www.wsp.com Prepared for: NORTH CAROLINA DEPARTMENT OF TRANSPORTATION Transportation Planning Division Raleigh, North Carolina Prepared by: June 24, 2019 Project Level Traffic Forecast I-5962 Proposed Interchange -- I-77 & SR 1302 (Cornelius Rd) and Bluefield Rd realignment / relocation WBS # 45912.1.1

U-5751 CoverPage SPupdate

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: U-5751 CoverPage SPupdate

www.wsp.com

Prepared for: NORTH CAROLINA DEPARTMENT OF TRANSPORTATION

Transportation Planning DivisionRaleigh, North Carolina

Prepared by:

June 24, 2019

Project Level Traffic Forecast

I-5962

Proposed Interchange -- I-77 & SR 1302 (Cornelius Rd) and Bluefield Rd realignment / relocation

WBS # 45912.1.1

Page 2: U-5751 CoverPage SPupdate

WSP USASuite 1500434 Fayetteville StreetRaleigh, NC 27601

Tel.: +1 919 836-4040Fax: +1 919 836-4099wsp.com

TRAFFIC FORECAST COVER LETTERMEMORANDUM TO: Brian Sowell, PE, NCDOT Division 12 Project Engineer

FROM: Nita Bhave

DATE: June 24, 2019

SUBJECT: Traffic Forecast for I-5962, Iredell County; Proposed Interchange at I-77 and Cornelius Rd & Bluefield Rd realignment / relocation

This forecast was approved by the NCDOT Transportation Planning Division on June 20, 2019.

___________________________________________________________________________________________________________

Please find attached the 2019 base year and 2045 future year Traffic Forecast for I-5962 located in Iredell County. This is the second

forecast completed for this project; the initial forecast was completed in June, 2018. This forecast was requested by NCDOT on

February 12, 2019.

I-5962 is a new interchange project at I-77 and Cornelius Rd. It also includes the relocation or realignment of Bluefield Rd. I-5962 is

located within Iredell County in NCDOT Division 12. This project is included in the 2018-2027 State Transportation Improvement

Program (STIP).

This project falls within the Charlotte Regional Transportation Planning Organization (CRTPO) and is contained in the 2045

Metropolitan Transportation Program (MTP), dated March 2018. The Metrolina Regional Travel Demand Model (MRM18v1.1),

adopted April, 2019 was utilized for this forecast along with project counts, and historical AADTs.

The following six (6) scenarios are provided in the forecast:

· 2019 No Build

· 2019 Build #1 – Interchange + Realign Bluefield Rd

· 2019 Build #2 – Interchange + Extend Exmore Rd + Close Bluefield Rd at Cornelius Rd intersection

· 2045 No Build

· 2045 Build #1 – Interchange + Realign Bluefield Rd

· 2045 Build #2 – Interchange + Extend Exmore Rd + Close Bluefield Rd at Cornelius Rd intersection

Certain assumptions were made in the development of the forecast, detailed below.

Page 3: U-5751 CoverPage SPupdate

Page 2

Fiscal Constraints:

For projects falling within an MPO, forecasts are fiscally constrained to match the assumptions of the MPO’s Metropolitan

Transportation Plan (MTP). The CRTPO MTP is dated March, 2018. This forecast assumes that all projects within the MTP are

constructed and open to traffic in 2045.

Interpolation:

To determine any intermediate years, straight-line interpolation may be used. AADT volumes may be extrapolated for up to two years

immediately following 2045. If it is determined that any of these assumptions have become inconsistent with the project and

surrounding area activity, please request updated information.

If you have any questions, or I can be of further assistance, please do not hesitate to call me at 919-376-2700, or e-mail me at

[email protected]. Thank you.

cc: FILE (Iredell County, Project I-5962)

cc: (via e-mail as PDF attachments):

Brenda Moore, PE, CPM -- NCDOT Roadway Design Unit ([email protected])

Clark Morrison, PhD, PE -- NCDOT Pavement Management Unit ([email protected])

Anil Panicker -- NCDOT Division 12 Planning Engineer ([email protected])

Mike Reese, PE -- NCDOT Congestion Management Unit ([email protected])

John A. Bailey -- NCDOT Transportation Planning Division ([email protected])

Keith Dixon -- NCDOT Transportation Planning Division ([email protected])

Robert Cook, AICP – NCDOT contact to CRTPO ([email protected])

Neil Burke -- CRTPO MPO ([email protected])

Matthew Todd – Iredell County ([email protected])

NCDOT Traffic Forecasting GIS Support ([email protected])

Page 4: U-5751 CoverPage SPupdate

L E G E N D

N

NOT TO SCALE

COUNTY: Iredell

TIP: I-5962

DATE: June 24, 2019

PREPARED BY: WSP USA

LOCATION: I-77 at SR 1302 (Cornelius Rd) SR 1395 (Bluefield Rd) and Exmore Rd

DIVISION: 12

WBS: 45912.1.1

PROJECT: Proposed interchange at Cornelius Rd and Bluefield Rd realignment / relocation

K Design Hour Factor

AM / PM AM / PM Peak Hour

D Peak Hour Directional Split

Indicates Direction of D

( d , t ) Duals, TT-STs (%)

AVERAGE ANNUAL DAILY TRAFFIC¯

SR 2383Shinnville Rd

Bypass

SR 2779Connector Rd

SR 1302Cornelius Rd

77

77

21

Bypass

21

W Plaza Dr W Plaza Dr

SR 1395Big Indian

Loop

SR 1109Williamson Rd

( d, t )Dk AM

kD PM### Vehicles Per Day (VPD) in 100s

1- Less than 50 VPD

Existing Roadway

Proposed Roadway

Existing Interchange

Future Interchange

Exmore Rd

Statesville Hwy

150150

115

115

SR 1395Bluefield Rd

58 38

24 8

32 44

116

4

8

60

24 88

72 36

128

( 6, 1 )707 AM

1165 PM

108

( 3, 1 )607 AM

1060 PM

96

( 3, 2 )607 AM

1060 PM

120

68

( 6, 1 )775 AM

6010 PM

412

( 5, 2 )755 AM

558 PM

412

( 2, 2 )557 AM

557 PM

372

( 3, 2 )557 AM

755 PM

312

( 3, 2 )557 AM

755 PM

24

( 2, 1 )557 AM

1165 PM

220

( 4, 8 )755 AM

557 PM

164

(7,2)

609

AM

558

PM

192

( 4, 2 )608 AM

860 PM

616

(3,9)

558

AM

855

PM

612

652200

(2,1)

607

AM

855

PM

112

(3,1)

707

AM

1055

PM

96

4

20

152

(2,1)

707

AM

855

PM

26 56

50 80

84 72

120 76

40 42

48 78

216

(7,2)

657

AM

855

PM

104

(7,1)

657

AM

860

PM

168

(6,2)

607

AM

955

PM

212

(6,2)

557

AM

855

PM

468

(3,9)

558

AM

855

PM(3,9

)55

8A

M

855

PM

( 2, 2 )557 AM

558 PM

380

( 4, 2 )755 AM

558 PM

148

(3,1)

607

AM

955

PM

24

(2,1)

607

AM

955

PM

100

( 3, 1 )557 AM

1055 PM16 8

No Build Alternative2019

Page 5: U-5751 CoverPage SPupdate

L E G E N D

N

NOT TO SCALE

COUNTY: Iredell

TIP: I-5962

DATE: June 24, 2019

PREPARED BY: WSP USA

LOCATION: I-77 at SR 1302 (Cornelius Rd) SR 1395 (Bluefield Rd) and Exmore Rd

DIVISION: 12

WBS: 45912.1.1

PROJECT: Proposed interchange at Cornelius Rd and Bluefield Rd realignment / relocation

K Design Hour Factor

AM / PM AM / PM Peak Hour

D Peak Hour Directional Split

Indicates Direction of D

( d , t ) Duals, TT-STs (%)

AVERAGE ANNUAL DAILY TRAFFIC¯

SR 2383Shinnville Rd

Bypass

SR 2779Connector Rd

SR 1302Cornelius Rd

77

77

21

Bypass

21

W Plaza Dr W Plaza Dr

SR 1395Big Indian

Loop

SR 1109Williamson Rd

( d, t )Dk AM

kD PM### Vehicles Per Day (VPD) in 100s

1- Less than 50 VPD

Existing Roadway

Proposed Roadway

Existing Interchange

Future Interchange

Exmore Rd

Statesville Hwy

150150

115

115

8

16

14064 48

72 36

Build Alternative 12019

SR 1395Bluefield Rd(Realigned)

( 3, 1 )558 AM

1055 PM

24 68

26 6

24 40

8

60

14 72

58 24

148

( 6, 1 )608 AM

1065 PM

192

( 3, 1 )558 AM

1055 PM

96

( 3, 2 )755 AM

1055 PM

68

( 6, 1 )775 AM

6010 PM

412

( 5, 2 )755 AM

558 PM

412

( 2, 2 )557 AM

557 PM

356

( 3, 2 )557 AM

755 PM

312

( 3, 2 )557 AM

755 PM

24

( 3, 1 )557 AM

1165 PM

216

( 4, 8 )755 AM

557 PM

156

(7,2)

609

AM

558

PM

192

( 4, 2 )608 AM

860 PM

632

(3,9)

558

AM

855

PM

628

664200

(2,1)

607

AM

855

PM

100

(3,1)

707

AM

1055

PM

92

140

(2,1)

707

AM

855

PM

26 42

50 78

64 58

100 62

34 36

46 76

208

(7,2)

657

AM

855

PM

100

(7,1)

657

AM

860

PM

152

(6,2)

607

AM

955

PM

204

(6,2)

557

AM

855

PM

456

(3,9)

558

AM

855

PM(3,9

)55

8A

M

855

PM

( 2, 2 )557 AM

558 PM

380

( 4, 2 )557 AM

558 PM

132

(3,1)

607

AM

955

PM

56

(6,2)

607

AM

955

PM

100

( 3, 1 )755 AM

1055 PM48 8

2019

624

(3,9)

558

AM

855

PM112

4

116

Page 6: U-5751 CoverPage SPupdate

L E G E N D

N

NOT TO SCALE

COUNTY: Iredell

TIP: I-5962

DATE: June 24, 2019

PREPARED BY: WSP USA

LOCATION: I-77 at SR 1302 (Cornelius Rd) SR 1395 (Bluefield Rd) and Exmore Rd

DIVISION: 12

WBS: 45912.1.1

PROJECT: Proposed interchange at Cornelius Rd and Bluefield Rd realignment / relocation

K Design Hour Factor

AM / PM AM / PM Peak Hour

D Peak Hour Directional Split

Indicates Direction of D

( d , t ) Duals, TT-STs (%)

AVERAGE ANNUAL DAILY TRAFFIC¯

SR 2383Shinnville Rd

Bypass

SR 2779Connector Rd

SR 1302Cornelius Rd

77

77

21

Bypass

21

W Plaza Dr W Plaza Dr

SR 1395Big Indian

Loop

SR 1109Williamson Rd

( d, t )Dk AM

kD PM### Vehicles Per Day (VPD) in 100s

1- Less than 50 VPD

Existing Roadway

Proposed Roadway

Existing Interchange

Future Interchange

Exmore Rd

Statesville Hwy

150150

115

115

Exmore RdExtension

92

Build Alternative 22019

8

60

68

( 6, 1 )775 AM

6010 PM

216

( 4, 8 )755 AM

557 PM

156

(7,2)

609

AM

558

PM

192

( 4, 2 )608 AM

860 PM

632

(3,9)

558

AM

855

PM

628 208

(7,2)

657

AM

855

PM

100

(7,1)

657

AM

860

PM

(3,9)

558

AM

855

PM

8

16

19242 70

46 62 ( 3, 1 )558 AM

1055 PM

26 6

24 40

148

( 6, 1 )608 AM

1055 PM

96

412

( 5, 2 )755 AM

558 PM

412

( 2, 2 )557 AM

557 PM

356

( 3, 2 )557 AM

755 PM

312

( 3, 2 )557 AM

755 PM

24

( 3, 1 )557 AM

1165 PM

664200

(2,1)

607

AM

855

PM

100

(3,1)

707

AM

1055

PM

140

(2,1)

707

AM

855

PM

26 42

50 78

64 58

100 62

34 36

46 76

152

(6,2)

607

AM

955

PM

204

(6,2)

557

AM

855

PM

456

(3,9)

558

AM

855

PM

( 2, 2 )557 AM

558 PM

380

( 4, 2 )755 AM

558 PM

132

(3,1)

607

AM

955

PM

148

(6,2)

607

AM

955

PM

100

120 28

624

(3,9)

558

AM

855

PM

( 3, 2 )755 AM

1055 PM( 3, 1 )

755 AM

1055 PM

14 72

58 24

112

4

116

Page 7: U-5751 CoverPage SPupdate

L E G E N D

N

NOT TO SCALE

COUNTY: Iredell

TIP: I-5962

DATE: June 24, 2019

PREPARED BY: WSP USA

LOCATION: I-77 at SR 1302 (Cornelius Rd) SR 1395 (Bluefield Rd) and Exmore Rd

DIVISION: 12

WBS: 45912.1.1

PROJECT: Proposed interchange at Cornelius Rd and Bluefield Rd realignment / relocation

K Design Hour Factor

AM / PM AM / PM Peak Hour

D Peak Hour Directional Split

Indicates Direction of D

( d , t ) Duals, TT-STs (%)

AVERAGE ANNUAL DAILY TRAFFIC¯

SR 2383Shinnville Rd

Bypass

SR 2779Connector Rd

SR 1302Cornelius Rd

77

77

21

Bypass

21

W Plaza Dr W Plaza Dr

SR 1395Big Indian

Loop

SR 1109Williamson Rd

( d, t )Dk AM

kD PM### Vehicles Per Day (VPD) in 100s

1- Less than 50 VPD

Existing Roadway

Proposed Roadway

Existing Interchange

Future Interchange

Exmore Rd

Statesville Hwy

150150

115

115

60 40

28 16

38 70

16

64

28 126

82 56

80

( 6, 1 )775 AM

6010 PM

500

( 5, 2 )755 AM

558 PM

480

( 2, 1 )557 AM

557 PM

500

( 3, 1 )557 AM

755 PM

420

( 3, 1 )557 AM

755 PM

32

( 3, 1 )557 AM

1165 PM

280

( 4, 10 )755 AM

557 PM

212

(7,2)

609

AM

557

PM

208

( 4, 2 )608 AM

860 PM

780

(3,9)

558

AM

855

PM

764

816248

(2,1)

607

AM

855

PM

116

(3,1)

557

AM

1055

PM

100

8

24

156

(2,1)

707

AM

855

PM

28 60

66 114

106 90

156 92

52 56

64 96

260

(7,2)

657

AM

755

PM

128

(7,1)

657

AM

860

PM

220

(6,2)

607

AM

955

PM

272

(6,2)

557

AM

855

PM

560

(3,9)

558

AM

855

PM(3,9

)55

8A

M

855

PM

( 2, 2 )557 AM

558 PM

464

( 4, 2 )755 AM

558 PM

192

(3,1)

607

AM

955

PM

48

(6,2)

607

AM

955

PM

28 20

No Build Alternative2045

SR 1395Bluefield Rd120

( 6, 1 )607 AM

1165 PM

100

( 3, 1 )557 AM

1060 PM

112

( 3, 2 )607 AM

1060 PM

92

( 3, 1 )557 AM

1060 PM

140

8

148

Page 8: U-5751 CoverPage SPupdate

L E G E N D

N

NOT TO SCALE

COUNTY: Iredell

TIP: I-5962

DATE: June 24, 2019

PREPARED BY: WSP USA

LOCATION: I-77 at SR 1302 (Cornelius Rd) SR 1395 (Bluefield Rd) and Exmore Rd

DIVISION: 12

WBS: 45912.1.1

PROJECT: Proposed interchange at Cornelius Rd and Bluefield Rd realignment / relocation

K Design Hour Factor

AM / PM AM / PM Peak Hour

D Peak Hour Directional Split

Indicates Direction of D

( d , t ) Duals, TT-STs (%)

AVERAGE ANNUAL DAILY TRAFFIC¯

SR 2383Shinnville Rd

Bypass

SR 2779Connector Rd

SR 1302Cornelius Rd

77

77

21

Bypass

21

W Plaza Dr W Plaza Dr

SR 1395Big Indian

Loop

SR 1109Williamson Rd

( d, t )Dk AM

kD PM### Vehicles Per Day (VPD) in 100s

1- Less than 50 VPD

Existing Roadway

Proposed Roadway

Existing Interchange

Future Interchange

Exmore Rd

Statesville Hwy

150150

115

115

Build Alternative 12045

14

18

14068 62

74 36

SR 1395Bluefield Rd(Realigned)

36 64

24 14

34 68

22

58

18 110

68 44

156 184 116

80

( 6, 1 )775 AM

6510 PM

500

( 5, 2 )755 AM

558 PM

480

( 2, 2 )557 AM

557 PM

484

( 3, 2 )557 AM

755 PM

420

( 3, 2 )557 AM

755 PM

32

( 3, 1 )557 AM

1165 PM

276

( 4, 8 )755 AM

557 PM

216

(7,2)

609

AM

558

PM

208

( 4, 2 )608 AM

860 PM

800

(3,9)

558

AM

855

PM

784

816244

(2,1)

607

AM

855

PM

104

(3,1)

557

AM

1055

PM

100

144

(2,1)

707

AM

855

PM

18 50

68 100

86 76

136 78

48 52

60 92

252

(7,2)

657

AM

855

PM

128

(7,1)

657

AM

860

PM

212

(6,2)

607

AM

955

PM

264

(6,2)

557

AM

855

PM

548

(3,9)

558

AM

855

PM(3,9

)55

8A

M

855

PM

( 2, 2 )557 AM

558 PM

464

( 4, 2 )755 AM

558 PM

192

(3,1)

607

AM

955

PM

80

(6,2)

607

AM

955

PM

92

64 16

764

(3,9)

558

AM

855

PM

( 3, 1 )558 AM

1055 PM( 6, 1 )

608 AM

1060 PM( 3, 1 )

558 AM

1055 PM( 3, 2 )

755 AM

1055 PM( 3, 1 )

755 AM

1055 PM

134

10

144

Page 9: U-5751 CoverPage SPupdate

L E G E N D

N

NOT TO SCALE

COUNTY: Iredell

TIP: I-5962

DATE: June 24, 2019

PREPARED BY: WSP USA

LOCATION: I-77 at SR 1302 (Cornelius Rd) SR 1395 (Bluefield Rd) and Exmore Rd

DIVISION: 12

WBS: 45912.1.1

PROJECT: Proposed interchange at Cornelius Rd and Bluefield Rd realignment / relocation

K Design Hour Factor

AM / PM AM / PM Peak Hour

D Peak Hour Directional Split

Indicates Direction of D

( d , t ) Duals, TT-STs (%)

AVERAGE ANNUAL DAILY TRAFFIC¯

SR 2383Shinnville Rd

Bypass

SR 2779Connector Rd

SR 1302Cornelius Rd

77

77

21

Bypass

21

W Plaza Dr W Plaza Dr

SR 1395Big Indian

Loop

SR 1109Williamson Rd

( d, t )Dk AM

kD PM### Vehicles Per Day (VPD) in 100s

1- Less than 50 VPD

Existing Roadway

Proposed Roadway

Existing Interchange

Future Interchange

Exmore Rd

Statesville Hwy

150150

115

115

Build Alternative 22045

100

80

( 6, 1 )775 AM

6510 PM

276

( 4, 8 )755 AM

557 PM

216

(7,2)

609

AM

558

PM

208

( 4, 2 )608 AM

860 PM

800

(3,9)

558

AM

855

PM

784 252

(7,2)

657

AM

855

PM

128

(7,1)

657

AM

860

PM

(3,9)

558

AM

855

PM

20844 86

50 60

156 116

500

( 5, 2 )755 AM

558 PM

480

( 2, 2 )557 AM

557 PM

484

( 3, 2 )557 AM

755 PM

420

( 3, 2 )557 AM

755 PM

32

( 3, 1 )557 AM

1165 PM

816244

(2,1)

607

AM

855

PM

104

(3,1)

557

AM

1055

PM

144

(2,1)

707

AM

855

PM

212

(6,2)

607

AM

955

PM

264

(6,2)

557

AM

855

PM

548

(3,9)

558

AM

855

PM

( 2, 2 )557 AM

558 PM

464

( 4, 2 )755 AM

558 PM

192

(3,1)

607

AM

955

PM

180

(6,2)

607

AM

955

PM

92

148 32

764

(3,9)

558

AM

855

PM

14

18

24 14

34 68

22

58

18 50

68 100

86 76

136 78

48 52

60 92

Exmore RdExtension

( 3, 1 )558 AM

1055 PM( 6, 1 )

608 AM

1055 PM( 3, 2 )

755 AM

1055 PM( 3, 1 )

755 AM

1055 PM

18 110

68 44

134

10

144