5500 REST AREA RENOVATIONS. REPLACE LIGHTING WITH EFFICIENT, LOW MAINTENANCE LED FIXTURES. PROJECT DELETED DUE TO RE-PRIORITIZATION.
STATEWIDE
I-95 DELETEDM-0412 CORRIDORS OF THE FUTURE PROGRAM. INTERSTATE MAINTENANCE DISCRETIONARY FUNDS(IMD) FOR IMPROVEMENTS TO I-95 FROM FLORIDA TO VIRGINIA. NORTH CAROLINA TO PROVIDE FUNDS TO ADJOINING STATES UNDER TERMS OF AN AGREEMENT. PROJECT DELETED DUE TO RE-PRIORITIZATION.
STATEWIDE
VARIOUS DELETEDP-3419 SEALED CORRIDOR-SELECTED SEHSRC CROSSINGS. MEDIAN BARRIERS, ARTICULATED GATES, FOUR- QUADRANT GATES, WARNING DEVICE REVISIONS, SIGNAGE AND CAMERA SYSTEMS. PROJECT DELETEDDUE TO RE-PRIORITIZATION.
STATEWIDE
VARIOUS DELETEDP-3814 CROSSING CONSOLIDATION PROJECTSAS IDENTIFIED IN SOUTH END SEHSRC TRAFFIC SEPARATION STUDY. RIGHT OF WAY TO BE ACQUIRED BY MUNICIPALITIES. PROJECT DELETED DUE TO RE-PRIORITIZATION.
STATEWIDE
NCRR-CSX DELETEDP-3819 FEDERALLY-DESIGNATED HIGH SPEED RAIL CORRIDOR BETWEEN CHARLOTTE AND VIRGINIA STATE LINE,ENVIRONMENTAL STUDY, PRELIMINARY ENGINEERING, RIGHT OF WAY, DESIGN AND CONSTRUCTION. PROJECT DELETED DUE TO RE-PRIORITIZATION.
STATEWIDE
C/D-39
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
VARIOUS DELETEDS-5106 PHASE II : NORTH CAROLINA SCENIC BYWAYS LAND CONSERVATION INITIATIVE TO ADVANCE THE PERMANENT PROTECTION OF IMPORTANT NATURAL, HISTORIC, CULTURAL AND VISUAL RESOURCES ALONG 25 OF NORTH CAROLINA'S SCENIC BYWAYS.
STATEWIDE
VARIOUS DELETEDSI-4735 SAFETY MANAGEMENT INITIATIVES. PROJECT DELETED DUE TO RE-PRIORITIZATION.
STATEWIDE
VARIOUS DELETEDY-4100 HIGHWAY-RAIL CROSSINGS SAFETY IMPROVEMENTS AND INVENTORY PASSENGER ROUTES. PROJECT DELETED DUE TO RE-PRIORITIZATION.
STATEWIDE
VARIOUS DELETEDY-4800 TRAFFIC SEPARATION STUDY IMPLEMENTATION AND CLOSURES. PROJECT DELETED DUE TO RE-PRIORITIZATION.
STATEWIDE
US 52 COMPLETEDB-4645 REPLACE BRIDGE 840029 AND BRIDGE 840030 OVER LITTLE YADKIN RIVER.
STOKES
SR 1697 (PITZER ROAD) DELETEDB-4819 REPLACE BRIDGE 840105 OVER SNOW CREEK. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
STOKES
SR 1961 (BOLEJACK ROAD)
DELETEDB-5509 REPLACE BRIDGE 840062 OVER NEATMAN CREEK. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
STOKES
SR 1484 (DAN GEORGE ROAD)
DELETEDB-5784 REPLACE BRIDGE 840125 OVER NORTH DOUBLE CREEK. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
STOKES
US 52 DELETEDFS-1209A NC 65 IN WINSTON-SALEM TO I-74 IN SURRY COUNTY. CORRIDOR UPGRADE TO INTERSTATE STANDARDS.
STOKES
US 311 COMPLETEDFS-1509B NC 65 IN VICINITY OF SR 1928 (STOKESBURG ROAD) IN WALNUT COVE. UPGRADE INTERSECTION WITH RAILROAD CROSSING IMPROVEMENTS.
STOKES
US 52 / FUTURE I-74 DELETEDI-5887 SR 1102 (TRINITY CHURCH ROAD) NEARKING. CONVERT EXISTING GRADE SEPARATION TO FULL-MOVEMENT INTERCHANGE.
STOKES
NC 8 DELETEDR-3801 NC 65 AT GERMANTOWN TO THE VIRGINIA STATE LINE. UPGRADE TWO LANE FACILITY.
STOKES
VARIOUS DELETEDU-5209 WINSTON-SALEM MPO. RESERVE FOR FUNDS TO BE FLEXED TO FEDERAL TRANSIT ADMINISTRATION FOR TRANSIT PROJECTS.
STOKES
VARIOUS DELETEDU-5506 SMALL ROADWAY PROJECTS IN THE WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION (MPO) AREA. PROJECT DELETED - NO AUTHORIZATIONS REQUESTED; USE OF GROUP PROJECTS DISCONTINUED FOR UNDEFINED ROADWAY SCOPES.
STOKES
ELKIN MUNICIPAL AIRPORT (ZEF)
DELETEDAV-5757 RUNWAY SAFETY AREA EXTENSION FOR RUNWAY 7. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUNDOF PRIORITIZATION.
SURRY
MOUNT AIRY/SURRY COUNTY AIRPORT (MWK)
DELETEDAV-5758 RUNWAY AND TAXIWAY EXTENSION - PAVING AND LIGHTING. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
SURRY
ELKIN MUNICIPAL AIRPORT (ZEF)
DELETEDAV-5759 RUNWAY 25. CONSTRUCT 500 FEET EXTENSION AND TAXIWAY TURNAROUND. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUNDOF PRIORITIZATION.
SURRY
SR 1624 (DON BARE ROAD)
DELETEDB-5824 REPLACE BRIDGE 850092 OVER PAULS CREEK.
SURRY
MOUNT AIRY DELETEDEB-5725 HAMBURG STREET FROM SOUTH MAIN STREET TO MOUNT AIRY MIDDLE SCHOOL. CONSTRUCT SIDEWALK. HAMBURG STREET TO MOUNT AIRY MIDDLE SCHOOL. CONSTRUCT GREENWAY. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
SURRY
C/D-40
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
US 52 DELETEDFS-1209A NC 65 IN WINSTON-SALEM TO I-74 IN SURRY COUNTY. CORRIDOR UPGRADE TO INTERSTATE STANDARDS.
SURRY
I-77 DELETEDI-5749 SR 1341 (WHITE DIRT ROAD) TO 1.3 MILES NORTH OF SR 1345 (BEULAH ROAD). PAVEMENT REHABILITATION. SECTION OF ROAD RECENTLY RESURFACED.
SURRY
I-77 DELETEDI-5803 SR 1341 (WHITE DIRT ROAD TO 1.3 MILES NORTH OF SR 1345 (BEULAH CHURCH ROAD). PAVEMENT REHABILITATION. SECTION OF ROAD WAS RECENTLY RESURFACED.
SURRY
SR 1364 (FONTANA DRIVE)
DELETEDEB-5737 DOWNTOWN BRYSON CITY TO SWAIN COUNTY HIGH SCHOOL. CONSTRUCT MULTI-USE PATH. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUNDOF PRIORITIZATION.
SWAIN
SR 1378 (ACQUONI ROAD) DELETEDEB-5758 US 441 END OF SIDEWALK TO ACQUONI ROAD END OF SIDEWALK. CONSTRUCT SIDEWALK, CURB CUTS, AND PEDESTRIAN SIGNALS. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
SWAIN
SR 1364-SR 1114 (NEEDMORE ROAD)
DELETEDR-4440 SR 1369 (BYRD ROAD) IN MACON COUNTYTO EXISTING PAVEMENT IN SWAIN COUNTY. UPGRADE TO SECONDARY ROAD STANDARDS. PROJECT DELETED DUE TO RE-PRIORITIZATION.
SWAIN
NC 28 COMPLETEDR-5529 CONSTRUCT HELIPAD ADJACENT TO NC 28 NEAR TSALI FOREST SERVICE RECREATIONAL AREA. FEDERAL AID NUMBER NC FLAP SWN HPAD(1).
SWAIN
SR 1504 (OLD US 64) COMPLETEDb-4291 REPLACE BRIDGE 870193 OVER DAVIDSON RIVER.
TRANSYLVANIA
US 64 COMPLETEDB-5010 REPLACE BRIDGE 870027 OVER ROCKYCREEK WITH CULVERT.
TRANSYLVANIA
SR 1139(OLD TOXAWAY ROAD)
DELETEDB-5405 REPLACE BRIDGE 870139 OVER EAST BRANCH TOXAWAY CREEK.
TRANSYLVANIA
VARIOUS COMPLETEDE-4975 BLUE RIDGE NATIONAL HERITAGE SITES. INTERPRETATIVE AND GATEWAY MARKERS. PROJECT COMPLETED.
TRANSYLVANIA
RAILROAD AVENUE / BREVARD WEST LOOP MULTI-USE PATH
DELETEDEB-5605 MCLEAN ROAD TO WEST MAIN STREET. CONSTRUCT MULTI-USE PATH. PROJECT DELETED DUE TO RE-PRIORITIZATION.
TRANSYLVANIA
NC 215, BALSAM GROVE SUNBURST, FH 32
DELETEDR-2594 US 64 AT CHERRYFIELD TO SR 1326 (MACEDONIA CHURCH ROAD) SOUTH OF BALSAM GROVE. TWO LANES ON NEW LOCATION. PROJECT DELETED DUE TO RE-PRIORITIZATION.
TRANSYLVANIA
US 178 DELETEDR-5601 SOUTH CAROLINA LINE TO SR 1156 (MAIN STREET) IN ROSMAN. UPGRADE ROADWAY. PROJECT DELETED DUE TORE-PRIORITIZATION.
TRANSYLVANIA
NEW ROUTE DELETEDR-5743 US 64/US 276 TO US 64. CONSTRUCT NEW ROUTE. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
TRANSYLVANIA
SR 1546 (NEELY ROAD) DELETEDR-5764 SR 1504 (OLD US 64) TO SR 1544 (FRENCH BROAD STREET). UPGRADE ROADWAY. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
TRANSYLVANIA
SR 1116 (NORTH COUNTRY CLUB ROAD)
DELETEDR-5765 BREVARD CITY LIMIT TO US 64. UPGRADE ROADWAY. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
TRANSYLVANIA
US 601 DELETEDB-5371 REPLACE BRIDGE 890071 OVER CLEAR CREEK.
UNION
SR 1681 (OLD CAMDEN ROAD)
DELETEDB-5376 REPLACE BRIDGE 890021 OVER STEWART'S CREEK.
UNION
SR 1301 (MARVIN ROAD) DELETEDB-5791 REPLACE BRIDGE 890224 OVER TWELVE MILE CREEK.
UNION
SR 2111 (BELK MILL ROAD)
DELETEDB-5806 REPLACE BRIDGE 890129 OVER LANES CREEK.
UNION
SR 1970 (HILL-FORD ROAD)
DELETEDB-5812 REPLACE BRIDGE 830105 OVER STONY RUN CREEK.
UNION
C/D-41
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
SR 1929 (HORTON ROAD) DELETEDB-5815 REPLACE BRIDGE 830097 OVER LANES CREEK.
UNION
SR 1009 (CHARLOTTE AVENUE)
DELETEDB-5819 REPLACE BRIDGE 890362 OVER BEARSKIN CREEK.
UNION
MARSHVILLE DELETEDC-4973 ROCKY RIVER RPO TO PROVIDE FUNDING FOR TWO-YEARS FOR OUTREACH AND MARKETING TO SUPPORT EXPANDED 74X CATS EXORESS BYS SERVUCE TI NARSGEVUKKE, CMAQ FUNDS TRANSFERRED TO FTA. PROJECT DELETED WITH FUNDS FLEXED TO FTA.
UNION
WESLEY CHAPEL DELETEDEB-5789 WEDDINGTON ROAD, WAXHAW-INDIAN TRAIL ROAD TO LESTER DAVIS ROAD. CONSTRUCT SIDEWALK. PROJECT DELETED-WORK TO BE ACCOMPLISHED IN U-3467
UNION
MONROE DELETEDU-2549 US 74 TO SR 1751 (WALKUP AVENUE) AT SR 1763 (BIVENS ROAD). TWO LANES ON FOUR LANE RIGHT OF WAY. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
UNION
SR 1523 (SOUTHERN MILL RD.)
COMPLETEDB-4827 REPLACE BRIDGE 900053 OVER SANDY CREEK.
VANCE
SR 1526 (WELDONS MILL ROAD)
DELETEDB-4828 REPLACE BRIDGE 900056 OVER SANDY CREEK. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
VANCE
SR 1326 (KELLY ROAD) DELETEDB-5679 REPLACE BRIDGE 900070 OVER FLAT CREEK. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
VANCE
SR 1308 (NUTBUSH ROAD)
DELETEDB-5685 REPLACE BRIDGE 900089 OVER KERR LAKE. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
VANCE
CSX S-LINE DELETEDEB-5128 PROPOSED MULTIPURPOSE TRAIL IN VICINITY OF SOUTHEAST HIGH-SPEED RAIL CORRIDOR, FROM RALEIGH TO VIRGINIA STATE LINE.
VANCE
VARIOUS DELETEDI-5205 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 5.
VANCE
SR 1162 (DABNEY DRIVE) DELETEDU-5831 US 158 BYPASS TO COBLE BOULEVARD IN HENDERSON. UPGRADE EXISTING FACILITY TO INCREASE CAPACITY, ENHANCE SAFETY, AND ADD MULTI-MODAL FACILITIES
VANCE
US 1 COMPLETEDW-5317 SR 1135 (WALL ROAD) IN FRANKLIN COUNTY TO US 1 BUSINESS IN VANCE COUNTY. INSTALL MEDIAN BARRIER.
VANCE
NC 50 DELETEDB-4654 REPLACE BRIDGE 910069 OVER US 70 IN GARNER. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
WAKE
SR 1393 (BASS LAKE ROAD)
COMPLETEDB-4659 REPLACE BRIDGE 910373 OVER BASSAL CREEK IN HOLLY SPRINGS.
WAKE
SR 2308 (FOWLER ROAD) DELETEDB-4662 REPLACE BRIDGE 910196 OVER MOCCASIN CREEK. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
WAKE
NC 97 DELETEDB-4830 REPLACE BRIDGE 910020 OVER MOCCASIN CREEK. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
WAKE
SR 1152 (HOLLY SPRINGS - NEW HILL ROAD)
DELETEDB-4831 REPLACE BRIDGE 910371 OVER WHITE OAK CREEK. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
WAKE
SR 2761 (WIMBERLY ROAD)
DELETEDB-4833 REPLACE BRIDGE 910376 OVER LITTLE BLACK CREEK. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
WAKE
SR 1163 (KELLY ROAD) COMPLETEDB-4991 REPLACE BRIDGE 910359 OVER BEAVER CREEK IN APEX.
WAKE
C/D-42
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
SR 1942 (OAK GROVE CHURCH ROAD)
COMPLETEDB-5113 REPLACE BRIDGE 910157 OVER SMITHS CREEK.
WAKE
SR 1001 (PEARCES ROAD) DELETEDB-5140 REPLACE BRIDGE 910195 OVER MOCASSIN CREEK. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
WAKE
SR 1162 (APEX BARBECUE ROAD)
DELETEDB-5161 REPLACE BRIDGE 910362 OVER BEAVER CREEK IN APEX. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
WAKE
SR 2703 (NEW BETHEL CHURCH ROAD)
DELETEDB-5237 REPLACE BRIDGE 910248 OVER MAHLER'S CREEK IN GARNER. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
WAKE
(OLD HOLLY SPRINGS - APEX ROAD)
DELETEDB-5321 REPLACE BRIDGE 910374 OVER LITTLE BRANCH. PROJECT DELETED AT REQUEST OF STRUCTURES MANAGEMENT UNIT.
WAKE
SR 1116 (CEDAR CREEK ROAD)
COMPLETEDB-5325 REPLACE BRIDGE 340012 OVER CEDAR CREEK.
WAKE
SR 1630 (GREEN LEVEL CHURCH ROAD)
DELETEDB-5673 REPLACE BRIDGE 910061 OVER KIT CREEK IN CARY. PROJECT DELETED ATREQUEST OF STRUCTURES MANAGEMENT UNIT.
WAKE
PULLEN ROAD DELETEDB-5675 REPLACE BRIDGE 910533 OVER SR 1012 (WESTERN BOULEVARD) IN RALEIGH. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
WAKE
SR 1670 (BLUE RIDGE ROAD)
DELETEDB-5676 REPLACE BRIDGE 910494 OVER CRABTREE CREEK IN RALEIGH. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
WAKE
SR 1633 (GOOD HOPE CHURCH ROAD)
DELETEDB-5680 REPLACE BRIDGE 910449 OVER CSX RAILROAD IN CARY. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
WAKE
SR 2713 (VANDORA SPRINGS ROAD)
DELETEDB-5681 REPLACE BRIDGE 910258 OVER US 70 IN GARNER. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
WAKE
SR 1371 (LAKE WHEELER ROAD)
DELETEDB-5683 REPLACE BRIDGE 910302 OVER YATES POND SPILLWAY. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
WAKE
VARIOUS COMPLETEDC-4923 CITYWIDE UPGRADE OF SIGNAL SYSTEM IN RALEIGH.
WAKE
VARIOUS DELETEDC-5565 TRIANGLE J COUNCIL OF GOVERNMENTS TRANSPORTATION DEMAND MANAGEMENT PROGRAM - PHASE II.
WAKE
MINGO CREEK GREENWAY
COMPLETEDEB-5002A PHASE I - EAST OF NEUSE RIVER BRIDGE TO WEST OF SR 2516 (HODGE ROAD)
WAKE
MINGO CREEK GREENWAY
COMPLETEDEB-5002B PHASE II - WEST OF SR 2516 (HODGE ROAD) TO SR 2233 (SMITHFIELD ROAD)
WAKE
CSX S-LINE DELETEDEB-5128 PROPOSED MULTIPURPOSE TRAIL IN VICINITY OF SOUTHEAST HIGH-SPEED RAIL CORRIDOR, FROM RALEIGH TO VIRGINIA STATE LINE.
WAKE
VARIOUS DELETEDEB-5515 INSTALLATION OF LOCAL WAYFINDING BICYCLE SIGNS AND BICYCLE RACK - COMFORT STATIONS IN RALEIGH. WORK TO BE COMPLETED UNDER U-5530.
WAKE
SR 1313 (WALNUT STREET)
DELETEDEB-5516 SR 1315 (BUCK JONES ROAD) TO MEETING STREET IN CARY. CONSTRUCT SIDEWALK.
WAKE
C/D-43
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
MOUNTAINS-TO-SEA TRAIL
COMPLETEDEB-5545 UPPER NEUSE RIVER GREENWAY - HORSESHOE BEND SECTION, WRAL SOCCER COMPLEX ON SR 2006 (PERRYCREEK ROAD) TO EXISTING SECTION WEST OF US 401 IN RALEIGH. CONSTRUCT GREENWAY.
WAKE
SR 2049 (FORESTVILLE ROAD)
DELETEDEB-5815 SR 2224 (MITCHELL MILL ROAD) TO SR 2982 (OLD COUNTRY LANE) IN RALEIGH. SIDEWALK IMPROVEMENTS, INCLUDING PEDESTRIAN SIGNALIZATION AND REFUGE ISLANDS, AND PAVED WALKWAY TO SCHOOL PROPERTY. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
WAKE
SR 2380 / NON- SYSTEM (EAST STRONACH AVENUE)
DELETEDEB-5816 SR 2406 (SHEPARD SCHOOL ROAD) TO SR 2344 (NORTH WHITLEY STREET) IN ZEBULON. CONSTRUCT SIDEWALK ON NORTH SIDE OF STREET, WITH CONNECTION TO HOUSING AUTHORITY. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
WAKE
BLACK CREEK GREENWAY
COMPLETEDEL-4998B PHASE III, SEGMENT 3, MAYNARD ROAD TO CASTALIA DRIVE
WAKE
SWIFT CREEK GREENWAY
COMPLETEDEL-4998C GREENWAY EXTENSION TO SYMPHONYLAKE GREENWAY AND KOKA BOOTH AMPHITHEATRE
WAKE
BLACK CREEK GREENWAY
COMPLETEDEL-4998D PHASE IV, SEGMENT 3 (BOND PARK SEGMENT)
WAKE
I-40; I-440 COMPLETEDFS-1005A I-40 FROM WEST OF SR 1728 (WADE AVENUE) NEAR CARY TO I-440 / US 64 INTERCHANGE (EXIT 301) IN RALEIGH AND I-440 FROM I-495 / US 64 / US 264 INTERCHANGE TO I-40 (EXIT 16) IN RALEIGH. UPGRADE CORRIDOR, INCLUDING ADDITIONAL GENERAL PURPOSE AND/OR MANAGED LANES, PAVEMENT REHABILITATION, INTERCHANGE MODIFICATIONS, AND OPERATIONAL IMPROVEMENTS.
WAKE
NC 54 COMPLETEDFS-1005B NC 540 IN MORRISVILLE TO NORTHWEST MAYNARD ROAD IN CARY. WIDEN TO MULTILANES.
WAKE
I-40 COMPLETEDFS-1205A NC 86 IN ORANGE COUNTY TO SR 1728 (WADE AVENUE) IN WAKE COUNTY. CONSTRUCT MANAGED LANES.
WAKE
US 401 COMPLETEDFS-1205B SR 2044 (LIGON MILL ROAD) / SR 2224 (MITCHELL MILL ROAD) INTERSECTION IN RALEIGH. CONSTRUCT INTERCHANGE.
WAKE
NC 50 (CREEDMOOR ROAD)
COMPLETEDFS-1205D I-540 TO NORTH OF NC 98. WIDEN TO MULTILANE DIVIDED ROADWAY.
WAKE
CSX S LINE DELETEDFS-1505A ROGERS ROAD (633905Y) IN WAKE FOREST. CONVERT AT-GRADE CROSSING TO GRADE SEPARATION.
WAKE
NORFOLK SOUTHERN H LINE
DELETEDFS-1505B SR 1652 (HARRISON AVENUE) (CROSSING 734755X) IN CARY. CONVERT AT-GRADE CROSSING TO GRADE SEPARATION.
WAKE
VARIOUS DELETEDI-5205 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 5.
WAKE
I-40 DELETEDI-5306 I-440 TO JOHNSTON COUNTY LINE. DIAMOND GRINDING AND JOINT RESEALING.
WAKE
I-540 COMPLETEDI-5307 I-40 IN DURHAM COUNTY TO NC 50 IN WAKE COUNTY. PAVEMENT REHABILITATION AND SHOULDER SEALS.
WAKE
I-440 / US 1 COMPLETEDI-5333A I-40 TO SR 1728 (WADE AVENUE). PHASE 1 REHABILITATION ACTIVITIES.
WAKE
I-540 DELETEDI-5335 EAST OF US 1 TO US 64 / US 264. CLEAN AND RESEAL JOINTS, AND REPAIR SPALLS.
WAKE
I-40 / US 64 COMPLETEDI-5338A ITS DEPLOYMENTWAKE
I-440 DELETEDI-5360 WEST OF SR 2000 (WAKE FOREST ROAD) TO EAST OF US 64 BUSINESS. PAVEMENT PRESERVATION.
WAKE
I-40 DELETEDI-5704 WEST OF SR 1728 (WADE AVENUE) TO EAST OF I-440 / US 1 / US 64. ADD LANES AND REHABILITATE PAVEMENT. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
WAKE
C/D-44
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
I-540 DELETEDI-5706 US 70 (GLENWOOD AVENUE) TO SR 1829 (LEESVILLE ROAD) IN RALEIGH. CONSTRUCT EASTBOUND AUXILIARY LANE.
WAKE
I-495 / FUTURE I-495 /US 64 / US 264
DELETEDI-5709 I-440 TO I-540 IN RALEIGH TO US 64 BUSINESS IN WENDELL. ADD LANES.
WAKE
US 70 (GLENWOOD AVENUE)
DELETEDU-2823 I-540 TO WEST OF SR 1664 (DURALEIGH ROAD) IN RALEIGH. UPGRADE ROADWAY TO IMPROVE CAPACITY, SAFETY AND TRAFFIC OPERATIONS INCLUDING INTERCHANGES AT VARIOUS LOCATIONS.
WAKE
VARIOUS COMPLETEDU-3802 CARY SIGNAL SYSTEMWAKE
NC 54 (HILLSBOROUGH STREET) SR 1664 / SR 3074 (BLUE RIDGE ROAD) BERYL ROAD
DELETEDU-4437 VICINITY OF NC RAILROAD CORRIDOR (CSX TRANSPORTATION SYSTEM AND SOUTHERN RAILROAD) IN RALEIGH. CONSTRUCT GRADE SEPARATIONS.
WAKE
SR 3007 (HILLSBOROUGH STREET)
DELETEDU-4447 GORMAN STREET TO WOODBURN ROAD INCLUDING HORNE STREET, BROOKS STREET, CLARK AVENUE AND OBERLIN ROAD, IN RALEIGH. RECONSTRUCT ROADWAY.
WAKE
SR 3097 (AVIATION PARKWAY) / NEW ROUTE (NORTHERN DURHAM PARKWAY)
DELETEDU-4721 I-540 IN RALEIGH / WAKE COUNTY TO US 501 (ROXBORO ROAD) IN DURHAM / DURHAM COUNTY. CONSTRUCT VARIABLE-WIDTH ROADWAY WITH MEDIAN ON MULTILANE SECTIONS, PART ON NEW LOCATION.
WAKE
NC 147 COMPLETEDU-4763B TRIANGLE PARKWAY / TRIANGLE EXPRESSWAY, NC 540 TO I-40 - 3.5 MILES
WAKE
SR 2000 (FALLS OF NEUSE ROAD)
COMPLETEDU-4901A RAVEN RIDGE ROAD TO FONVILLE ROAD
WAKE
VARIOUS DELETEDU-5205 CAPITAL AREA MPO.RESERVE FOR FUNDS TO BE FLEXED TO FEDERAL TRANSIT ADMINISTRATION FOR TRANSIT PROJECTS.
WAKE
SR 1624 (CARPENTER FIRE STATION ROAD)
DELETEDU-5502 NC 55 TO SR 3014 (MORRISVILLE-CARPENTER ROAD) IN CARY. REALIGN ROADWAY AND CONSTRUCT GRADE SEPARATION AT CSX RAILROAD. TOWN DECLINED PROJECT.
WAKE
SR 3014 (MORRISVILLE-CARPENTER ROAD)
COMPLETEDU-5503 WEST OF SR 1613 (DAVIS DRIVE) TO EAST OF OLD SAVANNAH DRIVE IN MORRISVILLE. CONSTRUCT TURN LANE, REALIGN INTERSECTION AND PROVIDE PEDESTRIAN AND SAFETY ENHANCEMENTS.
WAKE
SR 1009 (LAKE WHEELER ROAD)
COMPLETEDU-5504 SR 1009 / SR 1370 (TRYON ROAD) TO SR4746 (CENTENNIAL PARKWAY) IN RALEIGH. CONSTRUCT TURN LANES, SIDEWALK, MULTIUSE PATH, AND PEDESTRIAN SAFETY ENHANCEMENTS.
WAKE
(WHITE OAK ROAD); SR 5220 (JONES SAUSAGE ROAD)
COMPLETEDU-5520 GARNER - CONSTRUCT IMPROVEMENTS ON I-40 / US 70 EASTBOUND RAMP TO US 70 BUSINESSWESTBOUND; ADD THROUGH AND TURN LANES ON US 70 BUSINESS WESTBOUND BETWEEN SR 2547 / SR 5220 INTERSECTION AND I-40 / US 70 INTERCHANGE; CONSTRUCT THROUGHLANE ON SR 2547 SOUTHBOUND; CONSTRUCT THROUGH AND TURN LANES ON SR 5220.
WAKE
I-540 DELETEDU-5700 I-40 TO US 64 / US 264. WIDEN FROM SIX TO EIGHT LANES AND CONVERT TO TOLL FACILITY.
WAKE
CRABTREE VALLEY AVENUE
DELETEDU-5718 SR 3009 (EDWARDS MILL ROAD) TO I-440 / US 1 IN RALEIGH. REALIGN AND WIDEN CRABTREE VALLEY AVENUE, CONSTRUCT NEW INTERCHANGE AT I-440 / US 1 TO CONNECT TO RIDGE ROAD, AND REALIGN I-440 / US 1 INTERCHANGE WITH US 70 (GLENWOOD AVENUE).
WAKE
SR 1115 (AVENT FERRY ROAD)
DELETEDU-5830 SR 1116 (CASS HOLT ROAD) TO NC 55 BYPASS IN HOLLY SPRINGS. WIDEN TO MULTILANES.
WAKE
C/D-45
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
SR 1301(SUNSET LAKE ROAD)
COMPLETEDW-5137 SR 4701 (CYPRESS FORD ROAD) TO QUARRY ROCK DRIVE IN HOLLY SPRINGS. CUT VERTICAL CREST, IMPROVE SUPER-ELEVATION, INSTALL A LEFT TURN LANE AND IMPROVECROSS-SLOPE SOUTH OF CURVE.
WAKE
SR 1152 (HOLLY SPRINGS RD.)
DELETEDW-5323 SR 1385 (LILLY ATKINS ROAD) TO SR 1383 (CAMPBELL ROAD). WIDEN TO 3-LANE SECTION.
WAKE
SR 1314 (WAVERLY THOMPSON ROAD)
COMPLETEDB-4666 REPLACE BRIDGE 920080 OVER HAWTREE CREEK.
WARREN
SR 1620 (LICKSKILLET ROAD)
DELETEDB-5687 REPLACE BRIDGE 920043 OVER SHOCCO CREEK. PROJECT DELETED; LEGISLATIVE BRIDGE PROGRAM PROJECTS TO NO LONGER BE LISTED IN STIP.
WARREN
CSX S-LINE DELETEDEB-5128 PROPOSED MULTIPURPOSE TRAIL IN VICINITY OF SOUTHEAST HIGH-SPEED RAIL CORRIDOR, FROM RALEIGH TO VIRGINIA STATE LINE.
WARREN
VARIOUS DELETEDI-5205 INTERSTATE MAINTENANCE PRESERVATION FOR DIVISION 5.
WARREN
I-85 DELETEDK-5602 REST AREA RENOVATIONS - BUILDING AND GROUNDS. UPGRADE FIXTURES AND FINISHES.
WARREN
US 158 DELETEDR-2587 I-85 IN WARREN COUNTY TO SR 1405 (PICKLE PLANT ROAD) EAST OF LITTLETON IN HALIFAX COUNTY. WIDEN TO MULTI-LANES WITH BYPASSES OF NORLINA, MACON AND LITTLETON ON NEW LOCATION.
WARREN
SR 1130 (WORLEY ROAD) DELETEDB-4670 REPLACE BRIDGE 940200 OVER CREEKWATAUGA
SR 1540 (TWEETSIE RAILROAD)
DELETEDB-5177 REPLACE BRIDGE 940278 OVER MIDDLE FORK CREEK AND REALIGN INTERSECTIONS OF US 321 WITH SR 1540 AND SR 1531.
WATAUGA
SR 1227 (NORTH FORK ROAD)
DELETEDB-5386 REPLACE BRIDGE 940087 OVER NORTH FORK CREEK
WATAUGA
SR 1359 (BROWNWOOD ROAD)
DELETEDB-5532 REPLACE BRIDGE 940142 OVER CREEKWATAUGA
US 321 DELETEDR-5016 TENNESSEE STATE LINE TO US 421. WIDEN TO MULTI-LANES. PROJECT DELETED DUE TO RE-PRIORITIZATION.
WATAUGA
US 421 DELETEDU-2703 PROPOSED BYPASS SOUTH OF BOONE, PART ON NEW LOCATION. PROJECT DELETED DUE TO RE-PRIORITIZATION.
WATAUGA
NC 194 DELETEDU-5867 US 421 (KINGS STREET) TO SR 1306 (HOWARDS CREEK ROAD). WIDEN TO MULTI-LANES. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUNDOF PRIORITIZATION.
WATAUGA
SR 1006 (CORBETT HILL ROAD)
DELETEDB-4839 REPLACE BRIDGE 950096 OVER THROUGHFARE SWAMP.
WAYNE
SR 1117 (THUNDER SWAMP ROAD)
DELETEDB-4840 REPLACE BRIDGE 950264 OVER THUNDER SWAMP.
WAYNE
SR 1353 (HOOKS ROAD) DELETEDB-4842 REPLACE BRIDGE 950045 OVER GREAT SWAMP.
WAYNE
SR 1502 (ARTHUR DAVIS ROAD), SR 1958 (BENNETTS BRIDGE ROAD)
DELETEDB-4844 REPLACE BRIDGE 950117 OVER NORTHEAST CAPE FEAR RIVER.
WAYNE
SR 1009 (JORDAN STORE ROAD)
DELETEDB-4941 REPLACE BRIDGE 950093 OVER TOWN CREEK.
WAYNE
ROYALL AVENUE DELETEDEB-5621 SR 1286 (WILLIAM STREET) TO SR 1565 (SPENCE AVENUE). CONSTRUCT SIDEWALK ON NORTH SIDE.
WAYNE
US 13 DELETEDU-5865 SR 1705 (HOOD SWAMP ROAD) TO SR 1572 (SAULSTON ROAD). WIDEN TO FOUR LANES WITH A MEDIAN.
WAYNE
SR 1313 (CONGO ROAD) DELETEDB-4977 REPLACE BRIDGE 960075 OVER FISH DAM CREEK.
WILKES
SR 1154 (MT PLEASANT ROAD)
DELETEDB-4978 REPLACE BRIDGE 960082 OVER SOUTH PRONG LEWIS FORK CREEK.
WILKES
SR 1562 (OLD NC 16) COMPLETEDB-5146 REPLACE BRIDGE 960302 OVER MIDDLE FORK OF REDDIES RIVER.
WILKES
SR 1562 (OLD NC 16) COMPLETEDB-5416 REPLACE BRIDGE 960302 OVER MIDDLE FORK OF REDDIES RIVER.
WILKES
C/D-46
FEDERAL FISCAL YEAR 2015- 2017COUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
COMPLETED / DELETED PROJECTSCOUNTY ROUTE / CITY ID NO. STATUS DESCRIPTION
SR 1725 (CANE CREEK CHURCH ROAD)
DELETEDB-5523 REPLACE BRIDGE 960168 OVER CREEKWILKES
SR 1753 (ROARING GAP CHURCH)
DELETEDB-5834 REPLACE BRIDGE 960235 OVER CREEKWILKES
NC 268 DELETEDR-3309 SR 1966 TO THE ELKIN BYPASS. UPGRADE ROADWAY. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
WILKES
NC 16/NC 18 COMPLETEDSF-4911D INTERSECTION OF NC 16 AND 18 NORTH TO SR 2545 (PLAZA DRIVE). CONSTRUCT A TWO WAY LEFT TURN LANE AND INSTALL A SOUTHBOUND LEFT TURN LANE ON NC 16/NC 18 AT SR 2545.
WILKES
SR 1531 (EAGLE'S CROSS ROAD).
COMPLETEDB-4681 REPLACE BRIDGE 970119 OVER LITTLE CONTENTNEA CREEK.
WILSON
WILSON DELETEDEB-5509 SR 1326 (CORBETT AVENUE), SR 1327 (LONDON CHURCH ROAD) TO TOISNOT PARK. WIDEN SHOULDER ON BOTH SIDES.
WILSON
WILSON DELETEDEB-5511 US 301 (WARD BOULEVARD), SR 1515 (LIPSCOMB BOULEVARD) TO NEW BERN STREET. ADD SIDEWALK ON BOTH SIDES.
WILSON
WILSON DELETEDEB-5512 SR 1377 (NASH STREET), SR 1192 (HINES ROAD) TO US 301 (WARD BOULEVARD). ADD SIDEWALK ON NORTH SIDE.
WILSON
I-95 DELETEDI-5330 NORTH OF SR 1118 (SPRINGFIELD SCHOOL ROAD) TO NASH COUNTY LINE. PAVEMENT REHABILITATION.
WILSON
I-95 DELETEDI-5742 0.5 MILES NORTH OF I-795 (MILE POST 119.8) TO 0.7 MILES NORTH OF SR 1309 (BLOOMERY ROAD) (MILE POST 1213.7). PAVEMENT REHABILITATION.
WILSON
WILSON NORTHERN LOOP
DELETEDU-3470 NC 58 (NASH STREET) TO US 301 INTERCHANGE AT SR 1436 (ROSEBUD CHURCH ROAD). MULTI-LANES ON NEW LOCATION.
WILSON
NC 58 COMPLETEDW-5331 SOUTH OF SR 1626 (FAIRFIELD DAIRY ROAD) NORTHWARD ONE MILE. CONSTRUCT LEFT TURN LANE AT SR 1626, OVERLAY WITH FRICTION COURSE RE-STRIPE WITH THERMOPLASTIC MARKINGS AND INSTALL CENTERLINE PAVEMENT MARKINGS.
WILSON
SR 1152 (NEELIE ROAD) DELETEDB-4683 REPLACE BRIDGE 980020 OVER SOUTH DEEP CREEK.
YADKIN
SR 1710 (WATKINS ROAD) DELETEDB-4686 REPLACE BRIDGE 980010 OVER SOUTH DEEP CREEK.
YADKIN
US 21 BUSINESS DELETEDB-4979 REPLACE BRIDGE 980059 OVER JONESVILLE CREEK.
YADKIN
US 421 NBL DELETEDB-5389 REPLACE BRIDGE 980105 OVER YADKIN RIVER OVERFLOW.
YADKIN
US 421 DELETEDR-5733 CONSTRUCT NEW INTERCHANGE ON US 421 BETWEEN EXISTING EXITS 257 AND 259. PROJECT DELETED. WAS NOTRE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
YADKIN
SR 1605 (EAST MAIN STREET)
DELETEDR-5773 US 601 TO SR 1765 (UNIFI INDUSTRIAL ROAD). WIDEN TO 3-LANES. PROJECT DELETED. WAS NOT RE-SELECTED IN P4.0 ROUND OF PRIORITIZATION.
YADKIN
NC 80 DELETEDB-5864 REPLACE BRIDGE 990049 OVER BROWNS CREEK.
YANCEY
SR 1134 (OSSIE GOUGE ROAD)
DELETEDB-5894 REPLACE BRIDGE 990002 OVER BALD CREEK.
YANCEY
C/D-47