TPM Implementation Blue-Printwww.tpmquality.com

By: Moses Tan (MSc, BIT), Principal TPM Consultant, ZenPower International

ZenPower InternationalPresentation.

Z

Page 2: TPM Implementation Blue-Printplant-maintenance.com/articles/ExecutiveTPMOverview.pdf · 2015-10-08 · TPM Implementation Blue-Print By: Moses Tan (MSc, ... Prepare texts and daily

ZenPower InternationalIntroduction.

Who We Are:

ZenPower International was established in 1995 with its registered office in Singapore.

Our Vision.To be the preferred regional provider of training, consultancy and sales services known for its integrity and excellence in business Quality, Reliability and Delivery.

Z

Page 3: TPM Implementation Blue-Printplant-maintenance.com/articles/ExecutiveTPMOverview.pdf · 2015-10-08 · TPM Implementation Blue-Print By: Moses Tan (MSc, ... Prepare texts and daily

Understanding and Using Autonomous Maintenance and OEE concept for Continuous

Improvement in manufacturing

Focus:

Page 4: TPM Implementation Blue-Printplant-maintenance.com/articles/ExecutiveTPMOverview.pdf · 2015-10-08 · TPM Implementation Blue-Print By: Moses Tan (MSc, ... Prepare texts and daily
Page 5: TPM Implementation Blue-Printplant-maintenance.com/articles/ExecutiveTPMOverview.pdf · 2015-10-08 · TPM Implementation Blue-Print By: Moses Tan (MSc, ... Prepare texts and daily

LangkahLangkah--1 : 1 : MengembalikanMengembalikan PeralatanPeralatan SepertiSeperti AsalAsal( Step( Step--1 : Restoration Equipment )1 : Restoration Equipment )

OPERATORS

LEADER

MAINT.STAFF

ENGR.STAFF

CONFIRMATION OF PROGRESSDEPT.CHIEF

SUPERVISORSGROUP LEADER

LIST OF EXT/INTABNORMALITIES

MEETING TOPLAN COUNTERMEASURES

COUNTERMEASURES

STEP-1 AUDITMODEL MACHINE

MAINTENANCESTAFF

ENGINEERING STAFF

AUTONOMOUSMAINTENANCEGROUP

FOLLOW UP ON AUDITFEEDBACK

COUNTERMEASURESEXTENDED TO ALL

EQUIPMENT

AUDIT

DEPT.CHIEF

LEADER

SUPERVISORS

TO NEXT STEP

Page 6: TPM Implementation Blue-Printplant-maintenance.com/articles/ExecutiveTPMOverview.pdf · 2015-10-08 · TPM Implementation Blue-Print By: Moses Tan (MSc, ... Prepare texts and daily

LangkahLangkah--2 : 2 : MenghapuskanMenghapuskan PuncaPunca--PuncaPunca KekotoranKekotoran( Step( Step--2 : Eliminate Contamination & Stains on Area & Parts)2 : Eliminate Contamination & Stains on Area & Parts)

Complete Step-1

Step-1 Summary results & findings

What ?

Where ?

How much

Why ?

AM Team=> 70%

Countermeasures

1st Pre-Auditby TPM Dept.

Present Countermeasuresto TPM WC andimplementation

GM/SponsorsAudit

Step-3

Own areaBuy - Off

Page 7: TPM Implementation Blue-Printplant-maintenance.com/articles/ExecutiveTPMOverview.pdf · 2015-10-08 · TPM Implementation Blue-Print By: Moses Tan (MSc, ... Prepare texts and daily

Langkah-3 : Memudahkan Kerja-Kerja Pembersihan, Pemeriksaan Dan Pelinciran

( Step 3 : Improve Equipment Accessibility ).AM Leader

Model m/cPassedStep 2

Areas difficult orinaccessible for cleaningchecking & lubricating

Inaccessible

No Place ToStand

Wiring or pipingobstruct

Cannot see easily

Time Consumingto clean

Time Consumingto clean

Product Manager

Operator Leader/ Operators

Supervisor

Model MachineGoes To

Step 4

Pre-Auditby TPM Dept.

W/CBuy Off

GMAudit

OwnArea

Buy Off

Page 8: TPM Implementation Blue-Printplant-maintenance.com/articles/ExecutiveTPMOverview.pdf · 2015-10-08 · TPM Implementation Blue-Print By: Moses Tan (MSc, ... Prepare texts and daily

LangkahLangkah--4 : 4 : PiawaianPiawaian PenyelenggaraanPenyelenggaraan AwalAwal( Step 4 : Initial Maintenance Standards )( Step 4 : Initial Maintenance Standards )

Model m/cpassedStep 3

Initialmaintenancestandard

Hard to lubricate

Hard to checkoil level

Abnormalityin lubrication

equipmentAbnormalityin circulation of lubrication

Equipmentgets dirty

during oiling

Product Manager

AM Leader

Operator Leader/operatorCounter measure for

cleaning and checking

Supervisor

Draft standardsfor cleaning,inspection &lubrication

Engineer & Maintenance

Trial PeriodAttach

identificationlabel

Confirmstandard for

cleaning,inspect &

lubrication

TPM dept.Pre-audit GM audit

Proliferationof Step 4

Page 9: TPM Implementation Blue-Printplant-maintenance.com/articles/ExecutiveTPMOverview.pdf · 2015-10-08 · TPM Implementation Blue-Print By: Moses Tan (MSc, ... Prepare texts and daily

Prepare texts and dailyschedules/check lists

Prepare texts and dailyschedules/check lists

LangkahLangkah--5 : 5 : SkilSkil PemeriksaanPemeriksaan AmAm( Step 5 : General Inspection skills )( Step 5 : General Inspection skills )

•Lubrication •Equipment parts tightening •Pneumatics•Hydraulics•Electrical•Drive System•Water•Fire prevention/safety

•Lubrication •Equipment parts tightening •Pneumatics•Hydraulics•Electrical•Drive System•Water•Fire prevention/safety

select general inspection items

select general inspection items

ManualsManualsManuals

ChecklistChecklist

Cut awaymodels

Cut awayCut awaymodelsmodels

RevisedMaintenance

standards

RevisedRevisedMaintenanceMaintenance

standardsstandards

Managers/supervisorsparticipate in training

Managers/supervisorsparticipate in training

TestTest

Implementgeneral Im..

TPM office Pre-Audit

TPM office Pre-Audit

GM AuditGM AuditProliferate

Step-5

Page 10: TPM Implementation Blue-Printplant-maintenance.com/articles/ExecutiveTPMOverview.pdf · 2015-10-08 · TPM Implementation Blue-Print By: Moses Tan (MSc, ... Prepare texts and daily

Prepare texts and dailyschedules/check lists

Prepare texts and dailyschedules/check lists

( Step 5 : General Process Inspection )( Step 5 : General Process Inspection )

• Process Flow• Process knowledge.• Adjustment skills• Abnormalities in Process.• Process flowchart.

• Process Flow• Process knowledge.• Adjustment skills• Abnormalities in Process.• Process flowchart.

Select General Process items

Select General Process items

ManualsManualsManuals

ChecklistsChecklists

Cleaning standards

Cleaning Cleaning standardsstandards

Process Inspectionsschedules

Process Process InspectionsInspectionsschedulesschedules

Managers/supervisorsparticipate in training

Managers/supervisorsparticipate in training

TestTest

Implementgeneral Im..

TPM office Pre-Audit

TPM office Pre-Audit

GM AuditGM AuditProliferate

Step-5

Page 11: TPM Implementation Blue-Printplant-maintenance.com/articles/ExecutiveTPMOverview.pdf · 2015-10-08 · TPM Implementation Blue-Print By: Moses Tan (MSc, ... Prepare texts and daily

LangkahLangkah--6 : 6 : PemeriksaanPemeriksaan AutonomiAutonomi( Step( Step--6 : Autonomous Inspection )6 : Autonomous Inspection )

Maintenance Inspection standards,breakdown analysis

Operators who understand theirequipment (able to maintain inspection standards)

Step- 4Step- 4

Daily checking,adjustment,andimprovement ofconditions for correct operation

Daily checking,adjustment,andimprovement ofconditions for correct operation

Step1 to 3:Step1 to 3:

Establish basicconditions(cleaning andlubrication)

Establish basicconditions(cleaning andlubrication)

Step- 5 Revise provisional standards

Finalise standards for cleaning and lubrication

Insp

ectio

n sk

ill c

heck-

up

Page 12: TPM Implementation Blue-Printplant-maintenance.com/articles/ExecutiveTPMOverview.pdf · 2015-10-08 · TPM Implementation Blue-Print By: Moses Tan (MSc, ... Prepare texts and daily

LangkahLangkah--7 : 7 : MengaturMengatur Dan Dan MenguruskanMenguruskan TempatTempat KerjaKerjaStepStep--7 : 7 : OrganiseOrganise and Manage Workplaceand Manage Workplace

Organise and set standards for :

EQUIPMENT PRECISIONINSPECTION ITEMS

TOOLS AND MATERIALSFLOW AND STORAGESTANDARDS FOR

INDIVIDUAL WORKRESPONSIBILITIES

Page 13: TPM Implementation Blue-Printplant-maintenance.com/articles/ExecutiveTPMOverview.pdf · 2015-10-08 · TPM Implementation Blue-Print By: Moses Tan (MSc, ... Prepare texts and daily

OEE= Availability * Performance Rate * Quality

Rate

= Maximum 100%

Under Actual Manufacturing conditions, some losses are inevitable. Hence the Best Practices have adopted

85% as a realistic monthly target.

Page 14: TPM Implementation Blue-Printplant-maintenance.com/articles/ExecutiveTPMOverview.pdf · 2015-10-08 · TPM Implementation Blue-Print By: Moses Tan (MSc, ... Prepare texts and daily

Equipment OEE LossesEquipment Total Available time in 8 hr shift = 480 mins.

Equip. Planned D/T = 20 minsEquip Loading time = 460 mins

Equip UnPlanned D/T = 60 mins

Equip. Operating time

Equip Speed Performance Losses.

Equip Nett Operating time

Equip. Quality Losses

Equip Valuable Operating. time

Rea

l Mea

sura

ble

time

Virt

ual/I

mm

easu

rabl

e tim

e.

Page 15: TPM Implementation Blue-Printplant-maintenance.com/articles/ExecutiveTPMOverview.pdf · 2015-10-08 · TPM Implementation Blue-Print By: Moses Tan (MSc, ... Prepare texts and daily

Calculating

Availabilityin OEE .

Page 16: TPM Implementation Blue-Printplant-maintenance.com/articles/ExecutiveTPMOverview.pdf · 2015-10-08 · TPM Implementation Blue-Print By: Moses Tan (MSc, ... Prepare texts and daily

Equipment OEE LossesEquipment Total Available time in 8 hr shift = 480 mins.

Equip. Planned D/T = 20 minsEquip Loading time = 460 mins

Equip UnPlanned D/T = 60 mins

Equip. Operating time

Equip Speed Performance Losses.

Equip Nett Operating time

Equip. Quality Losses

Equip Valuable Operating. time

Rea

l Mea

sura

ble

time

Virt

ual/I

mm

easu

rabl

e tim

e.

A

B

C

Page 17: TPM Implementation Blue-Printplant-maintenance.com/articles/ExecutiveTPMOverview.pdf · 2015-10-08 · TPM Implementation Blue-Print By: Moses Tan (MSc, ... Prepare texts and daily

Availability & Utilization

• Losses due to unplanned downtime only.

• The unplanned events are Machine Breakdown and Setups.

• Small fluctuations.

• Losses due to the …same reasons plus

• Planned downtime ...mainly due to ‘no ...schedule’ during ...poor business …conditions or …holidays, PM shuts

Page 18: TPM Implementation Blue-Printplant-maintenance.com/articles/ExecutiveTPMOverview.pdf · 2015-10-08 · TPM Implementation Blue-Print By: Moses Tan (MSc, ... Prepare texts and daily

Calculating

Performance Ratein OEE .

Page 19: TPM Implementation Blue-Printplant-maintenance.com/articles/ExecutiveTPMOverview.pdf · 2015-10-08 · TPM Implementation Blue-Print By: Moses Tan (MSc, ... Prepare texts and daily

Equipment OEE LossesEquipment Total Available time in 8 hr shift = 480 mins.

Equip. Planned D/T = 20 minsEquip Loading time = 460 mins

Equip UnPlanned D/T = 60 mins

Equip. Operating time

Equip Speed Performance Losses.

Equip Nett Operating time

Equip. Quality Losses

Equip Valuable Operating. time

Rea

l Mea

sura

ble

time

Vir

tual

/Imm

easu

rab

le t

ime.

1.Equip Breakdown losses.2.Equip Setup losses (>10min)

3. Minor Stoppages losses.

4. Reduced Speed losses.

5. Defect losses

6. Yield/startup losses

Page 20: TPM Implementation Blue-Printplant-maintenance.com/articles/ExecutiveTPMOverview.pdf · 2015-10-08 · TPM Implementation Blue-Print By: Moses Tan (MSc, ... Prepare texts and daily

USEFULNESS OF OEE

• Provides a long-term baseline of equipment condition for improvement measurement.

• When an OEE analysis chart is plotted, the exact reasons in terms of the 6 Big Losses are clearly understood.

• Suitable tools can be used to address specific selected Losses.

Page 21: TPM Implementation Blue-Printplant-maintenance.com/articles/ExecutiveTPMOverview.pdf · 2015-10-08 · TPM Implementation Blue-Print By: Moses Tan (MSc, ... Prepare texts and daily

Machine Type : ASA 808 Month of data : Oct'01 Analysis Done By : CS Lee Date : 2001Dec05Machine Number : AM10 (TSSOP 14 / 16 ld) Data Attached : Verified By TPM : KS Chew Date : 2001Dec07

1-Month Summarized Data in Minutes1. Total available time = 44640 min2. No schedule time = 26870 min3. Planned downtime = 3655 min 3a. PM time = 0 min 3b. Meeting time = 0 min

3c. Housekeeping / TPM = 3655 min4. Loading time = 1 - 2 - 3 = 14115 min = 846900 sec5. Unplanned downtime = 2941 min 5a. Machine breakdown = 2168 min 5b. Engineering time = 0 min 5c. QC / QA time = 193 min 5d. P.Parts shortage = 580 min 5e. No material (Lot waiting) = 0 min 5f. Facility stoppages = 0 min 5g. Break time / No operator = 0 min 5h. Rework / Retest = 0 min 5i. Conv. / Setup = 0 min6. Production time = 4 - 5 = 11174 min7. Total quantity processed (Actual O/P) = 33877 frame8. TCT (theoretical cycle time) = 109.86 sec 8a. Theoretical possible O/P = 4/8 = 61671 frame9. MCT (machine cycle time) = 128.32 sec 9a. Currently possible O/P = 4/9 = 52799 frameOther remarks:10. Availability rate = 79.16 % Performance rate = 69.39 % Quality rate = 99.80 %

11. OEE = 54.82 % TIME

Remarks: TSSOP 14 / 16 ld = 50 unit / frame.

OEE-Analysis Format

output

Scale : Y-1 : 5k X-1 : 2.5k

10

20

30

40

50

5 10 15 20 25 30 35 40 45

60

70

80

90

100

110

Theoretical Possible O/P

Current Possible O/P

MTBA + Idling

Total Available Time

Planned downtime + No scheduleLoading time

Unplanned downtimeProduction time

Speed loss

Actual O/P

Unplanned dow ntime

Before

IDENTIFY THE MAJOR LOSSES THROUGH THE OEE ANALYSIS

Page 22: TPM Implementation Blue-Printplant-maintenance.com/articles/ExecutiveTPMOverview.pdf · 2015-10-08 · TPM Implementation Blue-Print By: Moses Tan (MSc, ... Prepare texts and daily

Machine Type : ASA 808 Month of data : Oct'01 Analysis Done By : CS Lee Date : 2001Dec05Machine Number : AM10 (TSSOP 14 / 16 ld) Data Attached : Verified By TPM : KS Chew Date : 2001Dec07

1-Month Summarized Data in Minutes1. Total available time = 44640 min2. No schedule time = 26870 min3. Planned downtime = 3655 min 3a. PM time = 0 min 3b. Meeting time = 0 min

3c. Housekeeping / TPM = 3655 min4. Loading time = 1 - 2 - 3 = 14115 min = 846900 sec5. Unplanned downtime = 2941 min 5a. Machine breakdown = 2168 min 5b. Engineering time = 0 min 5c. QC / QA time = 193 min 5d. P.Parts shortage = 580 min 5e. No material (Lot waiting) = 0 min 5f. Facility stoppages = 0 min 5g. Break time / No operator = 0 min 5h. Rework / Retest = 0 min 5i. Conv. / Setup = 0 min6. Production time = 4 - 5 = 11174 min7. Total quantity processed (Actual O/P) = (estimated) frame8. TCT (theoretical cycle time) = 106.79 sec 8a. Theoretical possible O/P = 4/8 = 63444 frame9. MCT (machine cycle time) = 112.64 sec 9a. Currently possible O/P = 4/9 = 60149 frameOther remarks:10. Availability rate = 79.16 % Performance rate = 81.63 % (etd) Quality rate = 99.80 %

11. OEE = 64.48 % TIME

Remarks: TSSOP 14 / 16 ld = 50 unit / frame.

(estimated)

OEE-Analysis Format

output

Scale : Y-1 : 5k X-1 : 2.5k

10

20

30

40

50

5 10 15 20 25 30 35 40 45

60

70

80

90

100

110

Theoretical Possible O/P

Current Possible O/P

MTBA + Idling

Total Available Time

Planned downtime + No scheduleLoading time

Unplanned downtimeProduction time

Speed loss

Estimated O/P

Unplanned dow ntime

IMPROVEMENT DONE CAN BE OBSERVED THROUGH THE OEE ANALYSIS

After

Page 23: TPM Implementation Blue-Printplant-maintenance.com/articles/ExecutiveTPMOverview.pdf · 2015-10-08 · TPM Implementation Blue-Print By: Moses Tan (MSc, ... Prepare texts and daily

Various Examples Of Improving OEE.

Page 24: TPM Implementation Blue-Printplant-maintenance.com/articles/ExecutiveTPMOverview.pdf · 2015-10-08 · TPM Implementation Blue-Print By: Moses Tan (MSc, ... Prepare texts and daily

No Description Delta (%)

Before After

2.79%109.86 106.79TCT

Improvement

4 OEE 54.82% 64.48%

1

128.32

* 9.66%

112.64 12.22%

3 UPH 2579 2905 12.64%

2 MCT

Speed ImprovementAM 10 - ASA Auto mold 808

Note: Item 1, 2 & 3 are calculated by IE department

Achievement !!

* item 4 is base on no loss from lot-waiting

Page 25: TPM Implementation Blue-Printplant-maintenance.com/articles/ExecutiveTPMOverview.pdf · 2015-10-08 · TPM Implementation Blue-Print By: Moses Tan (MSc, ... Prepare texts and daily

Example Of Improving

Performance Rate through Improving

the Equipment MTBA Losses.

Page 26: TPM Implementation Blue-Printplant-maintenance.com/articles/ExecutiveTPMOverview.pdf · 2015-10-08 · TPM Implementation Blue-Print By: Moses Tan (MSc, ... Prepare texts and daily

Summary of “Static” Restoration Activities (1st Part]

• Six standards “static” conditions were checked and identified areas need to be restored.

! Indexer clamp’s parallelism was out.

!The index clamper and back rail gap were out of the required spec.

!Output index clamper position not parallel when a lead-frame is clamped.

!One hot plate screw was missing.

Page 27: TPM Implementation Blue-Printplant-maintenance.com/articles/ExecutiveTPMOverview.pdf · 2015-10-08 · TPM Implementation Blue-Print By: Moses Tan (MSc, ... Prepare texts and daily

‘Before’ and ‘After’ Restoration MTBA

00002222444466668888

1010101012121212141414141616161618181818202020202222222224242424

BeforeBeforeBeforeBefore AfterAfterAfterAfter

HourHourHourHour

* MTBA based only on Alignment Error stoppages.

1st goal :3 Hr. 12 Min.

2nd goal :22 Hr. 40 Min.

Page 28: TPM Implementation Blue-Printplant-maintenance.com/articles/ExecutiveTPMOverview.pdf · 2015-10-08 · TPM Implementation Blue-Print By: Moses Tan (MSc, ... Prepare texts and daily

Equipment Quality Rate

Losses.

Page 29: TPM Implementation Blue-Printplant-maintenance.com/articles/ExecutiveTPMOverview.pdf · 2015-10-08 · TPM Implementation Blue-Print By: Moses Tan (MSc, ... Prepare texts and daily

Checked by Prepared by Phenomenon

P-M Analysis ChartNo 1/1

Contributing Condition

Investigation Result4 M

Correlation, Investigation Result 4M Correlation,

Second Item Investigation/ Investigation

Measuring Method

Temporary Decision Criterion

Measurement Value

DecisionInvestigation/

Measuring Method

Temporary Decision Criterion

Measurement Value

Decision(3rd, 4th, 5th and

6th Items)Measuring

Method

Physical view (Logical reasoning)

Investigation Result If NG, Countermeasure ResultTemporary Decision Criterion

Measure - ment Value

Decisionwhy NG? Restoration, Replace -

ment, Improvement, Remodeling

Measurement Value

Decision

1 2

3 4 5 6

7

Standardization and link to TPM

Maintenance System

8