Prepared for:
BP Australia
25 September 2019
The Transport Planning Partnership
BP Service Station, Schofields
Traffic Impact Assessment
BP Service Station, Schofields
Traffic Impact Assessment
Client: BP Australia
Version: V02
Date: 25 September 2019
TTPP Reference: 19081
Quality Record
Version Date Prepared by Reviewed by Approved by Signature
V01 11/06/19 Theo Jones Oasika Faiz Ken Hollyoak Ken Hollyoak
V02 25/09/19 Oasika Faiz Oasika Faiz Ken Hollyoak
19081-R01V02-190925-TIA i
Table of Contents
1 Introduction ................................................................................................................................. 1
2 Existing Conditions ...................................................................................................................... 2
2.1 Abutting Road Network ................................................................................................... 3
2.1.1 Schofields Road ........................................................................................................ 3
2.1.2 Tallawong Road ........................................................................................................ 4
2.1.3 Themeda Avenue ..................................................................................................... 4
2.2 Pedestrian and Cyclist Facilities ...................................................................................... 5
2.3 Public Transport Facilities ................................................................................................. 6
3 Proposed Development ............................................................................................................. 8
3.1 Development Description ............................................................................................... 8
3.2 Vehicle Access Arrangements ....................................................................................... 9
4 Parking Assessment ................................................................................................................... 10
4.1 Car Parking Requirements ............................................................................................. 10
4.1.1 Roads and Maritime Requirements ...................................................................... 10
4.1.2 Adequacy of Car Parking Provision...................................................................... 11
4.2 Drive-Through Lane ........................................................................................................ 11
4.3 Accessible Parking Requirements ................................................................................ 12
4.4 Servicing and Deliveries ................................................................................................. 12
4.5 Car Park Layout .............................................................................................................. 12
5 Traffic Assessment ..................................................................................................................... 13
5.1 Traffic Generation Estimate ........................................................................................... 13
5.1.1 Roads and Maritime Guide ................................................................................... 13
5.1.2 Service Stations Analysis Report ............................................................................ 14
5.1.3 Adopted Traffic Generation Estimate .................................................................. 15
5.2 Background Traffic Generation .................................................................................... 15
5.3 Traffic Modelling ............................................................................................................. 16
5.3.1 Modelling Scenarios ............................................................................................... 16
5.3.2 Traffic Distribution .................................................................................................... 16
5.3.3 Intersection Modelling Criteria .............................................................................. 18
5.3.4 Traffic Impact .......................................................................................................... 18
6 Conclusion ................................................................................................................................. 20
19081-R01V02-190925-TIA ii
Tables
Table 2.1: Existing Bus Services and Frequencies .............................................................................. 7
Table 4.1: DCP Car Parking Requirements ....................................................................................... 10
Table 4.2: Roads and Maritime Car Parking Requirement ............................................................. 11
Table 5.1: Traffic Generation Estimate (Roads and Maritime Guide) ........................................... 14
Table 5.2: Trip Generation Estimate (Service Station Analysis Report) .......................................... 15
Table 5.3: Level of Service Criteria for Intersection Operation ...................................................... 18
Table 5.4: Intersection Operation ...................................................................................................... 19
Figures
Figure 2.1: Locality Map ....................................................................................................................... 2
Figure 2.2: Abutting Road Network ..................................................................................................... 3
Figure 2.3: Indicative Themeda Avenue Extension ........................................................................... 4
Figure 2.4: Blacktown City Council Bike Plan 2016 ............................................................................ 5
Figure 2.5: Site Proximity to Public Transport Facilities ....................................................................... 6
Figure 3.1: Proposed Site Layout ......................................................................................................... 8
Figure 3.2: Proposed Slip Lane on Tallawong Road .......................................................................... 9
Figure 5.1: Year 2026 Base Traffic Volumes ...................................................................................... 17
Figure 5.2: Year 2026 Base + Development Traffic Volumes .......................................................... 17
APPENDICES
A. SITE LAYOUT
B. SWEPT PATHS
C. SIDRA OUTPUTS
19081-R01V02-190925-TIA 1
1 Introduction
This traffic impact assessment report relates to a proposed service station, drive-through fast
food outlet, car wash and convenience store with associated car parking at 1-9 Tallawong
Road, Rouse Hill (Lot 291 DP 1213279). A development application (DA) is to be lodged with
Blacktown City Council seeking approval for the proposed development.
The Transport Planning Partnership (TTPP) Pty Ltd has prepared this report on behalf of BP
Australia to accompany the DA.
This report assesses the traffic and parking implications of the proposed development and is
set out as follows:
▪ Chapter 2 discusses the existing conditions including a description of the subject site
▪ Chapter 3 provides a brief description of the proposed development
▪ Chapter 4 assesses the proposed on-site parking provision and internal layout
▪ Chapter 5 examines the traffic generation and its impact, and
▪ Chapter 6 presents the conclusions of the assessment.
19081-R01V02-190925-TIA 2
2 Existing Conditions
The subject site (the ‘site’) is located adjacent to the north-western corner of the Schofields
Road and Tallawong Road intersection in Rouse Hill and falls within the Blacktown City
Council. Notably, the site is located within the North West Growth Area, where an anticipated
33,000 homes are to be provided over the next ten years, along with various community and
public transport services necessary to support growth.
The site is currently vacant and has an area of approximately 7,440m2.
The location of the site and its surrounds is shown in Figure 2.1.
Figure 2.1: Locality Map
Source: Google Maps Australia
Land use in the area predominantly comprises low-density residential to the south and the
new Tallawong Metro Station to the immediate east, which began operation in May 2019.
Notably, the Rouse Hill Town Centre is located within 2km east of the site and is a 30-minute
walk or a 13-minute train trip.
19081-R01V02-190925-TIA 3
2.1 Abutting Road Network
The site is bound by Tallawong Road to the north and east, Schofields Road to the south and
Old Tallawong Road to the west, which is understood to be closed. A number of the roads in
the vicinity of the site have recently been upgraded.
Figure 2.2: Abutting Road Network
Source: Nearmap (aerial image dated 7 April 2019)
2.1.1 Schofields Road
Schofields Road is classified as an arterial road (RMS State Road 687) and upgrade works
between Windsor Road, Rouse Hill and Richmond Road, Marsden Park were completed on 28
June 2018.
The upgrade is intended to meet future transport needs associated with the North West
Growth Area. In the vicinity of the site, Schofields Road has widened from a single lane in
each direction to a two-way four-lane divided road, with a wide central median enabling
possible widening to six lanes in the future. Schofield Road is understood to be 70 km/hr and
no parking is permitted on-street.
19081-R01V02-190925-TIA 4
2.1.2 Tallawong Road
Tallawong Road is aligned in a north-south direction between Guntawong Road and
Schofields Road.
Tallawong Road has been recently upgraded and features two lanes in each direction plus
auxiliary lanes on approach to intersections. Parking is not permitted along Tallawong Road in
the vicinity of the site. It is understood that Tallawong Road has a 70km/hr speed limit.
2.1.3 Themeda Avenue
Themeda Avenue is a new road which provides vehicular and pedestrian access to the new
Tallawong Metro Station and associated commuter car parks. It joins Tallawong Road as a
signalised intersection at the northern corner of the site. Themeda Avenue is understood to
function as a local road and is assumed to operate with a 50 km/hr speed limit.
As part of the Sydney Metro Northwest works, it is proposed to extend Themeda Avenue to
the west, which would run along the northern boundary of the subject site. As well as
providing access to the subject site, the Themeda Avenue extension is to provide access to
the proposed light industrial area to the west of the site. The intersection design is currently
under development however, an indicative layout of the proposed extension is shown in
Figure 2.3.
Figure 2.3: Indicative Themeda Avenue Extension
Source: SMEC Australia, 2019, Sydney Metro Northwest Finishing Works – Signalised Development Access off
Tallawong Road Stage 2 Design Report
19081-R01V02-190925-TIA 5
2.2 Pedestrian and Cyclist Facilities
Nearby roads are generally provided with pedestrian footpaths on both sides of the road,
and signalised pedestrian crossings are provided adjacent to the site, including at the
Tallawong Road / Themeda Avenue and Tallawong Road / Schofields Road intersections.
The recent upgrades to Schofields Road have resulted in the provision of a new off-road
shared path on each or one side of the corridor, thereby connecting the site to Rouse Hill and
Schofields in respective east-west directions. The eastern side of Tallawong Road and
northern side of Themeda Avenue also includes new shared paths, providing cycling access
to Tallawong Metro Station.
The shared paths on Tallawong Road and Themeda Avenue are shown as “Proposed
Developer Funded” on Council’s current cycleway map as shown in Figure 2.4.
Figure 2.4: Blacktown City Council Bike Plan 2016
Source: https://www.blacktown.nsw.gov.au/Sport-and-recreation/Sport-and-Leisure/Walk-run-cycle#section-4
19081-R01V02-190925-TIA 6
2.3 Public Transport Facilities
The site is well accessed by public transport with the Tallawong Metro Station located
approximately 420m northeast of the site. The new North West Metro line provides services to
Chatswood every five minutes during the peak periods and every ten minutes during the off-
peak periods.
There are also several bus stops located within the vicinity of the site on Schofields Road and
at Tallawong Station.
The site’s proximity to existing public transport facilities is shown in Figure 2.5.
Figure 2.5: Site Proximity to Public Transport Facilities
Source: Google Maps Australia
A summary of the existing bus services within a 400m radius catchment from the site is
provided in Table 2.1.
19081-R01V02-190925-TIA 7
Table 2.1: Existing Bus Services and Frequencies
Service No. Route Description Approximate Frequency
Peak Off-peak
742 Rouse Hill to Riverstone Every hour
747 Marsden Park to Rouse Hill via Riverstone Every hour
751 Rouse Hill Town Centre to Blacktown Every 12-18 mins Every 30 mins
T72 Rouse Hill to Blacktown Every 30 mins
5133 Riverstone Station to Rouse Hill Anglican College
Once per day - 5632 St Johns PS to Rouse Hill Town Centre
6075 Quakers Hill East to Rouse Hill Anglican College
19081-R01V02-190925-TIA 8
3 Proposed Development
3.1 Development Description
The proposed development comprises a service station, drive-through fast-food outlet and
convenience store with associated car parking at 1-9 Tallawong Road, Rouse Hill. The
proposal would include the following provisions:
▪ service station featuring 16 fuel pumps/spaces for light vehicles
▪ one fill point for heavy vehicles up to a 19m AV
▪ 244m2 GFA convenience store
▪ a drive-through car wash facility
▪ a drive-through fast food outlet with approximately 170m2 GFA and 46 seats
▪ 37 car parking spaces, of which one is accessible and two are air and water servicing
spaces
▪ two new driveways, of which one is to be served by a new access road off the proposed
Themeda Avenue extension (as discussion in Section 2.1.3).
The proposed site layout is displayed in Figure 3.1, with the full site plan provided in Appendix
A.
Figure 3.1: Proposed Site Layout
Source: MCHR Architects
19081-R01V02-190925-TIA 9
3.2 Vehicle Access Arrangements
The proposed development includes the provision of two access points to serve the site:
▪ 11m wide ingress driveway via left-in slip lane from Tallawong Road
▪ 13m wide two-way driveway from a future access road on the site’s western boundary.
The access arrangements into the site have been coordinated with Roads and Maritime
Services who have indicated in-principal support for a dedicated left-in slip lane into the site,
in additional to the existing two northbound traffic lanes on Tallawong Road.
On this basis, the slip lane access off Tallawong Road has been designed in accordance with
Austroads, 2017, Guide to Road Design Part 4A, which indicates that a 70km/h road requires
a 70m long deceleration lane including a 23m long taper, for a 3.5m lane width.
The proposed access allows for a 70m long deceleration lane beginning 15m from the
tangent point of the intersection – with 15m being the length of the taper given to the
chevron linemarking on Tallawong Road at its intersection with Schofield Road. The proposed
slip lane/ deceleration lane is shown in Figure 3.2.
Figure 3.2: Proposed Slip Lane on Tallawong Road
The above driveways have been designed to accommodate vehicles up to and including a
19m fuel tanker truck. Swept path analysis is provided in Appendix B.
19081-R01V02-190925-TIA 10
4 Parking Assessment
4.1 Car Parking Requirements
The parking requirements for the site have been assessed against the Blacktown City Council
Growth Centre Precincts Development Control Plan (DCP), July 2018.
However, the DCP does not stipulate parking requirements for service stations or car wash
facilities. On this basis, the parking requirement has been assessed for the convenience store
as a retail shop and fast food outlet as a restaurant in the DCP.
The car wash has been assessed based on survey data as presented in the report; Proposed
Carwash, 412-416 Liverpool Rd, Croydon, D&H Kane investments, 2006 has been sourced,
which indicates that car wash facilities are required one employee space per car wash lane
and a 2.5 vehicle queueing area per lane.
However, noting that the proposed car wash facility will be an ancillary service to the service
station, the employee overlooking its operation is anticipated to be same as the employee(s)
overlooking the entire site. On this basis, an additional employee space is not required.
Notwithstanding, the site provides sufficient parking in accordance with Councils DCP
requirements as detailed in the car parking assessment in Table 4.1.
Table 4.1: DCP Car Parking Requirements
Land Use Size Parking Rate Required Provision
Convenience Store
(Retail shops/showrooms
greater than 200m2 GFA)
244m2 GFA 1 space per 22m2 GFA 11
Fast Food
(Restaurants/cafes) 167m2 GFA
1 space per 10m2 of dining area
1 space per 3 employees
(See Note 1)
21
Car wash 1 lane 1 employee space + 2.5 vehicle
queueing area per lane 1
Total 33
[1] Four employees assumed
Based on Table 4.1, the development is required to provide 33 car spaces.
4.1.1 Roads and Maritime Requirements
Noting that the DCP does not stipulate a specific requirement for service stations, the service
station parking requirement as recommended in the Roads and Maritime Services’ Guide to
Traffic Generating Developments 2002 (Roads and Maritime Guide) has been reviewed.
19081-R01V02-190925-TIA 11
On this basis, Roads and Maritime Guide recommends five spaces per 100m2 GFA of
convenience store on-site and 15 spaces per 100m2 GFA of restaurant area for a service
station. Based on this, the development is required 38 car parking spaces as assessed in Table
4.2.
Table 4.2: Roads and Maritime Car Parking Requirement
Land Use Size Parking Rate Required Provision
Convenience Store 244m2 GFA 5 spaces per 100m2 GFA 12
Fast Food
(Restaurants) 167m2 GFA 15 spaces per 100m2 GFA 25
Car wash 1 lane 1 employee space + 2.5 vehicle
queueing area per lane 1
Total 38
4.1.2 Adequacy of Car Parking Provision
The proposed development is to provide parking in between the requirements of the DCP (33
spaces) and Roads and Maritime Guide (38 spaces), with a proposed provision of 37 car
spaces (including two air and water servicing spaces). The proposed parking provision is
considered satisfactory to accommodate the development.
In addition to the car parking, motorists would also utilise the fuel dispenser spaces and visit
the convenience store after having refuelled the vehicles. The fuel dispensers provide an
additional sixteen spaces.
4.2 Drive-Through Lane
Based on the above car wash report, the car wash lane is estimated to demand queues of
up to three vehicles. The proposed car wash is to accommodate up to six queued vehicles.
The DCP also does not stipulate requirements for drive-through fast food facilities. On this
basis, guidance has been sourced from the Roads and Maritime Services Guide to Traffic
Generating Developments 2002 (herein, Roads and Maritime Guide).
The Roads and Maritime Guide indicates that there should be a minimum of four car spaces
for cars queued from the ordering point, with a queue length of 5 to 12 cars measured from
the pickup point.
It is proposed to provide a queuing area of 6-7 vehicles from the pickup point, and two
vehicles from the order point, with additional overflow within the site’s circulation aisle, which
is considered acceptable. The development also includes two additional waiting bays for
vehicles with longer wait times.
19081-R01V02-190925-TIA 12
The proposed drive-through facility is therefore considered satisfactory.
4.3 Accessible Parking Requirements
The Blacktown Growth Centre Precincts DCP does not have any specific parking rates for
accessible parking spaces. The Building Code of Australia (BCA) recommends accessible car
parking spaces to be provided at a rate of 1 space for every 50 car parking spaces or part
thereof. It is proposed to provide one accessible car parking space, which complies with BCA
requirements.
4.4 Servicing and Deliveries
Both the Blacktown Growth Centre Precincts DCP and the general Blacktown City Council
DCP do not stipulate requirements for servicing and delivery bays.
However, based on other service station facilities, the provision of a loading facility
accommodating up to an 8.8m MRV is considered sufficient.
Swept path analysis has been undertaken for the loading dock and this is provided in
Appendix B.
4.5 Car Park Layout
The car park layout and associated access arrangements have been reviewed for
compliance with Australian Standard requirements, namely AS2890:2004. The review included
assessment of the following:
▪ access into the car park
▪ car park circulation
▪ parking space and aisle dimensions.
The proposed car park is compliant with Australian Standards as Class 3 parking spaces
(which have minimum dimensions of a 2.6m wide by 5.4m long parking space with an aisle
width of 5.8) and is expected to operate satisfactory.
Accessible spaces have been designed as a minimum 2.4m wide by 5.4m long parking
space, with a shared area of equal dimensions adjacent to the accessible parking space.
Circulation through the site allows up to a 19m B-Double Vehicle to access the heavy vehicle
fill point.
The proposed car park layout is provided in Appendix A with swept paths with Appendix B.
19081-R01V02-190925-TIA 13
5 Traffic Assessment
The traffic generation estimates for the proposed development have been assessed using the
Roads and Maritime Guide and updated traffic generation studies undertaken by Roads and
Maritime for service station developments (Roads and Maritime Services Trip Generation
Surveys, Service Stations Analysis Report, TEF Consulting 2013).
5.1 Traffic Generation Estimate
5.1.1 Roads and Maritime Guide
Service Station
The Roads and Maritime Guide suggests the following peak hour traffic generation equation
for service station developments:
▪ evening peak hour vehicle trips = 0.66 x GFA of convenience store
Applying the above RMS peak hour traffic generation equation, the proposed service station
(244m2) is estimated to generate 161 in the evening peak hour. It is anticipated that a similar
traffic generation could be expected in the morning peak hour.
Further to this, since Schofields Road is a classified State road, the site is expected to attract a
significant proportion of passing trade (i.e. traffic already on the road network passing the
site). The RMS Guide indicates that passing trade for service stations would typically be at
least 50%. Notably, the American Institute of Transportation Engineers (ITE) Traffic Generation
Guide Version 10 suggests that passing trade is generally around 59%, with new primary trips
being around 15% and diverted trips being 26%.
On this basis, the proposed service station could be expected to generate a net additional
66 trips during the AM and PM peak hours (i.e. new primary trips and diverted trips).
Fast Food Restaurant
At this stage, it is not known what fast food restaurant will be provided on-site. Therefore, as a
conservative measure, the fast food restaurant has been assumed to generate a maximum
of 180 trips per hour in the evening peak hour based on the Roads and Maritime Guide’s
average rate for a McDonalds development. It is assumed that 50% of the evening peak hour
trips could occur during the morning peak (90 trips).
The RMS Guide suggests that the proportion of passing trade at McDonalds fast food
restaurants is typically about 35%. On this basis, the fast food restaurant could be expected to
generate a net additional 59vph (AM Peak) and 117vph (PM Peak).
19081-R01V02-190925-TIA 14
Car Wash
The Roads and Maritime guide does not provide a trip rate for a car wash. A rate has instead
been obtained from the “Proposed Carwash, 412-416 Liverpool Road, Croydon” report (K&H
Kane Investments Pty Ltd, 2006), which provides an average rate based on the survey data of
several car wash facilities. On this basis, a rate of 13.3 trips per car wash lane has been
adopted, for all two peak periods.
Combined Traffic Generation
A summary of the estimated traffic generation arising from the proposed development is
provided in Table 5.1.
Table 5.1: Traffic Generation Estimate (Roads and Maritime Guide)
Land Use Traffic Generation Estimate
Passing Trade Net Traffic Generation
AM Peak PM Peak AM Peak PM Peak
Service Station 161 161 59% 66 66
Fast Food Restaurant 90 180 35% 59 117
Car Wash 13 13 - 13 13
Total 264 354 - 138 196
Table 5.1 indicates that the proposed scheme is expected to generate a net additional
138vph (AM Peak) and 198vph (PM Peak).
5.1.2 Service Stations Analysis Report
TEF Consulting prepared the Roads and Maritime Services Trip Generation Surveys, Service
Stations Analysis Report on behalf RMS in June 2013. It was produced for the ‘soon to be
issued” updated Guide to Traffic Generating Developments. This study undertaken for Roads
and Maritime Services includes survey data for a number of service stations, with varying
services.
TTPP has undertaken an analysis of the survey sites that include a service station plus
convenience store and a fast food outlet. The surveyed sites included convenience stores
ranging in size between 140m2 and 260m2 and fast food outlets ranging in size between
138m2 and 220m2. Therefore, the surveyed sites are considered to be comparable to the
proposed development.
A comparable assessment of the traffic generation based on a relationship between trips
and the size of convenience store and the number of pumps has been undertaken and is
presented in Table 5.2.
19081-R01V02-190925-TIA 15
Table 5.2: Trip Generation Estimate (Service Station Analysis Report)
Land Use Trip Rate Trip Generation
AM Peak PM Peak AM Peak PM Peak
Service Station with fast food outlets
Convenience Store (244m2) -0.171 x Store + 167.26 0.0412 x Store + 186.42 126 196
Number of Pumps (16 pumps) 31.5 x Pumps – 287 46.25 x Pumps – 422 217 318
Sub-Total 126-217 196-318
Car Wash 13 13 13 13
Total - - 137 – 230 209 – 331
Table 5.2 indicates that the proposed development could generate up to 230vph (AM Peak)
and 331vph (PM Peak).
Adopting an average rate of 48% for passing trade, the net increase in traffic generation is
estimated to be up to 120vph and 172vph in the morning and afternoon peak periods
respectively.
5.1.3 Adopted Traffic Generation Estimate
As a conservative measure, the higher of the above traffic generation estimates has been
adopted for the purposes of this assessment, including:
▪ 264vph (incl. 138vph of new trips) in the morning peak
▪ 354vph (incl. 196vph of new trips) in the afternoon peak.
5.2 Background Traffic Generation
The intersection of Tallawong Road and Themeda Avenue has not been fully constructed
with the western approach to be constructed at later date as discussed in Section 2.1.3. In
addition, majority of the North West Growth area near the site and as would be accessed via
Tallowing Road, has not been developed.
On this basis, the traffic volumes anticipated for these roads has been obtained from a
design report prepared by Northwest Rapid Transit (2015) for Tallawong Road (Design Report
Tallawong Road RMS WAD Package 20 Stage 3 for North West Rail Link Operations, Trains and
Systems). The design report included base volumes for the year 2026 AM and PM peak hours
for the above study intersections.
However, the report does not include the proposed extension of Themeda Avenue to the
west and associated development traffic to access Tallawong Road via this intersection. On
this basis, the proposed development traffic to access the proposed road has been
estimated.
19081-R01V02-190925-TIA 16
Based on North West Rail Link Technical Paper 2 (Operational Traffic and Transport
Management Plan) prepared by Aurecon/ Arup in October 2012, the proposed light industrial
area (including the subject site and new roads etc) has a site area of 43,000m2. Assuming the
that gross floor area (GFA) equates to around 25% of the total site area and excluding the
subject site area (7,440m2), the remaining industrial area is estimated to have a GFA of
8,998m2.
Based on the Roads and Maritime Guide, the proposed light industrial area would generate
traffic at a rate of 0.52 trips per 100m2 in the morning (47vph) and 0.56 trips per 100m2 in the
afternoon (50vph). This estimated traffic has been included in modelling assessment
discussed below.
5.3 Traffic Modelling
5.3.1 Modelling Scenarios
SIDRA intersection modelling has been carried out for the following intersections:
▪ Schofields Road/ Tallawong Road
▪ Tallawong Road/ Themeda Avenue.
Based on the above, the following scenarios have been assessed in SIDRA:
▪ Scenario 1 – Year 2026 Base Conditions
▪ Scenario 2 – Year 2026 Base + Development.
Scenario 1 includes a SIDRA analysis of the volumes and data presented in the Northwest
Rapid Transit (2015) design report.
Scenario 2 includes the addition of the new Themeda Avenue approach to Tallawong Road
and inclusion of development traffic from the subject service station site and the proposed
light industrial developments to the west of the subject site.
5.3.2 Traffic Distribution
The proposed development traffic has been distributed into the road network based on the
traffic flow distributions of the 2026 base flows. Passer-by traffic (50% of development traffic
generation) is anticipated to largely arrive via Schofield Road with a 50 per cent distribution
to eastbound and westbound directions. The traffic volumes for each modelled scenario is
shown in Figure 5.1.
19081-R01V02-190925-TIA 17
Figure 5.1: Year 2026 Base Traffic Volumes
Figure 5.2: Year 2026 Base + Development Traffic Volumes
Year 2026 Base (AM Peak) Year 2026 Base (PM Peak)
303 182 392 25
12 153
347 284 79 324 35 332
380 176 97 109 186 420 187 119
1002 835
136 174
79 56
853 1093
210 172 154 117 165 117 92 196
Schofields Rd
Rid
gelin
e Rd
Tallaw
on
g R
d
Schofields Rd
Rid
gelin
e Rd
Tallaw
on
g R
d
Themeda Ave Themeda AveFuture RoadFuture Road
Proposed SiteAccess
Proposed SiteAccess
Year 2026 Base + Development (AM Peak) Year 2026 Base + Development (PM Peak)
12 32 303 182 34 41 392 25
0 0
132 185
12 153
0 0
34 347 284 79 9 324 35 332
106 139
450 238 112 164 260 512 206 193
970 795
136 174
137 113
821 1053
210 185 154 117 165 136 92 196
Schofields Rd
Rid
gelin
e Rd
Tallaw
on
g R
d
Schofields Rd
Rid
gelin
e Rd
Tallaw
on
g R
d
Themeda Ave Themeda AveFuture RoadFuture Road
Proposed SiteAccess
Proposed SiteAccess
19081-R01V02-190925-TIA 18
5.3.3 Intersection Modelling Criteria
The key intersections surrounding the site have been assessed using SIDRA Intersection 8, a
computer-based modelling package which assesses intersection performance under
prevailing traffic conditions.
SIDRA calculates intersection performance measures such as ‘average delay’ that vehicles
encounter and the level of service (LoS). SIDRA provides analysis of the operating conditions
which can be compared to the performance criteria set out in Table 5.3.
Table 5.3: Level of Service Criteria for Intersection Operation
Level of
Service
Average
Delay
(seconds
per vehicle)
Traffic Signals, Roundabout Give Way and Stop Signs
A Less than 14 good operation good operation
B 15 to 28 good with acceptable delays and
spare capacity
acceptable delays and spare
capacity
C 29 to 42 satisfactory satisfactory, but accident
study required
D 43 to 56 operating near capacity near capacity and accident
study required
E 57 to 70 at capacity
At signals, incidents will cause
excessive delays.
at capacity, requires other
control mode
F Greater
than 71
unsatisfactory with excessive queuing unsatisfactory with excessive
queuing; requires other
control mode
Source: Roads and Maritime Guide to Traffic Generating Developments, 2002
5.3.4 Traffic Impact
The result of the SIDRA analysis of the Year 2026 Base conditions and the Year 2026 Base plus
development scenario is presented in Table 5.4 with full results contained in Appendix C.
19081-R01V02-190925-TIA 19
Table 5.4: Intersection Operation
Intersection
AM Peak PM Peak
2026 Base 2026 Development 2026 Base 2026 Development
Delay
(sec/veh)
Level of
Service
Delay
(sec/veh)
Level of
Service
Delay
(sec/veh)
Level of
Service
Delay
(sec/veh)
Level of
Service
Tallawong Rd-
Themeda Ave 23 B 23 B 21 B 21 B
Tallawong Rd-
Schofields Rd 35 C 36 C 41 C 44 D
Based on Table 5.4, the proposed development traffic (and traffic to the light industrial sites to
the west) would have a negligible impact on the local road network with delay anticipated
to increase by three seconds in the afternoon peak period at the intersection of Tallawong
Road and Schofields Road and less than one second in the other scenarios.
19081-R01V02-190925-TIA 20
6 Conclusion
This traffic impact assessment report relates to a proposed service station, drive-through fast-
food outlet and convenience store with associated car parking at 1-9 Tallawong Road, Rouse
Hill. The key findings of the report are presented below.
▪ The development proposal seeks the construction of a new service station with a total of
8 fuel dispensers for light vehicles (i.e. 16 pumps) and an in-ground fill point for heavy
vehicles. The development also includes a drive-through fast food outlet and a drive-
through car wash facility.
▪ The DCP requires the proposed development to provide 33 car parking spaces.
Comparatively, the Roads and Maritime Guide recommends 38 spaces. It is proposed to
provide 37 spaces, including one accessible space and two air and water servicing
spaces.
▪ The proposed parking facilities will be designed in accordance with design requirements
as set out in AS2890.
▪ Vehicle access includes a left-in slip lane from Tallawong Road and a two-way access
from a new access road along the site’s western boundary. The new access road would
be access via Tallawong Road at the intersection of Themeda Avenue.
▪ The proposed development is expected to generate 264 and 354 vehicle trips per hour in
the morning and evening peak periods respectively. With consideration for passer-by
traffic, this would include 138 and 196 new trips per hour to the area in the morning and
evening peak periods respectively.
▪ SIDRA Intersection modelling has been undertaken to assess the cumulative impact of
the subject development site and surrounding proposed developments. The modelling
indicates that the development would have a negligible impact following the
completion of the proposed development.
Overall, the traffic and parking aspects of the proposed development is considered to be
satisfactory.
19081-R01V02-190925-TIA Appendix A
Appendix A
Site Layout
5000
LANDSCAPE
SETBACK
50
00
LA
ND
SC
AP
E
SE
TB
AC
K
10000
LA
ND
SC
AP
E
SE
TB
AC
K
5000
LA
ND
SC
AP
E
SE
TB
AC
K
5
0
0
0
L
A
N
D
S
C
A
P
E
S
E
T
B
A
C
K
16120 O/A BUILDING1482515000 O/A CAR CANOPY
1200
8350
FARM TANK
11
52
0
FR
OM
S
IT
E B
OU
ND
AR
Y
37
27
0 O
/A
B
UIL
DIN
G
14
86
5
FR
OM
S
IT
E B
OU
ND
AR
Y
21765 FROM SITE BOUNDARY 12780 CAR WASH
50
00
F
RO
M
SIT
E
BO
UN
DA
RY
72
25
CA
R W
AS
H
1
1
0
0
0
P
R
O
P
O
S
E
D
D
R
I
V
E
W
A
Y
1
3
0
0
0
P
R
O
P
O
S
E
D
D
R
I
V
E
W
A
Y
74335 FROM SITE BOUNDARY
14
20
5 F
RO
M
SIT
E B
OU
ND
AR
Y3
75
00
O
/A
C
AR
C
AN
OP
Y
24
13
5 F
RO
M S
IT
E B
OU
ND
AR
Y1
76
00
F
AR
M T
AN
K
54
00
TY
P
5400
TYP
26
00
TY
P
24
00
24
00
30
20
3
0
0
0
30
00
30
00
3
0
0
0
3000
35
00
TY
P
5500 TYP
3600 7800 3600
C
L
C
L
45
00
95
00
95
00
95
00
45
00
C
L
C
L
C
L
C
L
10475
11425
8860
67
00
/
/
/
/
/
/
/
/ /
/ / / /
/
/ / / / / / / / / / / / / / /
/
/
/
/
/
/
/
/ / / /
5400
66
00
1
3
8
4
5
15000
23000
4
7
0
0
0
S
L
IP
L
A
N
E
19566 FROM SITE BOUNDARY
1
7
4
8
0
2000
UNDERCANOPY DRAINAGE
TO ENGINEER'S DETAILS,
TYPICAL
ByAmendmentDateNo
RevisionDrawing No
A1 Scale A3 Scale Date DrawnProject
Client Drawing Title
ST LEONARDS NSW 2065
ABN 21 096 632 450
TELEPHONE:FACSIMILE:
www.mchp.com.au
SUITE 5, 38-46 ALBANY ST
02 9436 222202 9439 1340
BP AUSTRALIA
BP SCHOFIELDS - PROPOSED TIU & CARWASH DEVELOPMENTLOT 291 DP 12132791-9 TALLAWONG ROADROUSE HILL, NSW 2155
PROPOSED SITE PLAN
19-020 DA01 F
1:250 HALF A1 SCALE 01.03.2019 MF
A 17.05.2019 PRELIMINARY ISSUE FOR REVIEW PPB 21.05.2019 PRELIMINARY ISSUE FOR DA PPC 17.07.2019 LOT AND DP NUMBERS REVISED, TANKER PATH REVISED PPD 07.08.2019 REVISED COLLECTION PIT AND FILL POINT PPE 09.09.2019 REVISED PITS AND CPS PPF 23.09.2019 REVISED AS PER CLIENT COMMENTS PP
INTERNALLY ILLUMINATED
BP HELIOS BUTTONS (Ø914)
TO CAR CANOPY CFC
FASCIA PANELS (TYP)
SCALE: 1:250 @ A1, 1:500 @ A3
PROPOSED SITE PLAN
0
metres
2 5 10 20
OUTLINE OF EXISTING BITUMEN
ROAD
O L D T A L L A W O N G R O A D
SIT
E
BO
UN
DA
RY
58.3
8m
339°3
7'20"
SITE BOUNDARY 145m 162°40'
S
I
T
E
B
O
U
N
D
A
R
Y
3
8
.
3
4
5
m
3
1
6
°
2
1
'
SIT
E B
OU
ND
AR
Y 28.12m
68°31'
S
IT
E
B
O
U
N
D
A
R
Y
3
6
.9
3
m
5
7
°
1
7
'5
0
"
S
I
T
E
B
O
U
N
D
A
R
Y
3
3
.
8
8
m
2
9
3
°
1
0
'
3
0
"
SIT
E B
OU
ND
AR
Y
14.095m
252°40'
S
IT
E
B
O
U
N
D
A
R
Y
1
8
.8
6
5
m
3
3
1
°2
1
'2
0
"
CAR FUELLING
CANOPY
PLANT
ROOM
WASTE
ENCL. 37m²
SHOP &
SERVICE
STATION
244m²
T
A
L
L
A
W
O
N
G
R
O
A
D
TANK 1
UADF 50kL
E10 80kL
TANK 2
PULP 30kL
TANK 3
ULT 60kL
TANK 4
ENTRY
EXIT
APPROACH
SIDE
F
U
T
U
R
E
A
C
C
E
S
S
R
O
A
D
MODIFY KERB TO CREATE
NEW SLIP LANE
FOR DEVELOPMENT
APPROVAL
CAR WASH
SITE ID
SIGN 02
C
O
L
C
O
L
CAR PARKING
CAR PARKING
CA
R P
AR
KIN
G
GREEN DASHED LINE TO
DENOTE NEW 3D DECAL & LED
STRIP TO BE INSTALLED ON
CAR CANOPY CFC FASCIA
PANELS, TYPICAL
ENTRY
PROPOSED LOCATION OF AIR /
WATER POINT REFER DA06
SIGN 09
VACUUM
VACUUM
SERVICE
YARD
ME
CH
'L
P
LA
NT
LOADING
ZONE
DRIVE THRU
WINDOW PICK UP
/ PAY POINT
ORDER POINT
CANOPY
WAITING BAYS
VENTS
LANDSCAPING
9.0m HIGH INTERNALLY
ILLUMINATED SITE ID SIGN
REFER DA06 SIGN 01 / 02
S C
H
O
F
I E
L D
S
R
O
A
D
1
2
3
4
80,000
PROPOSED TANK SCHEDULE
TANK PRODUCT LITRES DESCRIPTION
UADF
NEW 110,000L DOUBLE WALL UNDERGROUND
FUEL TANK
ULT 98
PULP 95
E10
30,000
60,000
50,000
NEW 110,000L DOUBLE WALL UNDERGROUND
FUEL TANK
1
11
1912
27
20
28 35
FAST FOOD SERVICE YARD
SITE AREA + PARKING
36
37
C
A
R
P
A
R
K
IN
G
EXISTING TREES TO BE
REMOVED, SHOWN
DASHED (TYP.)
DISPDISP
PIT
PIT
PIT
DISPDISP
C
O
L
C
O
L
DISPDISP
C
O
L
C
O
L
DISPDISP
C
O
L
C
O
L
PROPOSED DOMINO 8 FUEL DISPENSING
CANOPY WITH 4.7M CLEAR HEIGHT UNDERSIDE,
REFER DRAWING DA05 FOR DETAILS
8x NEW WAYNE HELIX 5000 8
HOSE MPD's
CONCRETE
CROSSOVER
PIT
LANDSCAPING
LANDSCAPING
LANDSCAPING
LANDSCAPING
TURF
LANDSCAPING
BOL
N
E
W
K
E
R
B
NEW KERB
NEW KERB
NEW KERB
K
E
R
B
NE
W K
ER
B
C
O
N
C
R
E
T
E
F
O
O
T
P
A
T
H
BENCH MARK
RL 61.61 AHD
BOL BOL
OIL / WATER
SEPARATOR IN BUNDED
AREA WITH ROOF OVER
AIR &
WATER
DP
FAST FOOD
TIU
167m²
(46 SEATS)
PROPOSED CONVENIENCE
STORE & FAST FOOD TIU
442m²
SITE ID
SIGN 01
9.0m HIGH INTERNALLY ILLUMINATED SITE ID
SIGN REFER DA06 SIGN 01/02
UNDERCANOPY AND
PARKING AREA PAVEMENT
TO BE BLACK OXIDE FINISH
TO BP STANDARDS, TYPICAL
PROPOSED 2x110kL
COMPARTMENTED FUEL
STORAGE TANK FARM
EXTENSION OF ACCESS
ROAD TO FUTURE DETAIL
LOCATION OF PROPOSED
FUEL VENTS STACK
LOCATION OF PROPOSED
FILL POINT
FE
NC
E
NE
W K
ER
B
CARWASH
ENTRY
PROPOSED INTERNALLY
ILLUMINATED "WELCOME BACK
SIGN" REFER DA06 SIGN 08
PROPOSED INTERNALLY
ILLUMINATED EXIT SIGN
REFER DA06 SIGN 08
PROPOSED INTERNALLY
ILLUMINATED ENTRY SIGN
REFER DA06 SIGN 08
EN
TR
Y
EN
TR
Y
31m²
NEW CONCRETE FORECOURT
FILL
POINT
3000 LITRE UNDER
GROUND HOLDING TANK
TO ENGINEERS DETAILS
CH
AN
GE
O
F G
RA
DE
CH
AN
GE
O
F G
RA
DE
DRAINAGE
D
R
A
I
N
A
G
E
BIO 1
DP
DP
FSL 62.00
OSD 2
OSD 1
SITE AREA = 7,439 sq.m
BUILDING FOOTPRINT = 442 sq.m
(NOT INCLUDING WASTE ENCLOSURE.)
CAR PARKING
CONVENIENCE STORE = 5 SPACES / 100 sqm. GFA
FAST FOOD = 1 SPACE / 2 SEATS
REQUIRED - 36 SPACES
PROVIDED - 37 SPACES (INC. 1 ACCESSIBLE.)
LANDSCAPED BIO. RETENTION
AREA TO LANDSCAPE
ARCHICTECTS DETAILS
FENCE AND ARMCO BARRIER
AS REQUIRED TO OSD AREA
BIO
2
OSD AND BIO BASINS TO
ENGINEERS DETAILS
45000 LITRE UNDER
GROUND RAINWATER TANK
TO ENGINEERS DETAILS
HUMECEPTOR TO ENGINEERS
DETAILS
GANTRY
PORTAL
1-9 TALLAWONG ROAD
ROUSE HILL
LOT 291
DP 1213279
AREA OF SITE TO BE
TURFED SHOWN HATCHED
CARWASH ENTRY SIGNAGE
REFER DA06 SIGN 10
TURF
T
U
R
F
TURF
T
U
R
F
LANDSCAPED AREAS:
LANDSCAPED AREA: 40% - 1000m² approx.
TURFED AREA: 60% - 1500m² approx.
INCLUDING OSD
EXCLUDING BIO RETENTION
H:\M
CHP\
BP\S
chofi
elds\S
ite R
evelo
pmen
t\201
9 DA\
Draw
ings\1
9-02
0_DA
01 F
.dwg,
24/09
/2019
3:25
:29 P
M, ca
dfive
, Auto
CAD
(High
Qua
lity P
rint).
pc3,
ISO
full b
leed A
3 (42
0.00 x
297.0
0 MM)
, 1:2
19081-R01V02-190925-TIA Appendix B
Appendix B
Swept paths
5000
LANDSCAPE
SETBACK
50
00
LA
ND
SC
AP
E
SE
TB
AC
K
10000
LA
ND
SC
AP
E
SE
TB
AC
K
5000
LA
ND
SC
AP
E
SE
TB
AC
K
5
0
0
0
L
A
N
D
S
C
A
P
E
S
E
T
B
A
C
K
16120 O/A BUILDING1482515000 O/A CAR CANOPY
1200
8350
FARM TANK
11
52
0
FR
OM
S
IT
E B
OU
ND
AR
Y
37
27
0 O
/A
B
UIL
DIN
G
14
86
5
FR
OM
S
IT
E B
OU
ND
AR
Y
21765 FROM SITE BOUNDARY 12780 CAR WASH
50
00
F
RO
M
SIT
E
BO
UN
DA
RY
72
25
CA
R W
AS
H
1
1
0
0
0
P
R
O
P
O
S
E
D
D
R
I
V
E
W
A
Y
1
3
0
0
0
P
R
O
P
O
S
E
D
D
R
I
V
E
W
A
Y
74335 FROM SITE BOUNDARY
14
20
5 F
RO
M
SIT
E B
OU
ND
AR
Y3
75
00
O
/A
C
AR
C
AN
OP
Y
24
13
5 F
RO
M S
IT
E B
OU
ND
AR
Y1
76
00
F
AR
M T
AN
K
54
00
TY
P
5400
TYP
26
00
TY
P
24
00
24
00
30
20
3
0
0
0
30
00
30
00
3
0
0
0
3000
35
00
TY
P
5500 TYP
3600 7800 3600
C
L
C
L
45
00
95
00
95
00
95
00
45
00
C
L
C
L
C
L
C
L
10475
11425
8860
67
00
/
/
/
/
/
/
/
/ /
/ / / /
/
/ / / / / / / / / / / / / / /
/
/
/
/
/
/
/
/ / / /
5400
66
00
1
3
8
4
5
15000
23000
4
7
0
0
0
S
L
IP
L
A
N
E
19566 FROM SITE BOUNDARY
1
7
4
8
0
2000
19m
B
-D
ouble
19m
B
-D
ouble
19m
B
-D
ouble
DATE STAMP
PROJECT No. REV.
TITLE
REV. DESCRIPTION
APP'D DATECHECK
DWG No.PROJECT
DRAWN
SCALE
FIGURE 1
25 SEPTEMBER 2019
190811:500 @A3
A
BP SCHOFIELDS
19m ARTICULATED VEHICLE SWEPT PATH
A ISSUE FOR DISCUSSION
LM OF KH 25/09/19
19081CAD007
Filenam
e: 19081C
AD
007-190925-S
WE
PT
P
AT
H.dw
gD
ate: 25 S
eptem
ber 2019
By: Lalaine.m
alaluan
Forward Reverse
KEY:
Wheel path
Body envelope
500mm clearance
Forward Reverse
KEY:
Wheel path
Body envelope
500mm clearance
7.952 0.158
8.57
6.81
Max 72° Horiz
Max 6° Vert
4.6 1.3 1.3 0.56
6.17
Max 72° Horiz
Max 6° Vert
3.68 1.3 1.3 1.1
5.07
1.21 3.55 1.3
19m B-Double
Overall Length 19.000m
Overall Width 2.500m
Overall Body Height 4.300m
Min Body Ground Clearance 0.540m
Track Width 2.030m
Lock-to-lock time 6.00s
Max Wheel Angle 28.30°
5000
LANDSCAPE
SETBACK
50
00
LA
ND
SC
AP
E
SE
TB
AC
K
10000
LA
ND
SC
AP
E
SE
TB
AC
K
5000
LA
ND
SC
AP
E
SE
TB
AC
K
5
0
0
0
L
A
N
D
S
C
A
P
E
S
E
T
B
A
C
K
16120 O/A BUILDING1482515000 O/A CAR CANOPY
1200
8350
FARM TANK
21765 FROM SITE BOUNDARY 12780 CAR WASH
50
00
F
RO
M
SIT
E
BO
UN
DA
RY
72
25
CA
R W
AS
H
1
1
0
0
0
P
R
O
P
O
S
E
D
D
R
I
V
E
W
A
Y
1
3
0
0
0
P
R
O
P
O
S
E
D
D
R
I
V
E
W
A
Y
74335 FROM SITE BOUNDARY
54
00
TY
P
5400
TYP
26
00
TY
P
24
00
24
00
30
20
3
0
0
0
30
00
30
00
3
0
0
0
3000
35
00
TY
P
5500 TYP
3600 7800 3600
C
L
C
L
45
00
95
00
95
00
95
00
45
00
C
L
C
L
C
L
C
L
10475
11425
8860
67
00
/
/
/
/
/
/
/
/ /
/ / / /
/
/ / / / / / / / / / / / / / /
/
/
/
/
/
/
/
/ / / /
5400
66
00
1
3
8
4
5
15000
23000
4
7
0
0
0
S
L
IP
L
A
N
E
19566 FROM SITE BOUNDARY
1
7
4
8
0
2000
B99 Vehicle (Realistic min radius) (2004)B99 Vehicle (Realistic min radius) (2004)B99 Vehicle (Realistic min radius) (2004)
B99 Vehicle (Realistic min radius) (2004)B99 Vehicle (Realistic min radius) (2004)B99 Vehicle (Realistic min radius) (2004)
B99 Vehicle (Realistic min radius) (2004)B99 Vehicle (Realistic min radius) (2004)B99 Vehicle (Realistic min radius) (2004)
DATE STAMP
PROJECT No. REV.
TITLE
REV. DESCRIPTION
APP'D DATECHECK
DWG No.PROJECT
DRAWN
SCALE
FIGURE 2
25 SEPTEMBER 2019
190811:400 @A3
A
BP SCHOFIELDS
B99 VEHICLE SWEPT PATH
A ISSUE FOR DISCUSSION
LM OF KH 25/09/19
19081CAD007
Filenam
e: 19081C
AD
007-190925-S
WE
PT
P
AT
H.dw
gD
ate: 25 S
eptem
ber 2019
By: Lalaine.m
alaluan
KEY:
Wheel path
Body envelope
300mm clearance
Forward Reverse
5200
950 3050
B99 Vehicle (Realistic min radius) (2004)
Overall Length 5200mm
Overall Width 1940mm
Overall Body Height 1878mm
Min Body Ground Clearance 272mm
Track Width 1840mm
Lock-to-lock time 4.00s
Curb to Curb Turning Radius 6250mm
19081-R01V02-190925-TIA Appendix C
Appendix C
SIDRA Outputs
MOVEMENT SUMMARYSite: 103 [2026 Base AM Schofields Rd-Tallawong Rd]
Traffic volumes based on Tallawong Rd WAD Design ReportSite Category: (None)Signals - Fixed Time Isolated Cycle Time = 120 seconds (Site User-Given Cycle Time)Variable Sequence Analysis applied. The results are given for the selected output sequence.
Movement Performance - VehiclesDemand Flows 95% Back of QueueMov
ID Turn Deg.
SatnAverage
Delay Level ofService
Prop. Queued
Effective Stop Rate
Aver. No.Cycles
AverageSpeed Total HV Vehicles Distance
veh/h % v/c sec veh m km/hSouth: Ridgeline Drive (S)1 L2 221 2.0 0.341 34.6 LOS C 9.4 66.8 0.78 0.77 0.78 35.32 T1 183 2.0 0.522 47.2 LOS D 9.7 69.1 0.94 0.77 0.94 25.23 R2 162 2.0 0.664 60.0 LOS E 9.4 66.9 1.00 0.83 1.04 27.1Approach 566 2.0 0.664 46.0 LOS D 9.7 69.1 0.89 0.79 0.91 29.8
East: Schofields Road (E)4 L2 123 2.0 0.167 13.6 LOS A 2.9 23.7 0.53 0.61 0.53 48.35 T1 898 5.0 0.578 30.0 LOS C 19.9 141.8 0.83 0.74 0.83 38.96 R2 103 2.0 0.483 60.8 LOS E 5.8 41.6 0.98 0.78 0.98 20.1Approach 1124 4.4 0.578 30.9 LOS C 19.9 141.8 0.81 0.73 0.81 37.8
North: Tallawong Rd (N)7 L2 120 2.0 0.202 36.8 LOS C 5.0 35.9 0.76 0.76 0.76 26.88 T1 102 2.0 0.335 49.1 LOS D 5.4 38.4 0.93 0.74 0.93 26.19 R2 188 2.0 0.515 63.0 LOS E 5.4 38.8 0.99 0.78 0.99 22.1Approach 411 2.0 0.515 51.9 LOS D 5.4 38.8 0.91 0.76 0.91 24.2
West: Schofields Rd (W)10 L2 414 2.0 0.303 8.8 LOS A 6.0 43.0 0.33 0.65 0.33 46.211 T1 1055 5.0 0.704 32.1 LOS C 26.0 184.9 0.88 0.78 0.88 38.012 R2 143 2.0 0.670 63.0 LOS E 8.4 60.0 1.00 0.83 1.06 28.2Approach 1612 4.0 0.704 28.9 LOS C 26.0 184.9 0.75 0.75 0.76 37.9
All Vehicles 3713 3.6 0.704 34.7 LOS C 26.0 184.9 0.81 0.75 0.81 34.8
Site Level of Service (LOS) Method: Delay (RTA NSW). Site LOS Method is specified in the Parameter Settings dialog (Site tab).Vehicle movement LOS values are based on average delay per movement.Intersection and Approach LOS values are based on average delay for all vehicle movements.SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Movement Performance - PedestriansAverage Back of QueueMov
ID DescriptionDemand
Flow Average
Delay Level ofService
Prop. Queued
Effective Stop RatePedestrian Distance
ped/h sec ped mP1 South Full Crossing 53 32.3 LOS D 0.1 0.1 0.73 0.73P2 East Full Crossing 53 54.3 LOS E 0.2 0.2 0.95 0.95P2S East Slip/Bypass Lane
Crossing53 0.5 LOS A 0.0 0.0 0.13 0.13
P3 North Full Crossing 53 31.6 LOS D 0.1 0.1 0.73 0.73P4 West Full Crossing 53 54.3 LOS E 0.2 0.2 0.95 0.95P4S West Slip/Bypass Lane
Crossing53 0.5 LOS A 0.0 0.0 0.13 0.13
All Pedestrians 316 28.9 LOS C 0.61 0.61
Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)
MOVEMENT SUMMARYSite: 103 [2026 Base PM Schofields Rd-Tallawong Rd]
Traffic volumes based on Tallawong Rd WAD Design ReportSite Category: (None)Signals - Fixed Time Isolated Cycle Time = 120 seconds (Site User-Given Cycle Time)Variable Sequence Analysis applied. The results are given for the selected output sequence.
Movement Performance - VehiclesDemand Flows 95% Back of QueueMov
ID Turn Deg.
SatnAverage
Delay Level ofService
Prop. Queued
Effective Stop Rate
Aver. No.Cycles
AverageSpeed Total HV Vehicles Distance
veh/h % v/c sec veh m km/hSouth: Ridgeline Drive (S)1 L2 174 2.0 0.285 36.1 LOS C 7.4 53.0 0.78 0.76 0.78 34.82 T1 124 2.0 0.408 49.8 LOS D 6.7 47.4 0.95 0.76 0.95 24.53 R2 97 2.0 0.488 60.7 LOS E 5.5 39.4 0.99 0.78 0.99 27.0Approach 395 2.0 0.488 46.5 LOS D 7.4 53.0 0.88 0.77 0.88 29.7
East: Schofields Road (E)4 L2 206 2.0 0.270 15.2 LOS B 5.6 44.4 0.58 0.66 0.58 44.15 T1 1151 5.0 0.816 39.7 LOS C 31.4 223.7 0.96 0.90 1.02 35.06 R2 64 2.0 0.281 58.2 LOS E 3.5 24.9 0.95 0.76 0.95 20.6Approach 1421 4.4 0.816 36.9 LOS C 31.4 223.7 0.90 0.86 0.95 35.4
North: Tallawong Rd (N)7 L2 146 2.0 0.208 31.9 LOS C 5.7 40.4 0.71 0.75 0.71 28.88 T1 199 2.0 0.496 45.6 LOS D 10.4 74.0 0.93 0.77 0.93 27.29 R2 457 2.0 0.825 64.8 LOS E 14.1 100.7 1.00 0.92 1.20 21.8Approach 802 2.0 0.825 54.0 LOS D 14.1 100.7 0.93 0.86 1.05 23.9
West: Schofields Rd (W)10 L2 200 2.0 0.138 7.1 LOS A 1.8 12.8 0.22 0.61 0.22 47.911 T1 879 5.0 0.640 33.8 LOS C 21.4 152.6 0.88 0.76 0.88 37.312 R2 183 2.0 0.800 66.4 LOS E 11.3 80.8 1.00 0.90 1.19 27.5Approach 1262 4.1 0.800 34.3 LOS C 21.4 152.6 0.79 0.76 0.82 36.0
All Vehicles 3880 3.6 0.825 40.6 LOS C 31.4 223.7 0.87 0.82 0.92 32.6
Site Level of Service (LOS) Method: Delay (RTA NSW). Site LOS Method is specified in the Parameter Settings dialog (Site tab).Vehicle movement LOS values are based on average delay per movement.Intersection and Approach LOS values are based on average delay for all vehicle movements.SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Movement Performance - PedestriansAverage Back of QueueMov
ID DescriptionDemand
Flow Average
Delay Level ofService
Prop. Queued
Effective Stop RatePedestrian Distance
ped/h sec ped mP1 South Full Crossing 53 35.3 LOS D 0.1 0.1 0.77 0.77P2 East Full Crossing 53 53.3 LOS E 0.2 0.2 0.94 0.94P2S East Slip/Bypass Lane
Crossing53 0.5 LOS A 0.0 0.0 0.13 0.13
P3 North Full Crossing 53 34.6 LOS D 0.1 0.1 0.76 0.76P4 West Full Crossing 53 54.3 LOS E 0.2 0.2 0.95 0.95P4S West Slip/Bypass Lane
Crossing53 0.5 LOS A 0.0 0.0 0.13 0.13
All Pedestrians 316 29.8 LOS C 0.62 0.62
Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)
MOVEMENT SUMMARYSite: 101 [2026 Base AM Tallawong Rd-Themeda Ave]
Traffic volumes based on Tallawong Rd WAD Design ReportSite Category: (None)Signals - Fixed Time Isolated Cycle Time = 80 seconds (Site User-Given Phase Times)
Movement Performance - VehiclesDemand Flows 95% Back of QueueMov
ID Turn Deg.
SatnAverage
Delay Level ofService
Prop. Queued
Effective Stop Rate
Aver. No.Cycles
AverageSpeed Total HV Vehicles Distance
veh/h % v/c sec veh m km/hSouth: Tallawong Rd (S)2 T1 365 2.0 0.155 7.0 LOS A 3.0 21.4 0.45 0.38 0.45 49.73 R2 299 0.0 0.390 20.9 LOS B 7.5 52.7 0.74 0.83 0.93 33.2Approach 664 1.1 0.390 13.3 LOS A 7.5 52.7 0.58 0.58 0.67 40.6
East: Themeda Avenue4 L2 83 0.0 0.068 9.6 LOS A 1.1 7.9 0.37 0.63 0.37 39.26 R2 13 100.0 0.049 31.1 LOS C 0.4 5.1 0.80 0.68 0.80 35.6Approach 96 13.2 0.068 12.4 LOS A 1.1 7.9 0.43 0.63 0.43 38.3
North: Tallawong Rd (S)7 L2 192 7.0 0.731 41.7 LOS C 9.8 72.1 1.00 0.89 1.11 33.88 T1 319 2.0 0.731 35.8 LOS C 10.4 74.1 1.00 0.89 1.11 29.0Approach 511 3.9 0.731 38.0 LOS C 10.4 74.1 1.00 0.89 1.11 31.3
All Vehicles 1271 3.1 0.731 23.2 LOS B 10.4 74.1 0.74 0.71 0.83 35.6
Site Level of Service (LOS) Method: Delay (RTA NSW). Site LOS Method is specified in the Parameter Settings dialog (Site tab).Vehicle movement LOS values are based on average delay per movement.Intersection and Approach LOS values are based on average delay for all vehicle movements.SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Movement Performance - PedestriansAverage Back of QueueMov
ID DescriptionDemand
Flow Average
Delay Level ofService
Prop. Queued
Effective Stop RatePedestrian Distance
ped/h sec ped mP1 South Full Crossing 53 34.3 LOS D 0.1 0.1 0.93 0.93P2 East Full Crossing 53 32.5 LOS D 0.1 0.1 0.90 0.90
All Pedestrians 105 33.4 LOS D 0.91 0.91
Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)Pedestrian movement LOS values are based on average delay per pedestrian movement.Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.
SIDRA INTERSECTION 8.0 | Copyright © 2000-2019 Akcelik and Associates Pty Ltd | sidrasolutions.comOrganisation: TTPP - THE TRANSPORT PLANNING PARTNERSHIP | Processed: Tuesday, 11 June 2019 6:33:03 PMProject: \\TTPPSRV\Projects\19081 BP Schofields - New DA\07 Modelling Files\19081 SIDRA 190607.sip8
MOVEMENT SUMMARYSite: 101 [2026 Base PM Tallawong Rd-Themeda Ave]
Traffic volumes based on Tallawong Rd WAD Design ReportSite Category: (None)Signals - Fixed Time Isolated Cycle Time = 80 seconds (Site User-Given Phase Times)
Movement Performance - VehiclesDemand Flows 95% Back of QueueMov
ID Turn Deg.
SatnAverage
Delay Level ofService
Prop. Queued
Effective Stop Rate
Aver. No.Cycles
AverageSpeed Total HV Vehicles Distance
veh/h % v/c sec veh m km/hSouth: Tallawong Rd (S)2 T1 341 2.0 0.202 14.9 LOS B 4.1 29.1 0.65 0.54 0.65 41.83 R2 37 0.0 0.084 25.0 LOS B 1.0 7.3 0.79 0.70 0.79 31.1Approach 378 1.8 0.202 15.9 LOS B 4.1 29.1 0.67 0.55 0.67 40.4
East: Themeda Avenue4 L2 349 0.0 0.295 11.5 LOS A 6.0 42.2 0.48 0.69 0.48 37.86 R2 161 8.0 0.222 21.0 LOS B 4.1 30.5 0.68 0.73 0.68 40.4Approach 511 2.5 0.295 14.5 LOS A 6.0 42.2 0.54 0.70 0.54 38.9
North: Tallawong Rd (S)7 L2 26 48.0 0.549 37.3 LOS C 7.7 57.4 0.94 0.78 0.94 36.48 T1 413 2.0 0.549 31.1 LOS C 8.0 57.2 0.94 0.78 0.94 31.3Approach 439 4.8 0.549 31.5 LOS C 8.0 57.4 0.94 0.78 0.94 31.7
All Vehicles 1327 3.1 0.549 20.5 LOS B 8.0 57.4 0.71 0.69 0.71 36.7
Site Level of Service (LOS) Method: Delay (RTA NSW). Site LOS Method is specified in the Parameter Settings dialog (Site tab).Vehicle movement LOS values are based on average delay per movement.Intersection and Approach LOS values are based on average delay for all vehicle movements.SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Movement Performance - PedestriansAverage Back of QueueMov
ID DescriptionDemand
Flow Average
Delay Level ofService
Prop. Queued
Effective Stop RatePedestrian Distance
ped/h sec ped mP1 South Full Crossing 53 22.5 LOS C 0.1 0.1 0.75 0.75P2 East Full Crossing 53 30.7 LOS D 0.1 0.1 0.88 0.88
All Pedestrians 105 26.6 LOS C 0.81 0.81
Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)Pedestrian movement LOS values are based on average delay per pedestrian movement.Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.
SIDRA INTERSECTION 8.0 | Copyright © 2000-2019 Akcelik and Associates Pty Ltd | sidrasolutions.comOrganisation: TTPP - THE TRANSPORT PLANNING PARTNERSHIP | Processed: Tuesday, 11 June 2019 6:33:04 PMProject: \\TTPPSRV\Projects\19081 BP Schofields - New DA\07 Modelling Files\19081 SIDRA 190607.sip8
MOVEMENT SUMMARYSite: 103 [2026 Post-Dev AM Schofields Rd-Tallawong Rd]
Site Category: (None)Signals - Fixed Time Isolated Cycle Time = 120 seconds (Site User-Given Cycle Time)Variable Sequence Analysis applied. The results are given for the selected output sequence.
Movement Performance - VehiclesDemand Flows 95% Back of QueueMov
ID Turn Deg.
SatnAverage
Delay Level ofService
Prop. Queued
Effective Stop Rate
Aver. No.Cycles
AverageSpeed Total HV Vehicles Distance
veh/h % v/c sec veh m km/hSouth: Ridgeline Drive (S)1 L2 221 2.0 0.356 35.4 LOS C 9.5 67.7 0.79 0.77 0.79 35.02 T1 195 2.0 0.666 49.1 LOS D 10.6 75.5 0.96 0.81 0.98 24.73 R2 162 2.0 0.664 60.0 LOS E 9.4 66.9 1.00 0.83 1.04 27.1Approach 578 2.0 0.666 46.9 LOS D 10.6 75.5 0.90 0.80 0.92 29.4
East: Schofields Road (E)4 L2 123 2.0 0.165 13.7 LOS A 2.9 24.0 0.52 0.61 0.52 45.05 T1 864 5.0 0.556 29.7 LOS C 18.9 135.0 0.82 0.73 0.82 39.16 R2 144 2.0 0.675 63.2 LOS E 8.5 60.5 1.00 0.83 1.06 19.6Approach 1132 4.3 0.675 32.1 LOS C 18.9 135.0 0.81 0.73 0.82 36.8
North: Tallawong Rd (N)7 L2 173 2.0 0.290 37.9 LOS C 7.5 53.4 0.79 0.78 0.79 26.48 T1 118 2.0 0.387 49.6 LOS D 6.3 44.8 0.94 0.75 0.94 26.09 R2 251 2.0 0.631 63.3 LOS E 7.3 52.3 1.00 0.81 1.03 22.1Approach 541 2.0 0.631 52.2 LOS D 7.5 53.4 0.92 0.79 0.94 24.0
West: Schofields Rd (W)10 L2 474 2.0 0.357 10.1 LOS A 8.5 60.6 0.39 0.67 0.39 45.011 T1 1021 5.0 0.681 31.8 LOS C 24.8 176.7 0.87 0.77 0.87 38.212 R2 143 2.0 0.670 63.0 LOS E 8.4 60.0 1.00 0.83 1.06 28.2Approach 1638 3.9 0.681 28.2 LOS B 24.8 176.7 0.74 0.75 0.75 38.0
All Vehicles 3888 3.5 0.681 35.5 LOS C 24.8 176.7 0.81 0.75 0.82 34.1
Site Level of Service (LOS) Method: Delay (RTA NSW). Site LOS Method is specified in the Parameter Settings dialog (Site tab).Vehicle movement LOS values are based on average delay per movement.Intersection and Approach LOS values are based on average delay for all vehicle movements.SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Movement Performance - PedestriansAverage Back of QueueMov
ID DescriptionDemand
Flow Average
Delay Level ofService
Prop. Queued
Effective Stop RatePedestrian Distance
ped/h sec ped mP1 South Full Crossing 53 32.3 LOS D 0.1 0.1 0.73 0.73P2 East Full Crossing 53 54.3 LOS E 0.2 0.2 0.95 0.95P2S East Slip/Bypass Lane
Crossing53 0.5 LOS A 0.0 0.0 0.13 0.13
P3 North Full Crossing 53 31.6 LOS D 0.1 0.1 0.73 0.73P4 West Full Crossing 53 54.3 LOS E 0.2 0.2 0.95 0.95P4S West Slip/Bypass Lane
Crossing53 0.5 LOS A 0.0 0.0 0.13 0.13
All Pedestrians 316 28.9 LOS C 0.61 0.61
Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)
MOVEMENT SUMMARYSite: 103 [2026 Post-Dev PM Schofields Rd-Tallawong Rd]
Site Category: (None)Signals - Fixed Time Isolated Cycle Time = 120 seconds (Site User-Given Cycle Time)Variable Sequence Analysis applied. The results are given for the selected output sequence.
Movement Performance - VehiclesDemand Flows 95% Back of QueueMov
ID Turn Deg.
SatnAverage
Delay Level ofService
Prop. Queued
Effective Stop Rate
Aver. No.Cycles
AverageSpeed Total HV Vehicles Distance
veh/h % v/c sec veh m km/hSouth: Ridgeline Drive (S)1 L2 174 2.0 0.292 36.9 LOS C 7.5 53.7 0.79 0.77 0.79 34.52 T1 143 2.0 0.470 50.4 LOS D 7.8 55.3 0.96 0.77 0.96 24.43 R2 97 2.0 0.453 59.5 LOS E 5.5 38.9 0.98 0.78 0.98 27.2Approach 414 2.0 0.470 46.9 LOS D 7.8 55.3 0.89 0.77 0.89 29.4
East: Schofields Road (E)4 L2 206 2.0 0.282 16.3 LOS B 5.9 46.5 0.61 0.68 0.61 43.45 T1 1108 5.0 0.868 48.0 LOS D 33.4 238.2 0.99 0.99 1.13 32.36 R2 119 2.0 0.557 61.4 LOS E 6.8 48.5 0.99 0.79 0.99 19.9Approach 1434 4.3 0.868 44.4 LOS D 33.4 238.2 0.93 0.93 1.04 32.4
North: Tallawong Rd (N)7 L2 203 2.0 0.272 30.7 LOS C 7.8 55.7 0.71 0.76 0.71 29.48 T1 217 2.0 0.466 42.1 LOS C 10.9 77.6 0.91 0.76 0.91 28.49 R2 539 2.0 0.879 66.6 LOS E 17.3 123.0 1.00 0.98 1.29 21.4Approach 959 2.0 0.879 53.5 LOS D 17.3 123.0 0.91 0.88 1.08 24.0
West: Schofields Rd (W)10 L2 274 2.0 0.197 8.2 LOS A 3.4 24.3 0.28 0.63 0.28 46.811 T1 837 5.0 0.672 37.0 LOS C 21.2 151.1 0.91 0.79 0.91 36.012 R2 183 2.0 0.857 70.9 LOS F 11.9 84.4 1.00 0.95 1.30 26.6Approach 1294 3.9 0.857 35.7 LOS C 21.2 151.1 0.79 0.78 0.83 35.1
All Vehicles 4100 3.4 0.879 44.1 LOS D 33.4 238.2 0.88 0.85 0.97 31.0
Site Level of Service (LOS) Method: Delay (RTA NSW). Site LOS Method is specified in the Parameter Settings dialog (Site tab).Vehicle movement LOS values are based on average delay per movement.Intersection and Approach LOS values are based on average delay for all vehicle movements.SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Movement Performance - PedestriansAverage Back of QueueMov
ID DescriptionDemand
Flow Average
Delay Level ofService
Prop. Queued
Effective Stop RatePedestrian Distance
ped/h sec ped mP1 South Full Crossing 53 38.5 LOS D 0.1 0.1 0.80 0.80P2 East Full Crossing 53 49.6 LOS E 0.2 0.2 0.91 0.91P2S East Slip/Bypass Lane
Crossing53 0.5 LOS A 0.0 0.0 0.13 0.13
P3 North Full Crossing 53 37.7 LOS D 0.1 0.1 0.79 0.79P4 West Full Crossing 53 54.3 LOS E 0.2 0.2 0.95 0.95P4S West Slip/Bypass Lane
Crossing53 0.5 LOS A 0.0 0.0 0.13 0.13
All Pedestrians 316 30.2 LOS D 0.62 0.62
Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)
MOVEMENT SUMMARYSite: 101 [2026 Post-Dev AM Tallawong Rd-Themeda Ave-Proposed Road]
Based on Signalised Development Access Road off Tallawong Road Stage 2 Design ReportSite Category: (None)Signals - Fixed Time Isolated Cycle Time = 120 seconds (Site User-Given Cycle Time)
Movement Performance - VehiclesDemand Flows 95% Back of QueueMov
ID Turn Deg.
SatnAverage
Delay Level ofService
Prop. Queued
Effective Stop Rate
Aver. No.Cycles
AverageSpeed Total HV Vehicles Distance
veh/h % v/c sec veh m km/hSouth: Tallawong Rd (S)1 L2 36 0.0 0.146 9.8 LOS A 3.6 25.6 0.34 0.35 0.34 48.52 T1 365 2.0 0.146 5.6 LOS A 3.6 25.8 0.34 0.32 0.34 51.13 R2 299 0.0 0.442 23.5 LOS B 11.8 82.3 0.76 0.80 0.76 31.9Approach 700 1.0 0.442 13.5 LOS A 11.8 82.3 0.52 0.52 0.52 40.5
East: Themeda Avenue4 L2 83 0.0 0.100 24.6 LOS B 2.7 19.2 0.61 0.69 0.61 30.45 T1 1 0.0 0.070 44.6 LOS D 0.7 8.5 0.86 0.69 0.86 31.76 R2 13 100.0 0.070 49.6 LOS D 0.7 8.5 0.86 0.69 0.86 30.5Approach 97 13.0 0.100 28.1 LOS B 2.7 19.2 0.64 0.69 0.64 30.5
North: Tallawong Rd (S)7 L2 192 7.0 0.507 30.7 LOS C 17.5 126.7 0.76 0.74 0.76 38.38 T1 319 2.0 0.507 23.7 LOS B 17.5 126.7 0.72 0.67 0.72 34.49 R2 34 0.0 0.075 27.5 LOS B 1.2 8.2 0.62 0.70 0.62 40.5Approach 544 3.6 0.507 26.4 LOS B 17.5 126.7 0.73 0.69 0.73 36.6
West: Proposed Road10 L2 13 0.0 0.040 48.8 LOS D 0.7 4.6 0.85 0.68 0.85 32.911 T1 1 0.0 0.040 43.2 LOS D 0.7 4.6 0.85 0.68 0.85 33.512 R2 139 0.0 0.517 54.4 LOS D 7.5 52.8 0.95 0.80 0.95 22.6Approach 153 0.0 0.517 53.9 LOS D 7.5 52.8 0.94 0.79 0.94 23.7
All Vehicles 1494 2.7 0.517 23.3 LOS B 17.5 126.7 0.65 0.62 0.65 35.7
Site Level of Service (LOS) Method: Delay (RTA NSW). Site LOS Method is specified in the Parameter Settings dialog (Site tab).Vehicle movement LOS values are based on average delay per movement.Intersection and Approach LOS values are based on average delay for all vehicle movements.SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Movement Performance - PedestriansAverage Back of QueueMov
ID DescriptionDemand
Flow Average
Delay Level ofService
Prop. Queued
Effective Stop RatePedestrian Distance
ped/h sec ped mP1 South Full Crossing 53 51.5 LOS E 0.2 0.2 0.93 0.93P2 East Full Crossing 53 22.3 LOS C 0.1 0.1 0.61 0.61P3 North Full Crossing 53 51.5 LOS E 0.2 0.2 0.93 0.93P4 West Full Crossing 53 54.3 LOS E 0.2 0.2 0.95 0.95
All Pedestrians 211 44.9 LOS E 0.85 0.85
Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)Pedestrian movement LOS values are based on average delay per pedestrian movement.Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.
MOVEMENT SUMMARYSite: 101 [2026 Post-Dev PM Tallawong Rd-Themeda Ave-Proposed Road]
Based on Signalised Development Access Road off Tallawong Road Stage 2 Design ReportSite Category: (None)Signals - Fixed Time Isolated Cycle Time = 80 seconds (Site User-Given Cycle Time)
Movement Performance - VehiclesDemand Flows 95% Back of QueueMov
ID Turn Deg.
SatnAverage
Delay Level ofService
Prop. Queued
Effective Stop Rate
Aver. No.Cycles
AverageSpeed Total HV Vehicles Distance
veh/h % v/c sec veh m km/hSouth: Tallawong Rd (S)1 L2 9 0.0 0.174 14.7 LOS B 3.5 25.2 0.55 0.47 0.55 43.92 T1 341 2.0 0.174 10.6 LOS A 3.5 25.2 0.55 0.47 0.55 45.73 R2 37 0.0 0.091 21.7 LOS B 0.9 6.6 0.74 0.70 0.74 32.8Approach 387 1.8 0.174 11.7 LOS A 3.5 25.2 0.57 0.49 0.57 44.0
East: Themeda Avenue4 L2 349 0.0 0.396 19.2 LOS B 8.8 61.8 0.69 0.76 0.69 33.15 T1 1 0.0 0.361 22.8 LOS B 5.0 37.0 0.81 0.77 0.81 38.86 R2 161 8.0 0.361 27.4 LOS B 5.0 37.0 0.81 0.77 0.81 37.9Approach 512 2.5 0.396 21.8 LOS B 8.8 61.8 0.73 0.76 0.73 35.1
North: Tallawong Rd (S)7 L2 26 7.0 0.509 26.6 LOS B 11.1 79.3 0.82 0.72 0.82 41.08 T1 413 2.0 0.509 20.3 LOS B 11.1 79.3 0.80 0.68 0.80 37.49 R2 43 0.0 0.109 25.5 LOS B 1.2 8.3 0.72 0.72 0.72 41.5Approach 482 2.1 0.509 21.1 LOS B 11.1 79.3 0.79 0.69 0.79 38.2
West: Proposed Road10 L2 36 0.0 0.061 25.5 LOS B 1.0 6.9 0.72 0.70 0.72 41.611 T1 1 0.0 0.061 20.0 LOS B 1.0 6.9 0.72 0.70 0.72 42.412 R2 195 0.0 0.517 30.0 LOS C 6.4 44.7 0.86 0.81 0.86 30.9Approach 232 0.0 0.517 29.2 LOS C 6.4 44.7 0.84 0.79 0.84 33.0
All Vehicles 1613 1.8 0.517 20.2 LOS B 11.1 79.3 0.73 0.68 0.73 37.3
Site Level of Service (LOS) Method: Delay (RTA NSW). Site LOS Method is specified in the Parameter Settings dialog (Site tab).Vehicle movement LOS values are based on average delay per movement.Intersection and Approach LOS values are based on average delay for all vehicle movements.SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Movement Performance - PedestriansAverage Back of QueueMov
ID DescriptionDemand
Flow Average
Delay Level ofService
Prop. Queued
Effective Stop RatePedestrian Distance
ped/h sec ped mP1 South Full Crossing 53 28.1 LOS C 0.1 0.1 0.84 0.84P2 East Full Crossing 53 20.4 LOS C 0.1 0.1 0.71 0.71P3 North Full Crossing 53 28.1 LOS C 0.1 0.1 0.84 0.84P4 West Full Crossing 53 34.3 LOS D 0.1 0.1 0.93 0.93
All Pedestrians 211 27.7 LOS C 0.83 0.83
Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay)Pedestrian movement LOS values are based on average delay per pedestrian movement.Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.
The Transport Planning Partnership
Suite 402 Level 4, 22 Atchison Street
St Leonards NSW 2065
P.O. Box 237
St Leonards NSW 1590
02 8437 7800
www.ttpp.net.au