Country Manager, Zainal
Fitri Bapoo!s appointment took effect on July 2,
2008. He succeeds Yam Keong Chee (pic).
Zainal holds a Bachelor Degree
in Civil Engineering (Hon) from
Un i ve r s i t y o f Tenneesse ,
Knoxvi le in USA. He was
previously attached with PATI
Berhad since 1989 to 2000,
executing construction, National
Highway Projects and other PWD projects in
Malaysia. He was Project Manager for Gurgeon,
Katputli Highway project, commencing from
December 1997 until December 2000. He also
held a position of General Manager in a
Malaysian Company. His last posting was in
Kolkatta as a Senior Project Manager.
Head of Finance, Gan Chong Shyan, a
Malaysian, was appointed on June 15, 2008
succeeding Rozaifee Abu Zahasim (pic). CS Gan
is a member of the Malaysian Institute of
Accountants and a fe l low
member of the Malaysian
Institute of Taxation and was
trained as an auditor with one of
the top international accounting
firm. He has over 13 years of
extensive experience in financial management
and planning, corporate and legal affairs. His
directorship in other public companies is in Latexx
Partners Berhad, Gunung Capital Berhad.
Head of Legal, Gay Saw Ghin Lye, LL.B Hons,
succeeded Vijayashankar Thirunavakarasas
(pic) on October 17, 2008. She comes with
approximately 23 years of
working experience in the fields
of Construction, Intellectual
P r o p e r t y , I n f o r m a t i o n
Technology, Pharmaceutical, Oil
& Gas, General Corporate Work,
Banking, Conveyancing, and
Litigation.
Zainal Fitri, CS Gan and Gay Saw at the Heart of UEDI
DECEMBER 2008 UEDI TIMES ISSUE ONE
9 years later, the 5th Generation of UEDILeft: Zainal FitriRight Top: Gan Chong ShyanRight Bottom:Gay Saw Ghin Lye
LET’S CONNECT. UEDI is set to launch its website www.uediindia.com in
the next few weeks.
UE DEVELOPMENT INDIA TIMES
Chief Editor: Asha Pujar ! ! ! ! ! Designer & Technical Advisor: Manjunath
Contributors: JJ Yap, Ben, Manoj & G Saw
Despite the continuing economic gloom Country Manager, Zainal Fitri, is determined to drive UEDI forward
starting with a number of tenders. Times are tough but UEDI need not suffer says Zainal Fitri. There are sufficient
earthworks, infrastructures and buildings jobs in India. UEDI will slowly gain momentum as a main contractor for
National Highway Authority India (NHAI).
Among the projects tendered under his leadership are:
August 2008
• Construction of Compound Wall and Road related works at LPG Import and Export Terminal Project at Chennai
with a potential value of 4.61 crores.
!
September 2008
• Project NH 25, Lucknow Bypass - Infrastructure with a potential value of 113.30 crores.
• MRTS - Phase II - 18m Wide Approach Road with a potential value of 29.53 crores.
!
October 2008
• MRTS - Phase II - RCC Retaining Wall with a potential value of 44.30 crores.
November 2008
• ""Project NH 8 - Gurgaon, Jaipur. with a potential value of 365.89 crores."
December 2008
• NH 25, Lucknow By pass - Infrastructure. Client is NHAI and the project is 113.30 crores.
• Multi Tenant Building, Bangalore. "Client is HT City
Zainal Fitri and
his Team to
Rebuild UEDI
Project Management Workshop 2008
MalaysianMinister Counsellor (Economic Affairs) Visits UEDI4 DECEMBER 2008
Malaysian Minister Counsellor,
Mr. Subhash Bose Pillai paid a
surprise visit to UEDI, blore. He
was gladly received by Country
Manager, Zainal Fitri and Head
of Finance, Gan Chong Shyan.
H i g h C o m m i s s i o n ’ s
assistance assured
Mr. Subhash Bose assured UEDI
they would receive prompt
assistance from his staff." If
invited he would gladly attend
any meetings between UEDI and
Local Authority or private body.
He expressed his happiness noting
the issues being addressed by
UEDI, which are faced by other
Malaysian Contractors in India.
4 DECEMBER 2008 The Project Management workshop on "Creating change through Project Management and the Changing Trends in Project Management" was facilitated by Mr. Zainal Fitri, Country Manager, for the benefit of all UEDI’s Project Managers and O & M Managers. Among the attendees were Project Manager, Sivanesan; O & M Manager - TT, Sivarajan; O & M Manager - TA, Wong Yoke Sum; Project Manager -"KSTP-1, Lim Swee Goan, Plant Manager- KSTP - 1; Subri; Deputy Project Manager - UEM Ansal, Lucknow with guest Mr Subhash Bose Pillai, Minister Counsellor of Malaysia. A fruitful discussion was held on the present complexities, difficulties, uncertainties and risk encountered by the Project Management team. They were also reminded to adhere to the company's guidelines for material procurement, request for inspection (RFI) and monthly claims to client for Interim Payments (IPC). Zainal Fitri has confirmed UEDI will continually hold workshops for its staff.
RES IPSA LOQUITUR. MEANING, THE
MAP SPEAKS FOR ITSELF.
Tuni-Anakapalli BOT235 Cr 2002 – 2005
O&M 2005-2019
Tambaram-Tindivanam BoT 315 Cr 2002-2005
O&M 2005-2019
PLUS BKSP Bhilwandi-Kaylan –
Shil Phata BoT125 Cr 2002 – March2008
Dankuni-Koghat Pkg WB-1 World Bank
250 Cr 2001 - 2006
Etawah-Sikandra Pkg 1C World Bank
323 Cr 2002-2008
Trivandrum-Alappuzha KSTP-1 World Bank
227 Cr 2002 -ongoing
UEDI (ONGOING)
PATI
(ONGOING)
Barakar-Bawa Adda (ADB) 133.9Cr
1997-2001
Raniganj-Panagargh (ADB) 160.8Cr
1998-2002
Gurgaon-Kotpulli (ADB) 264.6Cr
1998-2002
Mehsana-Palanpur Gujarat (World Bank)
70 Cr 1999-2002
Tumkur - Haveri Package 2 ADB 253Cr
2002- March 2008
CONTRACT
COMPLETED
UEM BUILDERS-ANSAL API YEAR 2019
For quick facts about the projects see page 5.
QUICK FACTS OF
PROJECTS
1.# Tumkur – Haveri NH4: Package 2
This is a project to upgrade the existing single
carriageway along NH4 between Sira to Chitradurga
totalling 66.7km. This project was secured by UEM-
ESSAR JV through international open tender
Project Details:
• Client: National Highway Authority of India
• Scope: 66.7km dual 2 lane carriageway highway
• Project commenced in Mar 2002
• Contract completion on August 2004
• Contract Value: Rs. 253 Cr
2 # Grand Transport Improvement Road
project – 1C Etawah to Sikandra
This is a project to upgrade the existing single
carriageway along NH2 between Etawah to Sikandra
in Uttar Pradesh totalling 72 km. This project was
secured by Pati – Bhagheeratha Engineering Ltd JV
via an international open bid. The project is funded by
World Bank
Project Details
• Client: National Highway Authority of India
• Project commenced in Mar 2002
• Contract completion on Mar 2005
• Contract Value: Rs. 324 Cr
3.! Kerala State Transportation Project 1
This is a project to widen & improve various roads
totalling 127km in the state of Kerala – Pkg KSTP-1,
funded by World Bank. This project is secured by
PATI-Bhagheeratha Eng JV through international
open tender
Project Details:
• Client: Public Works Department Kerala State
Government
• Scope: 127.17km dual lane carriageway
highway
• Project commenced in December 2002
• Contract completion on December 2005
• Contract Value: Rs. 215 Crores
4.! Bhiwandi Kalyan Shil Phata Highway
This is PLUS’s maiden BOT project in India. It
involves widening & improvement of road totaling 22
km in the State of Maharasthra. The construction
package was awarded to UEDI based on a selected
competitive tendering exercise
Project Details
• Awarding Authority: Maharasthra State Road
Development Corporation (MSRDC)
• Client: PLUS BKSP Toll Limited
• Project commenced in Nov 2006
• Contract completion on Jan 2008
• Contract Value: Rs. 126 Cr (with materials)
3. ANNUITY BOT HIGHWAY PROJECTS
WITH GMR
Two Annuity BOT highway projects by with
GMR-UEM JV (74:26) were secured after competitive
bidding. The Engineering Procurement Contract
(EPC) was awarded to UEM/UEDI. Both contracts
were completed in 2004. On 6 May 2005 UEDI and
GMR has signed a Memorandum of Settlement to
settle all dispute between two Companies during the
EPC stage.
UEM/UEDI is currently undertaking the
Operations & Maintenance Contract for 15 years
Concession Period (2019)
O&M Fee (TT = Rs. 1.99 Cr/yr; TA = Rs. 1.5
Cr/yr)
UEM-Ansal JVApril 18, 2008
The Sushant Golf City,
Lucknow (Sushant) project was
awarded by ANSAL Properties &
Infrastructure Limited (ANSAL
API) to UEMB-ANSAL API JV
w h i c h i s o w n e d b y
UEM )Mauritius) Co Ltd (50%),
UEDI (10%) and ANSAL API
(40%). The project involves the
construction of a residential
township and related infrastructure
on 500 acres of land. The works
commenced on April 1, 2008 and
are expected to complete on
March 31, 2010.
Equipment Lease
Following the formation of the JV
UEDI was appointed to undertake
the supply of machineries on a
lease arrangement.
Project Management Services
Further UEDI is to provide
advisory and project management
services for the construction,
execution and completion of
v a r i o u s b u i l d i n g s a n d / o r
engineering works for the Sushant
Golf City Project for a period of 2
years with an option to extend for
a further term of 2 years.
AUDIT TEAM Pays a
Visit to UEDI’s
Bangalore Office
A team of auditors from Malaysia
headed by"Cik Hizita Abdullah"was
in UEDI Banglore office during the
period 15th October to 31st October
2008. Other team members were
Eanis Azman Latif, Chavlottee Lau
and Nzooi Pvey Kim.
The audit scope covered various
areas including balance sheet review,
profit & loss account review, Project
closures for completed projects and
Operation & Maintenance activities.
The team attended the Deepavali
celebrations at Prestige Acropolis
and while in
India, UEDI
ensured some
shopping
sprees and a
day trip to
Mysore.
Meaning, touch me and you will ouch!
THROUGH THE LENS...
12th MAY 2008: STAFF
ANNUAL GATHERING
12th MAY 2008: HR, JAMALIAH &
HATO MAKE A SITE VISIT
THE SUPPORT STAFFFrom L to R: Manjunath, - Admin & IT Dept, Jagdish – Driver, Pratima – HR Executive, Hanumesh –
Executive Taxation, Mercy – Secretary, Samir – Contracts Manager, Sunita – Company Secretary,
Karaba – Manager Finance, Chethan – Accounts Assistant, Ruma – Purchase Asst, Manoj – SR. Engineer,
Asha – Legal Asst, Magesh – Driver, Bhaskar – Admin/office Asst, Rekha – Rekha/front office Asst,
Shantala – Accounts Asst, Dimple – Accounts Executive.
Missing: Ben - Accounts Executive, Suresh - Driver.
MARRIAGES BETWEEN MANOJ & ....
ON ....
AND BEN & .... on ......
Head of Legal celebrates her first
Indian Birthday on 30 November
2008.
UEDI BIDS FAREWELL to
HR Manager Vankatesh(pic
above) and Head of Legal,
Vijay (pic below). UEDI
wishes them all the best in their
new endeavors.
UEDI SETS UP ITS TENDER DEPARTMENT. The newly set up
Department comprising of Contract Manager, JJ Yap (pic left), Contract
Manager, Samir (pic centre) and Project Manager, Sivanesen (pic right) will
identify new jobs and oversee all tenders and bids submitted by UEDI and
its related companies.
A team of 18 PLUS, UEMB and OPUS staff arrived from Malaysia on a
costing exercise. They have set their eyes on two potential NHAI BOOT
jobs. Highway No 1 is from Delhi to Agra and Highway No 2 is from
Coimbatore to Mettapalayam.
The team led by UEDI’s Contracts Manager, Mr. Samir, and SR. ENG –
Planning & Contracts, Mr. Manoj, visited Kosi and Coimbatore on a
feasible study.
UEDI wishes them all the best.
PLUS & UEMB SET
EYES ON 2 JOBS